    Specifcation Report to accompany the Estimate

    Estimate Amount : Rs. 100.00

    Provisions:-

    For CC Roads:-

    1) Providing and laying GSB 100mm thick in widening ortion!

    ") Providing #CC 1:$:% &elow CC avement!') Providing (' grade concrete *or CC avement

    $) Providing +ncoated mild steel *or contraction and e,ansion oints

    ) Providing and .,ing "!$ mm (astic ad in e,ansion oints

    /) Providing earthen sho+lders

    For CC rains:-

    1) arthwork e,cavation *or CC rains

    ") Sand .lling in *o+ndations *or CC avement and CC drains

    ') Providing #CC 1:$:% &elow CC avement and CC drains

    $) #CC (1 *or CC rain &ed and &ody walls) Providing #RCC ("0 grade concrete *or CC rain cover &locks

    /) Providing 23S *or Rein*orcement *or #RCC drain cover sla&s

    4) Plastering in C( 51:) 1" mm thick

    LS provisions:-

    1) Provision towards #67 8 9

    ") Provision *or rice ad+stment

    ') Provision *or C charges

    $) Provision towards ins+rance charges

    ) Provision towards ;6C/) Provision *or Seigniorage Charges!

    4) Provision *or 6vagahana sadass+

    %) Provision *or Saw c+tting< seeration mem&rane etc!

    1.Providing CC roads in SC Coony o! "anthetivaripodu in #.#. $era%a inProviding CC road to Choppaavari &roup SC Coony in $ai%ipuram #iag

    Providing CC Road to SC Coony at "andi%atavari &roup in La%%avara$ai%i uram $anda E.&.'t.

      7he work =1!Providing CC roads in SC Colony o* >anthetivariod+ in!G!t! "! Providing CC road to Choallavari Gro+ SC Colony in (aliki+ram #i'! Providing CC Road to SC Colony at >andikatlavari Gro+ in ?akkavaram #illag(andal< !G!t!= is sanctioned vide G!@!Rt!;o! 1%'< t! 01!0$!"01/ o* 7 RAB 5*or the year "01-1/! n this connection< the estimate *or this work is rerovisions as stated &elow!  Constr+ction o* CC roads is roosed in the internal roads o* the Scommercial vehic+lar trac on these internal roads is very less! 2ence< consPavement is roosed with a nominal cr+st o* 100mm GSB D 100 mm thick10mm thick #CC ('! 7he minim+m cross section o* 0!E00( width o* drain wa length o* 1"E!00m on one side o* the road in >athetivariod+ SC Colony and 'one side o* the road in Choallavari Gro+ SC Colony! 7he CC drains are

    >anthetivari Gro+ in ?akkavaram #illage!

    ith the e,lained rovisions< the internal roads in SC Colonies arethese rovisions are adoted as er the act+al re+irement &ased on the road ce,tent o* a&sol+te necessity!

  • 8/18/2019 CC Road With Drains

    2/80

    E) Provision *or Shi*ting o* lectrical oles

    10) Provision *or Hn*oreseen items and ro+nding oI 

    6sst ,ec+tive ngineer 5RAB)< e+ty ,ec+tive

    RAB Section< (aliki+ram RAB S+&-divisi

    ,ec+tive ngineer 5RAB)< S+erintending n

    RAB ivision< 6mala+ram RAB Circle< >  

      7he estimate is reared with "01-"01/ commom SSR *oreartment and datas as er (oR7A2 standard data &ook d+ly adoting over h/9 and contractors ro.t at 109 as er G!@!(s ;o 1$1< 75RAB) et< date

    Provision *or #67 is shown searately as P6R7 =B= in the estimate as er G!@!(set!< t "4!04!"00/ 7he work will &e carriedo+t as er relevant cla+ses o*

  • 8/18/2019 CC Road With Drains

    3/80

     

    La%hs

     

    E.&.'t. (.in E.&.'t. ).#iage*

    #!#! (eraka inlage in !G!t!e< (aliki+ram!) +nder SCSPared with the

    Colonies! 7hetr+ction o* CC#CC 51:$:%) Ds roosed *or0( length onot re+ired in

    reared andondition to the

  • 8/18/2019 CC Road With Drains

    4/80

      gineer 5RAB)<

      n< RaJole

      ineer 5RAB)<

      kinada

    ll ngineeringad charges 8"4!04!"00/!

    o 1$1< 75RAB)RC A (@R72

  • 8/18/2019 CC Road With Drains

    5/80

    &E+ERAL A,SRAC

    tem 'escription Amount

    Part - A

    1 Cost o* CC road work /

  • 8/18/2019 CC Road With Drains

    6/80

    5RAB) ivision : 6mala+ram 5RAB) Circle : >akinada

  • 8/18/2019 CC Road With Drains

    7/80

    'EALE' C8$ A,SRAC ES$AE 93R R3A' 73R" 

    +ame o! or% :

    4CC Road 7or%5

    SCRP7@; ;@ ? B Contents Rate Per

    1

    >anthetivariod+ in ## (eraka

    1,1 180 '!4 0!10 /4!0

    1,1 129 '!4 0!10 $%!'%

    Choallavari Gro+ SC Colony in (aliki+ram #illage

    1,1 350 '!4 0!10 1'1!"

    >andikatlavari Gro+< ?akkavaram #illage

    1,1 300 '!4 0!10 11"!0

      'E!/'or '/0!00 ""$!00 c+m

    c+m

    "

    >anthetivariod+ in ## (eraka

    1,1 180 '!4 0!10 /4!0

    1,1 129 '!4 0!10 $%!'%

    Choallavari Gro+ SC Colony in (aliki+ram #illage

    1,1 350 '!4 0!10 1'1!"

    >andikatlavari Gro+< ?akkavaram #illage

    1,1 300 '!4 0!10 11"!0

      'E!/'

    or '/0!00 $$1!00 c+m

    c+m

    1.Prov ng CC roa s n SC Co ony o "ant et var po u n #.#. $era a n E.&.Providing CC road to Choppaavari &roup SC Coony in $ai%ipuram #iage in E

    Providing CC Road to SC Coony at "andi%atavari &roup in La%%avaram #i$ai%i uram $anda E.&.'t.

    S!

    ;o!Constr+ction o* Gran+lar s+&-&ase &y roviding 2BGmaterial con.rming to Grading - o* (oR7A2 7a&le $00-" incl+ding cost< seigniorage charges and conveyance o*all materials to work site and sreading in +ni*orm layerswith motor grader or &y aroved means< on reareds+r*ace mi,ing &y mi, in lace method with Rotavator Karoved means at @(C and comacting with vi&ratoryroller to achieve the desired density etc!< comlete *or.nished item o* work as er (oR7A2 Seci.cation $015$th revision) and as directed &y the ngineer-in-charge! 5

    Payment will &e made &ased on levels *or .nished item o*work )!

    Providing #i&rated Cement Concrete 51:$:%) mi, +sing$0mm siJe 2BG cr+shed stone aggregate and .neaggregate con*orming to ta&le 1000-" o* (oR7A2incl+ding cost< seigniorage conveyance o* all materials tosite and la&o+r charges< centering< machine mi,ing<laying< #i&rating< c+ring etc!< incl+ding all otherincidental and oerational charges o* all 7AP etc!<

    comlete *or .nished item o* work as er (oR7A2seci.cation 100

  • 8/18/2019 CC Road With Drains

    8/80

    SCRP7@; ;@ ? B Contents Rate PerS!

    ;o!

    '

    >anthetivariod+ in ## (eraka

    1,1 180 '!4 0!1 101!"

    1,1 129 '!4 0!1 4"!/

    Choallavari Gro+ SC Colony in (aliki+ram #illage1,1 350 '!4 0!1 1E/!%%

    >andikatlavari Gro+< ?akkavaram #illage

    1,1 300 '!4 0!1 1/%!4

      'E!$$

    or $0!00 /%"!00 c+m

    c+m

    $

    >anthetivariod+ in ## (eraka

    1,$ 0.50 '!% - - 4!40

    1,' 0.50 '!% - - !4%

    Choallavari Gro+ SC Colony in (aliki+ram #illage

    1,% 0.50 '!% - - 1!$0

    >andikatlavari Gro+< ?akkavaram #illage

    1,4 0.50 '!% - - "%!%%

      kgKm 4!4

    or 0!0/ LLL (7

    (7

    >anthetivariod+ in ## (eraka

    #i&rated cement concrete ( ' grade +sing "0mm A10mm 2BG cr+shed stone aggregate 5Coarse aggregatecon*orming to ta&le 1000-1 and .ne aggregatecon*orming to ta&le 1000-") incl+ding cost< seigniorageconveyance o* all materials to site and la&o+r charges<centering< machine mi,ing< laying< vi&rating< c+ring etc!<

    incl+ding all other incidental and oerational charges o*all 7AP etc!< comlete *or .nished item o* work as er(oR7A2 seci.cation 100< 1400< "100 A "40" 5$thRevision) and as directed &y the ngineer-in-Charge *orC!C Pavement! 5incl+ding #ac++m dewatered Mooringservice< Saw c+tting and .lling oints with sealingcomo+nd)

    Providing Hncoated (ild Steel &ars 5 Fe-"0 ) o* diIerentdiameters< wro+ght and +t + &ars o* all diametersincl+ding cost and conveyance o* steel to site and all

    la&o+r charges *or *a&rication o* rein*orcement incl+dingc+tting< &ending< &inding rods< tying grills< lacing themin osition etc!< comlete incl+ding cost and conveyanceo* &inding wire and all handling charges and oerationalcharges etc!< and incl+ding over laing welding i*re+ired etc!< comlete *or all R!C!C items *or .nisheditem o* work as er standard drawings< as er thedirections o* the ngineer-in-Charge and as er (oR7A2seci.cation 1/00 A""00 5$th revision) and as er!S!14%/ o* 1E% !*or dowel &ars

    Providing "!$ mm mastic ads *or ?ongit+dinal oints<

     7ransversal e,ansion oints and Constr+ction oints o*aroved +ality incl+ding cost< conveyance and lacingin osition< etc!< comlete as directed &y the ngineer-in-charge!

  • 8/18/2019 CC Road With Drains

    9/80

    SCRP7@; ;@ ? B Contents Rate PerS!

    ;o!

    $ 3.75 0!1 "!"

    ' 3.75 0!1 1!/E

    Choallavari Gro+ SC Colony in (aliki+ram #illage

    % 3.75 0!1 $!0

    >andikatlavari Gro+< ?akkavaram #illage

    ' 3.75 0!11!/E

      10!1'

    or 11!00 EE1!00 sm

    sm

    /

    >anthetivariod+ in ## (eraka

    1," 180 1!00 0!" E0!00

    1,1 129 1!00 0!" '"!"

