MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
Distribution Capability
Statement
[2018 – 2020]
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
Preface
This Distribution Capability Statement is provided by
the Muscat Electricity Distribution Company (hereafter
MEDC) according to Distribution and Supply Licence
Condition number 32 and in accordance to the
Distribution Planning code 4.4.
This Statement describes the Distribution System
capability over the next three years 2018 -2020. The
Statement provides up-to-date Distribution System
data to provide customers with the information
needed to identify those parts of the system which
offer the most suitable opportunities for future
connections to the MEDC system and where
constraints currently exist, or will exist.
This year we have taken the decision to further provide
detailed system data in spreadsheet format. The
spreadsheet supplements this capability statement
and is available to customers and other relevant
stakeholders. We hope this provides our customers
and other stakeholders with a transparent and usable
platform to assess possible points of connection within
the MEDC licenced area and to assess the
opportunities it provides.
The board of MEDC has determined this three-year
plan to clarify and highlight MEDC’s key priorities over
the coming years. The plan will form the basis for the
company’s further investments and serve to confirm
MEDC’s contributions to the Omani electricity sector.
Eng. Abdullah Bin Said Al Badri
MEDC CEO
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
CONTENTS
LIST OF TABLES 2
LIST OF FIGURES 2
1. INTRODUCTION 1
1.1. PURPOSE OF THE STATEMENT 1 1.2. STRUCTURE OF THIS CAPABILITY STATEMENT 1
2. PLANNING PHILOSOPHIES AND PRACTICES 2
2.1. OBLIGATIONS OF THE DISTRIBUTION LICENCE 2 2.2. REQUIREMENTS OF THE DISTRIBUTION CODE 2 2.3. DISTRIBUTION SYSTEM SECURITY STANDARDS 2 2.4. SYSTEM VOLTAGES AND CONFIGURATION 3 2.5. FREQUENCY DEVIATIONS 4 2.6. VOLTAGE WAVEFORM QUALITY 4 2.7. VOLTAGE FLUCTUATIONS 4 2.8. AUTO-RECLOSING AND SINGLE PHASE PROTECTION
OPERATION 4 2.9. DESIGN FAULT LEVELS 4 2.10. STANDARD EQUIPMENT SIZES 5
Conductors 5 Transformers 5 Switchgear 5 Capacitors 5
2.11. TECHNICAL STANDARDS 6 2.12. SPECIFICATION OF APPARATUS AND PLANT 6 2.13. EARTHING 6 2.14. VOLTAGE REGULATION AND CONTROL 6 2.15. PROTECTION 6
3. PLANNING DRIVERS 8
3.1. BACKGROUND 8 3.2. ZONE 1 – (THE EASTERN ZONE) 8 3.3. ZONE 2 - (THE CENTRAL ZONE) 8 3.4. ZONE 3 - (THE WESTERN ZONE) 8
4. MEDC DISTRIBUTION SYSTEM 10
4.1. EXISTING DISTRIBUTION SYSTEM 10 4.2. AREA BASED SYSTEM HISTORICAL GROWTH 10 4.3. SYSTEM DEMAND AND LOAD DURATION 11 4.4. SYSTEM DEMAND FORECAST 12
Best Practice Distribution Load Forecasting 12 System Demand Growth 13
4.5. GRID SUPPLY POINTS 13 4.6. DISTRIBUTION SYSTEM ANALYSIS 17
Load Flow Analysis 17 Short Circuit Analysis 17
4.7. TECHNICAL LOSSES 18
4.8. CONTINUOUS IMPROVEMENT AREAS 18 Bulk Load Details and Modelling 18 33/11.5kV Transformers Tap Changer
Modelling 18 11kV System Modelling 19 Improved and Updated Motoric Short Circuit
Contribution 19 Technical Losses Calculation using Power
System Models 19 Maximum and Minimum Scenario Modelling
19
5. CHALLENGES AND OPPORTUNITIES WITHIN THE SYSTEM 20
5.1. NEW CONNECTION APPLICATIONS 20 5.2. SYSTEM CONSTRAINTS AND OPPORTUNITIES 20
6. THE INVESTMENT PLAN 23
6.1. SYSTEM DEVELOPMENT PROJECTS DURING THE PERIOD 2018– 2020 23
Zone 1 – (The Eastern Zone) 26 Zone 2 - (The Central Zone) 28 Zone 3 - (The Western Zone) 30
Appendix A: Distribution System Capability
Statement 32
Appendix B: DSSS Non Compliances 33
Appendix C: System Studies Results 35
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 2
L I S T O F T A B L E S
Table 1 DSSS Classifications and Defined Restoration Times . 3
Table 2 System Nominal Voltages and Tolerance .................. 4
Table 3 Short Circuit Rating of Switchgear ............................. 5
Table 4 Standard 33kV conductor Sizes and Ratings .............. 5
Table 5 Standard 11kV conductor Sizes and Ratings .............. 5
Table 6 Standard Switchgear Ratings ..................................... 5
Table 7 Summary of Installed and Firm Capacity of MEDC
Distribution System – 2017 [up to July 2017] ...................... 10
Table 8 Area Wise Compound Annual Growth Rate [CAGR] of
MEDC Distribution System ................................................... 10
Table 9 System Maximum and Minimum Demand in 2017 . 11
Table 10 The CAGR System Load Growth% from 2010 to 2017
............................................................................................. 13
Table 11 MEDC System Maximum Demand in MW [Historical
and Forecast] ....................................................................... 14
Table 12 MEDC System Technical Losses ............................. 18
Table 13 New 11kV and LV Customer Applications .............. 20
Table 14 2020 Projected Capacity Constraints in MVA ........ 22
Table 15 Status of the Primary Substations at a glance [2018-
2020] .................................................................................... 23
Table 16 Summary of Sponsored Projects ........................... 23
Table 17 Summary of Planned Projects in MEDC Distribution
System to meet Summer 2018 Maximum Demand ............. 24
Table 18 Summary of Planned Projects in MEDC Distribution
System to meet Summer 2019 Maximum Demand ............. 25
Table 19 Summary of Planned Projects in MEDC Distribution
System to meet Summer 2020 Maximum Demand ............. 26
L I S T O F F I G U R E S
Figure 1 MEDC Distribution System ....................................... 9
Figure 2 Hourly Demand – Summer Maximum Day Profile
2010 -2017 ........................................................................... 11
Figure 3 2017 Load Duration Curve ..................................... 12
Figure 4 System Historical and Forecast Maximum Demand
(2006-2020) ......................................................................... 14
Figure 5 33kV Existing System (2017) .................................. 15
Figure 6 33kV Expected System Development (2018 to 2020)
............................................................................................. 16
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 1
1 . I N T R O D U C T I O N
1.1. Purpose of the Statement
This Capability Statement is intended to provide an
understanding of MEDC’s 33kV and 11kV Distribution
System and to present MEDC’s development plans for
the 33kV and 11kV Distribution System for the years
2018-2020. This Statement includes electrical data for
the station loads, overhead lines, cable circuits,
transformers, switchgear and capacitors used in the
preparation of Distribution System models for the
power system studies and form the MEDC Distribution
System. The results of the load flow and short circuit
studies are presented thereby providing an assessment
of the capability of the Distribution System.
The schedule of committed and planned system
development projects on the 33kV Distribution System
is presented in Chapter 6. Implementation of these
system development projects is necessary to meet
future forecast demand growth, maintain or improve
the capability in the Distribution System to meet the
system growth and to address the issues of actual or
forecast non-compliance with the Distribution System
Security Standards (DSSS). Implementation of these
projects will increase the number of 33/11kV primary
substations(PSS) providing enhanced opportunities for
new and increased customer connections.
The impact of MEDC’s forecast demand growth and
Distribution System development projects on the
Transmission System, which is owned and operated by
Oman Electricity Transmission Company (OETC), has
been fully assessed in the development of MEDC’s
development plans. Where appropriate 33kV load
transfers from one 132/33kV grid station (GSS) to
another have been considered and where this option is
not feasible applications for additional 132/33kV GSS
capacity have been submitted to OETC, resulting in
OETC plans to construct and build additional 132/33kV
GSS capacity within the MEDC licence area.
1.2. Structure of this Capability Statement
Chapter 2 and Chapter 3 provide relevant information
associated with MEDC’s licence obligations, planning
assumptions and technical standards. Chapter 4
provides an overview of the Distribution System,
together with details of the demand profile, projected
demand forecast, system constraints and a summary of
the technical analysis of the Distribution System.
Chapter 5 summarises the current levels of connection
activity within the MEDC system and provides an
overview of the opportunities new customers may
have whilst identifying the challenges that MEDC face
currently along with measures to address them.
Chapter 6 provides detail of the development projects
proposed over the three-year period 2018 to 2020.
Appendices detail the results of the required
distribution system analysis studies.
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 2
2 . P L A N N I N G P H I L O S O P H I E S A N D P R A C T I C E S
MEDC recognise that it is fundamental to provide
sufficient guidance to enable relevant stakeholders and
current and potential customers to understand the
quality of supply that they may receive from the
Distribution System and to enable any person seeking a
connection to the system to be able to understand the
Distribution System at the intended point of connection.
This Capability Statement briefly identifies relevant
conditions of the Sector Law and the associated Planning
Codes and Security Standards that all regulated entities,
must adhere to. It further outlines the key technical
standards to which our Distribution System is designed
and constructed.
Royal Decree 78/2004 promulgating The Law for the
Regulation and Privatisation of the Electricity and
Related Water Sector. Article 90 places an obligation on
Distribution Companies to undertake to finance,
operate, maintain, develop and expand the Distribution
System in a safe manner, economic and efficient manner
and in accordance with the relevant performance and
security standards.
2.1. Obligations of the Distribution Licence
Condition 4 of our Distribution Licence as entitled
‘Implementation of and Compliance with the
Distribution Code’ and requires MEDC to become and
remain a party to and comply with the provisions of the
Distribution Code. It also requires MEDC to co-operate
with other Licensed System operators in the
maintenance and development of the Distribution Code.
Distribution Licence Condition 32 is titled ‘Distribution
System Capability Statement’ and requires MEDC to:
‘On an annual basis, prepare a statement in a
form approved by the Authority, showing in
respect of each of the three succeeding
financial years, circuit capacity, forecast power
flows and loading on each part of its
Distribution System and fault levels for each
transmission node.’
Licence Condition 32 also describes the further
information that needs to be included within the
Capability Statement relating to:
• Information on the status of the Distribution
System, its capacity and envisaged future needs.
• Advising potential customers on parts of the system
that are best suited to new connections.
• Information on the potential system constraints to
development.
• Provide an overview of current system
developments.
• Assessment of technical losses.
The full requirements of Licence Condition 32 are found
in Appendix A of this document.
The intent of this Capability Statement is to provide the
information as stated above in a form that is relevant
and useful to the Authority and other stakeholders.
2.2. Requirements of the Distribution Code
The Distribution Code covers all material technical
aspects relating to connections to, and the operation
and use of, the Distribution System. The Distribution
Code is structured into a number of specific sections.
The Distribution Planning Code (DPC) 2 states that its
objectives include for ‘the exchange of information and
interaction between Licensed Distributors and
Distribution System Users concerning any proposed
development of Distribution System User Systems that
are to be connected to the Distribution System’.
DPC 4.4 relates to the obligations of MEDC under its
Distribution Licence to produce, on an annual basis, the
Distribution System Capability Statement relating to the
three succeeding years.
2.3. Distribution System Security Standards
As part of maintaining an adequate electricity supply to
its consumers; MEDC is obliged under its distribution
licence to
‘plan and develop its Distribution System in
accordance with the approved Distribution
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 3
System Security Standards’1 and to ‘operate
and maintain a safe, efficient and economic
Distribution System in accordance with the
Security Standards’2.
Table 1 provides a summary of the DSSS classifications.
Table 1 DSSS Classifications and Defined Restoration
Times
Class Demand Group
First Outage Second Outage
A Less than 2 MW
Repair Time No Requirement
B 2MW to 6MW
3 Hours* No Requirement
C 6MW to 20MW
Within 15 minutes
Restoration time of planned outage
D 20MW to 100MW
Immediately Restoration time of planned outage
E Greater than 100MW
Immediately Immediately, 2/3 of demand**
*For 11kV networks in remote areas this restoration time may
be extended by the time it reasonably takes for a repair crew to
reach the area with the outage as long as the total restoration
time will not exceed 6 hours
**Planned Outages area assumed to be restricted to non-
summer periods when due to lower ambient temperatures
demand is reduced and equipment ratings enhanced
The DSSS places an obligation on MEDC to restore supply
following a circuit or transformer outage within
maximum time limits determined by the total demand
within a Demand Group as highlighted in Table 1
A first outage is a fault or planned outage occurring at
any time of the year including the period of maximum
demand. A second outage is a fault outage occurring
when an integral part of the system under consideration
is not available due to planned maintenance.
1 Licence Condition 31 (4a)
MEDC 33kV system and 33/11kV primary substations fall
into DSSS classes B to D with the majority being in
Class C.
Primary substations in Class B have a maximum demand
between 2MW and 6MW. Following a first outage the
affected load must be re-supplied within 3 hours. This
may be achieved by repair and restoration of the faulted
circuit, manual switching at the 33/11kV primary
substation with two or more transformers to re-supply
customers from an alternative transformer or manual
switching of the 11kV network feeders to re-supply
customers from an alternative 33/11kV primary
substation.
Substations in Class C have a maximum demand
between 6MW and 20MW. Following a first outage the
affected load must be re-supplied within 15 minutes.
This is achieved by the system configuration and
operational control, operating with parallel circuits and
remotely operating the circuit breakers from MEDC
Distribution Control Centre via SCADA.
The majority of MEDC 33/11kV primary substations have
2 x 20 MVA transformers with an N-1 firm capacity of
20MVA. These substations fall into the DSSS Class C
classification.
33/11kV primary substations in Class D have a maximum
demand between 20MW and 100MW. Following a first
outage, the affected load must be re-supplied
immediately. Immediate restoration means allowing an
adequate time for an interruption followed by
restoration through an automated transfer switching
scheme with restoration effected within 60 seconds.
33/11kV primary substations with 3 x 16MVA or 3 x
20MVA transformers fall into the Class D classification.
2.4. System voltages and configuration
Distribution Connection Conditions Code (DCC) 4.1
states the following:
2 Licence Condition 31 (4a) and (4b)
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 4
The voltage on the 33kV, 11kV and LV sides of
Distribution transformers at connection sites with
Distribution System Users shall normally be controlled
within the limits of ± 6.0% of the nominal voltage.
The voltage at customer’s terminals shall not vary from
the system nominal voltage +/- allowed tolerances as
shown in Table 2
Table 2 System Nominal Voltages and Tolerance
Voltage Level Tolerance
+6% -6%
33kV 34.98kV 31.02kV
11kV 11.66kV 10.34kV
415V 439.90V 390.10V
240V 254.40V 225.60V
2.5. Frequency Deviations
Distribution Connection Conditions Code (DCC) 4.2
states the following:
During normal operating conditions, the nominal System
Frequency of the Transmission and Distribution Systems
is 50.00 Hz and normally will be controlled by OETC
between 49.95 Hz and 50.05 Hz. During exceptional
steady state conditions, frequency deviations will not
exceed 49.90 Hz to 50.10 Hz unless disturbed
circumstances prevail. Under disturbed conditions,
System Frequency could rise transiently to 51.50 Hz or
fall to 48.00 Hz.
2.6. Voltage Waveform Quality
Distribution Connection Conditions Code (DCC) 4.3
states the following:
All apparatus and plant connected to the Distribution
System and that part of the Distribution System at each
connection point, must be capable of withstanding the
distortions of the voltage waveform in respect of
harmonic content and phase unbalance.
The maximum total levels of harmonic distortion on the
Distribution System at 33kV and 11kV, from all sources
under both normal, planned outage and fault outage
conditions is required to not exceed a total harmonic
distortion of 2.0%, with no individual harmonic greater
than 1.5% unless abnormal conditions prevail. At Low
Voltage (LV) the maximum total levels of harmonic
distortion from all sources is required to not exceed a
total harmonic distortion of 2.5%.
The maximum negative phase sequence component of
the phase voltage on the Distribution System should
remain below 1.0% unless abnormal conditions prevail.
A maximum value of 2.0% is permitted for phase
unbalance.
2.7. Voltage Fluctuations
Distribution Connection Conditions Code (DCC) 4.4
states the following:
Voltage fluctuations arising from disturbing or
fluctuating loads connected at a Connection Point to the
Distribution System shall not exceed 1.0% of the voltage
level for step changes that may occur repetitively. Any
large voltage excursions other than step changes may be
allowed up to a level of 3.0% provided that this does not
constitute a risk to the Distribution System or to any
User.
2.8. Auto-reclosing and Single Phase Protection Operation
Distribution Connection Conditions Code (DCC) 4.5
states the following:
Users should be aware that MEDC may use auto-
reclosing or automated sequential switching features on
the Distribution System. MEDC will on request provide
details of the auto-reclosing or sequential switching
features in order that the User may take this into
account in the design of the User System and protection
arrangements.
Distribution System Users should be aware that the
protection arrangements on some Distribution Systems
may cause disconnection of one phase or two phases
only of a three-phase supply for certain types of fault.
2.9. Design Fault Levels
The maximum short circuit withstand levels for the 33kV
and 11kV distribution system are stated in OES 11-
General Specifications for Electrical Materials and
Equipment and is shown in Table 3.
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 5
Table 3 Short Circuit Rating of Switchgear
Voltage Level Rated Short Circuit Capacity
33 kV 25kA (1429 MVA) for 3 sec
11 kV 18.4kA (350 MVA) for 3 sec
11kV (New) 25kA (476 MVA) for 3 sec
**Note that MEDC has adopted the standard for new 11kV
primary equipment to be 25kA for 3 seconds.
The 33kV system is earthed via a 12.5 ohm neutral
earthing resistor connected to the neutral point of each
grid transformer, thereby limiting the maximum
prospective 33kV earth fault current to 1,500 A per
transformer. The 11kV system is solidly earthed.
2.10. Standard Equipment Sizes
Conductors
The standard 33kV feeder conductors used by MEDC as
specified in OES 1-33kV and 11kV Overhead Lines and
OES 2-33kV & Pilot,11kV & LT underground cable
installations are shown in Table 4.
Table 4 Standard 33kV conductor Sizes and Ratings
Conductor Type
Conductor Size Rated
Capacity De-rated Capacity
33kV Cable
300 sq.mm Cu XLPE
435A (25MVA)
387A (22MVA)
33kV Overhead
200 sq.mm ACSR (Panther)
420A (24MVA)
*33kV Overhead
150 sq.mm ACSR (Wolf)
351A(20MVA)
*33kV Overhead
100 sq.mm ACSR (Dog)
271A(15.4MVA)
* Existing overhead conductor present on system; new lines will typically be
constructed of 200sq mm ACSR.
The standard 11kV conductors utilised by MEDC are
shown in Table 5.
Table 5 Standard 11kV conductor Sizes and Ratings
Conductor Type
Conductor Size Rated
Capacity De-rated Capacity
11kV Cable 240 sq.mm XLPE 431A
(8.2MVA) 349A
(6.7MVA)
11kV Cable 185 sq.mm XLPE 374A
(7.1MVA) 303A
(5.8MVA)
11kV Overhead
150 sq.mm ACSR (Wolf)
351A(6.7MVA)
11kV Overhead
100 sq.mm ACSR (Dog)
271A(5.2MVA)
3 Based on IEC 60076-7 calculations
The continuous ampere ratings shown in Table 4 and
Table 5 are based on typical manufacturers data and de-
rated for the standard installation conditions mentioned
in OES 1-33kV and 11kV Overhead Lines and OES 2-33kV
& Pilot,11kV & LT underground cable. These ratings
ensure safe working on our Distribution System given
the high temperatures experienced during the summer
maximum demand period.
Transformers
Standard 33/11.5kV transformer sizes are specified in
OES 6-33/11kV Transformers as being 1, 3, 6, 10MVA
ONAN and 20MVA ONAF, although other sizes such as
16MVA do still exist on the system. The overload
capability above the transformer name-plate rating has
been confirmed through modelling3 and supported by a
limited number of measurements. MEDC has
standardized on 20MVA transformers in the urban
areas.
Switchgear
33kV and 11kV switchgear ratings are specified within
OES 14-11kV Indoor Switchgear and OES 15-33kV
Indoor Switchgear as shown in Table 6.
Table 6 Standard Switchgear Ratings
Voltage Description Ratings
33kV Feeder 600 A
33kV Bus Section 1200 A
11kV TX Incomer 1200 A
11kV Bus Section 1200 A
11kV Feeder 400 A
Capacitors
All new 20 MVA primary substations are designed with a
single 5 MVAr capacitor bank connected to each 11kV
busbar section.
The capacitor banks are as specified in OES 13-11.5kV
5MVAr Capacitor Banks and consist of 5 x 1MVAr units
with one set of capacitor banks connected to each bus
section. The aim of the capacitors is to ensure that
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 6
MEDC maintains power factor and voltage to be within
prescribed limits to start with the 11kV busbars.
2.11. Technical standards
In order that MEDC can operate a safe and efficient
electricity distribution system all apparatus and plant
associated with the connection to the Distribution
System are required to comply with the following
standards, as applicable (in the following order of
precedence):
(a) Health and Safety Rules
(b) Oman Electrical Standards (OES), which are such
national standards as may be approved by and amended
by the AER as necessary
(c) Grid Code
(d) Distribution Code
(e) The standards and recommendations of the
International Standards Organisation and the
International Electro Technical Commission (IEC); and
(f) national standards and codes, which are accepted
internationally.
2.12. Specification of Apparatus and Plant
The specifications of all connected plant are required to
allow the safe operation of the Distribution System
within MEDC’s operational procedures. Details of this
can be obtained by contacting MEDC directly.
Apparatus and Plant must be suitable to use at the
operating frequency and within the intended operating
voltage range. This associated equipment should also be
suitable to operate to the maximum design short-circuit
rating of the Distribution System to which it is connected
having due regard to fault carrying capabilities including
making and breaking duties. As necessary MEDC will
provide additional details of the system at the point at
which a specific connection is to be made.
4 Please contact the customer services team via MEDC website
who will direct your enquiry to the relevant dept.
Apparatus and plant must be operated within the
thermal rating conditions contained in the appropriate
standards, specifications, and other relevant
publications, taking into account its intended use. Upon
request MEDC will provide this information4
2.13. Earthing
MEDC will provide advice on the method of earthing of
the Distribution System, for example, whether it is
connected solidly to earth or through impedance. The
specification of associated apparatus and plant of the
connected customer equipment must meet the voltages
that will be imposed on the apparatus and plant as a
result of the method of earthing. The method of
earthing must comply with the requirements of Oman
Electrical Standards.
Users should take precautions to limit the occurrence
and effects of circulating currents in respect of the
neutral points connected with Earth where there is more
than one earthed neutral point.
2.14. Voltage regulation and control
Any extension or Connection to the Distribution System
should be designed so as to not adversely affect the
voltage control employed by MEDC on the Distribution
System. MEDC will make information on the voltage
regulation and control arrangements available if
requested by the User.
2.15. Protection
MEDC’s system and the system of any User must
incorporate protective devices to ensure that apparatus
and plant with electrical faults are disconnected from
the system promptly and that the effects of faults on one
system do not impose unreasonable risks to other
systems.
To ensure satisfactory operation of the Distribution
System, protection systems, operating times,
discrimination and sensitivity at the ownership
boundary must be agreed between MEDC and the User
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 7
during the process of application for Connection and
may be reviewed from time to time by MEDC with the
agreement of the User.
Back-up protection by operation of other circuit
breakers or apparatus and plant having a similar
function must normally be provided to safeguard the
system against a circuit breaker, or apparatus and plant
having a similar function, failing to operate correctly to
interrupt the fault current on a high voltage system.
During the process of application for Connection, MEDC
will advise the User if back-up protection is not required.
Users must not use protection or associated equipment
to limit the fault current infeed to the Distribution
System unless expressly permitted by MEDC to avoid
protection operation malfunctioning loading to system
assets exceeding short-circuit ratings.
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 8
3 . P L A N N I N G D R I V E R S
3.1. Background
MEDC’s electricity Distribution System serves around
351,683 customers (as of July’2017) over an
approximate area of 3,900 sq.km and is divided into
three geographic zones. Figure 1 represents an overview
of the MEDC Distribution System within the Muscat
Governorate. The characteristics of the Distribution
System in each region differ because of two main
parameters:
1. The load density and
2. The majority type of feeder circuits (i.e. overhead
or underground).
The maximum demand recorded for 2017 on the MEDC
system was 2,348.6 MW (2472 MVA on 31st May 2017 at
03:00 PM).
The total existing number of 33/11kV primary
substations connected to the System is 170 with a Total
Installed Capacity of 6,119.5 MVA and a firm capacity of
3,384.5 MVA. The tables identifying each PSS capacity
and current demand can be found in the appendices and
in the spreadsheet that supplements this Capability
Statement.
3.2. Zone 1 – (The Eastern Zone)
The Zone 1 region includes the capital city of Muscat,
Muttrah and an extensive rural network, which covers
the wilayats of Amerat and Quriyat.
The number of customers served in the Zone 1 region is
115,260 which is approximately 33% of the total
customer population.
Amerat has seen the highest demand growth within the
Zone 1 region with a significant demand growth forecast
for the current planning horizon.
Muscat Municipality initiated Muttrah Master Plan to
demolish old buildings leading to conversion to new
multi-storied buildings in Muscat/Muttrah area by 2030
without any additional major load being forecast.
3.3. Zone 2 - (The Central Zone)
The Zone 2 region covers the commercial and residential
areas of Bousher, Al Khuwair, Al Ansab, Azaibah and
Qurum.
The number of customers served in the Zone 2 region is
102,219 which is approximately 29% of the total
customer population.
This is largely an established area, which has seen high
load growth in previous years and recently the growth
has slowed. Mall of Oman and Convention Centre are
the largest commercial projects in Zone 2 region.
3.4. Zone 3 - (The Western Zone)
The Zone 3 Region includes the Muscat International
Airport, Rusail Industrial Area, Seeb, Mawalleh, Al Khoud
and Mabelah areas.
The number of customers served in the Zone 3 region is
134,204 which is approximately 38% of the total
customer population.
Rusail industrial area is earmarked for some significant
development projects within this planning horizon and
new areas have been established for new industrial
factories in addition to the Knowledge Oasis Muscat
(KOM). There are two major industrial customers
connected to the 132kV system (Modern Steel and
Muscat Steel companies).
Mabelah area is one of the largest commercial and
residential areas located within the Zone 3 region. Palm
Mall and Boulevard Mall are the major expected
commercial projects in Zone 3 region. These
developments will be in the commercial and residential
areas.
Mawalleh, Al Khoud and Seeb areas are witnessing
steady demand growth compared with other areas
within Zone 3 region.
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 9
Figure 1 MEDC Distribution System
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 10
4 . M E D C D I S T R I B U T I O N S Y S T E M
MEDC is authorized to undertake all regulated activities
of electricity distribution and supply business below
132kV in Muscat area extending across the whole area of
Muscat including Seeb, Bousher, Muscat, Muttrah,
Amerat and Quriyat Wilayats.
The Distribution System has three nominal voltages; i.e.
33kV, 11kV and 415V.
Most customers connect at LV (415 Volt) and there are
bulk customers connected at 11kV and 33kV.
4.1. Existing Distribution System
The existing Distribution System consists of the following
[as of July’2017]:
• 1000.8 circuit-km of 33kV overhead line;
• 1125 circuit-km of 11kV overhead line;
• 1229.2 circuit-km of 33kV underground cable;
• 3207.3 circuit-km of 11kV underground cable;
• 28 grid supply points;
• 170 x 33/11.5kV primary substations;
• 10,783 x11/0.433kV Distribution Transformers.
Table 7 provides a summary of the installed and firm
capacity in each zone.
Table 7 Summary of Installed and Firm Capacity of MEDC
Distribution System – 2017 [up to July 2017]
Zone Installed Capacity
(MVA)
Firm Capacity
(MVA)
Out of Firm*5
(MVA)
Max. Load
2017*5
(MVA)
1 1746 917 19 695.2
2 2059 1170 31.5 917.3
3 2314.5 1297.5 110.2 1107.5
Total 6119.5 3384.5 160.7 2720
5 Out of firm and Max.Load - based on summation of individual
primary substations loads occurring at different times. The figure
reflects the audited value of DNS.
Figure 5 (later in this section) illustrates the existing
MEDC system (2017)
4.2. Area Based System Historical Growth
Table 8 provides a summary of the historic demand
growth providing the context for demand growth seen in
MEDC system. Over the previous 7 years, MEDC has seen
significant growth in specific areas6. The Compound
Annual Growth Rate % [CAGR] for the year 2010-2017 has
been used to inform our demand forecast going forward
to 2020.
Table 8 Area Wise Compound Annual Growth Rate [CAGR] of
MEDC Distribution System
Area
CAGR (%)
2010 To
2017
2010 To
2014
2015 To
2017
Airport 12.0% 13.2% 2.9%
Amerat 10.5% 9.4% 5.2%
Al Ansab 6.6% 8.6% 1.7%
Azaibah 8.0% 10.1% 1.1%
Bousher 14.7% 18.7% 7.4%
Ghubrah South 0.7% -0.6% -2.2%
Al Hail 3.3% 3.2% 1.4%
Al Khoud 11.2% 10.6% 0.1%
Al Khuwair 6.5% 5.4% 0.3%
Mabelah 10.7% 7.8% 4.9%
Mawalleh 8.3% 8.8% 2.7%
Misfah7 - - 10.7%
MSQ 4.8% 8.2% -1.9%
Muscat 0.0% 0.5% -2.1%
Mutrah -0.6% -0.5% 1.2%
Quriyat Group 9.5% 17.8% 7.7%
Qurum 5.8% 7.2% 3.9%
Rusail 7.0% 3.4% 6.7%
Ruwi 1.9% 3.9% -4.3%
6 The areas are defined on geographical and electrical
connectivity basis as ratified by the zonal teams.
7 The CAGR% used for Misfah was based on an area with similar
load characteristics as area created post 2014.
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 11
Area
CAGR (%)
2010 To
2017
2010 To
2014
2015 To
2017
Sarooj 1.7% 5.3% -6.5%
Seeb 8.6% 10.2% 2.6%
Wadi Adai -0.5% 0.1% -2.0%
Wadi Kabir 0.8% 7.4% -6.1%
4.3. System Demand and Load Duration
The Maximum and Minimum Demand for the MEDC
Distribution System in 2017 is illustrated in Table 9.
Table 9 System Maximum and Minimum Demand in 2017
System Demand
Load (MW)
Load (MVA)
Date & Time
Maximum 2348.6 2472 31st May 2017
@03:00 PM
Minimum 463 487 05th February 2017
@04:00 AM
MEDC notes that the date of system maximum demand
has fluctuated throughout the years. System maximum
demand has fallen generally between the second half of
May and June except for the year 2015 which could be
attributed to a high ambient temperature. There does
not appear to be a direct correlation between maximum
demand and the ambient temperature or the timing of
Ramadan. This results in a lack of predictability as to the
precise date of future system peaks. For this reason,
associated demand transfers are operationally planned
to have occurred before May each year to ensure MEDC
are in the best position possible to meet regulatory
requirements and ensure quality and security of supply to
consumers.
Figure 2 below indicates that from the last 7 years of data
[2010 -2017], the load profile on the day of system
maximum demand is generally consistent. This would
suggest no unforeseen event has occurred during this
period that may have influenced the demand profile
(with the exception of an abnormal drop @ 19:00hrs in
2013 which we believe to be erroneous in nature). During
the past 7 years maximum demand has been seen to
grown erratically between 2010 and 2014.
The maximum demand data is supplemented with the
associated load duration curve shown in Figure 3. Figure
3 illustrates that over a period of 7 months [Jan-July
2017], MEDC System Demand has essentially remained
above 2000 MW for around 11% of the time. The
associated distribution and utilisation of MEDC’s
distribution assets are seen to be generally in line with
common distribution utility practice.
Figure 2 Hourly Demand – Summer Maximum Day Profile 2010 -
2017
1000.0
1300.0
1600.0
1900.0
2200.0
2500.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
MW
Hours
System Maximum Day Profile [2010-2017]
31-May-17 12-Jun-16 05-Jul-15 26-Jun-14 16-Jun-13 20-Jun-12 22-May-11 01-Jun-10
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 12
Figure 3 2017 Load Duration Curve
4.4. System Demand Forecast
Accurate and realistic load demand forecasting is critical
for the effective operation of the Distribution System and
is the principal driver for capital expenditure. Realistic
assumptions must be made for inherent uncertainties in
forecasting and the underlying macro-economic factors,
such as the sustained low oil price.
Load growth can vary from year-to-year and is not
uniform across the whole system. It is not unusual to find
parts of the system growing at significantly higher rates
than for the system as a whole, while other parts of the
system can experience periods of low growth or demand
reduction.
MEDC high voltage distribution system operates at 33kV
and 11kV, both voltages being standard IEC voltages. The
33kV system is normally operated with duplicated radial
while the 11kV system is operated as a radial
configuration, normally with interconnection through
normally open points except in the more remote areas.
The system covers both urban and rural areas and the
characteristics depend on the load density.
Best Practice Distribution Load Forecasting
MEDC considers the following features are necessary to
produce an accurate demand forecast in line with best
practice:
• Accurate and unbiased actual demand data – careful
management of data and forecasting model
construction based on sound theoretical grounds
that closely fits the sample data.
• Transparency and repeatability – as evidenced by
good documentation, including documentation of
the use of judgment, which ensures consistency and
minimises subjectivity in forecasts.
MEDC also considers the following elements to be
relevant to maximum demand forecasting:
• Independent forecasts – spatial (bottom up)
forecasts should be validated by independent
system level (top down) forecasts and both spatial
and system level forecasts should be prepared
independently of each other. The impact of
macroeconomic and demographic trends is better
able to be identified and forecast in system level
data, whereas spatial forecasts are needed to
capture underlying characteristics of specific areas
within the system. Generally, the spatial forecasts
should be constrained (or reconciled) to system level
forecasts;
• Adjusting for temporary transfers – spatial data is
adjusted for historical spot loads arising from peak
load sharing and maintenance, before historical
trends are determined;
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 13
• Adjusting for discrete block loads – large new
developments, such as shopping centres and
housing developments, are incorporated into the
forecasts, taking account of the probability that each
development might not proceed. Only block loads
exceeding a certain size threshold are included in
the forecasts, to avoid potential double counting, as
historical demands incorporate block loads and
general demand growth.
System Demand Growth
Historical data indicates that the demand rate of growth
across MEDCs distribution system has slowed in recent
years. This may be attributed to the sustained low price
and general macro-economic factors. Over the 2010 to
2017 period the CAGR % system-wide load growth was as
shown in the Table 10.
Table 10 The CAGR System Load Growth% from 2010 to 2017
System Maximum Demand 2010-2017 CAGR system
load growth %
Non-Grid connected customers 5.7%
Grid connected customers 6.0%
Table 11 and Figure 4 shows the historical trend in system
maximum demand with the forecast maximum demand
over the period 2018 to 2020.
Despite the general slowing in demand growth at the
system level, there are areas within the system where
maximum demand is forecast to grow well beyond the
system average level, while other parts of the system are
forecast to experience no load growth or a small
reduction in maximum demand. This particularly applies
to Ruwi and Muttrah where the geography of the area
(city area predominantly domestic property) can be
considered saturated with little room for property
expansion.
Significant demand growth is expected in the South of
Zone 1 and Zone 3, largely due to new developments
associated with urban sprawl towards the edge of the
urban growth zone. As a result of this urban sprawl, we
expect to see continued strong growth in the Amerat and
Mabelah areas.
4.5. Grid Supply Points
By 2020, it is forecasted that there will be 38 grid supply
points within the MEDC licenced area. There are 10 new
and/or upgraded grid supply points currently in the
construction phase. The investment drivers for grid
supply points is to relieve existing overloaded (above the
firm) grid supply points and to provide new 33kV
connection points to accommodate new primary
substations. MEDC provides annually a demand forecast
for five years to OETC.
The existing system (2017) and expected system
development for the primary substations is updated in
Figure 5 and Figure 6[expansion for the next 3 years]
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 14
Table 11 MEDC System Maximum Demand in MW [Historical and Forecast]
Figure 4 System Historical and Forecast Maximum Demand (2006-2020)
300
700
1100
1500
1900
2300
2700
3100
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
MW
Year
Excluding Grid Connected Customers Including Grid Connected Customers
Actual Demand[MW] Forecast Demand[MW]
System Maximum Demand
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Excluding Grid
Connected Customers
(MW)
1146 1246 1342 1525 1567 1618 1763 1738 2014 2154 2254 2305 2436 2575 2722
Yearly Growth
0.0% 8.7% 7.7% 13.6% 2.8% 3.3% 9.0% 1.4% 15.9% 7.0% 4.6% 2.3% 5.7% 5.7% 5.7%
Including Grid
Connected Customers
(MW)
1146 1246 1342 1525 1567 1618 1763 1738 2014 2184 2304 2349 2580 2728 2892
Yearly Growth
0.0% 8.7% 7.7% 13.6% 2.8% 3.3% 9.0% 1.4% 15.9% 8.4% 5.5% 2.0% 9.8% 5.7% 6.0%
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 15
Figure 5 33kV Existing Distribution System (2017)
Amerat A &B
W.K A&B
Muttrah
Falaj
Qurum
MSQ A & B
Boshar-1 A&B
Ghoubrah
Misfah
Ghala (A & B)
AirportHeights
Rusail(A&B)
Mawalih North
Mawalleh South A & B
Seeb A & B
Mobella -1
Mobella -2 (A’Salam)
(A & B)
BarkaMain
Falaj(P178)
Darsait(P018)
Jabrooh(P041)
Sea Port(P086)
Muttrah Store(P085)
Ruwi Office(P108)
CBD Primary(P173)
Bait Al Falaj(P142)
Riyam(P099)
Waljah(P130)
Qasr Al Alam(P090)
Old Airport(P107)
M.B.D South(P075)
Sidab(P119)
Ruwi Markit(P076)
Wadi Al Kabir Height(P128)
Ruwi Valley(P174)
250
Majlis Oman(P066)
Amerat-1(P005)
125
125
250
Qurum-1(P093)
Qurum-2(P094)
Lulai (P095)
Rabiat Al qurum (P096)
Information City(P037)
MSQ Grid(GP06)
MSQ-1(P083)
Royal Office(P097)
Intercontinental(P109)
Sarooj-Shati Al Qurum(P110)
Digital TV Studio(P039)
Khuwair 25(P053)
ROP(P111)
Al Khuwair School(P146)
Post Office(P150)
Amerat Heights(P152)
Bousher Grid(GP02)
Al Khuwair 17/1(P050)
Khuwair South(P052)
Ghubrah So
uth-1
(P026)
Azaibah South 1-B
(P147)
Azaibah North-1(P011)
Ghubrah South
02
Almona(P084)
Tilal Al Khuwair(P055)
Royal H
ospita
l
(P024)
Azaibah North-2(P012)
Azaibah South1-A
(P014)
Ghubrah North(P023)
Diplomatic City(P022)
Ghubrah North-2(P149)
Airport Height-2(P002)
Airport Height-1(P001)
Airport Height-3(P003)
Airport Height-4(P004)
Azaibah North-3(P013)
Airport Height-5(P151)
Al Hail North-2(P028)
Royal Flight(P100)
Mawaleh South Grid
(GP05)
New Al Khoud(P047)
Al Jifnain(P042)
Cement Housing(P088)
Cement Factory(P079)
Seeb Grid(GP08)
Wadi Bahayis RGO)
(P098)
Wadi Al Arash(P115)
Sultan School(P029)
Al Khoud Shabiya(P046)
City Center(P073)
Mawaleh-C(P072)
Rusail-B(P101)
Mawalleh-B(P071)
Mawalleh-A(P070)
Al Khoud PH-6(P049)
Manomah(P067)
Mobella South03
125
Mobelah Grid(GP04)
Mobella South PH-7(P141)
Sur Al Hadid (P116)
Mobella South(P061)
Botanic Garden(P016)
Mobella
South
PH-4
(P062)
Mabelah-C(P064)
Rusail Industrial-1(P103) Rusail Industrial-2
(P104)
250
Rusail Industrial-3(P104)
Rusail Housing(P056)
Private Factory(P106)
SQU-1(P122)
SQU-2(P123)
Mobella South-8(P157)
250
Al Ansab STP(P009)
Al Ansab-2(P008)
Azaibah South02
PDO(P144)
Khuwair North(P054)
MOD Technical College(P081)
Al Misfah(P080)
Mebelah Shabiya(P060)
125
Wadi Al Lawami(P117)
Al Hail South-2(P153)
Al Khoud PH-3(P048)
Mawalleh North(P069)
Hail North-1(P027)
Muscat Electricity Distribution Company - 33kV Distribution System (2017)
(2x16MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(2x6MVA)
(3x16MVA)
(2x20MVA)
(3x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x6MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(3x20MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(3x20MVA)
(3x20MVA)
125
(2x20MVA)
(2x20MVA)
(3x20MVA)
(2x20MVA)(2x20MVA)(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x16MVA)
(2x16MVA)
(2x20MVA)
(3x20MVA)
(2x20MVA)
(3x20MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(3x2
0MVA)
(2x20MVA)
(3x2
0MVA)
(3x2
0MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
Ghala-1(P015)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x16MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)(2x16MVA)
(3x16MVA)
(1x6MVA)
(2x5MVA)
(3x20MVA)
(2x31.5 MVA)
(2x20MVA)
(2x20MVA)
125
(2x20MVA) (2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(3x2
0MVA)
(3x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(2x20MVA)
(3x20MVA)
(2x10MVA)
(3x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
Sea of Oman
N
Note:For 3x20 MVA primary substations, all connection lines are either two circuits or three circuits except where indicated on single lines as one or more circuits.
