central regions rural water supply and water supply and ... · sanitation subproject of tay giang-...

123
Initial Environmental Examination July 2016 Viet Nam: Central Regions Rural Water Supply and Sanitation Sector Project Water Supply and Sanitation of Tay Giang - Tay Thuan Communes, Tay Son District, Binh Dinh Province Prepared by The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult JSC for the Asian Development Bank.

Upload: others

Post on 23-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Initial Environmental Examination July 2016

Viet Nam: Central Regions Rural Water Supply and Sanitation Sector Project Water Supply and Sanitation of Tay Giang - Tay Thuan Communes, Tay Son District, Binh Dinh Province Prepared by The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult JSC for the Asian Development Bank.

Page 2: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

CURRENCY EQUIVALENTS (as of 10 July 2016)

Currency unit – dong (VND)

VND1.00 = $0.0000448 $1.00 = VND22,302

ABBREVIATIONS

ADB – Asian Development Bank CFFC – Communal Fatherland Front Committee CFU – Communal Farmer's Union CSC – Design-Build Supervision Consultant CPC – Commune People's Committee CPMU – central project management unit CRRWSSSP – Central Regions Rural Water Supply and Sanitation Sector

Project CVWU – Communal Vietnam Women's Union DARD – Department of Agriculture and Rural Development, Provincial DFU – District Famer's Union DPC – District People's Committee DVWU – District Vietnam Women's Union EARF – Environmental Assessment and Review Framework EC – Environmental Protection Commitment EIA – Environmental Impact Assessment EMoP – Environmental Monitoring Plan EMP – Environmental Management Plan EO – Environmental Officer FS – Feasibility Study GoV – Government of Vietnam HHs – Households IEE – Initial Environmental Examination lpcd – liters per capita per day MARD – Ministry of Agriculture and Rural Development MOH – Ministry of Health (MoH) MONRE – Ministry of Natural Resources and Environment (MoNRE) NCERWASS – National Centre for Rural Water Supply and Environmental

Sanitation NGO – Non-governmental Organization O&M – Operation and Maintenance ODA – Official Development Assistance OU – Operational Unit PAM – Project Administration Memorandum PCERWASS – Provincial Centre for Rural Water Supply and Environmental

Sanitation PIA – Project Implementation Assistance PIM – Project Implementation Manual POW – Project Orientation Workshop PPC – Provincial People's Committee PPMU – Provincial Project Management Unit

Page 3: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

PPTA – Project Preparatory Technical Assistance PVWU – Provincial Vietnam Women's Union REA – Rapid Environmental Assessment RWSS – Rural Water Supply and Sanitation SAR – Subproject Appraisal Report SIEE – Summary Initial Environmental Examination VWU – Vietnam Women's Union WSCC – Water and Sanitation Commune Committee WSSS – Water Supply and Sanitation Subproject –

NOTE

In this report, "$" refers to US dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 4: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT

NATIONAL CENTRE FOR RURAL WATER SUPPLY AND ENVIRONMENTAL SANITATION

CENTRAL REGIONS RURAL WATER SUPPLY AND SANITATION SECTOR PROJECT

{ADB Loan No. 2609-VIE (SF)}

Subproject Appraisal Report

Volume 04

UPDATED

INITIAL ENVIRONMENTAL EXAMINATION

WATER SUPPLY AND SANITATION OF

TAY GIANG - TAY THUAN COMMUNES, TAY SON DISTRICT,

BINH DINH PROVINCE

Consulting Services

For Project Implementation Assistance

The Joint Venture of

CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult JSC

Revision 02

January 2013

Page 5: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

CENTRAL REGIONS RURAL WATER SUPPLY AND SANITATION SECTOR PROJECT

{ADB Loan No. 2609-VIE(SF)}

Subproject Appraisal Report

Volume 04

UPDATED

INITIAL ENVIRONMENTAL EXAMINATION

WATER SUPPLY AND SANITATION OF

TAY GIANG - TAY THUAN COMMUNES, TAY SON DISTRICT,

BINH DINH PROVINCE

PIA

Consultant CPMU

Esko Toivonen Team Leader

Le Thieu Son Director

This report has been prepared based on a combination of information provided by others and by the PIA Consultant. The PIA Consultant has to the extent reasonably possible validated and verified the accuracy of the information in the reports and appendices. To the best of the PIA Consultant’s believe and knowledge, the included information is reasonably accurate and correct.

The Joint Venture of

CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult JSC

Revision 02 January 2013

Page 6: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Internal Quality Control

Project Central Region Rural Water Supply and Sanitation Sector Project

Project No. ADB Loan No. 2609-VIE (SF)

Client National Centre For Rural Water Supply And Environmental Sanitation

Classification Subproject Appraisal Report

Name of report Updated Initial Environmental Examination for Water Supply and Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province

File name VIE 2609 Binh Dinh SAR Rev.02 Vol 4 IEE Report 03012013 EN

Persons in charge Prepared by

Date December 2012

Marcelo Caleda, Dang Kim Chi, Environment Specialist

Checked by Nguyen Cong Thanh, Deputy Team Leader Date

02.01.2012

Approved for submission

Esko Toivonen, Team Leader Date

03.01.2013

Distribution Recipient CPMU Hard copy 2 copies in English

Soft copy VIE 2609 Binh Dinh SAR Rev.02 Vol 4 IEE Report 03012013 EN. pdf

Page 7: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

i

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Figure 1 Location map of six Project Provinces of the central coastal region of Vietnam.

Page 8: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

PREFACE

The Government of Vietnam and the Asian Development Bank have planned to implement the Central Regions Rural Water Supply and Sanitation Sector Project (CRRWSSSP).

The project is expected to improve health and living conditions of people living in rural areas in the six provinces of central coastal region of Vietnam: Thanh Hoa, Nghe An, Ha Tinh, Quang Binh, Quang Nam and Binh Dinh.

In December 2008 to July 2009, the Project Preparatory Technical Assistance (Project No. 40364-012, TA No. 7126-VIE) prepared the Central Region Rural Water Supply and Sanitation Sector Project. Six Pilot Subprojects have been identified, one in each project province, the 6 subprojects include the following:

1. Water supply and Sanitation Subproject for Tien Loc commune, Hau Loc district, Thanh Hoa province;

2. Water supply and Sanitation Subproject for Dien Yen, Dien Chau district, Nghe

An province; 3. Water supply and Sanitation Subproject for Thach Bang, Thach Kim and Thinh

Loc commune, Loc Ha district, Ha Tinh province; 4. Water supply and Sanitation Subproject for Thanh Trach commune, Bo Trach

district, Quang Binh province; 5. Water supply and Sanitation Subproject for A Tieng commune, Tay Giang

district, Quang Nam province; 6. Water supply and Sanitation Subproject for Tay Giang, Tay Thuan, Tay Son

district, Binh Dinh province.

Environmental assessment studies for the 6 subprojects were carried out. Subsequently, an Initial Environmental Examination (IEE) report for each subproject was prepared on June, 2009.

Based on the Signed Contract dated 26 July 2011 between the National Centre for Rural Water Supply and Environmental Sanitation (NCERWASS) of the Ministry of Agriculture and Rural Development (MARD) and the Project Implementation Assistance (PIA) Consultant, the PIA Consultant is tasked to assist the CPMU and PPMUs to review, revise, and prepare the IEE reports and the Environmental Assessment Review Framework (EARF) and related documents. These documents shall be finalized prior to the appraisal request to Asian Development Bank (ADB).

The updating of the IEE report was focused on the compliance of the subproject to the environmental assessment requirements of the Government of Vietnam and to the Asian Development Bank’s Policy on Environmental Assessment Guidelines 2003 and the Safeguard Policy Statement of 2009.

The updates to the IEE ensure the substantive and procedural requirements are followed, they include the following:

Screening of potential impacts using ADB’s Rapid Assessment Checklist (REA) for water supply;

Collection of additional data and information;

Page 9: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Subproject implementation schedule;

Description of the Subproject;

Additional raw water sampling analyses of the subproject;

Additional information on biophysical, social and economic conditions in the

Subproject area;

Detailed description of the subproject activities including solid waste, greywater and sludge management;

Environmental Management Plan (EMP), Environmental Compliance Monitoring Plan, Institutional Requirements and responsibilities; and

Documentation/evidences of the Public Consultations and Disclosure.

Page 10: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

LIST OF ABREVIATIONS

ADB Asian Development Bank CFFC Communal Fatherland Front Committee

CFU Communal Farmer's Union

CSC Design-Build Supervision Consultant CPC Commune People's Committee

CPMU Central Project Management Unit CRRWSSSP Central Regions Rural Water Supply and Sanitation Sector Project CVWU Communal Vietnam Women's Union

DARD Department of Agriculture and Rural Development, Provincial

DFU District Famer's Union

DPC District People's Committee

DVWU District Vietnam Women's Union

EARF Environmental Assessment and Review Framework

EC Environmental Protection Commitment

EIA Environmental Impact Assessment

EMoP Environmental Monitoring Plan EMP Environmental Management Plan

EO Environmental Officer

FS Feasibility Study

GoV Government of Vietnam

HHs Households

IEE Initial Environmental Examination

lpcd liters per capita per day

MARD Ministry of Agriculture and Rural Development MOH Ministry of Health (MoH)

MONRE Ministry of Natural Resources and Environment (MoNRE)

NCERWASS National Centre for Rural Water Supply and Environmental Sanitation

NGO Non-governmental Organization

O&M Operation and Maintenance

ODA Official Development Assistance

OU Operational Unit PAM Project Administration Memorandum

PCERWASS Provincial Centre for Rural Water Supply and Environmental Sanitation

PIA Project Implementation Assistance

PIM Project Implementation Manual POW Project Orientation Workshop

PPC Provincial People's Committee

PPMU Provincial Project Management Unit PPTA Project Preparatory Technical Assistance

PVWU Provincial Vietnam Women's Union

REA Rapid Environmental Assessment

RWSS Rural Water Supply and Sanitation

Page 11: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

SAR Subproject Appraisal Report SIEE Summary Initial Environmental Examination

VWU Vietnam Women's Union

WSCC Water and Sanitation Commune Committee

WSSS Water Supply and Sanitation Subproject

Page 12: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

PREFACE

LIST OF ABBREVIATIONS

1 INTRODUCTION......................................................................................................................... 1

1.1 Project Background.................................................................................................................... 1 1.2 Purpose and Extent of the Updated IEE Report ......................................................................... 1

2 DESCRIPTION OF THE SUBPROJECT ................................................................................. 4

2.1 Type of Subproject..................................................................................................................... 4 2.2 Category of the Subproject ........................................................................................................ 4 2.3 Need of the Subproject .............................................................................................................. 5 2.4 Subproject Location ................................................................................................................... 5 2.5 Subproject Components ............................................................................................................. 9

2.5.1 Piped Water Supply System ..................................................................................... 9 2.5.2 Promotion of Household and Public Hygiene and Sanitation ................................ 14

2.6 Subproject Schedule for Implementation................................................................................. 16

3 DESCRIPTION OF THE ENVIRONMENT ........................................................................... 17

3.1 Physical and Ecological Resources .......................................................................................... 17 3.2 Economic Development ........................................................................................................... 20 3.3 Social and Cultural Resources ................................................................................................. 21

4 SCREENING OF POTENTIAL ENVIRONMENTAL IMPACTS ....................................... 23

4.1 Impacts due to Location ........................................................................................................... 24 4.2 Impacts Related to Design ....................................................................................................... 26 4.3 Impacts during Construction .................................................................................................... 26 4.4 Impacts during Operation ........................................................................................................ 28

5 PROPOSED MITIGATION MEASURES ............................................................................... 29

5.1 Environmental Management Plan (EMP) ................................................................................ 30 5.2 Environmental Monitoring Plan (EMoP) ................................................................................. 32 5.3 Institutional Arrangements and Responsibilities ..................................................................... 34 5.4 Implementation of EMP ........................................................................................................... 34 5.5 Implementation of EMoP ......................................................................................................... 35 5.6 Environmental Reporting ......................................................................................................... 35 5.7 Budget for Environmental Monitoring .................................................................................... 36

6 PUBLIC CONSULTATIONS AND INFORMATION DISCLOSURE ................................. 37

6.1 Consultation and Participation Process .................................................................................... 37 6.2 Grievance Mechanism ............................................................................................................. 40 6.3 Future Consultation and Information Disclosure ..................................................................... 41

7 FINDINGS AND RECOMMENDATIONS.............................................................................. 41

8 CONCLUSIONS ......................................................................................................................... 42

Page 13: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

List of Figures

Figure 1 Location map of six Project Provinces of the central coastal region of Vietnam. .................. i Figure 2 Location of Tay Son district. .................................................................................................. 7 Figure 3 Layout of piped water supply system. .................................................................................... 8 Figure 4 Water treatment diagram. ..................................................................................................... 12

List of Tables

Table 1 Result of raw water sample analysis from drilled wells. ..................................................... 10 Table 2 Location and the number of public latrines to be constructed. ........................................... 15 Table 3 Average monthly rainfall .................................................................................................... 17 Table 4 Fluoride content in ground water of subproject area. .......................................................... 19 Table 5 Periodic Water Quality Analyses of the Subproject Water Supply System ........................ 32 Table 6 Estimated Cost of Environmental Monitoring. ................................................................... 36

List of Photos

Photo 1 Location of the bored holes on the bank of the Con river. .................................................. 11 Photo 2 WTP construction site to be located on the slope of the hill. .............................................. 13 Photo 3 Cultural/Historic Sites. ........................................................................................................ 22 Photo 4 Environmental and Social Condition of Tay Giang, Tay Thuan Communes...................... 23 Photo 5 Public consultation meeting ................................................................................................ 38 Photo 6 Focus group discussion ....................................................................................................... 40

List of Annexes

Annex 1. Rapid Environmental Assessment (REA) Checklist Annex 2. Raw Ground Water Sample Quality Analyses Annex 2.1. Water sample analyses of Well G1 Annex 2.2. Water sample analyses of Well G2 Annex 2.3. Water sample analyses of Well G3 Annex 3. Environmental Management Plan (EMP) and Environmental Monitoring Plan Annex 3.1. Environmental and Monitoring Report Forms Annex 3.2. Environmental Management Plan Annex 3.3. Environmental Monitoring Plan Annex 4. Public Consultation And Information Disclosure Annex 4.1. Minute of Public consultation meeting Annex 4.2. List of Affected people participating on Public consultation meeting Annex 5 Environmental Protection Commitment

Page 14: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

1

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

1 INTRODUCTION

1.1 Project Background

1. The Central Region Rural Water Supply and Sanitation Sector Project (The Project) will contribute to the Vietnam Rural Water Supply and Sanitation (RWSS) strategy, which states that by 2020, 100 percent of the rural population will (i) have access to clean water with a minimum volume of 80 liters per capita per day; (ii) use hygienic latrines; and (iii) practice proper personal hygiene.

2. The Project is designed as a sector investment project. The Project will result in better health and living conditions of people living in rural areas in the Project provinces. The output of the Project will be access to clean water and hygienic sanitation for about 350,000 rural people in approximately 30 communes in the six Project provinces in the central region of Viet Nam: Thanh Hoa, Nghe An, Ha Tinh, Quang Binh, Quang Nam, and Binh Dinh. The Project will comprise about 24 Subprojects, divided into 3 batches with 6-9 subprojects of each scheduled to be completed by 31 December 2016. Each Subproject includes the construction and operation of a sustainable piped water supply system for one commune (or several communes), and Improved household hygiene and public sanitation in the Subproject area.

3. The Water Supply and Sanitation Subproject (WSSS) for Tay Giang, Tay Thuan Communes, Tay Son District, Binh Dinh Province have been selected as one of six pilot subprojects of the Central Regions Rural Water Supply and Sanitation Sector Project (CRRWSSSP) to be implemented under the Loan Agreement No. 2609 – VIE (SF) between the Socialist Republic of Vietnam (GoV) and the Asian Development Bank (ADB).

4. The pilot subproject of Binh Dinh province includes two components: Water Supply System to construct a new WTP, with capacity of 1500m3/day and a pipeline network to provide clean and safe water to four hamlets in Tay Giang commune and two hamlets in Tay Thuan commune; and Environmental Sanitation to improve sanitation condition for 1,663 households, and public works and also raise awareness of environmental protection of people living in the beneficiary area. The pilot subproject, after completion, is expected to benefit about 14,535 persons by 2020 in both communes.

1.2 Purpose and Extent of the Updated IEE Report

5. The updated IEE report document will be submitted and included among the documents for review required for the Subproject Appraisal Report (SAR) of Binh Dinh Pilot Water Supply and Sanitation Subproject.

6. Updating of IEE report involves three main activities: (i) review of the subproject documents including the engineering design and the Feasibility Study (FS); (ii) consultations, site visit and field validation of data and information on the existing environmental conditions relating to the identified potential impacts, issues and concerns; and (iii) revisions and subsequently finalization of the updates to the Initial Environmental Examination (IEE) report.

Page 15: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

2

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

7. Updating of the IEE report was initiated by a review of the subproject’s compliance with the legal framework of the environmental assessment of the Government of Vietnam. The principal GoV Decree that the CRRWSSSP Subprojects need to comply with is the Decree No. 29/2011/ND-CP dated 18th April, 2011 on Strategic environmental assessment (SEA), Environmental impact assessment (EIA) and Environmental protection commitment (EC). The Decree is supplemented by Circular No. 26/2011/TT-BTNMT dated 18th July, 2011 by MoNRE, providing detailed guidelines for some articles of the Decree. According to the Decree, the Binh Dinh Pilot Subproject is required to apply and prepare an EC and to submit the EC document for registration and approval of the concerned DPC.

8. More specifically, the subproject needs to conform to the Laws, Decrees, Circulars and Environmental Standards as follows:

Law on Environmental Protection No. 52/2005/QH11 dated 29th November, 2005; Law on Water Resources Management dated 20th May, 1998;

Decree No. 29/2011/ND-CP dated 18th April, 2011 by Government on provisions on Strategic environmental assessment (SEA), Environmental impact assessment (EIA) and Environmental protection commitment (EC); Decree No. 149/2004/ND-CP dated 27th July, 2004 of the Government on

Licensing Regulations for exploration, exploitation and use of water resources, discharge of wastewater into water sources;

Circular No. 02/2005/TT-TNMT dated 24th June, 2005 of the Ministry of Natural Resources and Environment guiding the implementation of Decree No. 149/2004/ND-CP of the Government on the level of exploration, exploitation and use of water resources, discharge of wastewater into water sources;

Decree No. 117/2009/ND-CP dated 31st December, 2009, Handling of law violations on Environmental field;

Decree No. 59/2007/ND-CP dated 09th April, 2007 by Government on Solid waste management;

Circular No. 12/2011/TT-BTNMT dated 14th April on Hazardous waste management; and

Circular No. 26/2011/TT-BTNMT dated 18th July, 2011 by MoNRE, providing detailed guidelines for some articles of the Decree No. 29/2011/ND-CP.

9. Environmental Standards:

Standard for the Raw Water Quality QCVN 08:2008/BTNMT - National technical regulation on quality of surface

water; and QCVN 09:2008/BTNMT - National technical regulation on quality of ground

water. Standard for the Treated Water Quality

QCVN 01:2009/BYT - National technical regulation on quality of drinking water (Replace the 1329/2002/BYT/QĐ).

