![Page 1: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/1.jpg)
CEN
TRAL
PAR
K B
LVD
1
C I T Y A N D C O U N T Y O F D E N V E R
CENTRAL PARK BLVD
![Page 2: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/2.jpg)
CEN
TRAL
PAR
K B
LVD
2
WHY WE ARE HERE TODAY
• Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries, cultural centers, public-owned buildings, health and safety facilities.
• Included: $18 million toward the design and construction of 50 miles of high comfort bikeways citywide (neighborhood bikeways and protected bike lanes) from phases 1 and 2 of Denver Moves bicycles plan
![Page 3: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/3.jpg)
CEN
TRAL
PAR
K B
LVD
3
PROGRAM PURPOSE & PHILOSOPHY
All Denver residents, regardless of how they choose to get around, deserve a safe, accessible, reliable and connected transportation system that provides access to jobs and amenities.
![Page 4: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/4.jpg)
CEN
TRAL
PAR
K B
LVD
4
HCB’S FURTHER VISION ZERO GOALS
What is Vision Zero?To reduce all transportation related fatalities and serious injuries to ZERO.
2010 2017
2011 2018
CURRENT TRENDS
POPULATION
CRASHES
MOBILITY GOALS
HCBs SUPPPORT THESE GOALS
Increase mode shift
Decrease crashes
![Page 5: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/5.jpg)
CEN
TRAL
PAR
K B
LVD
5
HOW DENVERITES FEEL ABOUT BICYCLING
16% INDICATE THEY COULD RIDE A BICYCLE ON DENVER’S STREETS TODAY
Source: DRCOG statistically valid survey of Metro-Denverites
![Page 6: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/6.jpg)
CEN
TRAL
PAR
K B
LVD
6
HOW DENVERITES FEEL ABOUT BICYCLING
Source: DRCOG statistically valid survey of Metro-Denverites
75% INDICATE THEY WOULD RIDE A BICYCLE IF THEY HAD THE OPTION OF A NETWORK OF HIGH COMFORT BIKEWAYS
![Page 7: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/7.jpg)
CEN
TRAL
PAR
K B
LVD
7
WHAT’S A HIGH COMFORT BIKEWAY?
BUILDING BLOCKS OF A PROTECTED BIKE LANE HorizontalBuffer
Vertical Element
High visibility markings of conflict areas
![Page 8: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/8.jpg)
CEN
TRAL
PAR
K B
LVD
8
BENEFITS OF HIGH COMFORT BIKEWAYS
Design Impacts:
SAFETY
COMFORT
RIDERSHIP
SHIFTED TRIPS
Reduce/Eliminatedooring issues.
Source: Monsere et al. Lessons from the Green Lanes: Evaluating Protected Bike Lanes in the U.S. NITCRR-583. Portland, OR: Transportation Research and Education Center (TREC), 2014. http://dx.doi.org/10.15760/trec.115
Reduce/Eliminate parking and loading conflicts.
Reduce conflicts/slow turning vehicles
Reduce stress for all road users by providing space for ALL.
![Page 9: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/9.jpg)
CEN
TRAL
PAR
K B
LVD
9
YOUR HIGH COMFORT BIKEWAY IN CONTEXT
Links to other bikeways
Transit stations
Schools
Parks
![Page 10: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/10.jpg)
CEN
TRAL
PAR
K B
LVD
10
EXISTING CONDITIONS
![Page 11: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/11.jpg)
CEN
TRAL
PAR
K B
LVD
11
CENTRAL PARK BLVD - EXISTING CONDITIONS
Existing issues that make riding along the street high-stress:
Door zone
Loading issues
Speeds
Traffic Volume
Intersection Conflicts
Cars blocking bikeway
![Page 12: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/12.jpg)
CEN
TRAL
PAR
K B
LVD
12
WHAT WE HEARD - IMPACTS
SCHOOL LOADING PARKING BUS STOPS
CROSSINGSINTERSECTIONS SAFETY
![Page 13: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/13.jpg)
CEN
TRAL
PAR
K B
LVD
13
WHAT WE HEARD … AND HOW WE ADDRESSED IT
BIKE LANE SEPERATION We are adding curb stops
PEDESTRIAN CROSSINGSWe are adding intersection treatments to slow vehicular turning speeds and improve visibility
SAFETY FOR KIDS GETTING OUT OF PARKED CARS
We are adding additional pavement markings to highlight bike lanes
MLK APPROACHWe are realigning the bike lane closer to the curb and shortening the area where bikes and cars mix
![Page 14: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/14.jpg)
CEN
TRAL
PAR
K B
LVD
14
WHAT WE HEARD
BIKE LANE SEPERATION
+
… AND HOW WE ADDRESSED IT
We are adding curb stops
![Page 15: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/15.jpg)
CEN
TRAL
PAR
K B
LVD
15
WHAT WE HEARD … AND HOW WE ADDRESSED IT
CENTRAL PARK BLVD
PARKING
BLADIUM
8’
2.5’
-3’
4.5’
–6.