Prepared by Planning DepartmentThis diagram only for planning purpose
100
Legend
125
125
132/33kV Grid Station with Firm Capacity(MVA)
New 132/33kV Grid Station with Firm Capacity(MVA)
33/11kV Primary Station
Private Shifted 33/11kV Primary Station
132 kV Line
33 kV Line
New 33kV Lines
New 33/11kV Primary Station
New 132 kV Line
Upgrading 33/11kV Primary Station
New Privet 33/11kV Primary Station
Private 33/11kV Primary Station
(4x20MVA)
QuryatJahloot
Yitti
W. Adai
Wadi Al Kabir Workshop(P126)
Wadi Al Kabir Housing(P127)
Ali Al Shihani(P125)
Bustan Palace(P017)
Al Hamriya(P035)
Wattaya(P131)
Wadi Adai(P175)
Khoula Hospital(P132)
125
Sawaqim-1(P112)
Sayh Dhabiy02
Madinat Nahdah(P065) Shihbari
(P092)
Dhaghmar(P021)
Dibab(P019)
Quryat(P091)
Al Masarat(P068)
Siya
(P120)
Jahloot
(P040)
Hajir
(P031)
Yitti
(P134)
(2x3MVA)
Wadi Al
Mayh
(P129)
Yankit
(P133)
(1+6MVA)
Saraya Bandar(P145)
Khairan
(P045)
(2x3MVA)
Al Mazara(P074)
GTO
Royal Camp(P170)
Arqi(P121)
Al Khour
(200KVA)
Tunis Heim(P137)
GTO
Hail Ghaf(P036)
(2x6MVA)
(1x6MVA)(2x20MVA)
(2x16MVA)
(2x16MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(2x20MVA)
(1x3MVA)
(2x6MVA)
(2x6MVA)
(2x6MVA)
(2x3MVA)
(1x6MVA)
Wadi Arabian
(1x3MVA)
(1x6MVA)
(2x10MVA)
(2x20MVA)
(1x0.2MVA)
(1x3MVA)
(2x6MVA)
(3x20MVA)
(2x20MVA)
(2x20MVA)
(3x6MVA)
(1x6MVA)
(1x0.2MVA)
(2x6MVA)
1
1
1
1
1
Hussan Yiti(P169)(2x6MVA)
off
1
off
1
1
Sea of Oman
Sea of Oman
125
Street Lights(200kVA) Street Lights
(200kVA) Street Lights(200kVA)
RGO Halban Camp(P034)
(1x5MVA)
1
1
Direct Connected Transformer
Off
1
1
1
1
250+125
125 Upgrading 132/33kV Grid Station with Firm Capacity(MVA)offOn
Al Mahaj-2 Temp.
(1x6MVA)
Al Mahaj
(P136)
(2x6MVA)
1
1
1
1
1
off1
off
off
off
off
off
Sayh Dhabiy (P118)
(2x16MVA)
250(2018)
off
125125
Street Light
(P020)
(0.2MVA)
1
1
1
off
off
Shifted 33/11kV Primary Station
Al Nahdah(P006)
(2x20MVA)(3x20MVA , 2019)
Private Upgrading 33/11kV Primary Station
4
MOD(P143)
(1x6MVA)
Qantab(P089)
(1x6MVA)
(2x6MVA)
off
Barr Al Jissa(P044)
(2x20MVA)
Ghubrah GPS(P166)
(2x16MVA)
33kV RMU/ C.B ( proposed Off Point)
250
Al Ansab 1
(P007)
(2x20MVA)
Yitti Hights
(2x6MVA)
Oman Exhibition(P165)
(3x20MVA)
Water Department
(P102)(1x1MVA)
3
off
off
off
Mobela STP(P140)
(2x20MVA)
(3x20MVA)
Al Khoud PH-7(P154)
off
off
1
1
off
ABS ( existing Off Point)off
Off
250
125
1
off
off
off
125
1
off
Sawaqim-2(P113)
Wadi Al
Arbyeen
(P124)
(1x6MVA)
Debah(P114)(1x6MVA)
Al Salam Yiti
(P135)
(1+6MVA)
Amerat-2(1x6MVA)
Information City-2(P038)
(1x5MVA)
Holiday Inn(P051)
(3x20MVA)
1
off
Al Misfah OCP-1(P078)
(1x0.5MVA)
Al Misfah OCP-2(P176)
(2 x1MVA)
Al Awabi(P139)(3x6MVA)
Mobela-A(P063)
(2x20MVA)
Old Mabelah(P059)
(2x20MVA)
Al Hail South-1(P030)(2x20MVA)
250
100 132/11kV Grid Station with Firm Capacity(MVA)
11kV Waive Load
Palace Communication
(P033)(1MVA)
MSQ 02 (P155)
(3x20 MVA)
Rusail Industrial-4(P158)
(3x20 MVA)
Ghala 02(P156)
(3x20 MVA)
MOD Al Ansab(P167)
(2x10 MVA)
Mabelah Industrial(P191)
(1x6 MVA)
Orpic(P192)
2x6 MVA
(3x20 MVA)
Mabelah Phase 5(P190)
(1x6 MVA)
SQU-3(P160)
(3x20 MVA)
Al Atkiya(P182)
(1x6 MVA)
Jabal Seiffah(P159)
(3x20MVA)
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 16
Figure 6 33kV Expected Distirbution System Development (2018 to 2020)
Amerat A &B
W.K A&B
Muttrah
Al Falaj
Qurum
MSQ A & B
Boshar-1 A&B
Ghoubrah
Ghala
Heights
(A&B)
Misfah
Ghala (A & B)
AirportHeights(A & B)
Rusail(A&B)
Mawalih North
Mawalleh South A & B
Seeb A & B
Mobella -1
Mobella -2 (A’Salam)
(A & B)
BarkaMain
Falaj(P178)
Darsait(P018)
Jabrooh(P041)
Sea Port(P086)
Muttrah Store(P085)
Ruwi Office(P108)
CBD Primary(P173)
Bait Al Falaj(P142)
Riyam(P099)
Waljah(P130)
Qasr Al Alam(P090)
Old Airport(P107)
M.B.D South(P075)
Sidab(P119)
Ruwi Markit(P076)
Wadi Al Kabir Height(P128)
Ruwi Valley(P174)
250
Majlis Oman(P066)
Amerat-1(P005)
125
125
250(2019)
Qurum-1(P093)
Qurum-2(P094)
Lulai (P095)
Rabiat Al qurum (P096)
Information City(P037)
MSQ Grid(GP06)
MSQ-1(P083)
Royal Office(P097)
Intercontinental(P109)
Sarooj-Shati Al Qurum(P110)
Digital TV Studio(P039)
Khuwair 25(P053)
ROP(P111)
Al Khuwair School(P146)
Post Office(P150)
Amerat Heights(P152)
Bousher Grid(GP02)
Al Khuwair 17/1(P050)
Khuwair South(P052)
Ghubrah So
uth-1
(P026)
Azaibah South 1-B(P147)
Bousher-2(P163)
Azaibah North-1(P011)
Al Muna (P084)
Tilal Al Khuwair(P055)
Royal H
ospita
l
(P024)
Azaibah North-2(P012)
Azaibah South1-A(P014)
Ghubrah North 1(P023)
Diplomatic City(P022)
Ghubrah North-2(P149)
Airport Height-2(P002)
Airport Height-1(P001)
Airport Height-3(P003)
Airport Height-4(P004)
Azaibah North-3(P013)
Airport Height-5(P151)
City Center(P073)
Royal Flight(P100)
Mawaleh South Grid
(GP05)
New Al Khoud(P047)
Al Jifnain(P042)
Cement Housing(P088)
Cement Factory(P079)
Seeb Grid(GP08)
Wadi Bahayis RGO)
(P098)
Wadi Al Arash(P115)
Seeb 05(Boulevard)(P186)
Sultan School(P029)
Al Khoud Shabiya(P046)
Hail North-2(P028)
Mawaleh-C(P072)
Rusail-B(P101)
Mawalleh-B(P071)
Mawalleh-A(P070)
Al Khoud PH-6(P049)
Mobella South(P061)
125
Mobelah Grid(GP04)
Mobella South PH-7(P141)
Sur Al Hadid (P116)
Botanic Garden(P016)
Mobella
South
PH-4
(P062)
Mabelah-C(P064)
Rusail Industrial-1(P103) Rusail Industrial-2
(P104)
250
Rusail Industrial-3(P104)
Rusail Housing(P056)
Private Factory(P106)
SQU-1(P122)
SQU-2(P123)
Rusail08(KOM)(P164)
Rusail Industrial-4(P158)
SQU-3(P160)
Mobella South-8(P157)
250
Al Ansab STP(P009)
Al Ansab-2(P008)
Ghala-2(P156)
PDO(P144)
2019
Amerat-3 (P179)
Khuwair North(P054)
Sarooj04(P181)
2019
MSQ-2(P155)
ROP Hospital
2019
MOD Technical College(P081)
ROP Al Khoud(P161)
Al Misfah(P080)
Mebelah Shabiya(P060)
Halban 2020
250(2019)
Wadi Al Lawami(P117)
Al Hail South-2(P153)
Al Khoud PH-3(P048)
Mawalleh North(P069)
Hail North-1(P027)
2018
20
18
2018
2018
Muscat Electricity Distribution Company - 33kV Distribution System (2018-2020)
(2x16MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(2x6MVA)
(3x16MVA)
(2x20MVA)
(3x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x6MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(3x20MVA)
(3x20MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(3x20MVA)
(3x20MVA)
250(2019)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(3x20MVA)
(2x20MVA)(3x20MVA)(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(2x20MVA)
(2x16MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(2x20MVA)
(3x20MVA)
(3x20MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(3x2
0MVA)
(3x20MVA)
(3x2
0MVA)
(2x20MVA)
(3x20MVA)
(2x20MVA)
(3x20MVA)
Ghala-1(P015)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x16MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(3x20MVA)
(3x20MVA)(2x16MVA)
(3x16MVA)
(2x20MVA)
(1x6MVA)
(2x5MVA)
(3x20MVA)
(2x31.5MVA)
(3x20MVA)
125
250(2020)
(2x20MVA) (3x20MVA)
(2x20MVA)
(3x20MVA)
(3x20MVA)
(3x20MVA)
(3x2
0MVA)
(3x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(3x20MVA)
(3x20MVA)
(2x20MVA)
(3x20MVA)
(2x10MVA)
(3x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
Sea of Oman
N
Note:For 3x20 MVA primary substations, all connection lines are either two circuits or three circuits except where indicated on single lines as one or more circuits.
Prepared by Planning DepartmentThis diagram only for planning purpose
125
2019
2019
2019
(4x20MVA)
QuriyatJahloot
Yitti
W. Adai
Wadi Al Kabir Workshop(P126)
Wadi Al Kabir Housing(P127)
Ali Shihani(P125)
Bustan Palace(P017)
Al Hamriya(P035)
Wattaya(P131)
Wadi Adai(P175)
Khoula Hospital(P132)
125
Sawaqim-1(P112)
Sayh Dhabiy02
Madinat Nahdah(P065) Shihbari
(P092)
Dhaghmar 1(P021)
Dhabab(P019)
Quryat(P091)
Al Masarat(P068)
Siya
(P120)
Jahloot
(P040)
Hajir
(P031)
Yitti
(P134)
(2x3MVA)
Wadi Al
Mayh
(P129)
Yankit
(P133)
(1x1 + 1x3 MVA)
Saraya Bandar(P145)
Khairan
(P045)
(2x3MVA)
Al Mazara(P074)
GTO
Royal Camp(P170)
Arqi(P121)
Al Khour
(200KVA)
Tunis Heim(P137)
GTO
Hail Ghaf(P036)
(2x6MVA)
(1x6MVA)(2x20MVA)
(2x16MVA)
(2x16MVA)
(2x20MVA)
(2x20MVA)
(2x20MVA)
(3x20MVA)
(2x20MVA)
(1x3MVA)
(2x6MVA)
(2x6MVA)
(2x6MVA)
(2x3MVA)
(1x6MVA)
Wadi Al Arbyeen(P124)
(1x3MVA)
(1x6MVA)
(2x10MVA)
(2x20MVA)
(1x0.2MVA)
(1x3MVA)
(2x6MVA)
(3x20MVA)
(2x20MVA)
(2x20MVA)
(3x6MVA)
(1x3MVA)
(1x0.2MVA)
(2x6MVA)
1
1
1
1
1
Hussan Yiti(P169)(2x6MVA)
off
1
off
1
1
Sea of Oman
Sea of Oman
125
Street Light(200kVA)
(200kVA)
(200kVA)
Palace Communication
(P033)
(1MVA)
RGO Halban Camp(P034)
(1x5MVA)
1
1Off
1
1
1
1
250(2018)
1
1
2019
offOn
2018
Al Mahaj-2 Temp.
(1x6MVA)
Mawalleh North Grid
(GP01)(3x20MVA)
Al Mahaj
(P136)
(2x6MVA)
1
1
1
1
1
Mall of Oman(3x20MVA)
2019
Palm Mall(P168)
(3x20MVA)
2018
off1
off
off
off
off
ROP Saleel(2x6MVA)
2018
off
Seih Dhabi (P118)
(2x16MVA)
250(2019)
off
100(2017)
Dhaghmar IWP(132/11kV)
1252018125
Street Light
(P020)
(1x3 MVA)
1
1
1
Amerat04 (P180)
(3x20MVA)
off
off
Khoudh
Mobella South09(P184)
(3x20MVA)
2020
Al Nahdah(P006)
(3x20MVA)
2018
(2x20MVA)
4
MOD(P143)
(1x6MVA)
Qantab(P089)
(1x6MVA)
(2x6MVA)
off
Barr Al Jissa(P044)
(2x20MVA)
Ghubrah GPS(P166)
(2x16MVA)
off
250Azaiba South New(P189)
(3x20MVA)
2020
2502019
Al Ansab 1
(P007)
(2x20MVA)
2019
2019
Yitti Hights
(2x6MVA)
2019
Oman Exhibition(P165)
(3x20MVA)2018
off
2018
2018
Water Department
(P102)(1x1MVA)
3
off
off
off
Mobela STP(P140)
(2x10MVA)
(3x20MVA)
Al Khoud PH-7(P154)
Mawalleh South05(3x20MVA)
2018
1
1
off
off
Off
250
2019
2018
125
2020
250(2020)
2020
1
3 2020
1
off
off
off
125
2020
2020
2018
2018
1
2018
off
Sawaqim-2(P113)
Debah(P114)(1x6MVA)
Al Salam Yiti
(P135)
(1x6 MVA)
Amerat-2 (P177)(1x6MVA)2019
2019
Information City-2(P038)
(1x5MVA)
3
Holiday Inn(P051)
(3x20MVA)
1
off
2019
MOD Al Ansab
(2x10MVA)
Al Misfah OCP-1(P078)
(1x0.5MVA)
Al Misfah OCP-2(P176)
(2 x1MVA)
Al Awabi(P139)
(3x20 MVA)2019
Mobela-A(P063)
(3x20MVA)
2019
2019
Old Mabelah(P059)
(2x20MVA)
2020
off
2018
ROP Dog Kennel
(2x6MVA)
Al Khoud New(P187)
(3x20 MVA)
2019
2018
Al Hail South-1(P030)(2x20MVA)
250
Legend
125
125
132/33kV Grid Station with Firm Capacity(MVA)
New 132/33kV Grid Station with Firm Capacity(MVA)
33/11kV Primary Station
Private Shifted 33/11kV Primary Station
132 kV Line
33 kV Line
New 33kV Lines
New 33/11kV Primary Station
New 132 kV Line
Upgrading 33/11kV Primary Station
New Private 33/11kV Primary Station
Existing Private 33/11kV Primary Station
Direct Connected Transformer
125 Upgrading 132/33kV Grid Station with Firm Capacity(MVA)
Shifted 33/11kV Primary Station
Private Upgrading 33/11kV Primary Station
33kV RMU/ C.B ( proposed Off Point)
ABS ( existing Off Point)off
100 132/11kV Grid Station with Firm Capacity(MVA)
(2x20MVA)
Orpic(P192)
2x6 MVA
2019
2019
Mobella South Ph06(P185)
(3x20 MVA)
2020
2020
2020
2020
Street LightStreet Light
Mabelah Industrial(P191)
(1x6 MVA)
Mabelah Phase 5(P190)
(1x6 MVA)
Manomah(P067)
(2x20 MVA)
2020
Al Atkiya(P182)
(1x6 MVA)
2019
2019
2019
2019
Jabal Seiffah(P159)
(3x20MVA)
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 17
4.6. Distribution System Analysis
MEDC perform associated system studies to ensure the
distribution system is safe, efficient and provides the
required security of supply to its connected customers.
Load Flow Analysis
The planning tool adopted for system modelling and
studies is PSS®SINCAL. The models are built by
representing the 33kV system on an electrical
connectivity basis. The system created in the power
system model contains network topologies and system
details in terms of nameplate transformer impedances,
conductor types and lengths and loads. The models are
updated to reflect modifications and additions to the
system including the addition of recently
commissioned Grid Stations and Primary Substations.
The load demands are modelled as lumped loads
connected to the main 11kV bus bars. The recorded
maximum demands per primary of 2017 have been
used to update the model files.
Load flow analysis has been undertaken to determine
active and reactive power flows in the system. This
provides component loadings for transformers and
circuits along with the voltage profile at the system
buses/nodes under normal circuit operation. The load
flow simulations have been carried out for existing and
future 3 years system maximum loadings (2018 to
2020).
The power factor of the lumped load connected to the
11kV bus bars on each primary substation is taken as
per the actual recorded by the SCADA system for 93
primary substations. The power factor for the
remaining 77 substations, where only the feeder
Ampere values were available, is considered as 0.92
based on a calculated weighted average power factor
from the 93 primary substations from 1st May to
31st July.
The results are summarised in tabular form in
Appendix C and available in a downloadable excel file
that supplements this Capability Statement.
Short Circuit Analysis
MEDC carries out short circuit studies to establish the
capability of equipment to withstand three phase
maximum prospective fault current levels.
The principal source of fault currents is the generation
system connected to the transmission system with the
fault current contribution to the MEDC Distribution
System via the 132/33kV Grid Station transformers. The
source contribution in the power system models have
been updated to reflect the fault level infeeds at 33kV
as provided by the OETC’s 2017 Capability Statement
which covers up the transmission system
developments up to 2021.
The system configurations prepared for short circuit
studies in each year are based on the current standard
operational arrangements:
• For all the 2x20MVA PSS, the 33kV bus section
circuit breakers are normally open.
• For all the 2x20MVA PSS, the 11kV bus section
circuit breakers are normally closed wherever the
total loading is within the firm capacity of the
respective primary substation. For loadings above
the firm capacity, the 11kV bus section circuit
breakers are normally open.
• For all 3x20MVA PSS, both 33kV bus section circuit
breakers are normally open.
• For all 3x20MVA PSSs, one 11kV bus section
breaker is considered closed and one as open,
when the load is within the firm capacity. Both
11kV bus section breakers are considered open in
case of station loading beyond the firm capacity.
The design short circuit withstand and breaking ratings
of the 11kV switchgear components at new and
upgraded primary substations have been revised to
25 kA for 3 sec to comply with system requirements,
whereas for the older existing 11kV switchgear, the
rated value is 18.4kA for 3 sec.
Currently, in the absence of accurate fault level
contribution data on low voltage (LV) side, a worst case
allowance is made for LV motor fault contribution
majorly due to the nature of the air conditioning load
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 18
prevalent across the MEDC’s distribution system. A
motoric to static load type ratio of 80/20 (in
percentage) is considered using the system maximum
and minimum demands figures. An allowance of 100
Amp fault infeed per 1MVA of connected air
conditioning load is allowed to ensure adequate
headroom for short circuit withstand capability.
The maximum prospective fault current values are
shown in the tables in Appendix C.
The calculation of maximum prospective fault current
is compared against the rated withstand for primary
equipment.
The maximum prospective fault current [initial
symmetrical] is calculated as high as the rated capacity
of the primary equipment (switchgear) at the following
33kV primary substations.
1 Bousher Grid - GP02
2 Mabelah Grid - GP04
except at Seeb Grid where it exceeds by 3.2% on the
switchgear rating.
For all the above PSS, operational restrictions are in
place to manage the fault levels.
All the above primary substations are in close electrical
vicinity of their respective grid stations. The breaking
fault currents on these stations are however within the
limits of 25kA.
The fault current levels at all other primary substations
are within their rated breaking capacities.
4.7. Technical Losses
The technical losses in the MEDC distribution system is
a factor of the configuration of the system, type and
specification of equipment and the % loading on
equipment. Technical losses are attributed to copper
and iron losses in the 33kV feeders and 33/11kV
primary transformers, 11kV feeders and distribution
transformers and the LV distribution system. In line
with standard international practice for utilities where
the system is not fully modelled we calculate the losses
for specific network elements (transformers, overhead
lines and cables) across the different voltage levels
(33kV, 11kV and LV) and then summate the total losses
to obtain a percentage technical loss for each primary
substation.
The percentage technical losses are then apportioned
according to the proportion of total system energy
supplied by each substation. A summation of all
apportioned technical losses is then presented as the
system % technical losses. The summated technical
losses for the Distribution System are calculated to be
4.73%.
The breakdown of technical losses by voltage is as
shown in Table 12 below.
Table 12 MEDC System Technical Losses
System Component Loss Value
33kV Circuits 0.31 %
Primary Transformers 0.45 %
11kV Circuits 0.49 %
Distribution Transformers 2.37 %
LV network 1.11%
Total 4.73%
4.8. Continuous Improvement Areas
MEDC has identified and is working on a number of
continuous improvement areas as listed below as more
accurate data starts becoming available:
Bulk Load Details and Modelling
Currently, we are in process of collating the details of
existing 33kV and 11kV bulk customers to incorporate
as appropriate, the details of their power systems in
our models for impact assessment. For new
applications, this will be used for performing point of
connection studies.
33/11.5kV Transformers Tap Changer Modelling
The data on accurate operational status of on-load tap
changer installed on primary substation transformers
will be included in power system models. This will
enable MEDC to improve the accuracy in calculations
for all system studies.
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 19
11kV System Modelling
MEDC intends to enhance its power system models to
include 11kV system upto the main LV bus bar. This will
enable us to improve our existing studies (like short
circuit analysis and carry out additional system studies
on PSS®SINCAL like technical losses).
Improved and Updated Motoric Short Circuit Contribution
We aim to assess the motor fault contribution onto
MEDC’s system at LV due to the connection of typical
larger scale centralised commercial air-con units by
obtaining typical details of such systems from our larger
commercial customers and preparing sample grid
connection impact studies. Furthermore, the
assessment studies for MV motor fault contribution
from larger industrial customers in relevant parts of the
system will be undertaken to improve the
understanding of the actual short circuit contribution.
Technical Losses Calculation using Power System Models
It is our intention to modify the losses calculation
approach in the future by directly utilising the
PSS®SINCAL model to calculate the system losses. This
will require the development of PSS®SINCAL models for
the 11kV system as well as that already established for
the 33kV system.
Maximum and Minimum Scenario Modelling
Currently, MEDC performs system analysis for
maximum demand conditions only. It is planned to
carry out minimum demand scenario studies in future
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 20
5 . C H A L L E N G E S A N D
O P P O R T U N I T I E S W I T H I N
T H E S Y S T E M
MEDC recognise that the nature of electricity generation
and use is changing. We envisage that recent policy
initiatives will result in an increase in photovoltaic (PV)
generation on our distribution system. Unlike other
utilities in different regions, Oman has not seen significant
uptake in electric vehicle charging thus, the associated
demand characteristics for electric vehicles (EV) are not
considered to be a contributing factor to our system
planning in the short to medium planning horizon.
However, this will be closely monitored to check the
penetration rate of EV and PV in general.
With the introduction of domestic PV generation, we do
foresee challenges in the way we will plan and operate our
system. Whilst PV may have the impact of reducing
transmission and distribution congestion, we do envisage
that power quality, reverse power flow and operating
within voltage limits may become a challenge if PV uptake
is significant.
MEDC are responsible for ensuring power quality according
to the regulations under which we operate. However, with
the addition of intermittent, consumer-owned and non-
dispatchable PV units, current standard procedures for
guaranteeing power quality might not be as effective as
they are without PV.
Overvoltage is one of the main reasons for limiting the
capacity (active power) of non-dispatchable PV, that can be
connected to a low voltage Distribution System. During
high PV generation and low load periods, there is a
possibility of reverse power flow and consequently voltage
rise, in the HV & LV feeder. We envisage that this will be
most prominent during the winter period. For this reason,
MEDC believe that if uptake is significant it will impact
investment decision making for reinforcement and asset
replacement. Consideration of tap range, optimum
dispatch of capacitor banks and conductor sizing may be
necessary should PV penetration become high.
5.1. New Connection Applications
MEDC are responsible for the connection of customers for
all levels of demand that our system supplies. We are also
the initial point of connection request for customers
seeking a 33kV or 132kV connection at an OETC grid supply
point. In 2017, we have received 13 bulk connection
requests with a total of 119MW connected demand. 11kV
and lower voltages connection applications are identified in
Table 13.
Table 13 New 11kV and LV Customer Applications
S.No. Category No. of
Applications
1 Residential 7815
2 Commercial 960
3 Industrial 84
4 Government 159
5 Tourism 21
6 Agriculture 37
Total 9076
Whilst MEDC has received a considerable number of load
related requests, we have received very few requests for
distributed generation connections energisation. We
envisage that as PV uptake increases we will begin to
receive enquiries in the coming year.
5.2. System Constraints and Opportunities
Load related system constraints fall into one of two
categories:
• Current constraints that can be considered DSSS
obligations.
• Load related constraints based on current load growth
forecasts.
No. of Connections Applications Received in 2017
Agriculture
Commercial
Residential
Government
Industrial
Tourism
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 21
MEDC will seek to address such constraints as part of its
investment plan. Demand Not Secured (DNS) non
compliances are identified and documented within
Appendix B of this Capability Statement.
Table 14 provides a list of projected capacity constraints at
the end of the planning horizon in 2020. If the value is
identified as negative, MEDC envisage there will be a deficit
in spare capacity at that specific substation, thus it is less
advantageous for a customer to consider a new connection
in that area. Likewise, if there is spare capacity (positive),
then this substation may be considered more
advantageous as a point for new customer connection.
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 22
Table 14 2020 Projected Capacity Constraints in MVA
Area Name Forecast Load (MVA) Firm Capacity (MVA) Spare Capacity Available [MVA]
Airport 105.4 120 14.6
Amerat 189.5 252 62.5
Ansab 81.4 80 -1.4
Azaiba 290.2 320 29.8
Bousher 85.1 80 -5.1
Ghubrah South 50.0 80 30.0
Hail 128.6 140 11.4
Khoud 112.1 120 7.9
Khuwair 207.0 240 33.0
Mabelah 312.6 360 47.4
Mawaleh 194.0 190 -4.0
Misfah 39.6 40 0.4
MSQ 62.3 80 17.7
Muscat 35.7 40 4.3
Mutrah 92.8 128 35.2
Quriyat Group 51.0 40 -11.0
Qurum 77.1 112 34.9
Rusail 154.6 176 21.4
Ruwi 106.8 120 13.2
Sarooj 92.2 120 27.8
Seeb 178.0 180 2.0
WadiAdai 71.7 100 28.3
Wadi Kabir 69.4 100 30.6
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 23
6 . T H E I N V E S T M E N T P L A N
6.1. System Development Projects during the period 2018– 2020
Table 15 provides and overview of the status of primary
substation projects by zone in the period 2018 to 2020.
Table 16 summarise the list of sponsored projects that are
planned to be connected in the period 2018 to 2020.
Tables 17 to 19 summarise the projects planned for
completion in the years 2018, 2019 and 2020 respectively.
A summary description of each of the planned projects is
provided by operating zone in Sections 6.2 to 6.4.
Table 15 Status of the Primary Substations at a glance [2018-
2020]
Project Stage Zone1 Zone2 Zone3
Under Construction 2 - 3
Tendering - 2 1
Design 2 5 4
Planning 2 1 5
TOTAL 6 8 13
Table 16 Summary of Sponsored Projects
Zone Project Description Expected Compl.Date Status Details Purpose
1 New Al Saleel ROP[P162] Primary Substation Q2’2018 Under Construction 2 x 6 MVA TX Government
2 New Mall of Oman [P171] Primary Substation Q2’2019 Design Stage 3 x 20 MVA TX Commercial
2 New ROP Hospital [P172] Primary Substation Q2’2019 Design Stage 3 x 20 MVA TX Government
3 New ROP Al Khoud [P161] Primary Substation Q2’2018 Under Construction 2 x 20 MVA TX Government
3 New ROP Dog Kennel [P183] Primary Substation Q2’2018 Under Construction 2 x 6 MVA TX Government
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 24
Table 17 Summary of Planned Projects in MEDC Distribution System to meet Summer 2018 Maximum Demand
Zone Project Description Expected Compl.Date Status Details Purpose
1 Upgrading Al Hajir (P031) Primary
Substation Q1’2018
Under
Construction 2 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
2 New Amerat 3 [P179] Primary
Substation Q1’2018
Under
Construction 3 x 20 MVA TX
To relieve the load of adjacent PSS&
accommodate new loads
3 New Rusail08(KOM) [P164] Primary
Substation Q2’2018
Under
Construction 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
3 New Mawaleh South 05 [P148] Primary
Substation Q2’2018
Under
Construction 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
3 Upgrading Wadi Al Lawami [P117]
Primary Substation Q2’2018
Under
Construction 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 25
Table 18 Summary of Planned Projects in MEDC Distribution System to meet Summer 2019 Maximum Demand
Zone Project Description Expected Compl.Date Status Details Purpose
1 Upgrading Post Office [P150]
Primary Substation Q2’2019
Consultancy
Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
1 Upgrading Amerat Heights [P152]
Primary Substation Q2’2019
Consultancy
Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
1 Upgrading Al Nahdah (P006) Primary
Substation Q2’2019 Planning Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
1 New Amerat 4 [P180] Primary
Substation Q2’2019 Planning Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
2 New Bousher 2 [P163] Primary
Substation Q4’2018
Tender
Awarded 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
2 Upgrading Al Khuwair North[P054]
Primary substation Q4’2018
Tender
Awarded 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads & to replace the
assets
2 Upgrading Ghala 1[PP015] Primary
Substation Q2’2019
Consultancy
Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
2 Upgrading Azaibah North1 [P011]
Primary Substation Q2’2019
Consultancy
Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
2 Upgrading Al Awabi [P139] Primary
Substation Q2’2019
Consultancy
Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
2 Upgrading Qurum-2(P094) Primary
Substation Q2’2019 -- 2 x 20 MVA TX To replace the transformers.
2 New Sarooj-4(P181) Primary
Substation Q2’2019
PIAD Prepared
Land
Finalization
3 x 20 MVA TX To relieve the load of adjacent PSS.&
accommodate new loads
3 Upgrading Mabelah Shabiya [P060]
Primary Substation Q2’2019
Tender
Awarded 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads & to replace the
assets
3 Upgrading Mabelah C [P064] Primary
Substation Q2’2019 Design Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
3 Upgrading Mabelah South PH-7
[P141] Primary Substation Q2’2019 Design Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
3 Upgrading Mabelah A Primary [P063]
Substation Q2’2019 Design Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
3 New Seeb5 [P186] Primary
Substation Q2’2019 Design Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
3 Upgrading Sur Al Hadid [P116]
Primary Substation Q2’2019 Planning Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
3 New Al Khoud [P187] Primary
Substation Q2’2019 Planning Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 26
Table 19 Summary of Planned Projects in MEDC Distribution System to meet Summer 2020 Maximum Demand
Zone 1 – (The Eastern Zone)
The Zone 1 region includes the capital city of Muscat,
Muttrah and an extensive rural network, which covers the
wilayats of Amerat and Quriyat. The number of customers
served in the Zone 1 region is 115,260 which is
approximately 33 % of the total customer population.
The following primary projects are projected in the period
2018 to 2020.
Project 1: Upgrading Al Hajir (P031) Primary Substation
with 2 x 20 MVA Configuration
MEDC plan to upgrade Al Hajir primary substation, located
in the Hajir Area to accommodate the connection of new
loads in that area. Currently, this area is supplied via small
outdoor primary substations which are loaded above or
near to their firm capacity. The expected completion date
of the project is Q1’2018 and the 33kV connection point is
from Jahloot GSS.
Zone Project Description Expected Compl.Date Status Details Purpose
2 New Azaibah South [P189] Primary
Substation Q2’2020
Planning
Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
3 Upgrading Mabelah South [P061]
Primary Substation Q2’2020
Planning
Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads & to replace the assets
3 New Mabelah South 9 [P184]
Primary Substation Q2’2020
Planning
Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
3 New Mabelah South PH 6[P185]
Primary Substation Q2’2020
Planning
Stage 3 x 20 MVA TX
To relieve the load of adjacent PSS.&
accommodate new loads
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 27
Project 2: New Amerat-3 (P179) Primary Substation with
3 x 20 MVA Configuration
Amerat 3 primary substation is proposed in the Amerat
Area to provide additional capacity to accommodate the
new load in that area and to ensure security of supply in the
Amerat area is maintained. The expected completion date
of the project is Q1’2018 and the 33kV connection point is
from Amerat Grid.
Project 3: Upgrading Post Office (P150) Primary
Substation with 3 x 20 MVA Configuration
Upgrading Post Office primary substation in the Amerat
Area to provide additional capacity to ensure security of
supply is maintained. The expected completion date of the
project is Q2’2019 and the 33kV connection point is from
Amerat Grid.
Project 4: Upgrading Amerat Heights (P152) Primary
Substation with 3 x 20 MVA Configuration
Upgrading of Amerat Heights primary substation in the
Amerat Area to provide additional capacity to ensure
security of supply is maintained. The expected completion
date of the project is Q2’2019 and the 33kV connection
point is from Amerat Grid.
Project 5: New Amerat-4 (P180) Primary Substation with
3 x 20 MVA Configuration
Amerat-4 primary substation is proposed in the Amerat
Area to facilitate 11kV transfers from heavily loaded
primary substations as well as providing additional capacity
for new loads whilst ensuring security of supply is
maintained. The expected completion date of the project is
Q2’2019 and the 33kV connection point is from Amerat B
Grid.
Project 6: Upgrading Al Nahdah (P006) Primary Substation
with 2 x 20 MVA Configuration
Upgrading of Al Nahdah primary substation in the Amerat
Area is required to accommodate the high load growth in
that area and to ensure security of supply is maintained.
The expected completion date of the project is Q2’2019
and the 33kV connection point is from Amerat Grid.
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 28
Zone 2 - (The Central Zone)
The Zone 2 region covers the commercial and residential
areas of Bousher, Al Khuwair, Al Ansab, Azaibah and
Qurum. This is largely an established area, which has seen
high load growth in previous years. The Mall of Oman and
Seeb Exhibition were the largest commercial projects in
Zone 2 region.
The number of customers served in the Zone 2 region is
102,219 which is approximately 29 % of the total customer
population
The following primary projects are projected in the period
2018 to 2020.
Project 1: New Bousher 2 (P163) Primary Substation with
3 x 20 MVA Configuration
Bousher-2 primary substation is proposed in the Bousher
Area to facilitate 11kV transfers from heavily loaded
primary substations as well as providing additional capacity
for new loads whilst ensuring security of supply is
maintained. The expected completion date of the project is
Q4’2018 and the 33kV connection point is from Bousher A
GSS.
Project 2: Upgrading Al Khuwair North (P054) Primary
Substation with 3 x 20 MVA Configuration
MEDC plan to upgrade Al Khuwair North primary substation
in the Al Khuwair Area to provide additional capacity in the
area ensuring security of supply is maintained. The
expected completion date of the project is Q4’2018 and the
33kV connection point is from MSQ A GSS.
Project 3: Upgrading Azaibah North-1 (P011) Primary
Substation with 3 x 20 MVA Configuration
Upgrading Azaibah North-1 primary substation; located in
the Azaiba Area will facilitate the connection of new loads
whilst ensuring security of supply is maintained. The
expected completion date of the project is Q2’2019 and the
33kV connection point is from Ghubrah GSS.
Project 4: Upgrading Al Awabi (P139) Primary Substation
with 3 x 20 MVA Configuration
Upgrading of Al Awabi primary substation is proposed in
Awabi Area to facilitate the transfer of 11kV loads from
nearby heavily loaded primary substations to ensure
security of supply is maintained whilst also addressing the
voltage regulation issues in the area. The expected
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 29
completion date of the project is Q2’2019 and the 33kV
connection point is from Misfah GSS.
Project 5: Qurum-2 (P094) Primary Substation – Upgrading
of 2x16 MVA with 2 x 20 MVA Configuration
Upgrading of Qurum-2 primary substation is proposed in
the Qurum area to replace the existing 16 MVA
transformers with 20 MVA transformers to ensure security
of supply is maintained. The expected completion date of
the project is Q2’2019.