Page 16: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

3

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Other standards

QCVN 01:2011/BYT - National technical regulation on Hygienic conditions

for Latrines. (Replace the 08/2005/QĐ/BYT); QCVN 14:2008/BTNMT - National technical regulation on quality of domestic

wastewater; QCVN 40:2011/BTNMT - National technical regulation on industrial

wastewater; QCVN 15:2008/BTNMT - National technical regulation on plan protection

chemical residues in soil; QCVN 07: 2009/BTNMT - National technical regulation on threshold for

hazardous waste; QCVN 05:2009/BTNMT - National technical regulation on ambient air quality; QCVN 06:2009/BTNMT - National technical regulation on certain hazardous

substances in ambient air; QCVN 26:2010/BTNMT - National technical regulation on noise; QCVN 27:2010/BTNMT - National technical regulation on vibration; and TCVN 5948:1999/BTNMT Acoustics - Noise from speeding up the road transport

- the allowed maximum of noise level.

10. Guidelines:

O&M Manual of Water Treatment Plant.

Also, the review looks into the subproject’s compliance with the relevant ADB Environmental Policies and Guidelines including:

Safeguards Policy Statement, 2009; Environmental Assessment Guidelines, 2003; and Environmental Policy, 2002.

11. Activities:

Validations of the technical description of the subproject as described in the Feasibility Report are integrated into this updated IEE report. Additional data and information from the Provincial and Communal Authorities and the workshop participants were incorporated into this report. The PPMU of the Subproject and Communal Authorities were made aware of the environmental screening process and provided with the Rapid Environmental Assessment (REA) Checklists written in Vietnam language for screening of the impacts. Site visits were conducted to validate information in the REA and identify particular subcomponents that might warrant further study.

12. The final updates were supplemented by the needed data and information on the following:

The baseline information on the relevant physical-chemical and biological environment were integrated into the update, also additional data and information needed regarding the socio-economic conditions in the subproject area; cultural and historical sites and public consultation meetings;

Page 17: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

4

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

An Reviewed Environmental Management Plan (EMP) and an updated Environmental Monitoring Plan with the ADB templates, recommended monitoring of environmental baseline parameters; and

Revised institutional arrangements and responsibilities for the implementation of the EMP and Environmental Monitoring Plan.

2 DESCRIPTION OF THE SUBPROJECT

2.1 Type of Subproject

13. The CRRWSSSP is designed as a sector investment Project, The Project is expected to improve the health and living conditions of the people in the rural areas of the 6 Project provinces in the central region of Vietnam. The Project will be implemented for a period of five years comprise of 24 Subprojects, divided into 3 batches with 6-9 subprojects on each Project Province. Binh Dinh Subproject is among the six pilot subprojects that have been chosen for the first batch to be financed under the ADB loan.

2.2 Category of the Subproject

14. The screening and the environmental categorization of the Binh Dinh Water Supply and Sanitation Subproject (WSSS) was performed using the sector-specific Rapid Environmental Assessment (REA) Checklist of ADB. As the REA Checklist has indicated no significant impacts to the physical environment, forests or protected areas or to the cultural and historical sites located within the Binh Dinh Subproject area, the proposed water supply scheme therefore is classified as Category B under the ADB’s environmental classification. For projects in this Category, an Initial Environmental Examination (IEE) will have to be prepared to determine the need for an Environmental Impact Assessment (EIA).

15. Pursuant to the Decree No. 29/2011/ND-CP dated 18th April, 2011 on Strategic Environmental Assessment (SEA), Environmental impact assessment (EIA) and Environmental Protection Commitment (EC), environmental assessment requirements are determined based on the type, scale and capacity of the proposed project. The Decree classified projects into 3 types of projects i.e., projects listed in Annex 1 are required to prepare a SEA; Annex 2 list of projects are required to conduct and prepare an EIA report and Annex 3 projects are subjected to an EIA to be appraised and approved by the MoNRE.

16. Projects not listed in Appendices 1, 2 and 3 are required to apply and prepare an Environmental Protection Commitment (EC) to be submitted for registration and acceptance from the concerned District Peoples’ Committee (DPC). The EC document shall conform to the guidelines and requirements of the Circular No. 26/2011/TT-BTNMT dated 18th July, 2011 by MoNRE.

17. The Binh Dinh water supply scheme is not listed in any category of the Annex 1, 2 and 3 of the Decree because water requirement for the subproject will only be a volume of 1,500 m3/day to be sourced from the ground aquifer. Nonetheless, under the same Decree, it is required to apply and prepare an Environmental Protection Commitment

Page 18: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

5

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

(EC). The preparation of the EC document needs to conform to the guidelines of the Circular No. 26/2011/TT-BTNMT. The EC document was submitted for registration to the concerned District People’s Committee (DPC).

2.3 Need of the Subproject

18. Historical data have shown that groundwater in the existing residential areas along the National Road 19 (Ta Giang and Thuong Giang hamlets of Tay Giang commune; Thuong Son and Trung Son hamlets of Tay Thuan communes), are under fluorosis contamination, grease pollution and high level of hardness. Local people are not only suffering from periodontal disease and other waterborne diseases but also, facing shortages of water in dry season. They have to either carry water from the surrounding area (near Con river and other areas) or purchase water at a very high price of 37,500 VND/m3 from a vendor in Tay Giang commune. As a result, people living in the subproject area have so long wished for the Government’s interest and investment in clean water supply projects to meet their daily needs. Promotion of sanitation practices and facilities also helps reducing waterborne diseases.

19. The success of the project will not only help the communities of six rural hamlets of the two communes solve the problems of clean water , but also improve their lives, protect environment and reduce the use of poor quality water, untreated water, and insufficient water as well as decrease the risk of illness due to the poor water quality.

2.4 Subproject Location

20. Binh Dinh is one of six (6) Provinces in the central coastal region of Viet Nam which has been selected to the Central Regions Rural Water Supply and Sanitation Sector Project (CRRWSSSP). It is shown in the Figure 1 Location map of six Project Provinces of the central coastal region of Vietnam.

21. Tay Son District is located in the Southwestern part of Binh Dinh Province. It is 61 km from Quy Nhon City, as shown in Figure 2. Tay Giang and Tay Thuan communes are two midland communes in Tay Son district’s, 12-20 km far from the district center.

22. Tay Giang commune’s location is bordered by the following communes:

Binh Tuong and Binh Thanh communes in the East; Song An commune, An Khe towns - Gia Lai district in the West; Vinh An commune in the South, and Tay Thuan and Binh Tan communes in the North.

23. Tay Thuan commune: There are a main traffic Highway No. 19 from Tay Giang to An

Khe, a provincial road No. 637 from the Bridge 16’s turning point to Vinh Quang’s border, Vinh Thanh district, and Ha Nhe - Huu Giang road. Tay Thuan commune’s location has got the following borders:

Bordered by Binh Tan commune in the East; Bordered by An Khe commune, Gia Lai province in the West; Bordered by Tay Giang commune in the South, and Bordered by Vinh Quang and Vinh Hoa communes, Vinh Thanh district in the North.

Page 19: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

6

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

24. The location of the construction site for the Piped Water Supply System is shown in

figure 3. The drilled well pumping stations are on the bank of Con river, located at the rear side of Tay Giang People’s Committee of Ta Giang village, with geographical coordinates of 13057' 42’’North Latitude and 108049'46’’ East Longitude. This area has a relatively large deposit of underground water with good quality. The construction site for the Water Treatment Plant will be on the hill beside Highway No. 19 of Ta Giang village, Tay Giang commune is located very near the raw water exploiting area. Geographic coordinates of this area is about 14052' North Latitude and 108015' East Longitude. The transmission and distribution pipelines will come to supply clean water for some villages of Tay Son and Tay Thuan Communes as following:

Tay Giang commune: 4 hamlets of Thuong Giang 1, Thuong Giang 2, Ta Giang 1, Ta Giang 2, and Dong Pho town;

Tay Thuan commune: Thuong Son and Trung Son hamlets.

25. Regarding to the sanitation component, the latrines will also be constructed in the service area that mentioned above.

Page 20: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

7

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Figure 2 Location of Tay Son district.

Page 21: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

8

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

.

Figure 3 Layout of piped water supply system.

Bored holes

Water Treatment Plant

Con

river

Memorial of third Golden Star division

Caodaist oratory

Page 22: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

9

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

2.5 Subproject Components

2.5.1 Piped Water Supply System

26. With capacity of 1,500 m3/ day, the piped water supply system provides transmission and distribution pipeline system of approximately 54,300 m length. It will consist of: (i) a raw water source from the drilled well; (ii) treatment plant; (iii) pumping station; (vi) transmission main; (v) distribution system; and (vi) house connections or communal taps, with water meters.

27. Operational and sustainable piped water supply system will have to:(i) provide water continuously at quantities not lower than 80 liters per capita per day;1 (ii) tap water will be cleaned and safe for human consumption without further treatment; (iii) the number of breakdowns will be less than four times per month and these will not last more than 2 hours each;2 (iv) the water tariff will cover operation, maintenance and depreciation costs; (v) the water bill per household, based on 80 liters per capita per day, will be less than 3% of average monthly income.

Raw Water Source (Drilled Wells)

28. According to the result of Ground Water Quantity and Quality of Exploration Report of the Southern Water Resource Planning and Investigation Union dated January, 2009, the area located in the bank of the Con river’s (near the Head office of Tay Giang People’s Committee) in Ta Giang village has three following aquifers:

The intergranular aquifer of Holocen sediment (Q2) The intergranular aquifer of Pleistocen, middle and upper (Q12-3) Porous complex aquifer of Mezozoi-Pelozoi (MZ-PZ).

29. Of which, the intergranular aquifer of Pleistocene, middle and upper (Q12-3) has average distribution area with average depth of the aquifer being 19.80 m, including sand, pebbles and gravel. This area has a relatively large deposit of underground water with good quality. Thus, it can meet the water demand of the local people.

30. The result of the exploration survey of three drilled wells with the depth of 4-10m, namely G1, G2, G3, is shown that each of them can be exploited at the maximum capacity of 40 m3 per hour. The water sampling and analyses for these wells has been conducted and the result is shown in Table 1.

1 The RWSS strategy prescribes a minimum of 60 liters per capita per day (lcpd). For piped water supply schemes with

house connections, a rate of 80 lcpd is a more realistic design criteria, considering easy access to water supplies. This is supported by the World Bank's Red River Delta Water Supply Project, where the first batch of subprojects were designed for 60 lcpd which proved to be not enough. The next batches adopted 80 lcpd as design capacity. Source: Project Administration Memorandum, October 2011, Page 1.

2 Except in case of force majeure, such as typhoons and flooding. Source: Project Administration Memorandum, October 2011, Page 1.

Page 23: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

10

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Table 1 Result of raw water sample analysis from drilled wells.

No. Parameter Unit Result

QCVN 09:2008 G1 G2 G3

1 pH

7.11 6.87÷7.19 7.27 5.5 - 8.5

2 Hardness (calculating by CaCO3)

mg/l See the Annex … for reference 500

3 Total solids mg/l See the Annex …for reference 1500

4 COD (KMnO4) mg/l

4

5 Ammonia (NH4+)

(calculating by N) mg/l 0.00 0.00 0.00 0.1

6 Chloride (Clˉ) mg/l 31.91 24.82 124.08 250

7 Fluoride (Fˉ) mg/l Not found 0.5 0.72 1.0

8 Nitrite (NOˉ2) (calculating by N) mg/l 0.00 0.00 0.14 1.0

9 Nitrate (NOˉ3) (calculating by N) mg/l 1.73 5.87÷7.45 37.21 15

10 Sulphate (SO42ˉ) mg/l 7.20 4.8 ÷ 7.2 98.46 400

11 Cyanide (CNˉ) mg/l Not found Not found Not found 0.01

12 Phenol mg/l Not found Not found Not found 0.001

13 Arsenic (As) mg/l Not found Not found Not found 0.05

14 Cadmium (Cd) mg/l Not found Not found Not found 0.005

15 Lead (Pb) mg/l 0.01 Not found Not found 0.01

16 Chrome VI (Cr6+) mg/l Not found Not found Not found 0.05

17 Copper (Cu) mg/l 0.01 0.01 Not found 1.0

18 Zinc Zn mg/l 0.06 0.03 Not found 3.0

19 Manganese (Mn) mg/l 1.14 0.02 0.04 0.5

20 Mercury (Hg) mg/l Not found Not found Not found 0.001

21 Iron (Fe) mg/l 0.15 0.13÷0.15 0.06 5

22 Selenic (Se) mg/l Not found Not found Not found 0.01

23 Total radioactivity α Bq/l

0.1

24 Total radioactivity β Bq/l

1.0

25 E - Coli MPN/100 ml Not found Not found Not found Not found

26 Coliform MPN/100 ml

0 0 0 3.0

27 Residues of organo-chloride pesticides

DDE DDT Lindan

µg/l Not found Not found Not found Not listed in QCVN 09:2008

Page 24: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

11

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

31. As shown above, the water quality analyses that taken from drill-wells (G1 and G3) have indicated that the contents of Manganese (Mn) and Nitrate (NO-3) exceeded the Vietnamese standards indicated in QCVN 09:2008/BTNMT - National technical regulation on Ground water quality. The unusually high content of Nitrate needs to be carefully checked in the next water analysis. Mn with excessive content can be easily cleaned during the water treatment process. For COD (KMnO4), the PPMU is recommended testing this parameter during the detailed design. This parameter presents the amount of organic compounds in water. It should be less than value of 4 for ground water so that the water is not polluted and suitable for domestic and drinking purposes.

32. According to hydraulic investigation results, the hollow aquifer of the middle-late Pleistocene sediments was chosen to be the abstraction layer to supply water for domestic usage locally. The aquifer is recharged by rain water and mostly by water from Con river. Water extracted from the test wells during the hydraulic investigation seemed to be clear with no taste or odor . Water abstracted from dug and drilled residential wells nearby the well field has not been found contaminated with oil or fluoride. Experience of abstracting water from ground aquifer along Con river has shown good quality of water. In addition, the water treatment technology package for the subproject is designed to address the site specific water quality standards to meet the QCVN 01:2009/BYT - National technical regulation on Drinking Water Quality (attached with the Circular No.04/2009/TT-BYT dated 17 June, 2009 of Ministry of Health (MoH)).

33. Based on the result of the water exploration, the ground water to be exploited in the left bank of the Con river’s as shown in Photo 1 Location of the bored holes on the bank of the Con river below will be selected as the raw water source to supply to the Water Treatment Plant of Tay Giang and Tay Thuan communes. Since the drawing capacity of the Subproject is about 31 m3/hour/ well (two wells on duty and one well on standby), which produces a volume of 1,500 m3/ day, the Binh Dinh Province People’s Committee will pose for approval of the water supply after the Department of Natural Resource and Environment DoNRE’s assessment of the proposed wells. The hydraulic calculation showed that the amount of water needed for the WTP is enough even in the worst case scenario.

Photo 1 Location of the bored holes on the bank of the Con river.

Water Treatment Process Diagram

Page 25: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

12

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

34. Technology scheme shall be selected based on quality of the raw water source, capacity of the water treatment plant, management and operation requirements, and available terrain that facilities will be placed. In this case, ground water from drilled wells will be pumped to the Water Treatment Plan situated on the top of the hill beside. After treatment, the clean water will go through the transmission and distribution pipeline system to the house connections by gravity on low-load hours, taking advantage of largely different height between the plant and the residential area. On peaking hours, a pressure pump can be used.

35. The scheme is shown in Figure 4.

Figure 4 Water treatment diagram.

36. This technology has been applied in many places in Binh Dinh province and other

provinces of the country and shown that the technology has high effects and low investment costs with easy operation and meets management requirement of the Subproject Owner. Sludge arising during the settling and rinsing process will be stored in settling basin, then periodically scooped out and disposed in the landfill as specified; the overflow water from settling basin will be discharged into the drainage system of the treatment plant.

Water Treatment Plant

37. The Water Treatment Plant (WTP) site is an agriculture area which belongs to the Tay Giang Commune People’s Committee (see Photo 2 below). The WTP will be located on an elevated hill, near Highway No. 19 of Ta Giang village, Tay Giang commune. The drilled wells are located approximately 600-800 meters from WTP site. The

Bore Hole Wells High Rate Aeration Contact Basin/ Vertical Clarifier

Rapid Sand Filter

Disinfection, Cl2

Clean Water Reservoir

Clean Water Pumping Station

Distribution Network

Sludge Lagoon

Page 26: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

13

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

elevated location of the WTP could deliver the water supply to the residential areas located in the lower elevation by gravity flow on low-load hours. Total land area for building the Water Treatment Plant is about 1,630 m2.

Photo 2 WTP construction site to be located on the slope of the hill.

38. A list of materials and facilities of water supply plant is presented below:

No. Materials and facilities Unit Quantity

1

Well pumping station: size B x L = 3 m x 4 m, with brick wall and reinforced concrete slab

item 03

Abstraction well item 03

Submersible pump: Q= 31 m3 / day, H = 52m item 03

30 KVA transformer sub-station station 01

2

Raw water transmission pipeline with diameter of DN200, made of uPVC

m 788

Raw water transmission pipeline with diameter of DN150, made of uPVC

m 810

3 Aeration tower with dimensions DxH= 0.9mx2.5m and capacity of 469 m3/hr

item 02

4 Contact settling tank with dimensions of each: AxBxH = 3.5 m x 3.5m x 4.8m. Install pipes and fittings of influent and effluent, blow-off valve system and so on

item

02

5 Gravity rapid sand filters, filtration media is quartz sand. Each dimensions: B x L x H = 2.0m x 3.5m x 3.9m. Supply and install 11.6 m2 of HDPE underdrain

item 02

Page 27: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

14

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

No. Materials and facilities Unit Quantity

6 Treated water storage reservoir with dimensions B x L x H = 8m x 12m x 3.5m

m3 300

7

Treated water pumping station dimensions B x L = 4m x 8.1m. Supply and install 3 treated water pumps, rated: Q = 42 m3/h, H = 40m; 1 backwash pump, rated: Q = 125 m3/h, H = 10m; 1 air blower, rated: Q = 334 m3/h, H = 5m. Install pipes and fittings system in the pumping station and control panel in the station

m2 32.4

8

Chemical house in combination with warehouse, dimensions: B x L= 4m x 7m. Supply and install 4 Chlorine cylinders, capacity of 68 kg/each, Chlorinator with a capacity of 0-0.5kg/h, 2 booster pumps, rated: Q = 2 m3/h, H = 45m.

m2 28

9 Sludge lagoon made of quarry stone, bottom dimensions BxL= 9.6m x1.2m, and top: B x L = 6m x 14m, and height of H=2.4m.

