Capital Building Bond

Referendum

Creating College and Career Ready Graduates

Bill Holmgren, Director of Finance & Operations

Bryan Hennekens, Director of Technology & Security

Jeff Cacek, Principal North Park Elementary

June 13, 2017

C O R E V A L U E S

Community

Excellence

Collaboration

Integrity

Respect

Innovation

Courage

• North Park Elementary Space Needs, Upgrades &

Maintenance

• Columbia Heights High School Performing Art

Center Upgrades

• Columbia Heights High School Band Space

• Columbia Heights High School Gymnasium

Improved Performance Space

Proposed 2017 Facility Bond Referendum

Community Survey Spring 2017

Finding:

• Potential Improvements to North Park Elementary & Columbia Heights High School

72.4% Likely support with a margin of error of +5.3%

Past Upgrades at North Park

North Park has had many upgrades over the years

• Built in the 1966

• Roof Replacement 1989-1998

• Major remodel in 1998

• Addition to building

• Replacement of unit ventilators

• Investment in Technology

• Remodeled for Learning Studios 2012-2014

North Park Current Estimated

Facility Costs from the 2014

Capital Projects Levy Referendum

North Park Elementary School

Tuck-pointing

Windows / Doors

Casework

Roof

Parking

Plumbing

Total: *$2,693,204

*Over the period of the levy (2015-2025)

Technology Costs District Wide*

Technology Requests Safety & Security Requests

Upgrading districtwide bandwidth and

network infrastructure to match today's

globally connected 21st Century classrooms.

Providing laptops and tablets for students in

the Personalized Learning Initiative

Expanding Personalized Learning Online

systems.

Improving the existing parent and student

SchoolView web portal.

Increase/upgrade building security access

(including card access) systems.

Increasing internal/external security camera

systems districtwide

*Over the period of the levy (2015-2025)

North Park Necessary Upgrades Beyond the funding we have

already allocatedLearning Space Needs (Equivalent to the other Elementary

Buildings)

• Library

• Separate Science and Art classroom

• Early learning incubator

• Media Arts lab

Building Security

• Providing secure single point of entry for all visitors

• Move administrative office to main entry for enhanced security and customer service

Grounds Maintenance (Equivalent to all the other Buildings)

• New updated play area

• New drive entrance with separation of buses, parents & staff

Existing

Stage

Existing

Gym

Cafeteria

Music/Band

Cafeteria

Cafeteria

Columbia Heights High School

Estimated Facility Costs

Columbia Heights High School

Parking/Drives

Tuck-pointing

Track

Casework

Roof

PAC - Sound

Plumbing

Total: *$4,053,872

*Over the period of the levy (2015-2025)

Columbia Heights High School Necessary Upgrades Beyond The

Funding Already Allocated

Learning Space Needs

• Performing Arts Center Upgrades

• New Band Space

• Gymnasium Improved Performance Space

Columbia Heights High School Performing Arts Center Upgrades

Lighting• New Stage LED dimmable

lighting system• New lighting board in booth

upstairs• New house lighting system

controls

Columbia Heights High School Performing Arts Center Upgrades

Presentation System• New Screen / projector• New control system wired

for ease of use

Remodeled Sound/Light Booth• Enlarge openings• New cabinetry\Storage• Move lighting and sound

equipment to booth

Sound System• New sound board in booth

upstairs• Permanent Speaker system• New Wiring

Columbia Heights High School Performing Arts

Center Upgrades• Seating

• All new seating in the PAC

• New carpeting

• New paint throughout

• Stage

• New wood floor

• New steps to the stage

• New wood front of the stage

• Replace all Curtains

• Upgrading Dressing rooms

• New ADA compliant ramp

Columbia Heights High School Performing Arts Center Cost Estimates

• Construction Cost 765,000

• Lighting 165,000

• Sound System 150,000

• Presentation System 100,000

• Fees 190,000

• Contingency 150,000

• Total $1,500,000

Columbia Heights High School Band Space Needs

The High School band classroom will not meet the future needs of the expanding program

• The numbers of students in the band has been growing over the last 10yrs.• The district received several grants from VH1 save the music foundation• The district invested in additional staff and resources• The district has received smaller grants from the city of Columbia Heights

activity fund to support band students• These grants and investments continue to strengthen and grow the band

programing at Columbia Heights Schools

• The current space has lower ceilings resulting in poor acoustics and potential safety hazards.

• The current individual practice spaces need upgrading

After a walkthrough of the building by staff and consulting engineers, we are unable to find a space

large enough to accommodate the expanding band program

Columbia Heights High School Band Space Needs

Columbia Heights High School New Band Space

• Separate practice spaces

• Instrument repair and cleaning room

• Sufficient instrument storage

• Furnishings (chairs, risers, podium, etc..)

• Additional natural lighting

• Improved acoustics

Rendering of the New Band Space

New Band Space vs Current Band Space

Columbia Heights High School Band Room

• Building Construction $2,042,070

• Contingency $245,045

• Fees $204,000

• Furnishings and equipment allowance $75,000

• Total Estimated Project Costs $2,566,188

Columbia Heights High School Gymnasium Improved Performance Space

• The (PAC)Performing Arts Center is the only performance space that we have in the district.

• The (PAC)Performing Arts Center is frequently accessed by the community as it is the primary performance space for community groups as well.

• Columbia Heights High School accesses the space for its band, choir, theatre, and musical theatre programming

• Columbia Academy accesses the space for its band, choir, and musical theatre programming

As district performing arts programs are expanding added with community use, additional performance space is required

Thrust Stage

Columbia Heights High School Gymnasium Improved Performance Space

Columbia Heights High School Gymnasium Improved Performance Space

• Total Estimated Project Costs$150,000

Four Project Estimated Cost

• North Park Elementary $11,558,117

• Columbia Heights High School

Performing Arts Center $1,500,000

• Columbia Heights High School

Band Room $2,566,118

• Columbia Heights High School

Additional Performance Venue

$150,000

• Total Cost Estimate $15,774,235

Proposed Facility Bond Referendum

• North Park Elementary Space Needs, Upgrades & Maintenance

• High School Performing Arts Center upgrades

• High School New Band Space

• High School Gymnasium Improved Performance Space

Strong community support from recent community surveys

Tax Impact 16 million project15 year term

Taxable Market Value

Yearly Tax Impact Monthly Tax Impact

125,000 36 3.00

150,000 46 3.83

200,000 68 5.67

Facility Bond ReferendumGovernance Questions

• If?

• We put a question on ballot

• What?

• North Park Elementary Space Needs, Upgrades & Maintenance

• High School (PAC)Performing Arts Center Upgrades

• High School New Band Space

• High School Gymnasium Improved Performance Space

• When?

• November 7, 2017

Questions