    6.

    As on 31-03-12SL. REGION THERMAL Nuclear HYDRO R.E.S.@ TOTALNO. COAL GAS DSL TOTAL (Renewable) (MNRE)

    1 Northern 28357.50 4421.26 12.99 32791.75 1620.00 15122.75 4391.40 53925.90

    2 Western 38924.50 8254.81 17.48 47196.79 1840.00 7447.50 7909.95 64394.24

    3 Southern22882.50 4690.78 939.32 28512.60 1320.00 11338.03 11569.30 52739.93

    4 Eastern 21797.88 190.00 17.20 22005.08 0.00 3882.12 398.71 26285.91

    5 N. Eastern 60.00 824.20 142.74 1026.94 0.00 1200.00 228.00 2454.94

    6 Islands 0.00 0.00 70.02 70.02 0.00 0.00 6.10 76.12

    7 All India 112022.38 18381.05 1199.75 131603.18 4780.00 38990.40 24503.45 199877.03

    Captive Genration capacity in industries having demand of 1 MW and above, grid interactive (as on 31-03-10) MW 31516.87

    The installed capacity in respect of RES as on 31-03-12 is based on MNRE email of 10.04.2012 from Ministry of Renewable Energywhere cumulative Grid interactive power installed capacity has been indicated as 24914.32 MW as on 31.03.2012.( Reconciliation of installed ca acit of H dro ca acit resulted in transfer of 135 MW from conventional to SHP-RESand retrieval of installed capacity of 67.20 from SHP-RES to conventional Hydro has resulted in net addition of 67.8 MW to SHP .under RES Also 30 MW of capacity in the nature of Waste Heat Recovery Power Plant at Goa Energy Private Limited under U&Icate or of RES Out of this installed ca acit due to wind and small h dro amountin to 508.67 MW a earin in ca tive ca acit

    has been deducted to arrive at installed capacity of utilities in respect of RES(24914.32-508.67+67.8+30=22233.17)).

    Note: UNITS COMMISSIONED, DERATED & DECOMMISSIONED DURING MARCH. 12

    1) Mundra TPP,Ph-III, U-2 (660 MW) of Adani Power Ltd. has been commissioned successfully (i.e Achieving full load) on 03-03-2012

    2) Bhusawal TPS, U-4 (500 MW) of MSPGCL has been.commissioned successfully (i.e Achieving of Full load) on 07-03-2012

    3) Bellary TPP , U-2 (500 MW) of KPCL has been commissioned successfully ( Full load) on 23-03-2012

    5) Simhadri STPP St-II U-4 (500 MW) of NTPC Ltd. has been commissioned successfully (Full load) on 30-03-2012

    7) Bhusawal TPS, U-5 (500 MW) of MSPGCL has been.commissioned successfully (i.e Achieving of Full load) on 30-03-2012

    8) Mundra TPP,Ph-III, U-3 (660 MW) of Adani Power Ltd. has been commissioned successfully (i.e Achieving full load) on 09-03-2012

    9) Simhapuri TPP, U-1 (150 MW) of Simhapuri Energy Pvt Ltd. has been commissioned successfully ( Full load) on 24-03-2012

    10) Rosa TPS, U-4 (300 MW) of Rosa Power Supply Co. Ltd. has been commissioned successfully ( Full load) on 28-03-2012

    11) Durgapur Steel TPP, U-2 (500 MW) of DVC has been commissioned successfully ( Full load) on 23-03-2012

    12) Koteshwar HEP, U-4 (100 MW) of THDC has been commissioned successfully on 22-03-2012

    13) Myntdu (Leishka) Stage.I HEP, U-2 (42 MW) of MeECL has been commissioned successfully on 31-03-2012

    14) Maithon RB TPS, U-2 (525 MW) of MPL has been commissioned successfully (Full Load) on 23-03-2012

    15) The total Installed generating capacity retired during March 2012 was 155 MW ( Barauni TPS Units Nos 1 & 2 of BSEB &

    Unit No 3 of Harduaganj T P S of UPRVUNL)

    ALL INDIA REGIONWISE GENERATING INSTALLED CAPACITY MW OF POWER

    UTILITIES INCLUDING ALLOCATED SHARES IN JOINT AND CENTRAL SECTOR

    UTILITIES

    RES -Renewable Energy Sources includes Small Hydro Project(SHP), Biomass Gas(BG), Biomass Power(BP), Urban &

    Industrial waste Power(U&I), Wind Energy solar power

    4) Vallur St-I Ph-I TPP , U-1(500 MW) of NTPC/NTECL has been commissioned successfully ( Full load) on 28-03-2012

    6) Utraula IPP, U-2 (45 MW) of Bajaj Energy Pvt. Ltd. has been commissioned successfully (Full load) on 19-03-2012

    131603

    4780

    3899024503

    199877

    31516.87

    0

    25000

    50000

    75000

    100000

    125000

    150000

    175000

    200000

    Thermal Nuclear Hydro RES Total Captive

    Thermal Nuclear Hydro RES Total Captive

    ENERGY SAVED IS ENERGY PRODUCED