10 Area of water treatment plant m2 1,630

11 Administrative building, and a house for staff in combination with lab, each dimensions B x L = 4m x 8m; RC foundation and columns, brick walls

12 Auxiliary works: gates and fences in the water treatment plant site; entrance to the water treatment plant; yard piping for connecting facilities, drainage system and leveling.

m2 85,86

13 Drainage: DN600 centrifugal concrete pipe from the water treatment plant to the nearest stream (at Lo Gom bridge foot)

m 360

14 75KVA transformer sub-station for the water treatment plant station 01

15 A medium voltage line from the national grid from the National road 19 to the water treatment plant and raw exploitation area

16 Water meter item 3,249

17

Treated water pipelines: install uPVC and HDPE treated water transmission and distribution pipelines to the households, including: * DN150 uPVC pipe, 7.7mm thick (PN10)

* DN100 uPVC pipe, 5.3mm thick (PN10)

* DN 90 HDPE pipe, 5.4mm thick (PN8)

* D63 HDPE pipe, 3.8mm thick (PN8)

* D15 pipe and D15 meter to connect to the households and public works: 3,249 households.

m m m m

5,668 7,516 19,715 21,387

2.5.2 Promotion of Household and Public Hygiene and Sanitation

39. Improved household and public hygiene and sanitation will be achieved through three main activities: (i) construction and rehabilitation of latrines and small drainage works at households; (ii) construction and rehabilitation of school latrines; (iii) construction of

Page 28: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

15

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

latrines at public areas; (iv) extensive IEC campaigns aiming at improving knowledge on hygiene and changing behavior.

40. Subproject will include construction of hygienic latrines and domestic wastewater pits for 1,663 households including: 912 households of Tay Giang commune and 751 households of Tay Thuan commune, and also for public areas (10 school latrines and 2 market latrines).

Table 2 Location and the number of public latrines to be constructed.

No. School Number of pupils/people

Number of Toilet

I Tay Giang Commune

1 Kindergarten (Ta Giang) 89 1

2 Kindergarten (Thuong Giang 1) 34 1

3 Kindergarten (Thuong Giang 2) 131 1

4 Primary schools no. 1, no. 2 and no.3 3

5 Tay Giang secondary school 1

6 Vo Lai High school 1

7 Dong Pho market 1

II Tay Thuan Commune

1 Thuong Son and Trung Son Kindergartens 95 2

2 Bridge No.16 Market 1

41. Latrines for the school will be designed following the Toilet facilities model for Kindergarten, Primary and Secondary Schools (attached with the Decision No. 1486/QD-BGDDT dated March 31st, 2008 of the Ministry of Education and Training (MoET)).

42. In promoting construction of latrines among HHs and public areas, the QCVN 01: 2011/BYT National technical regulation on Hygienic condition for Latrines (attached with the Circular No. 27/2011/TT-BYT dated June 24th, 2011 of the Ministry of Health (MoH), becoming effective on January 01, 2012, will be adhered to ensure the environmental and health safeguards of the latrines build under the project. This circular indicates the following conditions: except for Septic tank latrine, the latrines must not to be built in the areas that are usually flooded or water logged to avoid or prevent contamination or spill of polluted and greywater to the ground water. In case the latrines will be constructed in the flooded or water logged area, it must be built at controlled level to avoid flooding and water logging to the area.

43. According to the Project Administration Memorandum (PAM), Project will support double vault composting and pour flush latrines for household use. Based on the

Page 29: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

16

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

data/information of the baseline survey (CBA-IEC), most households who have been consulted prefer to have septic tank latrine.

2.6 Subproject Schedule for Implementation

44. The Subproject Implementation Schedule is estimated to cover a period from 1 October 2011 until the Overall Project Completion on 31 December 2016 . At the pre-construction phase, after selection of the successful Design and Build Contractor (Contractor) through the bidding procedure, the Contractor shall prepare the Detailed design, and construct the water supply system based on the approved engineering plans. The following pre-construction activities will have to be accomplished:

Revision and finalization of the FS and EC for Approval of PPC and DPC respectively;

Updating of IEE Report and submission to ADB for review and approval; Environmental Training of PPMU/EO; and Updating of EMP by the Contractor based on Final Detailed Design or Changes in

the Design to be approved by the PPMU.

45. The construction is expected to commence after six months of contract signing and to be completed within 12 months. During the construction period, the following must be ensured:

Implementation of the EMP by the Contractor; Monitoring the Contractor’s compliance to the provisions listed in the EMP and

the Environmental Monitoring plan by the PPMU/EO in collaboration with the CSC;

Collation, preparation and submission of Monthly Reports by the PPMU/EO; Preparation and submission of Quarterly Reports to CPMU/PIA Consultant.

46. Subsequently, the O&M phase is expected to be started after construction. During the

O&M period the following periodic water sampling and water quality analyses must be ensured as provided in the environmental monitoring plan.

Preparation and submission of Monthly Report, on environmental monitoring to PPMU/EO to be submitted to CPMU;

Preparation and submission of Quarterly Report, to CPMU/PIA Consultant.

47. The land acquisition, resettlement and compensation have been accomplished for the subproject. Subproject Quarterly environmental monitoring Report will be prepared in each of quarter by the PPMUs and submit to CPMU/PIA Consultant. The PPMUs also summarize and include the finding from the monitoring to the Quarterly Subproject Progress Report and submit to CPMU/PIA Consultant, who will in turn be responsible for consolidation and reporting to the ADB, MARD and MoH.

Page 30: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

17

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

3 DESCRIPTION OF THE ENVIRONMENT

3.1 Physical and Ecological Resources

48. Binh Dinh is a coastal province in the southern part of the Central Region of Vietnam with a total land area of 6,039 km2. It borders Quang Ngai Province in the north, Phu Yen Province in the south, Gia Lai Province in the west and South China Sea in the east. The Eastern border is the coastal line with the length of 143km.

49. Tay Giang and Tay Thuan communes belong to Tay Son District in Binh Dinh Province. They are located about 12-20km far from the distinct center, along National Road No. 19, which is the main commercial road from Binh Dinh province to the Central Highland provinces.

Climate

50. Binh Dinh has a humid tropical climate with prevalent winds. Winter is slightly cool with winds mainly from the southwestern or southern direction. Summer temperatures are fair with winds from the east and southeast. Large storms usually occur in the rainy season, particularly in October.

51. Binh Dinh is a coastal province in the southern part of the Central Region of Vietnam with a total land area of 6,039 km2. It borders Quang Ngai Province in the north, Phu Yen Province in the south, Gia Lai Province in the west and South China Sea in the east. The Eastern border is the coastal line with the length of 143km.

52. Rainy season is from May to December. The annual average precipitation is around 2000 mm to 3000 mm with the highest precipitation being in October and November. Dry season is from January to April and usually causes drought and shortage of water for farming work and living conditions. In May and June, if average rainfall amounts are more than 100mmm, sub-chronic floods often occur. As the dry season lasts for 4 months, rain water does not guarantee a reliable source of water.

Table 3 Average monthly rainfall

Month/ year

1 2 3 4 5 6 7 8 9 10 11 12 Average annual

2004 45.0 0.2 34.0 7.8 223.7

29.5

58.6

101.0

217.8

709.2

1263.5

336.1

3026.4

2005 71.1 90.8 6.1 121 45.4 5.4 7.8 3.4 165.7

700.1

574.1 676.5

2467.4

2006 125.1

12.5 8.7 39.1

354.4

50.9

88.2

129.7

62.2 541.8

369.5 223.4

2005.5

53. As a coastal province with 124km of coastline and 24 communes located along the

coast, Binh Dinh is under the zone of substantial influence of climate change. Storms, draughts and sea water intrusion have become more serious in the recent years affecting local people’s daily and economic activities (according to http://www.pclb-tkcnbinhdinh.gov.vn/ and http://www.dostbinhdinh.org.vn/). Due to more severe natural catastrophes, water resources are subject to more unstable quantity and quality.

Page 31: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

18

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

54. The planned exploitable capacity of the water treatment plant is 2000 m3/day, which is a small number compared to the potential exploitable capacity of the extraction aquifer of 19,590 m3/day. This aquifer is recharged by the rainfall and water from Con River. As rainfall amounts in dry season and rainy season vary among years, the water level of Con River varies accordingly, affecting the recharge rate of the aquifer. Scientific research predicts the greatest decrease of water flows by 30% by 2070 due to the increase of 4.5 oC of temperatures (http://stnmt.binhdinh.gov.vn/newsdetail.php?newsid=262&id=39). In this case, the extraction aquifer with the current potential exploitable capacity of 19,590 m3/day could be less , but would still sustain abstraction of 2000 m3/day exploitation and most likely even higher needs in the future.

Air Quality and Noise

55. The subproject area is located along a road, so it is affected by dust and noise from traffic on the road.

Topography

56. Topography has high slope from West to East, with the western side bounded by the toe of the Truong Son mountain range. There are 30 different types of soil in the province with 71,000 hectares of silt. Approximately 117,000 hectares of land are used for agriculture; 202,700 hectares is forestry land, and 154,400 hectares is natural rain forest. There are more than 195,000 hectares of marginal land, potentially good for either agriculture or forestry development.

57. The communes have very complex terrain, which consists of high mountains, hills and flat plains, divided by large and small rivers and streams in the region, flowing from the northwest to the southeast. Elevations range from 400m to 800m, and typical slope is about 25 degree with high rate of erosion during rainy season.

Geology and Soils

58. Generally, the location for construction of the water treatment plant has a relatively good geological condition. The layer 1 m under the natural ground is weathered rocks, mixed soils and gravel with hard and tightly texture. Base-load capacity is more than 2 kg/cm2.

Water Resources

Surface water

59. The sub-project area has a well-developed network of rivers and streams, mainly from two river systems flowing from the North-west to the South-east into Con River and draining to the Southeast. The rivers and streams in the region are:

Con river is derived from the high mountains in the north flowing through the central region following Northwest – Southeast direction, length of the river flowing through the sub project area is about 8km, of which 3 km belonging to Tay Thuan commune in the North. River width is from 25m to 50m. The river has flow throughout the year, and is not affected by ocean tides.

Cai spring carries the flow from a group of springs originating in the high mountains which create northeastern streams and mango garden springs in the

Page 32: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

19

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

South. It flows from west to east and enters the central area. Length of the river flowing through the sub project area is about 7km. River width is from 15m to 25m. The river flows all year round.

Ba La spring is a merge of Dong Tre streams originating from the high mountains in the west and the system streams under mountains Hon Giac, and Hon Dung. It flows from the Southwest to Northeast and enters Con River in the central region. In the dry season, the water flow is not significant.

Ground water

60. The subproject area has a very limited ground water reserve. Ground water is extracted from dug and drilled wells. It is the main source of water for domestic use but many of the wells abstracting water from shallow aquifers are contaminated with fluorides and oil.

61. In the subproject area, along Highway 19 within the 2 communes, shallow well-water is polluted by petroleum spill during the war. Groundwater analysis of drilled wells and dug wells in some parts of the two communes shows that fluorides and Fe2+ exceed the standards, causing black teeth diseases (see Photo 4). Photo 4 shows signs of dental fluorosis due to high concentration of fluoride in shallow ground water.

Table 4 Fluoride content in ground water of subproject area.

No. Monitoring points Fluoride (mg/l)

1 Ta Giang village, Tay Giang Commune Tay Son District 1.80

2 Ta Giang village, Tay Giang Commune Tay Son District 3.34

QCVN 09/2008-BTNMT 1.00

Source: Department of Natural Resources and Environment (2005)

62. In these parts of the two communes, groundwater from shallow wells is not qualified for domestic use. However, according to water quality analysis at the subproject site, good quality of deep ground water can be found along a side of Con river (see Table 1: Result of raw water sample analysis form drilled wells).

Forests, Protected Areas and Endangered Species

63. Tay Giang and Tay Thuan communes is the habitat of some wild species such as deer, cow, rabbit, pig, python, snake and some bird species. However, based on consultation with provincial authorities, as well as review of DONRE/MONRE information, there are no known rare or endangered species found anywhere in the subproject area.

Coastal Resources

64. With a 134km coastline and large territorial sea area of 2,500km2 together with an exclusive economic area of 40,000km2, Binh Dinh has abundant sea product resources with high economic value such as: mackerel, yellow fin tuna, shrimp, squid, salangane's nests, lobster and emperor crab, etc.

65. Subproject area is not located along the coastal line, thus it will have no impact on coastal resources.

Page 33: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

20

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

3.2 Economic Development

Industries

66. Subproject area is not an industrialized zone with a few industrial activities. There is a sugar production factory and a brick factory in Tay Giang commune. In the future, two industrial zones will be developed, one in Thuong Giang 2 hamlet and the other in Thuong Son hamlet.

Agriculture development

67. In the subproject area, agriculture is main economic activity in Tay Thuan. Tay Giang commune has more diversified source of income. The agricultural sector in the two communes encompasses cultivation, husbandry, aquaculture and forestry.

Infrastructure Facilities

68. At the sub-project area, the main water supply source is groundwater from shallow or drilled wells. Tay Giang commune has 54 drilled wells, and 1814 shallow wells exploiting ground water at shallow level. Almost all wells in the commune have low water quality. Especially, the water source from two villages Ta Giang and Thuong Giang villages is contaminated with fluoride and oil spills from the US- Vietnam war. Tay Thuan commune has 32 drilled wells, and 1382 shallow wells exploiting ground water at shallow level. Wells in Tay Thuan commune also produce low water quality. Especially, water source from two villages Thuong Son and Trung Son is affected by oil spills. Diseases mainly related to water, environmental sanitation, and personal hygiene, are teeth inflammation, black and damaged teeth; and all kinds of fevers.

69. In Tay Giang commune, there is a water treatment facility that utilizes and treats water abstracted from Con river by simple sand filtering technology. Water is sold at a price of 37.500 dong/ m3, which is too high and above affordability of many local people.

70. The sub-project area has no rainwater drainage system and sewage system. Rainwater flows over the streets then to rivers and springs close by. Wastewater from households is directly discharged into the environment. In some areas, such as markets and houses along the road, wastewater flows directly to the road, at some places that might lead to environmental pollution.

71. Solid waste in the subproject area is not disposed into sanitary landfills. Household solid waste is sorted at the source. A portion is sold to scavengers and the rest is disposed to surrounding environment.

Transportation

72. The subproject has very convenient transportation because both communes are located mostly along National Road No. 19. Tay Giang commune allocates 1.72% of the total natural land area for traffic roads. Tay Thuan commune owns 76.90 km length of roads. Most of the inter-communal roads in both communes are concreted while inter-hamlet roads and lanes are mostly non- graded or graded soil roads.

Page 34: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

21

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Land Use

73. Binh Dinh province topography includes hills and mountains, delta and sea with 11 land groups and 30 different land types, in which 71,000 ha of alluvial soil, 117,000 ha of agriculture soil and 202,700 ha of forest soil with available forest.

74. Tay Giang commune has a natural area of 7,352 hectares, including production land of 1,740 hectares. Total natural area of the four hamlets in Tay Giang subproject area is 3,020 ha including 1,220 ha of production land.

75. Tay Thuan commune has a natural area of 7,751 hectares. The four hamlets in the subproject area possess a natural area of 5,648 ha and 3,217 ha of production land.

Power Source and Transmission

76. The national postal and telecommunication network has been covered most of the inhabited areas of the province. The subproject areas have electricity, postal and telecommunication stations to serve demands of local communities.

3.3 Social and Cultural Resources

Population and Communities

77. In the subproject area: Tay Giang has a population of approximately 13,070 people (2010) in which females are 6,845, and the number of households is 3,004 households. The number of poor households is 361 accounting for 12.03 % of the total households. The rate of natural population growth is 1.1% (2010). Tay Giang is divided into 06 villages and Dong Pho town, which is relatively developed. Kinh is the only ethnic group.

78. Tay Thuan commune is divided into 4 villages with 1,709 households and 7304 inhabitants; Thuong Son village has 681 households, 2,561 inhabitants; Trung Son village has 295 households with 1,163 people. Rate of natural population growth is 1.1%. The number of poor households accounts for 18%. Kinh is a main ethnic group.

79. People in working age makes up 45% of the total population. The average income in Tay Thuan and Tay Giang communes is approximately 1.2-1.4 million dong/ person/ month.

Health Facilities

80. In Tay Giang commune, there are 2 clinics with 8 beds while Tay Thuan commune has 1 clinic with 2 beds. The local clinic centers have played a sufficient role in providing daily health care for the local residents as well as running anti- epidemic diseases campaigns. For more severe diseases, local people may go to two general hospitals in Quy Nhon namely Hospital and City Hospital and two other hospitals either newly developed or being developed: Bong Son Hospital and Tay Son Hospital respectively. There is also one convalescence centre situated at Phu Cat District.

Page 35: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

22

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Education Facilities

81. Specification and diversification of education and training forms have been developed to meet demands of learners and human resource development. There are all levels of education from kindergarten to high school in the subproject area. At the kindergarten level, Tay Giang commune has 3 kindergarten locations but is insufficient with 8 class rooms while Tay Thuan commune has 2 kindergarten locations. Most of the children of kindergarten age go to the schools which do not have adequate sanitation and clean water supply facilities. Tay Giang and Tay Thuan have 3 and 1 primary schools respectively but the schools are not supplied with sanitary toilets and piped water. There are also two secondary schools and one high school in the communes meeting educational demand of local students.

Cultural/ Historic Sites

82. In Tay Giang subproject area, there are no cultural or historic places. In Tay Thuan commune, two cultural/ historic sites are located within subproject coverage. They are a Caodaist oratory in Trung Son hamlet and a Memorial of 3 Golden Star division located near National Road No.19 of Thuong Son and Mieu Tu hamlets (see Photo 3 Cultural/Historic Sites below)

Caodaist oratory Memorial of 3 Golden Star division

Photo 3 Cultural/Historic Sites.

Page 36: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

23

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Drilled wells and dug wells in Tay Giang, Tay Thuan communes.

Signs of tooth fluorosis due to high concentration of fluoride in shallow ground water.

Photo 4 Environmental and Social Condition of Tay Giang, Tay Thuan Communes.

4 SCREENING OF POTENTIAL ENVIRONMENTAL IMPACTS

83. The potential environmental impacts of the proposed subproject were screened using the Rapid Environmental Assessment (REA) checklist of the ADB, and the GoV Decree No. 29/2011/ND-CP, which generally categorized projects in:

Page 37: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

24

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Strategic Projects and Master Plans subject to Strategic Environmental Assessment (SEA) (Annex I)

Projects subject to Environmental Impact Assessment (EIA) (Annex 2) Projects subjected to EIA to be appraised and approved by the Ministry of Natural

Resources and Environment (MONRE) (Annex 3). Projects not listed in Annex 1, 2 and 3 will be required to prepare and register an

Environmental Protection Commitment (EC) to the District People Committee.

84. The daily water supply requirement of the Binh Dinh pilot subproject is 1,500m3 and will be drawn from ground water wells. Based on the above mentioned Decree, the scale or magnitude of the proposed subproject water supply scheme is small and not listed in Annex 1, 2 and 3 of the Decree. Nonetheless, the subproject is required to apply and submit an Environmental Protection Commitment to the concerned District Peoples Commune for registration and approval. Under the ADB’s REA Checklist the Binh Dinh Subproject is classified as Category B and requires an IEE report.

85. The screening processes were supplemented with field investigation surveys and evaluation of the existing environmental conditions in the subproject location to reassess and confirm the potential impacts identified to be generated on the physical environment such as soils, air, vegetation, trees, protected species of flora and fauna, landslides, forest land protected areas, cultural/historical sites, bodies of water, river system, etc.

