Continuous Monitoring inside boiler up to 400°C (752°F)

Sub-mm wall thickness loss measurement over 6 months

Bespoke solution developed to meet client needs

Compact Belenus size (50 x 32 x 20 mm) easily fitted to complex pipework

Simple sensor install avoided impact on other shutdown works

Client has access to thickness measurements at all times

Belenus permanently installed in aBoiler in a Gas Power Station

Belenus installed in 400°C boiler at a Gas Power Station

Belenus wall thickness measurement