MITSUBISHI CEMENT CORPORATION
CEMS Challenges of Cement NESHAP
CDAWG November 2017
David Rib, Environmental Manager Keith Shannon, Environmental Specialist
Mitsubishi Cement Corporation
![Page 2: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/2.jpg)
MITSUBISHI CEMENT CORPORATION
OR…. NESHAP turned my CEMS into a MONSTER
The dreaded “Ka-boo-key”
monster!
![Page 3: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/3.jpg)
MITSUBISHI CEMENT CORPORATION
CEMS “In the Beginning”
A couple analyzers and a strip chart.
But the Times they are A-Changin’
![Page 4: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/4.jpg)
MITSUBISHI CEMENT CORPORATION
MCC CEMS in 2005
![Page 5: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/5.jpg)
MITSUBISHI CEMENT CORPORATION
Mitsubishi Cement Corporation Cushenbury Plant
![Page 6: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/6.jpg)
MITSUBISHI CEMENT CORPORATION
Exhausting Challenges
![Page 7: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/7.jpg)
MITSUBISHI CEMENT CORPORATION
California AB32 – GHG monitoring adds CO2,
flow and coal mill vents
– GHG verification requires auditable DAS, strict QC and high availability
– Alternate fuels help GHG
liability, but all fuels must have tight accounting.
![Page 8: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/8.jpg)
MITSUBISHI CEMENT CORPORATION
US EPA NESHAP – Initial limits on D/F and
required opacity monitoring (D/F means WHAT???)
– New limits for HCl, Hg, THC, PM with monitoring flow and clinker production
– MCC uses lime injection and activated carbon injection for emissions control
![Page 9: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/9.jpg)
MITSUBISHI CEMENT CORPORATION
MCC CEMS in 2015
![Page 10: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/10.jpg)
MITSUBISHI CEMENT CORPORATION
A New Stack Arises!
![Page 11: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/11.jpg)
MITSUBISHI CEMENT CORPORATION
Stack of 105’ is high enough.
Someone called it a “Baby Stack”
![Page 12: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/12.jpg)
MITSUBISHI CEMENT CORPORATION
And a New CEM Building
![Page 13: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/13.jpg)
MITSUBISHI CEMENT CORPORATION
MCC CEMS in 2016
![Page 14: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/14.jpg)
MITSUBISHI CEMENT CORPORATION
“CEMS” Rack: Moisture
THC
CO2
CO
SOx
NOx
O2
![Page 15: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/15.jpg)
MITSUBISHI CEMENT CORPORATION
Even the reliable Oxygen monitor is vulnerable to
corrosive gases!
![Page 16: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/16.jpg)
MITSUBISHI CEMENT CORPORATION
FTIR HCl CEMS Backup for:
CO2
CO
SOx
NOx
Moisture
Mr. PS-18
![Page 17: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/17.jpg)
MITSUBISHI CEMENT CORPORATION
Mercury CEMS Elemental & Ionic
Calibrator(s)
Permeater
Permeater permeater
![Page 18: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/18.jpg)
MITSUBISHI CEMENT CORPORATION
So many calibrations! It becomes a…….
Mercury Analyzer QC: Hg Analyzer QA (PS12A-Procedure 5): •Weekly Oxidation Test-System Integrity Test •Monthly Permeation Test •System Response Times (Elemental and Oxidized)-upscale and downscale •Quarterly Calibration Gas Audits (Elemental and Oxidized)-Quarterly, Except RATA Quarter. •Analyzer Linearity Test (Elemental and Oxidized)-Internal Calibrations •Measurement Error Test (3 Point Test in Triplicate)-Elemental and Oxidized (System Calibration) •Relative Accuracy Test Audit (RATA)-Annual •7-Day Calibration Drift Test: Initial Compliance Test Only
FTIR HCl QC: •7-Day Calibration Drift Test •Quarterly Calibration Gas Audits: Quarterly, Except RATA Quarter. •Analyzer Linearity Test (Elemental and Oxidized)-Internal Calibrations •Measurement Error Test (3 Point Test in Triplicate)-System Calibrations •Relative Accuracy Test Audit (RATA)-Annual •Interference Tests: N2, CO, CO2, SO2, O2, THC, NOx, NH3, and Formaldehyde •System Response Times (upscale and downscale) •Dynamic Spiking (DS) •Level of Detection (LOD)
![Page 19: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/19.jpg)
MITSUBISHI CEMENT CORPORATION
Clinker Cooler Dust Collector Retrofitted for particulate monitoring Two new ducts with particulate CPMS
![Page 20: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/20.jpg)
MITSUBISHI CEMENT CORPORATION
Particulate spiking feeder
![Page 21: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/21.jpg)
MITSUBISHI CEMENT CORPORATION
Data Acquisition System Data Inputs:
Analyzer measurements Analyzer status
Flow values and checks Particulate CPMS output
Clinker Production Emission Control Injection Rates Process Status
Reporting Outputs: Daily Calibrations Weekly Hg checks Quarterly audits
Annual RATA Adjustments to 7% O2
Data Substitutions Periodic Compliance Reports
![Page 22: CEMS Challenges of Cement NESHAP CDAWG November 2017](https://reader031.vdocuments.us/reader031/viewer/2022012100/6169d8d911a7b741a34c075f/html5/thumbnails/22.jpg)
MITSUBISHI CEMENT CORPORATION
Can cement manufacturing and environment sustain each other?