4.1 Impacts due to Location

Water Supply Structures and Facilities

86. The Subproject water supply system will include installation and construction of structures and facilities such as: 3 well pumping stations, water treatment plant, oxidization tower, settling basin, rapid sand filter, the reservoir, raw water pipeline, clean water basin, chemical and storage house, drying yard for sediment, administrative house, housing of staffs, pipeline system, and waste water drainage system. It will also provide construction of two guard houses, entrance gate, fence, garage, and access road to the water treatment plant.

87. The proposed sites for the installation of boreholes and construction WTP and associated structures will be located in an agricultural land presently cultivated for peanut production. The total permanent land loss is 1,900 m2 including land allocated for the WTP, access road to the WTP and the 03 boreholes. The total temporary acquired land for pipelines and works on system is 35,000 m2.

88. Within the proposed sites for the construction and installation of the buildings, structures and facilities no forest land, heritage site will be encroached by the proposed subproject, no environmentally sensitive sites and precious ecological areas will be affected. Moreover, there will be no impact on protected and red-listed species of flora and fauna in the proposed subproject sites as there are none of them. Further, there will be no impacts on cultural use of lands by indigenous minorities or impairment of aesthetics in the environment will not occur.

89. Two cultural and historical sites namely: the Caodaist Oratory in Trung Son hamlet and Three Golden Star Division in Thuong Son and Mieu Tu hamlet will be given due

Page 38: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

25

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

attention in the final engineering design of the subproject in order to avoid encroachment and impairment of the sites and its structures.

90. Also, subproject facilities are unlikely to impact on the natural drainage pattern and no local flooding will occur. The structures in flood prone areas will be protected from floods by constructing adequate drainage around the structure.

91. Selected location for WTP and clean water storage tank is on a hill, 20-30 m higher than the residential area adjacent to the Highway 19, in Ta Giang village of Tay Giang commune. This agricultural land belongs to management of Tay Giang People's Committee. An access road will be used with manual labor for haulage during construction on the hill where there are some small trees, and vegetation coverage is thin. A temporary disruption of the land use is expected during the construction and laying of pipe-lines.

92. The total land recovery required for subproject facilities is 35,000 m2 temporarily and 1,900 m2 permanently (for the WTP area, access road to the WTP and the well field). There are 148 HHs and 2 Commune People’s Committees are affected by land acquisition. Such land recovery and a resettlement plan have been prepared according to ADB and GoV resettlement policies to address the affected parties.

Water Sources

93. Site selection for water abstraction was based on the availability of adequate quantity of good quality treatable water sources. Subproject follows relevant guidelines/regulations and policies of the GoV and MoNRE at the national level or DoNRE at District level.

94. Decree 149/ND-CP, dated 27 July 2004, on issues related to certification for exploratory drilling, exploitation and using water recourses and discharge was followed to obtain the permission for water abstraction. Potential sources have been tested for water quality to ensure that the source water can be feasibly treated to meet QCVN 01:2009/BYT - National technical regulation on Drinking Water Quality (attached with the Circular No.04/2009/TT-BYT dated 17 June, 2009 of Ministry of Health (MoH). Water treatment units (e.g., aeration tower, clarification, filtration, chlorination, etc.) for each system are designed to address site specific conditions as identified by the water quality analysis. This adherence to GoV regulation minimizes the chances for any environmental and health adverse impacts.

95. Hydrological data supports the availability of adequate water resources throughout the year in the selected source to meet the full demand including that of dry season demand over the long term. The laboratory analysis of water quality from drilled wells have indicated high concentrations of nitrate and manganese that exceeds the water quality standards of Vietnam, other water quality parameters analyzed have passed the water quality standards of Vietnam.

Sanitary Latrine Construction

96. Household and public latrines will be built considering specific conditions such as water-logged and flooded areas to minimize any potential contamination of the groundwater.

Page 39: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

26

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

97. All latrines for the households will be designed and constructed according to the Guideline for design, construction, use and maintenance of household latrine - Published in 2010 by Medical Publisher (MoH).

98. Also, all latrines for households and public areas will comply with the QCVN 01: 2011/BYT National technical regulation on Hygienic condition for Latrines (attached with the Circular No. 27/2011/TT-BYT dated June 24th, 2011 of the Ministry of Health (MoH) to ensure protection of the environment and to safeguard peoples’ health.

4.2 Impacts Related to Design

99. The potential impacts issues and concerns related to the design that would bring about increased costs in O&M, and possible adverse impacts on the environment and public health.

Water Supply Facilities

100. Potential impacts include:

Unsatisfactory raw water quality, the pollutants of which could not be removed using available treatment processes, e.g. high iron content in ground water and possible pesticide residues and high content of nitrogen and phosphate content form chemical fertilizer;

Inadequate design of facilities for receiving, storing, handling chlorine cylinders so that, with improper O&M, workers (and neighbors) will suffer from toxicity from chlorine gas escaping to the environment;

Absence of disposal facility for sludge from water treatment facilities; Inadequate buffer zones around pumping stations and treatment plants as may be

necessary to mitigate noise and other possible nuisances to neighboring properties (and/or communities) and for protecting these facilities from damage by outsiders;

Increase of greywater production that could not be managed due to absence of, or inadequate, drainage facilities; and

Water distribution lines in the drainage canals, which exposes leaking water pipes to contaminated water.

Sanitary Latrines

101. This is the midland region and people have been gradually transferred the use of septic tank replacing the latrines with two compartments and pour flush latrines. The subproject will support building substructures of septic tank latrines for subproject households. The subproject will support the construction of new septic latrines and self-absorbed domestic wastewater collection pits for households without toilets in both communes.

4.3 Impacts during Construction

102. Even if most of the potential significant impacts are avoided by selection of proper sites, negative temporary impacts may occur mainly during the construction phase, if adequate attention is not paid to control them. The potential adverse impacts at varying magnitudes are discussed below.

Page 40: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

27

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Air Quality

103. Increase in total suspended particles from clearing and grubbing and excavation activities; movements of construction equipment; and emissions and noise from operation of construction equipment will have substantial impact when construction of facilities are in settlement centers or in densely populated areas. Nevertheless, these can be easily be mitigated by proper construction methods. The distribution and network of pipelines will have a wider distribution or coverage and relatively will not have greater impacts as compared to the construction of other required structures or facilities for the subproject. The same significance of impact is expected in public areas and road sides.

Physical Environment

104. During construction, exposed soils, generated construction debris, sewage, hazardous wastes may affect nearby water bodies, unless construction sites are properly managed.

105. Soil erosion from construction activities will have some impacts if land clearing and construction activities are not properly planned and executed. Flooding (intermittent or perennial) in adjacent areas could be a consequence of heavy siltation in nearby drainage or stream channels caused by inadequate management of exposed ground surfaces, removed topsoil, soil stockpiles and construction debris.

106. Adverse impacts due to quarrying of construction material (rock particles or coarse grains, sand or fine grains) or borrow pits is unlikely as all such material will be procured from the quarries legally operating with required permits from relevant authorities.

Biological Environment

107. If siltation of construction wastes into nearby water bodies is uncontrolled that may have detrimental effect to aquatic/marine flora and fauna downstream.

108. Except the WTP and the clean water reservoir located on the hill with scattered and commune plant species, low or negligible impact on local flora and fauna are expected. The cut-down and compensated trees were 183 fruit trees and 172 perennial trees and no rare or endangered species occur in the subproject area. The boreholes are sited on agricultural land, and requires very little land for permanent structures. The largest extent of land required for the WTP is a commune’s land. The main transmission pipes will be located within the right of way of the existing roads. No land degradation will happen within the Subproject area.

Page 41: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

28

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Socio-Economic Environment

109. Little or no impact is anticipated on land use since the sites are located on agricultural and public land area. Temporary agricultural land acquisition is about 12,718 m2. The permanent land acquisition from residential area is only 180 m2.

110. Construction vehicle noise, dust, and emissions near construction sites and on local roads can be a nuisance to communities. Under similar circumstances, excavation and construction activities may cause noise and dust; vibration and noise from cement mixers, generators and other equipment.

111. Adverse impacts on the public in terms of traffic, inconvenience, disruption of socio-economic activities, and disruption of power supply, blockade of access road, cut off service utilities and accidents will be more of a concern in population centers and particularly for laying transmission and distribution pipelines. However, these can be mitigated without difficulty.

112. Installing the transmission and distribution pipelines may cause minor traffic slow-downs. Some of transport pipe and distribution of water line would cross the street causing traffic disturbance. To mitigate the impact the agreement with the organizations and individuals involved needs to be achieved. Also the working time should be arranged in suitable time when traffic density is less crowded. Road deterioration may take place from construction heavy equipment and hauling trucks to transport construction materials.

113. Construction-related accidents may happen to construction workers and/or the local people if construction activities are not well-planned and supervised. Solid waste generation from construction activities and workers as well as human waste is likely to have impacts on peoples’ health and to the environment if not properly disposed.

114. Low to moderate positive impacts include short-term employment of local population (skilled and unskilled workers) in construction and some increased earnings in micro-enterprises in the vicinities of construction areas. Employment of outside skilled/unskilled laborers may increase social conflicts. To prevent such unwanted incidents, the employment of the local people in the commune should be given the priority to work during the construction period.

4.4 Impacts during Operation

115. The potential adverse impacts at varying magnitudes that can be expected during operation of the completed projects are briefly discussed below.

116. No significant impacts of water supply schemes on air quality are expected. However, noise vibration nuisance may occur, especially in pumping station at the WTP.

117. Access to larger amounts of better quality water will generate larger amounts of wastewater, including: human waste from improved latrines (which generate more wastewater), more wastewater from animals. While waste water is often recycled in gardens, use of greywater (from washing dishes, etc.) or black water (human and animal waste products) can cause adverse environmental impacts if not properly managed.

Page 42: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

29

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

118. Adverse impacts on the general public may be in terms of delivery of unsafe water to the distribution system that could result from inadequate chlorine residual in the distribution system. For the operator, leaking distribution system generate non-revenue water.

119. Improperly installed (or poor quality) water pipes may break, causing leaks and swampy areas. If the pipeline is leaked and not sufficiently pressurized, poor quality ground or surface water may enter the pipelines and contaminate the water supply system.

120. Exposure of workers to an inappropriate use of hazardous and toxic chemicals such as chlorine may cause health problems.

121. Adverse impacts on groundwater and nearby wells are likely to result if unsuitable types of latrines (underground pit and pour flush types) are built in flood prone and water logged areas. Similarly proximity of latrines to wells, particularly in shallow groundwater areas can contaminate the ground water. Also the possible leakage and release of grey and black water from septic tank and overflow into drainage canals and into ground water table must at all times be prevented to ensure water quality.

122. The operation of the proposed subcomponents (i.e. water supply, and sanitation facilities) will bring about the following significant socio-economic benefits to the commune:

Access to adequate amount of good quality water by 100% of the population in

the service area at a reasonable cost (both for drinking and sanitation); Improved personal sanitation resulting from hygiene and sanitation behavioral

change program (IEC) coupled with latrine facilities, etc.; Better health and environmental sanitation resulting in marked improvement in

community health indicators (e.g., reduced frequency of diarrheal and other water related diseases);

Reduced lost work days for adults, and lost school days for children (improved educational benefits) due to reduced incidences of diseases;

Saving of time spent for fetching water from distant sources and/or money spent for buying water from vendors’; and

Induced socio-economic growth, (promotion of economic growth in various sectors)

5 PROPOSED MITIGATION MEASURES

123. The potential issues, concerns and problems that could arise from the subprojects will be avoided or, mitigated by sufficiently considering in the overall design of subcomponents, from site development planning to the design of structures, selection of equipment, and more importantly, operation and maintenance (O&M) procedures. In order to eliminate or minimize the other negative environmental impacts, various mitigation measures are recommended as appropriate at each stage of implementation of the project for all subcomponents.

124. The proposed measures to mitigate the identified adverse impacts during construction and operation of subcomponents are standard practices, and are widely used and can be provided and instituted without difficulty as described in the Environmental Management Plan and Monitoring Plan.

Page 43: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

30

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

125. The Environmental Management Plan (EMP) and Monitoring Plan provide the set of

mitigation and management measures to be taken during subproject implementation to avoid, reduce, mitigate, or compensate for adverse environmental impacts. It identifies the potential impacts and their locations or occurrences, proposed mitigation measures and identifies the responsibilities for implementation of mitigation and monitoring activities including the estimated costs.

5.1 Environmental Management Plan (EMP)

126. The EMP involves planning activities prior to construction, adherence to mitigation measures during construction and collaborative group action during the operation and maintenance of the subproject. Prior to the start of construction of the Subproject, the Contractor shall update the EMP based on the final engineering design and/or any changes in the design of the subproject scheme to be approved by the PPMU.

127. During construction, mitigation measures relating to the minimization of soil

disturbance, and dust nuisance, noise and vibrations, and other related impacts are summarized in Annex 3.3 (Environmental Management Plan). The cost of compliance with these measures is to be included in Contractor’ bid prices. Annex 3.3 summarized the potential environmental impacts and corresponding mitigation measure. The required environmental monitoring activities to ensure implementation of mitigation measures and responsibilities for carrying out those activities is presented in Annex 3.4.

128. It is important to note that in addition to the recommended mitigation measures, other applicable Vietnamese regulations on environmental protection, safety and hygiene shall be complied with by the subproject. Further, access to construction sites located near the vicinities of schools and public areas must be restricted by fencing the perimeter of the area and install signboards and temporary traffic signs to caution the public and prevent accidents.

129. In the Contract Stipulations, Contractor must be made responsible for ensuring that:

Work activities are reasonably organized and properly implemented and safely measures are carried out as prescribed in the EMP and the Environmental Monitoring Plan;

Trucks and heavy equipment to be used in the construction must be registered and drivers and operators are duly licensed, and trucks must not exceed standard limits for overloading;

Essential protective equipment must be provided by the Contractor to the construction workers and staff in the construction area;

Workers are properly trained and obey all relevant regulations on work safety and risk prevention;

Limited transportation or heavy equipment movement, or mechanical digging is used beyond 20:00hrs in residential areas;

130. The Contractor must follow and comply with the relevant GoV regulations and

environmental standards listed below:

Page 44: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

31

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

QCVN 14:2008/BTNMT - National technical regulation on quality of domestic wastewater;

QCVN 40:2011/BTNMT - National technical regulation on industrial wastewater;

QCVN 15:2008/BTNMT - National technical regulation on plant protection chemical residues in soil;

QCVN 07: 2009/BTNMT - National technical regulation on threshold for hazardous waste;

QCVN 05:2009/BTNMT - National technical regulation on ambient air quality; QCVN 06:2009/BTNMT - National technical regulation on certain hazardous

substances in ambient air; QCVN 26:2010/BTNMT - National technical regulation on noise; QCVN 27:2010/BTNMT - National technical regulation on vibration; TCVN 5948:1999/BTNMT - Acoustics - Noise from speeding up the road

transportation - the allowed maximum of noise level.

Page 45: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

32

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

5.2 Environmental Monitoring Plan (EMoP)

131. At the pre-construction and construction periods of the subproject, the Contractor shall undertake some of the environmental monitoring activities. During operation and maintenance, environmental monitoring responsibility will lie with the operational unit and shall primarily focus on safe operation of the WTP and distribution of treated water. The operator will carry out measurements and water sampling and quality analysis which shall be performed regularly on a quarterly, semi- annual and annual basis.

132. Annex 3.4 summarizes and presents the environmental monitoring plan. It includes the parameters to be measured and the standards to be followed based on the required Vietnamese environmental standards. The table also includes the location, frequency and responsibilities for carrying out those activities.

133. During the preconstruction period, the Contractor shall conduct water sampling and analysis at all source water to establish the baseline water quality for the subproject water supply system. Towards the end of the construction period when the WTP has been constructed and ready for operation, the Contractor shall conduct another water quality sampling and analysis from the same source of water to monitor any changes in water quality. During the operation and maintenance of the water supply system, the operational unit shall conduct the following periodic water quality analyses.

Table 5 Periodic Water Quality Analyses of the Subproject Water Supply System

No. Water Quality Parameter Monthly Quarterly Semi-annually Annually

I PRE-CONSTRUCTION PHASE

1 Raw Water Quality (once time)

II CONSTRUCTION PHASE

1 Raw Water Quality (once time)

III O&M PHASE

1 Raw Ground Water

1. pH x

2. Hardness (calculating by CaCO3) x

3. Total solids x

4. Clorua (Cl-) x

5. Nitrate (NO-3) (calculating by N) x

6. Sulphate (SO42-) x

7. Arsenic (As) x

8. Cadmium (Cd) x

9. Lead (Pb) x

10. Chrome VI (Cr6+) x

11. Copper (Cu) x

12. Manganese (Mn) x

Page 46: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

33

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

No. Water Quality Parameter Monthly Quarterly Semi-annually Annually

13. Iron (Fe) x

14. E - Coli x

15. Coliform x 2 Treated water quality

1. Color x

2. Turbidity x

3. pH x

4. Mangan (Mn) x

5. Nitrite x

6. Nitrate x

7. Chlorine residual x

8. E - Coli x

9. Coliform x 3 Wastewater from WTP

1. pH x

2. Smell x

3. Color level (Co-Pt at pH=7) x

4. Suspended Solid x

5. Lead (Pb) x

6. Copper (Cu) x

7. Manganese (Mn) x

8. Iron (Fe) x

9. Chlorine residual x

10. Flouride (F-) x

11. Clorua (Cl-) x

12. Ammonia (NH+4) (calculating by N)

x

13. Coliform x

Page 47: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

34

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

5.3 Institutional Arrangements and Responsibilities

134. Ministry of Agriculture and Rural Development (MARD) will be the Executing Agency (EA) of the Project. The National Center for Rural Water Supply and Environmental Sanitation (NCERWASS) will be the Project Owner. A Central Project Management Unit (CPMU) has been established within NCERWASS to be Representative of the Project Owner, and be responsible for Coordination of Project Implementation. A Provincial Project Management Unit (PPMU) established at each Provincial Center for Rural Water Supply and Environmental Sanitation (PCERWASS) consisting of professional staff and representatives from subproject CPC is the owner of subproject.

135. The Water and Sanitation Commune Committee (WSCCs) to be formed in each Subproject commune, which include community leaders, representatives from the communes’ VWU and other organizations such as commune health officials, village leaders, men and women representatives from the water users, school teachers and HSPs. Also, the WSCC will be responsible for subproject implementation supervision at commune level.

136. The PIA Consultant will assist the PPMU and CPMU in implementing the Subproject. The support may include training of EOs and PPMU staff in implementation of EMP and environmental monitoring. Relevant provincial departments such as DoH, DARD and the District People’s Committees (DPCs) shall also provide assistance to the PPMU.

137. During the pre-construction and construction period, the key tasks are monitoring the compliance with environmental mitigation measures stipulated in the environmental management plan for subproject, which shall be done by the Design-Build Supervision Consultant (CSC) in coordination with the Environmental Officer (EO) of the PPMU.