Project 6: New Sarooj-4 (P181) Primary Substation with
3 x 20 MVA Configuration
The new Sarooj-4 primary substation is proposed in the
Sarooj Area to facilitate the connection of new loads and
the transfer of 11kV loads from nearby heavily loaded
primary substations to ensure security of supply is
maintained. The expected completion date of the project is
Q2’2019 and the 33kV connection point is from MSQ A GSS.
Project 7: Upgrading Ghala 1 (P015) Primary Substation
with 3 x 20 MVA Configuration
Upgrading of Ghala 1 primary substation in the Ghala area
is based on a bulk load customer request. The expected
completion date of the project is Q2’2019 and the 33kV
connection point is from Ghala GSS.
Project 8: New Azaibah South (P189) Primary Substation
with 3 x 20 MVA Configuration
The new Azaibah South primary substation is proposed in
the Azaibah area to provide spare capacity in that area
ensuring security of supply is maintained. The expected
completion date of the project is Q2’2020 and the 33kV
connection point is from the new Bousher GSS.
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 30
Zone 3 - (The Western Zone)
The Zone 3 Region includes the Muscat International
Airport, Rusail Industrial Area, Seeb, Mawalleh, Al Khoud
and Mabelah areas. The number of customers served in
the Zone 3 region is 134,204 which is approximately 38 %
of the total customer population.
The following primary projects are projected in the period
2018 to 2020.
Project 1: New Rusail-8 (KOM) (P182) Primary Substation
with 3 x 20 MVA Configuration
Rusail-8 primary substation is proposed in the Rusail Area
to address the bulk load request of KOM. The new primary
substation will also provide additional capacity fo11kV
transfer capacity to enable load to be transferred from
nearby primary substations ensuring security of supply is
maintained. The expected completion date of the project is
Q2’2018 and the 33kV connection point is from Rusail GSS.
Project 2: New Mawaleh South-5 (P148) Primary
Substation with 3 x 20 MVA Configuration
Mawaleh South-5 primary substation is proposed in
Mawalleh Area to facilitate the connection of new loads
and the transfer of 11kV loads from nearby primary
substations to ensure security of supply is maintained. The
expected completion date of the project is Q2’2018 and the
33kV connection point is from Mawaleh South GSS.
Project 3: Upgrading Wadi Al Lawami (P117) Primary
Substation with 3 x 20 MVA Configuration
Upgrading of Wadi Al Lawami primary substation in the
Seeb Area to facilitate the connection of new loads and the
transfer of 11kV loads from nearby heavily loaded primary
substations to ensure security of supply is maintained. The
expected completion date of the project is Q2’2018 and the
33kV connection point is from Seeb Main GSS.
Project 4: Upgrading Mabelah Shabiya (P060) Primary
Substation with 3 x 20 MVA Configuration
MEDC propose to Upgrade Mabelah Shabiya primary
substation in the Mabelah area by replacing the existing
assets, ensuring security of supply is maintained by
providing additional capacity to facilitate 11kV load
transfers from other nearby primary substations. The
expected completion date of the project is Q2’2019 and the
33kV connection point is from Mabelah-2(A’Salam) GSS.
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 31
Project 5: Upgrading Mabelah C (P064) Primary Substation
with 3 x 20 MVA Configuration
Upgrading of Mabelah-C primary substation in the Mabelah
area is proposed to accommodate new loads and facilitate
11kV load transfers in that area whilst ensuring security of
supply is maintained. The expected completion date of the
project is Q2’2019 and the 33kV connection point is from
Mabelah-2 (A’Salam) GSS.
Project 6: Upgrading Mabelah South PH-7 (P141) Primary
Substation with 3 x 20 MVA Configuration
Upgrading of Mabelah South PH-7 primary substation in
the Mabelah area is proposed to accommodate new loads
and facilitate 11kV load transfers in that area whilst
ensuring security of supply is maintained. The expected
completion date of the project is Q2’2019 and the 33kV
connection point is from Mabelah GSS.
Project 7: Upgrading Mabelah A (P063) Primary
Substation with 3 x 20 MVA Configuration
Upgrading of Mabelah-A primary substation in the Mabelah
area is proposed to accommodate new loads and facilitate
11kV load transfers in that area whilst ensuring security of
supply is maintained. The expected completion date of the
project is Q2’2019 and the 33kV connection point is from
Mabelah GSS.
Project 8: New Seeb5 (P186) Primary Substation with
3 x 20 MVA Configuration
The New Seeb primary substation in the Seeb area is
proposed to accommodate new loads and facilitate 11kV
load transfers in that area whilst ensuring security of supply
is maintained. The expected completion date of the project
is Q2’2019 and the 33kV connection point is from Seeb
Main GSS.
Project 9: Upgrading Sur Al Hadid (P116) Primary
Substation with 3 x 20 MVA Configuration
Upgrading of Sur Al Hadid primary substation in the Seeb
area is proposed to accommodate new loads and facilitate
11kV load transfers in that area whilst ensuring security of
supply is maintained. The expected completion date of the
project is Q2’2019 and the 33kV connection point is from
Mabelah GSS.
Project 10: New Al Khoud (P187) Primary Substation with
3 x 20 MVA Configuration
The new Al Khoud primary substation in the Al Khoud area
is proposed to accommodate new loads and facilitate 11kV
load transfers in that area whilst ensuring security of supply
is maintained. The expected completion date of the project
is Q2’2019 and the 33kV connection point is from Seeb GSS.
Project 11: New Mabelah South-9 (P184) Primary
Substation with 3 x 20 MVA Configuration
The new Mabelah South-9 primary substation in the Halban
area is proposed to accommodate new loads and facilitate
11kV load transfers in that area whilst ensuring security of
supply is maintained. The expected completion date of the
project is Q2’2020 and the 33kV connection point is from
Mabelah 2(A’Salam) GSS.
Project 12: New Mabelah South PH 6 (P185) Primary
Substation with 3 x 20 MVA Configuration
The new Mabelah South PH 6 primary substation in the
Mabelah area is proposed to accommodate new loads and
facilitate 11kV load transfers in that area whilst ensuring
security of supply is maintained. The expected completion
date of the project is Q2’2020 and the 33kV connection
point is from Halban GSS.
Project 13: Upgrading Mabelah South (P061) Primary
Substation with 3 x 20 MVA Configuration
Upgrading of Mabelah South primary substation in the
Mabelah area to upgrade the existing assets and improve
the security of supply in the area. The expected completion
date of the project is Q2’2020 and the 33kV connection
point is from Mabelah(A’Salam) GSS.
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 32
A P P E N D I X A : D I S T R I B U T I O N S Y S T E M C A P A B I L I T Y S T A T E M E N T
Distribution Licence Condition 32: Distribution System Capability Statement
1. The Licensee shall, within 12 months of the grant of this Licence, and thereafter, on an annual basis, prepare a statement,
in a form approved by the Authority, showing, in respect of each of the three succeeding financial years, circuit capacity,
forecast power flows and loading on each part of its Distribution System and fault levels for each transmission node,
together with:
a. Information on the status of distribution circuit capacity and the anticipated future requirements of such capacity,
including (i) applications for new connections and (ii) applications to Connect Generation capacity to its Systems;
b. A commentary prepared by the Licensee indicating the Licensee's views as to those parts of its Distribution System
most suited to new Connections and Distribution of further quantities of electricity, including the prospective for
Connection of Systems operated by the Rural Areas Electricity Company SAOC;
c. Information on what constraints are foreseen on the Licensee's Distribution System and where;
d. Information relating to progress of ongoing investment in its Distribution System;
e. Such further information as shall be reasonably necessary to enable any Person seeking to Connect to or use the
Licensee's Distribution System to identify and evaluate the opportunities for so doing;
f. An assessment of technical losses from the Licensee's Distribution System; and
g. Such other matters as shall be specified in directions issued by the Authority from time to time for the purposes of this
Condition, provided that the Authority may, upon application of the Licensee, relieve the Licensee from the obligation
to prepare any such statement in respect of any period and any part or parts of its Distribution System specified in
directions issued to the Licensee by the Authority from time to time for the purposes of this Condition.
2. The Licensee shall include in every statement prepared in accordance with paragraph 1 above the information required by
that paragraph except that the Licensee may with the prior consent of the Authority omit from any such statement any
details as to the capacity, flows, loading or other information, disclosure of which would, in the view of the Authority,
seriously and prejudicially affect the commercial interests of the Licensee or any third party.
3. The Licensee may periodically revise the information set out in and, with the approval of the Authority, alter the form of
the statement prepared in accordance with paragraph 1 and shall, at least once in every year this Licence is in force, revise
such statement in order that the information set out in the statement shall continue to be accurate in all material respects.
4. The Licensee shall, when preparing the statement referred to in paragraph 1 of this Condition, ensure that the statement
takes due account of information required to be provided to it by Persons bound by the Distribution Code.
5. The Licensee shall send a copy of the statement prepared in accordance with paragraph 1 and of each revision of such
statement in accordance with paragraph 3 to the Authority. Each such revision shall require to be approved by the
Authority and shall not become effective until approved by the Authority.
6. The Licensee shall, subject to paragraph 6, give or send a copy of the statement prepared in accordance with paragraph 1
or (as the case may be) of the latest revision of such statement in accordance with paragraph 3 approved by the Authority
pursuant to such paragraph to any Person who requests a copy of such statement.
7. The Licensee may make a charge for any statement given or sent pursuant to paragraph 4 of an amount reflecting the
Licensee's reasonable costs of providing such a statement, which shall not exceed the maximum amount specified in
directions issued by the Authority from time to time for the purposes of this Condition
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 33
A P P E N D I X B : D S S S N O N C O M P L I A N C E S
Zone Primary Substation P-No. TX Config Firm(MVA)8 MW MVAr MVA DNS(MVA)
1 Amerat 1 P005 2 x 16 16 22.9 7.6 24.1 8.1
1 Amerat Heights P152 2 x 20 22 21.9 5.6 22.6 0.6
1 Al Nahdah P006 2 x 20 22 27.2 11.7 29.6 7.6
1 Al Mahaj P136 2 x 6 6 8.0 3.4 8.7 2.7
2 Al Ansab 1 P007 2 x 20 22 23.9 7.0 24.9 2.9
2 Al Khuwair 25 P053 2 x 20 22 21.1 7.4 22.4 0.4
2 Qurum 2 P094 2 x 16 16 16.2 5.0 17.0 1.0
2 Airport Height 1 P001 2 x 20 22 23.7 12.7 26.9 4.9
2 Ghala 1 P015 2 x 20 22 22.1 3.6 22.4 0.4
2 Bousher Grid GP02 2 x 20 22 22.1 9.8 24.2 2.2
2 Al Muna P084 2 x 20 22 31.4 13.5 34.2 12.2
2 MSQ Grid GP06 2 x 20 22 27.1 11.6 29.5 7.5
3 Sultan School P029 2 x 20 22 23.4 10.1 25.5 3.5
3 Al Khoud PH-6 P049 2 x 20 22 26.6 8.8 28.0 6.0
3 Mabelah South PH-4 P062 3 x 20 44 45.8 17.1 48.9 4.9
3 New Al Khoud P047 2 x 20 22 20.6 9.1 22.5 0.5
3 Wadi Al Lawami P117 2 x 20 22 25.0 13.8 28.6 6.6
3 Mabelah A P063 2 x 20 22 25.1 6.6 26.0 4.0
3 Al Hail North 2 P028 2 x 20 22 21.5 8.9 23.3 1.3
3 Al Hail South 1 P030 2 x 20 22 24.1 9.7 26.0 4.0
3 Rusail Private Factory P106 2 x 20 22 22.2 9.8 24.3 2.3
3 Old Mabelah P059 2 x 20 22 21.3 8.8 23.0 1.0
3 Mabelah South PH-7 P141 2 x 20 22 24.7 3.8 25.0 3.0
3 Mabelah Grid GP04 2 x 20 22 23.9 8.9 25.5 3.5
3 Mawaleh A P070 3 x 20 44 43.2 16.2 46.1 2.1
3 Al HailNorth 1 P027 2 x 20 22 21.5 9.2 23.4 1.4
3 Mawaleh C P072 2 x 20 22 20.4 9.1 22.3 0.3
3 Mabelah C P064 2 x 20 22 30.0 12.0 32.3 10.3
3 Rusail Industrial 2 P104 2 x 20 22 23.9 10.2 26.0 4.0
3 Rusail Industrial 1 P103 2 x 16 16 21.7 9.3 23.7 7.7
3 Sur Al Hadid P116 2 x 20 22 24.5 7.6 25.7 3.7
3 Wadi Al Aresh P115 2 x 20 22 30.8 13.2 33.5 11.5
3 Mabelah South P061 2 x 20 22 27.8 11.9 30.2 8.2
8 For all 20 MVA primary stations, AER has allowed an additional 10% to the Firm Capacity [i.e.: For 2x20 MVA TX -22MVA Firm and for 3x20 MVA
TX -44MVA Firm] for the DNS calculation purposes only and not system planning or development.
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 34
Zone Primary Substation P-No. TX Config Firm(MVA)8 MW MVAr MVA DNS(MVA)
3 Mawaleh South Grid GP05 2 x 20 22 23.7 10.2 25.8 3.8
3 Rusail B P101 2 x 10 10 14.8 6.4 16.1 6.1
3 Mabelah Shabiya P060 2 x 20 22 28.3 12.1 30.8 8.8
3 Al Jifnain P042 1 x 6 - 3.1 1.3 3.3 1.7
Total 160.7
MUSCAT ELECTRICITY DISTRIBUTION COMPANY S.A.O.C
MEDC Distribution Capability Statement (2018-2020) – V2.2 35
A P P E N D I X C : S Y S T E M S T U D I E S R E S U L T S
Muscat Electricity Distribution Company S.A.O.C
Falaj P178
Darsait P018
Mutrah Store P085
Jibrooh P041
Seaport P086
P.D.O P144
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Falaj P178 16.0 16.0 16.0 16.0 12.9 80.8 3.1 12.9 80.8 3.1 12.9 80.8 3.1 12.9 80.8 3.1
Darsait P018 20.0 20.0 20.0 20.0 20.2 101.0 -0.2 20.2 101.0 -0.2 20.2 101.0 -0.2 20.2 101.0 -0.2
Mutrah Store P085 20.0 20.0 20.0 20.0 15.9 79.5 4.1 15.9 79.5 4.1 15.9 79.5 4.1 15.9 79.5 4.1
Jibrooh P041 40.0 40.0 40.0 40.0 28.5 71.3 11.5 29.0 72.6 11.0 29.6 74.0 10.4 30.2 75.4 9.8
Seaport P086 6.0 6.0 6.0 6.0 3.4 57.0 2.6 3.4 57.0 2.6 3.4 57.0 2.6 3.4 57.0 2.6
P.D.O P144 60.0 60.0 60.0 60.0 28.4 47.3 31.6 28.4 47.3 31.6 28.4 47.3 31.6 28.4 47.3 31.6
Darsait-A P018
Darsait-B P018
Falaj-A P178
Falaj-B P178
Jibrooh-A P041
Jibrooh-B P041
Jibrooh-C P041
Mutrah Store-A P085
Mutrah Store-B P085
PDO-33 P144
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Falaj-A P178 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 20.4 13.5 20.5 13.6 22.0 13.8 22.1 13.8
Falaj-B P178 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 20.4 13.5 20.5 13.6 22.0 13.8 22.1 13.8
Darsait-A P018 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 19.8 8.2 19.9 8.2 21.3 8.3 21.3 8.3
Darsait-B P018 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 19.8 8.3 19.8 8.3 21.3 8.3 21.3 8.3
Jibrooh-A P041 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 15.2 14.1 15.3 14.2 16.1 11.9 16.1 12.0
Jibrooh-B P041 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 15.3 14.1 15.4 14.2 16.2 11.9 16.2 12.0
Jibrooh-C P041 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 15.3 8.0 15.4 8.0 16.2 6.5 16.2 6.6
Mutrah Store-A P085 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 17.3 14.0 17.3 14.1 18.4 14.3 18.4 14.3
Mutrah Store-B P085 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 17.3 14.0 17.3 14.1 18.4 14.3 18.4 14.3
PDO-A P144 25.0 25.0 25.0 25.0 - - - - 18.4 - 18.4 - 19.6 - 19.7 -
PDO-B P144 25.0 25.0 25.0 25.0 - - - - 18.3 - 18.4 - 19.6 - 19.7 -
PDO-C P144 25.0 25.0 25.0 25.0 - - - - 18.3 - 18.4 - 19.6 - 19.6 -
PDO-D P144 25.0 25.0 25.0 25.0 - - - - 18.3 - 18.4 - 19.6 - 19.6 -
Seaport-A P086 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 8.0 4.2 8.1 4.2 8.3 4.2 8.3 4.2
Seaport-B P086 - - - - 18.4 18.4 18.4 18.4 - 4.2 - 4.2 - 4.2 - 4.2
MVAr
11.9 5.1 11.9 5.1 11.9 5.1 11.9 5.1
MVAr MW MVAr MW MVAr MW
Al Falaj Grid Network Results
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW
26.1 11.2
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
26.1 11.2 26.1 11.2 26.1 11.2
29.3 7.1
3.1 1.3 3.1 1.3 3.1 1.3 3.1 1.3
27.7 6.7 28.2 6.8 28.8 7.0
19.5 5.3
14.2 7.2 14.2 7.2 14.2 7.2 14.2 7.2
19.5 5.3 19.5 5.3 19.5 5.3
101.6
99.4 101.9 99.4 101.9 99.3 101.8 99.3 101.7
101.5 99.3 101.5
99.4 101.7 99.4 101.7 99.3 101.6 99.3
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
99.4 101.6 99.4 101.6 99.3
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
99.1 100.9
99.3 101.1 99.2 101.0 99.2 101.0 99.1 100.9
99.3 101.1 99.2 101.0 99.2 101.0
98.7 100.5
98.9 101.3 98.8 101.3 98.7 100.3 98.7 100.2
98.9 101.6 98.8 101.5 98.7 100.6
99.3 101.7
99.1 101.6 99.1 101.5 99.0 100.6 99.0 100.5
99.4 101.9 99.4 101.9 99.3 101.8
2020
99.2 101.5
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
99.3 101.6 99.3 101.6 99.2 101.5
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 10.4 10.4 10.4 10.4
22.0 22.0 22.0 22.0 10.3 10.3 10.3 10.3
22.0 22.0 22.0 22.0 6.6 6.6 6.6 6.6
22.0 22.0 22.0 22.0 6.6 6.6 6.6 6.6
22.0 22.0 22.0 22.0 9.7 9.9 10.1 10.3
22.0 22.0 22.0 22.0 19.4 19.7 20.3 20.7
22.0 22.0 22.0 22.0 8.2 8.2 8.2 8.2
22.0 22.0 22.0 22.0 8.1 8.1 8.1 8.1
22.0 22.0 22.0 22.0 7.1 7.1 7.1 7.1
22.0 22.0 22.0 22.0 7.1 7.1 7.1 7.1
22.0 22.0 22.0 22.0 7.1 7.1 7.1 7.1
22.0 22.0 22.0 22.0 7.1 7.1 7.1 7.1
22.0 22.0 22.0 22.0 3.4 3.4 3.4 3.4
%Loading %Loading
Darsait-A-P018 47.2% 47.2% 47.2% 47.2%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
Mutrah Store-B-P085 36.8% 36.8% 36.8% 36.8%
PDO-A-P144 32.1% 32.1% 32.1% 32.1%
Jibrooh-B-P041 88.0% 89.7% 92.4% 94.3%
Mutrah Store-A-P085 37.1% 37.1% 37.1% 37.1%
Falaj-B-P178 29.9% 29.9% 29.9% 29.9%
Jibrooh-A-P041 44.3% 45.1% 46.1% 47.0%
Darsait-B-P018 46.7% 46.7% 46.7% 46.7%
Falaj-A-P178 30.2% 30.2% 30.2% 30.2%
PDO-D-P144 32.1% 32.1% 32.1% 32.1%
Seaport-A-P086 15.4% 15.4% 15.4% 15.4%
PDO-B-P144 32.1% 32.1% 32.1% 32.1%
PDO-C-P144 32.1% 32.1% 32.1% 32.1%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
C.B.D P173
Ruwi Office P108
M.O.D P143
Bait Al Falaj P142
Riyam P099
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
C.B.D P173 32.0 32.0 32.0 32.0 25.1 78.4 6.9 25.1 78.4 6.9 25.1 78.4 6.9 25.1 78.4 6.9
Ruwi Office P108 20.0 20.0 20.0 20.0 17.8 89.0 2.2 16.5 82.6 3.5 16.8 84.2 3.2 17.2 85.8 2.8
M.O.D P143 1TX 1TX 1TX 1TX 5.1 - - 5.1 - - 5.1 - - 5.1 - -
Bait Al Falaj P142 40.0 40.0 40.0 40.0 20.0 50.0 20.0 18.6 46.6 21.4 18.6 46.6 21.4 18.6 46.6 21.4
Riyam P099 20.0 20.0 20.0 20.0 17.4 87.0 2.6 17.3 86.4 2.7 17.3 86.4 2.7 17.3 86.4 2.7
Bait Al Falaj-A P142
Bait Al Falaj-B P142
Bait Al Falaj-C P142
C.B.D-A P173
C.B.D-B P173
C.B.D-C P173
M.O.D-A P143
Riyam-A P099
Riyam-B P099
Ruwi Office-A P108
Ruwi Office-B P108
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Bait Al Falaj-A P142 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 16.4 14.0 16.4 13.9 17.4 14.1 17.4 14.1
Bait Al Falaj-B P142 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 17.9 14.0 17.9 13.9 19.1 14.1 19.1 14.1
Bait Al Falaj-C P142 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 17.9 8.0 17.9 7.9 19.1 8.0 19.1 8.0
C.B.D-A P173 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 21.7 14.5 21.7 14.5 23.4 14.8 23.4 14.8
C.B.D-B P173 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 21.7 14.5 21.7 14.5 23.5 14.8 23.5 14.8
C.B.D-C P173 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 21.7 7.9 21.7 7.9 23.4 8.0 23.4 8.0
M.O.D -A P143 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 19.5 5.0 19.5 5.0 20.9 5.0 20.9 5.0
Riyam-A P099 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 7.8 12.3 7.8 12.2 8.0 12.4 8.0 12.4
Riyam-B P099 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 7.8 12.3 7.8 12.2 8.0 12.4 8.0 12.4
Ruwi Office-A P108 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 18.7 14.4 18.7 14.3 19.9 14.5 19.9 14.6
Ruwi Office-B P108 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 18.7 14.4 18.7 14.3 19.9 14.5 19.9 14.6
MW MVAr MW MVAr MW MVAr
Muttrah Grid Network Results
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
16.4 5.4
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
16.4 5.8 16.4 5.4 16.4 5.4
4.7 2.0
17.7 9.3 17.7 5.8 17.7 5.8 17.7 5.8
4.7 2.0 4.7 2.0 4.7 2.0
20.8 14.0
15.4 8.9 15.7 5.2 16.0 5.3 16.3 5.4
20.8 14.0 20.8 14.0 20.8 14.0
103.7
100.0 102.1 100.6 103.6 100.6 103.6 100.6 103.5
103.7 100.5 103.7
100.0 102.3 100.6 103.7 100.6 103.7 100.6
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
99.9 102.3 100.5 103.7 100.5
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
99.5 101.9
98.9 101.1 99.5 101.9 99.5 101.9 99.5 101.9
98.9 101.1 99.5 101.9 99.5 101.9
100.7 102.3
100.1 101.9 100.6 102.5 100.6 102.5 100.6 102.5
100.1 101.7 100.7 102.3 100.7 102.3
100.7 101.5
100.1 100.9 100.7 101.5 100.7 101.5 100.7 101.5
100.1 100.9 100.7 101.5 100.7 101.5
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
100.6 103.0
100.0 101.2 100.6 103.1 100.6 103.0 100.6 103.0
100.0 101.2 100.6 103.1 100.6 103.0
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 6.5 6.0 6.0 6.0
22.0 22.0 22.0 22.0 6.7 6.2 6.2 6.2
22.0 22.0 22.0 22.0 7.3 6.8 6.8 6.8
22.0 22.0 22.0 22.0 9.3 9.3 9.3 9.3
22.0 22.0 22.0 22.0 9.3 9.3 9.3 9.3
22.0 22.0 22.0 22.0 7.4 7.4 7.4 7.4
15.4 15.4 15.4 15.4 8.9 8.8 8.8 8.8
15.4 15.4 15.4 15.4 9.0 8.9 8.9 8.9
22.0 22.0 22.0 22.0 9.2 8.5 8.6 8.8
22.0 22.0 22.0 22.0 9.2 8.4 8.6 8.8
22.0 22.0 22.0 22.0 5.2 5.2 5.2 5.2
%Loading
Bait Al Falaj-A-P142 29.7% 27.5% 27.5% 27.5%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Riyam-B-P099 58.2% 57.7% 57.7% 57.7%
Ruwi Office-A-P108 41.9% 38.4% 39.2% 39.9%
C.B.D-C-P173 33.6% 33.6% 33.6% 33.6%
Riyam-A-P099 57.8% 57.3% 57.3% 57.3%
C.B.D-A-P173 42.2% 42.2% 42.2% 42.2%
C.B.D-B-P173 42.2% 42.2% 42.2% 42.2%
Bait Al Falaj-B-P142 30.3% 28.0% 28.0% 28.0%
Bait Al Falaj-C-P142 33.4% 30.8% 30.8% 30.8%
Ruwi Office-B-P108 41.8% 38.3% 39.0% 39.8%
M.O.D-A-P143 23.7% 23.6% 23.6% 23.6%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
M.B.D. South P075
Qasr Al Alam P090
Waljah P130
Sidab P119
Wadi Al Kabir Workshop P126
Wadi Al Kabir Housing P127
Ali Shihani P125
Majlis Oman P066
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
M.B.D. South P075 20.0 20.0 20.0 20.0 17.4 87.0 2.6 17.5 87.7 2.5 17.7 88.4 2.3 17.8 89.1 2.2
Qasr Al Alam P090 20.0 20.0 20.0 20.0 18.4 92.0 1.6 18.4 92.0 1.6 18.4 92.1 1.6 18.4 92.1 1.6
Waljah P130 20.0 20.0 20.0 20.0 18.9 94.5 1.1 19.3 96.3 0.7 19.6 98.1 0.4 20.0 100.0 0.0
Sidab P119 6.0 6.0 6.0 6.0 3.4 57.5 2.6 3.4 57.5 2.6 3.4 57.5 2.6 3.4 57.5 2.6
Wadi Al Kabir
WorkshopP126 6.0 6.0 6.0 6.0 3.7 61.0 2.3 3.7 61.0 2.3 3.7 61.0 2.3 3.7 61.0 2.3
Wadi Al Kabir
HousingP127 1TX 1TX 1TX 1TX 2.5 - - 2.5 - - 2.5 - - 2.5 - -
Ali Shihani P125 20.0 20.0 20.0 20.0 13.1 65.5 6.9 12.3 61.5 7.7 12.4 62.0 7.6 12.5 62.5 7.5
Majlis Oman P066 20.0 20.0 20.0 20.0 4.3 21.5 15.7 4.3 21.7 15.7 4.4 21.8 15.6 4.4 22.0 15.6
Ali Shihani-A P125
Ali Shihani-B P125
M.B.D. South-A P075
M.B.D. South-B P075
Majlis Oman-A P066
Majlis Oman-B P066
Qasr al Alam-A P090
Qasr al Alam-B P090
Sidab-A P119
Sidab-B P119
Wadi Al Kabir
Housing-AP127
Wadi Al Kabir
Workshop-AP126
Wadi Al Kabir
Workshop-BP126
Walja-A P130
Walja-B P130
17.3 4.2
17.6 5.4 17.6 5.4 17.6 5.4 17.6 5.4
16.9 4.1 17.0 4.2 17.2 4.2
MW MVAr MW MVAr MW MVAr
WadiKabir-A Grid Network Results
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
11.9 3.9
4.2 0.9 4.2 0.9 4.3 0.9 4.3 0.9
11.6 6.1 11.7 3.8 11.8 3.9
3.4 1.4
2.3 1.0 2.3 1.0 2.3 1.0 2.3 1.0
3.4 1.4 3.4 1.4 3.4 1.4
20.0 0.0
3.2 1.4 3.2 1.4 3.2 1.4 3.2 1.4
18.9 0.0 19.3 0.0 19.6 0.0
105.2 102.0 105.2
101.9 104.3 102.1 105.2 102.1 105.2 102.0
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
101.9 104.3 102.1 105.2 102.1
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
101.9 103.0
101.1 103.5 101.2 103.7 101.2 103.7 101.2 103.7
101.7 103.0 101.9 103.0 101.9 103.0
101.9 104.9
101.7 103.0 101.9 103.0 101.9 103.0 101.9 103.0
101.8 104.8 102.0 104.9 102.0 104.9
105.2
101.8 104.8 102.0 104.9 102.0 104.9 101.9 104.9
101.9 105.6
- 105.4 - 105.6 - 105.5 - 105.5
101.7 105.4 101.9 105.6 101.9 105.6
101.7 105.5
101.8 105.1 101.9 105.3 101.9 105.3 101.9 105.2
101.5 105.4 101.7 105.5 101.7 105.5
101.2 103.7
101.5 105.4 101.7 105.5 101.7 105.5 101.7 105.5
101.1 103.5 101.2 103.7 101.2 103.7
101.9 103.0
101.8 103.0 101.9 103.0 101.9 103.0 101.9 103.0
101.8 103.0 101.9 103.0 101.9 103.0
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Ali Shihani-A P125 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 19.9 14.1 20.0 14.0 21.3 14.2 21.3 14.2
Ali Shihani-B P125 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 19.9 14.1 20.0 14.0 21.3 14.2 21.4 14.2
M.B.D. South-A P075 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 18.1 14.7 18.1 14.7 19.2 14.9 19.2 14.9
M.B.D. South-B P075 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 18.0 14.7 18.1 14.7 19.2 14.9 19.2 14.9
Majlis Oman-A P066 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 7.5 10.9 7.5 10.9 7.7 11.1 7.7 11.1
Majlis Oman-B P066 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 7.5 10.9 7.5 10.9 7.7 11.1 7.7 11.1
Qasr al Alam-A P090 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 9.2 12.9 9.2 12.9 9.5 13.1 9.5 13.1
Qasr al Alam-B P090 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 9.2 12.9 9.2 12.9 9.5 13.1 9.5 13.1
Sidab-A P119 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 9.8 8.0 9.8 8.0 10.1 8.0 10.1 8.0
Sidab-B P119 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 9.8 8.0 9.8 8.0 10.1 8.0 10.1 8.0
Wadi Al Kabir
HousingP127 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 15.4 4.6 15.4 4.6 16.2 4.6 16.2 4.6
Wadi Al Kabir
Workshop-AP126 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 15.6 4.6 15.6 4.6 16.4 4.6 16.4 4.6
Wadi Al Kabir
Workshop-BP126 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 16.5 4.4 15.1 4.4 15.8 4.4 15.8 4.4
Walja-A P130 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 16.5 14.2 15.1 14.3 15.8 14.6 15.8 14.6
Walja-B P130 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 15.9 14.2 15.5 14.3 16.3 14.6 16.3 14.6
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 6.6 6.2 6.2 6.3
22.0 22.0 22.0 22.0 6.7 6.2 6.3 6.3
22.0 22.0 22.0 22.0 8.8 8.9 9.0 9.0
22.0 22.0 22.0 22.0 8.9 8.9 9.0 9.1
22.0 22.0 22.0 22.0 2.1 2.2 2.2 2.2
22.0 22.0 22.0 22.0 2.2 2.2 2.2 2.2
22.0 22.0 22.0 22.0 9.7 9.7 9.7 9.7
15.4 15.4 15.4 15.4 11.0 11.2 11.4 11.6
15.4 15.4 15.4 15.4 10.0 10.2 10.4 10.6
22.0 22.0 22.0 22.0 9.4 9.4 9.4 9.4
22.0 22.0 22.0 22.0 9.4 9.4 9.4 9.4
%Loading
Ali Shihani-F1-P125 30.2% 28.2% 28.4% 28.6%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
Qasr al Alam-F1OHL-P090 71.2% 72.6% 74.1% 75.6%
Qasr al Alam-F2OHL-P090 65.1% 66.4% 67.7% 69.1%
Majlis Oman-F2-P066 9.8% 9.9% 10.0% 10.1%Muscat 01 Fdr-WorkshopP126,
SidabP119 & WK Housing44.2% 44.2% 44.2% 44.2%
M.B.D. South-F2-P075 40.3% 40.6% 40.9% 41.2%
Majlis Oman-F1-P066 9.7% 9.8% 9.9% 10.0%
Ali Shihani-F2-P125 30.4% 28.3% 28.6% 28.8%
M.B.D. South-F1-P075 40.1% 40.4% 40.7% 41.1%
Walja-F1-P130 42.8% 42.8% 42.8% 42.9%
Walja-F2-P130 42.9% 42.9% 42.9% 42.9%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Ruwi Valley P174
Ruwi Market P076
Old Airport P107
Wadi Al Kabir Height P128
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Ruwi Valley P174 20.0 20.0 20.0 20.0 19.8 98.9 0.2 19.9 99.6 0.1 20.1 100.4 -0.1 20.2 101.2 -0.2
Ruwi Market P076 20.0 20.0 20.0 20.0 16.9 84.5 3.1 17.2 86.1 2.8 17.6 87.8 2.4 17.9 89.4 2.1
Old Airport P107 20.0 20.0 20.0 20.0 20.4 102.0 -0.4 20.8 103.9 -0.8 21.2 105.9 -1.2 21.6 108.0 -1.6
Wadi Al Kabir Height P128 20.0 20.0 20.0 20.0 14.1 70.5 5.9 14.2 71.1 5.8 14.3 71.6 5.7 14.4 72.2 5.6
Old Airport-A P107
Old Airport-B P107
Ruwi Market-A P076
Ruwi Market-B P076
Ruwi Valley-A P174
Ruwi Valley-B P174
Wadi Al Kabir Height-
AP128
Wadi Al Kabir Height-
BP128
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Old Airport-A P107 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 16.6 8.2 16.7 8.3 17.6 8.4 17.7 8.4
Old Airport-B P107 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 16.6 8.3 16.7 8.3 17.6 8.4 17.6 8.4
Ruwi Market-A P076 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 17.9 14.5 18.0 14.5 19.1 14.8 19.2 14.8
Ruwi Market-B P076 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 17.9 14.5 18.0 14.5 19.1 14.8 19.1 14.8
Ruwi Valley-A P174 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 20.7 14.7 20.8 14.7 22.3 8.1 22.4 8.1
Ruwi Valley-B P174 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 20.7 14.7 20.8 14.7 22.3 8.5 22.3 8.5