5’
![Page 16: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/16.jpg)
CEN
TRAL
PAR
K B
LVD
16
WHAT WE HEARD … AND HOW WE ADDRESSED IT
MLK
BLV
D
![Page 17: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/17.jpg)
CEN
TRAL
PAR
K B
LVD
17
CENTRAL PARK BLVD - SELECTED ALTERNATIVE
IMRPOVES SAFETY: MINIMIZES IMPACTS:
• Places bikes farther from traffic• Reduces car speeds• Makes intersections safer
• Retains parking• Retains bus and postal space• Makes pedestrians safer
![Page 18: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/18.jpg)
CEN
TRAL
PAR
K B
LVD
18
CENTRAL PARK BLVD - SELECTED ALTERNATIVE
Parking outside of bike lane provides additional protection from moving
traffic
Green markings indicate conflict zone where
people driving and people on bikes may interact
Curb stops will provide physical barrier between
bicycles and vehicles
![Page 19: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/19.jpg)
CEN
TRAL
PAR
K B
LVD
19
CENTRAL PARK BLVD - SELECTED ALTERNATIVE
28T
HA
VE
CENTRAL PARK BLVD
N
SPACE FOR CARS TO YIELD
PARKINGPARKING
SIGHT DISTANCE ZONE
SIGHT DISTANCE ZONE
![Page 20: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/20.jpg)
CEN
TRAL
PAR
K B
LVD
20
CENTRAL PARK BLVD - SELECTED ALTERNATIVE
28T
HA
VE
CENTRAL PARK BLVD
N
PEDESTRIAN SPACE
PARKINGPARKING
COMBINATION OF CURB STOPS AND BOLLARDS
TURN SLOWS BIKES SLIGHTLY AT INTERSECTION
![Page 21: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/21.jpg)
CEN
TRAL
PAR
K B
LVD
21
CENTRAL PARK BLVD - SELECTED ALTERNATIVE
28T
HA
VE
CENTRAL PARK BLVD
N
PARKINGPARKING
BUFFER ENCOURAGES CARS TO TURN SLOWER
RAISED CURB
![Page 22: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/22.jpg)
CEN
TRAL
PAR
K B
LVD
22
CENTRAL PARK BLVD - SELECTED ALTERNATIVE
33rd
AV
E
CENTRAL PARK BLVDN
PARKING
![Page 23: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/23.jpg)
CEN
TRAL
PAR
K B
LVD
23
NEXT STEPS
Nov 21, 2019Public Meeting
MID DECEMBERSummarize Feedback
END OF DECEMBERRevise Design
JANUARYFinish Design
FEBUARYFinal Design Revisions
SPRINGHire Contractor
SUMMERInstall Project
Design Construction
Fall Winter
TIMELINE
![Page 24: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/24.jpg)
CEN
TRAL
PAR
K B
LVD
24
QUESTION & ANSWER
denvergov.org/bikeprogramWEBSITE:
THANK YOU FOR JOINING US!
Riley [email protected]
![Page 25: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/25.jpg)
CEN
TRAL
PAR
K B
LVD
25
EXISTING CONDITIONS
![Page 26: CENTRAL PARK BLVD...CENTRAL PARK BLVD 2 WHY WE ARE HERE TODAY • Elevate Denver bond program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,](https://reader033.vdocuments.us/reader033/viewer/2022041708/5e469d49e622cd03176c1f93/html5/thumbnails/26.jpg)
CEN
TRAL
PAR
K B
LVD
26
EXISTING CONDITIONS