    I SSCOREMd Nasir Bin Md SafarJKA, POLITEKNIK SULTAN ABDUL HALIM

    MUADZAM SHAH.

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    2/27

    DEFINITION

    A structured and

    systematically evaluation

    systemsUsed to measure the content

    usage of IBS components in

    a building

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    3/27

    PRINCIPLE OF IBS SCORE

    The use of prefabricated and precast concrete

    components

    Off-site production of components

    The use of standardized components

    Repeatability

    Design using MC concept

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    4/27

    HIGHERIBS SCOREREFLECT:

    Clean environment

    Quality

    safe

    Faster completion

    workers on site

    Wastage

    Site materials

    Total cost

    100

    70

    50

    30

    Total IBS Score (%)

    = +

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    5/27

    5

    Modular MS 1064

    PART 3 : OTHER SIMPLIFIED CONSTRUCTION

    Repetitiveness

    PART 1 : STRUCTURAL SYSTEMtrusses

    ColumnSlab

    PART 2 : WALL SYSTEM

    Internal wall

    External wall

    IBS CONTENT SCORING SYSTEM (IBS SCORE)

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    6/27

    IBS CONTENT SCORING SYSTEM (IBS SCORE)

    MAX IBS Score for a building is = 100 pointsThe IBS Score is made up of the following components :

    Part 1: Structural System, Max= 50 points

    Part 2: Wall System, Max= 20 points

    Part 3: Other Simplified Construction

    Solutions, Max= 30 points

    +IBS SKOR 2010 50p + =20p 30p 100p

    Part 1 Part 2 Part 3

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    7/27

    7

    STRUCTURAL SYSTEM WALL SYSTEM

    OTHER SIMPLIFIED

    CONSTRUCTION

    SOLUTIONS

    Formula IBS Score

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    8/27

    CALCULATION PRINSIP1. Structural system

    Sub-structure works (elements) are not taken into account in the calculation

    e.g. Piling, ground beam, ground slab, underground car park etc)

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    9/27

    Table 1: IBS Factor: Structural System

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    10/27

    Table 1A: IBS Factor: Roof System

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    11/27

    Beam : precast beam

    Column : insitu column with reusable

    formwork

    Slab :precast concrete half floor slab

    Ground floor

    First floor

    Roof

    Beam : precast beam

    Column : insitu column with reusable

    formwork

    No floor :

    Roof : Roof truss using prefab roof truss

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    12/27

    STRUCTURALSYSTEM :NOTES TABLE 1)1.Precast concrete slabs include half slab, hollow core slab and

    precast prestressed plank.

    2. Reusable formworks include plastics, fiberglass, Steel,aluminium and other metal formworks that can be used notless than 20 cycles

    3. Timber formwork (timber roof trusses) means the timbercomponents are sized, cut and fabricated in-situ to form theformworks and the required temporary works.

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    13/27

    5. The factor for tunnel formwork system is 0.6

    8. For other structural systems not mentioned in the table

    please refer to IBS Centre, CIDBfor the factor.

    6. Load-bearing blockwork include interlocking block, concrete

    mansory unit, hollow and lightweight block

    7. This is structures without floor.

    STRUCTURALSYSTEM:NOTES TABLE1)

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    14/27

    EXERCISE1

    Question

    What is the IBS Factor for the following Structural components?

    (Refer Table 1 & 1A)

    1. Ground Floor

    i) Precast Concrete beamii) Column with timber formwork

    iii) All slab pre-stress plank except toilet area insitu

    2. Roofi) Prefab roof truss.

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    15/27

    EXERCISE1Question

    What is the IBS Factorfor the following Structural components?

    (Refer Table 1 & 1A)

    1. Ground Floor

    i) Precast Concrete beamii) Column with timber formwork = 0.8

    iii) All slab pre-stress plank except toilet area insitu

    2. Roofi) Prefab roof truss = 1.0

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    16/27

    2. Wall system- Points are awarded based on the wall system

    used

    - Allocation based on the % of the length of thewall system used

    Point =

    Qw Length of wall system is used

    Qst Total wall length of the building

    Fw from Table 2

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    17/27

    Table 2: IBS Factor: Wall System

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    18/27

    1. Precast concrete panels include sandwich panel, solidpanel, hollow core panel and bay-window.

    2. Wall cladding consists of panel actings as wall or facade

    and not as a skim to brickwall

    3. For full height windows, use the IBS factor for panel glass.

    For wall with non-full height windows, take the highest or

    the widest materials.