Wadi Al Kabir Height -
AP128 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 14.3 13.6 14.4 13.6 15.1 13.8 15.1 13.8
Wadi Al Kabir Height -
BP128 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 14.3 13.6 14.4 13.6 15.1 13.8 15.1 13.8
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 11.0 11.2 11.4 11.6
22.0 22.0 22.0 22.0 10.0 10.2 10.4 10.6
22.0 22.0 22.0 22.0 8.6 8.8 9.0 9.2
22.0 22.0 22.0 22.0 8.7 8.9 9.0 9.2
22.0 22.0 22.0 22.0 10.2 10.3 8.4 8.5
22.0 22.0 22.0 22.0 10.2 10.3 12.3 12.4
22.0 22.0 22.0 22.0 7.1 7.1 7.2 7.2
22.0 22.0 22.0 22.0 7.1 7.2 7.3 7.3
18.6 8.0
15.4 7.0 15.7 7.1 16.0 7.2 16.3 7.4
18.2 7.8 18.3 7.9 18.5 7.9
MW MVAr MW MVAr MW MVAr
WadiKabir-B Grid Network ResultsPrimary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
101.1 101.8 101.1 101.6 101.0
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
18.5 11.1
13.5 4.1 13.6 4.1 13.7 4.1 13.8 4.2
17.5 10.5 17.8 10.7 18.2 10.9
101.1 103.0
101.4 103.0 101.4 102.9 101.3 103.5 101.3 103.4
101.3 103.3 101.2 103.2 101.2 103.1
101.8
101.3 103.3 101.2 103.2 101.2 103.1 101.1 103.0
101.5 101.0 101.3
101.2 102.2 101.1 102.1 101.1 102.0 101.0
2020
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
101.0 103.9
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
101.2 104.2 101.1 104.1 101.1 104.0
101.3 102.2
101.2 104.2 101.1 104.1 101.1 104.0 101.0 103.9
101.4 103.0 101.4 102.9 101.3 102.2
Ruwi Valley-F2-P174 46.3% 46.7% 56.0% 56.4%Wadi Al Kabir Height 1-F1-
P12832.0% 32.3% 32.6% 32.8%
Ruwi Market-F2-P076 39.5% 40.2% 41.0% 41.8%
Ruwi Valley-F1-P174 46.3% 46.7% 38.3% 38.6%
Old Airport-F2-P107 45.6% 46.5% 47.4% 48.4%
Ruwi Market-F1-P076 39.2% 40.0% 40.8% 41.6%
%Loading %Loading
Old Airport-F1-P107 49.8% 50.8% 51.9% 52.9%
Wadi Al Kabir Height 1-F2-
P12832.5% 32.8% 33.0% 33.3%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Amerat 1 P005
Qantab P089
Al Bustan Palace P017
Al Hamryah P035
Wadi Adai P175
Wattaya P131
Khoula Hospital P132
Al Mahaj P136
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Amerat 1 P005 16.0 16.0 16.0 16.0 24.1 150.6 -8.1 19.7 122.9 -3.7 12.4 77.7 3.6 13.7 85.8 2.3
Qantab P089 1TX 1TX 1TX 1TX 0.0 - - 0.0 - - 0.0 - - 0.0 - -
Al Bustan Palace P017 16.0 16.0 16.0 16.0 4.4 27.4 11.6 4.4 27.4 11.6 4.4 27.4 11.6 4.4 27.4 11.6
Al Hamryah P035 20.0 20.0 20.0 20.0 14.2 71.0 5.8 14.2 71.0 5.8 14.2 71.0 5.8 14.2 71.0 5.8
Wadi Adai P175 20.0 20.0 20.0 20.0 20.1 100.3 -0.1 20.1 100.3 -0.1 20.1 100.3 -0.1 20.1 100.3 -0.1
Wattaya P131 20.0 20.0 20.0 20.0 17.2 86.0 2.8 17.2 86.0 2.8 17.2 86.0 2.8 17.2 86.0 2.8
Khoula Hospital P132 40.0 40.0 40.0 40.0 21.6 54.0 18.4 20.2 50.5 19.8 20.2 50.5 19.8 20.2 50.5 19.8
Al Mahaj P136 6.0 6.0 6.0 6.0 8.7 144.5 -2.7 4.3 71.1 1.7 4.3 71.1 1.7 4.3 71.1 1.7
Al Bustan Palace-A P017
Al Bustan Palace-B P017
Al Hamryah-A P035
Al Hamryah-B P035
Al Mahaj-A P136
Al Mahaj-B P136
Amerat 1-A P005
Amerat 1-B P005
Khoula Hospital-A P132
Khoula Hospital-B P132
Khoula Hospital-C P132
Qantab P089
Wadi Adai-A P175
Wadi Adai-B P175
Wattaya-A P131
Wattaya-B P131
3.9 13.0 4.3
0.0 0.0 0.0 0.0 0.0 0.0 0.0
MVAr MW MVAr MW MVAr
22.9 7.5 18.7 6.1 11.8
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr MW
Wadi Adai Grid Network Results
14.5 9.3
19.2 9.9 19.2 6.3 19.2 6.3 19.2 6.3
14.5 9.3 14.5 9.3 14.5 9.3
12.7 6.4
18.4 7.9 18.4 7.9 18.4 7.9 18.4 7.9
12.7 6.4 12.7 6.4 12.7 6.4
0.0
4.0 1.7 4.0 1.7 4.0 1.7 4.0 1.7
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
98.2 102.1 99.0 102.9 99.3
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
3.9 1.7
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
8.0 3.4 3.9 1.7 3.9 1.7
99.3 101.4
95.6 97.5 98.1 101.4 98.4 101.8 98.4 101.7
98.3 100.3 99.0 101.1 99.4 101.5
103.2
98.3 100.3 99.0 101.1 99.3 101.5 99.3 101.4
103.3 99.2 103.2
98.4 102.1 99.2 102.9 99.5 103.3 99.4
99.5 102.3
98.4 100.4 99.2 102.1 99.5 102.4 99.5 102.3
98.4 100.3 99.2 102.0 99.5 102.4
98.7 101.3
98.4 100.3 99.2 102.0 99.5 102.4 99.5 102.3
95.9 95.4 97.9 99.6 98.8 101.7
- 101.7
97.3 99.4 97.9 99.6 98.8 101.7 98.7 101.3
- 97.5 - 101.4 - 101.8
99.5 100.598.5 99.4 99.2 100.3 99.6 100.6
99.7 101.1
98.5 99.4 99.2 100.3 99.6 100.6 99.5 100.5
98.7 100.0 99.4 100.8 99.7 101.2
99.3 103.8
98.6 100.0 99.4 100.8 99.7 101.2 99.7 101.1
98.3 102.7 99.0 103.5 99.3 103.9
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Bustan Palace-A P017 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 4.9 9.1 4.9 9.1 5.0 9.1 5.0 9.2
Al Bustan Palace-B P017 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 4.9 9.1 4.9 9.1 5.0 9.1 5.0 9.2
Al Hamryah-A P035 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 13.0 13.5 12.9 13.4 13.4 13.6 13.4 13.6
Al Hamryah-B P035 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 13.0 13.5 13.0 13.4 13.5 13.6 13.5 13.6
Al Mahaj-A P136 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 3.8 3.7 3.7 3.4 3.7 3.4 3.7 3.4
Al Mahaj-B P136 - - - - 16.0 16.0 16.0 16.0 - 3.7 - 3.5 - 3.5 - 3.5
Amerat 1-A P005 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 6.6 6.3 7.2 11.9 7.2 11.3 7.3 11.4
Amerat 1-B P005 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 6.8 7.0 7.2 11.9 7.3 11.3 7.3 11.4
Khoula Hospital-A P132 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 15.8 13.8 15.7 13.7 16.4 13.9 16.4 13.9
Khoula Hospital-B P132 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 15.8 13.8 15.7 13.7 16.4 13.9 16.4 13.9
Khoula Hospital-C P132 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 16.4 7.7 16.3 7.7 17.1 7.7 17.1 7.7
Qantab P089 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 4.2 3.4 4.2 3.4 4.2 3.4 4.2 3.4
Wadi Adai-A P175 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 22.2 15.0 22.0 15.0 23.5 15.2 23.6 15.2
Wadi Adai-B P175 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 22.2 15.0 22.0 15.0 23.6 15.2 23.6 15.2
Wattaya-A P131 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 18.3 14.3 18.2 14.3 19.2 14.5 19.2 14.5
Wattaya-B P131 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 18.2 14.3 18.1 14.3 19.1 14.5 19.2 14.5
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 1.8 1.8 1.8 1.8
22.0 22.0 22.0 22.0 2.4 2.4 2.4 2.4
15.4 15.4 15.4 15.4 7.3 7.3 7.3 7.3
15.4 15.4 15.4 15.4 7.3 7.3 7.3 7.3
15.4 15.4 15.4 15.4 8.7 10.2 6.3 7.0
15.4 15.4 15.4 15.4 16.5 10.1 6.3 6.9
22.0 22.0 22.0 22.0 9.0 4.2 4.2 4.2
22.0 22.0 22.0 22.0 7.4 6.9 6.9 6.9
22.0 22.0 22.0 22.0 7.4 6.8 6.8 6.8
22.0 22.0 22.0 22.0 7.3 6.8 6.8 6.8
22.0 22.0 22.0 22.0 10.4 10.3 10.3 10.3
22.0 22.0 22.0 22.0 10.4 10.4 10.4 10.4
22.0 22.0 22.0 22.0 8.9 8.9 8.9 8.9
22.0 22.0 22.0 22.0 8.9 8.9 8.9 8.9
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
Al Hamryah-F2-P035 47.2% 47.1% 47.1% 47.1%
Amerat 1-F1-P005 56.3% 66.3% 41.0% 45.5%
Al Bustan Palace-F2-P017 11.1% 11.1% 11.1% 11.1%
Al Hamryah-F1-P035 47.2% 47.2% 47.2% 47.2%
%Loading %Loading
Al Bustan Palace-F1-P017 8.3% 8.3% 8.3% 8.3%
2020
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
Wadi Adai-F2-P175 47.1% 47.1% 47.1% 47.1%
Wattaya-F1-P131 40.3% 40.3% 40.3% 40.3%
Khoula Hospital-F3-P132 33.4% 31.0% 31.0% 31.0%
Wadi Adai-F1-P175 47.1% 47.0% 47.0% 47.0%
Khoula Hospital-F1-P132 33.7% 31.3% 31.3% 31.3%
Khoula Hospital-F2-P132 33.5% 31.1% 31.1% 31.1%
Amerat 1-F2-P005 107.3% 65.3% 40.6% 45.0%
Interlink Fdr Al Mahaj-F1-P136-OD 41.0% 19.3% 19.3% 19.3%
Wattaya-F2-P131 40.4% 40.3% 40.3% 40.3%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Sawaqim 1 P112
Sawaqim 2 P113
Tunis Heium P137
Jahloot P040
Siya P120
Barr Al Jissah P044
Al Masarat P068
Al Hajir P031
Al Hajir (Upgrade) P031
Wadi Al Mayh P129
Hussan Yiti P169
Debah P114
ROP Al Saleel P162
Al Atkiya P182
Arqi P121
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Sawaqim 1 P112 6.0 6.0 6.0 6.0 5.4 89.5 0.6 5.4 89.5 0.6 5.4 89.5 0.6 5.4 89.5 0.6
Sawaqim 2 P113 1TX 1TX 1TX 1TX 0.6 - - 0.6 - - 0.6 - - 0.6 - -
Tunis Heium P137 1TX 1TX 1TX 1TX 4.8 - - 4.8 - - 4.8 - - 4.8 - -
Jahloot P040 6.0 6.0 6.0 6.0 3.5 59.1 2.5 3.5 59.1 2.5 3.5 59.1 2.5 3.5 59.1 2.5
Siya P120 6.0 6.0 6.0 6.0 2.5 41.0 3.5 2.5 41.0 3.5 2.5 41.0 3.5 2.5 41.0 3.5
Barr Al Jissah P044 20.0 20.0 20.0 20.0 7.2 36.0 12.8 7.2 35.8 12.8 7.2 35.8 12.8 7.2 35.8 12.8
Al Masarat P068 10.0 10.0 10.0 10.0 4.3 42.6 5.7 4.1 41.2 5.9 4.1 41.2 5.9 4.1 41.2 5.9
Al Hajir P031 6.0 - - - 6.1 101.3 -0.1 - - - - - - - - -
Al Hajir (Upgrade) P031 - 20.0 20.0 20.0 - - - 5.9 29.4 14.1 5.9 29.4 14.1 5.9 29.4 14.1
Wadi Al Mayh P129 1TX 1TX 1TX 1TX 2.0 - - 2.0 - - 2.0 - - 2.0 - -
Hussan Yiti P169 6.0 6.0 6.0 6.0 0.9 14.6 5.1 0.9 14.6 5.1 0.9 14.6 5.1 0.9 14.6 5.1
Debah P114 1TX 1TX 1TX 1TX 0.1 - - 0.1 - - 0.1 - - 0.1 - -
ROP Al Saleel P162 - 6.0 6.0 6.0 - - - 4.5 74.6 1.5 4.5 74.6 1.5 4.5 74.6 1.5
Al Atkiya P182 1TX 1TX 1TX 1TX 4.5 - - 4.5 - - 4.5 - - 4.5 - -
Arqi P121 1TX 1TX 1TX 1TX 1.0 - - 1.0 - - 1.0 - - 1.0 - -
2.1 4.9 2.1
0.6 0.3 0.6 0.3 0.6 0.3 0.6
MVAr MW MVAr MW MVAr
4.9 2.1 4.9 2.1 4.9
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr MW
Jahloot Grid Network Results
6.8 2.2
3.9 1.7 3.9 1.3 3.9 1.3 3.9 1.3
6.8 2.4 6.8 2.2 6.8 2.2
3.3 1.4
2.3 1.0 2.3 1.0 2.3 1.0 2.3 1.0
3.3 1.4 3.3 1.4 3.3 1.4
0.3
4.4 1.9 4.4 1.9 4.4 1.9 4.4 1.9
0.1 0.0
- - 4.3 1.4 4.3 1.4 4.3 1.4
0.1 0.0 0.1 0.0 0.1 0.0
1.8 0.8
0.8 0.3 0.8 0.3 0.8 0.3 0.8 0.3
1.8 0.8 1.8 0.8 1.8 0.8
- -
- - 5.6 1.8 5.6 1.8 5.6 1.8
5.6 2.4 - - - -
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
4.1 1.8
0.9 0.4 0.9 0.4 0.9 0.4 0.9 0.4
4.1 1.8 4.1 1.8 4.1 1.8
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Al Atkiya-A P182
Al Masarat-A P068
Al Masarat-B P068
Arqi-A P121
Bar Al Jissah 1-A P044
Bar Al Jissah 1-B P044
Debha-A P114
Hajir 1-A P031
Hajir 1-B P031
Hussan Yitti-A P169
Hussan Yitti-B P169
Jahloot 1-A- P040
Jahloot 1-B P040
ROP Al Saleel-A P162
ROP Al Saleel-B P162
Sawaqim 1-A P112
Sawaqim 1-B P112
Sawaqim 2-A P113
Siya 1-A P120
Siya 1-B P120
Tunis-A P137
Wadi Meih 1-A P129
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Atkiya-A P182 21.9 21.9 21.9 21.9 16.0 16.0 16.0 16.0 2.8 3.3 2.8 3.3 2.8 3.3 2.8 3.3
Al Masarat-A P068 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 17.2 10.8 17.3 10.8 17.7 10.9 17.7 10.9
Al Masarat-B P068 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 17.2 10.8 17.4 10.8 17.8 10.9 17.8 10.9
Arqi-A P121 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 2.2 2.0 2.2 2.0 2.2 2.0 2.2 2.0
Bar Al Jissah 1-A P044 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 2.9 6.1 2.9 6.1 2.9 6.1 2.9 6.1
Bar Al Jissah 1-B P044 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 2.8 6.1 2.8 6.1 2.9 6.1 2.9 6.1
Debha-A P114 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 1.4 2.3 1.4 2.3 1.4 2.3 1.4 2.3
Hajir 1-A P031 16.0 25.0 25.0 25.0 16.0 25.0 25.0 25.0 3.2 3.4 12.4 11.6 12.5 11.7 12.5 11.7
Hajir 1-B P031 16.0 25.0 25.0 25.0 16.0 25.0 25.0 25.0 3.2 3.4 12.4 11.6 12.5 11.7 12.5 11.7
Hussan Yitti-A P169 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 3.1 3.1 3.1 3.1 3.1 3.1 3.1 3.1
Hussan Yitti-B P169 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 3.1 3.1 3.1 3.1 3.1 3.1 3.1 3.1
Jahloot 1-A P040 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 7.3 4.2 7.3 4.2 7.4 4.2 7.4 4.2
Jahloot 1-B P040 16.0 16.0 16.0 16.0 16.0 16.0 16.0 16.0 7.3 4.1 7.3 4.1 7.4 4.1 7.4 4.1
ROP Al Saleel-A P162 - 25.0 25.0 25.0 - 25.0 25.0 25.0 1.9 3.4 2.0 3.8 2.1 3.8 2.1 3.8
ROP Al Saleel-B P162 - 25.0 25.0 25.0 - 25.0 25.0 25.0 1.9 3.4 2.0 3.8 2.1 3.8 2.1 3.8
Sawaqim 1-A P112 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 2.2 4.2 2.2 4.3 2.2 4.3 2.2 4.3
Sawaqim 1-B P112 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 2.2 4.2 2.2 4.3 2.2 4.3 2.2 4.3
Sawaqim 2-A P113 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 1.9 2.6 2.0 2.7 2.0 2.7 2.0 2.7
Siya 1-A P120 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 2.9 4.5 2.9 4.5 2.9 4.5 2.9 4.5
Siya 1-B P120 - - - - 16.0 16.0 16.0 16.0 - 4.5 - 4.5 - 4.5 - 4.5
Tunis-A P137 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 8.7 4.5 8.7 4.5 8.8 4.5 8.8 4.5
Wadi Meih 1-A P129 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 2.2 2.1 2.1 2.0 2.1 2.0 2.1 2.0
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
98.1 100.1 98.6 100.6 98.6
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
98.7 102.3
97.3 100.8 97.9 101.4 97.9 101.4 97.9 101.4
98.2 101.8 98.7 102.3 98.7 102.3
104.6
100.2 104.0 100.7 104.6 100.7 104.6 100.7 104.6
100.6 98.6 100.6
100.2 104.0 100.7 104.6 100.7 104.6 100.7
98.0 102.2
97.5 101.7 98.0 102.2 98.0 102.2 98.0 102.2
97.5 101.7 98.0 102.2 98.0 102.2
100.7 105.9
96.7 99.5 100.7 105.9 99.9 105.9 100.7 105.9
96.7 99.5 100.7 105.9 99.9 105.9
97.8 101.4
100.2 104.8 100.7 105.3 100.7 105.3 100.7 105.3
97.3 100.8 97.8 101.4 97.8 101.4
98.1 95.7
96.7 95.3 97.2 95.7 97.2 95.7 97.2 95.7
100.5 95.3 98.1 95.7 98.1 95.7
100.7 101.6
100.5 105.1 98.1 101.6 98.1 101.6 98.1 101.6
100.2 105.1 100.7 101.6 100.7 101.6
99.8 103.5
100.2 103.0 100.7 103.4 100.7 103.4 100.7 103.4
99.4 103.0 99.8 103.5 99.8 103.5
99.5 102.1
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
96.3 98.7 99.5 102.1 99.5 102.1
98.8 102.7
99.7 101.6 100.2 102.1 100.2 102.1 100.2 102.1
98.4 102.2 98.8 102.7 98.8 102.7
97.2 102.3
100.5 102.2 98.1 102.7 98.1 102.7 98.1 102.7
96.7 104.7 97.2 102.3 97.2 102.3
2020
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 4.6 4.6 4.6 4.6
22.0 22.0 22.0 22.0 2.2 2.1 2.1 2.1
22.0 22.0 22.0 22.0 2.1 2.0 2.0 2.0
22.0 22.0 22.0 22.0 4.1 4.1 4.1 4.1
22.0 22.0 22.0 22.0 3.7 3.6 3.6 3.6
22.0 22.0 22.0 22.0 4.0 4.0 4.0 4.0
22.0 22.0 22.0 22.0 0.1 0.1 0.1 0.1
15.4 15.4 15.4 15.4 8.5 2.0 2.0 2.0
- 22.0 22.0 22.0 - 3.5 3.5 3.5
- 22.0 22.0 22.0 - 3.5 3.5 3.5
22.0 22.0 22.0 22.0 7.0 7.0 7.0 7.0
22.0 22.0 22.0 22.0 5.6 5.6 5.6 5.6
22.0 22.0 22.0 22.0 0.8 5.1 5.1 5.1
22.0 22.0 22.0 22.0 4.6 4.6 4.6 4.6
20.9%
Bar Al Jissah 1-A-P044 18.8% 18.7% 18.7% 18.7%
Bar Al Jissah 1-A-P044 16.7% 16.6% 16.6% 16.6%
Al Masarat-A-P068 9.9% 9.6% 9.6% 9.6%
Al Masarat-B-P068 9.6% 9.3% 9.3% 9.3%
%Loading %Loading
Al Atkiya-A-P182 20.9% 20.9% 20.9%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
Sawaqim 1-A-P112 25.6% 25.5% 25.5% 25.5%
Sawaqim 2--P113 3.9% 23.1% 23.1% 23.1%
Hajir 1-B-P031 - 16.1% 16.1% 16.1%
Mazra Fdr - Jahloot1+Siya+Al
Arqi31.8% 31.8% 31.8% 31.8%
Hajir 1-A-P031 55.1% 13.1% 13.1% 13.1%
Hajir 1-A-P031 - 16.1% 16.1% 16.1%
Bar Al Jissah 1-B-P044 18.2% 18.1% 18.1% 18.1%
Debha-A-P114 0.5% 0.5% 0.5% 0.5%
Tunis-A-P137 20.8% 20.7% 20.7% 20.7%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Al Khairan P045
Yenket P133
Saraya Bander P145
Jabal Al Sifah P159
Yiti P134
Al Salam Yiti P135
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Al Khairan P045 3.0 3.0 3.0 3.0 1.8 60.3 1.2 1.8 60.3 1.2 1.8 60.3 1.2 1.8 60.3 1.2
Yenket P133 1.0 1.0 1.0 1.0 0.7 70.5 0.3 0.7 70.5 0.3 0.7 70.5 0.3 0.7 70.5 0.3
Saraya Bander P145 40.0 40.0 40.0 40.0 8.7 21.8 31.3 8.7 21.8 31.3 8.7 21.8 31.3 8.7 21.8 31.3
Jabal Al Sifah P159 40.0 40.0 40.0 40.0 3.3 8.3 36.7 3.3 8.2 36.7 3.3 8.2 36.7 3.3 8.2 36.7
Yiti P134 3.0 3.0 3.0 3.0 2.8 94.0 0.2 2.8 94.0 0.2 2.8 94.0 0.2 2.8 94.0 0.2
Al Salam Yiti P135 1TX 1TX 1TX 1TX 0.5 - - 0.5 - - 0.5 - - 0.5 - -
Al Khairan-A P045
Al Khairan-B P045
Al Salam Yiti-A P135
Jabal Al Sifah-A P159
Jabal Al Sifah-B P159
Jabal Al Sifah-C P159
Saraya Bander-A P145
Saraya Bander-B P145
Saraya Bander-C P145
Yanket-A P133
Yanket-B P133
Yiti-A P134
Yiti-B P134
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Khairan-A P045 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 5.4 5.1 5.4 5.1 5.4 5.1 5.4 5.1
Al Khairan-B P045 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 5.3 5.1 5.4 5.1 5.4 5.1 5.4 5.1
Al Salam Yiti-A P135 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 6.7 4.0 6.7 4.0 6.8 4.0 6.8 4.0
Jabal Al Sifah-A P159 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 5.5 8.3 5.5 8.2 5.5 8.2 5.5 8.2
Jabal Al Sifah-B P159 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 5.5 8.3 5.5 8.2 5.5 8.2 5.5 8.2
Jabal Al Sifah-C P159 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 5.5 5.6 5.5 5.7 5.5 5.7 5.5 5.7
Saraya Bander-A P145 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 4.8 8.7 4.8 9.0 4.9 9.0 4.9 9.0
Saraya Bander-B P145 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 4.8 8.7 4.8 9.0 4.9 9.0 4.9 9.0
Saraya Bander-C P145 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 4.8 5.3 4.8 5.0 4.9 5.0 4.9 5.0
Yanket-A P133 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 7.5 1.1 7.5 1.1 7.6 1.1 7.6 1.1
Yanket-B P133 - - - - 12.5 12.5 12.5 12.5 - 2.4 - 2.4 - 2.4 - 2.4
Yiti-A P134 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 11.3 2.4 11.3 2.4 11.5 2.4 11.5 2.4
Yiti-B P134 - - - - 12.5 12.5 12.5 12.5 - 2.4 - 2.4 - 2.4 - 2.4
0.7 1.7 0.7
0.6 0.3 0.6 0.3 0.6 0.3 0.6
MVAr MW MVAr MW MVAr
1.7 0.7 1.7 0.7 1.7
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr MW
Yitty Grid Network Results
0.4 0.2
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
0.4 0.2 0.4 0.2 0.4 0.2
3.1 1.0
2.6 1.1 2.6 1.1 2.6 1.1 2.6 1.1
3.1 1.1 3.1 1.0 3.1 1.0
0.3
8.5 1.9 8.5 1.9 8.5 1.9 8.5 1.9
103.1
99.5 103.7 99.5 103.8 99.5 103.8 99.5 103.8
103.1 99.2 103.1
99.2 103.1 99.2 103.1 99.2 103.1 99.2
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
99.2 103.1 99.2 103.1 99.2
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
99.0 103.0
98.2 101.6 99.0 103.0 99.0 103.0 99.0 103.0
99.4 103.7 99.0 103.0 99.0 103.0
99.2 103.5
99.4 103.7 99.0 103.0 99.0 103.0 99.0 103.0
99.2 103.6 99.2 103.5 99.2 103.5
99.2 103.5
99.2 103.3 99.2 103.5 99.2 103.5 99.2 103.5
99.2 103.3 99.2 103.5 99.2 103.5
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
99.5 102.6
- 102.5 - 102.6 - 102.6 - 102.6
99.5 102.5 99.5 102.6 99.5 102.6
99.4 103.1
- 103.5 - 103.6 - 103.6 - 103.6
99.4 103.0 99.4 103.1 99.4 103.1
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 1.1 1.1 1.1 1.1
22.0 22.0 22.0 22.0 1.1 1.1 1.1 1.1
22.0 22.0 22.0 22.0 1.1 1.1 1.1 1.1
22.0 22.0 22.0 22.0 1.3 2.9 2.9 2.9
22.0 22.0 22.0 22.0 1.3 2.9 2.9 2.9
22.0 22.0 22.0 22.0 6.2 2.9 2.9 2.9
22.0 22.0 22.0 22.0 2.5 2.5 2.5 2.5
22.0 22.0 22.0 22.0 3.3 3.3 3.3 3.3
Saraya Bander-A-P145 5.9% 13.2% 13.2% 13.2%
Saraya Bander-B-P145 5.9% 13.2% 13.2% 13.2%
Jabal Al Sifah-B-P159 5.0% 4.9% 4.9% 4.9%
Jabal Al Sifah-C-P159 5.0% 4.9% 4.9% 4.9%
%Loading
Jabal Al Sifah-A-P159 4.9% 4.9% 4.9% 4.9%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Yiti-A-P134-OD 15.0% 15.0% 15.0% 15.0%
Saraya Bander-C-P145 28.3% 13.2% 13.2% 13.2%
Yenkit--P1-OD 11.5% 11.5% 11.5% 11.5%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Quriyat P091
Al Shahbari P092
Dhagmar 1 P021
Dhabab P019
Hail Al Ghaf P036
Al Mazara P074
Wadi Al Arbyeen P124
Street Light P020
RoyalCamp P170
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Quriyat P091 20.0 20.0 20.0 20.0 20.8 104.0 -0.8 22.8 113.9 -2.8 24.9 124.7 -4.9 27.3 136.5 -7.3
Al Shahbari P092 20.0 20.0 20.0 20.0 18.1 90.5 1.9 19.8 99.1 0.2 21.7 108.5 -1.7 23.8 118.8 -3.8
Dhagmar 1 P021 12.0 12.0 12.0 12.0 9.0 75.1 3.0 9.0 75.1 3.0 9.0 75.1 3.0 9.0 75.1 3.0
Dhabab P019 6.0 6.0 6.0 6.0 4.2 69.2 1.8 4.2 69.2 1.8 4.2 69.2 1.8 4.2 69.2 1.8
Hail Al Ghaf P036 6.0 6.0 6.0 6.0 4.8 79.7 1.2 4.8 79.7 1.2 4.8 79.7 1.2 4.8 79.7 1.2
Al Mazara P074 6.0 6.0 6.0 6.0 3.2 52.7 2.8 3.2 52.7 2.8 3.2 52.7 2.8 3.2 52.7 2.8
Wadi Al Arbyeen P124 1TX 1TX 1TX 1TX 1.3 - - 1.3 - - 1.3 - - 1.3 - -
Street Light P020 1TX 1TX 1TX 1TX 0.7 - - 0.7 - - 0.7 - - 0.7 - -
RoyalCamp P170 1TX 1TX 1TX 1TX 0.0 - - 0.0 - - 0.0 - - 0.0 - -
Al Mazara 1-A P074
Al Mazara 1-B P074
Al Shahbari-A P092
Al Shahbari-B P092
Dhabab-A P019
Dhabab-B P019
Dhagmar-A P021
Dhagmar-B P021
Dhagmar-C P021
Hayl Ghaf -A P036
Hayl Ghaf -B P036
Quriyat-A P091
Quriyat-B P091
RoyalCamp P170
Street Light P020
Wadi Al Arbyeen P124
MVAr MW MVAr MW MVAr
19.7 6.7 21.6 7.3 23.6
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr MW
Quriyat Grid Network Results
3.8 1.6
4.4 1.9 4.4 1.9 4.4 1.9 4.4 1.9
3.8 1.6 3.8 1.6 3.8 1.6
3.5
8.3 3.6 8.3 3.6 8.3 3.6 8.3 3.6
8.0 25.9 8.8
17.9 2.7 19.6 2.9 21.5 3.2 23.5
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
0.6 0.3
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.6 0.3 0.6 0.3 0.6 0.3
2.9 1.2
1.2 0.5 1.2 0.5 1.2 0.5 1.2 0.5
2.9 1.2 2.9 1.2 2.9 1.2
101.2
100.9 103.9 100.7 103.6 100.5 103.4 100.2 102.9
101.4 97.6 101.2
- 101.9 - 101.7 - 101.4 -
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
98.2 101.9 98.0 101.7 97.8
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
- 103.2
- 103.6 - 103.4 - 103.3 - 103.1
- 103.6 - 103.5 - 103.3
- 101.0
100.6 103.6 100.5 103.4 100.3 103.3 100.1 103.1
- 101.5 - 101.4 - 101.2
99.8 102.6
98.2 101.5 98.0 101.4 97.9 101.2 97.7 101.0
100.4 103.9 100.2 103.6 100.0 103.0
99.6 104.1
100.9 104.9 100.8 104.8 100.6 104.6 100.4 104.4
100.0 104.6 99.9 104.4 99.8 104.3
101.0 101.0
101.5 102.6 101.3 102.1 101.2 101.5 101.0 100.9
101.5 102.7 101.4 102.2 101.2 101.6
98.7 101.9
- 102.6 - 102.4 - 102.2 - 101.9
99.4 102.7 99.2 102.5 99.0 102.2
99.8 103.6100.2 104.1 100.1 104.0 99.9 103.8
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Mazara 1-A P074 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 2.1 3.7 2.1 3.7 2.1 3.7 2.1 3.7
Al Mazara 1-B P074 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 - 3.7 - 3.7 - 3.7 - 3.7
Al Shahbari-A P092 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 9.8 12.7 9.9 12.8 9.8 7.5 9.9 7.6
Al Shahbari-B P092 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 9.9 12.7 10.0 12.8 9.9 7.3 10.0 7.4
Dhabab-A P019 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 1.9 3.6 1.9 3.6 1.9 3.6 1.9 3.6
Dhabab-B P019 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 - 3.6 - 3.6 - 3.6 - 3.6
Dhagmar-A P021 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 8.6 4.3 8.6 4.3 8.7 4.3 8.7 4.3
Dhagmar-B P021 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 - 4.4 - 4.4 - 4.4 - 4.4
Dhagmar-C P021 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 - 4.2 - 4.2 - 4.2 - 4.2
Hayl Ghaf -A P036 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 5.2 3.9 5.2 3.9 5.2 3.9 5.2 3.9
Hayl Ghaf -B P036 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 - 3.7 - 3.7 - 3.7 - 3.7
Quriyat-A P091 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 15.7 7.4 15.8 7.5 16.2 7.6 16.3 7.7
Quriyat-B P091 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 15.7 7.4 15.8 7.5 16.2 7.6 16.3 7.7
RoyalCamp P170 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 4.4 2.2 4.5 2.2 4.5 2.2 4.5 2.2
Street Light P020 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 10.0 2.7 10.1 2.7 10.2 2.7 10.2 2.7
Wadi Al Arbyeen P124 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 4.8 3.6 4.8 3.6 4.8 3.6 4.9 3.6
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 9.7 10.6 11.8 12.9
22.0 22.0 22.0 22.0 16.5 17.4 18.2 19.2
22.0 22.0 22.0 22.0 15.2 15.2 15.2 15.2
22.0 22.0 22.0 22.0 7.9 7.9 7.9 7.9
22.0 22.0 22.0 22.0 10.4 11.5 12.6 13.9
22.0 22.0 22.0 22.0 10.6 11.6 12.8 14.1
Al Shahbari-B-P092 74.9% 78.9% 82.7% 87.4%
Dhagmar 1-F1-P021 69.1% 69.1% 69.1% 69.1%
%Loading %Loading
Al Shahbari-A-P092 44.0% 48.2% 53.5% 58.7%
2020
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
Quriyat-B-P092 48.1% 52.9% 58.3% 64.2%
Jahloot Feeder-to Hail Ghaf and
Al Mazara36.1% 36.1% 36.1% 36.1%
Quriyat-A-P091 47.3% 52.1% 57.3% 63.2%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Amerat 2 P177
Seih Dhabi P118
Madinat Al Nahdah* P065
Al Nahdah P006
Post Office P150
Post Office [Upgrade] P150
Amerat Heights P152
Amerat Heights
[Upgrade]P152
Amerat 3 P179
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Amerat 2 P177 1TX 1TX 1TX 1TX 4.6 - - 4.6 - - 4.6 - - 4.6 - -
Seih Dhabi P118 16.0 16.0 - - 15.1 94.4 0.9 16.7 104.3 -0.7 - - - - - -
Madinat Al Nahdah* P065 20.0 20.0 - - 22.0 110.0 -2.0 24.3 121.6 -4.3 - - - - - -
Al Nahdah P006 20.0 20.0 - - 29.6 147.9 -9.6 31.6 158.1 -11.6 - - - - - -
Post Office P150 20.0 20.0 - - 21.1 105.5 -1.1 23.3 116.6 -3.3 - - - - - -
Post Office [Upgrade] P150 - - 40.0 40.0 - - - - - - 31.5 78.6 8.5 34.8 86.9 5.2
Amerat Heights P152 20.0 20.0 - - 22.6 113.0 -2.6 25.0 124.9 -5.0 - - - - - -
Amerat Heights
[Upgrade]P152 - - 40.0 40.0 - - - - - - 36.7 91.8 3.3 40.6 101.4 -0.6
Amerat 3 P179 - 40.0 40.0 40.0 - - - 15.1 37.7 24.9 16.7 41.6 23.3 18.4 46.0 21.6
Al Nahdah-A P006
Al Nahdah-B P006
Amerat 2 P177
Amerat 3-A P179
Amerat 3-B P179
Amerat 3-C P179
Amerat Heights-A P152
Amerat Heights-B P152
Amerat Heights-C P152
Madinat Al Nahdah -
AP065
Madinat Al Nahdah -B P065
Post Office-A P150
Post Office-B P150
Post Office-C P150
Seih Dhabi-A P118
Seih Dhabi-B P118
MVAr MW MVAr MW MVAr
4.2 1.8 4.2 1.8 4.2
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr MW
Amerat A Grid Network Results
- -
20.5 5.0 22.7 5.5 - - - -
27.2 11.7 30.0 9.9 - -
-
21.0 6.6 23.2 7.2 - - - -
1.8 4.2 1.8
13.8 6.1 15.2 6.8 - - -
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
39.3 10.0
- - 14.3 4.7 15.8 5.2 17.5 5.7
- - - - 35.6 9.1
33.8 8.2
21.9 5.6 24.2 6.2 - - - -
- - - - 30.6 7.4
-
98.9 100.9 98.7 100.5 100.1 102.0 99.7 101.6
- - -
97.6 97.6 97.4 97.9 - - -
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
97.8 98.2 97.6 98.4 -
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
99.5 101.1
- - - - 100.0 102.0 99.5 101.1
98.8 100.9 98.5 100.4 100.0 102.0
100.0 104.4
98.8 100.9 98.5 100.4 100.0 102.0 99.5 101.1
- - 99.1 103.7 100.5 105.0
100.0 104.4
- - 99.1 103.7 100.5 105.0 100.0 104.4
- - 99.1 103.7 100.5 105.0
100.0 102.1
99.4 101.4 99.2 100.9 - - - -
- - - - 100.4 102.9
100.0 102.1
99.2 101.5 98.9 101.0 100.4 102.9 100.0 102.1
99.2 101.5 98.9 101.0 100.4 102.9
- -
99.8 97.0 99.8 96.0 - - - -
95.1 98.3 94.4 97.3 - -
- -99.4 101.4 99.2 100.9 - -
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Nahdah-A P006 25.0 25.0 - - 18.4 18.4 - - 8.8 8.2 9.0 8.3 - - - -
Al Nahdah-B P006 25.0 25.0 - - 18.4 18.4 - - 8.8 8.3 9.0 8.4 - - - -
Amerat 2 P177 25.0 25.0 25.0 25.0 16.0 16.0 16.0 16.0 8.3 4.3 8.4 4.3 8.5 4.3 8.5 4.3
Amerat 3-A P179 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 13.0 7.4 13.5 18.5 13.6 18.7
Amerat 3-B P179 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 13.0 7.4 13.5 18.5 13.6 18.7
Amerat 3-C P179 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 13.0 7.4 13.5 18.5 13.6 18.7
Amerat Heights-A P152 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 13.1 14.5 13.5 14.8 13.4 8.1 13.5 8.3
Amerat Heights-B P152 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 13.1 14.5 13.5 14.8 13.4 8.2 13.5 8.3
Amerat Heights-C P152 - - 25.0 25.0 - - 25.0 25.0 - - - - 13.4 8.2 13.5 8.3
Madinat Al Nahdah-A P065 25.0 25.0 - - 18.4 18.4 - - 6.4 6.7 6.5 6.9 - - - -
Madinat Al Nahdah-B P065 25.0 25.0 - - 18.4 18.4 - - 2.6 4.4 2.6 4.5 - - - -
Post Office-A P150 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 16.7 8.1 17.2 8.3 17.6 14.8 17.7 15.1
Post Office-B P150 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 16.7 8.1 17.2 8.3 17.5 14.8 17.7 15.1
Post Office-C P150 - - 25.0 25.0 - - 25.0 25.0 - - - - 17.5 8.2 17.7 8.3
Seih Dhabi-A P118 25.0 25.0 - - 18.4 18.4 - - 20.7 13.7 21.5 14.0 - - - -
Seih Dhabi-B P118 25.0 25.0 - - 18.4 18.4 - - 20.7 13.7 21.5 14.0 - - - -
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 - - 14.9 15.9 - -
22.0 22.0 - - 16.3 17.4 - -
22.0 22.0 22.0 22.0 4.7 4.7 4.7 4.7
- 22.0 22.0 22.0 - 4.9 5.3 5.9
- 22.0 22.0 22.0 - 4.9 5.4 5.9
- 22.0 22.0 22.0 - 4.9 5.3 5.9
22.0 22.0 22.0 22.0 11.5 12.7 12.5 13.9
22.0 22.0 22.0 22.0 11.5 12.8 12.5 13.9
- - 22.0 22.0 - - 12.5 13.9
22.0 22.0 - - 13.5 15.0 - -
22.0 22.0 - - 9.7 10.9 - -
22.0 22.0 22.0 22.0 10.8 12.0 10.6 11.8
22.0 22.0 22.0 22.0 10.7 11.9 10.7 11.8
- - 22.0 22.0 - - 10.7 11.8
22.0 22.0 - - 7.7 8.6 - -
22.0 22.0 - - 7.7 8.6 - -
%Loading %Loading
Al Nahdah-A 67.8% 72.3% - -
2020
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
Amerat Heights-B 52.4% 58.1% 56.7% 63.0%
Amerat Heights-C - - 56.7% 63.0%
Amerat 3-C - 22.1% 24.2% 26.6%
Amerat Heights-A 52.1% 57.9% 56.7% 63.0%
Amerat 3-A - 22.1% 24.2% 26.7%
Amerat 3-B - 22.1% 24.4% 26.9%
Al Nahdah-B 74.1% 78.9% - -
Amerat 2 21.2% 21.4% 21.4% 21.4%
Seih Dhabi-B 35.1% 38.9% - -
Post Office-C - - 48.5% 53.7%
Seih Dhabi-A 35.1% 38.9% - -
Post Office-A 49.1% 54.4% 48.4% 53.6%
Post Office-B 48.6% 53.9% 48.5% 53.8%
Madinat Al Nahdah-A 61.2% 68.1% - -
Madinat Al Nahdah-B 44.3% 49.5% - -
* Madinat Al Nahdah – P065 is having split feeder source arrangement with Feeder 1 connected from Amerat A Grid and Feeder 2 connected from
Jahloot grid. By 2019, both the incoming feeders will be connected from one source i.e. Amerat B grid.
