Case Study for the CWC
July 17 , 2013
![Page 2: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/2.jpg)
Purpose
NODOS as a case study in public and non-public benefits
Outline – Background – Measuring Benefits – Allocation of Costs – Financing
![Page 3: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/3.jpg)
Caveats:
• Preliminary • Subject to revision
![Page 4: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/4.jpg)
Proposed Water Bond - Requirements
Non Public
Ecosystem
Emergency Response
Recreation
Water Quality
Flood
![Page 5: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/5.jpg)
NODOS Objectives
Primary Objectives and
Secondary Objectives M&I and Environmental Water Quality
Emergency Response
Recreation
Flexible Generation
Water Supply
Ecosystem
Flood Protection
![Page 6: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/6.jpg)
NODOS Alternatives Components
• Location • Conveyance • Size • Operations
![Page 7: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/7.jpg)
NODOS Reservoir Location Alternatives
• Red Bank Reservoir • Newville Reservoir • Colusa Reservoir • Sites Reservoir
Red Bank Project (Dipping Vat Reservoir
and Schoenfield Reservoir)
Newville Reservoir
Colusa Reservoir
Sites Reservoir
![Page 8: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/8.jpg)
Proposed Sites Reservoir Elements
![Page 9: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/9.jpg)
Benefits
How Methods Where
![Page 10: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/10.jpg)
How: Proposed Reservoir Operations Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Fill Reservoir
Drain Reservoir
SWP
Wildlife Refuges
CVP
Augment Delta Water Quality
Hydropower
![Page 11: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/11.jpg)
How: Integrated Operations Shasta
Sites Oroville
Folsom
Trinity
![Page 12: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/12.jpg)
Methods: System-Wide Benefits
Hydrology & System Operations
CALSIM II, USRDOM
Water supply impacts, river flows, exports, storage
Salinity (EC, Cl, TDS, Br) and fingerprinting (EC, volume)
Delta Hydrodynamics DSM2-HYDRO
Delta Water Quality DSM2-QUAL
Reservoir/River Temp USRWQM,
Reclamation Temperature
Power LTGEN, PLEXOS
SWP Power, NODOS Power
Economics SWAP,
LCPSIM/SUPEM, LCRBWQM/SBWQM
Delta channel flows, stages, velocities
Reservoir, River temperatures
Fisheries Reclamation
Mortality, SALMOD, WRCLCM (IOS)
Quantification of Economic Benefits
Net Generation, Daily Pump-Back and Benefits
Survival, Potential Production, Population
![Page 13: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/13.jpg)
Methods: Local Benefits
SRH-SIAM
Sediment Loads
SRH-Meander
Point Bar Growth
SRH-2D Local Velocity, Scour, & Stage
SRH-1DV Riparian Vegetation
Survival
RHEM Riparian
Vegetation Growth
Fluvial Geomorphology and Riparian Habitat
Surface Water Quality
USRWQM Daily Sacramento River
Temperature
Other Quantitative and Qualitative
Analyses
CAL2DOM CALSIM II
Monthly storage, flow &
diversion operations
USRDOM Daily storage, Sac River and tributary flow and
diversion operations
Surface Water Resources
Aquatic Biological Resources
WRCLCM (IOS/DPM Model)
Sacramento River Winter Chinook
SALMOD Sacramento River
Fall, Late-Fall, Winter & Spring Chinook
SAC-EFT Sacramento River Chinook salmon, steelhead, green
sturgeon, bank swallow, western pond turtle
Other Quantitative and Qualitative
Analyses
![Page 14: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/14.jpg)
Recreation
• Two potential recreation sites • Potentially improves lake
levels at existing reservoirs
![Page 15: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/15.jpg)
Recreation
![Page 16: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/16.jpg)
Flood Protection
Flood damage reduction in project vicinity (up to 8,600 acres)
![Page 17: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/17.jpg)
Potential Contribution to Hydropower Generation
• Potentially generates up to 125 MW of new hydropower through pump-back facilities
• Could be quickly ramped up or down to complement other renewable energy sources
PHOTO: DWR. CASTAIC
![Page 18: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/18.jpg)
Water Benefits Summary
Ecosystem Enhancement
Water Quality
Water Supply
Yiel
d En
hanc
emen
t, TA
F
Long-Term Average Dry/Critical Years Average
700
600
500
400
300
200
100
0
![Page 19: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/19.jpg)
Water Supply
Municipal & Industrial
Agricultural
Wildlife Refuges
![Page 20: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/20.jpg)
System Flexibility and Emergency Response
Additional Water in System Storage
Sites Shasta Oroville
Addi
tiona
l Wat
er in
Sys
tem
Sto
rage
(TAF
)
Average Driest Period
1600
1400
1200
1000
800
600
400
200
0
Trinity Folsom
![Page 21: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/21.jpg)
Water Quality
Municipal & Industrial
Agricultural
Environmental – X2
![Page 22: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/22.jpg)
Ecosystem
Coldwater pool
In-stream flows
X2
![Page 23: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/23.jpg)
$151.9
$19.7
$45.4
$0.7 $2.2 $0.0
100-Year Period of Analysis
Water Supply Water Quality Ecosystem Enhancement Hydropower (Net Revenue) Recreation Flood Damage Reduction
Values in $millions
Estimated Federal Annual Benefits
![Page 24: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/24.jpg)
Preliminary Benefit Cost Ratio
($M)
Proposed Project Costs $3,384
Interest During Construction $972
Annual Costs:
Interest/Amortization $176
Operations & Maintenance $14
Total Annual Costs $190
Total Annual Benefits
$231
Net Annual Benefits $41
Benefit Cost Ratio 1.2 Preliminary – Subject to Change
![Page 25: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/25.jpg)
Cost Allocation
![Page 26: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/26.jpg)
Preliminary Proposed Project Costs
Dams
Outlet Works
Pump/Gen Plants
Conveyance
Roads Misc
Total: $3.4 Billion
![Page 27: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/27.jpg)
$2,041.3 $374.6
$864.4
$86.9 $41.9 $0.05
Water Supply Water Quality Ecosystem Enhancement Hydropower (Net Revenue) Recreation Flood Damage Reduction
Values in $millions
Preliminary Total Cost Allocation Summary
![Page 28: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/28.jpg)
Public and Non-Public Share
Benefit Type Percentage Allocation
Public Allocation Non-Public Allocation
Water Supply 53.4% 53.4%
Water Quality 11.0% 11.0%
Ecosystem 31.9% 31.9%
Hydropower 2.5% 2.5%
Recreation 1.2% 1.2%
Flood Reduction 0.0% 0.0%
TOTAL 44.1% 55.9%
Note: Ecosystem is 72.3% of Public Benefits
![Page 29: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/29.jpg)
Finance
![Page 30: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/30.jpg)
Potential Funding Partners
State Water Bond Federal CVP
Contractors SWP
Contractors Power Utility
Water Supply M&I SWP
Ag CVP Ag SWP
Water Quality M&I SWP
Ag CVP Ag SWP
Ecosystem Recreation Power Flood
Emergency Storage
![Page 31: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/31.jpg)
Estimated Construction Cost Assignment by Cost Share Partner
$-
$500.0
$1,000.0
$1,500.0
$2,000.0
$2,500.0
$3,000.0
$3,500.0
$4,000.0
Scenario 1 Scenario 2 Scenario 3
Utility Providers Water Bond Water Contractors/Users Federal
Values in $millions
![Page 32: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/32.jpg)
Purpose
Sites Joint Powers Authority
![Page 33: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/33.jpg)
Sites Joint Powers Authority (JPA)
• Authorized under Section Water Code 79749(a). – The purpose of JPA is to establish a public entity to
design, acquire, manage and operate Sites Reservoir and related facilities to improve the operation of the state's water system and provide improvements in ecosystem and water quality conditions the Sacramento River system and in the Bay-Delta as well as provide flood control and other benefits for the State of California.
• Senate (Feinstein) also proposing similar language in current Appropriations Bill
![Page 34: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/34.jpg)
JPA Members
• Glenn County • Colusa County • Glenn-Colusa Irrigation District • Tehama Colusa Canal Authority • Reclamation District 108 • Maxwell Irrigation District • Yolo County Flood Control and Water Conservation
District • DWR – no voting member
![Page 35: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/35.jpg)
2013 Actions and Engagement
• Conduct Public Outreach and Information • Address Affordability & Funding Options • Identify Beneficiaries and Cost/Benefit Evaluation • Project Construction Cost Evaluation
![Page 36: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/36.jpg)
Conduct Public Outreach and Information
• Cooperating with DWR and Center for Collaborative Policy
• Focused Outreach to Stakeholders – Landowners - Project Footprint – Counties – Road relocation, bridge, Recreation Areas – Sac Valley Region – Districts, Counties, IWRMP’s – NGO’s – aquatic and terrestrial goals
• JPA not limited by state/federal pre-decisional concerns
• Outreach could true-up EIR/EIS to improve formal public review process and comments
![Page 37: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/37.jpg)
Address Affordability
• Financial Feasibility vs. Affordability • Economics (benefits to costs) vs. Repayment (is there a
customer base) • Pooled Benefits and Repayment or value discounting? • How will the public share be funded?
– Water Bond, capital or annual payments? – Valuing Public Benefits, are or science?
• How will the non-public share be funded + terms? – Federal Authorization and Budget – WIFIA – Equity/Bond Market
![Page 38: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/38.jpg)
Identify beneficiaries and cost/benefit evaluation
• “What will I get, and what will it cost me?” • How do I finance my share? Local bonding or Project
bonding? • How does Sites perform without and with BDCP?
– Without BDCP, operations provide dry and critical year water supply.
– With BDCP, could meet new outflow requirements and water supply reliability
• How do we value reoperation benefits? • JPA developing a financial modeling tool to evaluate
different funding and payment scenarios
![Page 39: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/39.jpg)
Project Construction Cost evaluation
• Conducting a new capital cost study for Sites - current costs indexed for inflation
• Cost of Construction at $972M and 12 years -need to expedite construction schedule, timing of capital purchases
![Page 40: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing](https://reader031.vdocuments.us/reader031/viewer/2022030403/5a791bab7f8b9a07628c57d1/html5/thumbnails/40.jpg)
Contacts:
Sean Sou Department of Water Resources P.O. Box 942836 Sacramento CA 94236 916-651-9269 [email protected]
Sharon McHale Bureau of Reclamation 2800 Cottage Way, MP-700 Sacramento CA 95825 916-978-5086 [email protected]
Project Websites: www.storage.water.ca.gov/northdelta/index.cfm www.usbr.gov/mp/nodos/index.html