"carrefour ,china - building a greener store" case study analysis
TRANSCRIPT
CARREFOUR, CHINA BUILDING A GREENER
STOREPresented By: Sindoor Naik
Case Synopsis Carrefour : 2nd Largest Retailer in the World Entered China in 1995 Carrefour approach : French Manager for new project David Monaco : Asset and construction director of Carrefour in
China Transition from traditional markets to super markets in China Product range : A mixture of East and West (from food product
to non food products) Success factors : Experience gained in Taiwan and Local
Strategies Environment Friendly Initiative Green Building trends in China The LEED Green Building rating system The Competition
Problem Definition Store Development in China During the early years Retail operations Chinese Climate Frequent Power Shortages Protests against genetically modified products Green Building trends in China during Olympics Reducing power consumption and operating costs Green Market Certification Competition from Walmart, Auchan and other retailers in the
race for green initiative Cost for installing green equipments
Solutions Centralize and standardize all asset expansions and construction
activities Monaco reduced the average store development cost by 25% Shorten the average construction time by 20% Maintenance an operating cost by 12% Established long term relationships Assigned engineers to work on low-cost preventive maintenance of
store Tie up with Schneider electric Solar Panels and in-store refrigeration systems were tested Deco lighting provided energy savings by 33% per sq. meter Energy management systems were used which reduced the savings
by 550,460 KWh Installed various alternate energy equipment
THANK YOU