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Al Nahdah
[Upgrading]P006
Seih Dhabi P118
Madinat Al Nahdah P065
Amerat 4 P180
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Al Nahdah
[Upgrading]P006 - - 40.0 40.0 - - - - - - 34.9 87.3 5.1 38.6 96.5 1.4
Seih Dhabi P118 - - 16.0 16.0 - - - - - - 12.4 77.5 3.6 13.7 85.6 2.3
Madinat Al Nahdah P065 - - 20.0 20.0 - - - - - - 15.3 76.4 4.7 16.9 84.5 3.1
Amerat 4 P180 - - 40.0 40.0 - - - - - - 11.6 29.1 28.4 12.9 32.1 27.1
Al Nahdah-A P006
Al Nahdah-B P006
Al Nahdah-C P006
Seih Dhabi-A P118
Seih Dhabi-B P118
Madinat Al Nahdah -
AP065
Madinat Al Nahdah -B P065
Amerat 4-A P180
Amerat 4-B P180
Amerat 4-C P180
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Nahdah-A P006 - - 25.0 25.0 - - 18.4 18.4 - - - - 9.3 14.4 9.4 14.6
Al Nahdah-B P006 - - 25.0 25.0 - - 18.4 18.4 - - - - 9.3 14.4 9.4 14.6
Al Nahdah-C P006 - - 25.0 25.0 - - 25.0 25.0 - - - - 8.8 7.9 8.8 8.0
Seih Dhabi-A P118 - - 25.0 25.0 - - 18.4 18.4 - - - - 21.9 13.6 22.2 13.8
Seih Dhabi-B P118 - - 25.0 25.0 - - 18.4 18.4 - - - - 21.9 13.6 22.2 13.8
Madinat Al Nahdah-A P065 - - 25.0 25.0 - - 18.4 18.4 - - - - 6.3 6.3 6.4 6.4
Madinat Al Nahdah-B P065 - - 25.0 25.0 - - 18.4 18.4 - - - - 6.3 6.1 6.3 6.2
Amerat 4-A P180 - - 25.0 25.0 - - 25.0 25.0 - - - - 13.2 17.7 13.2 17.8
Amerat 4-B P180 - - 25.0 25.0 - - 25.0 25.0 - - - - 13.2 17.7 13.2 17.8
Amerat 4-C P180 - - 25.0 25.0 - - 25.0 25.0 - - - - 13.2 17.7 13.2 17.8
Amerat B Grid Network Results
5.6
- - - - 14.6 4.6 16.1 5.0
10.9 36.7 12.1
- - - - 11.3 5.0 12.5
MVAr MW MVAr MW MVAr
- - - - 33.2
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr MW
101.9 99.6 101.2
- - - - 100.0 101.9 99.6
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
- - - - 100.0
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
12.2 4.0
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
- - - - 11.1 3.6
99.3 101.4
- - - - 100.2 103.2 99.8 102.7
- - - - 99.8 102.1
100.2 102.5
- - - - 100.6 103.2 100.2 102.5
- - - - 100.6 103.2
101.2
- - - - 100.0 101.9 99.6 101.2
2020
100.7 104.3
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
- - - - 101.0 104.7
100.7 104.3
- - - - 101.0 104.7 100.7 104.3
- - - - 101.0 104.7
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 MVA MVA MVA MVA
- - 22.0 22.0 - - 12.0 13.4
- - 22.0 22.0 - - 12.0 13.3
- - 22.0 22.0 - - 12.0 13.3
- - 22.0 22.0 - - 6.3 7.0
- - 22.0 22.0 - - 6.3 7.0
- - 22.0 22.0 - - 9.2 10.2
- - 22.0 22.0 - - 6.5 7.2
- - 22.0 22.0 - - 3.8 4.2
- - 22.0 22.0 - - 3.8 4.2
- - 22.0 22.0 - - 3.8 4.2
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
Madinat Al Nahdah-A - - 41.6% 46.2%
Madinat Al Nahdah-B - - 29.7% 32.9%
Seih Dhabi-A - - 28.7% 31.8%
Seih Dhabi-B - - 28.6% 31.7%
Al Nahdah-B - - 54.5% 60.5%
Al Nahdah-C - - 54.6% 60.7%
%Loading %Loading
Al Nahdah-A - - 54.7% 60.8%
Amerat 4-C - - 17.2% 19.1%
Amerat 4-A - - 17.2% 19.1%
Amerat 4-B - - 17.2% 19.1%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Azaibah North 2 P012
Azaibah South 1-A P014
Ghubrah North 2 P149
Ghubrah North 1 P023
Diplomatic City P022
Ghubrah GPS P166
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Azaibah North 2 P012 20.0 20.0 20.0 20.0 19.3 96.5 0.7 20.8 104.2 -0.8 16.9 84.7 3.1 18.3 91.5 1.7
Azaibah South 1-A P014 20.0 20.0 - - 17.5 87.5 2.5 17.2 85.8 2.8 - - - - - -
Ghubrah North 2 P149 40.0 40.0 40.0 40.0 30.4 76.0 9.6 31.7 79.3 8.3 34.3 85.6 5.7 37.0 92.5 3.0
Ghubrah North 1 P023 40.0 40.0 40.0 40.0 39.1 97.8 0.9 40.9 102.1 -0.9 38.4 96.1 1.6 41.5 103.8 -1.5
Diplomatic City P022 40.0 40.0 40.0 40.0 26.7 66.8 13.3 26.3 65.8 13.7 26.8 66.9 13.2 27.2 68.1 12.8
Ghubrah GPS P166 16.0 16.0 16.0 16.0 6.7 41.7 9.3 6.7 41.7 9.3 6.7 41.7 9.3 6.7 41.7 9.3
Azaiba North 2-A P012
Azaiba North 2-B P012
Azaiba South 1A-A P014
Azaiba South 1A-B P014
Diplomatic City 1-A P022
Diplomatic City 1-B P022
Diplomatic City 1-C P022
Ghubra North 1-A P023
Ghubra North 1-B P023
Ghubra North 1-C P023
Ghubrah GPS-A P166
Ghubrah GPS-B P166
Ghubrah North 02-A P149
Ghubrah North 02-B P149
Ghubrah North 02-C P149
MVAr MW MVAr MW MVAr
18.7 4.8 20.2 5.2 16.4
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr MW
Ghubrah Grid Network Results
39.4 13.0
24.6 10.5 25.0 8.2 25.4 8.4 25.9 8.5
35.9 15.4 38.8 12.8 36.5 12.0
-
27.9 12.1 30.1 9.9 32.5 10.7 35.1 11.6
4.2 17.7 4.5
15.1 8.8 16.3 5.4 - - -
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
100.7 103.3 99.8 101.4 100.8
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
6.1 2.6
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
6.1 2.6 6.1 2.6 6.1 2.6
- -
101.0 103.2 100.3 102.9 101.0 103.7 100.7 103.3
99.8 101.1 99.4 101.8 - -
103.2
99.9 101.1 99.4 101.8 - - - -
103.7 100.5 103.2
100.7 103.3 100.2 103.3 100.9 103.7 100.5
100.7 101.9
101.1 104.5 100.4 103.8 101.2 104.6 100.8 104.3
101.0 101.7 100.3 101.4 101.0 102.5
100.7 102.6
101.0 101.4 100.2 100.1 101.0 102.3 100.6 100.5
101.0 101.4 100.3 102.2 101.0 102.3
100.7 103.3
100.9 102.1 100.2 102.0 101.0 102.8 100.7 102.3
100.9 103.2 100.3 102.9 101.0 103.7
100.9 102.4
100.8 101.5 100.1 101.2 100.8 101.7 100.5 101.0
101.1 102.8 100.4 102.4 101.2 103.0
100.8 104.3
101.1 102.8 100.4 102.4 101.2 103.0 100.9 102.4
101.1 104.5 100.4 103.8 101.2 104.6
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Azaiba North 2-A P012 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 16.4 14.3 16.4 8.2 16.2 14.1 16.3 14.2
Azaiba North 2-B P012 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 16.3 14.3 16.2 7.5 16.2 14.1 16.3 14.2
Azaiba South 1A-A P014 25.0 25.0 - - 25.0 25.0 - - 9.0 12.6 9.0 12.6 - - - -
Azaiba South 1A-B P014 25.0 25.0 - - 25.0 25.0 - - 8.6 12.6 8.6 12.6 - - - -
Diplomatic City 1-A P022 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 19.5 14.1 19.6 14.1 19.3 14.0 19.4 14.1
Diplomatic City 1-B P022 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 19.5 14.1 19.6 14.1 19.3 14.0 19.4 14.1
Diplomatic City 1-C P022 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 21.1 8.4 21.3 8.4 20.9 8.4 21.0 8.4
Ghubra North 1-A P023 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 22.1 15.4 22.2 8.3 21.9 15.3 22.0 8.3
Ghubra North 1-B P023 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 22.1 15.4 22.3 8.8 21.8 15.3 22.0 8.8
Ghubra North 1-C P023 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 22.1 8.4 22.2 8.4 21.8 8.4 21.9 8.4
Ghubrah GPS-A P166 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 22.7 11.9 22.8 11.9 22.4 11.9 22.5 11.9
Ghubrah GPS-B P166 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 22.7 11.9 22.8 11.9 22.4 11.9 22.5 11.9
Ghubrah North 02-A P149 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 17.2 14.8 17.3 14.9 17.0 14.9 17.1 15.1
Ghubrah North 02-B P149 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 17.2 14.8 17.3 14.9 17.0 14.9 17.1 15.1
Ghubrah North 02-C P149 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 17.1 8.4 17.2 8.5 16.9 8.5 17.0 8.6
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 9.9 14.3 8.7 9.4
22.0 22.0 22.0 22.0 9.6 6.9 8.4 9.1
15.4 15.4 - - 9.0 8.8 - -
15.4 15.4 - - 8.8 8.6 - -
22.0 22.0 22.0 22.0 7.7 7.5 7.7 7.8
22.0 22.0 22.0 22.0 7.8 7.6 7.8 7.9
22.0 22.0 22.0 22.0 11.8 11.6 11.8 12.0
22.0 22.0 22.0 22.0 13.8 11.0 13.5 11.1
22.0 22.0 22.0 22.0 13.8 17.9 13.5 18.2
22.0 22.0 22.0 22.0 13.0 13.5 12.6 13.7
22.0 22.0 22.0 22.0 3.4 3.4 3.4 3.4
22.0 22.0 22.0 22.0 3.3 3.3 3.3 3.3
22.0 22.0 22.0 22.0 9.1 9.5 10.3 11.1
22.0 22.0 22.0 22.0 9.0 9.4 10.2 11.0
22.0 22.0 22.0 22.0 13.0 13.5 14.6 15.9
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
Azaiba South 1A-F2-P014 57.2% 55.9% - -
Diplomatic City 1-33A-P022 34.8% 34.2% 34.8% 35.4%
Azaiba North 2-33B-P012 43.8% 31.6% 38.3% 41.4%
Azaiba South 1A-F2-P014 58.2% 56.9% - -
%Loading
Azaiba North 2-33A-P012 45.1% 65.1% 39.4% 42.7%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Ghubrah GPS-33B-P166 15.2% 15.2% 15.2% 15.2%
Ghubrah North 02-33A-P149 41.5% 43.2% 46.7% 50.6%
Ghubra North 1-33C-P023 58.9% 61.3% 57.5% 62.3%
Ghubrah GPS-33A-P166 15.4% 15.4% 15.4% 15.4%
Ghubra North 1-33A-P023 62.9% 49.9% 61.4% 50.7%
Ghubra North 1-33B-P023 62.8% 81.3% 61.3% 82.7%
Diplomatic City 1-33B-P022 35.3% 34.7% 35.3% 36.0%
Diplomatic City 1-33C-P022 53.6% 52.5% 53.4% 54.4%
Ghubrah North 02-33B-P149 40.9% 42.7% 46.3% 50.1%
Ghubrah North 02-33C-P149 58.9% 61.4% 66.5% 72.1%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Al Khuwair North P054
Al Khuwair
North(Upgrade)P054
MSQ Grid GP06
MSQ 1 P083
Royal Office P097
Intercontinental P109
Al Khuwair School P146
Information City 2 P038
Sarooj -Shati Al Qurum P110
Digital TV Studio P039
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Al Khuwair North P054 20.0 20.0 - - 18.9 94.5 1.1 20.1 100.6 -0.1 - - - - - -
Al Khuwair
North(Upgrade)P054 - - 40.0 40.0 - - - - - - 20.6 51.6 19.4 22.0 54.9 18.0
MSQ Grid GP06 20.0 20.0 20.0 20.0 21.2 106.0 -1.2 22.2 111.1 -2.2 17.6 87.9 2.4 18.4 92.2 1.6
MSQ 1 P083 20.0 - - - 20.0 100.0 0.0 - - - - - - - - -
Royal Office P097 20.0 20.0 20.0 20.0 6.8 33.8 13.2 6.5 32.7 13.5 6.5 32.7 13.5 6.5 32.7 13.5
Intercontinental P109 20.0 20.0 20.0 20.0 14.9 74.5 5.1 14.4 71.8 5.6 14.6 73.0 5.4 14.9 74.3 5.1
Al Khuwair School P146 40.0 - - - 18.9 47.3 21.1 - - - - - - - - -
Information City 2 P038 1TX 1TX 1TX 1TX 0.5 - - 0.5 - - 0.5 - - 0.5 - -
Sarooj -Shati Al Qurum P110 20.0 20.0 20.0 20.0 18.8 94.0 1.2 19.1 95.6 0.9 19.5 97.3 0.5 19.8 99.0 0.2
Digital TV Studio P039 20.0 - - - 2.2 11.0 17.8 - - - - - - - - -
Al Khuwair North-A P054
Al Khuwair North-B P054
Al Khuwair North-C P054
Al Khuwair School-A P146
Al Khuwair School-B P146
Al Khuwair School-C P146
Digital TV Studio-A P039
Digital TV Studio-B P039
Information City 2 P038
Intercontinental-A P109
Intercontinental-B P109
MSQ 1-A P083
MSQ 1-B P083
MSQ Grid-A GP06
MSQ Grid-B GP06
Royal Office-A P097
Royal Office-B P097
Sarooj -Shati Al Qurum-A P110
Sarooj -Shati Al Qurum-B P110
- -
- - - - 19.6 6.4 20.9 6.9
17.3 7.6 18.4 8.1 - -
MW MVAr MW MVAr MW MVAr
MSQ-A Grid Network Results
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
- -
0.5 0.2 0.5 0.2 0.5 0.2 0.5 0.2
17.4 7.5 - - - -
6.2 2.0
13.4 6.5 13.6 4.5 13.9 4.6 14.1 4.6
6.2 2.7 6.2 2.0 6.2 2.0
16.9 7.3
18.9 6.5 - - - - - -
19.5 8.4 20.4 8.8 16.2 6.9
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
100.3 102.3 100.0 101.7 100.4
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
18.0 8.2
2.0 0.9 - - - - - -
17.1 7.8 17.4 7.9 17.7 8.1
- -
100.3 103.0 - - - - - -
100.3 103.0 - - - -
103.3
- - - - 100.4 103.5 100.3 103.3
103.5 100.3 103.3
100.3 102.3 100.0 101.8 100.4 103.5 100.3
100.1 103.2
100.2 102.7 99.9 103.0 100.2 103.3 100.1 103.2
100.1 102.7 99.9 103.0 100.2 103.3
- -
100.5 104.7 100.2 104.4 100.5 104.7 100.4 104.6
100.5 104.7 - - - -
- -
100.5 104.7 - - - - - -
100.3 103.1 - - - -
100.3 104.1
100.3 103.9 100.0 103.8 100.4 104.2 100.3 104.1
100.3 103.9 100.0 103.8 100.4 104.2
100.4 102.2
100.5 100.6 100.2 100.0 100.5 102.5 100.4 102.2
100.5 103.1 100.2 102.6 100.5 102.5
- -
100.4 102.2 - - - - - -
100.3 102.2 - - - -
100.0 102.0
100.1 102.2 99.8 101.8 100.1 102.2 100.0 102.0
100.1 102.2 99.8 101.8 100.1 102.2
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Khuwair North-A P054 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 20.3 16.1 19.3 8.9 19.9 15.5 17.2 15.6
Al Khuwair North-B P054 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 20.3 16.1 19.3 9.0 19.9 15.5 17.2 15.6
Al Khuwair North-C P054 - - 25.0 25.0 - - 25.0 25.0 - - - - 19.8 8.6 17.1 8.6
Al Khuwair School-A P146 25.0 - - - 25.0 - - - 18.2 14.1 - - - - - -
Al Khuwair School-B P146 25.0 - - - 25.0 - - - 18.2 14.1 - - - - - -
Al Khuwair School-C P146 25.0 - - - 25.0 - - - 18.1 7.7 - - - - - -
Digital TV Studio-A P039 25.0 - - - 18.4 - - - 16.9 13.0 - - - - - -
Digital TV Studio-B P039 25.0 - - - 18.4 - - - 16.9 13.0 - - - - - -
Information City 2 P038 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 11.5 3.2 11.2 3.2 11.3 3.2 10.4 3.2
Intercontinental-A P109 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 15.3 16.0 14.7 15.7 15.0 15.9 13.4 15.9
Intercontinental-B P109 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 15.4 16.0 14.9 15.7 15.2 15.9 13.4 15.9
MSQ 1-A P083 25.0 - - - 20.0 - - - 20.7 14.8 - - - - - -
MSQ 1-B P083 25.0 - - - 20.0 - - - 20.7 14.8 - - - - - -
MSQ Grid-A GP06 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 24.8 8.2 23.3 8.2 24.1 15.2 20.5 15.2
MSQ Grid-B GP06 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 24.8 9.0 23.3 9.0 24.1 15.2 20.5 15.2
Royal Office-A P097 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 14.7 13.1 14.3 12.9 14.5 13.0 14.8 13.0
Royal Office-B P097 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 14.8 13.1 14.3 12.9 14.5 13.0 14.8 13.0
Sarooj -Shati Al Qurum-A P110 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 16.2 16.5 15.6 16.3 16.0 16.4 13.9 16.5
Sarooj -Shati Al Qurum-B P110 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 16.2 16.5 15.6 16.3 16.0 16.4 13.8 16.5
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 9.6 10.3 6.9 7.4
22.0 22.0 22.0 22.0 9.7 10.3 7.0 7.5
- - 22.0 22.0 - - 6.9 7.4
22.0 - - - 6.5 - - -
22.0 - - - 6.6 - - -
22.0 - - - 6.1 - - -
22.0 - - - 1.0 - - -
22.0 - - - 1.0 - - -
22.0 22.0 22.0 22.0 7.5 7.2 7.3 7.4
22.0 22.0 22.0 22.0 7.6 7.3 7.4 7.5
22.0 - - - 10.3 - - -
22.0 - - - 10.1 - - -
22.0 22.0 22.0 22.0 7.0 7.3 9.0 9.4
22.0 22.0 22.0 22.0 15.1 15.9 9.1 9.6
22.0 22.0 22.0 22.0 3.5 3.3 3.3 3.3
22.0 22.0 22.0 22.0 3.4 3.3 3.3 3.3
22.0 22.0 22.0 22.0 9.5 9.7 9.8 10.0
22.0 22.0 22.0 22.0 9.5 9.7 9.8 10.0
%Loading
Al Khuwair North-A-P054 43.7% 46.8% 31.4% 33.4%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
Digital TV Studio-B-P039 4.6% - - -
Intercontinental-A-P109 33.9% 32.7% 33.3% 33.9%
Al Khuwair School-C-P146 27.9% - - -
Digital TV Studio-A-P039 4.7% - - -
Al Khuwair School-A-P146 29.8% - - -
Al Khuwair School-B-P146 29.9% - - -
Al Khuwair North-B-P054 44.3% 46.8% 31.8% 33.9%
Al Khuwair North-C-P054 - - 31.6% 33.7%
Royal Office-B-P097 15.4% 14.9% 14.9% 14.9%
Sarooj -Shati Al Qurum-B-P110 43.1% 43.9% 44.7% 45.5%
MSQ Grid-B-GP06 68.6% 72.1% 41.4% 43.5%
Royal Office-A-P097 15.7% 15.2% 15.2% 15.2%
MSQ 1-B-P083 46.1% - - -
MSQ Grid-A-GP06 31.7% 33.2% 40.9% 42.9%
Intercontinental-B-P109 34.4% 33.0% 33.6% 34.2%
MSQ 1-A-P083 46.9% - - -
Sarooj -Shati Al Qurum-A-P110 43.1% 43.9% 44.7% 45.5%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Al Khuwair 25 P053
Al Khuwair School P146
MSQ 1 P083
ROP -Shati Al Qurum P111
Digital TV Studio P039
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Al Khuwair 25 P053 20.0 20.0 20.0 20.0 22.4 112.0 -2.4 16.9 84.6 3.1 18.0 90.1 2.0 19.2 95.9 0.8
Al Khuwair School P146 - 40.0 40.0 40.0 - - - 32.9 82.3 7.1 35.0 87.6 5.0 37.3 93.3 2.7
MSQ 1 P083 - 20.0 20.0 20.0 - - - 21.0 104.8 -1.0 18.6 93.2 1.4 19.5 97.7 0.5
ROP -Shati Al Qurum P111 20.0 20.0 20.0 20.0 15.2 76.2 4.8 15.5 77.5 4.5 15.8 78.8 4.2 16.0 80.2 4.0
Digital TV Studio P039 - 20.0 20.0 20.0 - - - 2.1 10.5 17.9 2.1 10.5 17.9 2.1 10.5 17.9
Al Khuwair 25-A P053
Al Khuwair 25-B P053
Al Khuwair School-A P146
Al Khuwair School-B P146
Al Khuwair School-C P146
Digital TV Studio-A P039
Digital TV Studio-B P039
MSQ 1-A P083
MSQ 1-B P083
ROP -Shati Al Qurum-A P111
ROP -Shati Al Qurum-B P111
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Khuwair 25-A P053 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 9.7 7.8 14.2 14.2 15.1 14.6 13.5 14.7
Al Khuwair 25-B P053 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 9.7 7.3 14.3 14.2 15.2 14.6 13.5 14.7
Al Khuwair School-A P146 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 16.8 14.6 18.1 15.0 15.7 15.2
Al Khuwair School-B P146 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 16.8 14.6 18.2 15.0 15.7 15.2
Al Khuwair School-C P146 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 16.7 8.1 18.1 8.2 15.7 8.3
Digital TV Studio-A P039 - 25.0 25.0 25.0 - 18.4 18.4 18.4 - - 15.7 12.6 16.8 12.9 14.3 12.9
Digital TV Studio-B P039 - 25.0 25.0 25.0 - 18.4 18.4 18.4 - - 15.6 12.6 16.8 12.9 14.3 12.9
MSQ 1-A P083 - 25.0 25.0 25.0 - 20.0 20.0 20.0 - - 18.7 8.0 20.5 14.6 17.6 14.7
MSQ 1-B P083 - 25.0 25.0 25.0 - 20.0 20.0 20.0 - - 18.8 8.1 20.5 14.6 17.6 14.7
ROP -Shati Al Qurum-A P111 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 10.7 13.6 16.2 15.9 17.5 16.3 15.3 16.4
ROP -Shati Al Qurum-B P111 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 10.7 13.6 16.2 15.9 17.5 16.3 15.3 16.4
5.6 18.2 6.0
- - 31.3 10.3 33.3 10.9 35.4
MVAr MW MVAr MW MVAr
21.1 7.5 16.1 5.3 17.1
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr MW
MSQ-B Grid Network Results
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
14.7 6.3
- - 2.0 0.7 2.0 0.7 2.0 0.7
14.0 6.0 14.2 6.1 14.5 6.2
11.6
- - 19.8 6.9 17.6 6.1 18.5 6.4
103.1
- - 99.9 101.7 99.8 101.4 100.8 102.3
102.1 100.8 103.1
100.8 103.1 99.9 102.4 99.8 102.1 100.8
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
100.6 101.5 99.9 102.4 99.8
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
101.0 103.0
- - 100.0 101.5 100.0 102.1 101.0 103.0
- - 100.1 102.0 100.0 102.1
101.2 105.5
- - 100.2 104.5 100.1 104.4 101.2 105.5
- - 100.2 104.5 100.1 104.4
100.8 102.3
- - 99.9 101.7 99.8 101.4 100.8 102.3
- - 99.9 101.7 99.8 101.4
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
100.9 103.6
100.9 103.6 100.0 102.6 99.9 102.5 100.9 103.6
100.9 103.6 100.0 102.6 99.9 102.5
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 MVA MVA MVA MVA
15.4 15.4 15.4 15.4 14.0 8.6 9.2 9.8
15.4 15.4 15.4 15.4 9.1 8.6 9.2 9.8
- 22.0 22.0 22.0 - 11.2 12.0 12.8
- 22.0 22.0 22.0 - 11.3 12.1 12.9
- 22.0 22.0 22.0 - 11.3 12.0 12.8
- 22.0 22.0 22.0 - 1.0 1.0 1.0
- 22.0 22.0 22.0 - 1.0 1.0 1.0
- 22.0 22.0 22.0 - 10.0 9.6 10.1
- 22.0 22.0 22.0 - 11.5 9.4 9.9
22.0 22.0 22.0 22.0 7.7 7.8 8.0 8.1
22.0 22.0 22.0 22.0 7.6 7.8 7.9 8.0
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Digital TV Studio-A-P039 - 4.6% 4.6% 4.6%
Digital TV Studio-B-P039 - 4.6% 4.6% 4.6%
Al Khuwair School-B-P146 - 51.4% 54.9% 58.5%
Al Khuwair School-C-P146 - 51.3% 54.7% 58.3%
Al Khuwair 25-B-P053 59.2% 55.9% 59.7% 63.6%
Al Khuwair School-A-P146 - 51.1% 54.5% 58.1%
%Loading
Al Khuwair 25-A-P053 90.8% 56.0% 59.7% 63.7%
ROP -Shati Al Qurum-A-P111 35.0% 35.7% 36.3% 36.9%
ROP -Shati Al Qurum-B-P111 34.6% 35.3% 35.9% 36.6%
MSQ 1-A-P083 - 45.3% 43.6% 45.8%
MSQ 1-B-P083 - 52.4% 42.9% 45.0%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Information City 1 P037
Qurum 1 P093
Qurum 2 P094
Qurum 2(Upgrade) P094
Sarooj04 P181
Lulai P095
MSQ 2 P155
Rabiat Al Qurum P096
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Information City 1 P037 20.0 20.0 20.0 20.0 13.9 69.5 6.1 13.8 69.1 6.2 14.1 70.3 5.9 14.3 71.5 5.7
Qurum 1 P093 16.0 16.0 16.0 16.0 16.4 102.5 -0.4 17.3 108.4 -1.3 12.8 79.9 3.2 13.5 84.5 2.5
Qurum 2 P094 16.0 16.0 - - 17.0 106.3 -1.0 18.0 112.5 -2.0 - - - - - -
Qurum 2(Upgrade) P094 - - 20.0 20.0 - - - - - - 13.5 67.5 6.5 14.3 71.5 5.7
Sarooj04 P181 - - 40.0 40.0 - - - - - - 11.1 27.8 28.9 11.8 29.4 28.2
Lulai P095 20.0 20.0 20.0 20.0 17.3 86.5 2.7 15.7 78.5 4.3 16.6 83.0 3.4 17.6 87.8 2.4
MSQ 2 P155 40.0 40.0 40.0 40.0 14.1 35.3 25.9 13.7 34.2 26.3 23.2 57.9 16.8 24.3 60.7 15.7
Rabiat Al Qurum P096 20.0 20.0 20.0 20.0 16.7 83.5 3.3 16.6 82.9 3.4 17.5 87.7 2.5 18.6 92.8 1.4
Information City 1-A P037
Information City 1-B P037
Lulai-A P095
Lulai-B P095
MSQ 02-A P155
MSQ 02-B P155
MSQ 02-C P155
Qurum 1-A P093
Qurum 1-B P093
Qurum 2-A P094
Qurum 2-B P094
Rabiat Al Qurum-A P096
Rabiat Al Qurum-B P096
Sarooj 4-A P181
Sarooj 4-B P181
Sarooj 4-C P181
MW MVAr MW MVAr MW MVAr
Qurum Grid Network Results
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
11.2 3.7
14.1 10.0 14.9 4.9 15.8 5.2 16.7 5.5
- - - - 10.6 3.5
- -
- - - - 12.8 4.3 13.6 4.4
16.2 5.2 17.1 5.6 - -
13.6 4.5
15.6 5.1 16.5 5.4 12.2 3.9 12.9 4.2
12.9 5.2 13.1 4.3 13.4 4.4
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
99.2 101.8 100.0 102.9 99.5
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
23.1 7.6
14.9 7.5 15.8 5.2 16.7 5.5 17.6 5.8
12.4 6.7 13.0 4.3 22.0 7.2
99.5 101.8
99.4 102.6 100.1 103.6 99.6 102.2 99.3 101.9
99.3 100.1 100.1 102.7 99.7 102.1
102.2
99.4 100.1 100.2 102.7 99.7 102.1 99.5 101.8
102.4 99.3 102.2
99.3 101.8 100.1 102.9 99.7 102.4 99.4
99.3 102.0
99.2 101.4 99.9 102.1 99.6 102.3 99.4 102.0
99.1 101.3 99.9 102.0 99.6 102.3
99.2 102.0
99.1 101.5 99.8 102.1 99.5 102.4 99.3 102.0
99.0 101.3 99.7 102.0 99.4 102.4
99.3 101.9
99.3 101.6 100.1 103.6 99.6 102.2 99.3 101.9
99.4 102.6 100.1 103.6 99.6 102.2
99.5 103.1- - - - 99.8 103.4
99.5 103.1
- - - - 99.8 103.4 99.5 103.1
- - - - 99.8 103.4
99.6 101.7
99.5 101.1 100.2 102.7 99.8 102.1 99.6 101.7
99.5 101.1 100.2 102.7 99.8 102.1
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Information City 1-A P037 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 13.1 13.6 13.1 13.6 13.9 13.9 13.9 14.0
Information City 1-B P037 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 15.8 13.6 15.9 13.6 17.1 13.9 17.2 14.0
Lulai-A P095 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 17.8 13.8 17.9 13.7 19.4 14.0 19.5 14.1
Lulai-B P095 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 16.3 13.8 16.3 13.7 17.6 14.0 17.6 14.1
MSQ 02-A P155 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 14.7 13.2 14.7 13.3 15.8 14.1 15.9 14.2
MSQ 02-B P155 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 14.7 13.2 14.7 13.3 15.8 14.1 15.8 14.2
MSQ 02-C P155 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 14.7 7.6 14.7 7.5 15.8 7.8 15.9 7.8
Qurum 1-A P093 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 11.4 7.1 11.4 7.1 12.3 12.9 12.3 13.0
Qurum 1-B P093 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 12.6 7.2 12.6 7.3 13.5 12.9 13.6 13.0
Qurum 2-A P094 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 13.3 7.1 13.3 7.2 14.3 13.0 14.3 13.1
Qurum 2-B P094 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 14.7 7.3 14.8 7.3 15.8 13.0 15.9 13.1
Rabiat Al Qurum-A P096 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 19.1 14.0 19.2 14.0 21.0 14.4 21.1 14.5
Rabiat Al Qurum-B P096 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 19.1 14.0 19.2 14.0 21.0 14.4 21.1 14.5
Sarooj 4-A P181 - - 25.0 25.0 - - 25.0 25.0 - - - - 16.5 13.2 16.5 13.3
Sarooj 4-B P181 - - 25.0 25.0 - - 25.0 25.0 - - - - 16.5 13.2 16.5 13.3
Sarooj 4-C P181 - - 25.0 25.0 - - 25.0 25.0 - - - - 16.4 7.3 16.4 7.3
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 7.0 7.0 7.1 7.2
22.0 22.0 22.0 22.0 7.1 7.1 7.2 7.3
22.0 22.0 22.0 22.0 9.0 8.1 8.6 9.1
22.0 22.0 22.0 22.0 8.9 7.9 8.4 8.9
22.0 22.0 22.0 22.0 3.7 4.5 7.8 8.2
22.0 22.0 22.0 22.0 3.7 4.5 7.8 8.2
22.0 22.0 22.0 22.0 6.5 4.5 7.8 8.2
22.0 22.0 22.0 22.0 8.3 8.8 6.3 6.6
22.0 22.0 22.0 22.0 8.3 8.8 6.6 7.0
22.0 22.0 22.0 22.0 8.7 9.2 6.7 7.1
22.0 22.0 22.0 22.0 8.8 9.2 7.0 7.4
22.0 22.0 22.0 22.0 8.6 8.5 9.0 9.5
22.0 22.0 22.0 22.0 8.5 8.4 8.9 9.4
- - 22.0 22.0 - - 3.7 3.9
- - 22.0 22.0 - - 3.7 3.9
- - 22.0 22.0 - - 3.7 3.9
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
Lulai-B-P095 40.2% 36.0% 38.1% 40.4%
MSQ 02-A-P155 16.8% 20.5% 35.3% 37.1%
Information City 1-B-P037 32.3% 32.1% 32.7% 33.3%
Lulai-A-P095 41.1% 36.8% 39.0% 41.3%
%Loading %Loading
Information City 1-A-P037 31.9% 31.6% 32.2% 32.8%
2020
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
Rabiat Al Qurum-A-P096 39.1% 38.5% 40.8% 43.3%
Rabiat Al Qurum-B-P096 38.7% 38.2% 40.5% 42.9%
Qurum 2-B-P094 39.7% 41.6% 30.5% 32.3%
Qurum 2-B-P094 40.1% 42.0% 31.7% 33.5%
Qurum 1-A-P093 37.7% 39.9% 28.5% 30.2%
Qurum 1-B-P093 37.9% 40.2% 30.0% 31.7%
MSQ 02-B-P155 16.9% 20.5% 35.4% 37.1%
MSQ 02-C-P155 29.5% 20.6% 35.4% 37.1%
Sarooj 4-C-P181 - - 16.7% 17.7%
Sarooj 4-A-P181 - - 16.7% 17.7%
Sarooj 4-B-P181 - - 16.7% 17.7%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Azaibah South 1-B P147
Bousher Grid GP02
Bousher 2 P163
Al Khuwair South P052
Al Khuwair 17/1 P050
Royal Hospital P024
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Azaibah South 1-B P147 40.0 40.0 - - 42.9 107.2 -2.9 44.8 112.0 -4.8 - - - - - -
Bousher Grid GP02 20.0 20.0 20.0 20.0 24.2 121.0 -4.2 26.7 133.5 -6.7 18.5 92.7 1.5 21.3 106.4 -1.3
Bousher 2 P163 - - 40.0 40.0 - - - - - - 29.0 72.5 11.0 33.3 83.1 6.7
Al Khuwair South P052 40.0 40.0 40.0 40.0 33.6 84.0 6.4 35.8 89.4 4.2 38.1 95.2 1.9 40.5 101.3 -0.5
Al Khuwair 17/1 P050 20.0 20.0 20.0 20.0 19.0 95.0 1.0 18.4 92.0 1.6 19.6 98.0 0.4 20.8 104.0 -0.8
Royal Hospital P024 40.0 40.0 - - 22.6 56.5 17.4 20.7 51.7 19.3 - - - - - -
Azaiba South 1B-A P147
Azaiba South 1B-B P147
Azaiba South 1B-C P147
Bousher G-A GP02
Bousher G-B GP02
Bousher 02-A P163
Bousher 02-B P163
Bousher 02-C P163
Al Khuwair South-A P052
Al Khuwair South-B P052
Al Khuwair South-C P052
Al Khuwair 17/1-A P050
Al Khuwair 17/1-B P050
Royal Hospital-A P024
Royal Hospital-B P024
Royal Hospital-C P024
MVAr MW MVAr MW MVAr
39.4 16.9 42.6 14.0 -
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr MW
Bousher-1-A Grid Network Results
38.5 12.7
16.4 9.6 17.5 5.7 18.6 6.2 19.8 6.4
31.9 10.6 34.0 11.2 36.2 12.0
6.6
- - - - 27.5 9.1 31.6 10.4
- - -
22.1 9.9 25.4 8.3 17.6 5.8 20.2
- - -
100.3 100.9 100.1 101.3 - - -
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
100.3 101.1 100.1 101.4 -
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
- -
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
19.5 11.4 19.6 6.5 - -
100.7 102.4
- - - - 101.0 101.4 100.7 102.4
- - - - 101.0 103.2
100.9 102.9
101.1 102.2 100.9 102.4 101.2 103.6 100.9 102.9
101.1 101.9 100.9 102.1 101.2 103.6
-
99.8 98.4 99.6 98.9 - - - -
100.6 102.6
100.8 101.8 100.6 103.0 100.9 103.1 100.5 102.6
100.8 102.0 100.7 103.0 100.9 103.1
100.7 102.4
100.9 101.8 100.7 101.3 101.0 102.9 100.7 102.4
101.0 103.9 100.8 103.6 101.0 102.9
100.7 102.4
101.0 103.9 100.8 103.6 101.0 102.9 100.7 102.4
- - - - 101.0 103.2
- -100.7 101.9 100.7 103.6 - -
- -
100.8 102.9 100.7 103.6 - - - -
100.8 102.9 100.7 103.6 - -
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Azaiba South 1B-A P147 25.0 25.0 - - 25.0 25.0 - - 13.7 7.9 13.7 7.9 - - - -
Azaiba South 1B-B P147 25.0 25.0 - - 25.0 25.0 - - 13.7 7.9 13.7 8.0 - - - -
Azaiba South 1B-C P147 25.0 25.0 - - 25.0 25.0 - - 13.8 8.4 13.8 8.5 - - - -
Bousher G-A GP02 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 24.8 8.8 24.7 8.9 24.1 15.2 24.4 15.5
Bousher G-B GP02 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 24.8 8.7 24.7 8.7 24.1 15.2 24.4 15.5
Bousher 02-A P163 - - 25.0 25.0 - - 25.0 25.0 - - - - 19.8 14.4 20.0 14.7
Bousher 02-B P163 - - 25.0 25.0 - - 25.0 25.0 - - - - 19.8 14.4 20.0 14.7
Bousher 02-C P163 - - 25.0 25.0 - - 25.0 25.0 - - - - 19.7 8.0 20.0 8.1
Al Khuwair South-A P052 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 21.0 16.5 21.0 16.6 20.6 17.1 20.8 17.3
Al Khuwair South-B P052 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 21.0 16.5 21.0 16.6 20.6 17.1 20.8 17.3
Al Khuwair South-C P052 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 21.2 10.0 21.1 10.1 20.7 9.7 20.9 9.7
