capability statement as at 20th june 2013 file: ops pla 01 revision: 1 … · ops pla 01 enegen...
TRANSCRIPT
OPS PLA 01 Enegen Field Solutions Capability Statement Page 1 of 16
Capability Statement as at 20th June 2013
File: OPS PLA 01
Revision: 1.3
VERSION HISTORY
Revision
#
Implemented
By
Revision
Date
Approved
By
Approval
Date Amendment/ Change
1.0 Josh Herbert 23/04/2011 Graham Copeland 24/04/2011 Creation
1.1 Josh Herbert 21/03/2012 Graham Copeland 21/03/12 Update Safety Statistics
1.2 Josh Herbert 07/02/2013 Graham Copeland 07/02/2013 Update Statistics
1.3 Josh Herbert 20/06/2013 Graham Copeland 20/06/2013 Update Statistics
OPS PLA 01 Enegen Field Solutions Capability Statement Page 2 of 16
Company Overview
Enegen Field Solutions “EFS”, is a privately owned, Trade Contracting Company that was formed, after
the need for a Hazardous Area Contracting Company was recognised, to perform predominantly
electrical works in the Oil, Gas and Mining Industries.
Through ongoing communications with our Client’s Management and Field Staff, Enegen Field Solutions has developed a professional and qualified team, specifically to meet our client’s requirements. Enegen Field Solutions has selected and employed staff who have vast experience in Wellhead Facilities, Water Treatment or Transfer Stations and Gas Compressor Stations and all other associated Hazardous Area Electrical works involved in the oil and gas industries.
Our employee determination and input will place Enegen Field Solutions at the forefront of trade suppliers. We pride ourselves on our ability to bring our Projects in on-time and under-budget.
Although dedicated to providing the best service for our client, Enegen Field Solutions have proven that we are able to work successfully in partnership with other Contractors, such as mechanical and civil to achieve a common goal for the client.
We are currently attaining our Hazardous Area Auditors Certification (completed March 2014) and our Type B Gas Compliance Certification (completed November 2013), allowing EFS to meet an ever growing demand for these services.
Enegen Field Solutions strive to be the Trade Contracting Company of choice, where
tradesmen want to work and the client looks forward to engaging our services
0
1
2
3
4
5
6
0
5
10
15
20
25
30
35
40
45
50
2010-2011 2011-2012 2012-2013 Estimated 2013-2014
Mill
ion
s ($
AU
D)
Tho
usa
nd
s
Man Hours vs Turnover Report
Man Hours Turnover
OPS PLA 01 Enegen Field Solutions Capability Statement Page 3 of 16
Workplace Health, Safety and Environmental Management
Enegen Field Solutions is committed to the highest standard of Workplace Health and Safety of its’
employees and clients.
The majority of EFS’ work is performed in hazardous environments such as gas compressor stations, gas
plants, power stations, wellheads and petrochemical facilities. The hazardous environments that EFS operate
in, has required the development of an extensive Workplace Health, Safety and Environmental Management
System to ensure the safety of personnel, equipment, client assets and the environment. This Safety
Management System is constantly monitored through liaison with EFS personnel and client representatives
to ensure the most effective Hazard and Risk Identification and Mitigation Strategies and Plans.
EFS’ Workplace Health, Safety and Environment Management is completed through various methods
including:
Project and Company Level Inductions
Hazard and Risk Management Procedures
Daily Toolbox Meetings
EFS’ Workplace Health Safety and Environmental
Manual (WHS PLA 01 – WHSEMS)
EFS’ Safety Management Plan
EFS’ Environmental Management Plan
Incident & Injury Management & Performance Reporting
The following Table outlines the total Man Hours (MH) performed by Enegen Field Solutions’ Personnel and
lists all recordable incidents and injuries.
Type Total No# Criteria Notes
Man Hours as
at 20/06/2013 88,476 Hours Performed by EFS Personnel
LTI’s 1
Injury or illness resulting in an inability to work at
least one full day or shift following the day or
shift on which the injury occurred.
Suspected Heat Stress
Event
MTI’s 0
A serious work injury requiring defined
prescribed medical treatment, which is beyond
the scope of normal First Aid.
OPS PLA 01 Enegen Field Solutions Capability Statement Page 4 of 16
Our Personnel
EFS recognise the key to our success as a company, relies on the development and retention of our skilled and
experienced personnel.
EFS have a current staff level of 20, but through a vast network of resources developed through decent
business practices, can instantaneously increase staffing levels should the client demand occur.
EFS have a variety of skilled tradespeople as detailed by the table below.
Discipline Number
Project Managers 2
Electrical Supervisors/ Hazardous Area Inspectors 2
Hazardous Area Electricians 9
Apprentice Electricians 2
Instrument Tube Fitters 1
Trade’s Assistants 2
Administration Staff 2
EFS recognise the need for both internal and external training of its’ personnel to ensure a high level of skills,
abilities and knowledge are maintained.
