capacity building dialogue
DESCRIPTION
CAPACITY BUILDING DIALOGUE. SIPRD,WEST BENGAL. Capacity Building is a process which leads to complete/total access and control over Resources those are required for an Institution or an individual to exist with dignity and quality. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/1.jpg)
CAPACITY BUILDING DIALOGUE
SIPRD,WEST BENGAL
![Page 2: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/2.jpg)
Capacity Building is a Capacity Building is a process which leads to process which leads to
complete/total access and complete/total access and control over Resources control over Resources
those are required for an those are required for an Institution or an individual Institution or an individual
to exist with dignity and to exist with dignity and quality. quality.
![Page 3: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/3.jpg)
IT must be viewed in totality and not in
disaggregated manner
![Page 4: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/4.jpg)
TASKS OF SIPRD
TRAINING
RESEARCH ADVOCACY
FACILITATION
STORE HOUSE OF KNOWLEDGE & INFORMATION
![Page 5: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/5.jpg)
TNA-2003 & 2008
Systematic Approach of SIPRD to Training : 2000 Onwards
DecentralizedTraining
Cycle of PRIs:West Bengal
TMD–2000, 2002,2005, 2006,2007, 2008(Ref.
Trg.)
TOT- 2000, 2002,2003, 2005, 2007, 2008
TPRIs-2002, 2003, 2004,2005, 2006,2007, 2008(Ref. Trg. PRI)
TIA- 2004
![Page 6: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/6.jpg)
Systematic Approach of SIPRD towards Research
• Enriching content of training• Reflected in Training Materials• Publication
![Page 7: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/7.jpg)
STRATEGY OF SIPRD (2008-2013)
1. Organizing TNA exercises before preparing training modules.
2. In order to enhance effectiveness and efficiency of newly elected Panchayat functionaries at least 1 time coverage of training of all elected representaives
![Page 8: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/8.jpg)
STRATEGY OF SIPRD (2008-2013)
3. Coverage of ZP & PS members as early as possible.
4. Organizing District level TOT programmes.
![Page 9: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/9.jpg)
STRATEGY OF SIPRD (2008-2013)
6.Exchanging Ideas through State-level ,National level & Interntional Workshops
5. Capacity Building of EWRs and Gender Sensitisation.
![Page 10: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/10.jpg)
STRATEGY OF SIPRD (2008-2013)
7. Construction of permanent state level Resource –pool
8. Formation of Help-Desk and Mobile Support Staff to revitalize and to motivate the PRI functionaries .
![Page 11: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/11.jpg)
STRENGTH OF SIPRD
• Experienced , Skilled , communicative and very sound subject specific faculties.• Large Infrastructure• Very equipped supporting staffs• Technical know-hows & Expertise.• Strong Networking with the field.• Very strong networking & good name with other states • Regular communication with the field level practitioners , activists , NGOs• Very active Cells. • Fellow-feeling and Fraternity.
![Page 12: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/12.jpg)
WEAKNESSES• Lack of Manpower • Lack of Money • Low scope of exchanging views with other institutions• Low scope of experiencing alternative training strategy or latest training methodologies • Low scope of faculty upgradation • No formal Resource-pool is there.• Less mobility support • Less liberty , less autonomy
![Page 13: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/13.jpg)
DEMAND SIDE GAPSNo training coverage of ZP & PS members. No training coverage of EWRs.
No timely training coverage towards Officials of PRIs.
No training intervention towards opposition leaders . No Follow-up session has been done
District Council members have not been addressed
Need-based trainings are imparted less due to lack of manpower & lack of time
![Page 14: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/14.jpg)
• Chairpersons of 6 standing Committees 2000• Special Training programme for lady
Sabhapatis , Pradhans & Karmadhyakshas 1270 +
118 + 1000+ 2388• Officials of ZP & PS 4100 + 450• General Members of Standing Committees
with opposition leaders 4000• Follow-up Sessions of Sabhapati &
Sahakari Sabhapaties 329 x 2 = 658• Follow-up Sessions of Karmadhyakshas 329 x 9= 2961• Training of general members other than
the members of Sthayee samitis 1000
Refresher Courses of the officials 4500• Members of District Council 18 x 5 = 90• Need-based Training ---------• District level TOT 18 x 10 = 180
Total 25,715
Targets of SIPRD
![Page 15: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/15.jpg)
Supply Side Gaps • Lack of Continuous Support towards PRI
functionaries due to lack of manpower• Lack of necessary skill development
( photography ,doccumentation etc.)• SIPRD can’t play the role of Knowledge-
Hubs properly due to lack of support-staffs • It has not used TDCC properly due to man-
power.• TIS can’t be undertaken due to lack of
manpower.
![Page 16: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/16.jpg)
Supply Side Gaps
• Each cell is very effective but can’t perform optimally as no support staff is attached with each cell.
• Field visit can’t be done due to lack of mobility support.
• Ready training material can’t be supplied due to lack of Printing unit and man power within the institute.
• A continuous monitoring can’t be done due to manpower.
![Page 17: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/17.jpg)
Supply Side Gaps
• Training material as per need of the field can’t be supplied due to lack of manpower & lack of technical infrastructure as well as money
• Regular monitoring of training or other problem regressal intervention can’t be done due to same reason.
![Page 18: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/18.jpg)
Requirements
• Renovation & Upgradation of Class-room.
• Training Aids --- Projector Machine (Hanging & Compact ),computers ( desktops & laptops ) , lease-line connectivity for internet users ,Large size wall-monitor ,
• Doccumentation Laboratory
• A total Printing Unit
• Upgradation of TDCC unit for communication with Zilla Parishad Panchayat Samitis and Gram Panchayats
![Page 19: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/19.jpg)
REQUIREMENTS
• Upgradation of Cells with manpower ---- dedicated contractual support staffs , machineries etc.
• Mobility Support --- two dedicated mobile van for field visit & doccumentation.
• An autonomy like NIRD to serve effectively & optimally as per need .
• Upgradation of Faculty through ----- Faculty Exchange programmeVisit to Best practicesCommon Issue-based Exchange Programme
![Page 20: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/20.jpg)
Miles to go
………………..
![Page 21: CAPACITY BUILDING DIALOGUE](https://reader035.vdocuments.us/reader035/viewer/2022062304/5681458d550346895db27802/html5/thumbnails/21.jpg)
THANK YOU