Al Khuwair 17/1-A P050 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 17.9 8.1 17.9 14.7 17.6 14.7 17.8 14.8
Al Khuwair 17/1-B P050 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 17.8 8.2 17.9 14.7 17.6 14.7 17.8 14.8
Royal Hospital-A P024 25.0 25.0 - - 20.0 20.0 - - 16.4 13.7 16.4 13.7 - - - -
Royal Hospital-B P024 25.0 25.0 - - 20.0 20.0 - - 16.4 13.7 16.4 13.7 - - - -
Royal Hospital-C P024 25.0 25.0 - - 20.0 20.0 - - 16.3 7.8 16.2 7.6 - - - -
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 - - 12.4 12.9 - -
22.0 22.0 - - 12.9 13.5 - -
22.0 22.0 - - 19.4 20.2 - -
22.0 22.0 22.0 22.0 13.1 14.4 9.5 10.9
22.0 22.0 22.0 22.0 12.0 13.2 9.5 10.9
- - 22.0 22.0 - - 9.9 11.4
- - 22.0 22.0 - - 9.9 11.4
- - 22.0 22.0 - - 9.9 11.4
22.0 22.0 22.0 22.0 8.5 9.1 13.1 13.9
22.0 22.0 22.0 22.0 8.5 9.1 13.0 13.9
22.0 22.0 22.0 22.0 17.5 18.7 13.0 13.9
22.0 22.0 22.0 22.0 9.5 9.3 9.9 10.6
22.0 22.0 22.0 22.0 9.9 9.4 10.0 10.7
22.0 22.0 - - 6.7 6.8 - -
22.0 22.0 - - 6.8 6.9 - -
22.0 22.0 - - 9.2 6.8 - -
2020
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
Bousher 02-A-P163 - - 44.8% 51.7%
Bousher 02-B-P163 - - 44.8% 51.7%
Bousher Grid H-BB01 59.5% 65.4% 43.2% 49.7%
Bousher Grid H-BB02 54.5% 59.9% 43.0% 49.5%
Azaiba South 1B-B-P147 58.7% 61.2% - -
Azaiba South 1B-C-P147 88.1% 91.6% - -
%Loading %Loading
Azaiba South 1B-A-P147 56.2% 58.6% - -
Royal Hospital-A-P024 30.6% 30.9% - -
Royal Hospital-B-P024 31.0% 31.3% - -
Al Khuwair 17/1-A-P050 43.2% 42.1% 45.0% 48.0%
Al Khuwair 17/1-B-P050 45.1% 42.6% 45.5% 48.5%
Al Khuwair South-B-P052 38.7% 41.2% 59.1% 63.0%
Al Khuwair South-C-P052 79.5% 84.9% 59.2% 63.2%
Bousher 02-C-P163 - - 44.8% 51.7%
Al Khuwair South-A-P052 38.8% 41.4% 59.3% 63.3%
Royal Hospital-C-P024 42.0% 31.1% - -
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Al Ansab 1 P007
Azaibah North 1 P011
Azaibah North
1(upgrade)P011
Ghubrah South 1 P026
Holiday Inn P051
Al Muna P084
Tilal Al Khuwair P055
Azaibah South(New) P189
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Al Ansab 1 P007 20.0 20.0 - - 21.5 107.5 -1.5 22.9 114.6 -2.9 - - - - - -
Azaibah North 1 P011 20.0 20.0 - - 20.3 101.5 -0.3 21.5 107.4 -1.5 - - - - - -
Azaibah North
1(upgrade)P011 - - 40.0 40.0 - - - - - - 34.6 86.4 5.4 37.3 93.3 2.7
Ghubrah South 1 P026 40.0 40.0 - - 29.2 73.0 10.8 28.6 71.6 11.4 - - - - - -
Holiday Inn P051 40.0 40.0 40.0 40.0 31.0 77.5 9.0 33.0 82.5 7.0 35.1 87.8 4.9 37.4 93.5 2.6
Al Muna P084 20.0 20.0 20.0 20.0 34.2 171.0 -14.2 38.0 189.8 -18.0 26.7 133.3 -6.7 30.6 152.9 -10.6
Tilal Al Khuwair P055 40.0 40.0 40.0 40.0 27.0 67.4 13.0 27.8 69.4 12.2 29.6 73.9 10.4 31.5 78.7 8.5
Azaibah South(New) P189 - - - 40.0 - - - - - - - - - 17.1 42.6 22.9
Al Ansab 1-A P007
Al Ansab 1-B P007
Azaiba North 1-A P011
Azaiba North 1-B P011
Azaiba North 1-C P011
Ghubrah South 1-A P026
Ghubrah South 1-B P026
Ghubrah South 1-C P026
Holiday Inn-A P051
Holiday Inn-B P051
Holiday Inn-C P051
Al Muna 1-A P084
Al Muna 1-B P084
Tilal Al Khuwair-A P055
Tilal Al Khuwair-B P055
Tilal Al Khuwair-C P055
Azaibah South(New)-A P189
Azaibah South(New)-B P189
Azaibah South(New)-C P189
- - -
18.9 7.4 20.4 6.7 - - -
MVAr MW MVAr MW MVAr
20.6 6.2 22.0 6.6 -
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr MW
Bousher-1-B Grid Network Results
29.1 9.5
24.8 10.6 26.4 8.7 28.1 9.2 29.9 9.8
31.4 13.5 36.1 11.9 25.3 8.3
- -
29.4 9.8 31.3 10.5 33.3 11.1 35.5 11.9
27.0 11.1 27.2 8.9 - -
-
- - - - 32.8 10.8 35.5 11.7
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
100.2 103.3 99.3 102.3 -
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
16.2 5.3
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
- - - - - -
100.0 101.4
- - - - 99.8 101.5 100.0 101.4
100.1 101.7 99.2 101.0 99.8 101.5
-
100.1 102.0 99.2 101.2 99.8 101.5 100.0 101.4
- - -
99.4 100.3 98.4 98.9 - - -
100.4 101.8
100.5 101.9 99.6 100.7 100.2 101.1 100.4 101.1
100.5 102.7 99.7 101.6 100.2 102.0
- -
100.5 102.7 99.7 101.6 100.2 102.0 100.5 102.3
100.4 102.8 99.5 102.3 - -
- -
100.3 102.5 99.5 102.0 - - - -
100.3 102.5 99.5 102.0 - -
100.5 102.1
- - - - - - 100.5 103.7
100.6 102.1 99.7 101.6 100.2 102.0
100.5 102.7
100.6 102.7 99.7 102.1 100.3 102.6 100.5 102.7
100.6 102.7 99.7 102.1 100.3 102.6
99.9 100.5
99.8 98.5 98.9 97.8 99.8 100.7 99.9 100.2
99.8 98.9 98.9 98.2 99.8 100.9
100.5 103.7
- - - - - - 100.5 103.7
- - - - - -
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Ansab 1-A P007 25.0 25.0 - - 20.0 20.0 - - 11.5 7.3 11.5 7.3 - - - -
Al Ansab 1-B P007 25.0 25.0 - - 20.0 20.0 - - 11.7 8.0 11.7 8.0 - - - -
Azaiba North 1-A P011 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 14.2 7.9 14.2 8.0 14.2 14.5 14.4 14.8
Azaiba North 1-B P011 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 14.2 8.0 14.2 8.0 14.2 14.5 14.4 14.8
Azaiba North 1-C P011 - - 25.0 25.0 - - 25.0 25.0 - - - - 14.0 8.0 14.2 8.1
Ghubrah South 1-A P026 25.0 25.0 - - 18.4 18.4 - - 17.2 16.2 17.2 16.2 - - - -
Ghubrah South 1-B P026 25.0 25.0 - - 18.4 18.4 - - 17.2 16.2 17.3 16.2 - - - -
Ghubrah South 1-C P026 25.0 25.0 - - 18.4 18.4 - - 17.0 9.0 17.0 9.0 - - - -
Holiday Inn-A P051 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 20.3 14.6 20.3 14.7 19.8 14.8 20.3 8.2
Holiday Inn-B P051 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 20.1 14.6 20.1 14.7 19.7 14.8 20.1 8.3
Holiday Inn-C P051 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 20.3 8.2 20.3 8.3 19.8 8.3 20.3 8.4
Al Muna 1-A P084 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 15.3 8.4 15.3 8.5 15.0 8.1 15.3 8.3
Al Muna 1-B P084 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 15.3 8.3 15.3 8.5 15.0 8.0 15.3 8.2
Tilal Al Khuwair-A P055 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 21.0 14.8 21.1 14.8 20.5 14.8 21.1 15.0
Tilal Al Khuwair-B P055 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 21.0 14.8 21.1 14.8 20.5 14.8 21.1 15.0
Tilal Al Khuwair-C P055 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 21.0 8.2 21.0 8.2 20.5 8.2 21.0 8.3
Azaibah South(New)-A P189 - - - 25.0 - - - 25.0 - - - - - - 16.8 7.5
Azaibah South(New)-B P189 - - - 25.0 - - - 25.0 - - - - - - 16.9 13.5
Azaibah South(New)-C P189 - - - 25.0 - - - 25.0 - - - - - - 16.9 13.5
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 - - 6.3 6.8 - -
22.0 22.0 - - 15.7 16.8 - -
22.0 22.0 22.0 22.0 9.9 10.5 11.6 12.6
22.0 22.0 22.0 22.0 10.7 11.3 11.6 12.6
- - 22.0 22.0 - - 11.6 12.6
22.0 22.0 - - 10.4 10.2 - -
22.0 22.0 - - 10.3 10.1 - -
22.0 22.0 - - 9.1 8.9 - -
22.0 22.0 22.0 22.0 9.8 10.5 11.2 11.1
22.0 22.0 22.0 22.0 9.7 10.3 11.0 12.6
22.0 22.0 22.0 22.0 12.4 13.2 14.1 15.0
22.0 22.0 22.0 22.0 17.7 19.7 13.5 15.6
22.0 22.0 22.0 22.0 18.4 20.5 14.0 16.2
22.0 22.0 22.0 22.0 8.8 9.1 9.7 10.3
22.0 22.0 22.0 22.0 8.5 8.7 9.3 9.9
22.0 22.0 22.0 22.0 10.4 10.6 11.3 12.1
- - - 22.0 - - - 5.8
- - - 22.0 - - - 5.8
- - - 22.0 - - - 5.8
%Loading
Al Ansab 1-A-P007 28.8% 30.8% - -
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
Ghubrah South 1-C-P026 41.6% 40.6% - -
Holiday Inn-A-P051 44.6% 47.6% 50.8% 50.3%
Ghubrah South 1-A-P026 47.4% 46.3% - -
Ghubrah South 1-B-P026 47.0% 45.9% - -
Azaiba North 1-B-P011 48.5% 51.5% 52.9% 57.3%
Azaiba North 1-C-P011 - - 52.9% 57.3%
Al Ansab 1-B-P007 71.2% 76.4% - -
Azaiba North 1-A-P011 45.2% 47.9% 52.9% 57.3%
Tilal Al Khuwair-C-P055 47.1% 48.3% 51.5% 54.9%
Azaibah South(New)-A-P189 - - - 26.2%
Tilal Al Khuwair-A-P055 40.1% 41.2% 43.9% 46.8%
Tilal Al Khuwair-B-P055 38.6% 39.6% 42.3% 45.1%
Al Muna 1-A-P084 80.5% 89.4% 61.3% 70.8%
Al Muna 1-B-P084 83.7% 93.0% 63.6% 73.6%
Holiday Inn-B-P051 44.0% 47.0% 50.1% 57.4%
Holiday Inn-C-P051 56.2% 60.0% 64.0% 68.3%
Azaibah South(New)-B-P189 - - - 26.2%
Azaibah South(New)-C-P189 - - - 26.2%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Al Ansab 1 P007
Ghubrah South 1 P026
Azaibah South 1-A P014
Azaibah South 1-B P147
Royal Hospital P024
Mall Of Oman P171
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Al Ansab 1 P007 - - 20.0 20.0 - - - - - - 18.9 94.3 1.1 20.1 100.5 -0.1
Ghubrah South 1 P026 - - 40.0 40.0 - - - - - - 28.8 72.1 11.2 29.0 72.6 11.0
Azaibah South 1-A P014 - - 20.0 20.0 - - - - - - 18.5 92.7 1.5 20.0 100.1 0.0
Azaibah South 1-B P147 - - 40.0 40.0 - - - - - - 48.4 121.0 -8.4 35.2 88.0 4.8
Royal Hospital P024 - - 40.0 40.0 - - - - - - 20.8 52.1 19.2 21.0 52.4 19.0
Mall Of Oman P171 - - 40.0 40.0 - - - - - - 38.3 95.7 1.7 38.3 95.7 1.7
Al Ansab 1-A P007
Al Ansab 1-B P007
Azaiba South 1A-A P014
Azaiba South 1A-B P014
Azaiba South 1B-A P147
Azaiba South 1B-B P147
Azaiba South 1B-C P147
Ghubrah South 1-A P026
Ghubrah South 1-B P026
Ghubrah South 1-C P026
Mall of Oman-A P171
Mall of Oman-B P171
Mall of Oman-C P171
Royal Hospital-A P024
Royal Hospital-B P024
Royal Hospital-C P024
19.3 5.8
- - - - 27.4 9.0 27.6 9.1
- - - - 18.1 5.4
MW MVAr MW MVAr MW MVAr
GhalaHeights Grid Network Results
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
19.9 6.5
- - - - 36.4 12.0 36.4 12.0
- - - - 19.8 6.5
19.0 6.3
- - - - 46.0 15.1 33.4 11.0
- - - - 17.6 5.8
102.1
- - - - 100.0 102.2 99.1 101.0
103.1 99.8 102.1
- - - - 100.7 103.1 99.8
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
- - - - 100.7
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
100.1 102.6
- - - - 100.9 103.4 100.1 102.6
- - - - 100.9 103.4
99.6 101.1
- - - - 100.1 100.4 99.6 101.1
- - - - 100.1 100.4
99.0 101.0
- - - - 100.1 100.3 99.6 101.1
- - - - 99.9 102.2
100.1 102.9
- - - - 100.9 103.8 100.1 102.9
- - - - 100.9 103.8
99.7 101.0
- - - - 100.5 101.9 99.7 101.0
- - - - 100.6 101.8
100.1 102.8
- - - - 100.5 101.8 99.7 101.0
- - - - 100.9 103.7
100.1 103.0- - - - 100.9 103.8
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Ansab 1-A P007 - - 25.0 25.0 - - 20.0 20.0 - - - - 16.3 14.9 16.2 15.0
Al Ansab 1-B P007 - - 25.0 25.0 - - 20.0 20.0 - - - - 16.1 14.9 16.0 15.0
Azaiba South 1A-A P014 - - 25.0 25.0 - - 25.0 25.0 - - - - 9.1 13.0 9.0 13.1
Azaiba South 1A-B P014 - - 25.0 25.0 - - 25.0 25.0 - - - - 8.6 13.0 8.6 13.1
Azaiba South 1B-A P147 - - 25.0 25.0 - - 25.0 25.0 - - - - 14.0 8.5 14.0 14.8
Azaiba South 1B-B P147 - - 25.0 25.0 - - 25.0 25.0 - - - - 13.9 8.5 14.0 14.8
Azaiba South 1B-C P147 - - 25.0 25.0 - - 25.0 25.0 - - - - 13.9 8.5 13.8 8.1
Ghubrah South 1-A P026 - - 25.0 25.0 - - 18.4 18.4 - - - - 20.8 17.1 20.6 17.1
Ghubrah South 1-B P026 - - 25.0 25.0 - - 18.4 18.4 - - - - 20.8 17.1 20.6 17.1
Ghubrah South 1-C P026 - - 25.0 25.0 - - 18.4 18.4 - - - - 20.8 9.5 20.6 9.5
Mall of Oman-A P171 - - 25.0 25.0 - - 25.0 25.0 - - - - 16.5 15.2 16.4 15.2
Mall of Oman-B P171 - - 25.0 25.0 - - 25.0 25.0 - - - - 16.6 15.2 16.5 15.2
Mall of Oman-C P171 - - 25.0 25.0 - - 25.0 25.0 - - - - 16.6 8.4 16.5 8.4
Royal Hospital-A P024 - - 25.0 25.0 - - 20.0 20.0 - - - - 19.9 14.4 19.8 14.4
Royal Hospital-B P024 - - 25.0 25.0 - - 20.0 20.0 - - - - 19.9 14.4 19.8 14.4
Royal Hospital-C P024 - - 25.0 25.0 - - 20.0 20.0 - - - - 19.9 8.0 19.7 8.0
2017 2018 2019 2020 MVA MVA MVA MVA
- - 22.0 22.0 - - 9.5 10.2
- - 22.0 22.0 - - 9.6 10.3
- - 15.4 15.4 - - 9.5 10.3
- - 15.4 15.4 - - 9.3 10.1
- - 22.0 22.0 - - 16.8 11.9
- - 22.0 22.0 - - 16.8 12.0
- - 22.0 22.0 - - 16.8 12.0
- - 22.0 22.0 - - 10.3 10.3
- - 22.0 22.0 - - 10.2 10.2
- - 22.0 22.0 - - 9.0 9.1
- - 22.0 22.0 - - 13.0 13.0
- - 22.0 22.0 - - 13.2 13.2
- - 22.0 22.0 - - 13.1 13.1
- - 22.0 22.0 - - 7.0 7.0
- - 22.0 22.0 - - 7.1 7.1
- - 22.0 22.0 - - 7.0 7.1
%Loading %Loading
Al Ansab 1-A-P007 - - 43.2% 46.2%
2020
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
Ghubrah South 1-A-P026 - - 46.7% 47.0%
Ghubrah South 1-B-P026 - - 46.2% 46.6%
Azaiba South 1B-B-P147 - - 76.2% 54.6%
Azaiba South 1B-C-P147 - - 76.2% 54.4%
Azaiba South 1A-B-P014 - - 60.7% 65.9%
Azaiba South 1B-A-P147 - - 76.2% 54.3%
Al Ansab 1-B-P007 - - 43.7% 46.7%
Azaiba South 1A-A-P014 - - 61.7% 67.0%
Royal Hospital-C-P024 - - 31.9% 32.1%
Royal Hospital-A-P024 - - 31.6% 31.9%
Royal Hospital-B-P024 - - 32.1% 32.4%
Mall of Oman-C-P171 - - 60.0% 60.1%
Mall of Oman-A-P171 - - 59.6% 59.6%
Ghubrah South 1-C-P026 - - 40.9% 41.2%
Mall of Oman-B-P171 - - 59.2% 59.2%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Al Ansab 2 P008
ROP Hospital P172
Oman Exhibition P165
Ghala 2 P156
Ghala 1 P015
Ghala 1(Upgrade) P015
MOD Al Ansab P167
Al Ansab STP P009
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Al Ansab 2 P008 20.0 20.0 - - 18.7 93.5 1.3 19.9 99.7 0.1 - - - - - -
ROP Hospital P172 - - 40.0 40.0 - - - - - - 21.1 52.6 18.9 21.1 52.6 18.9
Oman Exhibition P165 40.0 40.0 40.0 40.0 4.2 10.5 35.8 4.2 10.5 35.8 4.2 10.5 35.8 4.2 10.5 35.8
Ghala 2 P156 40.0 40.0 - - 33.2 83.0 6.8 33.9 84.7 6.1 - - - - - -
Ghala 1 P015 - 20.0 - - - - - 24.2 121.0 -4.2 - - - - - -
Ghala 1(Upgrade) P015 - - 40.0 40.0 - - - - - - 37.3 93.3 2.7 40.3 100.8 -0.3
MOD Al Ansab P167 10.0 10.0 10.0 10.0 9.5 94.7 0.5 9.5 94.7 0.5 9.5 94.7 0.5 9.5 94.7 0.5
Al Ansab STP P009 20.0 20.0 20.0 20.0 7.3 36.4 12.7 7.3 36.4 12.7 7.3 36.4 12.7 7.3 36.4 12.7
Ansab 2-A P008
Ansab 2-B P008
Ansab STP-A P008
Ansab STP-B P008
Ghala 1-A P008
Ghala 1-B P008
Ghala 1-C P008
Ghala 2-A P008
Ghala 2-B P008
Ghala 2-C P008
MOD Al Ansab-A P008
MOD Al Ansab-B P008
Oman Exhibition-A P008
Oman Exhibition-B P008
Oman Exhibition-C P008
ROP Hospital-A P008
ROP Hospital-B P008
ROP Hospital-C P008
Ghala-A Grid Network Results
6.6
4.1 0.9 4.1 0.9 4.1 0.9 4.1 0.9
- - -
- - - - 20.0 6.6 20.0
MVAr MW MVAr MW MVAr
18.5 2.7 19.7 2.9 -
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr MW
6.7 2.9
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
6.7 2.9 6.7 2.9 6.7 2.9
39.8 6.6
8.7 3.7 8.7 3.7 8.7 3.7 8.7 3.7
- - - - 36.8 6.1
- -
- - 23.9 3.9 - - - -
30.2 13.8 32.2 10.6 - -
-
100.7 104.1 100.4 103.8 101.3 104.8 101.2 104.7
- - -
100.1 101.6 99.7 101.0 - - -
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
100.1 101.6 99.8 101.0 -
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
- -
99.9 100.8 99.7 102.1 - - - -
100.0 101.4 99.7 102.1 - -
100.5 102.9
- - - - 100.7 103.3 100.5 102.9
- - 99.8 102.4 100.7 103.3
101.2 104.7
- - 99.8 102.4 100.7 103.3 100.5 102.9
100.7 104.1 100.4 103.8 101.3 104.8
101.2 105.6
100.7 105.3 100.4 104.8 101.3 105.7 101.2 105.6
100.7 105.0 100.4 104.8 101.3 105.7
100.9 103.8
100.7 105.0 100.4 104.8 101.3 105.7 101.2 105.6
100.5 103.4 100.1 102.9 101.0 103.9
- -
100.4 103.0 100.1 102.9 101.0 103.9 100.9 103.8
99.9 100.8 99.7 102.1 - -
101.0 104.6- - - - 101.1 104.7
101.0 104.6
- - - - 101.1 104.7 101.0 104.6
- - - - 101.1 104.7
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Ansab 2-A P008 25.0 25.0 - - 20.0 20.0 - - 13.1 14.0 12.8 14.0 - - - -
Ansab 2-B P008 25.0 25.0 - - 20.0 20.0 - - 13.1 14.0 12.8 14.0 - - - -
Ansab STP-A P009 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 18.3 13.9 17.6 13.7 17.2 13.7 17.3 13.7
Ansab STP-B P009 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 18.3 13.9 17.6 13.7 17.2 13.7 17.3 13.7
Ghala 1-A P015 - 25.0 25.0 25.0 - 20.0 20.0 20.0 - - 12.8 7.6 12.7 7.9 12.7 8.0
Ghala 1-B P015 - 25.0 25.0 25.0 - 20.0 20.0 20.0 - - 12.9 8.2 12.9 14.4 12.9 14.6
Ghala 1-C P015 - - 25.0 25.0 - - 20.0 20.0 - - - - 12.9 14.4 12.9 14.6
Ghala 2-A P156 25.0 25.0 - - 25.0 25.0 - - 12.2 7.9 12.3 19.7 - - - -
Ghala 2-B P156 25.0 25.0 - - 25.0 25.0 - - 12.5 14.5 12.2 19.7 - - - -
Ghala 2-C P156 25.0 25.0 - - 25.0 25.0 - - 12.5 14.5 12.3 19.7 - - - -
MOD Al Ansab-A P167 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 12.5 11.2 12.2 11.1 12.1 11.0 12.1 11.0
MOD Al Ansab-B P167 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 12.5 11.2 12.2 11.1 12.1 11.0 12.1 11.0
Oman Exhibition-A P165 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 22.7 13.9 21.6 13.6 21.1 13.5 21.2 7.6
Oman Exhibition-B P165 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 22.7 13.9 21.5 13.6 21.1 13.5 21.1 7.6
Oman Exhibition-C P165 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 22.7 7.6 21.6 7.7 21.1 7.7 21.2 7.7
ROP Hospital-A P172 - - 25.0 25.0 - - 25.0 25.0 - - - - 15.2 13.7 15.2 13.7
ROP Hospital-B P172 - - 25.0 25.0 - - 25.0 25.0 - - - - 15.2 13.7 15.2 13.7
ROP Hospital-C P172 - - 25.0 25.0 - - 25.0 25.0 - - - - 15.1 7.6 15.1 7.6
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 - - 10.1 10.8 - -
22.0 22.0 - - 10.2 10.9 - -
22.0 22.0 22.0 22.0 3.7 3.7 3.7 3.7
22.0 22.0 22.0 22.0 3.7 3.7 3.7 3.7
- 22.0 22.0 22.0 - 12.3 12.6 13.7
- 22.0 22.0 22.0 - 12.3 12.6 13.7
- - 22.0 22.0 - - 12.6 13.7
22.0 22.0 - - 10.4 11.2 - -
22.0 22.0 - - 11.9 11.3 - -
22.0 22.0 - - 11.8 11.2 - -
22.0 22.0 22.0 22.0 5.0 4.6 4.6 4.6
22.0 22.0 22.0 22.0 4.2 4.6 4.6 4.6
22.0 22.0 22.0 22.0 2.1 1.4 1.4 1.4
22.0 22.0 22.0 22.0 2.1 1.4 1.4 1.4
22.0 22.0 22.0 22.0 0.0 1.4 1.4 1.4
- - 22.0 22.0 - - 6.8 6.8
- - 22.0 22.0 - - 6.9 6.9
- - 22.0 22.0 - - 6.9 6.9
2020
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
Ghala 1-B-P015 - 55.9% 57.5% 62.3%
Ghala 1-C-P015 - - 57.5% 62.2%
Ansab STP-B-P009 16.6% 16.6% 16.6% 16.6%
Ghala 1-A-P015 - 55.8% 57.4% 62.1%
Ansab 2-B-P008 46.2% 49.5% - -
Ansab STP-A-P009 16.7% 16.7% 16.7% 16.7%
%Loading %Loading
Ansab 2-A-P008 46.0% 49.2% - -
Oman Exhibition-B-P165 9.6% 6.4% 6.4% 6.4%
Oman Exhibition-C-P165 0.1% 6.4% 6.4% 6.4%
MOD Al Ansab-B-P167 18.9% 20.9% 20.9% 20.9%
Oman Exhibition-A-P165 9.6% 6.4% 6.4% 6.4%
Ghala 2-C-P156 53.8% 51.1% - -
MOD Al Ansab-A-P167 22.9% 20.9% 20.9% 20.9%
Ghala 2-A-P156 47.1% 50.8% - -
Ghala 2-B-P156 54.1% 51.4% - -
ROP Hospital-C-P172 - - 31.2% 31.2%
ROP Hospital-A-P172 - - 30.9% 30.9%
ROP Hospital-B-P172 - - 31.2% 31.2%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Ghala 2 P156
Al Ansab 2 P008
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Ghala 2 P156 - - 40.0 40.0 - - - - - - 38.4 95.9 1.6 40.9 102.2 -0.9
Al Ansab 2 P008 - - 20.0 20.0 - - - - - - 19.1 95.5 0.9 20.4 101.8 -0.4
Ghala 2-A P156
Ghala 2-B P156
Ghala 2-C P156
Ansab 2-A P008
Ansab 2-B P008
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Ghala 2-A P156 - - 25.0 25.0 - - 25.0 25.0 - - - - 11.7 7.9 11.7 8.0
Ghala 2-B P156 - - 25.0 25.0 - - 25.0 25.0 - - - - 11.9 14.6 12.0 14.8
Ghala 2-C P156 - - 25.0 25.0 - - 25.0 25.0 - - - - 11.9 14.6 12.0 14.8
Ansab 2-A P008 - - 25.0 25.0 - - 20.0 20.0 - - - - 12.1 11.0 12.1 11.0
Ansab 2-B P008 - - 25.0 25.0 - - 20.0 20.0 - - - - 12.1 11.0 12.1 11.0
2017 2018 2019 2020 MVA MVA MVA MVA
- - 22.0 22.0 - - 11.7 12.6
- - 22.0 22.0 - - 12.7 13.6
- - 22.0 22.0 - - 14.0 14.9
- - 22.0 22.0 - - 10.3 15.6
- - 22.0 22.0 - - 10.4 6.8
MVAr MW MVAr MW MVAr
- - - - 36.4
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr MW
Ghala-B Grid Network Results
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
- - - - 100.6
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
3.0
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
12.0 38.8 12.8
- - - - 18.9 2.8 20.1
100.1 100.0
- - - - 100.7 102.2 100.7 103.3
- - - - 100.7 102.2
102.1
- - - - 100.4 102.1 100.2 101.6
102.9 100.3 102.4
- - - - 100.5 102.6 100.3
Ghala 2-B-P156 - - 57.8% 61.9%
Ghala 2-C-P156 - - 63.4% 67.9%
%Loading
Ghala 2-A-P156 - - 53.4% 57.2%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
Ansab 2-A-P008 - - 46.9% 70.8%
Ansab 2-B-P008 - - 47.2% 30.8%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Ghala 1 P015
Airport Height 2 P002
Airport Height 1 P001
Azaibah North 3 P013
Airport Height 5 P151
MOD Technical College P081
Airport Height 3 P003
Airport Height 4 P004
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Ghala 1 P015 20.0 - - - 22.4 112.0 -2.4 - - - - - - - - -
Airport Height 2 P002 20.0 20.0 20.0 20.0 12.6 63.0 7.4 14.1 70.6 5.9 19.3 96.5 0.7 21.6 108.1 -1.6
Airport Height 1 P001 20.0 20.0 20.0 20.0 26.9 134.5 -6.9 27.9 139.7 -7.9 19.5 97.5 0.5 21.8 109.2 -1.8
Azaibah North 3 P013 40.0 40.0 - - 34.8 87.0 5.2 37.3 93.2 2.7 - - - - - -
Airport Height 5 P151 20.0 20.0 20.0 20.0 4.5 22.5 15.5 5.0 25.2 15.0 16.8 84.2 3.2 18.9 94.3 1.1
MOD Technical
CollegeP081 20.0 20.0 20.0 20.0 8.2 41.0 11.8 8.9 44.4 11.1 10.0 49.8 10.0 11.1 55.7 8.9
Airport Height 3 P003 20.0 20.0 20.0 20.0 17.8 89.0 2.2 19.9 99.7 0.1 18.9 94.3 1.1 21.1 105.6 -1.1
Airport Height 4 P004 20.0 20.0 20.0 20.0 7.9 39.7 12.1 8.6 43.0 11.4 9.6 48.2 10.4 10.8 54.0 9.2
Airport Height 1-A P001
Airport Height 1-B P001
Airport Height 2-A P002
Airport Height 2-B P002
Airport Height 3-A P003
Airport Height 3-B P003
Airport Height 4-A P004
Airport Height 4-B P004
Airport Height 5-A P151
Airport Height 5-B P151
Azaiba North 3-A P013
Azaiba North 3-B P013
Azaiba North 3-C P013
Ghala 1-A P015
Ghala 1-B P015
MOD Technical
College-AP081
MOD Technical
College-BP081
- -
12.1 3.5 13.6 3.9 18.5 5.4 20.8 6.0
22.1 3.7 - - - -
MW MVAr MW MVAr MW MVAr
Airport Height-A Grid Network Results
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
20.4 5.4
7.3 3.1 8.2 2.7 9.2 3.0 10.3 3.4
17.2 4.6 19.3 5.1 18.2 4.9
18.9 0.0
7.5 3.2 8.4 2.8 9.5 3.1 10.6 3.5
4.5 0.0 5.0 0.0 16.8 0.0
20.8 6.8
32.8 11.6 35.4 11.6 - - - -
23.7 12.7 26.5 8.7 18.5 6.1
102.7 100.1 101.7
100.8 100.7 100.3 101.5 100.5 102.7 100.1
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
100.7 100.0 100.3 100.9 100.5
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
100.1 102.4
101.2 104.7 100.8 104.4 100.8 104.3 100.4 103.7
100.9 103.7 100.4 102.9 100.5 103.1
100.2 102.1
100.9 103.7 100.4 102.9 100.5 103.1 100.0 102.4
101.1 104.3 100.6 103.6 100.6 102.9
102.1
101.1 104.3 100.6 103.6 100.6 102.9 100.2 102.1
- -
100.3 102.1 99.7 101.1 - - - -
100.6 103.3 99.7 101.1 - -
100.1 104.2
99.7 99.5 99.7 101.1 - - - -
101.3 105.8 100.8 105.3 100.6 104.8
100.4 103.7
101.3 105.8 100.8 105.3 100.6 104.8 100.1 104.2
101.2 104.7 100.8 104.4 100.8 104.3
100.5 103.7
101.3 104.7 100.8 104.4 100.9 104.3 100.5 103.7
101.3 104.7 100.8 104.4 100.9 104.3
- -
99.7 102.0 - - - - - -
100.4 103.6 - - - -
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Airport Height 1-A P001 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 16.2 8.2 15.2 8.2 14.9 13.9 14.9 7.9
Airport Height 1-B P001 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 16.2 8.1 15.2 8.0 14.9 13.9 15.0 7.8
Airport Height 2-A P002 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 17.0 13.5 15.8 13.4 15.5 13.7 15.7 13.9
Airport Height 2-B P002 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 16.9 13.5 15.8 13.4 15.5 13.7 15.6 13.9
Airport Height 3-A P003 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 15.4 14.4 14.5 14.3 14.2 14.1 14.4 14.3
Airport Height 3-B P003 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 15.3 14.4 14.4 14.3 14.2 14.1 14.3 14.3
Airport Height 4-A P004 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 18.7 13.7 17.3 13.5 16.9 13.4 17.1 13.6
Airport Height 4-B P004 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 18.6 13.7 17.2 13.5 16.8 13.4 17.0 13.6
Airport Height 5-A P151 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 14.2 12.5 13.5 12.3 13.3 13.2 13.4 13.4
Airport Height 5-B P151 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 14.2 12.5 13.4 12.3 13.3 13.2 13.4 13.4
Azaiba North 3-A P013 25.0 25.0 - - 20.0 20.0 - - 11.1 7.9 11.0 19.0 - - - -
Azaiba North 3-B P013 25.0 25.0 - - 20.0 20.0 - - 10.9 7.3 11.0 19.0 - - - -
Azaiba North 3-C P013 25.0 25.0 - - 20.0 20.0 - - 11.0 7.6 11.0 19.0 - - - -
Ghala 1-A P015 25.0 - - - 20.0 - - - 8.3 6.8 - - - - - -
Ghala 1-B P015 25.0 - - - 20.0 - - - 8.7 7.2 - - - - - -
MOD Technical
College-AP081 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 21.0 13.8 19.3 13.6 18.8 13.6 19.0 13.7
MOD Technical
College-BP081 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 21.2 13.8 19.4 13.6 18.9 13.6 19.1 13.7
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 14.9 15.3 9.9 11.8
22.0 22.0 22.0 22.0 13.2 13.6 9.9 10.5
22.0 22.0 22.0 22.0 6.4 7.2 9.9 11.1
22.0 22.0 22.0 22.0 6.3 7.0 9.7 10.9
22.0 22.0 22.0 22.0 9.1 10.2 9.7 10.9
22.0 22.0 22.0 22.0 8.9 10.0 9.5 10.7
22.0 22.0 22.0 22.0 4.0 4.4 4.9 5.5
22.0 22.0 22.0 22.0 3.9 4.2 4.7 5.3
22.0 22.0 22.0 22.0 2.3 2.6 8.5 9.5
22.0 22.0 22.0 22.0 2.3 2.6 8.5 9.5
22.0 22.0 - - 17.3 12.6 - -
22.0 22.0 - - 7.7 12.9 - -
22.0 22.0 - - 11.0 12.9 - -
15.4 - - - 8.7 - - -
15.4 - - - 14.1 - - -
22.0 22.0 22.0 22.0 4.1 4.5 5.0 5.6
22.0 22.0 22.0 22.0 4.1 4.5 5.0 5.6
Airport Height 2-B-P002 28.4% 31.9% 44.1% 49.6%
Airport Height 3-A-P003 41.4% 46.5% 43.9% 49.4%
Airport Height 1-B-P001 59.9% 61.8% 45.1% 47.8%
Airport Height 2-A-P002 28.9% 32.5% 44.9% 50.5%
%Loading
Airport Height 1-A-P001 67.5% 69.5% 45.0% 53.7%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Azaiba North 3-B-P013 35.1% 58.8% - -
Azaiba North 3-C-P013 50.1% 58.9% - -
Airport Height 5-B-P151 10.5% 11.7% 38.5% 43.1%
Azaiba North 3-A-P013 78.5% 57.3% - -
Airport Height 4-B-P004 17.6% 19.2% 21.5% 24.2%
Airport Height 5-A-P151 10.5% 11.7% 38.7% 43.3%
Airport Height 3-B-P003 40.6% 45.6% 43.1% 48.4%
Airport Height 4-A-P004 18.2% 19.8% 22.3% 25.0%
MOD Technical College-A-P081 18.7% 20.2% 22.7% 25.5%
MOD Technical College-B-P081 18.8% 20.4% 22.8% 25.6%
Ghala 1-A-P015 56.2% - - -
Ghala 1-B-P015 91.6% - - -
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Azaibah North 3 P013
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Azaibah North 3 P013 - - 40.0 40.0 - - - - - - 40.3 100.7 -0.3 43.5 108.7 -3.5
Azaiba North 3-A P013
Azaiba North 3-B P013
Azaiba North 3-C P013
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Azaiba North 3-A P013 - - 25.0 25.0 - - 20.0 20.0 - - - - 10.5 18.7 10.2 7.6
Azaiba North 3-B P013 - - 25.0 25.0 - - 20.0 20.0 - - - - 10.5 18.7 10.1 7.7
Azaiba North 3-C P013 - - 25.0 25.0 - - 20.0 20.0 - - - - 10.5 18.7 10.2 7.7
2017 2018 2019 2020 MVA MVA MVA MVA
- - 22.0 22.0 - - 13.6 15.1
- - 22.0 22.0 - - 14.0 15.1
- - 22.0 22.0 - - 14.0 15.1
MW MVAr MW MVAr MW MVAr
Airport Height-B Grid Network Results
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
101.7 98.7 99.3
- - - - 100.6 101.7 98.7
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
- - - - 100.6
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
41.3 13.6
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
- - - - 38.3 12.6
%Loading
Azaiba North 3-A-P013 - - 62.0% 68.5%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
99.5
- - - - 100.6 101.7 98.7 99.5
Azaiba North 3-B-P013 - - 63.6% 68.4%
Azaiba North 3-C-P013 - - 63.7% 68.4%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
SQU 1 P122
SQU 2 P123
Rusail Industrial 1 P103
Rusail Industrial 2 P104
Rusail Industrial 3 P105
Rusail Housing P056
Rusail Private Factory P106
ROP Al Khoud P161
Rusail08(KOM) P164
Water Department P102
Al Jifnain P042
Cement Housing P088
Al Misfah OCP 2 P176
Al Misfah OCP 1 P078
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
SQU 1 P122 32.0 32.0 32.0 - 24.9 77.8 7.1 24.9 77.8 7.1 24.9 77.8 7.1 - - -
SQU 2 P123 16.0 16.0 16.0 16.0 16.5 103.1 -0.5 16.5 103.1 -0.5 16.5 103.1 -0.5 16.5 103.1 -0.5
Rusail Industrial 1 P103 16.0 16.0 16.0 16.0 13.1 81.9 2.9 13.6 84.7 2.4 14.5 90.6 1.5 15.5 96.9 0.5
Rusail Industrial 2 P104 20.0 20.0 20.0 20.0 18.8 94.0 1.2 19.5 97.3 0.5 17.4 87.1 2.6 18.6 93.2 1.4
Rusail Industrial 3 P105 20.0 - - - 14.6 73.0 5.4 - - - - - - - - -