All EFS personnel have the following Competencies as a minimum:
Origin Modules 0,1 and 2
Gas Detection Training
4x4 Training
First Aid
Cardio Pulmonary Rescue (CPR)
Low Voltage Rescue (LVR)
Although EFS is a relatively new company, the personnel that have been sourced have over 60 years’
experience in the Oil and Gas Industries. EFS’ personnel base is constantly expanding to meet demand. All
personnel are keen to be involved with a new company dedicated to safety, efficiency and excellent standards
and in which they can have pride in their workmanship.
OPS PLA 01 Enegen Field Solutions Capability Statement Page 5 of 16
Personnel Experience
EFS personnel have a vast level of experience in the Oil and Gas Industry. Some of the Projects in
which they have been involved include:
Gas Well Electrical, Instrumentation, and Mechanical Works for ORIGIN ENERGY
Gas Compressor Upgrades for ORIGIN ENERGY
Gas Metering and Pumping Stations for ORIGIN ENERGY
SAM Unit PCP Well Head Manager Installations for KUDU AUSTRALIA
Camp Construction for AUSTRALIAN PORTABLE CAMPS
Electrical, Plumbing, Civil and Pipe Works for GEODYNAMICS
Oil Load-Out Bays and Tank Farms for BEACH PETROLEUM and SANTOS
Phase #6 and Phase #1 Wellhead Facilities Installation for EAST COAST PIPELINE & APLNG
3 x Dewatering Stations for EAST COAST PIPELINE & APLNG
Wellhead I&E Rectification for LEIGHTONS CONTRACTORS
Work Locations
Enegen Field Solutions have an extensive footprint throughout Australia, with a headquarters based near
Toowoomba, Queensland at the gateway to the Surat Basin Resource boom. The following diagram shows
locations where EFS personnel have completed or are performing contracted works.
OPS PLA 01 Enegen Field Solutions Capability Statement Page 6 of 16
Organisational Structure
EFS’ organisation structure is shown in the diagram below.
EFS Plant and Equipment
From EFS’ commencement in October 2010, our fleet of Vehicles and Equipment has
expanded to include:
10 x 4x4 I&E Rigs
1 x Crane Truck
1 x Body Truck
All Terrain Telescopic Handler
Plant Trailers
Bobcat (with Trencher, Post-hole Borer)
Welders (Stick, MIG & TIG)
Pipe Threading Machine
Hydro-Testing Equipment
Mobile Site Office/Crib Room/ Ablutions
Shipping Containers for Gear Storage
Workshop (with Manufacturing Facilities)
Tradespeople
Job Supervision
Project Supervision
Management
Director
Operations Manager
Project Managers
Electrical Supervisors
Hazardous Area Electricians
Electricians
Mechanical Supervisor
Construction Supervisor
Builders
WHSO
Administration
OPS PLA 01 Enegen Field Solutions Capability Statement Page 7 of 16
Capabilities and Services
Discipline Services
Instrumentation and Electrical
Wellhead Facilities Installations
Wellhead Facilities Upgrades
Pilot Well Field Development
Wellhead EEHA Inspection and Rectification
SAM Unit PCP Well Head Manager Installation
Gas Compressor Installation and Upgrades
Gas Pumping and Metering Stations
Compressor Station EEHA Rectification
RO Plant Upgrades
Control Valve Upgrades
Solar and RTU Installation
Micro Turbine Installation
Instrument Air Tube Fitting
Hazardous Area Inspections
Instrumentation Installation and Commissioning
Underground Services
Hazardous Area Auditing
Civil
Site Plan Development
Civil Construction
Excavations
Concreting(Precast & Onsite)
Formwork
Mining/ Temporary Camps
Construction/ Demob
Maintenance
Logistical Management
Enegen Field Solutions are also able to provide access to and the completion of other services through
working closely with the following companies:
Company Services
Mechanical Piping, Welding and Threading Specialists
Stainless Steel Pipe Welding and Installation
NDT Testing
Mechanical Material Supply and Distribution
Major Civil Earthworks and Construction
Lease Pads
Flowlines and Trenching
OPS PLA 01 Enegen Field Solutions Capability Statement Page 8 of 16
Current and Completed Projects
Client Project Year Location Status
NACAP Pipeline Camp Build &
Maintenance
2010-
2011
Charleville-
Innamincka Complete
Barrow Island Camp Maintenance 2011 Barrow Island Complete
Cameron’s Corner Camp
Construction 2011
Cameron’s
Corner Complete
FMG Railway Camp Construction 2011 -
2012 Port Headland Complete
SAM Unit Installation 2012 Windabri Complete
Auto-Drain Project 2011 Talinga Complete
Compressor Dumplines Reliability
Project 2011
Strathblane,
Spring Gully &
Taloona
Complete
Contactor Drainlines Control Upgrade 2011 Strathblane &
Taloona Complete
Talinga EEHA Compliance Project 2011 –
2012
Talinga Gas
Plant Complete
Flare Flow Meter Replacement 2011 Spring Gully &
Taloona Complete
Talinga Flood Recovery 2011 Talinga Complete