    Choallavari Gro+ SC Colony in (aliki+ram #illage

    1,1 350 1!00 0!" %4!0

    >andikatlavari Gro+< ?akkavaram #illage

    1," 300 1!00 0!" 10!00

      'E!4

    or '/0!00 11/0!00 c+m

    c+m

    6sst! ,ec+tive ngineer 5RAB)< y! ,ec+tive ngineer

    5RAB) Section : (aliki+ram 5RAB) S+& ivision :

    ,ec+tive ngineer 5RAB)< S+erintending nginee

    5RAB) ivision : 6mala+ram 5RAB) Circle : >akin

    Forming sho+lders with &orrowed +se*+l selected earthhaving ( o* not less than 1!4 gmsKCC *rom o+tsideroad &o+ndary &y mechnical means with a lead o* 14kms! and li*ts incl+ding re-watering o* soil at &orrowarea< removal o* to soil< e,cavation o* soils at &orrowedarea< conveyance o* soil< deositing the soils on the

    em&ankment< sreading soils< &reaking clods< sectioning<grading and consolidation with vi&ratory road roller 8@(C to meet re+irement o* ta&le '00-" o* (@R7A2incl+ding all hire and oerational charges o* 7AP andcomlete *or .nished item o* work as er (@R7A2seci.cation '0 5$th revision)

  • 8/18/2019 CC Road With Drains

    10/80

     

    6mo+nt

    %0%"00

    1%E$00

    't. (..&.'t. ).ge*

  • 8/18/2019 CC Road With Drains

    11/80

    6mo+nt

    '/%00

    "%$0

  • 8/18/2019 CC Road With Drains

    12/80

    6mo+nt

    10E01

    $14/00

    ;E600<

      5RAB)<

      aJole

      r 5RAB)<

      ada

  • 8/18/2019 CC Road With Drains

    13/80

    'EALE' C8$ A,SRAC ES$AE

    +ame o! the or%:

    4CC 'rains 7or%5

    'escription o! item +o L , ' Amount

    1 ( ) 2 < ; /

    1

    >anthetivariod+ in ## (eraka

    5 1 , 1 ) 1"E 0!E00 0!E0 110!'0

    Choallavari Gro+ SC Colony in (aliki+ram #illage

    5 1 , 1 ) '0 0!E00 0!E0 "EE!"

     7otal length o* drain $4E!00

    $0E!

    or say 210.00 E'!00 '%anthetivariod+ in ## (eraka

    5 1 , 1 ) 1"E!00 0!E00 0!100 11!/1

    Choallavari Gro+ SC Colony in (aliki+ram #illage

    5 1 , 1 ) '0!00 0!E00 0!100 '1!0$'!11

    1.Providing CC roads in SC Coony o! "anthetivaripodu in #.#. $era%ain E.&.'t. (. Providing CC road to Choppaavari &roup SC Coony in$ai%ipuram #iage in E.&.'t. ). Providing CC Road to SC Coony at"andi%atavari &roup in La%%avaram #iage* $ai%ipuram $anda*E.&.'t.

    S.+o.

    =uantity

    Rate>Per

    arthwork e,cavation in soils +to SR &y mechanical means *or*o+ndations o* str+ct+res as er drawing and technicalseci.cation incl+ding setting o+t< constr+ction o* shoring and&racing< removal o* st+ms and other deleterio+s matter< dressingsides o* &ottom< &ack .lling the e,cavation earth to the e,tentre+ired etc!< comlete incl+ding seignioarge charges *or .nisheditem o* work as er (oR7A2 seci.cation '0$5$th Revision) and

    as directed &y the ngineer-in-Charge

    Sand .lling in *o+ndation incl+ding cost< seignoirage andconveyence o* all materials to site and watering< taming etc!<comlete *or .nshed item o* work as er (oR7A2 seci.cation '0$5$th Revision) and as directed &y the ngineer - in - Charge!

    Providing #i&rated Cement Concrete 51:$:%) mi, +sing $0mm siJe2BG cr+shed stone aggregate and .ne aggregate con*orming tota&le 1000-" o* (oR7A2 incl+ding cost< seigniorage conveyance o*all materials to site and la&o+r charges< centering< machinemi,ing< laying< #i&rating< c+ring etc!< incl+ding all other incidentaland oerational charges o* all 7AP etc!< comlete *or .nished itemo* work as er (oR7A2 seci.cation 100

  • 8/18/2019 CC Road With Drains

    14/80

    'escription o! item +o L , ' Amount

    1 ( ) 2 < ; /

    S.+o.

    =uantity

    Rate>Per

    or say 2).11 $$1!00 1

  • 8/18/2019 CC Road With Drains

    15/80

    'escription o! item +o L , ' Amount

    1 ( ) 2 < ; /

    S.+o.

    =uantity

    Rate>Per

    Cover Blocks 5 1 , 400 ) 0!0 0!E00 0!"00 /'!00%/!""

    or say ;.00 /"%/!00 gs >gs

    or say anthetivariod+ in ## (eraka

    Cover Blocks 5 1 , 1 ) 1"E!00 "!'"0 -- "EE!"%

    0!00Cover Blocks 5 1 , 1 ) '0!00 "!'"0 -- %1"!00

    1akinada

    Providing 23S &ars 5 Fe-$1 ) o* diIerent diameters< wro+ght and+t + &ars o* all diameters incl+ding cost and conveyance o* steelto site and all la&o+r charges *or *a&rication o* rein*orcementincl+ding c+tting< &ending< &inding rods< tying grills< lacing themin osition etc!< comlete incl+ding cost and conveyance o*&inding wire and all handling charges and oerational charges etc!<and incl+ding over laing welding i* re+ired etc!< comlete *or allR!C!C items *or .nished item o* work as er standard drawings< aser the directions o* the ngineer-in-Charge and as er (oR7A2seci.cation 1/00 A""00 5$th revision) and as er !S!14%/ o*1E% *or S+& str+ct+re o* R!C!C items!

    Plastering in C( 51:) 1" mm thick incl+ding cost and conveyanceo* all materials< seigniorage charges< la&o+r charges< c+ring etccomlete *or .nished item o* work as directed &y the ngineer -in-

     

  • 8/18/2019 CC Road With Drains

    16/80

    LEA' CALC8LA3+ 93R #AR38S $AERALS 8P3 CE+ER 39 @E 73R"+& SREC@

    ;ame o* the work:

    -:o@o:-

    >anthetivariod+ in ## (erakaReach roosed in the resent estimate: km 0 K 0 to 0 K '0E N 0!'0E kms

    Centre "$ o! the 7or%ing Reach N 0!1 kms

    N0.1

    ".$.A5 9or @,& meta:

    2BG metal *rom >ather+ +arry

    a) Cart track length N N "!"00 kms

    &) (etalled road length:

    From km E0/ K $00 to E$$ K %0 o* ;2 1/ N '%!$0 kms

    From km /1 K $" to '1 K 4' o* ;2 1/ to RP road N "E!/E0 kms

    From km 1"0 K '0 to 11 K 0 o* ;2 "1/ N $!%00 kms

    From km 0 K 000 to " K /00 o* S ( road N "!/00 kms

    From km 0 K 000 to K /0 o* CB( Road N !/0 kms

    From km 0 K 000 to 0 K 4' o* CB( road to ;RGS B+ilding N 0!4' kms

    From km 0 K 000 to 0 K 4% o* ;RGS B+ilding to >anthetivariod+ N 0!4% kms

    orking >!(! 0.1 ".$. N 0!1 kmsc) 7otal lead N %$!EE' kms

    @r say: kms

    ,5 9or grave:

    Gravel *rom >adi+m +arry

    a) Cart track length N N 0!000 kms

    &) (etalled road length:

    +arry at >adi+m +arry

    From km K /00 to /0 K "00 o* >akinada - Raahm+ndry Road N $!/00 kms

    From km E1% K "00 to E$$ K %0 o* ;2 1/ N "/!/0 kms

    From km /1 K $" to '1 K 4' o* ;2 1/ to RP road N "E!/E0 kms

    From km 1"0 K '0 to 11 K 0 o* ;2 "1/ N $!%00 kms

    From km 0 K 000 to " K /00 o* S ( road N "!/00 kms

    From km 0 K 000 to K /0 o* CB( Road N !/0 kms

    From km 0 K 000 to 0 K 4' o* CB( road to ;RGS B+ilding N 0!4' kms

    From km 0 K 000 to 0 K 4% o* ;RGS B+ilding to >anthetivariod+ N 0!4% kms

    orking >!(! 0.1 ".$. N 0!1 kms

    c) 7otal lead N 4!E' kms

    @r say: kms

    C5 9or Sand :

    Sand +arry at River Godavari at P! Gannavaram

     River Bed to Panchayat Road N 0!110 kms

    Panchayat Road N 0!"00 kms

    From km $E K 04" to /1 K $" o* Raavaram - Podalada Road N 1"!'' kmsFrom km 1"0 K '0 to 11 K 0 o* ;2 "1/ N $!%00 kms

    From km 0 K 000 to " K /00 o* S ( road N "!/00 kms

    From km 0 K 000 to K /0 o* CB( Road N !/0 kms

    From km 0 K 000 to 0 K 4' o* CB( road to ;RGS B+ilding N 0!4' kms

    From km 0 K 000 to 0 K 4% o* ;RGS B+ilding to >anthetivariod+ N 0!4% kms

    orking >!(! 0.1 ".$. N 0!1 kms

    c) 7otal lead N "4!'/1 kms

    @r say: kms

    sst! ,ec+tive ngineer 5RAB) e+ty ,ec+tive ngineer 5RAB)< ,ec+tive ngineer 5RAB)<

    RAB Section : (aliki+ram RAB S+&-division : RaJole AB ivision : 6mala+ra

    S+erintending ngineer 5RAB)<

    5RAB) Circle : >akinada

    1!Providing CC roads in SC Colony o* >anthetivariod+ in #!#! (eraka in !G!t! "!Providing CC road to Choallavari Gro+ SC Colony in (aliki+ram #illage in !G!t! '!Providing CC Road to SC Colony at >andikatlavari Gro+ in ?akkavaram #illage

  • 8/18/2019 CC Road With Drains

    17/80

    LEA' CALC8LA3+ 93R #AR38S $AERALS 8P3 CE+ER 39 @E 73R"+& SREC@

    ;ame o* the work:

    -:o@o:-

    Choallavari Gro+ SC Colony in (aliki+ram #illage

    Reach roosed in the resent estimate: km 0 K 000 to 0 K '0 N 0!'0 kms

    Centre "$ o! the 7or%ing Reach N 0!14 kms

    N 0.1; ".$.

    A5 9or @,& meta:

    2BG metal *rom >ather+ +arry

    a) Cart track length N N "!"00 kms

    &) (etalled road length:

    From km E0/ K $00 to E$$ K %0 o* ;2 1/ N '%!$0 kms

    From km /1 K $" to '1 K 4' o* ;2 1/ to RP road N "E!/E0 kms

    From km 1"' K E' to 11 K 4/0 o* ;2 "1/ N %!14 kmsFrom km %1 K /00 to %/ K E%0 o* >6;F Road N !'%0 kms

    orking >!(! 0.1; ".$. N 0!14 kms

    c) 7otal lead N %$!0" kms

    @r say: kms

    ,5 9or &rave:

    Gravel *rom >adi+m +arry

    a) Cart track length N N 0!000 kms

    &) (etalled road length:

    +arry at >adi+m +arry

    From km K /00 to /0 K "00 o* >akinada - Raahm+ndry Road N $!/00 kmsFrom km E1% K "00 to E$$ K %0 o* ;2 1/ N "/!/0 kms

    From km /1 K $" to '1 K 4' o* ;2 1/ to RP road N "E!/E0 kms

    From km 1"' K E' to 11 K 4/0 o* ;2 "1/ N %!14 kms

    From km %1 K /00 to %/ K E%0 o* >6;F Road N !'%0 kms

    orking >!(! 0.1; ".$. N 0!14 kms

    c) 7otal lead N 4$!/" kms

    @r say: kms

    C5 9or Sand :

    Sand +arry at River Godavari at P! Gannavaram

     River Bed to Panchayat Road N 0!110 kms

    Panchayat Road N 0!"00 kmsFrom km $E K 04" to /1 K $" o* Raavaram - Podalada Road N 1"!'' kms

    From km 1"' K E' to 11 K 4/0 o* ;2 "1/ N %!14 kms

    From km %1 K /00 to %/ K E%0 o* >6;F Road N !'%0 kms

    orking >!(! 0.1; ".$. N 0!14 kms

     7otal lead N "/!'E' kms

    @r say: kms

    sst! ,ec+tive ngineer 5RAB) e+ty ,ec+tive ngineer 5RAB ,ec+tive ngineer 5RAB)<

    RAB Section : (aliki+ram RAB S+&-division : RaJole RAB ivision : 6mala+ram

    S+erintending ngineer 5RAB)<

    5RAB) Circle : >akinada

    1!Providing CC roads in SC Colony o* >anthetivariod+ in #!#! (eraka in !G!t! "!Providing CC road to Choallavari Gro+ SC Colony in (aliki+ram #illage in !G!t!'! Providing CC Road to SC Colony at >andikatlavari Gro+ in ?akkavaram #illage<(aliki+ram (andal< !G!t!

