Capacity to Customer (C2C) Update

ENA 2012 Low Carbon Network Fund Conference26 October 2012

Page 2: Capacity to Customer (C 2 C) Update ENA 2012 Low Carbon Network Fund Conference 26 October 2012

2

Electricity North West

Licensed distribution network operator in NW England

Area: 12,500 square kilometres

Key network asset statistics;• 13,000 km of overhead lines• 44,000 km of underground

cables • 84,000 items of switchgear• 34,000 transformers

Customer base: 2.3 million

Deliver over 25 TWh pa

Page 3: Capacity to Customer (C 2 C) Update ENA 2012 Low Carbon Network Fund Conference 26 October 2012

What is Capacity to Customers?

Technical Innovation

Current Demand

Latent Capacity

Total available network capacity

Apply remote control equipment to the HV circuit and close the normal open point

Enhance network management software

This effectively doubles the available capacity of the circuit negating the need for traditional reinforcement

New Commercial Contracts

To retain customers’ security of supply we will utilise innovative demand side response contracts

These contracts will allow ENWL to control the consumption of customers on a circuit at the time of fault

Utilised Capacity

Capacity to Customers

Total available network capacity

Combining proven technology and new commercial contracts

Allows ENWL to release significant network capacity back to customers

Facilitating connection of new demand and generation without reinforcement

3

Page 4: Capacity to Customer (C 2 C) Update ENA 2012 Low Carbon Network Fund Conference 26 October 2012

Standard 11kV Network Configuration

4

XX X

11kV Primary busbar

33/11kV

NOP

NOP

Load point

NOP

Page 5: Capacity to Customer (C 2 C) Update ENA 2012 Low Carbon Network Fund Conference 26 October 2012

C2C Network Configuration

5

X

X

A

11kV Primary busbar

33/11kV

NOP

NOP

Managed Load

X X

A

A

A

A

Page 6: Capacity to Customer (C 2 C) Update ENA 2012 Low Carbon Network Fund Conference 26 October 2012

6

Monitoring the effect of the trial

We have partnered with the University of Manchester and the University of Strathclyde

Strathclyde Scope of Works includes;• Power System Modelling & Simulation – To inform the hypothesis that ‘C2C

method will reduce like-for-like power losses initially but this benefit will gradually be eroded as newly released capacity is utilised’ and ‘C2C method will improve power quality’

Manchester Scope of Works includes;• Carbon Impact Assessment – To inform the hypothesis ‘C2C method will

facilitate a reduction in the carbon costs of network reinforcement’

• Economic Benefit Analysis - To inform the hypothesis that ‘C2C will facilitate lower reinforcement costs for customers for the connection of a new loads and generation’ and to also consider the wider impacts on both customer and network operator’s business models.

Page 7: Capacity to Customer (C 2 C) Update ENA 2012 Low Carbon Network Fund Conference 26 October 2012

Project startup Software design Circuit selection and methodology Customer engagement plans & survey New commercial templates and processes

2012

Project Timeline

Software user acceptance testing

Equipment installation & commisioning

Trial ‘go live’

Recruit trial participants

Carbon, economic & losses impact assessments

Continously engage customers & stakeholders

2013/14

Closedown report & closureQ4 2014

Learning & knowledge

sharingBuild & trial

Design

Closure

7

Page 8: Capacity to Customer (C 2 C) Update ENA 2012 Low Carbon Network Fund Conference 26 October 2012

8insert file location/author/filename/version

Contact info

For further information please contact:

Craig McNicol

[email protected]