5.4 Implementation of EMP

138. During pre-construction and construction phases, the implementation of environmental mitigation measures stipulated in the EMP will be the responsibility of the Contractor and will be monitored by PPMU/EO in coordination with CSC.

139. The following actions and responsibilities are proposed:

a) The Contractor’s will be responsible for updating of EMP based on the finalized detailed design;

b) The PPMU/EO in coordination with the Design-Build Supervision Consultant (CSC) will be responsible for monitoring the Contractor’s compliance to the EMP to ensure the mitigation measures are timely and properly implemented;

c) The PPMU shall keep the Subproject affected people and other stakeholders of Subproject informed about activities and to allow them to access general information about the Subproject; and

140. In addition, should people which be affected by the Subproject have any grievances they have the right to lodge complaints through a grievance redress process established for the Subproject.

Page 48: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

35

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

5.5 Implementation of EMoP

141. At the pre-construction, construction and during the operation and maintenance period of the subproject, the environmental monitoring activities will be primarily focused on environmental measurements and water sampling and quality analysis which shall be performed regularly. The implementation of the environmental monitoring plan during the preconstruction and construction phase of the Subproject will be largely the responsibility of the Contractor and closely monitored by the PPMU’s Environmental Officer (EO) in coordination with the Design-Build Supervision Consultant (CSC).

142. For water sampling, the Contractor needs to inform the EO and the CSC of these activities beforehand and will receive closely guidance and supervision from the EO and the CSC when undertaking the action.

143. During the O&M period, the environmental management and monitoring shall be the responsibility of the PPMU/ EO and the Operational Unit and the Water and Sanitation Commune Committee (WSCC).

144. The DPC, Department of Health, and Vietnam Women’s Union, Vietnam Youth Union and other NGOs will designate their respective representatives to assist the PPMU (if needed).

5.6 Environmental Reporting

145. The implementation of environmental monitoring activities will be recorded and documented. A template for environmental management and monitoring report forms is attached as Annex 3.2. The environmental monitoring will cover (i) compliance monitoring, to ensure that mitigations specified in the EMP is carried out to an adequate standard; (ii) community feedback to obtain views and information relevant to environmental management, issues and concerns about the subproject.

146. The reporting system should be based on site supervision to see whether mitigation measures are carried out according to the Environmental Management and Environmental Monitoring Plans. The report should also include cases of compliance and non-compliance if any and the corresponding actions or measures to be adopted to correct the non-compliances and also include the outcome of the monitoring, important issues identified and the measures to be undertaken to ameliorate them.

147. Subproject Quarterly Report - In the pre-construction and during construction phases of the Subproject, Design and Build Supervision Consultant (CSC) will be responsible for preparing and submitting quarterly environmental management and monitoring implementation status reports to PPMU/EO. The environmental measurements and water quality analyses will be undertaken by the Contractor. The Contractor shall prepare and submit the required reports based on the periodic measurements and water quality analyses and quarterly reports with a section on implementation status of environmental management and monitoring measures to PPMU/EO. During the O&M phase, the monthly Operation and Maintenance status reports in accordance with the O&M manual will be prepared by the Operational Unit (OU) established by PCERWASS and the assigned staff of Water Supply Commune Committee (WSCC), separately, based on the collected data, and also to be submitted to PPMU/EO.

Page 49: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

36

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

148. The Environmental Officer (EO) of the PPMU will be responsible for checking the monthly reports submitted by the Contractor and/or OU and assigned staff of WSCC and verifying whether or not the Contractor have complied with the mitigations/conditions as stated in the EMP. The EO shall also be responsible for data collection and consolidation of monthly reports from Contractor and/or Technical operational staff and member of WSCC, preparing quarterly environmental monitoring reports and submitting to PPMU director, who will in turn submit to CPMU and PIA Consultant.

149. CPMU will consolidate all findings/data of PPMU’s quarterly environmental monitoring reports and report to the ADB and MARD. Any issues that call for further monitoring activities or other investigation will be raised by the CPMU in the quarterly progress reports and discussed at review missions.

150. These quarterly reports and data should be submitted within 15 days of the end of each quarter. The report will be based on field inspection, investigation, consultation and information given in the monitoring report.

5.7 Budget for Environmental Monitoring

151. The cost of environmental monitoring will be that required for the remuneration of staff involved in EMP activities and their traveling expenses as well as any direct cost for monitoring activities. Cost Estimates for Environmental Monitoring is given in Table 6 Estimated Cost of . The cost estimate excludes salaries of PPMU/ EO staff and some costs incurred by the Contractor during construction as they are difficult to separate from the construction unit cost.

152. Subproject Construction phase will last 12 months. Subproject Operation and Maintenance (O&M) phase is expected to start in the third quarter of 2014, and Project completion will come in the end of 2016. In this Table, it is calculated for Subproject O&M phase Environmental monitoring of 2,5 years. This estimation is based on quotations from laboratories in Binh Dinh and where the quotation is not available, the estimated cost is taken from Circular no. 232/2009 TT- BTC dated 9th December, 2009 of Ministry of Finance.

Table 6 Estimated Cost of Environmental Monitoring.

Unit: VN Dong

No. Subproject Phase/ Point/ Location Frequency No. of test/

analysis Unit cost Total cost Parameters

(1) (2) (3) (4) (5) (6)

I PRE-CONSTRUCTION PHASE 22,200,000

1 Raw Ground Water 3 1 3 7,400,000 22,200,000 II CONSTRUCTION PHASE

(for 12 months) 22,200,000

1 Raw Ground Water 3 1 3 7,400,000 22,200,000 III Estimated Cost of Sampling,

Transportation and 13,300,000

Page 50: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

37

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Reporting: 30%(I+II)

IV Contingencies :

11%(I+II+III) 6,300,000

TOTAL 1 (I+II+III +IV) 64,000,000 V O&M PHASE (for 2,5

years) 37,400,000

1 Raw Ground Water 3 1 3 6,800,000 20,400,000

2 Treated Water 1 10 10 950,000 9,500,000

3 Wastewater from WTP 1 5 5 1,500,000 7,500,000 VI Estimated Cost of Sampling,

Transportation and

Reporting: 30%(V) 11,200,000 VII Contingencies : 11%(V+VI) 5,400,000

TOTAL 2 (V+VI+VII) 54,000,000

GRAND TOTAL (TOTAL 1 + TOTAL 2) 118,000,000

GRAND TOTAL ( in USD) 5,620 Note: Exchange rate 1 USD = 21 000 VND

153. Based on the location of the subproject and convenience of transportation, the estimated cost of sample handling, transportation and reporting is taken to be 30% of the total cost of measurements. Total cost of environmental monitoring during preconstruction and construction phase will be included in the Contractor’ financial bids. Environmental monitoring cost in the O&M phase will be taken from the O&M budget of the subproject.

154. The nature of the Subproject and the Subproject locations do not necessitate any specific measurements, such as vibration level or quality of water in waste receiving water bodies, during the construction phase. However, if any unexpected impact arises or are likely to occur, the environmental officer will take necessary action in coordination with the PPMU and request the Contractor to carry out measurements.

6 PUBLIC CONSULTATIONS AND INFORMATION DISCLOSURE

6.1 Consultation and Participation Process

155. To fulfill safeguard requirements of a ADB’s class B project as well as Decision No. 48/2008/QD-TTg (General Guideline on preparing FS report for ODA projects), the PIA consultant proposes 2 public consultations to be held before commencement of construction: one for local officials and representatives of the mass organizations such as youth’s union, farmers’ union, women’s union and veterans’ union and representatives of the beneficiaries during preparation of the updated IEE and one for all of them right prior to construction. The former meetings’ objective is to introduce related groups about estimated timing and detailed content of subproject’s components as well as collect their opinions and recommendations on the subproject with focus on their concerns about construction and operation of the plant. The latter meeting is conducted right prior to construction to inform the beneficiaries about startup of

Page 51: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

38

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

construction works and foreseen impacts and gather their concerns/ suggestions. The former meeting was held during preparation of FS and updated IEE while the latter will be done during the detailed design phase right prior to construction.

156. In this subproject, one main public meeting and several supplementary public meetings

have been held so far. The main public meeting was conducted on 5th November 2011, facilitated by PPMU staff with guidance and assistance from the PIA consultant. The venue of the meeting was in the meeting room of Tay Giang commune, Tay Son district, Binh Dinh province. This consultation is conducted during the phase of FS review and environmental assessment for subproject preparation. It was a follow up of the public consultation organized by the PPTA consultant in 2009 so its roles are to reintroduce about the subproject as well as update information related to the environment and obtain local people’s views on environmental aspects of the subproject. Photo 5 was taken during the main public meeting.

Photo 5 Public consultation meeting

157. Attendances at the main consultation meeting included some affected people and other

concerned stakeholders, namely:

Representatives of the subproject owner (Binh Dinh PPMU); Representatives of the local technical and environmental consultants; Representatives of the local authorities: Tay Giang CPC and Tay Thuan CPC; Representatives of the district department of environment and natural resources; Representatives of the local mass organizations such as Commune Fatherland

Front Committee, Commune Women’s Union, Commune Farmers’ Union from the two subproject communes; and

Representatives of subproject affected people (including both males and females).

158. The contents addressed in the consultation meeting include:

(i). Collecting information/data about subproject environmental conditions; (ii). Presenting the subproject’s preliminary design, and the proposed subproject

construction site;

Page 52: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

39

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

(iii). Stating positive impacts of the subproject, the potential adverse impacts that

subproject may cause to the environment and the communities; (iv). Introducing the effective mitigation measures and environmental management and

monitoring plans; and (v). Obtaining comments of the participants on the subproject: consensus on

construction of the water supply plant in the area; their support to mitigation measures before, during and after the construction phase; and any suggestions/concerns about the subproject.

159. Necessary and adequate information was able to be collected during the consultation

due to good attitude from participants. Stakeholders and affected persons were eager to contribute opinions as well as time and labor to the subproject. Issues and recommendations raised by the participants are summarized as follows:

(i). Densely populated hamlets have high demand for clean water and sanitation facilities. (ii). Representatives from affected households supports land acquisition for construction

of the project. (iii). Adverse impacts during construction should be minimized by reducing the duration

of pipeline installation and returning road to its initial stage right after pipeline is installed.

(iv). Utilization of big transportation vehicles during construction should be limited to avoid traffic jams occurring on narrow village roads.

(v). The PPMU is requested to ask the Contractor and the operator of WTP to comply strictly with environmental mitigation measures and environmental monitoring plans during construction and operation stages.

(vi). High consensus on immediate construction of water supply plant and early implementation of all other subproject’s components.

160. A record of the main public consultation meeting minute in Vietnamese is attached in

the Annex 4.

161. In combination with CBA- IEC activities of the subprojects, some separate public consultation meetings for the beneficiaries was adopted into some focused group discussions, a tool of community consultation to collect more information from various groups of concerned people including the poor, the females, the males and the ethnic minority (if there are ethnic minority people in the subproject area). A household survey was conducted mong 5% of the households in the proposed subproject area. The focus group discussions and the household survey were implemented by the CBA- IEC consulting group during February and March of 2012. Information collected from these meetings and the survey supplements the main public consultation in terms of status of the environment in the subproject area, sources of water for domestic use, drainage system, sanitation conditions, willingness to connect, demand of water consumption and sanitary behavior. The information collected from group discussions served as a supplementary or comparative source of information during the field validation. The detailed results of Baseline survey are presented in Volume 2 of Binh Dinh SAR report.

Page 53: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

40

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Photo 6 Focus group discussion

6.2 Grievance Mechanism

162. To continuously receive feedback from Subproject’s beneficiaries, the grievance redress mechanism in accordance with ADB’s guidelines shall be introduced to communities and maintained for the duration of the Subproject. The PPMU will establish a Subproject Site Office (SSO) in the commune where people’s complaints can be lodged. The Subproject site office will be used for (a) construction supervision; (b) disclosing all the safeguard documents; (c) receiving and responding to the comments/feedbacks from the community.

163. If people affected by the proposed Subproject have any grievances they could raise their concerns to the contractors, the CSC, the project owner and relevant government officials through the grievance redress mechanism set up for the Subproject. Affected people’s complaints should be addressed and resolved by the contractors, the CSC and the PPMU within 3 weeks from the date of complaint receipt. If the affected people are not satisfied with the resolutions or in the absence of any response within the stipulated time, they can lodge their complaints to the competent authorities at higher levels such as the concerned CPC at commune level and the Environmental Division of the DPC at district level. Procedures of lodging complaints and resolutions at these levels are in compliance with the GoV’s regulations. All records of the public meetings and how grievances are addressed will be maintained by the CSC and the PPMU at the SSO and the public will have access to these records.

Page 54: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

41

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

6.3 Future Consultation and Information Disclosure

Future consultation

164. At least two future public consultations will be held right before the commencement of construction, and during construction following the general guidelines below:

a. All stakeholders should be invited and encouraged to participate in the consultation

workshops. b. The affected people are informed of progress of the subproject. c. Suggestions from the general public may be sought, when necessary. d. The PPMUs and, when necessary, People’s Committees (at relevant level) should be

open to contact by the public on matters concerning the progress of the subprojects, adverse impacts and mitigation measures and environmental monitoring.

Information Disclosure

165. According to ADB’s Safeguard Policy Statement 2009, for projects of Category B, environmental documents that need to be submitted and disclosed on ADB’s website include:

Draft IEE Final IEE Updated or corrective IEE during project implementation Environmental monitoring reports.

166. The draft versions of IEE and SIEE were prepared by the PPTA in 2009. According to

the Loan Agreement, this IEE document has to be reviewed and updated in compliance with the Safeguard Policy Statement (June 2009). This updated IEE document will be submitted in the Subproject Appraisal Report for ADB’s approval and disclosed on ADB’s website. All of the IEE reports shall be prepared in both English and Vietnamese. The Vietnamese version of the IEE shall be attached in notification boards of Tay Giang and Tay Thuan communes. Other related documents shall also be attached for references. In addition, the IEE reports of the subproject will be disclosed at ADB office in Hanoi.

7 FINDINGS AND RECOMMENDATIONS

167. The screening of the proposed subproject based on the Rapid Environmental Assessment Checklist have indicated that there will be no impacts to forest land, protected area, mangrove or to any protected species of flora and fauna. Although a cultural and historical site i.e., the Caodaist Oratory Cultural site in Trung Son hamlet and the Three Golden Star Division Historical site along the National Road no. 19 in Thuong Son hamlet is located, these important sites will not be encroached or affected by the construction of the WTP and other facilities associated with the water supply system. During construction the placement of main and distribution pipelines, careful construction and supervision will be ensured to eliminate any potential defacement and destruction of the cultural and historical structures.

Page 55: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

42

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

168. The potential adverse impacts associated with the subproject that would occur during the construction period are soil erosion, nuisance from dust, noise and vibration including accumulation and disposal solid wastes. These impacts will be minimal and mitigation measures will be implemented to eliminate if not reduced the impacts to the minimum. Moreover, the members of the communes and CPC have an important role in project implementation and operation phases so that they can intervene when necessary or when complaints arise.

169. The operation and maintenance of the water supply will bring benefits that include

availability of safe and reliable clean supply of water to the households at a reasonable cost; will improved personal hygiene and public health and sanitation and environmental condition (e.g., reduced frequency of water related diseases; reduced lost work days for adults; increased in school days for children due to reduced incidences of diseases; and will boost the socio-economic growth of the communes.

170. All subproject activities prior to construction, during construction and during operation will be managed as provided in the EMP and EMoP and the Contractor’s compliance and implementation of the mitigation measures shall be monitored. An environmental monitoring plan has been provided to ensure water quality is maintained according to the prevailing Vietnamese standards. Tay Son DPC also approved the Environmental Protection Commitment in accordance with Vietnamese regulations (see Annex 5).

8 CONCLUSIONS

171. Based on the screening process using the REA Checklist, the subproject site is not: Adjacent to or within protected area; Adjacent to or within buffer zone of protected area; Adjacent to or within wetland; Adjacent to or within mangrove; Adjacent to or within estuarine; Adjacent to or within bay; Adjacent to or within special area for protecting biodiversity; and Although the Caodaist Oratory Cultural site and the Three Golden Star Division

Historical site are located in the Subproject area, these two sites are situated separately from the WTP area, wells location and distantly from the pipeline so they will not be encroached by the subproject.

172. The subproject has been classified as Category “B” project under the ADB’s Policy on

Environmental Assessment Guidelines 2003, so only an IEE report is required. Moreover, due to the nature of the subproject, location and environmental conditions of the subproject area, any special study or an EIA to comply with the environmental policies of the ADB are not required. Also, under the requirements of the Decree No. 29/2011/ND-CP dated 18th April 2011 On Strategic Environmental Assessment (SEA) and Environmental Impact Assessment (EIA) and Environmental Protection Commitment (EC) of the Government of Vietnam, the water supply scheme for the subproject do not demand an EIA study. However, the Environmental Protection Commitment has been registered and accepted by the DPC.

Page 56: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 1

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Annex 1. Rapid Environmental Assessment (REA) Checklist

Page 57: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 1

1

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Translation

RAPID ENVIRONMENTAL ASSESSMENT (REA) CHECKLIST

Instructions:

□ This checklists is to be prepared to support the environmental classification of a project. It is to be attached to the environmental categorization form that is to be prepared and submitted to the Chief Compliance Officer of the Regional and Sustainable Development Department.

□ This checklists is to be completed with the assistance of an Environment Specialist in a Regional Department.

□ This checklist focuses on environmental issues and concerns. To ensure that social dimensions are adequately considered, refer also to ADB checklists and handbooks on (i) involuntary resettlement, (ii) Indigenous Peoples planning; (iii) poverty reduction, (iv) participation; and (d) gender and development.

□ Answer the questions assuming the “without mitigation” case. The purpose is to identify potential impacts. Use the “remarks” section to discuss any anticipated mitigation measures.

Country/Project Title:

Sector Division:

SCREENING QUESTIONS YES NO REMARKS

A. Project Siting Is the project area…

Densely populated? X There are densely populated areas. High Population density along roads

Heavy with development activities?

X

Adjacent to or within any environmentally sensitive areas?

Cultural heritage site

X There are 2 cultural/ historic sites: the Caodaist Oratory Cultural site in Trung Son hamlet and the Three Golden Star Division Historical site along the National Road no. 19 in Thuong Son hamlet. These two sites are located separately from proposed WTP area and well location and distantly from the pipeline so they are not affected by the subproject.

Protected Area

X

Water Supply and Sanitation Subproject of Tay Giang and Tay Thuan Communes, Tay Son District, Binh Dinh Province, Vietnam

Rural Water Supply and Sanitation

Page 58: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 1

2

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

SCREENING QUESTIONS YES NO REMARKS

Wetland X

Mangrove X

Estuarine X

Buffer zone of protected area X

Special area for protecting biodiversity

X

Bay X

B. Potential Environmental Impacts Will the Project cause…

pollution of raw water supply from upstream wastewater discharge from communities, industries, agriculture, and soil erosion runoff?

X

impairment of historical/cultural monuments/areas and loss/damage to these sites?

X The pipeline is situated under the roads nearby the two cultural/ historic sites so the protected areas of the sites are not affected.

hazard of land subsidence caused by excessive ground water pumping?

X

social conflicts arising from displacement of communities ?