    4. Pre-assemble brickwall/blockwall means brick that being

    laid in form of a panel and transported to site.

    5. Wall constructed using tunnel formworks, use Factor 0.6

    WALL SYSTEM: NOTES (TABLE 2)

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    19/27

    - Points are awarded based on the utilisation ofconstruction methods or solutions that cancontribute to the objectives of IBS.

    Point = 30%S

    3. Other Simplified Construction

    - Use of standardised components; MS1064

    (Beams, columns, walls, slab, windows, door)- Repeating features Vertical repetitions, horizontal

    repetition

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    20/27

    TABLE 3 : IBS SCORE FOR OTHER SIMPLIFIED CONSTCRUTION SOLUTIONS

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    21/27

    OTHERSIMPLIFIEDCONSTRUCTION: NOTES(TABLE3)

    1. Refer to MS 1064: Pt 4: 2001 ( Coordinating sizes andPreferred sizes for doorsets.

    2. Refer to MS 1064: Pt 5: 2001 (Coordinating sizes andPreferred sizes for window sets.

    3. Refer to MS 1064:Pt 10: 2001 ( Coordinating sizes andPreferred sizes for reinforced concrete components.

    4. For structure using load bearing wall system, 8 marks isgiven automatically

    5. For non-concrete beams columns and slabs, 4 marks isgiven automatically for each component

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    22/27

    EXAMPLE

    IBS Score Calculation

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    23/27

    Double Storey TerraceHouse

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    24/27

    Say, from measurement taken from drawings:

    1) Construction area

    i) Construction area ground floor = 117.0 m2ii) Construction area 1st floor = 117.0 m2iii) Construction roof area = 117.0 m2Total construction area = 351.0 m2

    2)Structural Systems

    i) Beams: Precast concrete beamsii) Columns : In-situ concrete using steel formworksiii) Floor slab: Precast half slabs flooriv) Roof truss: Prefabricated timber roof truss.

    3) Wall Systemi) Internal wall: Precast concrete panelii) External wall: Precast blockworks

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    25/27

    Other simplified construction solutions

    i) Beams: 60% complies to MS 1064

    Columns: 100% complies to MS 1064

    Walls and slabs: Less than 50% complies to MS 1064

    Doors : 80% complies to MS 1064

    Windows: 0% complies to MS 1064

    ii) Horizontal repetition of structure = 100%

  • 8/13/2019 Cc206 - Bab 4 Ibs Score New

    26/27

    75.6IBS CONTENTS SCORE OF PROJECT (Part 1 + Part 2 + Part 3)

    16Total Part 3

    6100%iv) Horizontal repetition of structure = 100%

    480%iii) 80% of door sizing follow MS 1064 Part 4: 2001

    4100%ii) 100% of column sizing follow MS 1064 Part 10:

    2001

    260%i) 60% beam sizes follow MS 1064 Part 10: 2001

    Part 3: Other simplified construction solutions

    14.81.00167.3mTotal Part 2

    0.48 x 1.0 x 20

    =9.6

    (79.5/167)

    =0.481.0079.5mInternal wall using precast concrete panel

    0.52 x 0.5 x 20

    =5.2

    (87.8/167)

    =0.520.587.8mExternal wall using precast concrete blockworks

    Part 2: Wall System

    44.61.00351.0 m2Total Part 1

    0.33 x 1.0 x 50

    =16.5

    (117/351)

    =0.331.0117.0m2

    Roof truss using prefab roof truss

    Roof area = 117.0m2

    0.33 x 0.8 x 50

    =13.2

    (117 / 351)

    =0.330.8117.0 m2

    Precast beams + in-situ column with reusable

    formwork (no floor)

    1stfloor area = 117.0m2

    0.33 x 0.9 x 50

    =14.9

    (117 / 351)

    =0.330.9117.0m2

    Precast beams + in-situ column with reusable

    formwork + precast concrete half slab floor.Ground floor area = 117.0m2

    Part 1: Structure Elements

    IBS

    SCORECOVERAGE

    IBS

    FACTOR

    AREA (m2) or

    Length (m)ELEMENTS