  • 8/18/2019 CC Road With Drains

    18/80

    LEA' CALC8LA3+ 93R #AR38S $AERALS 8P3 CE+ER 39 @E 73R"+& SREC@

    ;ame o* the work:

    -:o@o:-

    >andikatlavari Gro+< ?akkavaram #illage

    Reach roosed in the resent estimate: km 0 K 0 to 0 K '00 N 0!'00 kms

    Centre "$ o! the 7or%ing Reach N 0!10 kms

    N 0.10 ".$.

    A5 9or @,& meta:2BG metal *rom >ather+ +arry

    a) Cart track length N N "!"00 kms

    &) (etalled road length:

    From km E0/ K $00 to E$$ K %0 o* ;2 1/ N '%!$0 kms

    From km /1 K $" to '1 K 4' o* ;2 1/ to RP road N "E!/E0 kms

    From km 1"0 K '0 to 11 K 0 o* ;2 "1/ N $!%00 kms

    From km 0 K 000 to " K /00 o* S ( road N "!/00 kms

    From km 0 K 000 to $ K 14 o* CB( Road N $!14 kms

    orking >!(! 0.10 ".$. N 0!10 kms

    c) 7otal lead N %"!'/" kms

    @r say: kms

    ,5 9or grave:

    Gravel *rom >adi+m +arry

    a) Cart track length N N 0!000 kms

    &) (etalled road length:

    +arry at >adi+m +arry

    From km K /00 to /0 K "00 o* >akinada - Raahm+ndry Road N $!/00 kms

    From km E1% K "00 to E$$ K %0 o* ;2 1/ to RP road N "/!/0 kms

    From km /1 K $" to '1 K 4' o* ;2 1/ to RP road N "E!/E0 kms

    From km 1"0 K '0 to 11 K 0 o* ;2 "1/ N $!%00 kms

    From km 0 K 000 to " K /00 o* S ( road N "!/00 kms

    From km 0 K 000 to $ K 14 o* CB( Road N $!14 kms

    orking >!(! 0.10 ".$. N 0!10 kmsc) 7otal lead N 4"!E/" kms

    @r say: kms

    C5 9or Sand :

    Sand +arry at River Godavari at P! Gannavaram

     River Bed to Panchayat Road N 0!110 kms

    Panchayat Road N 0!"00 kms

    From km $E K 04" to /1 K $" o* Raavaram - Podalada Road N 1"!'' kms

    From km 1"0 K '0 to 11 K 0 o* ;2 "1/ N $!%00 kms

    From km 0 K 000 to " K /00 o* S ( road N "!/00 kms

    From km 0 K 000 to $ K 14 o* CB( Road N $!14 kms

    orking >!(! 0.10 ".$. N 0!10 kms

    c) 7otal lead N "$!4'0 kms

    @r say: kms

    sst! ,ec+tive ngineer 5RAB) e+ty ,ec+tive ngineer 5RAB)< ,ec+tive ngineer 5RAB)<

    RAB Section : (aliki+ram RAB S+&-division : RaJole AB ivision : 6mala+ra

    S+erintending ngineer 5RAB)<

    5RAB) Circle : >akinada

    1!Providing CC roads in SC Colony o* >anthetivariod+ in #!#! (eraka in !G!t! "!Providing CC road to Choallavari Gro+ SC Colony in (aliki+ram #illage in !G!t! '!Providing CC Road to SC Colony at >andikatlavari Gro+ in ?akkavaram #illage

  • 8/18/2019 CC Road With Drains

    19/80

    7E&@E' A#ERA&E LEA' CALC8LA3+S

    Road +ame

    @,& &rave Sand

    1 >anthetivariod+ in ## (eraka 0!'0E %$!EE' "/!"/' 4!E' "'!'% "4!'/1 %!$$

    " 0!'0 %$!0" "E!$0E 4$!/" "/!11E "/!'E' E!"'%

    ' 0!'00 %"!'/" "$!40E 4"!E/" "1!%%E "$!4'0 4!$1E

    7eighted Average Lead ).1; ;2.21; (andikatlavari Gro+< ?akkavaram#illage

  • 8/18/2019 CC Road With Drains

    20/80

    ROAD METAL RATES

    ;6( @F @R> ::-

    escrition o* (etal

     A) FOR ROAD WORKS

    1 /0 to /' mm RC and (oR72 2BG metal "atheru 2 /2./0 $1E!00 40!00 -- -- -11'!41

    " 0 to mm RC and (oR72 2BG metal -- do -- %$ E$%!E0 $/!00 40!00 -- -- -11'!41

    ' $0 to $ mm RC and (oR72 2BG metal -- do -- %$ E$%!E0 %%!00 40!00 -- -- -11'!41

    0 to mm RC and (oR72 2BG (KC metal -- do -- %$ E$%!E0 $/!00 40!00 11$!00 -- -11'!41

    $ $0 to $ mm RC and (oR72 2BG (KC metal -- do -- %$ E$%!E0 %%!00 40!00 1$4!00 -- -11'!41

    " to "4 mm RC and (oR72 2BG (KC metal -- do -- %$ E$%!E0 E$$!00 40!00 "'/!00 -- -11'!41 "

    / 1E to "" mm RC and (oR72 2BG (KC metal -- do -- %$ E$%!E0 E%$!00 40!00 "$/!00 -- -11'!41 "

    4 1" to 1$ mm RC and (oR72 2BG (KC metal -- do -- %$ E$%!E0 4%0!00 40!00 1E!00 -- -11'!41

    % -- do -- %$ E$%!E0 //!00 40!00 1/$!00 -- -11'!41

    E to 4 mm RC and (oR72 2BG (KC metal -- do -- %$ E$%!E0 0$!00 40!00 1"/!00 -- -11'!4110 "!'/ to mm RC and (oR72 2BG (KC metal -- do -- %$ E$%!E0 '0%!00 40!00 44!00 -- -11'!41

    11 2BG Stone chis "!'/mm and &elow -- do -- %$ E$%!E0 '0!00 -- -- -- -11'!41

    1" Gravel "adiyam ;2 2./0 10'!00 -- -- -- -101!'4

    B) FOR C.D. WORKS

    1' $0 mm SS- 2BG (KC metal "atheru 2 /2./0 /"0!00 40!00 1!00 -- -11'!41

    1$ " mm SS- 2BG (KC metal -- do -- %$ E$%!E0 EE$!00 40!00 "$%!0 -- -11'!41 "

    1 "0 mm SS- 2BG (KC metal -- do -- %$ E$%!E0 10'/!00 40!00 "E!00 -- -11'!41 "

    1/ 1" mm SS- 2BG (KC metal -- do -- %$ E$%!E0 %""!00 40!00 "0!0 -- -11'!41

    14 10 mm SS- 2BG (KC metal -- do -- %$ E$%!E0 /E"!00 40!00 14'!00 -- -11'!41

    1% / mm SS- 2BG (KC metal -- do -- %$ E$%!E0 '"!00 40!00 1''!00 -- -11'!41

    1!Providing CC roads in SC Colony o* >anthetivariod+ in #!#! (eraka in !G!t! "! Providinroad to Choallavari Gro+ SC Colony in (aliki+ram #illage in !G!t! '! Providing CC RSC Colony at >andikatlavari Gro+ in ?akkavaram #illage< (aliki+ram (andal< !G!t!

    Sl!;o

    So+rce o*S+ly

    ?eadin

    >ms

    Conveyance

    nitialcost

    Blastingcharges

    (achinecr+shin

    gcharges

       S  e   i  g  n   i  o  r  a  g

      e  c   h  a  r  g  e  s ed+ct

    1'!/19 CP A@2 charges

    *romconveyance

     7

    ! o ! mm an ometal

  • 8/18/2019 CC Road With Drains

    21/80

    escrition o* (etalSl!;o

    So+rce o*S+ly

    ?eadin

    >ms

    Conveyance

    nitialcost

    Blastingcharges

    (achinecr+shin

    gcharges

       S  e   i  g  n   i  o  r  a  g

      e  c   h  a  r  g  e  s ed+ct

    1'!/19 CP A@2 charges

    *romconveyance

     7

    1E Sand *or Concrete &annavaram (< )2).10 /10!00 -- -- -- -$1!1"

    "0 Sand *or Filling &annavaram "/ '$'!10 $0!00 -- -- -- -$1!1"

    "1 Sand *or Plastering &annavaram "/ '$'!10 /44!00 -- -- -- -$1!1"

    "" 23S Steel '$000!00

    "' /mm (ild Steel '/000!00

    "$ (ild Steel '%000!00

    " Cement E"0!00

    6sst! ,ec+tive ngineer RAB < y! ,ec+tive ngineer RAB < ,ec+tive ngineer RAB <

    5RAB) Section : (aliki+ram 5RAB) S+& ivision : RaJole 5RAB) ivision : 6mala+ram

    S+erintending ngineer 5RAB)<  rc e : a na a

  • 8/18/2019 CC Road With Drains

    22/80

    'AA

    +ame o! 7or% ::-

    =uantity 'escription o! tem Rate per Amount

    1

    Hnit N c+m

     7aking o+t+t N '00 c+m Page / o! $oR@ S',4A5 LaBour

    0!$0 day (ate '4!00 day 10!00

    "!00 day (aJdoor skilled '%%!0 day 444!00

    %!00 day (aJdoor +nskilled '"0!00 day "/0!00

     7otal '$%4!00

    4,5 $achinery/!00 hr (otor grader '!'( Blade 80 c+mK2r '""0!00 hr 1E'"0!00

    1"!00 hr  7ractor with Rotavator $"!00 hr 100!00

    /!00 hr #i&ratory roller %7 "/0E!10 hr 1/$!/0

    '!00 hr ater tanker / >? /'0!00 hr 1%E0!00 7otal $1E/$!/0

    4C5 $ateria

    "!00 c+m

    11/!%/ C+m '%/4EE!'0

    1"E!00 c+m11%!1E C+m 1"%%E!1

     7otal 'E/%%!%1

    4'5 3ver head charges 2.