Micro Turbine Test Bed Construction 2011 Talinga Complete
Permeate Recycle Project 2011 Spring Gully Complete
Super High Flow Upgrades 2011 Spring Gully Complete
Ironbark Duke #3 Pilot Wells 2012 Ironbark Complete
Yellowbank X105 Replacement 2011 Yellowbank Complete
Yellowbank Flame Cameras 2013 Yellowbank Complete
SAM Unit Installation Round #1 2012 Spring Gully Complete
SAM Unit Installation Round #2 2013 Spring Gully Ongoing
DDPS 2011-
2012 Kogan Complete
SAM Unit and Hydrapack Prewires 2010-
2013 Dalby, Roma Ongoing
Echo Hills Dewatering Station 2012 Echo Hills Complete
Phase #6 Wellhead Facilities 2012 Echo Hills/
Spring Gully Complete
Phase #1 Water Gathering Station
WGS-011 – Waikola 2013 Waikola Complete
Phase #1 Water Gathering Station
WGS-007 – Lighthouse 2013 Lighthouse Complete
Phase #1 Wellhead Facilities 2012-
2013 Taloona Complete
Phase #1 Wellhead Facilities
Rectification 2013 Condabri Ongoing
OPS PLA 01 Enegen Field Solutions Capability Statement Page 9 of 16
CSG Experience Overview
Type Quantity
Wellhead Facilities Installation 44
Wellhead Facilities Upgrades 128
Pilot Well Installations 6
Wellhead EEHA Rectifications 46
Compressor Station Upgrades 16
Compressor Station Type B Compliance 4
Compressor Station EEHA Compliance 1
RO Plant Upgrades 7
Dewatering Stations 3
OPS PLA 01 Enegen Field Solutions Capability Statement Page 10 of 16
Major Project Completions
Project: Micro Turbine Test Bed Construction
Client:
Location: Talinga
Duration: 3 Months
LTI/ MTI: 0
Recordable Incidents: 0
Scope of Work: The supply of materials, labour, equipment, consumables, plant and transport for construction, quality assurance requirements and associated documentation for the completion of the Micro Turbine Test Bed.
Project Activities: o Site Development and associated civil works, o Supply, manufacture and installation of all pipes and fittings o Supply, manufacture and installation of structural steel o Scheduling and co-ordination of both the off-site fabrication and on-site installation o Supply and installation of Hazardous Area electrical cable, glands &cable trays o Supply, manufacture and installation of Junction Boxes and Distribution Board o Installation of Heat Tracing and Load Banks o Installation and Termination of Instruments o Construction of 6 x Concrete slabs o Supply & Installation of Structural Grout o Supply and application of surface treatments o Hydrostatic test of installation o Procurement and Logistics o Supply and maintain full quality records, “as built” drawings and MDR o Installation Traceability Documentation o Project Management and Project Liaison with Client Representatives o Development and maintenance of Management Plans o Commissioning of Installation
OPS PLA 01 Enegen Field Solutions Capability Statement Page 11 of 16
Major Project Completions
Project: Talinga Suction Header Auto Drains
Client:
Location: Talinga
Duration: 1 Month
LTI/ MTI: 0
Recordable Incidents: 0
Aim of Project: To install level control and actuated valves on the Reciprocating Compressor drip legs to allow automatic draining and to remove the requirement for twice daily manual draining.
Scope of Work: The supply of materials, labour, equipment, consumables, plant and transport, construction, testing, quality assurance (QA) requirements and associated documentation for the completion of 3 auto drains at Talinga Gas Plant.
Project Activities: o Site Development and associated civil works, o Supply, manufacture and installation of all pipes and fittings o Supply, manufacture and installation of structural steel o Scheduling and co-ordination of both the off-site fabrication and on-site installation o Supply and installation of Hazardous Area electrical cable, glands &cable trays o Installation and Termination of Instruments o Supply & Installation of Structural Grout o Supply and application of surface treatments o Polyethylene Welding o Hydrostatic test of installation o Procurement and Logistics o Supply and maintain full quality records, “as built” drawings and MDR o Installation Traceability Documentation o Project Management and Project Liaison with Client Representatives o Development and maintenance of Management Plans o Commissioning of Installation
OPS PLA 01 Enegen Field Solutions Capability Statement Page 12 of 16
Major Project Completions
Project: NACAP QSN3 Pipeline Camp Installation and Maintenance
Client:
Location: Roma - Moomba
Duration: 12 Months
LTI/ MTI: 0
Recordable Incidents: 0
Scope of Work: The supply of labour and plant required for the construction, shifting and maintenance of 11 Camps between Roma and Moomba.