X

conflicts in abstraction of raw water for water supply with other beneficial water uses for surface and ground waters?

X

unsatisfactory raw water supply (e.g. excessive pathogens or mineral constituents)?

X Result of water quality analysis is available. Water treatment technology has met requirements.

delivery of unsafe water to distribution system?

X Complete technology diagram, professional administration of plant operation

inadequate protection of intake works or wells, leading to pollution of water supply?

X

over pumping of ground water, leading to salinization and ground subsidence?

X Wells located on one side of Con river

excessive algal growth in storage reservoir?

X Ground water

increase in production of sewage beyond capabilities of community facilities?

X Will build holes to collect domestic waste water at household

inadequate disposal of sludge from water treatment plants?

X Sludge will be sucked and transported to the landfill in Binh Nghi commune, Tay Son district.

Page 59: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 1

3

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

SCREENING QUESTIONS YES NO REMARKS

inadequate buffer zone around pumping and treatment plants to alleviate noise and other possible nuisances and protect facilities?

X Wells are located far from residential areas. Wells are in protected area with a buffer zone.

impairments associated with transmission lines and access roads?

X Will test pipe pressure before the pipes are used (including .

health hazards arising from inadequate design of facilities for receiving, storing, and handling of chlorine and other hazardous chemicals.

X Review design documents, test operation, and propose mitigation measures (if applicable) before the plant is officially operated.

health and safety hazards to workers from the management of chlorine used for disinfection and other contaminants?

X Equip O&M workers with anti-poison masks and safety equipment/ materials (boots, hat, life jacket, safety clothes)

dislocation or involuntary resettlement of people?

X No dislocation or resettlement of local people

social conflicts between construction workers from other areas and community workers?

X Skilled workers are recruited by contractors. Contractors are requested to use local labor for simple assignments.

noise and dust from construction activities?

X Noise is negligible as construction activities are far from populated areas. Dust will be minimized by regular watering.

increased road traffic due to interference of construction activities?

X Little increase of load traffic

continuing soil erosion/silt runoff from construction operations?

X Measures for renovating roofs and grass planting are proposed.

delivery of unsafe water due to poor O&M treatment processes (especially mud accumulations in filters) and inadequate chlorination due to lack of adequate monitoring of chlorine residuals in distribution systems?

X Management and operation system needs to be professional. Experiment mechanism is set up to monitor raw water and clean water quality.

delivery of water to distribution system, which is corrosive due to inadequate attention to feeding of corrective chemicals?

X Regular maintenance of the distribution pipelines.

accidental leakage of chlorine gas?

X Possible leakage. An automatic spraying system is activated in case of chlorine leakage.

excessive abstraction of water affecting downstream water users?

X Investigation and assessment of the ground water reserve have been made. PPC has issued a certificate for abstraction of ground water.

competing uses of water?

X PPC has issued a certificate for abstraction of ground water.

Page 60: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 1

4

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

SCREENING QUESTIONS YES NO REMARKS

increased sewage flow due to increased water supply

X Wastewater is treated to class B before discharged.

increased volume of sewage (wastewater from cooking and washing) and sludge from wastewater treatment plant

X There is a wastewater collecting pond in the treatment area.

Page 61: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 1

5

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Original

Page 62: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 1

6

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 63: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 1

7

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 64: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Annex 2. Raw Ground Water Sample Quality (For Three Drilled Wells) Analyses

Page 65: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.1

1

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Annex 2.1. Water sample analyses of Well G1

DIVISION OF WATER RESOURCES PLANNING AND INVESTIGATION FOR THE SOUTH OF VIET NAM (DWRPIS) CENTER FOR LAB FOR THE SOUTH OF VIETNAM Office: 59 Street 2, Binh An ward, District 2 , Ho Chi Minh city, Vietnam. Tel: +84.8.68992087 - 8.62960637 Fax: +84.8.62960633

ANALYSIS RESULT UNIT SENT THE WATER SAMPLE: CENTER FOR GEOLOGICAL AND CONSTRUCTION PRODUCTION SUBPROJECT: PIPED WATER SUPPLY SCHEME FOR THE TAY GIANG COMMUNE - TAY SON - BINH DINH TESTING LETTER No.: HB 460 - 3

Sample No. Unit G1 - TD G1 - Fe Lab BT 805 BF 92

Analysis Requirement Total Iron Sampling Date 16 December, 2008 12 December, 2008 Analysis Date 2 January, 2009 2 January, 2009

Physical Properties

{ pH 7.11 { Color Yellow { Smell No { Taste Bland

SiO2 (mg/l) 28.70

CO2 (mg/l) { Free 12.32 { Bond 48.40 { Erosion 7.88

Hardness (meq/l) { Total 1.900 { Temporary 1.480 { Permanent 0.420

The ions / Unit mg/l meq/l %meq mg/l meq/l %meq Na+ 23.16 1.007 32.13 K+ 0.96 0.025 0.78 Ca++ 24.05 1.200 38.27 Mg++ 8.51 0.700 22.33 NH4

- 0.00 0.000 0.00 Fe++ 0.01 0.000 0.01 11.63 0.419 Fe+++ 0.14 0.008 0.24 1.81 0.098 Al+++ 1.76 0.195 6.23 Total Cation 58.59 3.135 100.00 HCO3

- 134.24 2.200 67.12 Cl- 31.91 0.900 27.46 SO4

-- 7.20 0.150 4.58 NO3

- 1.73 0.028 0.84 NO2

- 0.00 0.000 0.00 CO3

-- 0.00 0.000 0.00 11.63 0.419 Total Anion 175.08 3.278 100.00 Dryed Sludge (mg/l) - 105oC 224 Note: Result only valid on the testing sample. Sample storage time is 15 days. ANALYSER

Date: 09 January, 2009

Phuong Thi Thuyen

ON BEHLF OF DIVISION CHIEF

Pham Thi Thanh Ha

LAB. DIRECTOR Nguyen Thi Nam

INSPECTOR Phuong Thi Thuyen

Nguyen Thi Han

Page 66: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.1

2

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

BINH DINH PROVINCIAL DEPARTMENT OF SCIENCE AND TECHNOLOGY ANALYSIS CENTER Office: 173 - 175 Street Phan Boi Chau, Quy Nhon city, Binh Dinh Province Vietnam. Tel: 822322 Fax: 823816

08.12.1251a ANALYSIS RESULT Date of receipt: 16 December, 2008 Date of return: 23 December, 2008

1. Sample Name : Drilled well water (VS - G1)

2. Requirement Customer : DIVISION FOR WATER RESOURCES PLANNING AND INVESTIGATION FOR THE SOUTH OF VIET NAM

3. Address: : 59 Street 2, Binh An ward, District 2 , Ho Chi Minh city

4. Sampling Location : Tay Giang - Tay Son - Binh Dinh

5. Sampling Date : 16 December, 2008

6. Analysis Result :

No. Parameter Unit Method of testing Result 1329/2002/BYT-QD

1 Coliform(**) MPN/100 ml TCVN 6187-2-96 0 0

2 E - Coli MPN/100 ml TCVN 6187-2-96 0 0

Conclusion: Microbiological parameter of the sample water is satsfactory according to the 1329/2002/BYT-QD LAB. MANAGER BINH DINH ANALYSIS CENTER ON BEHLF OF DIRECTOR

DEPUTY DIRECTOR

Nguyen An Thinh

Hoang Thuy Lan

Page 67: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.1

3

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

GENERAL DEPARTMENT OF STANDARDIZATION, METROLOGY AND QUALITY TECHNICAL CENTER 3 OF STANDARDIZATION, METROLOGY AND QUALITY Office: 49 Pasteur Street, 1 District, Ho Chi Minh city, Vietnam. Tel: (84-8) 3829 4274 Fax: (84-8) 3829 3012

KT3 - 3995MT8/1 ANALYSIS RESULT Date of receipt: 25 December, 2008 Date of return: 20 January, 2009

1. Sample Name : Water - G1-VL

2. Requirement Customer : DIVISION FOR WATER RESOURCES PLANNING AND INVESTIGATION FOR THE SOUTH OF VIET NAM

3. Address: : 59 Street 2, Binh An ward, District 2 , Ho Chi Minh city

4. Sampling Location : Tay Giang - Tay Son - Binh Dinh

5. Testing Timing : 26 December, 2008 - 20 January, 2009

6. Analysis Result :

No. Parameter Unit Method of testing Limit value of parameter Result

7.1 Content of Arsenic (As) mg/l APHA (*) 3114 B 0.001 Not found 7.2 Content of Hg mg/l APHA (*) 3112 B 0.001 Not found 7.3 Content of Pb mg/l APHA (*) 3120 B 0.01 0.01 7.4 Content of Cadmium (Cd) mg/l APHA (*) 3120 B 0.002 Not found 7.5 Content of Cr mg/l APHA (*) 3120 B 0.01 Not found 7.6 Content of Cu mg/l APHA (*) 3120 B 0.01 0.01 7.7 Content of Zn mg/l APHA (*) 3120 B 0.01 0.06 7.8 Content of Ni mg/l APHA (*) 3120 B 0.02 Not found 7.9 Content of Manganese (Mn) mg/l APHA (*) 3120 B 0.01 0.14 7.10 Content of Selenic (Se) mg/l APHA (*) 3114 B 0.003 Not found 7.11 Content of Cyanua (CNˉ) mg/l APHA (*) 4500-CNˉ F 0.05 Not found 7.12 Content of Phenol µg/l QTTN/KT3 035:2005 1 Not found 7.13 Content of Flouride (Fˉ) mg/l APHA (*) 4500-Fˉ D 0.5 Not found Note: (*) : APHA Standard Methods for the Examination of Water and Wastewater, 20th Edition 1998.

ENVIRONMENT LAB. MANAGER ON BEHLF OF DIRECTOR

DEPUTY DIRECTOR

NGUYEN VAN MUOI MOT TRAN THI MY HIEN

Page 68: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.1

4

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

GENERAL DEPARTMENT OF STANDARDIZATION, METROLOGY AND QUALITY TECHNICAL CENTER 3 OF STANDARDIZATION, METROLOGY AND QUALITY Office: 49 Pasteur Street, 1 District, Ho Chi Minh city, Vietnam. Tel: (84-8) 3829 4274 Fax: (84-8) 3829 3012

KT3 - 3995MT8/2 ANALYSIS RESULT Date of receipt: 25 December, 2008 Date of return: 20 January, 2009

1. Sample Name : Water - G1-TTS

2. Requested Customer : DIVISION OF WATER RESOURCES PLANNING AND INVESTIGATION , SOUTH OF VIET NAM

3. Address: : 59 Street 2, Binh An ward, District 2 , Ho Chi Minh city

4. Sampling Location : Tay Giang - Tay Son - Binh Dinh

5. Testing Timing : 26 December, 2008 - 20 January, 2009

6. Analysis Result :

No. Parameter Unit Method of testing Result 7.1 Residues of organochlorine pesticides µg/l APHA (*) 6630 B • DDE Not found • DDT Not found • Lindan Not found Note: (*) : APHA Standard Methods for the Examination of Water and Wastewater, 20th Edition 1998.

ENVIRONMENT LAB. MANAGER ON BEHLF OF DIRECTOR

DEPUTY DIRECTOR

NGUYEN VAN MUOI MOT TRAN THI MY HIEN

Page 69: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.1

5

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Original

Page 70: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.1

6

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 71: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.1

7

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 72: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.1

8

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 73: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.1

9

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 74: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.2

1

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Annex 2.2. Water sample analyses of Well G2

Translation

DIVISION FOR WATER RESOURCES PLANNING AND INVESTIGATION FOR THE SOUTH OF VIET NAM (DWRPIS) CENTER FOR LAB FOR THE SOUTH OF VIETNAM Office: 59 Street 2, Binh An ward, District 2 , Ho Chi Minh city, Vietnam. Tel: +84.8.68992087 - 8.62960637 Fax: +84.8.62960633

ANALYSIS RESULT UNIT SENT THE WATER SAMPLE: CENTER FOR GEOLOGICAL AND CONSTRUCTION PRODUCTION

SUBPROJECT: PIPED WATER SUPPLY SCHEME FOR THE TAY GIANG COMMUNE-TAY SON-BINH DINH

TESTING LETTER No.: HB 460 - 1

Sample No. Unit G2 - TD Lab BT 803

Analysis Requirement Total Sampling Date 19 December, 2008 Analysis Date 2 January, 2009

Physical Properties

{ pH 7.19 { Color Clear { Smell No { Taste Bland

SiO2 (mg/l) 37.15

CO2 (mg/l) { Free 6.60 { Bond 35.20 { Erosion 4.94

Hardness (meq/l) { Total 1550.000 { Temporary 1180.000 { Permanent 370.000

The ions / Unit mg/l meq/l %meq Na+ 17.36 0.755 32.23 K+ 1.17 0.030 1.28 Ca++ 19.04 0.950 40.55 Mg++ 7.30 0.600 25.61 NH4

- 0.00 0.000 0.00 Fe++ 0.01 0.000 0.02 Fe+++ 0.14 0.008 0.32 Al+++ 0.00 0.000 0.00 Total Cation 45.02 2.343 100.00 HCO3

- 97.63 1.600 62.28 Cl- 24.82 0.700 27.25 SO4

-- 7.20 0.150 5.84 NO3

- 7.45 0.119 4.64 NO2

- 0.00 0.000 0.00 CO3

-- 0.00 0.000 0.00 Total Anion 137.10 2.569 100.01 Dryed Sludge (mg/l) - 105oC 194

Note: Result only valid on the testing sample. Sample storage time is 15 days. ANALYSER Date: 09 January, 2009 Phuong Thi Thuyen ON BEHLF OF DIVISION CHIEF

Page 75: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.2

2

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Pham Thi Thanh Ha LAB. DIRECTOR Nguyen Thi Nam

INSPECTOR Phuong Thi Thuyen Nguyen Thi Han

DIVISION FOR WATER RESOURCES PLANNING AND INVESTIGATION FOR THE SOUTH OF VIET NAM (DWRPIS) CENTER FOR LAB FOR THE SOUTH OF VIETNAM Office: 59 Street 2, Binh An ward, District 2 , Ho Chi Minh city, Vietnam. Tel: +84.8.68992087 - 8.62960637 Fax: +84.8.62960633

ANALYSIS RESULT UNIT SENT THE WATER SAMPLE: CENTER FOR GEOLOGICAL AND CONSTRUCTION PRODUCTION

SUBPROJECT: PIPED WATER SUPPLY SCHEME FOR THE TAY GIANG COMMUNE - TAY SON - BINH DINH

TESTING LETTER No.: HB 463

Sample No. Unit G2/1 - TD G2/1 - Fe Lab BT 807 BF 94

Analysis Requirement Total Iron Sampling Date 25 December, 2008 25 December, 2008 Analysis Date 2 January, 2009 2 January, 2009

Physical Properties

{ pH 6.87 { Color Clear { Smell No { Taste Bland

SiO2 (mg/l) 36.04

CO2 (mg/l) { Free 10.56 { Bond 39.60 { Erosion 7.84

Hardness (meq/l) { Total 1.600 { Temporary 1.480 { Permanent 0.120

The ions / Unit mg/l meq/l %meq mg/l meq/l %meq Na+ 19.78 0.860 34.44 K+ 1.22 0.031 1.25 Ca++ 21.04 1.050 42.03 Mg++ 6.69 0.550 22.01 NH4

- 0.00 0.000 0.00 Fe++ 0.01 0.000 0.01 0.35 0.013 Fe+++ 0.12 0.006 0.26 0.23 0.012 Al+++ 0.00 0.000 0.00 Total Cation 48.86 2.497 100.00 HCO3

- 109.84 1.800 66.82 Cl- 24.82 0.700 25.98 SO4

-- 4.80 0.100 3.71 NO3

- 5.87 0.094 3.49 NO2

- 0.00 0.000 0.00 CO3

-- 0.00 0.000 0.00 Total Anion 145.33 2.694 100.00 Dryed Sludge (mg/l) - 105oC 199

Page 76: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.2

3

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Note: Result only valid on the testing sample. Sample storage time is 15 days. ANALYSER

Date: 09 January, 2009

Phuong Thi Thuyen

ON BEHLF OF DIVISION CHIEF

Pham Thi Thanh Ha

LAB. DIRECTOR Nguyen Thi Nam

INSPECTOR Phuong Thi Thuyen

Nguyen Thi Han

BINH DINH PROVINCIAL DEPARTMENT OF SCIENCE AND TECHNOLOGY ANALYSIS CENTER Office: 173 - 175 Street Phan Boi Chau, Quy Nhon city, Binh Dinh Province Vietnam. Tel: 822322 Fax: 823816

08.12.1288a ANALYSIS RESULT Date of receipt: 25 December, 2008 Date of return: 06 December, 2008

1. Sample Name : Drilled well water (VS - G2)

2. Requirement Customer : DIVISION FOR WATER RESOURCES PLANNING AND INVESTIGATION FOR THE SOUTH OF VIET NAM

3. Address: : 59 Street 2, Binh An ward, District 2 , Ho Chi Minh city

4. Sampling Location : Tay Giang - Tay Son - Binh Dinh

5. Sampling Date :

6. Analysis Result :

No. Parameter Unit Method of testing Result 1329/2002/BYT-QD

1 Coliform(**) MPN/100 ml TCVN 6187-2-96 0 0

2 E - Coli MPN/100 ml TCVN 6187-2-96 0 0

Conclusion: Microbiological parameter of the sample water is satsfactory according to the 1329/2002/BYT-QD LAB. MANAGER BINH DINH ANALYSIS CENTER ON BEHLF OF DIRECTOR

DEPUTY DIRECTOR

Nguyen An Thinh

Hoang Thuy Lan

Page 77: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.2

4

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

GENERAL DEPARTMENT OF STANDARDIZATION, METROLOGY AND QUALITY TECHNICAL CENTER 3 OF STANDARDIZATION, METROLOGY AND QUALITY Office: 49 Pasteur Street, 1 District, Ho Chi Minh city, Vietnam. Tel: (84-8) 3829 4274 Fax: (84-8) 3829 3012

KT3 - 4033MT8/1 ANALYSIS RESULT Date of receipt: 30 December, 2008 Date of return: 20 January, 2009

1. Sample Name : Water - G2-VL

2. Requirement Customer : DIVISION FOR WATER RESOURCES PLANNING AND INVESTIGATION FOR THE SOUTH OF VIET NAM

3. Address: : 59 Street 2, Binh An ward, District 2 , Ho Chi Minh city

4. Sampling Location : Tay Giang - Tay Son - Binh Dinh

5. Testing Timing : 31 December, 2008 - 20 January, 2009

6. Analysis Result :

No. Parameter Unit Method of testing Limit value of parameter

Result

7.1 Content of Arsenic (As) mg/l APHA (*) 3114 B 0.001 Not found 7.2 Content of Hg mg/l APHA (*) 3112 B 0.001 Not found 7.3 Content of Pb mg/l APHA (*) 3120 B 0.01 Not found 7.4 Content of Cadmium (Cd) mg/l APHA (*) 3120 B 0.002 Not found 7.5 Content of Cr mg/l APHA (*) 3120 B 0.01 Not found 7.6 Content of Cu mg/l APHA (*) 3120 B 0.01 0.01 7.7 Content of Zn mg/l APHA (*) 3120 B 0.01 0.03 7.8 Content of Ni mg/l APHA (*) 3120 B 0.02 Not found 7.9 Content of Manganese (Mn) mg/l APHA (*) 3120 B 0.01 0.02 7.10 Content of Selenic (Se) mg/l APHA (*) 3114 B 0.003 Not found

7.11 Content of Cyanua (CNˉ) mg/l APHA (*) 4500-CNˉ F 0.05 Not found

7.12 Content of Phenol µg/l QTTN/KT3 035:2005 1 Not found

7.13 Content of Flouride (Fˉ) mg/l APHA (*) 4500-Fˉ D 0.5 0.5

Note: (*) : APHA Standard Methods for the Examination of Water and Wastewater, 20th Edition 1998.