  • 8/18/2019 CC Road With Drains

    23/80

    =uantity 'escription o! tem Rate per Amount

    (

    Hnit N c+m 7aking o+t+t N 1 c+m

    4A5 LaBour

    0!/$ nos (ate '4!00 day "$0!00

    1!00 nos (ason '%%!0 day '%%!0

    1!00 nos (aJdoor '"0!00 day $%00!00

     7otal $"%!0

    4,5 $ateria

    1'!0 c+m Cost o* $0mm SS- 2BG (KC metal 1/%0!1E c+m ""/%"!4

    /!4 c+m Sand at site E11!E% c+m /1!%4

    "!$' (7 Cement at site E"0!00 (7 1$'%!/0 7otal $'""$!0$

    $achinery

    /!00 hr Concrete mi,er 0!$K0!"% c+m $/!"0 hr "4'4!"0

    /!00 hr Generator set ' >#6 %1/!%0 hr $E00!%0

    "!00 hr ater tanker / >? /'0!00 hr 1"/0!00

     7otal %%E%!00

    4'5 3ver head charges 2.

  • 8/18/2019 CC Road With Drains

    24/80

    =uantity 'escription o! tem Rate per Amount 7otal 41010!0$

    $achinery

    /!00 hr Concrete mi,er 0!$K0!"% c+m $/!"0 hr "4'4!"0

    /!00 hr Generator set ' >#6 %1/!%0 hr $E00!%0

    4/'%!00

    4'5 9orm or% 

    '!0 9 Form work 8 '!09 on 56)D5B)D5 C) %E'!"E C+m '00%!'44E5 3ver head charges 2.

  • 8/18/2019 CC Road With Drains

    25/80

    =uantity 'escription o! tem Rate per Amount

    <

    ? /'0!00 hr ""0!00

    1!00 hr #i&ratory roller %7 "/0E!10 hr "/0E!10100$/"!'%

    4C5 Seigniorage charges100!00 C+m Seigniorage charges 0!00 c+m 0!00

    4'5 3ver head charges 2.

  • 8/18/2019 CC Road With Drains

    26/80

    =uantity 'escription o! tem Rate per Amount

    1!00 R(

    '1!%0 1 R(

    '1!%0

    Rate to &e adoted )(.00

    1 R$

    P#C Pie "!$0mm dia 5item no! -?C 1!"!$ o* SSR "01-1/)

  • 8/18/2019 CC Road With Drains

    27/80

    'RA+ 'AA

    =uantity 'escription o! tem Rate per Amount

    1

    Hnit N c+m

     7aking o+t+t N 1 c+m

    4A5 LaBour

    0!/$ nos (ate '4!00 day "$0!00

    1!00 nos (ason '%%!0 day '%%!0

    1!00 nos (aJdoor '"0!00 day $%00!00

     7otal $"%!0

    4,5 $ateria

    1'!0 c+m Cost o* $0mm SS- 2BG (KC metal 1/%0!1E c+m ""/%"!4

    /!4 c+m Sand at site E11!E% c+m /1!%4

    "!$' (7 Cement at site E"0!00 (7 1$'%!/0

     7otal $'""$!0$

    $achinery

    /!00 hr Concrete mi,er 0!$K0!"% c+m $/!"0 hr "4'4!"0

    /!00 hr Generator set ' >#6 %1/!%0 hr $E00!%0

    "!00 hr ater tanker / >? /'0!00 hr 1"/0!00

     7otal %%E%!00

    4'5 3ver head charges 2.

  • 8/18/2019 CC Road With Drains

    28/80

    =uantity 'escription o! tem Rate per Amount

    4'5 3ver head charges 2.

  • 8/18/2019 CC Road With Drains

    29/80

    =uantity 'escription o! tem Rate per Amount

    Hnit N c+m Page ))*2 o! $oR@ S', 7aking o+t+t N 1 c+m

    4A5 LaBour

    0!%/ nos (ate '4!00 day '""!0

    1!0 nos (ason '%%!0 day %"!4

    "0!00 nos (aJdoor '"0!00 day /$00!00

     7otal 4'0!"

    4,5 $ateria

    %!10 c+m Cost o* $0mm SS- 2BG (KC metal 1/%0!1E c+m 1'/0E!$

    $!0 c+m Cost o* "0mm SS- 2BG (KC metal ""00!1E c+m %E10!44

    1!' c+m Cost o* 10mm SS- 2BG (KC metal 1440!1E c+m "'%E!4/

    /!4 c+m Sand at site E11!E% c+m /1!%4

    $!1' (7 Cement at site E"0!00 (7 "$$$E!/0

     7otal 1!$

    $achinery

    /!00 hr Concrete mi,er 0!$K0!"% c+m $/!"0 hr "4'4!"0

    /!00 hr Generator set ' >#6 %1/!%0 hr $E00!%0

    4/'%!00

    4'5 9orm or% 

    10!00 9 Form work 8 109 on 56)D5B)D5 C) 40$%!4E C+m 40$!%%

    4E5 3ver head charges 2.

  • 8/18/2019 CC Road With Drains

    30/80

    =uantity 'escription o! tem Rate per Amount

    /!00 hr Concrete mi,er 0!$K0!"% c+m $/!"0 hr "4'4!"0

    /!00 hr Generator set ' >#6 %1/!%0 hr $E00!%0

     7otal 4/'%!00

    4'5 9orm or% 

    $!00 9 Form work 8 109 on 56)D5B)D5 C) 4%4E0!0E C+m '11!/0

    4E5 3ver head charges 2.g Binding wire '/000!00 (7 "1/!00

     7otal 'E1/!00

    4C5 3ver head charges 2.

  • 8/18/2019 CC Road With Drains

    31/80

    =uantity 'escription o! tem Rate per Amount

    4C5 3ver head charges 2.

  • 8/18/2019 CC Road With Drains

    32/80

    Statement shoing the Seigniorage charges

    Short description o! tem 8nit =uantity

    $eta Sand $eta Sand

    1 Sand .lling 1 C+m! 0!00 1!000 -- 4!00 0!00 -- 0!00 $'!11 "Earth

    &rave

    >Earth

    constr+ction o*earthensho+lders

  • 8/18/2019 CC Road With Drains

    33/80

    Short description o! tem 8nit =uantity

    $eta Sand $eta Sand

    S.+o.

    heoriticareGuirement o!

    $ateria per 8nit asper 'ata 4in Cum.5

    Seignorage chargesper Cum.

       S  e   i  g  n  o  r  -  a  g  e

      c   h  a  r  g  e  s

      p  e  r

       8  n   i   t Amount o!

    Seigniorag&rave

    >Earth

    &rave>

    Earth5RAB) Section : (aliki+ram 5RAB) S+& ivision : RaJole RAB) ivision : 6mala+ram 5RAB) Circle : >akinada

  • 8/18/2019 CC Road With Drains

    34/80

    CER9CAE

    +ame o! 7or%:

    1)

    ")

    ') Certi.ed that all the distances in the +arry ma are correct!

    $) Certi.ed that the +arries rovided are the nearest!

    )

    /)

    4)

    %)

    E)

    10)

    11)

    6sst! ,ec+tive ngineer 5RAB)< y! ,ec+tive ngineer 5RAB)<

    5RAB) Section : (aliki+ram 5RAB) S+& ivision : RaJole

    ,ec+tive ngineer 5RAB)< S+erintending ngineer 5RAB)<

    5RAB) ivision : 6mala+ram 5RAB) Circle : >akinada

    1.Providing CC roads in SC Coony o! "anthetivaripodu in#.#. $era%a in E.&.'t. (. Providing CC road to Choppaavari&roup SC Coony in $ai%ipuram #iage in E.&.'t. ).Providing CC Road to SC Coony at "andi%atavari &roup inLa%%avaram #iage* $ai%ipuram $anda* E.&.'t.

    Certi.ed that have ersonally insected the a&ove road onOOOOOOOOOand the rovisions made in the estimate *or the a&ove work are ade+ate andessential!

    Certi.ed that the leads rovided in the R!(!R o* the estimate are shortest and there iss+cient yield o* good +ality material *rom the +arries roosed in the estimate!

    Certi.ed that the ro+tes shown in the +arry ma are the shortest *or thetransortation o* the materials!

    Certi.ed that all the materials can &e easily +arried!

    Certi.ed that the descrition o* all materials mentioned are correct to the &est o* myknowledge!

    Certi.ed that the selected earth is roosed *rom >adiyam +arry nearest *rom theworksot !

    Certi.ed that no land ac+isition is re+ired *or the roosed work and the landsavaila&le are *ree *rom enc+m&rance encroachments and +tiliJation!

    Certi.ed that the C!B!R! #al+e o* Proosed internal C!C!Roads in SC Colonies is a&o+t

    Constr+ction o* CC road is roosed in the internal roads o* the SCKS7 Colonies and ass+ch there is no commercial vehic+lar trac on these internal roads! 2ence<constr+ction o* CC Pavement is roosed with a nominal cr+st o* 100mm GSB D 100mm thick #CC 51:$:%) D 10mm thick #CC ('!

  • 8/18/2019 CC Road With Drains

    35/80

    LEAD CHARGES (SSR 2015-16) Cost of Materials, Labour 

    MetalSSR 2015-16

    loading 51.40 102.80 Material Rates  As per ! of "! #ept.

    unloading 15.70 15.70 $0 to $3 %% &!C ' Mo!() )*+ %etal 419.00 "g. o.17, l.53 -!oadssta/ing 50 to 55 %% &!C ' Mo!() )*+ %etal 45$.00 "g. o.17, l.52 -!oads

    0.25 40 to 45 %% &!C ' Mo!() )*+ %etal 588.00 "g. o.1$, l.51 -!oads0.5 !ougstone 300%% -)*+for reet%ent 172.00 "g. o.13, l.9 -!oads

    1 31.00 29.90 !ougstone 225%% -)*+for reet%ent 177.00 "g. o.13, l.8 -!oads2 43.40 41.90 !eet%ent or 225%% 144.00 "g. o.13, l.2 -!oads3 57.90 57.90 !eet%ent or 300%% 1$4.00 "g. o.13, l.3 -!oads

    4 70.30 70.30 !eet%ent or 450%% 15$.00 "g. o.13, l.4 -!oads5 82.70 82.70 Laterite for !eet%ent 225%% 13$.00 "g. o.13, l.$ -!oads$ 95.10 95.10 Laterite for !eet%ent 300%% 159.00 "g. o.13, l.7 -!oads7 107.50 107.50 edd6 stone aboe 450%% to $00%% 20$.00 "g. o.13, l.5 -!oads

    8 119.90 119.9049.50

    9 132.30 132.30 150 %% soling stone )*+ %etal 95.00 "g. o.18, l.79 -!oads10 144.70 144.70 40 to 45 %% &!C ' Mo!() )*+ MC %etal 588.00 "g. o.1$, l.51 -!oads

    11 157.10 157.1025 to 27 %% &!C ' Mo!() )*+ MC %etal 944.00 "g. o.1$, l.50 -!oads

    12 1$9.50 1$9.5019 to 22 %% &!C ' Mo!() )*+ MC %etal 984.00 "g. o.1$, l.49 -!oads

    13 181.90 181.9012 to 14 %% &!C ' Mo!() )*+ MC %etal 780.00 "g. o.1$, l.48 -!oads

    14 194.30 194.30 9.5 to 11.20 %% &!C ' Mo!() )*+ MC %etal $5$.00 "g. o.1$, l.47 -!oads15 20$.70 20$.70 5 to 7 %% &!C ' Mo!() )*+ MC %etal 504.00 "g. o.1$, l.4$ -!oads1$ 219.10 219.10 2.3$ to 5 %% &!C ' Mo!() )*+ MC %etal 308.00 "g. o.1$, l.45 -!oads17 231.50 231.50 )*+ tone /ips 2.3$%% and belo 350.00 "g. o.18, l.92 -!oads18 243.90 243.90 +rael 103.00 "g. o.18, l.90 -!oads19 25$.30 25$.30 40 %% 5 %/ )*+ %etal $20.00 "g. o.15, l.30 -!oads