Project Activities: o Site Development and associated civil works, o Installation, disassembly and maintenance of Camp Plumbing and Drainage o Installation and maintenance of Gas appliances o Installation and maintenance of Refrigeration Appliances o Installation, disassembly and maintenance of Camp Electrical Network o Installation of Building Tie-downs o Installation, disassembly and maintenance of Sewerage Treatment Plants o Installation, disassembly and maintenance of Reverse Osmosis Plants o Construction of Concrete Walkways, Skillion Roofing and Fencing o Procurement and Logistics o Electrical, Plumbing and Gasfitting Certification o Project Management and Project Liaison with Client Representatives o Development and maintenance of Management Plans o Commissioning of Installation
OPS PLA 01 Enegen Field Solutions Capability Statement Page 13 of 16
Major Project Completions
Project: APLNG Phase #6 and Phase #1 Wellhead Facilities
Client:
Location: Taloona, Echo Hills, Waikola and Strathblane
Duration: 6 Months
LTI/ MTI: 0
Recordable Incidents: 0
Scope of Work: The supply of materials, labour, equipment, consumables, plant and transport for construction, quality assurance requirements and associated documentation for the completion of 20 x Phase #6 and 30 x Phase #1 Wellhead Facilities.
Project Activities: o Civil Works associated with Earth Grid Installation o Cable Tray Design and Installation o Power and Instrumentation Cabling Installation o Instrument Terminations o Instrument Air Tubing Design and Installation o Testing and Verification o Hazardous Area Compliance Inspections and Rectification Work o Quality Assurance Development including FICs, HA Checksheets and ITPs o Procurement and Logistics o Supply and maintain “as built” drawings and MDR o Project Management and Project Liaison with Client Representatives o Development and maintenance of Management Plans o Commissioning of Installation
OPS PLA 01 Enegen Field Solutions Capability Statement Page 14 of 16
Major Project Completions
Project: APLNG Phase #6 Echo Hills Dewatering Station
Client:
Location: Taloona, Echo Hills, Lighthouse, Waikola
Duration: 6 Months
LTI/ MTI: 0
Recordable Incidents: 0
Scope of Work: The supply of materials, labour, equipment, consumables, plant and transport for construction, quality assurance requirements and associated documentation for the completion of the I&E Installation of Echo Hills Dewatering Station.
Project Activities: o Civil Works associated with Earth Grid Installation o Cable Tray Design and Installation o Power and Instrumentation Cabling Installation o Instrument and Equipment Terminations o Plant Lighting and Power Design and Installation o Communication Tower and Cabling Installation o Connection of Plant Generators o Instrument Air Tubing Design and Installation o Installation of DN25 Galvanised Instrument Airlines and Fittings o Construction and Installation of Cable Tray and Pipe Supports o Structural Grouting o Testing and Verification o Hazardous Area Compliance Inspections o Quality Assurance Development including FICs, HA Checksheets and ITPs o Procurement and Logistics o Supply and maintain “as built” drawings and MDR o Project Management and Project Liaison with Client Representatives o Development and maintenance of Management Plans o Commissioning of Installation
OPS PLA 01 Enegen Field Solutions Capability Statement Page 15 of 16
OPS PLA 01 Enegen Field Solutions Capability Statement Page 16 of 16
Major Project Completions
Project: APLNG Phase #1 Lighthouse and Waikola Dewatering Stations
Client:
Location: Lighthouse and Waikola
Duration: 6 Months
LTI/ MTI: 0
Recordable Incidents: 0
Scope of Work: The supply of materials, labour, equipment, consumables, plant and transport for construction, quality assurance requirements and associated documentation for the completion of the I&E Installation of Lighthouse and Waikola Water Gathering Stations.
Project Activities: o Civil Works associated with Earth Grid Installation o Cable Tray Design and Installation o Power and Instrumentation Cabling Installation o Instrument and Equipment Terminations o Plant Lighting and Power Design and Installation o Communication Tower and Cabling Installation o Connection of Plant Generators o Instrument Air Tubing Design and Installation o Construction and Installation of Cable Tray and Pipe Supports o Structural Grouting o Testing and Verification o Hazardous Area Compliance Inspections o Quality Assurance Development including FICs, HA Checksheets and ITPs o Procurement and Logistics o Supply and maintain “as built” drawings and MDR o Project Management and Project Liaison with Client Representatives o Development and maintenance of Management Plans o Commissioning of Installation