ENVIRONMENT LAB. MANAGER ON BEHLF OF DIRECTOR

DEPUTY DIRECTOR

NGUYEN VAN MUOI MOT TRAN THI MY HIEN

Page 78: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.2

5

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

GENERAL DEPARTMENT OF STANDARDIZATION, METROLOGY AND QUALITY TECHNICAL CENTER 3 OF STANDARDIZATION, METROLOGY AND QUALITY Office: 49 Pasteur Street, 1 District, Ho Chi Minh city, Vietnam. Tel: (84-8) 3829 4274 Fax: (84-8) 3829 3012

KT3 - 4033MT8/2 ANALYSIS RESULT Date of receipt: 30 December, 2008 Date of return: 20 January, 2009

1. Sample Name : Water - G2-TTS

2. Requirement Customer : DIVISION FOR WATER RESOURCES PLANNING AND INVESTIGATION FOR THE SOUTH OF VIET NAM

3. Address: : 59 Street 2, Binh An ward, District 2 , Ho Chi Minh city

4. Sampling Location : Tay Giang - Tay Son - Binh Dinh

5. Testing Timing : 31 December, 2008 - 20 January, 2009

6. Analysis Result :

No. Parameter Unit Method of testing Result

7.1 Residues of organochlorine pesticides µg/l APHA (*) 6630 B

• DDE Not found

• DDT Not found

• Lindan Not found

Note: (*) : APHA Standard Methods for the Examination of Water and Wastewater, 20th Edition 1998.

ENVIRONMENT LAB. MANAGER ON BEHLF OF DIRECTOR

DEPUTY DIRECTOR

NGUYEN VAN MUOI MOT TRAN THI MY HIEN

Page 79: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.2

6

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 80: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.2

7

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 81: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.2

8

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 82: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.2

9

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 83: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.2

10

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 84: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.2

11

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 85: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.3

12

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Annex 2.3. Water sample analyses of Well G3

Translated DIVISION FOR WATER RESOURCES PLANNING AND INVESTIGATION FOR THE SOUTH OF VIET NAM (DWRPIS) CENTER FOR LAB FOR THE SOUTH OF VIETNAM Office: 59 Street 2, Binh An ward, District 2 , Ho Chi Minh city, Vietnam. Tel: +84.8.68992087 - 8.62960637 Fax: +84.8.62960633

ANALYSIS RESULT UNIT SENT THE WATER SAMPLE: CENTER FOR GEOLOGICAL AND CONSTRUCTION PRODUCTION

SUBPROJECT: PIPED WATER SUPPLY SCHEME FOR THE TAY GIANG COMMUNE - TAY SON - BINH DINH

TESTING LETTER No.: HB 460 - 2

Sample No. Unit G3 - TD G3 - Fe Lab BT 804 BF 91

Analysis Requirement Total Iron Sampling Date 12 December, 2008 12 December, 2008 Analysis Date 2 January, 2009 2 January, 2009

Physical Properties

{ pH 7.27 { Color Clear { Smell No { Taste Bland

SiO2 (mg/l) 33.72

CO2 (mg/l) { Free 7.04 { Bond 88.00 { Erosion 0.00

Hardness (meq/l) { Total 5.600 { Temporary 3.430 { Permanent 2.170

The ions / Unit mg/l meq/l %meq mg/l meq/l %meq Na+ 93.00 4.045 40.55 K+ 1.52 0.039 0.39 Ca++ 66.13 3.300 33.08 Mg++ 27.97 2.300 23.06 NH4

- 0.00 0.000 0.00 Fe++ 0.01 0.000 0.00 0.06 0.002 Fe+++ 0.05 0.003 0.03 0.05 0.003 Al+++ 2.60 0.289 2.89 Total Cation 191.28 9.976 100.00 HCO3

- 244.08 4.000 39.41 Cl- 124.08 3.500 34.49 SO4

-- 98.46 2.050 20.20 NO3

- 37.21 0.595 5.87 NO2

- 0.14 0.003 0.03 CO3

-- 0.00 0.000 0.00 Total Anion 503.97 10.148 100.00 Dryed Sludge (mg/l) - 105oC 632

Note: Result only valid on the testing sample. Sample storage time is 15 days. ANALYSER

Date: 09 January, 2009

Phuong Thi Thuyen

ON BEHLF OF DIVISION CHIEF Pham Thi Thanh Ha

LAB. DIRECTOR

Nguyen Thi Nam

Page 86: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.3

13

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

INSPECTOR Phuong Thi Thuyen

Nguyen Thi Han

BINH DINH PROVINCIAL DEPARTMENT OF SCIENCE AND TECHNOLOGY ANALYSIS CENTER Office: 173 - 175 Street Phan Boi Chau, Quy Nhon city, Binh Dinh Province Vietnam. Tel: 822322 Fax: 823816

08.12.1236a ANALYSIS RESULT Date of receipt: 12 December, 2008 Date of return: 23 December, 2008

1. Sample Name : Drilled well water (VS - G3)

2. Requirement Customer : DIVISION FOR WATER RESOURCES PLANNING AND INVESTIGATION FOR THE SOUTH OF VIET NAM

3. Address: : 59 Street 2, Binh An ward, District 2 , Ho Chi Minh city

4. Sampling Location : Tay Giang - Tay Son - Binh Dinh

5. Sampling Date : 12 December, 2008

6. Analysis Result :

No. Parameter Unit Method of testing Result 1329/2002/BYT-QD

1 Coliform(**) MPN/100 ml TCVN 6187-2-96 0 0

2 E - Coli MPN/100 ml TCVN 6187-2-96 0 0

Conclusion: Microbiological parameter of the sample water is satsfactory according to the 1329/2002/BYT-QD LAB. MANAGER BINH DINH ANALYSIS CENTER ON BEHLF OF DIRECTOR

DEPUTY DIRECTOR

Nguyen An Thinh

Hoang Thuy Lan

Page 87: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.3

14

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

GENERAL DEPARTMENT OF STANDARDIZATION, METROLOGY AND QUALITY TECHNICAL CENTER 3 OF STANDARDIZATION, METROLOGY AND QUALITY Office: 49 Pasteur Street, 1 District, Ho Chi Minh city, Vietnam. Tel: (84-8) 3829 4274 Fax: (84-8) 3829 3012

KT3 - 3995MT8/3 ANALYSIS RESULT Date of receipt: 25 December, 2008 Date of return: 20 January, 2009

1. Sample Name : Water - G3-VL

2. Requirement Customer : DIVISION FOR WATER RESOURCES PLANNING AND INVESTIGATION FOR THE SOUTH OF VIET NAM

3. Address: : 59 Street 2, Binh An ward, District 2 , Ho Chi Minh city

4. Sampling Location : Tay Giang - Tay Son - Binh Dinh

5. Testing Timing : 26 December, 2008 - 20 January, 2009

6. Analysis Result :

No. Parameter Unit Method of testing Limit value of parameter Result 7.1 Content of Arsenic (As) mg/l APHA (*) 3114 B 0.001 Not found 7.2 Content of Hg mg/l APHA (*) 3112 B 0.001 Not found 7.3 Content of Pb mg/l APHA (*) 3120 B 0.01 Not found 7.4 Content of Cadmium (Cd) mg/l APHA (*) 3120 B 0.002 Not found 7.5 Content of Cr mg/l APHA (*) 3120 B 0.01 Not found 7.6 Content of Cu mg/l APHA (*) 3120 B 0.01 Not found 7.7 Content of Zn mg/l APHA (*) 3120 B 0.01 Not found 7.8 Content of Ni mg/l APHA (*) 3120 B 0.02 Not found 7.9 Content of Manganese (Mn) mg/l APHA (*) 3120 B 0.01 0.04 7.10 Content of Selenic (Se) mg/l APHA (*) 3114 B 0.003 Not found 7.11 Content of Cyanua (CNˉ) mg/l APHA (*) 4500-CNˉ F 0.05 Not found 7.12 Content of Phenol µg/l QTTN/KT3 035:2005 1 Not found 7.13 Content of Flouride (Fˉ) mg/l APHA (*) 4500-Fˉ D 0.5 0.72 Note: (*) : APHA Standard Methods for the Examination of Water and Wastewater, 20th Edition 1998.

ENVIRONMENT LAB. MANAGER ON BEHLF OF DIRECTOR

DEPUTY DIRECTOR

NGUYEN VAN MUOI MOT TRAN THI MY HIEN

Page 88: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.3

15

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

GENERAL DEPARTMENT OF STANDARDIZATION, METROLOGY AND QUALITY TECHNICAL CENTER 3 OF STANDARDIZATION, METROLOGY AND QUALITY Office: 49 Pasteur Street, 1 District, Ho Chi Minh city, Vietnam. Tel: (84-8) 3829 4274 Fax: (84-8) 3829 3012

KT3 - 3995MT8/4 ANALYSIS RESULT Date of receipt: 25 December, 2008 Date of return: 20 January, 2009

1. Sample Name : Water - G3-TTS

2. Requirement Customer : DIVISION FOR WATER RESOURCES PLANNING AND INVESTIGATION FOR THE SOUTH OF VIET NAM

3. Address: : 59 Street 2, Binh An ward, District 2 , Ho Chi Minh city

4. Sampling Location : Tay Giang - Tay Son - Binh Dinh

5. Testing Timing : 26 December, 2008 - 20 January, 2009

6. Analysis Result :

No. Parameter Unit Method of testing Result

7.1 Residues of organochlorine pesticides µg/l APHA (*) 6630 B

• DDE Not found

• DDT Not found

• Lindan Not found

Note: (*) : APHA Standard Methods for the Examination of Water and Wastewater, 20th Edition 1998.

ENVIRONMENT LAB. MANAGER ON BEHLF OF DIRECTOR

DEPUTY DIRECTOR

NGUYEN VAN MUOI MOT TRAN THI MY HIEN

Page 89: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.3

16

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Original

Page 90: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.3

17

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 91: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 2.3

18

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 92: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 3

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Annex 3 Environmental Management Plan (EMP) and

Environmental Monitoring Plan (EMoP)

Page 93: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 3.1

1

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Annex 3.1. Environmental and Monitoring Report Forms

1. Project Implementation Progress

Reporting period (Date): Work program/Project Activities

Project status: a. On-going activities/site works: provide details of specific activities such as earthworks, vegetation clearing, borrow pit operation, establishment of construction camp, etc. including locations, schedule, etc. b. Construction activities during the previous month b. Construction activities for the next month

Previous report date:

Persons met and dates:

Report prepared by:

2. Environmental Monitoring

a. Summary of Compliance with Environmental Mitigation Measures

Specific Mitigation Measures)

Compliance Attained (Yes, No, Partial)

Comment on Reasons for Non-Compliance

Issues for Further Action

1.

2.

3.

b. Issues for Further Action

Issue Cause Required Action Responsibility Timing Resolution

Old Issues from Previous Reports

1.

2.

New Issues from this Report

1.

Page 94: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 3.1

2

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

2.

3.

Report prepared by:

3. Environmental Effects Monitoring

a. Environmental Inspection and Monitoring Results

Monitoring Parameter Comparison to Relevant Standard / Criteria

Comment on Incidences of Exceedance

Issues for Further Action

1.

2.

3.

b. Problems/Issues for Further Action

Issue Cause Required Action Responsibility Timing Resolution

Old Problems/Issues from Previous Reports (if any)

1.

2.

New Problems/Issues from this Report

1.

2.

Report prepared by:

4. Compliance with EMP

a. Determine if the required mitigation measures are sufficient or still appropriate considering current site conditions and on-going site works.

b. Describe any difficulties related to the implementation of the proposed mitigation measures. Indicate any changes proposed by the Contractor to improve environmental protection.

5. Permits:

a. Indicate any environmental permit/license/consent obtained during the previous period or to be obtained for the coming month in order to continue the project construction activities.

b. Provide details of any environmental permit that the Contractor failed to secure prior to conducting any specific activities.

6. Complaint(s)

1. Provide details of any complaints that have been raised by the local population and other stakeholders (who, what, where, when).

Page 95: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 3.1

3

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

2. Document how the complaints were addressed or will be addressed, who are the responsible project staff, specific actions and dates.

7. Environmental Training/Orientation Provide details of environmental training or orientation carried out during the previous month and the coming month (if any). 8. Summary of Problems/issues Encountered and Recommendations

9. Appendices

a. Correspondence b. Monitoring Results, laboratory analysis c. etc.

Page 96: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 3.2

1

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Annex 3.2. Environmental Management Plan (EMP)

SUBPROJECT PHASE MITIGATION MEASURES IMPLEMENTING

RESPONSIBILITY SUPERVISION RESPONSIBILITY

BUDGET REQUIREMENT Activities/Impacts

(1) (2) (3) (4) (5)

I. PRE-CONSTRUCTION PHASE 1. Survey of Unexploded bomb(s) in the

subproject area

Damage property and hurt people Establish safe buffer zone during disarmament, proper fencing, protective barriers, sufficient signal, site supervisors and information disclosure.

Binh Dinh Provincial Military Command

PPMU/ EO and CSC Included in the subproject budget

II. CONSTRUCTION PHASE 1. Land clearing, grading and excavation

Soil erosion and landslide may occur due to disturbance/removal of vegetative cover

Schedule construction during dry months; Supervision and proper implementation of construction activities.

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

Re-plant trees and re-seeding of indigenous grasses at the end of/or completion of construction activities.

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

Cover exposed soil from diggings and stock piles and soil during the rainy days.

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

Uncontrolled disposal of excessive soil and construction debris

Disposal sites must be selected and approved before construction

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

Damage to the road, particularly for installation of transmission and distribution pipelines

Restoration of existing road right after completion of each construction item

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

Page 97: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 3.2

2

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

SUBPROJECT PHASE MITIGATION MEASURES IMPLEMENTING

RESPONSIBILITY SUPERVISION RESPONSIBILITY

BUDGET REQUIREMENT Activities/Impacts

(1) (2) (3) (4) (5)

Traffic disruption Schedule transport and hauling of construction materials during light traffic hours. Arrange adequate traffic detour, and provide sufficient signal & warning lights.

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

Dust Regularly spray water on dry and exposed soil in construction site and along the road;

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

Trailer-truck hauling and transporting construction materials must be covered with canvas Tires and body of vehicles must be washed with water when returning to public roads from WTP construction site.

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

Noise & vibration Contractor to maintain equipment and transport vehicles in proper working order and ensure that muffler and other measures are installed to reduce noise in compliance with TCVN 5948:1999/BTNMT.

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

Emission from construction vehicles, equipment

and machinery

As much as possible implement working hours between 07:00 and 17:00; The discharge standards promulgated under the Environmental Protection Law 2005 will be strictly adhered. All vehicles, equipment, and machinery used for construction will conform to the relevant Vietnam standards.

All vehicles, equipment and machinery used for construction will be regularly maintained to ensure that pollution emission levels comply with the

Contractor

Contractor

PPMU/ EO and CSC

PPMU/ EO and CSC

Included in the Contractor’s financial bidIncluded in the Contractor’s financial bid

Page 98: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 3.2

3

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

SUBPROJECT PHASE MITIGATION MEASURES IMPLEMENTING

RESPONSIBILITY SUPERVISION RESPONSIBILITY

BUDGET REQUIREMENT Activities/Impacts

(1) (2) (3) (4) (5) relevant regulations, namely QCVN 05:2009.

2. Construction camps and workers’ activities

Solid waste and gray water disposal Construction of temporary latrines, at a distance from the proposed wells for the WTP. Regular collection and disposal of garbage to the proper disposal site.

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

Contamination of soil/water by fuel and lubricants Ensure proper handling of oil and fuel materials. Fuel storage will be in proper bounded areas.

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

Fuel storage and refilling areas will be located at least 300 m from all cross drainage structures and important water bodies, or as directed by the consultant.

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

Any spillage oil shall be neutralized by a neutralizer, and reported to the consultant.

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

3. Environment, health and safety

Public and worker safety Ensure proper fencing and protective barriers in construction area. Sufficient signal and information disclosure about the subproject must be conducted.

Contractor

PPMU/ EO and CSC

Included in the Contractor’s financial bid

Construction workers and supervisors must be equipped with protective clothes gears in the construction site.

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

Page 99: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 3.2

4

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

SUBPROJECT PHASE MITIGATION MEASURES IMPLEMENTING

RESPONSIBILITY SUPERVISION RESPONSIBILITY

BUDGET REQUIREMENT Activities/Impacts

(1) (2) (3) (4) (5)

Risk of socially and sexually transmitted infections, including HIV/AIDS transmission, to the workers

Maximize employment of local laborers who will live at home during construction.

Contractor PPMU/EO and CSC Included in the Contractor’s financial bid

Disseminate information on the risks of socially and sexually transmitted infections, including HIV transmission, to their employees, temporary laborers, and subcontractors during Subproject implementation.

Contractor PPMU/EO and CSC Included in the Contractor’s financial bid

4. Cultural historical site

Caodaist Oratory Cultural site Alignment of water pipeline/distribution lines and location of proposed construction sites

Contractor PPMU/ EO and CSC Included in the Contractor’s financial bid

Three Golden Star Division Historical site

5. Social/ cultural/ religious or archaeological items

Chances of finding social/cultural/ religious or archaeological items during excavation and pipe lining

Immediately inform competent agencies of suspected social/ cultural/ religious or archaeological items and stop all excavation activities that may potentially affect the items.

Contractor

PPMU/ EO and CSC Included in the Contractor’s financial bid

Set up work stoppage and sign boards to prevent unauthorized trespassing.

Contractor

PPMU/ EO and CSC Included in the Contractor’s financial bid

III. OPERATION & MAINTENANCE PHASE

Page 100: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 3.2

5

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

SUBPROJECT PHASE MITIGATION MEASURES IMPLEMENTING

RESPONSIBILITY SUPERVISION RESPONSIBILITY

BUDGET REQUIREMENT Activities/Impacts

(1) (2) (3) (4) (5) 1. Environmental and Health Safety

Health and safety hazards to workers in the WTP from water disinfection and other related activities

Equipped workers with gas masks and protective clothing and gears such as boots, helmets during working.

OU PPMU/EO, WSCC and DoNRE

WSSS Operation budget

Risks caused by chemicals used for water treatment

WTP operator will strictly comply with instructions of use and storage of chemicals. If leakage or spillage events happen, the WTP operator will inform to relevant agency to deal with immediately.