    20 2$8.70 2$8.7025 %% 5 %/ )*+ %etal 994.00 "g. o.15, l.29 -!oads

    21 281.10 281.1020 %% 5 %/ )*+ %etal 103$.00 "g. o.15, l.28 -!oads

    22 293.50 293.5012 %% 5 %/ )*+ %etal 822.00 "g. o.15, l.27 -!oads

    23 305.90 305.90 10 %% 5 %/ )*+ %etal $92.00 "g. o.14, l.2$ -!oads24 318.30 318.30 $ %% 5 %/ )*+ %etal 532.00 "g. o.14, l.25 -!oads25 330.70 330.70 and for Con/rete $10.00 "g. o.19, l.94 -!oads

    2$ 343.10 343.10 and for illing 4$0.00 "g. o.19, l.95 -!oads27 355.50 355.50 ):# teel 41000.00

    ;art+raeland

  • 8/18/2019 CC Road With Drains

    36/80

    28 3$7.90 3$7.90 Mild teel 42500.00  As per te +.=.s

    29 380.30 380.30 Ce%ent 5920.00 =/tober, 2014 += !(30 392.70 392.70 Mild teel $%% 42500.00 o.8$9, dt.31.12.201431 403.00 403.00 Blasting charges32 413.30 413.30 *lasting /arges 70.00 "g. o.19, l.95 -!oads33 423.$0 423.$0 *lasting /arges for roug stone 34 433.90 433.90 Seignirage charges

    35 444.20 444.20 Metal 50.00

    3$ 454.50 454.50 +raeleart 22.00 As per te +.=.s

    37 4$4.80 4$4.80 and 40.00

    38 475.10 475.10 La!"r Rates

    39 485.40 485.40 Mate 375.00 "g. o.10, l.71 -!oads40 495.70 495.70 Ma?door silled -385 30@ > 345 70@ 388.5041 50$.00 50$.00 Ma?door unsilled 320.00 "g. o.10, l.73 -!oads42 51$.30 51$.30 Machiner# Rates

    43 52$.$0 52$.$0 #o?er 80 )" for spreading 200 /u% per our  2540.90 "g. o.25, l.1 -!oads44 53$.90 53$.90 Motor grader 3.35M *lade 50 /u%)r  3220.00 "g. o.25, l.3 -!oads45 547.20 547.20 )6drali/ e/aator 2791.00 "g. o.25, l.4 -!oads4$ 557.50 557.50 ront end loader 1 /u% /apa/it6 1$50.00 "g. o.25, l.5 -!oads47 5$7.80 5$7.80 (ipper 5 /u% 909.70 "g. o.25, l.$ -!oads48 578.10 578.10 Bibrator6 roller 8( 2$09.10 "g. o.25, l.7 -!oads49 588.40 588.40 s%oot eeled roller 8 (on 1101.00 "g. o.25, l.8 -!oads50 598.70 598.70 ater taner $ DL $30.00 "g. o.25, l.10 -!oads51 $09.00 $09.00 (ra/tor 415.00 "g. o.25, l.11 -!oads52 $19.30 $19.30 (ra/tor it !otaator 425.00 "g. o.25, l.12 -!oads53 $29.$0 $29.$0

    Tractor with ripper attachment @ 60 cum per hour425.00 "g. o.25, l.13 -!oads

    54 $39.90 $39.90  Air /o%pressor 250 /f% 538.20 "g. o.25, l.14 -!oads55 $50.20 $50.20 et %i plant of $0 tonne r. /apa/it6 1$50.00 "g. o.2$, l.15 -!oads5$ $$0.50 $$0.50 Me/ani/al broo% 1250 sE%r. 375.00 "g. o.2$, l.1$ -!oads57 $70.80 $70.80 *itu%en pressure distributor 1750 sE%r  1500.00 "g. o.2$, l.17 -!oads58 $81.10 $81.10 ;%ulsion pressure distributor 1750 sE%r  8$0.00 "g. o.2$, l.18 -!oads59 $91.40 $91.40 )ot %i plant 40 to $0 (") 19200.00 "g. o.2$, l.22 -!oads

    $0 701.70 701.70 Me/ani/al "aer finiser 100 (") 2250.00 "g. o.2$, l.24 -!oads

    $1 712.00 712.00 Hydraulic self propelled chip spreader @ 1500 sqm/hr. 2$95.00 "g. o.2$, l.25 -!oads$2 722.30 722.30 Finish rolling with 6! tonne smooth wheeled tandem roller. 1$50.00 "g. o.2$, l.2$ -!oads

    $3 732.$0 732.$0 "neu%ati/ road !oller  1347.00 "g. o.2$, l.27 -!oads

    $4 742.90 742.90 +* "lant 50 Cu% 1257.00 "g. o.2$, l.30 -!oads$5 753.20 753.20 +enerator 250 DBA 1850.00 "g. o.27, l.43 -!oads

    $$ 7$3.50 7$3.50 +enerator set 125 DBA 1320.00 "g. o.27, l.43 -!oads

    $7 773.80 773.80 +enerator set 35 DBA 81$.80 "g. o.28, l.43 -!oads

    $8 784.10 784.10 Con/rete %ier 0.40.28 /u% 45$.20 "g. o.27, l.38 -!oads

  • 8/18/2019 CC Road With Drains

    37/80

    $9 794.40 794.40 (ipper 5.50 /u% /apa/it6 per 10 (onnes per t% 4.50 (As $er SSR 200%-200&)

    70 804.70 804.70 Tipper 5 cum capacity for "oil# $"%# &''# Hot mi( 4.50 (As $er SSR 200%-200&)

    71 815.00 815.00 "late /o%pa/tor"oer ra%%er  58.00 "g. o.28, l.48 -!oads72 825.30 825.30

    73 835.$0 835.$0 San' r Mrtar  $77.00 "g. o.19, l.93 -!oads74 845.90 845.90

    75 85$.20 85$.20

    7$ 8$$.50 8$$.50

    77 87$.80 87$.80

    78 887.10 887.10

    79 897.40 897.40

    80 907.70 907.7081 918.00 918.00

    82 928.30 928.30

    83 938.$0 938.$0

    84 948.90 948.90

    85 959.20 959.20

    8$ 9$9.50 9$9.50

    87 979.80 979.80 (ipper 10(onne /apa/it6 for /arriage of stone88 990.10 990.10 /ips fro% sto/ pile on road side to /ip89 1000.40 1000.40 spreader  

    90 1010.70 1010.70

    91 1021.00 1021.00

    92 1031.30 1031.30

    93 1041.$0 1041.$0

    94 1051.90 1051.90

    95 10$2.20 10$2.20

    9$ 1072.50 1072.50

    97 1083.00 1083.00

    98 1093.50 1093.50

    99 1104.00 1104.00

    100 1114.50 1114.50

    101 1125.00 1125.00

    102 1135.50 1135.50

    103 114$.00 114$.00

    104 115$.50 115$.50

    105 11$7.00 11$7.00

    10$ 1177.50 1177.50

    107 1188.00 1188.00

    108 1198.50 1198.50

    109 1209.00 1209.00110 1219.50 1219.50

  • 8/18/2019 CC Road With Drains

    38/80

    111 1230.00 1230.00

    112 1240.50 1240.50

    113 1251.00 1251.00

    114 12$1.50 12$1.50

    115 1272.00 1272.00

    11$ 1282.50 1282.50

    117 1293.00 1293.00

    118 1303.50 1303.50

    119 1314.00 1314.00

    120 1324.50 1324.50

    121 1335.00 1335.00

    122 1345.50 1345.50123 135$.00 135$.00

    124 13$$.50 13$$.50

    125 1377.00 1377.00

    12$ 1387.50 1387.50

    127 1398.00 1398.00

    128 1408.50 1408.50

    129 1419.00 1419.00

    130 1429.50 1429.50

    131 1440.00 1440.00

    132 1450.50 1450.50

    133 14$1.00 14$1.00

    134 1471.50 1471.50

    135 1482.00 1482.00

    13$ 1492.50 1492.50

    137 1503.00 1503.00

    138 1513.50 1513.50

    139 1524.00 1524.00

    140 1534.50 1534.50

    141 1545.00 1545.00

    142 1555.50 1555.50

    143 15$$.00 15$$.00

    144 157$.50 157$.50

    145 1587.00 1587.00

    14$ 1597.50 1597.50

    147 1$08.00 1$08.00

    148 1$18.50 1$18.50

    149 1$29.00 1$29.00

    150 1$39.50 1$39.50

  • 8/18/2019 CC Road With Drains

    39/80

    "g. o.275, M055 -!s.845

    "g. o.272, M003

    "g. o.275, M055 -!s.845

    "g. o.275, M054 -!s.1313

    "g. o.275, M053 -!s.13$5

    "g. o.275, M052 -!s.1097

    "g. o.274, M051 -!s.935

    "g. o.274, M050 -!s.735

    "g. o.273, M024 -!s.474

    "g. o.2$1, l.o.$7

    "g. o.272, M008

    "g. o.275, M055 -!s.845

    "g. o.275, M054 -!s.1313

    "g. o.275, M053 -!s.13$5

    "g. o.275, M052 -!s.1097

    "g. o.274, M051 -!s.935

    "g. o.274, M050 -!s.735

    "g. o.259, l. 27-a

    "g. o.259, l. 27-b

  • 8/18/2019 CC Road With Drains

    40/80

     As per te +.=.s

    =/tober, 2014 += !(

    o.8$9, dt.31.12.2014

    "g. o.273

     As per te +.=.s

    e%isilled Ma?door 

    illed 30@ > e%i 70@

    Fnsilled Ma?door 

    "g. o.288, l.o.8

    "g. o.289, l.o.52

    "g. o.289, l.o.54

    "g. o.290, l.o.$2

    "g. o.289, l.o.50

    "g. o.288, l.o.2

    "g. o.289, l.o.24

    "g. o.289, l.o.18

  • 8/18/2019 CC Road With Drains

    41/80

  • 8/18/2019 CC Road With Drains

    42/80

  • 8/18/2019 CC Road With Drains

    43/80

    A,38 ES$AE

    1 ;ame o* the wor

    " Section 6sst! ,ec+tive ngineer 5RAB)<5RAB) Section : (aliki+ram

    ' S+& - ivision y! ,ec+tive ngineer 5RAB)<

    5RAB) S+& ivision : RaJole

    $ ivision ,ec+tive ngineer 5RAB)<

    5RAB) ivision : 6mala+ram

    Circle S+erintending ngineer 5RAB)<

    5RAB) Circle : >akinada

    1!Providing CC roads in SC Colony o* >anthetivariod+ in #!#! (eraka in !G!t! "!Providing CC road to Choallavari Gro+ SC Colony in (aliki+ram #illage in!G!t! '! Providing CC Road to SC Colony at >andikatlavari Gro+ in ?akkavaram#illage< (aliki+ram (andal< !G!t!

  • 8/18/2019 CC Road With Drains

    44/80

    R@6S A BH?;GS P6R7(;7

    ;ame o* the work:

    Estimate Amount : ??? La%hs

    RAB Section : Gannavaram

    RAB S+& division : >othaeta

    RAB ivision : 6mala+ram

    RAB Circle : >akinada

    Gannavaram 6ssem&ly Constit+ency

    6mala+ram Parliamentary Constit+ency

    1.Providing CC roads in SC Coony o! "anthetivaripodu

    in #.#. $era%a in E.&.'t. (. Providing CC road toChoppaavari &roup SC Coony in $ai%ipuram #iage

  • 8/18/2019 CC Road With Drains

    45/80

  • 8/18/2019 CC Road With Drains

    46/80

  • 8/18/2019 CC Road With Drains

    47/80

  • 8/18/2019 CC Road With Drains

    48/80

    Statement shoing the Seigniorage charges

    8nit =uantity

    $eta Sand Sand

    1 1 C+m! 0!E0 0!$ -- 4!00 0!00 -- E0!00 '/0!00

    " #RCC (' 1 C+m! 0!E0 0!$ -- 4!00 0!00 -- E0!00 $0!00

    ' 1 C+m! -- -- 1!00 -- -- '0!00 '0!00 '/0!00

     7otal Rs!

    or say

    6sst! ,ec+tive ngineer 5RAB)< y! ,ec+tive ngineer 5RAB)< ,ec+tive ngineer 5R

    5RAB) Section : (aliki+ram 5RAB) S+& ivision : RaJole 5RAB) ivision : 6mal

    S+erintending ngineer 5RAB)<5RAB) Circle : >akinada

    ;ame o* ork :  1.Providing CC roads in SC Coony o! "anthetivaripodu in #.#. $era(. Providing CC road to Choppaavari &roup SC Coony in $ai%ipurE.&.'t. ). Providin CC Road to SC Coon at "andi%atavari &rou i

    S+o

    Shortdescription o!

    tem

    heoriticareGuirement o!

    $ateria per 8nit asper 'ata 4in Cum.5

    Seignorage

    charges per Cum. Seignor-age

    chargesper 8nit&rave

    > Earth$eta

    &rave >

    Earth

    #!C!C! 51:$:%)*or &ase co+rse

    cons r+c on oearthensho+lders

  • 8/18/2019 CC Road With Drains

    49/80

    '"

  • 8/18/2019 CC Road With Drains

    50/80

    C3S 39 ,8$E+ > $

    +ame o! 7or% 

    Re! ::- 9or Emusion 4,u%5 :- @+C3L Price List 7ith EHect 9rom 't.1-0(-(01<

    9or ,u% ,itumen 0>100* ;0:- @PCL Price List 7ith EHect 9rom 't. 1-0(-(01<

    ,u% 0>100 &r. ,u% ;0 &r. Emusion 4,u%5

    #isa%hapatnam #isa%hapatnam #isa%hapatnam

    Basic Price "1

  • 8/18/2019 CC Road With Drains

    51/80

    LEA' CALC8LA3+ 93R #AR38S $AERALS 8P3 CE+ER 39 @E 73R"+& SREC@

    +ame o! the or

    -:o3o:-

    Reach proposed in the present estimatkm /$ K 0 to /% K '0 N $!'0 kms

    Center "m. o! the or%ing stretch //!1'A5 9or @,& meta:

    2BG metal *rom >ather+ +arry

    a) Cart track length N N '!000 kms

    &) (etalled road length:

    From km E04 K 000 to E10 K 400 o* ;2 -1/ N '!400 kms

    From km 0 K 000 to ' K 100 o* R> Road 5#) P+nyakshetram N '!100 kms

     7otal metalled road length /!%00 kms

    ?ead +to k 1 K $E o* Bye-Pass Road E!%00 kms

    6dd *or centre o* working reach N "!1' kms

    c) 7otal lead N 11!E' kms

    @r say: esavaram

    a) Cart track length N N 1!400 kms

    &) (etalled road length:

    From km 0 K 000 to 1$ K /00 o* R> Road 5#)P+nyakshetram N 1$!/00 kms

    ?ead +to k /% K '0 o* >akinada - Raahm+ndry ro 1/!'00 kms

    6dd *or centre o* working reach "!1' kms

     7otal metalled road length 1%!$' kms

    c) 7otal lead N 1%!$' kms

    @r say:

  • 8/18/2019 CC Road With Drains

    52/80

    &E+ERAL A,SRAC

    SuB-7or% 

    tem 'escription Amount

    Part - A

    1 Cost o* Road work LRF

    " Constr+ction o* C works 5S+& estimate) "

  • 8/18/2019 CC Road With Drains

    53/80

    'EALE' C8$ A,SRAC ES$AE

    ame o or :-

    SuB 7or% Providing Road Sa!ety ntervention

    escrition o* tem ;o ? B ty! Rate Per

    1 " ' $ / 4 % E 10

    1

    Centre Broken linesn >m /$K0-/%K'0 " 'K4! $000 0!100 - '"0!00

    6dacent to divider

    n >m /$K0-/%K'0 1 " "00 0!100 - 00!00n >m /$K0-/%K'0 1 " "00 0!100 - 00!00

    Qe&ra Crossings '0 1$ " 0! - $"0!00

      LLL 40" 1 Sm 1""1$%0

    "

    n >m /$K0-/%K'0 " "4 0

    5"0/0K4!N"4 nos)

    n >( //K0/0 to /%K'0 1 "0 "0

    $ain 7or%: 7idening and Strengthening o! "a%inada -

    RaJahmundry Road !rom "$

  • 8/18/2019 CC Road With Drains

    54/80

    escrition o* tem ;o ? B ty! Rate Per

    1 " ' $ / 4 % E 10

    Sl!;o!

    6mo+nt5in R+ees)

    "0!00 '1/!00 ach 4E000

  • 8/18/2019 CC Road With Drains

    55/80

    escrition o* tem ;o ? B ty! Rate Per

    1 " ' $ / 4 % E 10

    Sl!;o!

    6mo+nt5in R+ees)

    '

    n km /$K0 to /%K'0 1 " "!00 $44!00 ach 10E$

    $

    n >m!/$K0-/%K'0)

    6t divider oenings 10 " "0!00

      "0!00 $00'!00 ach %00/0

    n >m!/$K0-/%K'0) " 1$ "E0!00

    "E0!00 $/1!00 ach 1''/E0

    ota Rs. 1*(*12

    6sst! ,ec+tive ngineer 5RAB)< y! ,ec+tive ngineer 5RAB)<

    5RAB) Section : So+th 5RAB) S+&-divn!< : Raahm+ndry

    Providing and .,ing #illage name &oard siJe E00,$0 mm made o+t o* 7ye # o*6S7( $E/-0E 2igh ntensity Prismatic Prismatic Retro reMective sheeting andcon.rming to RC /4:"01" *or *+ll &ackgro+nd o* Green Colo+r A hite ?etters and.,ed over '(( 6ll+mini+m Comosite (aterial sheet having minim+m 0!'0 mmthick 6l+mini+m skin on &oth sides with &ack side ainted grey colo+r and .,edover &ack s+ort *rame o* (!S angle ",",'mm all ro+nd and .,ing with

    ',',$mm and mo+nted on a (S angle ost o* siJe 4,4,/mm with clear heighto* not less than "!1 m *rom the gro+nd level to the &ottom o* the &oard! 7hesignost sho+ld &e ainted with one coat o* red o,ide aint and " coats o*synthetic enamel aint Black and hite colo+r with &ands o* '0cm o* height! 7hesignost shall &e .rmly .,ed with (S &ase angle ',',$ mm in to the gro+nd &y(-1 Concrete *o+ndation o* siJe $0,$0,/00mm incl+ding cost and conveyanceo* all materials

  • 8/18/2019 CC Road With Drains

    56/80

    escrition o* tem ;o ? B ty! Rate Per

    1 " ' $ / 4 % E 10

    Sl!;o!

    6mo+nt5in R+ees)

    ,ec+tive ngineer 5RAB)< S+erintending ngineer 5RAB)<5RAB) ivision : Raah+mndry 5RAB) Circle : >akinada

  • 8/18/2019 CC Road With Drains

    57/80

    'EALE'-C8$-A,SRAC ES$AE

    me o! the or%:

    'escription o! item +o Length ,readth 'epth =uantity

    1 ( ) 2 < ;

    Part - A1

    >m! /$ K 0 to /% K '0 $0!000

    $0!000or say 20.000 C+m ?RE9I

    >Cum.

    (

    >m! /$ K 0 to // K 0/0 1 , " "0/0!00 "!E4 0!0 /4$1!'0

    /4$1!'0

    or say Cum.

    )

     

    /40!000 , "91/%4!00

    or say 1Cum.

    2

    >m! /$ K 0 to // K 0/0 5 1 , " ) "0/0!00 "!E4 0!'00 '/44!100

    '/44!100

    or say )m! /$ K 0 to // K 0/0 1 , " "0/0!00 "!E4 0!"0 '0/$!"0

    '0/$!"0or say )0;0.000 C+m ?RE9I

    S.+o

    Rate >per

    Providing B!7! atchwork +sing 1!"0 C+m o* $0mm RC siJe 2BG metal to get comacted+antity o* 1 C+m recoated with &it+men %0K100 grade +sing a total +antity o* $" >gs!

    arthwork e,cavation in soils +to SR &y mechanical means e,cl+ding trimming &ottom and

    side sloes in accordance with re+irements o* lines < grades and cross sections etc!<

    e,cl+ding seignioarge charges *or .nished item o* work *or trench c+tting a

    Forming em&ankment with aroved materials deosited at site *rom roadway c+tting

    incl+ding deositing the soils on the em&ankment< sreading soil< &reaking clods< sectioning <

    grading and consolidation with % to 10 7onnes #i&ratory Road Roller 8 @(C to m

    Constr+ction o* Gran+lar s+&-&ase &y roviding Coarse graded 2BG material con.rming to

    Grading - o* (oR7A2 7a&le $00-" incl+ding cost< seigniorage charges and conveyance o* all

    materials to work site and sreading in +ni*orm layers with motor grader

    Providing< ?aying< Sreading and comacting graded 2BG cr+shed stone aggregate to et (i,

    macadem seci.cation incl+ding cost

  • 8/18/2019 CC Road With Drains

    58/80

    1 ( ) 2 < ;

    <

    >m! /$ K 0 to // K 0/0 5 1 , " ) "0/0!00 "!E4 1""4!000

    1""4!000

    or say 1((m! /$ K 0 to // K 0/0 5 1 , " ) "0/0!00 1$!00 -- E4$0!000

    >m! // K 0/0to // K /00 5 1 , " ) $0!00 1$!000 -- 11"0!000

    >m! /% K 0 to /% K '0 5 1 , 1 ) '0!00 ""!000 -- /410!000  or e mo+ s a +nc ons !

    %"00!000or say (00.000 Sm ?RE9I

    >m! /$ K 0 to // K 0/0 5 1 , 1 ) "0/0!00 1$!00 0!00 1$E'!00

    >m! // K 0/0to // K /00 5 1 , 1 ) $0!00 1$!000 0!00 '4%!000

    6dd *or Bell mo+ths at V+nctions and Patch wo (0.00 "%!001E00!000or say 1/00.000 C+m ?RE9I

    /

    >m! /$ K 0 to // K 0/0 1 , 1 "0/0!00 1$!00 0!0'0 %E/!100>m! // K 0/0to // K /00 1 , 1 $0!00 1$!000 0!0'0 ""/!%00

    >m! /% K 0 to /% K '0 5 1 , 1 ) '0!00 ""!000 0!0'0 "01!'006 or Be mo+t s at V+nctions

    (.00"!%00

    1'0!000or say 1)0.000 C+m ?RE9I

    10

    >m! /$ K 0 to // K 0/0 5 1 , " ) 1000!00 1!000 0!100 "00!000"00!000

    or say (00.000 C+m 11

  • 8/18/2019 CC Road With Drains

    59/80

    1 ( ) 2 < ;

    11

    >m! /$ K 0 to // K 0/0 Rectang 1 , LLL 1!" 0!$0 0!"0 "10!E'4?engt a ter gas 7ra Jo 1 , LLL 1!"