OU PPMU/EO, WSCC and DoNRE

WSSS Operation budget

List of Abbreviations: CSC Build and Design Supervision Consultant EO Environmental Officer OU Operational Unit PPMU Provincial Project Management Unit WTP Water Treatment Plant WSCC Water and Sanitation Commune Committee DoNRE Department of Natural Resources and Environment

Page 101: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 3.3

1

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Annex 3.3. Environmental Monitoring Plan (EMoP)

SUBPROJECT PHASE PARAMETERS MONITORING

METHOD LOCATION FREQUENCY MONITORING RESPONSIBILITY Activities/Items

(1) (2) (3) (4) (5) (6) I. PRE-

CONSTRUCTION PHASE

1. Baseline Data:

Raw (ground) water quality

All of Parameters listed in QCVN 09:2008/BTNMT

Lab test Raw water pumping stations (3 wells)

Once during detailed design

PPMU/EO and Contractor

2. Unexploded bomb(s) in the subproject area

Location and number of unexploded bombs

Inspection and reports WTP site To be done before the construction

PPMU/EO and Binh Dinh Provincial Military Command

II. CONSTRUCTION PHASE

Raw (ground) water

quality All of Parameters listed in QCVN 09:2008/BTNMT

Lab test Raw water pumping stations (3 wells)

Once at the end of construction

PPMU/EO and Contractor

Land clearing, grading and excavation

Excessive soils, soil erosion and landslide, disturbance/ removal of vegetation cover.

Ocular inspection and reports

Construction site: WTP, pumping station, water distribution lines

1x weekly PPMU/EO and CSC

Dust suppression Inspect if dust suppression is maintained and is effective.

Ocular inspection and reports

Specific point sources, for example, concrete batching plants and/or hot mix asphalt plants (according to contract).

1x weekly PPMU/EO and CSC

Installation of transmission and

Damage to roads, buildings and structures etc.

Ocular inspection Construction site 1x weekly PPMU/EO and CSC

Page 102: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 3.3

2

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

SUBPROJECT PHASE PARAMETERS MONITORING METHOD LOCATION FREQUENCY MONITORING

RESPONSIBILITY Activities/Items

(1) (2) (3) (4) (5) (6) distribution pipelines

Industrial and domestic solid waste

Volume and composition of wastes (organic, inorganic, and hazardous components(%))

Measurement of the volume and reports

Disposal/Dump site 1x monthly PPMU/EO and CSC

Domestic waste water from temporary latrines and daily activities of workers

Volume produced and location of disposal site, communal sewage system

Inspection, measurement of volume and reports

Construction site 1x monthly PPMU/EO and CSC

Construction area cleanup

Traces of oil, grease, fuel and solid waste and hazardous materials

Ocular inspection Construction site 1x monthly PPMU/EO and CSC

Transmission of social and sexual infectious diseases, including HIV/AIDS

Dissemination of information throughout meetings before and during construction, and display of warning signs on site information board.

Inspection, worker interview and reports

Construction site and workers’ camps

1x monthly, and random spot check

PPMU/EO and CSC

III. OPERATION & MAINTENANCE PHASE

Raw (ground) water quality

Typical parameters listed in QCVN 09:2008/BTNMT

Lab test Raw water pumping stations (3 wells)

1x annually PPMU/EO and OU

1. pH

2. Hardness (calculating by CaCO3)

3. Total solids

4. Clorua (Cl-) 5. Nitrate (NO-

3) (calculating by N)

Page 103: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 3.3

3

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

SUBPROJECT PHASE PARAMETERS MONITORING METHOD LOCATION FREQUENCY MONITORING

RESPONSIBILITY Activities/Items

(1) (2) (3) (4) (5) (6) 6. Sulphate (SO4

2-) 7. Arsenic (As) 8. Cadmium (Cd) 9. Lead (Pb) 10. Chrome VI (Cr6+) 11. Copper (Cu) 12. Manganese (Mn) 13. Iron (Fe) 14. E - Coli 15. Coliform

Treated water quality Typical parameters listed in QCVN 01:2009/BYT

Lab test Treated water basin 1x quarterly PPMU/EO and OU

1. Color

2. Turbidity

3. pH

4. Mangan (Mn) 5. Nitrite 6. Nitrate 7. Chlorine residual 8. E - Coli 9. Coliform

Wastewater from WTP Typical parameters listed in QCVN 40:2011/BTNMT (refer to column A of value C)

Lab test Sludge lagoon Twice/year PPMU/EO and OU

Page 104: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 3.3

4

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

SUBPROJECT PHASE PARAMETERS MONITORING METHOD LOCATION FREQUENCY MONITORING

RESPONSIBILITY Activities/Items

(1) (2) (3) (4) (5) (6) 1. pH 2. Smell 3. Color level (Co-Pt at pH=7) 4. Suspended Solid 5. Lead (Pb) 6. Copper (Cu) 7. Manganese (Mn) 8. Iron (Fe) 9. Chlorine residual 10. Flouride (F-) 11. Clorua (Cl-) 12. Ammonia (NH+

4) (calculating by N)

13. Coliform

Sludge from WTP Volume produced Measurement WTP site Quarterly PPMU/EO and OU

List of Abbreviations: CSC Design-Build Supervision Consultant EO Environmental Officer PPMU Provincial Project Management Unit WTP Water Treatment Plant DoNRE Department of Natural Resources and Environment

Page 105: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Annex 4 Public Consultation Meeting

Page 106: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.1

1

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Annex 4.1. Minute of Public consultation meeting

Translation

SOCIALIST REPUBLIC OF VIETNAM

Independence – Freedom – Happiness

**********

MINUTE OF PUBLIC CONSULTATION MEETING ON ENVIRONMENTAL ASSESSMENT

Subproject: Rural Water Supply and Sanitation for Tay Giang, Tay Thuan Communes, Tay Son

Binh Dinh Province

Time: 8h, 05th November, 2011

Location: Meeting Room of Tay Giang CPC, Tay Son District, Binh Dinh Province.

I. Participants

Representatives of PPMU

- Mr. Ho Dac Chương Position: Deputy Director of PPMU;

- Mr. Nguyen Dang Xuan Position: Chief of General Planning Division;

- Mr. Le Quang Khoi Position: Chief of Technical Division.

Representative of Consultant: Environmental specialist

- Mr. Le Van Xin Position: Director

Representatives of Local Authorities

- Mr. Ngo Tot Position: CPC’s Chairman;

- Mr. Cao Phan Minh Phuc Position: CPC’s cadastral staff.

Representatives of Local Mass Organizations

- Ms. Nguyen Thị Thanh Van Position: Tay Giang CVWU’s Chairman;

- Mr. Nguyen Đac Quy Chuong Position: Tay Giang CFFC’s Chairman;

- Mr. Phan Minh Trieu Position: Head of Tay Giang Communal Health Station;

- Mr. Tran Thanh Hung Position: Tây Giang CFU’s Chairman;

- Mr. Huynh Tan Hau Position: Vice chairman of Tay Thuan CPC;

- Ms. Thai Thi Kim Lien Position: Head of Tây Thuận Communal Health Station;

- Ms. Tran Thi Thu Ha Position: Tay Thuan CVWU’s Chairman

Page 107: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.1

2

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Representatives of Natural Resources and Environment Division of Tây Sơn district.

- Mr. Nguyen Van Hau Position: Chief of Natural Resources and Environment Division

Representatives of communities and affected people (included list)

II. Public Consultation meeting content

The presentation of PPMU and Consultants

Representative of PPMU: Introduced the objectives and social significance of the Public consultation meeting.

Representative of Design Consultant: Presented the contents of Subproject design.

Representative of Environmental specialists: Displayed positive and negative impacts of the Subproject to the environmental and social communities; and mitigation measures to the negative impacts to the environment and lives of the people in the subproject area.

Impacts to the environment

1. Positive impacts

The construction of the water supply system will have positive impacts on the local socio-economic development, meeting the need of cleaned water for thousands of local people. Success of the project will help solving not only clean water condition of the two communal communities, but also improving people’s living condition in the Subproject area, improving the health and living standard of the people, environment protection, reducing the use of poor quality water, the shortage of water and decreasing waterborne diseases as well.

After construction is completed, the operation of the Subproject will favours environmental protection activities on soil, water bodies and air as clean and safe water is the primary factor that helps conducting protection activities to achieve safe environment for the community.

Clean water supply will support to reduce the incidence of diseases related to using unhygienic water sources. The livestock and poultry development to increase people’s income will not cause much risk on the environment and people’s health because of using clean water. It is more meaningful when the diseases related to unclean water in the Subproject area have been seen statistically at high percentage.

2. Negative impacts

The Subproject is expected to provide clean water and hygienic sanitation for people. However, it potentially causes some negative impacts to the environment:

- Transportation of construction materials, soil excavation and filling at WTP, ditch excavation to install pipelines will cause dust, noise, and traffic jam…Although these impacts are not too serious, it is needed to implement preventing measures.

- Demolition waste during construction of works will cause negative impacts to the environment if not managed properly.

- Waste water discharged from construction works such as storm water, waste water from treatment facilities (settling tank, filter, workshop, chemical house), domestic waste water from operators.

Page 108: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.1

3

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

- During operation of works, it is required to ensure safety to avoid exploration, fire in case of power problem, pipeline broken that impact on lives, production activities and traffic jam… in the subproject area.

III. Environment Management Plan

During the project implementation as well as operation of facilities, standards and solution mentioned in Chapter 6 of FS report and Chapter II “Mitigation Measures for Negative Impacts” of the Environment Protection Commitment need to be followed to minimize negative impacts on the Environment. The Environment Management Plan will be carried out in steps similarly as bellows:

Summary of environmental impacts of the project:

Environmental Impacts

Mitigation Measures Implementation Unit Monitoring

Construction Phase

Impact on soil Adverse impact is minor as the land use purpose for construction of WTP has been changed and the construction area is not large. For filled soil layer of the pipeline, the natural ecosystem of the surface layer will be recovered by itself, so this impact is temporary.

Contractor PPMU and District Division of Environment

Impact on air Adverse impact is minor and temporary as construction is small, short construction period and sparse population density. Closed monitoring of materials and chemical transportation is needed.

Contractor PPMU and District Division of Environment

Impact on water bodies

Adverse impact is minor and in short period, low toxicity of water, self-cleaning ability of water body is much higher than the potential contamination impact of polluted substances. Closed monitoring of chemical used during construction is needed.

Contractor PPMU and District Division of Environment

Impact on human activities

Manage the travel of vehicles properly to avoid

Contractor PPMU and District Division of

Page 109: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.1

4

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Environmental Impacts

Mitigation Measures Implementation Unit Monitoring

impacts on the surrounding residential area.

Environment

Accident and risks of explosion, fire

Workers must be fully equipped with working clothes, hat, gloves, shoes, glasses, safety belt,… machines, equipment must include a history of operation and be regularly checked.

Contractor PPMU and District Division of Environment

Operation Phase

Impact on air - Air pollution control is mainly to decrease or remove leaked Chlorine gas, which is used for disinfection.

- Machines, equipment used for the project should be new and modern. Pumps and mixing devices are run by electrical motors; manufactured by developed countries, so they will not cause vibration and noise that are beyond allowed limits.

- Planting trees is very useful to the climate and the environment.

Operation and Management unit of WTP

District Division of Environment

Impact on water bodies

- Treatment of domestic wastewater within WTP

- Treatment of waste water from WTP

- Treatment of oily waste water.

Operation and Management unit of WTP

District Division of Environment

IV. Comments from Local Government and Representatives of Community: Comments from Local Government:

The project brings to the people of Tay Giang and Tay Thuan Communes great, practical and long-term benefits. Implementation of the project has impacts on the environment but it’s not significant and can be mitigated. As for the impacts on the population and community, the total positive impact is greater than the total negative impact which can be mitigated by the measures

Page 110: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.1

5

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

stipulated in the Project Investment Report and the Registration for Environmental Protection Commitment.

The Project Management Unit as well as the Contractor are requested to provide specific assignments of Environmental Monitoring as specified in the Project Investment Report for sustainable development of the project. The Local Government of Tay Giang and Tay Thuan Communes commit to comply with provisions of the Environmental Protection Commitment, encourage people to overcome difficulties and agree on project implementation.

Comments from Representatives of Community:

Representative of Vietnamese Fatherland Front Committee of Tay Giang Commune: The project brings practical benefits to the people, improves the living conditions, reduces diseases related to polluted water and environment. Although the implementation of project has impact on the environment of the local area such as noise of construction machinery, dust, excavation of road which obstructs traffic, it will not affect significantly on the people’s lives, and the impacts can be reduced by the people’s efforts and mitigation measures as provided in the Project Investment Report. Therefore, the Vietnamese Fatherland Front Committee of Tay Giang Communes agreed on project implementation.

Representatives of Women’s Union of Tay Giang Commune: After listening to the Project Investment Report presented by the Consultant’s Representative, Representatives of Women’s Union of Tay Giang Commune felt very excited because the expectation of Tay Giang Commune’s People, is going to become true, especially for the women who are directly affected the most due to not having clean water and hygienic latrines. During implementation of Project, in spite of some impact on the environment and daily activities of the people, for the benefit of every people, they must be encouraged to overcome difficulties, meanwhile, there will be mitigation measures as provided in the Project Investment Report. Therefore, the Women’s Union of Tay Giang Commune agree on early implementation of project.

Representative of Farmer Association of Tay Giang Commune: Highly agreeing with opinions of the Government and Unions, the Commune’s Farmer Association hoped that the project will be implemented soon so that the people will soon be benefited by the project and in its assigned tasks, the Association will encourage every member to contribute to construction and operation management of the facilities, so that the facilities for effective operation and long term benefit. For negative impacts on the community during implementation of project, the Association will mobilize the people to cooperate with concerned parties to overcome and reduce such negative impacts.

Representative of Health Center of Tay Thuan Commune: In recent years, due to water and environment pollution, the diseases related to domestic water and sanitation, , especially fatal diseases tend to increase. The water supply & sanitation project is necessary to the people of Tay Giang, Tay Thuan Communes. During implementation of project, there will be negative impacts on the environment and people’s lives. However, with the measures provided in the Environmental Protection Commitment and if they’re strictly implemented by the concerned parties and with the effort of the people to overcome them, the impacts can be mitigated. We kindly request to implement the project soon.

Representatives of beneficiaries

Mr. Diep Bao Tai, from Thuong Giang 2 hamlet, Tay Giang commune: Our hamlet is very crowded with limited residential land. Clean water and sanitary facilities are an urgent demand. If

Page 111: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.1

6

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

the construction team does not implement a reasonable construction option, traffic congestion will occur, obstructing travelling and polluting the environment. Therefore, big trucks carrying construction materials into the hamlet are not recommended and backfilling roads must be done right after installation of pipes for convenience of the residents.

Mr. Do Loc, from Thuong Giang 2 hamlet, Tay Giang commune: I represents the affected households of land acquisition. I really support the project as it is a public project bringing benefits of health improvement to all of the local residents. I agree to allocate land to the project though I understand that during construction, we may encounter some difficulties. Hence, I request the construction team to propose sound construction measures and time to mitigate the negative impacts of construction.

Mr. Nguyen Huu Vinh, from Thuong Giang 1 hamlet, Tay Giang commune: In our hamlet, most of the households have registered to participate in connection to pipeline and construction of toilets. We understand that during construction, we will encounter some difficulties such as congestions on lanes and roads, gardens excavated for pipe installation, obstructed travelling, noise and dust …Therefore, we recommend that construction should be done in a timely and neat manner, and one route should be completed before starting construction of a new route.

Opinions of representative of division of natural resources and environment of Tay Son district

- agreed with the presented positive and negative impacts that the Subproject will potentially cause on the environment;

- requested Binh Dinh Provincial Project Management Unit (PPMU) to ask Contractors to properly carry out the environmental impact mitigation measures stipulated in the Initial Environmental Examination report as well as environmental management plant during construction and O&M.

Participants also express their desire on timely construction of Subproject structures for early access to clean water supply and hygiene sanitation for local people.

V. Conclusions

Discussion on the meeting showed that local authorities and communities highly agreed with and supported the Subproject and expected that the Subproject will be commenced soon. They request the Subproject owner to comply with environmental protection measures which are stated in the Initial Environmental Examination report during Subproject implementation.

REPRESENTATIVE OF PPMU

REPRESENTATIVE OF DPC

REPRESENTATIVE OF CPC

REPRESENTATIVE OF

AFFETED PEOPLE

Page 112: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.1

7

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Original

Page 113: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.1

8

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 114: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.1

9

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 115: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.1

10

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 116: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.1

11

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 117: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.1

12

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 118: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.1

13

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 119: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.1

14

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Page 120: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 4.2

1

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Annex 4.2.

List of Affected People Participating on Public Consultation Meeting

Page 121: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 5

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Annex 5. Notice On Acceptance Of EC Registration

Page 122: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 5

1

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Translation TAY SON DISTRICT PEOPLE COMMITTEE --------------- No: 156/TB-UBND

SOCIALIST REPUBLIC OF VIETNAM Independence – Freedom - Happiness

---------------------------------------

Tay Son, November 14, 2011

NOTICE

Acceptance of registration of Environment Protection Commitment of Project

“Water Supply and Sanitation of Tay Giang and Tay Thuan Commune, Tay Son District”

To: Provincial Project Management Unit of National Target Program for

Rural Water Supply and Environmental Sanitation

After reviewing the documents for registration of Environment Protection Commitment of the project “Water Supply and Sanitation of Tay Giang and Tay Thuan Communes, Tay Son District”, Tay Son District People’s Committee hereby announces the following:

1. The Environment Protection Commitment of the project “Water Supply and Sanitation of Tay Giang and Tay Thuan Commune, Tay Son District” has been registered in Tay Son District People’s Committee.

2. Provincial Project Management Unit of National Target Program for Rural Water Supply and Environmental Sanitation shall comply completely and strictly with the contents stated in the Environment Protection Commitment.

3. This registered and noticed Environmental protection commitment shall be the basis for the environmental management agencies to supervise, evaluate and inspect the implementation of environmental protection during the implementation of Water Supply and Sanitation of Tay Giang and Tay Thuan Communes, Tay Son District.

4. Provincial Project Management Unit of National Target Program for Rural Water Supply and Environmental Sanitation must report to Tay Son District People’s Committee when there are changes, adjustments of contents of the Environmental Protection Commitment and they can be implemented only upon the official acceptance of Tay Son District People Committee./.

To:

- As above; - District Department of Natural Resources and Environment; - Tay Giang CPC; - Tay Thuan CPC; - Central file (05b).

For the President/Vice President

(Signature, full name, position, seal)

Page 123: Central Regions Rural Water Supply and Water Supply and ... · Sanitation Subproject of Tay Giang- Tay Thuan Communes, Tay Son District, Binh Dinh Province File name VIE 2609 Binh

Central Regions Rural Water Supply and Sanitation Sector Project Subproject Appraisal Report Consulting Services for Project Implementation Assistance Revision 02 Volume 4: Updated IEE Report

Tay Giang and Tay Thuan Communes Tay Son District, Binh Dinh Province

Annex 5

2

The Joint Venture of CDM International Inc., Nippon Koei Co. Ltd. and Vinaconsult.JSC

Original