    !"D0!$)K0!"4 1%0!$/E

    !$00!000 ?RE9I

    or say 200.000 C+m!

    1(

    >m! /4 K LL to /4 K 40 1 , 1 100!000 1/!000 1/00!000>m! /$ K 0 to // K 0/0 1 , 1 "0/0!000 0!00 10'0!000

    "/'0!000or say (m! /4 K to /4 K 40 1 , 1 "00!000 0!00 0!%E0 %E!000

    ;os ?engt eac >gKRm >gs/.000

    or say 0.100 (7 $$4/!00

    1<

    Providing "mm W 100K$! N ""D1 oints 1/K0!N'"X"N/$;os>m! /4 K LL to /4 K 40 1 , "' /$ 0!00 '!%0 "%''!/00

     Voints ;os ?engt eac >gKRm >gs

    #i&rated cement concrete ( 1 Grade Concrete +sing $0mm < "0mm and 10mm siJe 2BG

    cr+shed stone aggregate 5Coarse aggregate con*orming to ta&le 1000-1 and .ne aggregate

    con*orming to ta&le 1000-") incl+ding cost< and conveyance o* all materials to site and all

    la&o+r charges < centering< machine mi,ing< laying in osition< Comacting< #i&rating and

    c+ring incl+ding all other incidental and all other oerational charges o* 7AP re+ired etc!<

    comlete as er (oR7A2 Seci.cation 100

  • 8/18/2019 CC Road With Drains

    60/80

    1 ( ) 2 < ; "%''!/00

    or say (./00 (7 $%E%!00

    1;

    100K$N "D1 N ' oints

    >m! /4 K LL to /4 K 40 5 1 , ' ) 1/!00 0!"00 E!/00

     Voints (ts E!/00

    or say 10.000 Sm EE1!00

    1

    100K$N "D1 N ' oints 1/K0!N'"X"N/$;os>m! /4 K LL to /4 K 40 5 1 , ' ) /$ 0!10 "%!%00

     Voints ;os ?engt eac "%!%00or say (/.000 Sm '"!00

    1/

    >m! /4 K LL to /4 K 40 1 , 1 100!000 1/!000 1/00!0001

  • 8/18/2019 CC Road With Drains

    61/80

    1 ( ) 2 < ; RAB ivision : Raa +mn ry RAB Circ e : >a ina a

  • 8/18/2019 CC Road With Drains

    62/80

    Amount

    /

    ?RE9I

    1*)0*(;

    1*/0*/;0

    (*

  • 8/18/2019 CC Road With Drains

    63/80

    /

    ?RE9I

    ?RE9I

    ?RE9I

    ?RE9I

    (*)(*000

  • 8/18/2019 CC Road With Drains

    64/80

    /

    ?RE9I

    *1/*/

    ;*0

  • 8/18/2019 CC Road With Drains

    65/80

    /

    1*21*/;

    */*/10

    **/(

    *;*;/(

    *(*00

    h+mndry

    *1*()

    ?RE9I

    ?RE9I

  • 8/18/2019 CC Road With Drains

    66/80

    /

  • 8/18/2019 CC Road With Drains

    67/80

    'EALS 39 R3A' RE+E7ALS

    ype o! Road:: Corenet State @ighay

    S ;o C26;6G ; >(

    1 /1!/00 /4!000 4 to 1$ ( B7 "00E - 10 F6R

    " /4!000 /%!000 1$ to "" ( B7 "0011 - 1" G@@

    ' /%!000 /%!'0 "" ( B7 "00E - 10 F6R

    6ssistant ,ec+tive ngineer e+ty ,ec+tive ngineer

    5RAB) So+th Section 5RAB) S+& ivision Raahm+ndry

    Raahm+ndry

    ,ec+tive ngineer 5RAB) S+erintending ngineer

    Raahm+ndry 5RAB) Circle >akinada

    +ame o!

    7or%::

    $ain 7or%: 7idening and Strengthening o! "a%inada -RaJahmundry Road !rom "$

  • 8/18/2019 CC Road With Drains

    68/80

    'ES&+ 39 CR8S

     7he C#P on >akinada - Raahm+ndry road N m /$K000 to

    //K0/0

    6dditional cr+st with 5BCDB() %0mm to &e rovided in ;e,t years

  • 8/18/2019 CC Road With Drains

    69/80

    5RAB) ivision : Raah+mndry 5RAB) Circle : >akinada

  • 8/18/2019 CC Road With Drains

    70/80

    KPCAL CR3SS SEC3+

    ;ame o* the Proect :

    B!C! 5'0(( thick)

    ,.$. 40 $$5 ,.$. 40 $$5

    ":1 Sloe ":1 S

    Cross Section !rom "m. akinada

    (ain ork: idening and Strengthening o* >akinada - Raahm+ndry Road *rom >( /1K/00 to /%K'0 in astGodavari istrictS+&-ork 5"): idening and Strengthening o* >akinada - Raahm+ndry Road *rom >( /$K000 to /%K'0 in astGodavari istrict

    Berm1!0

    ,isting road1$ to "" (ts!

    Berm1!0 (ts!

    CCoulders

    ;isting !oad

    CCoulders

  • 8/18/2019 CC Road With Drains

    71/80

    KPCAL CR3SS SEC3+

    ;ame o* the Proect :

    Formation idth 1%!00 (7s!

    1$!E (7s!B!C! 5'0(( thick)

    Centre ividers

    ,.$. 40 $$5 ,.$. 40 $$5

    ":1 Sloe "

    Proosed arth ork *or em&ankment

    Cross Section !rom "m. 000 to akinada - Raahm+ndry Road *rom >( /$K000 to /%K'0 in asistrict

    Berm1!0

    idening ortion'!E4 to "!E4 (ts!

    ,isting road4!00 to E!00 (ts!

    idening ortion'!E4 to "!E4 (ts!

    Berm1!0 (ts!

    G!S!B!510 (()

    ;artenoulders

    .M.M.-250 MM

    ;isting !oad

    .M.M.-250 MM

    ;artenoulders

    +..*.-300 MM

    +..*.-300 MM

  • 8/18/2019 CC Road With Drains

    72/80

    +ame o! 7or% ::

    SuB 7or% ::

    #!C!C! (-1 #!C!C! (-1

    ypica Cross Section o! CC 'rain

    6sst! ,ec+tive ngineer 5RAB)< y! ,ec+tive ngineer 5RAB)<

    5RAB) Section : (aliki+ram 5RAB) S+&-divn!< : Raahm+ndry

    ,ec+tive ngineer 5RAB)< S+erintending ngineer 5RAB)<5RAB) ivision : Raah+mndry 5RAB) Circle : >akinada

    (ain ork: idening and Strengthening o* >akinada - Raahm+ndry Road*rom >( /1K/00 to /%K'0 in ast Godavari istrictS+&-ork 5"): idening and Strengthening o* >akinada - Raahm+ndry Road*rom >( /$K000 to /%K'0 in ast Godavari istrict

    Providing CC rains in >akinada - Raahm+ndry Road *rom >( /1K/00 to/%K'0 in ast Godavari istrict!

    #CC (-1 For Base co+rce

    #CC 5 1:$:%) For &elow Base co+rce

    Sand C+shion

    1!$0(

    0!/0( 0!/0(0!"0(

    0!10(

    0!10(

    0!"0(

    0!$0(

    1!"0(

    0!"0( 0!"0(0!E0(

    1!$0(

  • 8/18/2019 CC Road With Drains

    73/80

    Specifcation report to accompany the detaied estimate !or the or% o!

    1

    "

    '

    $

    mprovements to Aamuru to "otipai road !rom "m 0>000 to)>00 in East &odavari 'istrict.

      7he road *rom 6lam+r+ to >otialli *rom >m 0K000 to "'K'00 is animortant (aor istrict Road in ast Godavari istrict! 7his road connects n+m&er o*imortant villages s+ch as 6lam+r+< Vonnada< 7ata+di < ?ankaagraharam<>aileswara+ram< Srirama+ram< >or+milli< >+lla< (allavaram< S+ndaraalli< A >otialli ! 7his road connects n+m&er o* cross roads &elonging to RAB and Panchayat Radeartments!7he road starts in km 1/$!%0 o* #iayawada- #isakhaatnam road at Vonnada56lam+r+)otiallivillage! 6s the road is on the canal &+nd o* Godavari ?e*t Bank 5G?B)< the rrigationa+thorities have taken + the Mood &ank works on this road! ;ow< the road is not in aosition to receive the resent day trac< as no imrovements were taken + *or the last11 years 5ie!< since "00'-0$)! 6s there are many no! o* &athing ghats all along the road

    viJ!< 6lam+r+< 7ata+di< ?ankaagraharam< >aileswara+ram< Srirama+ram< >or+milli<>+lla< (allavaram< S+ndaraalli< A >otialli ! the connecting roads *rom 6lam+r+ to>otialli is to &e imroved *or transortations o* vehicles and movement o* +&lic andilgrims d+ring the time o* Godavari P+shkaramsm 0K0 to 'K00 is to &e imroved to RABstandards! 2ence< an estimate is reared with the *ollowing rovisions to strengthen theroad *rom >m 0K0 to 'K00!

      6dministrative sanction accorded &y Government vide G@ Rt! ;o!%"/< 7> K P?6; K 6> Road K K R K -' K 6< dt!"0!1"!"01$ *or Rs!"00!00 ?akhsermitted &y the Government vide Govt! (emo ;o!E/$' K R!5") K "01$-1< dt!14!1"!"01$&ased on "00%-"00E commom SSR *or all ngineering eartment!

      7he Government o* 6!P! vide G!@! (s! ;o!"< 7

  • 8/18/2019 CC Road With Drains

    74/80

    /

    4

    %

    E

    10 Providing #i&rated Cement Concrete 51:':/) mi, +sing $0mm siJe *or &ase co+rse &elow

    11

    1"

    RAES:

    Asst.Engineer 4R,5* 'y. EMecutive Engineer 4R,5* EMecutive Engineer 4R,5*

    'ra%sharama. Ramachandrapuram 4R,5 'ivision : "a%inada

    Providing and laying o* 0mm thick Bit+mino+s (acadam with hot mi, lantrod+cing an average o+t+t o* '4! tonnes er ho+r +sing hard &lasted granite

    Providing " mm thick comacted Semi-ense Bit+mino+s Concrete &y hot mi, lant+sing hard &lasted granite cr+shed aggregates o* Grading -" as er ta&le 00-1 o*

    Forming sho+lders with &arrowed +se*+l selected earth having ( o* not less than

    1!4 GmsKCC *rom o+t side road &o+ndary &y mechanical means O!!

    arthwork e,cavation in soils +to SR &y mechanical means *or *o+ndations o*str+ct+res as er drawing and technical seci.cation incl+ding setting o+t!

    #i&rated cement concrete ( 1 Grade Concrete +sing $0mm < "0mm and 10mm siJe2BG cr+shed stone aggregate 5Coarse aggregate con*orming to ta&le 1000-1 and .neaggregate con*orming to ta&le 1000-")!! For war* wall

    ?!S! Provisions *or Price ad+stment< #67 8 9< +ality Control Charges< Road Sa*etynterventions< Shi*ting o* +tilities s+ch lectrical lines< ater s+ly ie lines< etc!<6vagahana Sadassal+ and *or stationery < UR@U etc!A Hn*oreseen items!

      7he estimate is reared with "01$-"01 common SSR *or all ngineering

    eartment and datas as er (oR7A2 standard data &ook d+ly adoting over head charges

    8 9 and contractors ro.t at 109 as er G!@!(s ;o 1$1< 75RAB) et< dated "4!04

  • 8/18/2019 CC Road With Drains

    75/80

    Specifcation report to accompany the detaied estimate !or the or% o!

    1

    "

    '

    mprovements to Aamuru to "otipai road !rom "m 0>000 to 1;>000 inEast &odavari 'istrict.

    mprovements to Aamuru to "otipai road !rom "m )>00 to;>000 in East &odavari 'istrict.

      7he road *rom 6lam+r+ to >otialli *rom >m 0K000 to "'K'00 is an imortant

    (aor istrict Road in ast Godavari istrict! 7his road connects n+m&er o* imortant

    villages s+ch as 6lam+r+< Vonnada< 7ata+di < ?ankaagraharam< >aileswara+ram<

    Srirama+ram< >or+milli< >+lla< (allavaram< S+ndaraalli< A >otialli ! 7his road connects

    n+m&er o* cross roads &elonging to RAB and Panchayat Ra deartments!7he road starts

    in km 1/$!%0 o* #iayawada- #isakhaatnam road at Vonnada56lam+r+)otialli village! 6s the road is on the canal

    &+nd o* Godavari ?e*t Bank 5G?B)< the rrigation a+thorities have taken + the Mood &ank

    works on this road! ;ow< the road is not in a osition to receive the resent day trac< as

    no imrovements were taken + *or the last 11 years 5ie!< since "00'-0$)! 6s there are

    many no! o* &athing ghats all along the road viJ!< 6lam+r+< Vonnada< 7ata+di <

    ?ankaagraharam< >aileswara+ram< Srirama+ram< >or+milli< >+lla< (allavaram<

    S+ndaraalli A >otialli ! the connecting roads *rom 6lam+r+ to >otialli is to &e imroved

    *or transortations o* vehicles and movement o* +&lic and ilgrims d+ring the time o*

    Godavari P+shkaramsm 'K00 to 4K000 is to &e imroved to RAB standards! 2ence< an estimate is reared

    with the *ollowing rovisions to strengthen the road *rom >m 'K00 to 4K000 !

      6dministrative sanction accorded &y Government vide G@ Rt! ;o!%"/< 7> K P?6; K 6> Road K K R K -' K 6<dt!"0!1"!"01$ *or Rs!"00!00 ?akhs ermitted &y the Government vide Govt! (emo;o!E/$' K R!5") K "01$-1< dt!14!1"!"01$ &ased on "00%-"00E commom SSR *or all

    ngineering eartment!

      7he Government o* 6!P! vide G!@! (s! ;o!"< 7

  • 8/18/2019 CC Road With Drains

    76/80

    $

    /

    4

    %

    E

    10

    11

    1"

    RAES:

    Asst.Engineer 4R,5* 'y. EMecutive Engineer 4R,5* EMecutive Engineer 4R,5*

    'ra%sharama. Ramachandrapuram 4R,5 'ivision : "a%inada

    Providing and alying rime coat with &it+men m+lsion on reared s+r*ace o*gran+lar &ase incl+ding clearing o* road s+r*ace and sraying rimer at the rate o* 0!/0

    Providing and alying tack coat with &it+men m+lsion 5(edi+m setting) 5B+lk) +singm+lsion ress+re distri&+tor at the rate o* 0!"0 kgs er sm on the reared

    Providing and laying o* 0mm thick Bit+mino+s (acadam with hot mi, lantrod+cing an average o+t+t o* '4! tonnes er ho+r +sing hard &lasted granite

    Providing " mm thick comacted Semi-ense Bit+mino+s Concrete &y hot mi, lant+sing hard &lasted granite cr+shed aggregates o* Grading -" as er ta&le 00-1 o*

    Forming sho+lders with &arrowed +se*+l selected earth having ( o* not less than

    1!4 GmsKCC *rom o+t side road &o+ndary &y mechanical means O!

    arthwork e,cavation in soils +to SR &y mechanical means *or *o+ndations o*

    str+ct+res as er drawing and technical seci.cation incl+ding setting o+t!

    Providing #i&rated Cement Concrete 51:':/) mi, +sing $0mm siJe For &ase co+rse&elow war* wall O!

    #i&rated cement concrete ( 1 Grade Concrete +sing $0mm < "0mm and 10mm siJe2BG cr+shed stone aggregate 5Coarse aggregate con*orming to ta&le 1000-1 and .neaggregate con*orming to ta&le 1000-")!! For war* wall

    ?!S! Provisions *or Price ad+stment< #67 8 9< +ality Control Charges< Road Sa*etynterventions< Shi*ting o* +tilities s+ch lectrical lines< ater s+ly ie lines< etc!<6vagahana Sadassal+ and *or stationery < UR@U etc!A Hn*oreseen items!

      7he estimate is reared with "00%-"00E commom SSR *or all ngineeringeartment and datas as er (oR7A2 standard data &ook d+ly adoting over head charges8 9 and contractors ro.t at 109 as er G!@!(s ;o 1$1< 75RAB) et< dated "4!04!"00/!Provision *or #67 is shown searately as P6R7 =B= in the estimate as er G!@!(s ;o 1$1< 75RAB) et!< t "4!04!"00/ 7he work will &e carriedo+t as er relevant cla+ses o* RC A(@R72 seci.cations!

  • 8/18/2019 CC Road With Drains

    77/80

    Specifcation report to accompany the detaied estimate !or the or% o!

    1

    "

    mprovements to Aamuru to "otipai road !rom "m 1;>000 to ()>)00and "otipai - Pian%a road !rom %m 0>000 to />000 in East &odavari

    'istrict.

    mprovements to Aamuru to "otipai road !rom "m ()>100 to()>)00 and "otipai to Pian%a road !rom %m 0>000 to (>/00 in

    East &odavari 'istrict.

      7he roads *rom 1)6lam+r+ to >otialli *rom >m "'K100 to "'K'005Proosed) 5(R)

    ") >otialli to Pillanka road *rom >m 0K000 to "KE00 5R+ral road)5Proosed) are imortant

    roads in ast Godavari istrict! 7hese roads connect n+m&er o* imortant villages

    s+ch as >otialli >otaotialli - Pillanka road !

      6dministrative sanction accorded &y Government vide G@ Rt! ;o!%"/< 7> K P?6; K 6> Road K K R K -' K 6< dt!"0!1"!"01$ *or

    Rs!"00!00 ?akhs ermitted &y the Government vide Govt! (emo ;o!E/$' K R!5") K

    "01$-1< dt!14!1"!"01$ &ased on "00%-"00E commom SSR *or all ngineering

    eartment!

      7he Government o* 6!P! vide G!@! (s! ;o!"< 7

  • 8/18/2019 CC Road With Drains

    78/80

    '

    $

    /

    4

    %

    1% Constr+ction o* arthen Sho+lders on &oth sides to a deth o* the cr+st!

    1E Providing #i&rated Cement Concrete 51:':/) mi, +sing $0mm siJe &elow war* wall

    "0

    "1

    RAES:

    Asst.Engineer 4R,5* 'y. EMecutive Engineer 4R,5* EMecutive Engineer 4R,5*

    'ra%sharama. Ramachandrapuram 4R,5 'ivision : "a%inada

    Providing and alying rime coat with &it+men m+lsion on reared s+r*ace o*gran+lar &ase incl+ding clearing o* road s+r*ace and sraying rimer at the rate o* 0!/0

    Providing and alying tack coat with &it+men m+lsion 5(edi+m setting) 5B+lk) +singm+lsion ress+re distri&+tor at the rate o* 0!"0 kgs er sm on the reared

    Providing and laying o* 0mm thick Bit+mino+s (acadam with hot mi, lantrod+cing an average o+t+t o* '4! tonnes er ho+r +sing hard &lasted granite

    Providing " mm thick comacted Semi-ense Bit+mino+s Concrete &y hot mi, lant+sing hard &lasted granite cr+shed aggregates o* Grading -" as er ta&le 00-1 o*

    ;artor e/aation in soils upto #! b6 %e/ani/al %eans as per Mo!(') spe/ifi/ation301-4t !eision and as dire/ted b6 te ;ngineerinCarge

    or%ing soulders it barroed useful sele/ted eart aing M## of not less tan 1.75 +%sCCfro% out side road boundar6 b6 %e/ani/al %eans G.

    #i&rated cement concrete ( 1 Grade Concrete +sing $0mm < "0mm and 10mm siJe2BG cr+shed stone aggregate 5Coarse aggregate con*orming to ta&le 1000-1 and .neaggregate con*orming to ta&le 1000-") incl+ding

    ?!S! Provisions *or Price ad+stment< #67 8 9< +ality Control Charges< Road Sa*etynterventions< Shi*ting o* +tilities s+ch lectrical lines< ater s+ly ie lines< etc!<6vagahana Sadassal+ and *or stationery < UR@U etc!A Hn*oreseen items!

      7he estimate is reared with "00%-"00E commom SSR *or all ngineeringeartment and datas as er (oR7A2 standard data &ook d+ly adoting over head charges8 9 and contractors ro.t at 109 as er G!@!(s ;o 1$1< 75RAB) et< dated "4!04!"00/!Provision *or #67 is shown searately as P6R7 =B= in the estimate as er G!@!(s ;o 1$1< 75RAB) et!< t "4!04!"00/ 7he work will &e carriedo+t as er relevant cla+ses o* RC A(@R72 seci.cations!

  • 8/18/2019 CC Road With Drains

    79/80

    +ame o! 7or% :

    #Q6G

    Sand Ram

    (ain ork: idening and Strengthening o* >akinada - Raahm+ndry Road *rom >( /1K/00 to /%K'0 inast Godavari istrictS+&-ork 5"): idening and Strengthening o* >akinada - Raahm+ndry Road *rom >( /$K000 to /%K'0in ast Godavari istrict

    >ather+ +arry

    '!00 >ms

    >m E04K0

    7or%ing Reach

            R    -        > 

             R      o      a        d

             5         v         )          P

          +      n       y        a         k

          e      s        t      r

          a      m

    ;    2    -  1   

    /   

    (oram+di

    Gravel +arry

    >m 1$K/00

    1!40 >ms

       >  m    1

       /   K   E   1   0

    Re.nery

       1 !   /

       0   >  m  s

    >m 41EK$

      Assistant ;e/utie ;ngineer-!'* out e/tion, !aHa%undr6

      #6.;e/utie ;ngineer -!'* ub#n.,!aHa%undr6

      ;e/utie ;ngineer -!'* #iision, !aHa%undr6

      uperintending ;ngineer -!'* Cir/le, Daainada

           >      m

           /       %       K        '       0       )

    0!40 k(

                        >               m

                         /                    1                    K                      /                    0                    0

    >m 0K0

    > m  $ E  K / 0 0 

    >m E10K4>m 'K100

                        >               m

                         /                    $                    K                      0                    0                    0