Rusail Housing P056 20.0 - - - 15.2 76.0 4.8 - - - - - - - - -
Rusail Private Factory P106 20.0 - - - 24.3 121.5 -4.3 - - - - - - - - -
ROP Al Khoud P161 - 20.0 20.0 20.0 - - - 14.0 70.0 6.0 14.0 70.0 6.0 14.0 70.0 6.0
Rusail08(KOM) P164 - 40.0 40.0 40.0 - - - 14.7 36.8 25.3 25.9 64.7 14.1 27.7 69.2 12.3
Water Department P102 1TX 1TX 1TX 1TX 0.5 - - 0.5 - - 0.5 - - 0.5 - -
Al Jifnain P042 1TX 1TX 1TX 1TX 3.3 - - 3.3 - - 3.3 - - 3.3 - -
Cement Housing P088 5.0 5.0 5.0 5.0 2.3 46.0 2.7 2.3 46.0 2.7 2.3 46.0 2.7 2.3 46.0 2.7
Al Misfah OCP 2 P176 1.0 1.0 1.0 1.0 0.5 50.0 0.5 0.5 50.0 0.5 0.5 50.0 0.5 0.5 50.0 0.5
Al Misfah OCP 1 P078 1TX 1TX 1TX 1TX 0.5 - - 0.5 - - 0.5 - - 0.5 - -
- -
13.3 9.8 13.3 9.8 13.3 9.8 13.3 9.8
21.2 13.1 21.2 13.1 21.2 13.1
MW MVAr MW MVAr MW MVAr
Rusail-A Grid Network Results
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
- -
- - 13.3 4.4 13.3 4.4 13.3 4.4
22.2 9.9 - - - -
- -
14.5 4.6 - - - - - -
13.4 5.8 - - - -
14.7 4.8
17.3 7.4 18.5 6.1 16.6 5.4 17.7 5.8
12.0 5.2 12.9 4.2 13.8 4.5
0.5 0.2
0.5 0.2 0.5 0.2 0.5 0.2 0.5 0.2
0.5 0.2 0.5 0.2 0.5 0.2
3.1 1.3
2.1 0.9 2.1 0.9 2.1 0.9 2.1 0.9
3.1 1.3 3.1 1.3 3.1 1.3
26.3 8.6
0.5 0.2 0.5 0.2 0.5 0.2 0.5 0.2
- - 14.0 4.6 24.6 8.1
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Al Jifnain-A P042
Al Misfah OCP 1-A P078
Al Misfah OCP 2-A P176
Al Misfah OCP 2-B P176
Cement Housing-A P088
Cement Housing-B P088
ROP Al Khoudh-A P161
ROP Al Khoudh-B P161
Rusail 08-A P164
Rusail 08-B P164
Rusail 08-C P164
Rusail Industrial 1-A P103
Rusail Industrial 1-B P103
Rusail Industrial 2-A P104
Rusail Industrial 2-B P104
Rusail Industrial 3-A P105
Rusail Industrial 3-B P105
Rusail Private Factory-A P106
Rusail Private Factory-B P106
Rusail Housing-A P056
Rusail Housing-B P056
SQU 1-A P122
SQU 1-B P122
SQU 1-C P122
SQU 2-A P123
SQU 2-B P123
Water Department-A P102
102.8 99.8 102.5
99.4 - 100.7 - 100.3 - 100.1
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
99.2 101.9 100.4 103.2 100.0
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
100.1 99.2
- - 100.5 103.4 100.2 103.0 99.9 102.7
99.5 98.6 100.8 99.9 100.4 99.5
- -
99.3 98.6 100.6 99.9 100.2 99.5 100.0 99.2
- - - - - -
-
99.4 - 100.7 - 100.3 - 100.1 -
100.3 98.5
99.7 97.8 101.0 99.4 100.6 98.9 100.3 98.5
99.7 97.8 101.0 99.4 100.6 98.9
99.9 102.1
- - 100.8 104.2 100.2 102.6 99.9 102.1
- - 100.8 104.2 100.2 102.6
99.9 102.7
- - 100.8 104.2 100.2 102.6 99.9 102.1
- - 100.5 103.4 100.2 103.0
- -
99.7 101.0 - - - - - -
99.6 99.3 - - - -
- -
99.5 101.9 - - - - - -
99.5 101.9 - - - -
100.2 102.4
99.5 101.2 100.8 103.0 100.5 102.9 100.2 102.4
99.5 101.2 100.8 103.0 100.5 102.9
- -
99.1 99.7 100.4 101.1 100.0 100.7 99.7 100.4
99.3 100.4 100.6 101.8 100.2 101.3
- -
99.3 100.3 100.6 101.6 100.2 101.2 - -
99.3 100.3 100.6 101.6 100.2 101.2
- -
99.4 102.2 - - - - - -
99.4 102.2 - - - -
99.7 100.4
99.6 - 100.9 - 100.5 - 100.2 -
99.1 99.7 100.4 101.1 100.0 100.7
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Jifnain-A P042 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 6.6 4.1 6.6 4.1 6.6 4.1 6.6 4.1
Al Misfah OCP 1-A P078 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 3.1 - 3.1 - 3.1 - 3.1 -
Al Misfah OCP 2-A P176 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 3.1 - 3.1 - 3.1 - 3.1 -
Al Misfah OCP 2-B P176 - - - - 12.5 12.5 12.5 12.5 - - - - - - - -
Cement Housing-A P088 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 5.1 5.9 5.0 5.9 5.0 5.9 5.0 5.9
Cement Housing-B P088 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 5.1 5.9 5.1 5.9 5.1 5.9 5.1 5.9
ROP Al Khoudh-A P161 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 12.9 13.3 12.9 13.3 12.8 13.2
ROP Al Khoudh-B P161 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 12.9 13.3 12.9 13.3 12.8 13.2
Rusail 08-A P164 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 15.2 13.3 15.3 13.9 15.1 13.9
Rusail 08-B P164 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 15.2 13.3 15.3 13.9 15.1 13.9
Rusail 08-C P164 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 15.0 7.3 15.1 7.6 14.9 7.7
Rusail Industrial 1-A P103 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 23.6 15.6 23.1 15.6 23.1 15.7 22.6 15.7
Rusail Industrial 1-B P103 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 23.6 15.6 23.1 15.6 23.2 15.7 22.6 15.7
Rusail Industrial 2-A P104 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 20.0 14.6 19.7 14.6 19.7 14.4 19.4 14.5
Rusail Industrial 2-B P104 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 20.0 14.6 19.7 14.6 19.7 14.4 19.4 14.5
Rusail Industrial 3-A P105 25.0 - - - 25.0 - - - 18.4 14.3 - - - - - -
Rusail Industrial 3-B P105 25.0 - - - 25.0 - - - 18.4 14.3 - - - - - -
Rusail Private Factory-A P106 25.0 - - - 20.0 - - - 22.9 8.4 - - - - - -
Rusail Private Factory-B P106 25.0 - - - 20.0 - - - 22.9 8.1 - - - - - -
Rusail Housing-A P056 25.0 - - - 20.0 - - - 16.5 14.3 - - - - - -
Rusail Housing-B P056 25.0 - - - 20.0 - - - 16.5 14.3 - - - - - -
SQU 1-A P122 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 15.4 13.3 15.2 13.3 15.2 13.3 - -
SQU 1-B P122 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 15.4 13.3 15.2 13.3 15.2 13.3 - -
SQU 1-C P122 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 15.2 7.2 15.0 7.2 15.0 7.2 - -
SQU 2-A P123 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 13.2 13.0 13.0 12.9 13.0 12.9 12.9 12.9
SQU 2-B P123 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 13.2 13.0 13.0 12.9 13.0 12.9 12.9 12.9
Water Department-A P102 25.0 25.0 25.0 25.0 14.5 - 14.3 - 14.3 - 14.2 -
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 1.0 1.0 1.0 1.0
22.0 22.0 22.0 22.0 4.9 4.9 4.9 4.9
22.0 22.0 22.0 22.0 1.2 1.2 1.2 1.2
- 22.0 22.0 22.0 - 7.1 7.1 7.1
- 22.0 22.0 22.0 - 7.1 7.1 7.1
- 22.0 22.0 22.0 - 5.0 8.8 9.5
- 22.0 22.0 22.0 - 5.0 8.8 9.5
- 22.0 22.0 22.0 - 5.0 8.8 9.5
22.0 22.0 22.0 22.0 6.8 7.0 7.5 8.0
22.0 22.0 22.0 22.0 6.6 6.8 7.3 7.8
22.0 22.0 22.0 22.0 9.7 9.9 8.9 9.5
22.0 22.0 22.0 22.0 9.7 9.9 8.9 9.5
22.0 - - - 7.6 - - -
22.0 - - - 7.4 - - -
22.0 - - - 15.1 - - -
22.0 - - - 10.2 - - -
22.0 - - - 7.7 - - -
22.0 - - - 7.8 - - -
22.0 22.0 22.0 - 8.7 8.7 8.7 -
22.0 22.0 22.0 - 8.7 8.7 8.7 -
22.0 22.0 22.0 - 8.5 8.4 8.5 -
22.0 22.0 22.0 22.0 8.6 8.6 8.6 8.6
22.0 22.0 22.0 22.0 8.6 8.6 8.6 8.6
%Loading
Al Misfah OCP 1&2 4.4% 4.4% 4.4% 4.4%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Rusail 08-C-P164 - 22.6% 40.1% 43.0%
Rusail Industrial 1-A-P103 30.9% 31.8% 34.1% 36.5%
Rusail 08-A-P164 - 22.6% 40.1% 43.0%
Rusail 08-B-P164 - 22.6% 40.1% 43.0%
ROP Al Khoudh-A-P161 - 32.4% 32.4% 32.4%
ROP Al Khoudh-B-P161 - 32.4% 32.4% 32.4%
Cement Housing-A-P088 22.1% 22.1% 22.1% 22.1%
Cement Housing-B-P088 5.5% 5.5% 5.5% 5.5%
Rusail Private Factory-B-P106 46.4% - - -
RusailHousing-A-P056 35.0% - - -
Rusail Industrial 3-B-P105 33.5% - - -
Rusail Private Factory-A-P106 68.5% - - -
Rusail Industrial 2-B-P104 43.9% 45.2% 40.4% 43.3%
Rusail Industrial 3-A-P105 34.4% - - -
Rusail Industrial 1-B-P103 29.8% 30.8% 33.0% 35.3%
Rusail Industrial 2-A-P104 43.9% 45.2% 40.4% 43.3%
SQU 2-A-P123 38.9% 38.9% 38.9% 38.9%
SQU 2-B-P123 38.9% 38.9% 38.9% 38.9%
SQU 1-B-P122 39.5% 39.5% 39.5% -
SQU 1-C-P122 38.4% 38.4% 38.4% -
RusailHousing-B-P056 35.5% - - -
SQU 1-A-P122 39.5% 39.5% 39.5% -
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Rusail Industrial 3 P105
Rusail Housing P056
Rusail Private Factory P106
Rusail Industrial 4 P158
SQU 3 P160
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Rusail Industrial 3 P105 - 20.0 20.0 20.0 - - - 15.1 75.5 4.9 16.2 80.8 3.8 17.3 86.4 2.7
Rusail Housing P056 - 20.0 20.0 20.0 - - - 16.3 81.3 3.7 17.4 86.9 2.6 18.6 93.0 1.4
Rusail Private Factory P106 - 20.0 20.0 20.0 - - - 25.0 125.0 -5.0 20.0 99.9 0.0 21.4 106.8 -1.4
Rusail Industrial 4 P158 40.0 40.0 40.0 40.0 30.0 74.9 10.0 31.0 77.5 9.0 33.2 82.9 6.8 35.5 88.7 4.5
SQU 3 P160 40.0 40.0 40.0 40.0 1.5 3.8 38.5 1.5 3.7 38.5 1.5 3.7 38.5 1.5 3.7 38.5
Rusail Ind 4-A P158
Rusail Ind 4-B P158
Rusail Ind 4-C P158
Rusail Industrial 3-A P105
Rusail Industrial 3-B P105
Rusail Private Factory-A P106
Rusail Private Factory-B P106
Rusail05(Housing)-A P056
Rusail05(Housing)-B P056
SQU 03-A- P160
SQU 03-B P160
SQU 03-C P160
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Rusail Ind 4-A P158 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 22.4 14.9 24.0 15.1 23.8 15.2 23.9 15.4
Rusail Ind 4-B P158 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 22.4 14.9 24.0 15.1 23.8 15.2 23.9 15.4
Rusail Ind 4-C P158 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 22.4 8.3 24.0 8.4 23.8 8.5 24.0 8.5
Rusail Industrial 3-A P105 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 18.0 14.2 17.9 14.3 18.0 14.4
Rusail Industrial 3-B P105 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 18.0 14.2 17.9 14.3 18.0 14.4
Rusail Private Factory-A P106 - 25.0 25.0 25.0 - 20.0 20.0 20.0 - - 22.3 8.4 22.1 14.6 22.2 8.3
Rusail Private Factory-B P106 - 25.0 25.0 25.0 - 20.0 20.0 20.0 - - 22.3 8.1 22.1 14.6 22.2 8.0
Rusail05(Housing)-A P056 - 25.0 25.0 25.0 - 20.0 20.0 20.0 - - 16.2 14.3 16.1 14.3 16.2 14.4
Rusail05(Housing)-B P056 - 25.0 25.0 25.0 - 20.0 20.0 20.0 - - 16.2 14.3 16.1 14.3 16.2 14.4
SQU 03-A- P160 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 12.5 12.5 13.0 12.7 12.9 12.7 13.0 12.7
SQU 03-B P160 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 12.5 12.5 13.0 12.7 12.9 12.7 13.0 12.7
SQU 03-C P160 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 12.3 7.1 12.7 7.2 12.6 7.2 12.7 7.2
Rusail-B Grid Network Results
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
20.3 6.7
27.5 11.8 29.5 9.7 31.5 10.4 33.7 11.1
- - 23.7 7.8 19.0 6.2
16.4 5.4
- - 15.5 4.9 16.6 5.2 17.7 5.6
- - 14.4 4.7 15.3 5.0
MW MVAr MW MVAr MW MVAr
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
100.2 101.7 101.0 102.9 101.0
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
1.4 0.5
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
1.4 0.6 1.4 0.5 1.4 0.5
100.5 103.0
- - 100.8 103.5 100.8 103.4 100.6 103.0
- - 100.8 103.5 100.8 103.4
102.3
100.2 102.0 101.0 103.2 101.0 103.1 100.8 102.7
102.8 100.8 102.3
100.2 101.7 101.0 102.9 101.0 102.8 100.8
100.8 105.3
100.2 104.6 101.0 105.5 101.0 105.5 100.8 105.3
100.2 104.6 101.0 105.5 101.0 105.5
100.4 102.8
- - 100.7 103.4 100.7 103.2 100.4 102.8
- - 100.7 103.4 100.7 103.2
100.7 102.0
- - 100.9 102.9 101.0 103.0 100.7 103.1
- - 100.9 101.5 101.0 103.0
2020
100.8 105.3
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
100.2 104.7 101.0 105.5 101.0 105.5
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 10.7 11.0 11.8 12.6
22.0 22.0 22.0 22.0 10.5 10.9 11.6 12.5
22.0 22.0 22.0 22.0 9.7 10.0 10.7 11.4
- 22.0 22.0 22.0 - 7.8 8.4 9.0
- 22.0 22.0 22.0 - 7.6 8.1 8.7
- 22.0 22.0 22.0 - 15.4 10.2 13.1
- 22.0 22.0 22.0 - 10.4 10.3 8.9
- 22.0 22.0 22.0 - 8.2 8.8 9.4
- 22.0 22.0 22.0 - 8.4 9.0 9.6
22.0 22.0 22.0 22.0 0.5 0.5 0.5 0.5
22.0 22.0 22.0 22.0 0.5 0.5 0.5 0.5
22.0 22.0 22.0 22.0 0.5 0.5 0.5 0.5
%Loading %Loading
Rusail Ind 4-F1-P158 48.5% 49.9% 53.5% 57.3%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
Rusail05(Housing)-F1-P056 - 37.4% 40.1% 42.9%
Rusail05(Housing)-F2-P056 - 38.0% 40.7% 43.6%
Rusail Private Factory-F1-P106 - 69.9% 46.4% 59.4%
Rusail Private Factory-F2-P106 - 47.4% 46.6% 40.4%
Rusail Industrial 3-F1-P105 - 35.5% 38.0% 40.7%
Rusail Industrial 3-F2-P105 - 34.5% 36.9% 39.6%
Rusail Ind 4-F2-P158 47.9% 49.4% 52.9% 56.7%
Rusail Ind 4-F3-P158 44.0% 45.3% 48.6% 52.0%
SQU 03-F3-P160-Pvt 2.4% 2.3% 2.3% 2.3%
SQU 03-F1-P160-Pvt 2.3% 2.3% 2.3% 2.3%
SQU 03-F2-P160-Pvt 2.5% 2.4% 2.4% 2.4%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Al Misfah P080
Al Awabi P139
Al Awabi(upgrade) P139
Orpic P192
Cement Factory 1 P079
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Al Misfah P080 40.0 40.0 40.0 40.0 32.7 81.8 7.3 34.9 87.1 5.1 37.2 92.9 2.8 39.6 99.0 0.4
Al Awabi P139 12.0 12.0 - - 10.1 83.8 1.9 10.1 83.8 1.9 - - - - - -
Al Awabi(upgrade) P139 - - 40.0 40.0 - - - - - - 15.0 37.5 25.0 15.0 37.5 25.0
Orpic P192 6.0 6.0 6.0 6.0 0.6 10.5 5.4 0.6 10.5 5.4 0.6 10.5 5.4 0.6 10.5 5.4
Cement Factory 1 P079 91.5 91.5 91.5 91.5 65.9 72.0 25.6 65.9 72.0 25.6 65.9 72.0 25.6 65.9 72.0 25.6
Al Awabi-A P139
Al Awabi-B P139
Al Awabi-C P139
Al Misfah-A P080
Al Misfah-B P080
Al Misfah-C P080
Cement Factory 1-A P079
Cement Factory 1-B P079
Cement Factory 1-C P079
Cement Factory 1-D P079
Cement Factory 1-E P079
Orpic-A P192
Orpic-B P192
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Awabi-A P139 25.0 25.0 25.0 25.0 16.0 16.0 25.0 25.0 13.2 5.2 13.2 5.2 13.1 12.7 13.1 12.7
Al Awabi-B P139 - - 25.0 25.0 16.0 16.0 25.0 25.0 - 5.2 - 5.2 12.5 12.5 12.5 12.5
Al Awabi-C P139 - - 25.0 25.0 16.0 16.0 25.0 25.0 - 5.2 - 5.2 12.5 12.5 12.5 12.5
Al Misfah-A P080 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 16.5 14.3 16.5 14.5 16.6 14.6 16.7 14.7
Al Misfah-B P080 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 16.5 14.3 16.5 14.5 16.6 14.6 16.6 14.7
Al Misfah-C P080 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 16.4 8.4 16.5 8.5 16.6 8.6 16.6 8.7
Cement Factory 1-A P079 25.0 25.0 25.0 25.0 - - - - 12.3 - 12.3 - 12.4 - 12.4 -
Cement Factory 1-B P079 25.0 25.0 25.0 25.0 - - - - 12.3 - 12.3 - 12.4 - 12.4 -
Cement Factory 1-C P079 25.0 25.0 25.0 25.0 - - - - 12.3 - 12.3 - 12.3 - 12.4 -
Cement Factory 1-D P079 25.0 25.0 25.0 25.0 - - - - 12.3 - 12.3 - 12.3 - 12.4 -
Cement Factory 1-E P079 25.0 25.0 25.0 25.0 - - - - 12.3 - 12.3 - 12.3 - 12.4 -
Orpic-A P192 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 12.9 4.9 13.0 4.9 13.0 4.9 13.0 4.9
Orpic-B P192 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 12.9 4.9 13.0 4.9 13.0 4.9 13.0 4.9
MVAr MW MVAr MW MVAr
31.3 9.5 33.4 10.1 35.6
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr MW
Misfah Grid Network Results
0.6 0.2
60.6 26.0 60.6 26.0 60.6 26.0 60.6 26.0
0.6 0.2 0.6 0.2 0.6 0.2
-
- - - - 14.2 4.7 14.2 4.7
10.8 37.9 11.5
9.2 4.0 9.2 4.0 - - -
104.4 100.3 104.3
- 103.3 - 103.2 100.4 104.4 100.3
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
100.3 103.3 100.2 103.2 100.4
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
100.0 100.1
100.0 - 99.9 - 99.9 - 99.8 -
100.4 101.4 100.3 101.0 100.2 100.6
100.2 102.1
100.6 103.0 100.5 102.7 100.4 102.4 100.2 102.1
100.6 103.0 100.5 102.7 100.4 102.4
104.3
- 103.3 - 103.2 100.4 104.4 100.3 104.3
100.6 105.0
100.8 105.3 100.8 105.2 100.7 105.1 100.6 105.0
100.8 105.3 100.8 105.2 100.7 105.1
99.7 -
100.0 - 99.9 - 99.8 - 99.7 -
100.0 - 99.9 - 99.8 -
99.8 -
100.0 - 99.9 - 99.8 - 99.7 -
100.0 - 99.9 - 99.9 -
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 10.1 10.1 4.9 4.9
- - 22.0 22.0 - - 4.9 4.9
- - 22.0 22.0 - - 4.9 4.9
22.0 22.0 22.0 22.0 9.4 10.0 10.7 11.4
22.0 22.0 22.0 22.0 9.3 10.0 10.6 11.4
22.0 22.0 22.0 22.0 14.7 15.8 16.9 18.1
15.4 15.4 15.4 15.4 13.7 13.7 13.7 13.7
15.4 15.4 15.4 15.4 13.7 13.7 13.7 13.7
15.4 15.4 15.4 15.4 13.8 13.8 13.8 13.8
15.4 15.4 15.4 15.4 13.8 13.8 13.8 13.8
15.4 15.4 15.4 15.4 13.8 13.8 13.8 13.8
22.0 22.0 22.0 22.0 0.3 0.3 0.3 0.3
22.0 22.0 22.0 22.0 0.4 0.4 0.4 0.4
Al Awabi-B-P139 - - 22.2% 22.2%
Al Awabi-C-P139 - - 22.2% 22.2%
%Loading
Al Awabi-A-P139 45.7% 45.7% 22.2% 22.2%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Cement Factory 1-D-P079 89.6% 89.6% 89.6% 89.6%
Cement Factory 1-E-P079 89.6% 89.6% 89.6% 89.6%
Cement Factory 1-B-P079 88.7% 88.7% 88.7% 88.7%
Cement Factory 1-C-P079 89.6% 89.6% 89.6% 89.6%
Al Misfah-C-P080 67.0% 71.7% 76.7% 82.1%
Cement Factory 1-A-P079 88.7% 88.7% 88.7% 88.7%
Al Misfah-A-P080 42.6% 45.5% 48.7% 52.0%
Al Misfah-B-P080 42.4% 45.3% 48.4% 51.7%
Orpic-A-P192-OD 1.5% 1.5% 1.5% 1.5%
Orpic-B-P192-OD 1.8% 1.8% 1.8% 1.8%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Manomah P067
Mabelah South P061
Palace
CommunicationP033
RGO Halban Camp P034
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Manomah P067 20.0 20.0 20.0 - 18.2 91.0 1.8 17.7 88.4 2.3 17.7 88.4 2.3 - - -
Mabelah South P061 20.0 20.0 20.0 - 30.2 151.1 -10.2 32.4 161.8 -12.4 35.8 179.2 -15.8 - - -
Palace
CommunicationP033 1TX 1TX 1TX - 0.5 - - 0.5 - - 0.5 - - - - -
RGO Halban Camp P034 1TX 1TX 1TX - 1.0 - - 1.0 - - 1.0 - - - - -
Mabelah South-A P061
Mabelah South-B P061
Manoma 1-A P067
Manoma 1-B P067
Old Mabelah-A P059
Palace
Communication-AP033
RGO Halban Camp-A P034
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Mabelah South-A P061 25.0 25.0 25.0 - 18.4 18.4 18.4 - 4.2 6.2 4.1 5.9 4.1 6.0 - -
Mabelah South-B P061 25.0 25.0 25.0 - 18.4 18.4 18.4 - 3.9 5.3 4.1 5.9 4.1 6.0 - -
Manoma 1-A P067 25.0 25.0 25.0 - 18.4 18.4 18.4 - 7.7 7.4 7.7 7.4 7.7 7.4 - -
Manoma 1-B P067 25.0 25.0 25.0 - 18.4 18.4 18.4 - 7.2 7.5 7.2 7.5 7.2 7.5 - -
Old Mabelah-A P059 25.0 25.0 25.0 - 18.4 18.4 18.4 - 3.4 5.4 3.4 5.5 - - - -
Palace Communication-A P033 25.0 25.0 25.0 - 4.0 1.0 4.0 1.0 4.0 1.0 - -
RGO Halban Camp-A P034 25.0 25.0 25.0 - 4.1 2.7 4.1 2.7 4.1 2.7 - -
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 - 24.0 17.7 20.0 -
22.0 22.0 22.0 - 10.2 17.7 20.0 -
22.0 22.0 22.0 - 7.9 7.6 7.6 -
22.0 22.0 22.0 - 10.9 10.5 10.5 -
15.4 15.4 - - 16.8 18.1 -
15.4 15.4 15.4 - 1.6 1.6 1.6 -
- -
27.8 11.9 30.8 10.1 34.0 11.2 - -
16.8 7.0 16.8 5.5 16.8 5.5
MW MVAr MW MVAr MW MVAr
Barka Main Grid Network Results
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
94.8 95.2 99.1 102.7 96.9
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
- -
1.0 0.4 1.0 0.4 1.0 0.4 - -
0.5 0.2 0.5 0.2 0.5 0.2
- -
96.1 101.4 97.4 101.1 - - - -
101.6 98.9 103.1 100.9 101.8 99.6
-
102.2 100.1 103.6 102.0 102.3 100.6 - -
99.6 - -
99.9 102.6 99.1 102.6 96.8 99.5 -
Mabelah South-F2-P061 46.2% 80.5% 90.8% -
Manoma 1-F1-P067 35.7% 34.6% 34.7% -
%Loading %Loading
Mabelah South-F1-P061 109.0% 80.5% 90.7% -
2020
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
- -
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
102.7 103.4 104.1 104.8 102.8 103.5
Manoma 1-F2-P067 49.4% 47.6% 47.7% -
RGO Halban Camp-F1-P034 10.1% 10.1% 10.1% -
Old Mabelah-F1-P059 108.9% 117.6% -
104.1 103.3 102.8 102.0 - -102.7 102.0
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Mabelah Grid GP04
Mabelah A P063
Mabelah A(Upgrade) P063
Sur Al Hadid P116
Sur Al
Hadid(Upgrade)P116
Old Mabelah * P059
Botanic Garden P016
Mabelah South PH-7 P141
Mabelah South PH-
7(Upgrade)P141
Mabelah Industrial P191
Mabelah PH-5 P190
ROP Dog Kennel P183
Mabelah STP P140
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Mabelah Grid GP04 20.0 20.0 20.0 20.0 25.5 127.5 -5.5 27.9 139.3 -7.9 30.8 154.2 -10.8 20.2 100.8 -0.2
Mabelah A P063 20.0 20.0 - - 18.1 90.5 1.9 20.0 100.2 0.0 - - - - - -
Mabelah A(Upgrade) P063 - - 40.0 40.0 - - - - - - 22.2 55.5 17.8 24.6 61.4 15.4
Sur Al Hadid P116 20.0 20.0 - - 25.7 128.5 -5.7 27.9 139.5 -7.9 - - - - - -
Sur Al
Hadid(Upgrade)P116 - - 40.0 40.0 - - - - - - 30.3 75.7 9.7 32.9 82.2 7.1
Old Mabelah * P059 20.0 20.0 - - 23.0 115.0 -3.0 24.8 124.1 -4.8 - - - - - -
Botanic Garden P016 20.0 20.0 20.0 20.0 10.0 50.0 10.0 9.7 48.4 10.3 9.7 48.4 10.3 9.7 48.4 10.3
Mabelah South PH-7 P141 20.0 20.0 - - 25.0 125.0 -5.0 27.7 138.4 -7.7 - - - - - -
Mabelah South PH-
7(Upgrade)P141 - - 40.0 - - - - - - - 30.6 76.6 9.4 - - -
Mabelah Industrial P191 1TX 1TX 1TX 1TX 4.5 - - 4.5 - - 4.5 - - 4.5 - -
Mabelah PH-5 P190 1TX 1TX 1TX 1TX 4.1 - - 4.1 - - 4.1 - - 4.1 - -
ROP Dog Kennel P183 - 6.0 6.0 6.0 - - - 3.7 61.9 2.3 3.7 61.9 2.3 3.7 61.9 2.3
Mabelah STP P140 10.0 10.0 10.0 10.0 5.5 54.7 4.5 5.5 54.7 4.5 5.5 54.7 4.5 5.5 54.7 4.5
19.1 6.3
17.6 4.2 19.5 4.7 - - - -
23.9 8.9 26.5 8.7 29.3 9.6
MW MVAr MW MVAr MW MVAr
Mabelah 1 Grid Network Results
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
9.2 3.0
24.7 3.9 27.3 4.3 - - - -
9.2 3.9 9.2 3.0 9.2 3.0
31.4 9.9
21.3 8.7 23.6 7.8 - - - -
- - - - 28.9 9.2
23.9 5.7
24.5 7.8 26.6 8.4 - - - -
- - - - 21.6 5.2
5.0 2.2
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
5.0 2.2 5.0 2.2 5.0 2.2
3.8 1.6
- - 3.5 1.2 3.5 1.2 3.5 1.2
3.8 1.6 3.8 1.6 3.8 1.6
- -
4.1 1.8 4.1 1.8 4.1 1.8 4.1 1.8
- - - - 30.3 4.7
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Botanic Garden-A P016
Botanic Garden-B P016
Mabelah A-A P063
Mabelah A-B P063
Mabelah A-C P063
Mabelah Grid-A GP04
Mabelah Grid-B GP04
Mabelah Industrial-A P191
Mabelah PH-5 -A P190
Mabelah South PH-7-A P141
Mabelah South PH-7-B P141
Mabelah South PH-7-C P141
Mabelah STP-A P140
Mabelah STP-B P140
Old Mabelah-A [Fed
from Barka Grid]P059
Old Mabelah-B P059
ROP Dog Kennel-A P183
ROP Dog Kennel-B P183
Sur Al Hadid -A P116
Sur Al Hadid -B P116
Sur Al Hadid -C P116
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Botanic Garden-A P016 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 10.9 12.8 11.1 12.8 11.1 12.8 11.0 12.7
Botanic Garden-B P016 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 11.3 12.8 11.4 12.8 11.5 12.8 11.3 12.7
Mabelah A-A P063 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 16.1 14.0 16.5 14.3 16.5 13.9 16.1 13.9
Mabelah A-B P063 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 16.1 14.0 16.5 14.3 16.5 13.9 16.2 13.9
Mabelah A-C P063 - - 25.0 25.0 - - 25.0 25.0 - - - - 16.4 7.7 16.2 7.7
Mabelah Grid-A GP04 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 24.1 8.4 24.9 8.5 25.0 8.6 24.1 8.2
Mabelah Grid-B GP04 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 24.1 8.5 24.9 8.6 25.0 8.7 24.1 8.3
Mabelah Industrial-A P191 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 11.5 4.6 11.7 4.6 11.7 4.6 11.5 4.6
Mabelah PH-5 -A P190 25.0 25.0 25.0 25.0 12.5 12.5 12.5 12.5 5.2 4.0 5.3 4.0 5.3 4.0 5.2 4.0
Mabelah South PH-7-A P141 25.0 25.0 25.0 - 25.0 25.0 25.0 - 12.3 7.7 12.5 7.8 12.8 13.9 - -
Mabelah South PH-7-B P141 25.0 25.0 25.0 - 25.0 25.0 25.0 - 12.4 7.9 12.6 8.0 12.8 13.9 - -
Mabelah South PH-7-C P141 - - 25.0 - - - 25.0 - - - - - 12.6 7.6 - -
Mabelah STP-A P140 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 9.7 10.3 9.8 10.4 9.8 10.4 9.7 10.3
Mabelah STP-B P140 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 9.7 10.3 9.8 10.4 9.8 10.4 9.7 10.3
Old Mabelah-A [Fed
from Barka Grid]P059 25.0 25.0 - - 20.0 20.0 - - - - - - - - - -
Old Mabelah-B P059 25.0 25.0 - - 20.0 20.0 - - 5.2 5.9 5.2 6.0 - - - -
ROP Dog Kennel-A P183 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 22.2 8.7 22.3 8.7 21.5 8.7
ROP Dog Kennel-B P183 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 22.2 8.7 22.3 8.7 21.5 8.7
Sur Al Hadid -A P116 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 8.8 7.2 8.9 7.3 9.3 12.9 9.4 18.0
Sur Al Hadid -B P116 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 8.8 7.2 8.9 7.3 9.3 12.9 9.4 18.0
Sur Al Hadid -C P116 - - 25.0 25.0 - - 25.0 25.0 - - - - 8.8 7.0 9.4 18.0
103.5
100.5 103.3 100.1 102.6 100.3 103.4 100.2 103.1
103.6 100.1 103.5
100.5 103.6 100.1 103.5 100.2 103.6 100.1
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
100.4 103.6 100.0 103.5 100.2
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
100.1 102.3
99.9 102.3 99.5 101.9 99.6 102.0 99.5 101.9
100.5 102.7 100.1 102.3 100.2 102.4
100.5 102.5
100.8 101.8 100.4 101.4 100.6 101.0 100.5 102.5
100.8 101.8 100.4 101.4 100.6 101.0
100.2 103.1
- - - - 100.3 103.4 100.2 103.1
100.5 103.3 100.1 102.6 100.3 103.4
100.2 103.8
- - - - - - - -
100.6 104.1 100.2 103.7 100.3 103.9
- -
100.6 104.1 100.2 103.7 100.3 103.9 100.2 103.8
- - - - 99.9 102.9
- -
99.8 102.1 99.3 101.2 99.9 102.9 - -
100.1 103.1 99.7 102.4 99.9 102.9
99.0 100.7
- - - - 99.2 101.2 99.0 100.7
99.1 100.2 98.5 99.3 99.2 101.2
100.5 104.2
99.1 100.3 98.5 99.3 99.2 101.2 99.0 100.7
- - 100.4 104.2 100.6 104.3
- -
- - 100.4 104.2 100.6 104.3 100.5 104.2
99.1 101.4 98.6 101.1 - -
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 4.8 4.7 4.7 4.7
22.0 22.0 22.0 22.0 4.9 4.7 4.7 4.7
22.0 22.0 22.0 22.0 9.1 10.1 7.4 8.2
22.0 22.0 22.0 22.0 9.3 10.3 7.6 8.4
- - 22.0 22.0 - - 7.5 8.3
22.0 22.0 22.0 22.0 13.2 14.4 16.0 10.3
22.0 22.0 22.0 22.0 13.3 14.5 16.1 10.4
22.0 22.0 22.0 22.0 4.6 4.6 4.6 4.6
22.0 22.0 22.0 22.0 4.2 4.2 4.2 4.2
22.0 22.0 22.0 - 10.7 11.8 10.4 -
22.0 22.0 22.0 - 14.8 16.5 10.3 -
- - 22.0 - - - 10.4 -
22.0 22.0 22.0 22.0 2.5 2.5 2.5 2.5
22.0 22.0 22.0 22.0 2.8 2.8 2.8 2.8
15.4 15.4 - - - - - -
15.4 15.4 - - 8.0 8.7 - -
- 22.0 22.0 22.0 - 1.9 1.9 1.9
- 22.0 22.0 22.0 - 1.9 1.9 1.9
22.0 22.0 22.0 22.0 13.0 14.2 10.1 11.1
22.0 22.0 22.0 22.0 13.4 14.6 10.4 11.1
- - 22.0 22.0 - - 10.4 11.1
Botanic Garden-F2-P016 22.1% 21.5% 21.5% 21.5%
Mabelah A-F1-P063 41.4% 46.0% 33.6% 37.3%
%Loading
Botanic Garden-F1-P016 22.0% 21.5% 21.5% 21.5%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Mabelah South PH-7-F1-P141 48.4% 53.8% 47.2% -
Mabelah South PH-7-F2-P141 67.4% 74.9% 46.9% -
Mabelah Industrial-F1-P191 20.8% 20.8% 20.8% 20.8%
Mabelah PH-5-F1-P190 19.1% 19.1% 19.1% 19.1%
Mabelah Grid-F1-GP04 59.8% 65.3% 72.6% 46.8%
Mabelah Grid-F2-GP04 60.4% 66.0% 73.3% 47.2%
Mabelah A-F2-P063 42.2% 46.8% 34.4% 38.1%
Mabelah A-F3-P063 - - 34.2% 37.9%
ROP Dog Kennel-F2-P183 - 8.5% 8.5% 8.5%
Sur Al Hadid-F1-P116 59.2% 64.7% 46.1% 50.3%
Old Mabelah-F2OHL-P059 52.0% 56.2% - -
ROP Dog Kennel-F1-P183 - 8.4% 8.4% 8.4%
Mabelah STP-F2-P140 12.6% 12.6% 12.6% 12.6%
Old Mabelah-F1OHL-P059 - - - -
Mabelah South PH-7-F3-P141 - - 47.2% -
Mabelah STP-F1-P140 11.5% 11.5% 11.5% 11.5%
Sur Al Hadid-F2-P116 60.7% 66.2% 47.1% 50.3%
Sur Al Hadid-F3-P116 - - 47.1% 50.3%
* Old Mabelah - P059 is having a split feeder source arrangement with Feeder 1 from Barka Grid and Feeder 2 from Mabelah 1 Grid. By 2019, both
the incoming feeders will be connected from one source i.e. A'Salam B [Mabelah 2] Grid.
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Mabelah Shabiya P060
Mabelah
Shabiya(Upgrade)P060
Mabelah C P064
Mabelah C(Upgrade) P064
Mabelah South PH-4 P062
Mabelah South PH-8 P157
PalmMall P168
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
Spare
Mabelah Shabiya P060 20.0 20.0 - - 30.8 154.1 -10.8 33.0 165.0 -13.0 - - - - - -
Mabelah
Shabiya(Upgrade)P060 - - 40.0 40.0 - - - - - - 36.5 91.3 3.5 40.4 101.1 -0.4
Mabelah C P064 20.0 20.0 - - 24.4 122.0 -4.4 27.0 135.1 -7.0 - - - - - -
Mabelah C(Upgrade) P064 - - 40.0 40.0 - - - - - - 38.5 96.2 1.5 42.6 106.5 -2.6
Mabelah South PH-4 P062 40.0 40.0 40.0 40.0 43.3 108.3 -3.3 46.7 116.8 -6.7 - - - - - -
Mabelah South PH-8 P157 40.0 40.0 40.0 40.0 17.2 42.9 22.8 18.4 46.0 21.6 20.3 50.9 19.7 22.5 56.3 17.5
PalmMall P168 - 40.0 40.0 40.0 - - - 16.7 41.8 23.3 18.5 46.3 21.5 20.5 51.3 19.5
Mabelah C-A P064
Mabelah C-B P064
Mabelah C-C P064
Mabelah Shabiya-A P060
Mabelah Shabiya-B P060
Mabelah Shabiya-C P060
Mabelah South PH-4-A P062
Mabelah South PH-4-B P062
Mabelah South PH-4-C P062
Mabelah South PH-8-A P157
Mabelah South PH-8-B P157
Mabelah South PH-8-C P157
Palm Mall-A P168
Palm Mall-B P168
Palm Mall-C P168
- -
- - - - 34.7 11.4 38.4 12.6
28.3 12.1 31.3 10.3 - -
MW MVAr MW MVAr MW MVAr
A'salam - A(Mabelah 2) Grid Network ResultsPrimary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
19.5 6.4
Percentage Loading of Primary Substations
Primary P.No.
Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
- - 15.9 5.2 17.6 5.8
- -
15.8 6.8 17.5 5.7 19.3 6.4 21.4 7.0
40.1 16.3 44.4 14.6 - -
- -
- - - - 37.7 7.7 41.7 8.6
23.9 4.9 26.5 5.4 - -
102.4
- - - - 100.9 103.1 100.4 102.3
103.2 100.4 102.4
100.1 103.4 100.9 104.1 100.9 103.2 100.4
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
100.1 101.4 100.8 101.8 100.9
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
- -
99.8 99.5 100.5 100.7 - - - -
99.8 99.3 100.5 100.4 - -
100.1 101.1
99.9 100.7 100.6 101.7 - - - -
- - - - 100.6 102.1
100.1 101.9
99.7 100.5 100.5 101.7 100.6 102.8 100.1 102.0
99.7 100.3 100.4 101.5 100.6 102.8
100.4 103.3
- - 100.9 104.1 100.9 104.0 100.4 103.3
- - 100.9 104.1 100.9 104.0
100.0 102.8
- - 100.9 104.1 100.9 104.0 100.4 103.3
99.6 101.9 100.6 103.7 100.6 103.5
100.0 102.8
99.9 103.1 100.6 103.7 100.6 103.5 100.0 102.8
99.9 103.1 100.6 103.7 100.6 103.5
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Mabelah C-A P064 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 22.5 9.1 23.3 9.3 22.7 15.9 23.0 8.9
Mabelah C-B P064 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 22.5 8.2 23.2 8.3 22.7 15.9 23.0 8.9
Mabelah C-C P064 - - 25.0 25.0 - - 25.0 25.0 - - - - 22.7 8.6 23.0 8.8
Mabelah Shabiya-A P060 25.0 25.0 25.0 25.0 18.4 18.4 25.0 25.0 17.6 10.2 18.1 10.4 17.8 17.7 17.9 10.1
Mabelah Shabiya-B P060 25.0 25.0 25.0 25.0 18.4 18.4 25.0 25.0 17.7 10.2 18.1 10.3 17.9 17.7 18.0 10.1
Mabelah Shabiya-C P060 - - 25.0 25.0 - - 25.0 25.0 - - - - 17.7 8.3 17.9 8.4
Mabelah South PH-4-A P062 25.0 25.0 - - 20.0 20.0 - - 18.7 8.2 19.2 8.4 - - - -
Mabelah South PH-4-B P062 25.0 25.0 - - 20.0 20.0 - - 18.8 8.7 19.3 8.9 - - - -
Mabelah South PH-4-C P062 25.0 25.0 - - 20.0 20.0 - - 18.7 8.7 19.3 8.8 - - - -
Mabelah South PH-8-A P157 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 12.6 13.4 12.8 13.8 12.7 13.8 12.8 14.0
Mabelah South PH-8-B P157 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 12.6 13.4 12.8 13.8 12.7 13.8 12.8 14.0
Mabelah South PH-8-C P157 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 12.3 7.7 12.5 7.6 12.4 7.6 12.5 7.7
Palm Mall-A P168 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 21.1 14.2 20.6 14.3 20.9 14.5
Palm Mall-B P168 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 21.1 14.2 20.6 14.3 20.9 14.5
Palm Mall-C P168 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 21.0 7.8 20.6 7.9 20.8 7.9
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 17.5 19.5 13.1 14.6
22.0 22.0 22.0 22.0 7.7 8.5 13.1 14.6
- - 22.0 22.0 - - 13.1 14.6
22.0 22.0 22.0 22.0 16.2 17.3 12.4 13.8
22.0 22.0 22.0 22.0 15.7 16.7 12.4 13.8
- - 22.0 22.0 - - 12.5 13.9
22.0 22.0 - - 12.5 13.5 - -
22.0 22.0 - - 16.7 18.0 - -
22.0 22.0 - - 16.0 17.2 - -
22.0 22.0 22.0 22.0 4.6 6.0 6.7 7.5
22.0 22.0 22.0 22.0 4.8 6.2 6.9 7.7
22.0 22.0 22.0 22.0 7.7 6.0 6.7 7.5
- 22.0 22.0 22.0 - 5.6 6.2 6.9
- 22.0 22.0 22.0 - 5.7 6.3 7.0
- 22.0 22.0 22.0 - 5.6 6.2 6.9
Mabelah C-B-P064 35.0% 38.8% 59.7% 66.2%
Mabelah C-C-P064 - - 59.6% 66.2%
%Loading
Mabelah C-A-P064 79.6% 88.5% 59.5% 66.1%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
Mabelah South PH-8-A-P157 20.7% 27.5% 30.5% 34.0%
Mabelah South PH-8-B-P157 21.7% 28.3% 31.4% 34.8%
Mabelah South PH-4-B-P062 76.0% 81.7% - -
Mabelah South PH-4-C-P062 72.8% 78.3% - -
Mabelah Shabiya-C-P060 - - 56.8% 63.2%
Mabelah South PH-4-A-P062 56.8% 61.2% - -
Mabelah Shabiya-A-P060 73.8% 78.8% 56.4% 62.7%
Mabelah Shabiya-B-P060 71.2% 76.1% 56.4% 62.7%
Palm Mall-B-P168-Pvt - 25.7% 28.5% 31.6%
Palm Mall-C-P168-Pvt - 25.5% 28.3% 31.4%
Mabelah South PH-8-C-P157 34.8% 27.5% 30.5% 34.0%
Palm Mall-A-P168-Pvt - 25.5% 28.3% 31.4%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Mabelah South PH-4 P062
Old Mabelah P059Mabelah South PH
6[Oldname:Halban]P185
Mabelah South 9 P184
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMabelah South PH-4 P062 - - 40.0 40.0 - - - - - - 51.7 129.3 -11.7 39.8 99.5 0.2
Old Mabelah P059 - - 20.0 20.0 - - - - - - 15.8 79.1 4.2 17.5 87.6 2.5Mabelah South PH
6[Oldname:Halban]P185 - - - 40.0 - - - - - - - - - 31.5 78.7 8.5
Mabelah South 9 P184 - - - 40.0 - - - - - - - - - 10.5 26.3 29.5
Mabelah South 9-A P184
Mabelah South 9-B P184
Mabelah South 9-C P184
Mabelah South PH-4-A P062
Mabelah South PH-4-B P062
Mabelah South PH-4-C P062
Mabelah South PH 6-A P185
Mabelah South PH 6-B P185
Mabelah South PH 6-C P185
Old Mabelah-A P059
Old Mabelah-B P059
MW MVAr MW MVAr MW MVAr
A'salam - B(Mabelah 2) Grid Network ResultsPrimary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
29.9 9.8
- - - - - - 10.0 3.2
- - - - - -
37.8 12.4
- - - - 15.0 4.9 16.6 5.5
- - - - 49.1 16.2
104.8
- - - - - - 101.0 104.8
- 101.0 104.8
- - - - - - 101.0
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
- - - - -
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
100.0 101.8
- - - - - - 100.0 101.8
- - - - - -
99.8 100.6
- - - - - - 100.0 101.8
- - - - 100.3 99.8
99.8 101.0
- - - - 100.2 99.5 99.8 101.0
- - - - 100.4 101.0
99.2 101.6
- - - - 99.9 102.5 99.2 101.6
- - - - 99.9 102.5
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Mabelah South 9-A P184 - - - 25.0 - - - 25.0 - - - - - - 18.3 13.5
Mabelah South 9-B P184 - - - 25.0 - - - 25.0 - - - - - - 18.3 13.5
Mabelah South 9-C P184 - - - 25.0 - - - 25.0 - - - - - - 18.2 7.5
Mabelah South PH-4-A P062 - - 25.0 25.0 - - 20.0 20.0 - - - - 18.1 8.4 18.6 15.3
Mabelah South PH-4-B P062 - - 25.0 25.0 - - 20.0 20.0 - - - - 18.2 9.0 18.6 15.3
Mabelah South PH-4-C P062 - - 25.0 25.0 - - 20.0 20.0 - - - - 18.2 8.9 18.6 8.6
Mabelah South PH 6-A P185 - - - 25.0 - - - 25.0 - - - - - - 19.9 15.0
Mabelah South PH 6-B P185 - - - 25.0 - - - 25.0 - - - - - - 19.9 15.0
Mabelah South PH 6-C P185 - - - 25.0 - - - 25.0 - - - - - - 19.9 8.3
Old Mabelah-A P059 - - 25.0 25.0 - - 20.0 20.0 - - - - 8.8 12.9 8.9 13.1
Old Mabelah-B P059 - - 25.0 25.0 - - 20.0 20.0 - - - - 8.8 12.9 8.9 13.1
2017 2018 2019 2020 MVA MVA MVA MVA
- - - 22.0 - - - 3.3
- - - 22.0 - - - 3.3
- - - 22.0 - - - 3.3
- - 22.0 22.0 - - 15.0 13.2
- - 22.0 22.0 - - 20.0 13.4
- - 22.0 22.0 - - 19.2 14.6
- - - 22.0 - - - 10.7
- - - 22.0 - - - 10.8
- - - 22.0 - - - 10.7
- - 22.0 22.0 - - 8.1 9.0
- - 22.0 22.0 - - 8.1 9.0
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
Mabelah South PH-4-C-P062 - - 87.3% 66.2%
Mabelah South PH 6-A-P185 - - - 48.8%
Mabelah South PH-4-A-P062 - - 68.1% 59.8%
Mabelah South PH-4-B-P062 - - 91.0% 61.0%
Mabelah South 9-B-P184 - - - 15.0%
Mabelah South 9-C-P184 - - - 15.0%
%Loading
Mabelah South 9-A-P184 - - - 15.0%
Old Mabelah-A-P059 - - 36.9% 41.0%
Old Mabelah-B-P059 - - 36.7% 40.8%
Mabelah South PH 6-B-P185 - - - 49.0%
Mabelah South PH 6-C-P185 - - - 48.8%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Mabelah South PH-7 P141
Manomah P067Mabelah
South(Upgrade)P061
Palace
CommunicationP033
RGO Halban Camp P034
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMabelah South PH-7 P141 - - - 40.0 - - - - - - - - - 33.9 84.8 6.1
Manomah P067 - - - 20.0 - - - - - - - - - 17.7 88.4 2.3Mabelah
South(Upgrade)P061 - - - 40.0 - - - - - - - - - 39.7 99.2 0.3
Palace
CommunicationP033 - - - 1TX - - - - - - - - - 0.5 - -
RGO Halban Camp P034 - - - 1TX - - - - - - - - - 1.0 - -
Mabelah South-A P061
Mabelah South-B P061
Mabelah South-C P061
Mabelah South PH-7-A P141
Mabelah South PH-7-B P141
Mabelah South PH-7-C P141
Manoma 1-A P067
Manoma 1-B P067
Palace Communication-A P033
RGO Halban Camp-A P034
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Mabelah South-A P061 - - - 25.0 - - - 25.0 - - - - - - 7.4 13.1
Mabelah South-B P061 - - - 25.0 - - - 25.0 - - - - - - 7.4 13.1
Mabelah South-C P061 - - - 25.0 - - - 25.0 - - - - - - 6.7 6.9
Mabelah South PH-7-A P141 - - - 25.0 - - - 25.0 - - - - - - 13.1 14.6
Mabelah South PH-7-B P141 - - - 25.0 - - - 25.0 - - - - - - 13.1 14.6
Mabelah South PH-7-C P141 - - - 25.0 - - - 25.0 - - - - - - 12.9 7.9
Manoma 1-A P067 - - - 25.0 - - - 18.4 - - - - - - 4.9 10.7
Manoma 1-B P067 - - - 25.0 - - - 18.4 - - - - - - 4.9 10.7
Palace Communication-A P033 - - - 25.0 - - - - - - - - - 5.7 1.1
RGO Halban Camp-A P034 - - - 25.0 - - - - - - - - - 6.0 2.9
MW MVAr MW MVAr MW MVAr
Halban Grid Network ResultsPrimary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
1.0 0.4
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
- - - - - -
37.7 12.4
- - - - - - 0.5 0.2
- - - - - -
33.5 5.2
- - - - - - 16.8 5.5
- - - - - -
99.8
- - - - - - 98.8 99.7
- 98.8 99.8
- - - - - - 98.8
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
- - - - -
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
98.3 100.7
- - - - - - 100.7 104.1
- - - - - -
100.3 103.2
- - - - - - 98.3 100.7
- - - - - -
100.3 103.2
- - - - - - 100.3 103.2
- - - - - -
2020
100.7 104.5
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
- - - - - -
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 MVA MVA MVA MVA
- - - 22.0 - - - 14.0
- - - 22.0 - - - 13.9
- - - 22.0 - - - 14.0
- - - 22.0 - - - 11.5
- - - 22.0 - - - 11.4
- - - 22.0 - - - 11.5
- - - 22.0 - - - 9.2
- - - 22.0 - - - 9.3
- - - 15.4 - - - 1.6
Mabelah South-F2-P061 - - - 63.1%
Mabelah South-F3-P061 - - - 63.5%
%Loading %Loading
Mabelah South-F1-P061 - - - 63.8%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
Manoma 1-F2-P067 - - - 42.2%RGO Halban Camp-F1-P034 (+
Palace Commmunication)- - - 10.1%
Mabelah South PH-7-F3-P141 - - - 52.3%
Manoma 1-F1-P067 - - - 42.0%
Mabelah South PH-7-F1-P141 - - - 52.4%
Mabelah South PH-7-F2-P141 - - - 52.0%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Seeb Grid GP08
Sultan School P029
Al Hail South 2 P153
New Al Khoud P047
Seeb05(Boulevard) P186
Al Khoud New P187
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareSeeb Grid GP08 20.0 20.0 20.0 20.0 18.2 91.0 1.8 16.3 81.4 3.7 13.1 65.3 6.9 14.2 70.9 5.8
Sultan School P029 20.0 20.0 20.0 20.0 25.5 127.5 -5.5 25.4 127.2 -5.4 19.8 98.8 0.2 20.4 102.0 -0.4
Al Hail South 2 P153 40.0 40.0 40.0 40.0 17.0 42.5 23.0 17.6 43.9 22.4 31.2 78.1 8.8 32.2 80.6 7.8
New Al Khoud P047 - - 20.0 20.0 - - - - - - 15.1 75.5 4.9 16.8 84.0 3.2
Seeb05(Boulevard) P186 - - 40.0 40.0 - - - - - - 37.7 94.4 2.3 46.7 116.7 -6.7
Al Khoud New P187 - - 40.0 40.0 - - - - - - 37.5 93.6 2.5 41.6 104.1 -1.6
Khod New-A P187
Khod New-B P187
Khod New-C P187
New Al Khoud-A P047
New Al Khoud-B P047
Seeb Grid-A GP08
Seeb Grid-B GP08
Seeb05 (Boulevard)-A P186
Seeb05 (Boulevard)-C P186
Seeb05 (Boulevard)-C P186
Sultan School-A P029
Sultan School-B P029
Al Hail South 2-A P153
Al Hail South 2-B P153
Al Hail South 2-C P153
Seeb Main -A Grid Network ResultsPrimary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
30.5 10.4
- - - - 14.3 4.7 16.0 5.2
16.1 5.5 16.6 5.6 29.6 10.0
13.5 4.4
23.4 10.1 24.2 7.9 18.8 6.2 19.4 6.4
16.8 7.0 15.5 5.1 12.4 4.1
MW MVAr MW MVAr MW MVAr
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
- - - - 99.2
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
44.4 14.6
- - - - 35.6 11.7 39.6 13.0
- - - - 35.9 11.8
99.5 101.9
- - - - 99.6 102.2 99.5 101.9
- - - - 99.6 102.2
99.9
- - - - 99.2 100.4 99.1 99.9
100.4 99.1 99.9
- - - - 99.2 100.4 99.1
99.7 100.1
99.7 101.9 99.8 101.9 99.7 101.7 99.8 102.8
- - - - 99.8 101.0
99.7 100.1
- - - - 99.8 101.0 99.7 100.1
- - - - 99.8 101.0
100.0 98.4
100.0 97.5 100.0 97.5 100.0 98.5 100.0 98.4
100.0 97.5 100.0 97.5 100.0 98.5
99.3 101.0
99.3 100.6 99.7 100.6 99.4 101.2 99.3 101.0
99.9 103.8 99.7 103.8 99.4 101.2
99.5 100.2
99.9 103.8 99.7 103.8 99.4 101.2 99.3 101.0
99.4 97.9 99.4 97.9 99.7 101.7
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Khod New-A P187 - - 25.0 25.0 - - 25.0 25.0 - - - - 14.1 7.9 14.3 8.0
Khod New-B P187 - - 25.0 25.0 - - 25.0 25.0 - - - - 14.3 14.4 14.3 8.0
Khod New-C P187 - - 25.0 25.0 - - 25.0 25.0 - - - - 14.4 14.4 14.3 8.0
New Al Khoud-A P047 - - 25.0 25.0 - - 16.0 16.0 - - - - 12.7 13.4 12.8 13.5
New Al Khoud-B P047 - - 25.0 25.0 - - 16.0 16.0 - - - - 12.7 13.4 13.0 13.5
Seeb Grid-A GP08 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 13.9 14.4 13.8 14.2 25.4 16.4 25.8 16.5
Seeb Grid-B GP08 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 13.9 14.4 13.8 14.2 25.4 16.4 25.8 16.5
Seeb05 (Boulevard)-A P186 - - 25.0 25.0 - - 25.0 25.0 - - - - 21.3 15.1 21.6 8.5
Seeb05 (Boulevard)-C P186 - - 25.0 25.0 - - 25.0 25.0 - - - - 21.3 15.1 21.6 8.5
Seeb05 (Boulevard)-C P186 - - 25.0 25.0 - - 25.0 25.0 - - - - 21.3 8.3 21.6 8.5
Sultan School-A P029 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 11.5 7.2 11.4 7.2 18.1 14.4 18.2 7.7
Sultan School-B P029 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 11.5 7.9 11.4 7.9 18.1 14.4 18.3 8.2
Al Hail South 2-A P153 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 9.8 11.3 9.8 11.7 14.3 14.2 14.4 14.3
Al Hail South 2-B P153 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 9.8 11.3 9.8 11.7 14.3 14.2 14.5 14.3
Al Hail South 2-C P153 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 9.9 7.3 9.7 6.8 14.1 7.8 14.2 7.8
2017 2018 2019 2020 MVA MVA MVA MVA
- - 22.0 22.0 - - 12.8 14.3
- - 22.0 22.0 - - 12.8 14.3
- - 22.0 22.0 - - 12.9 14.4
- - 22.0 22.0 - - 7.7 8.6
- - 22.0 22.0 - - 7.7 8.6
22.0 22.0 22.0 22.0 9.4 8.3 6.6 7.2
22.0 22.0 22.0 22.0 9.4 8.3 6.7 7.2
- - 22.0 22.0 - - 13.0 16.2
- - 22.0 22.0 - - 13.0 16.2
- - 22.0 22.0 - - 13.0 16.2
22.0 22.0 22.0 22.0 7.9 7.9 10.2 6.3
22.0 22.0 22.0 22.0 18.7 18.5 10.0 14.6
22.0 22.0 22.0 22.0 2.4 5.8 10.6 10.9
22.0 22.0 22.0 22.0 2.4 5.8 10.6 10.9
22.0 22.0 22.0 22.0 12.4 5.9 10.7 11.1
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
New Al Khoud-F1-P047 - - 35.1% 39.1%
New Al Khoud-F2-P047 - - 35.1% 39.1%
Khod New-F2-P187 - - 58.2% 65.2%
Khod New-F3-P187 - - 58.7% 65.5%
%Loading
Khod New-F1-P187 - - 58.2% 65.2%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Sultan School-F2-P029 85.2% 84.2% 45.2% 66.6%
Al Hail South 2-F1-P153 11.0% 26.4% 48.1% 49.8%
Seeb05 (Boulevard)-F3-P186 - - 59.1% 73.8%
Sultan School-F1-P029 36.0% 35.9% 46.3% 28.6%
Seeb05 (Boulevard)-F1-P186 - - 59.0% 73.7%
Seeb05 (Boulevard)-F2-P186 - - 59.0% 73.7%
Seeb Grid-F1-GP08 42.5% 37.8% 30.2% 32.8%
Seeb Grid-F2-GP08 42.7% 37.9% 30.3% 32.9%
Al Hail South 2-F2-P153 11.0% 26.4% 48.1% 49.7%
Al Hail South 2-F3-P153 56.4% 27.0% 48.6% 50.3%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Al Khoud Shabiya P046
New Al Khoud * P047
Wadi Bahayis (RGO) P098
Wadi Al Aresh P115
Wadi Al Lawami P117Wadi Al
Lawami(Upgrade)P117
Al Khoud PH-7 P154
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareAl Khoud Shabiya P046 20.0 20.0 20.0 20.0 20.3 101.5 -0.3 22.6 112.9 -2.6 15.9 79.4 4.1 17.7 88.3 2.3
New Al Khoud * P047 20.0 20.0 - - 22.5 112.5 -2.5 24.1 120.6 -4.1 - - - - - -
Wadi Bahayis (RGO) P098 20.0 20.0 20.0 20.0 19.1 95.5 0.9 20.3 101.7 -0.3 22.1 110.4 -2.1 24.0 119.9 -4.0
Wadi Al Aresh P115 20.0 20.0 20.0 20.0 33.5 167.6 -13.5 30.1 150.7 -10.1 25.3 126.6 -5.3 21.8 108.9 -1.8
Wadi Al Lawami P117 20.0 - - - 28.6 143.0 -8.6 - - - - - - - - -Wadi Al
Lawami(Upgrade)P117 - 40.0 40.0 40.0 - - - 36.5 91.3 3.5 35.4 88.5 4.6 38.5 96.1 1.5
Al Khoud PH-7 P154 40.0 40.0 40.0 40.0 22.7 56.8 17.3 34.1 85.1 5.9 37.9 94.7 2.1 42.1 105.3 -2.1
Al Khoud PH-7-A P154
Al Khoud PH-7-B P154
Al Khoud PH-7-C P154
Al Khoud Shabiya-A P046
Al Khoud Shabiya-B P046
New Al Khoud-A P047
New Al Khoud-B P047
Wadi Al Aresh-A P115
Wadi Al Aresh-B P115
Wadi Al Lawami-A P117
Wadi Al Lawami-B P117
Wadi Al Lawami-C P117
Wadi Bahayis (RGO)-A P098
Wadi Bahayis (RGO)-B P098
17.1 4.6
20.6 9.0 22.9 7.5 - - - -
19.6 5.3 21.8 5.9 15.3 4.1
MW MVAr MW MVAr MW MVAr
Seeb Main -B Grid Network ResultsPrimary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
40.0 13.1
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
21.1 8.4 32.4 10.6 36.0 11.8
- -
- - 34.7 11.4 33.6 11.1 36.5 12.0
25.0 13.9 - - - -
22.8 7.5
30.8 13.2 28.6 9.4 24.1 7.9 20.7 6.8
17.8 6.9 19.3 6.4 21.0 6.9
99.9
100.0 104.6 99.3 100.9 99.2 100.4 99.1 99.8
100.4 99.1 99.8
99.2 100.4 99.3 100.9 99.2 100.4 99.1
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
99.2 100.4 99.3 100.9 99.2
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
99.3 102.3
98.5 97.5 98.7 99.2 98.9 100.2 99.4 103.1
98.4 97.4 98.7 99.2 98.9 100.1
- -
99.2 99.8 99.2 100.3 - - - -
99.3 100.5 99.3 101.0 - -
99.1 101.7
99.0 101.4 98.8 101.0 99.2 102.0 99.1 101.7
98.9 101.0 98.7 100.5 99.2 102.0
99.8 101.299.9 101.6 99.9 101.8 99.8 101.5
99.9 101.0
99.9 101.6 99.9 101.8 99.9 101.5 99.8 101.2
- - 99.9 101.2 99.9 101.3
99.9 101.0
99.8 98.8 99.9 101.2 99.9 101.3 99.9 101.0
99.8 98.8 99.9 101.2 99.9 101.3
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Khoud PH-7-A P154 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 13.9 14.3 13.9 14.3 13.7 14.5 13.6 8.0
Al Khoud PH-7-B P154 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 13.9 14.3 14.0 14.3 13.8 14.5 13.6 8.0
Al Khoud PH-7-C P154 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 13.5 6.9 13.7 7.8 13.5 7.9 13.6 8.0
Al Khoud Shabiya-A P046 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 8.6 7.0 8.7 7.1 9.0 12.5 9.1 12.7
Al Khoud Shabiya-B P046 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 8.6 7.0 8.6 7.1 9.1 12.5 9.1 12.7
New Al Khoud-A P047 25.0 25.0 - - 16.0 16.0 - - 12.4 7.5 12.5 7.6 - - - -
New Al Khoud-B P047 25.0 25.0 - - 16.0 16.0 - - 12.5 7.7 12.5 7.7 - - - -
Wadi Al Aresh-A P115 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 11.3 8.0 11.2 7.9 11.1 7.7 11.1 7.5
Wadi Al Aresh-B P115 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 11.7 8.0 11.7 8.0 11.5 7.7 11.5 7.6
Wadi Al Lawami-A P117 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 22.4 8.4 22.6 15.1 22.0 14.9 22.1 15.1
Wadi Al Lawami-B P117 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 22.5 8.4 22.6 15.1 22.0 14.9 22.1 15.1
Wadi Al Lawami-C P117 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 22.6 8.3 22.0 8.2 22.1 8.3
Wadi Bahayis (RGO)-A P098 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 21.8 14.5 22.0 8.1 21.4 8.1 21.5 8.2
Wadi Bahayis (RGO)-B P098 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 21.8 14.5 21.9 8.0 21.3 8.1 21.5 8.1
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 17.8 15.8 13.1 10.6
22.0 22.0 22.0 22.0 17.8 15.7 13.1 10.5
22.0 22.0 22.0 22.0 15.1 12.6 12.2 13.2
22.0 22.0 22.0 22.0 15.1 12.6 12.2 13.2
- 22.0 22.0 22.0 - 12.6 12.2 13.2
22.0 22.0 22.0 22.0 9.8 10.4 11.3 12.3
22.0 22.0 22.0 22.0 9.8 10.5 11.4 12.4
22.0 22.0 22.0 22.0 11.5 11.5 12.9 14.5
22.0 22.0 22.0 22.0 11.7 11.6 13.0 14.5
22.0 22.0 22.0 22.0 0.0 11.7 13.0 14.6
22.0 22.0 22.0 22.0 10.9 12.1 8.0 8.9
22.0 22.0 22.0 22.0 9.9 11.0 8.1 9.1
22.0 22.0 - - 10.8 11.5 - -
22.0 22.0 - - 12.6 13.4 - -
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
Wadi Al Lawami-F2-P117 68.6% 57.1% 55.3% 60.2%
Wadi Al Lawami-F3-P117 - 57.1% 55.3% 60.2%
Wadi Al Aresh-F2-P115 80.8% 71.6% 59.7% 47.6%
Wadi Al Lawami-F1-P117 68.6% 57.1% 55.3% 60.2%
%Loading %Loading
Wadi Al Aresh-F1-P115 81.0% 71.7% 59.7% 48.3%
2020
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
Al Khoud Shabiya-F2-P046 44.8% 49.8% 37.0% 41.2%
New Al Khoud-F1-P047 49.0% 52.3% - -
Al Khoud PH-7-F3-P154 0.2% 53.1% 59.3% 66.2%
Al Khoud Shabiya-F1-P046 49.7% 55.0% 36.4% 40.7%
Al Khoud PH-7-F1-P154 52.5% 52.4% 58.6% 65.9%
0 53.0% 52.9% 59.2% 65.9%
Wadi Bahayis (RGO)-F1-P098 44.7% 47.3% 51.4% 56.0%
Wadi Bahayis (RGO)-F2-P098 44.4% 47.5% 51.7% 56.3%
New Al Khoud-F2-P047 57.1% 60.9% - -
* New Al Khoud – P047 is having split feeder source arrangement with Feeder 1 connected from Seeb B Grid and Feeder 2 connected from Seeb A
Grid. By 2019, both the incoming feeders will be connected from one source i.e. Seeb A grid.
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Al Hail North 2 P028
Mawaleh North P069
Mawaleh South Grid GP05
City Centre P073
Mawaleh C P072
Al Hail North 1 P027
Al Khoud PH-3 P048
Rusail B P101
Royal Flight P100
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareAl Hail North 2 P028 20.0 20.0 20.0 20.0 23.3 116.5 -3.3 17.9 89.7 2.1 18.5 92.6 1.5 19.1 95.7 0.9
Mawaleh North P069 20.0 - - - 4.7 23.5 15.3 - - - - - - - - -
Mawaleh South Grid GP05 20.0 20.0 20.0 20.0 25.8 128.8 -5.8 20.4 102.0 -0.4 18.7 93.4 1.3 20.2 101.1 -0.2
City Centre P073 20.0 - - - 17.9 89.5 2.1 - - - - - - - - -
Mawaleh C P072 20.0 20.0 20.0 20.0 20.1 100.5 -0.1 16.4 82.1 3.6 17.8 88.9 2.2 19.2 96.2 0.8
Al Hail North 1 P027 20.0 - - - 23.4 117.2 -3.4 - - - - - - - - -
Al Khoud PH-3 P048 20.0 20.0 20.0 20.0 19.3 96.5 0.7 21.5 107.3 -1.5 17.2 85.8 2.8 19.1 95.4 0.9
Rusail B P101 10.0 - - - 16.1 161.4 -6.1 - - - - - - - - -
Royal Flight P100 20.0 20.0 20.0 20.0 8.1 40.5 11.9 7.5 37.4 12.5 7.5 37.4 12.5 7.5 37.4 12.5
Al Hail North 1-A P027
Al Hail North 1-B P027
Al Hail North 2-A P028
Al Hail North 2-B P028
Al Khoud PH-3-A P048
Al Khoud PH-3-B P048
City Centre-A P073
City Centre-B P073
Mawaleh C-A P072
Mawaleh C-B P072
Mawaleh North-A P069
Mawaleh North-B P069
Mawaleh South Grid-A GP05
Mawaleh South Grid-B GP05
Royal Flight-A P100
Royal Flight-B P100
Rusail B-A P101
Rusail B-B P101
5.8 18.2 6.0
4.2 2.1 - - - - -
MVAr MW MVAr MW MVAr
21.5 9.0 17.0 5.6 17.6
Primary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr MW
Mawaleh South -A Grid Network Results
- -
19.2 2.0 21.3 2.2 17.1 1.7 19.0 1.9
21.5 9.2 - - - -
- -
19.7 4.0 16.1 3.3 17.4 3.5 18.9 3.8
16.1 7.8 - - - -
-
23.7 10.2 19.4 6.4 17.7 5.8 19.2 6.3
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
98.8 99.4 - - -
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
- -
7.1 3.9 7.1 2.3 7.1 2.3 7.1 2.3
14.8 6.4 - - - -
100.3 102.8
100.0 103.4 100.8 104.5 101.0 104.9 100.8 104.6
99.3 100.3 100.4 103.1 100.5 103.1
-
99.3 100.3 100.5 103.1 100.5 103.1 100.3 102.8
- - -
99.2 101.1 - - - - -
100.8 103.9
100.1 103.9 - - - - - -
100.0 102.7 100.9 104.3 100.9 104.3
- -
100.0 102.7 100.9 104.3 100.9 104.3 100.8 103.9
99.8 101.4 - - - -
100.8 104.6
99.8 101.4 - - - - - -
100.0 103.4 100.8 104.4 101.0 104.9
100.8 104.8
99.6 96.5 - - - - - -
99.9 103.1 100.9 104.9 101.0 105.0
101.0 103.6
99.9 103.1 100.9 104.9 101.0 105.0 100.8 104.8
100.2 101.1 101.0 103.6 101.1 103.9
- -
100.2 101.1 101.0 103.6 101.1 103.9 101.0 103.6
100.1 103.9 - - - -
- -- 96.5 - - - -
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Hail North 1-A P027 25.0 - - - 20.0 - - - 10.4 8.4 - - - - - -
Al Hail North 1-B P027 25.0 - - - 20.0 - - - 10.3 7.9 - - - - - -
Al Hail North 2-A P028 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 13.0 8.0 12.6 13.9 12.5 14.0 12.6 14.1
Al Hail North 2-B P028 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 13.0 8.0 12.6 13.9 12.5 14.0 12.6 14.1
Al Khoud PH-3-A P048 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 18.7 15.0 17.4 8.3 17.3 14.5 17.5 14.7
Al Khoud PH-3-B P048 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 18.7 15.0 17.4 8.2 17.3 14.5 17.5 14.7
City Centre-A P073 25.0 - - - 20.0 - - - 17.2 14.6 - - - - - -
City Centre-B P073 25.0 - - - 20.0 - - - 17.2 14.6 - - - - - -
Mawaleh C-A P072 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 19.1 8.2 17.8 14.4 17.7 14.5 17.9 14.7
Mawaleh C-B P072 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 19.1 8.2 17.8 14.4 17.7 14.5 17.9 14.7
Mawaleh North-A P069 25.0 - - - 18.4 - - - 20.5 13.7 - - - - - -
Mawaleh North-B P069 25.0 - - - 18.4 - - - 20.4 13.7 - - - - - -
Mawaleh South Grid-A* GP05 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 25.8 9.5 23.5 9.1 23.2 16.1 23.5 9.1
Mawaleh South Grid-B* GP05 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 25.8 9.5 23.5 9.1 23.2 16.1 23.5 9.1
Royal Flight-A P100 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 14.3 13.5 13.5 13.2 13.5 13.2 13.6 13.2
Royal Flight-B P100 25.0 25.0 25.0 25.0 18.4 18.4 18.4 18.4 14.3 13.5 13.5 13.2 13.5 13.2 13.6 13.2
Rusail B-A P101 25.0 - - - 25.0 - - - 17.3 12.9 - - - - - -
Rusail B-B P101 - - - - 25.0 - - - - 12.9 - - - - - -
2017 2018 2019 2020 MVA MVA MVA MVA
15.4 - - - 14.3 - - -
15.4 - - - 10.0 - - -
22.0 22.0 22.0 22.0 11.8 9.0 9.3 9.6
22.0 22.0 22.0 22.0 11.9 9.0 9.3 9.7
22.0 22.0 22.0 22.0 9.8 10.7 8.7 9.6
22.0 22.0 22.0 22.0 9.7 10.9 8.6 9.6
22.0 - - - 9.1 - - -
22.0 - - - 9.1 - - -
22.0 22.0 22.0 22.0 10.2 8.3 9.0 9.8
22.0 22.0 22.0 22.0 10.3 8.3 9.0 9.8
22.0 - - - 2.3 - - -
22.0 - - - 2.3 - - -
22.0 22.0 22.0 22.0 13.4 10.4 9.5 10.3
22.0 22.0 22.0 22.0 13.4 10.4 9.5 10.3
22.0 22.0 22.0 22.0 3.9 3.6 3.6 3.6
22.0 22.0 22.0 22.0 3.9 3.6 3.6 3.6
22.0 - - - 16.6 - - -
Al Hail North 1-B-P027 64.8% - - -
Al Hail North 2-A-P028 53.7% 40.7% 42.1% 43.5%
%Loading %Loading
Al Hail North 1-A-P027 92.8% - - -
2020
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019
Mawaleh C-B-P072 46.7% 37.8% 41.0% 44.5%
Mawaleh North-A-P069 10.4% - - -
City Centre-B-P073 41.4% - - -
Mawaleh C-A-P072 46.4% 37.9% 41.1% 44.6%
Al Khoud PH-3-B-P048 44.0% 49.7% 39.1% 43.5%
City Centre-A-P073 41.3% - - -
Al Hail North 2-B-P028 54.3% 41.1% 42.5% 43.9%
Al Khoud PH-3-A-P048 44.4% 48.7% 39.4% 43.8%
Royal Flight-B-P100 17.5% 16.5% 16.5% 16.5%
Rusail B-A-P101 75.5% - - -
Mawaleh South Grid-A-GP05 60.7% 47.4% 43.3% 47.0%
Royal Flight-A-P100 17.5% 16.4% 16.4% 16.4%
Mawaleh North-B-P069 10.5% - - -
Mawaleh South Grid-B-GP05 60.7% 47.5% 43.3% 47.0%
* Mawaleh South Grid-GP05 - The 33kV fault levels on this primary substation are slightly higher than the rated capacity in 2017. But from 2018
onwards, the fault levels are calculated to be within the limits bacause of reduction in motor infeed at 11kV due to load shifting.
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Mawaleh A * P070
Mawaleh B * P071
Al Khoud PH-6 P049
Al Hail South 1 P030
Mawaleh South05 P148
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMawaleh A * P070 40.0 40.0 40.0 - 46.1 115.3 -6.1 49.2 123.1 -9.2 47.6 119.1 -7.6 - - -
Mawaleh B * P071 40.0 40.0 40.0 - 30.6 76.5 9.4 32.0 80.1 8.0 40.4 101.0 -0.4 - - -
Al Khoud PH-6 P049 20.0 20.0 20.0 20.0 28.0 140.0 -8.0 21.8 108.8 -1.8 14.8 74.2 5.2 16.5 82.5 3.5
Al Hail South 1 P030 20.0 20.0 20.0 20.0 26.0 130.0 -6.0 26.2 131.0 -6.2 20.5 102.7 -0.5 21.2 106.1 -1.2
Mawaleh South05 P148 - 40.0 40.0 40.0 - - - 29.0 72.5 11.0 34.8 87.0 5.2 37.7 94.2 2.3
AL Hail South 1-A P030
AL Hail South 1-B P030
Al Khoud PH-6-A P049
Al Khoud PH-6-B P049
Mawaleh A-A P070
Mawaleh A-B P070
Mawaleh A-C P070
Mawaleh B-A P071
Mawaleh B-B P071
Mawaleh B-C P071
Mawaleh South 5-A P148
Mawaleh South 5-B P148
Mawaleh South 5-C P148
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
AL Hail South 1-A P030 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 16.3 8.6 16.7 8.6 16.6 8.3 15.6 8.2
AL Hail South 1-B P030 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 16.2 8.1 16.6 8.1 16.5 7.9 15.6 7.9
Al Khoud PH-6-A P049 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 11.7 8.2 11.8 7.8 12.1 13.6 11.6 13.6
Al Khoud PH-6-B P049 25.0 25.0 25.0 25.0 20.0 20.0 20.0 20.0 11.6 7.9 11.8 7.7 12.1 13.6 11.6 13.6
Mawaleh A-A P070 25.0 25.0 25.0 - 18.4 18.4 18.4 - 18.8 9.4 19.3 9.6 19.2 9.5 - -
Mawaleh A-B P070 25.0 25.0 25.0 - 18.4 18.4 18.4 - 23.3 9.4 24.1 9.6 23.9 9.5 - -
Mawaleh A-C P070 25.0 25.0 25.0 - 25.0 25.0 25.0 - 24.1 10.2 25.0 10.3 24.8 10.3 - -
Mawaleh B-A P071 25.0 25.0 25.0 - 18.4 18.4 18.4 - 20.8 16.8 21.4 17.0 21.4 17.7 - -
Mawaleh B-B P071 25.0 25.0 25.0 - 18.4 18.4 18.4 - 20.7 16.8 21.4 17.0 21.3 17.7 - -
Mawaleh B-C P071 25.0 25.0 25.0 - 25.0 25.0 25.0 - 20.6 8.8 21.2 8.9 21.1 9.0 - -
Mawaleh South 5-A P148 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 22.1 8.3 22.0 15.5 20.3 15.4
Mawaleh South 5-B P148 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 22.1 8.3 22.0 15.5 20.3 15.4
Mawaleh South 5-C P148 - 25.0 25.0 25.0 - 25.0 25.0 25.0 - - 22.1 8.3 22.0 8.5 20.3 8.5
Mawaleh South -B Grid Network ResultsPrimary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
15.7 5.2
24.1 9.8 24.9 8.2 19.5 6.4 20.2 6.6
26.6 8.7 20.7 6.8 14.1 4.6
- -
28.1 12.1 30.4 10.0 38.4 12.6 - -
43.2 16.1 46.8 15.4 45.2 14.9
MW MVAr MW MVAr MW MVAr
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
99.3 99.1 99.3 99.7 99.5
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
35.8 11.8
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
- - 27.5 9.0 33.1 10.9
99.3 101.8
99.6 99.9 99.6 99.9 99.6 100.1 - -
99.0 100.3 99.2 101.4 99.4 102.1
102.0
98.6 98.7 99.0 100.2 99.4 102.1 99.3 101.8
100.9 99.5 100.7
99.5 100.9 99.6 101.3 99.7 102.1 99.6
- -
- - 100.0 101.9 99.8 101.4 99.8 101.1
100.0 103.2 100.0 103.4 100.0 103.1
- -
100.0 101.0 100.0 101.5 100.0 100.5 - -
100.0 101.0 100.0 101.5 100.0 100.5
- -
99.9 100.1 99.9 100.2 99.9 100.3 - -
99.9 101.2 99.9 101.2 99.9 101.4
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
99.8 101.1
- - 100.0 101.9 99.8 101.4 99.8 101.1
- - 100.0 101.9 99.8 101.4
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 MVA MVA MVA MVA
22.0 22.0 22.0 22.0 16.1 16.1 12.5 12.9
22.0 22.0 22.0 22.0 11.0 11.1 8.6 8.9
22.0 22.0 22.0 22.0 16.5 12.6 7.3 8.2
22.0 22.0 22.0 22.0 12.4 9.5 7.4 8.3
22.0 22.0 22.0 - 16.8 18.0 17.4 -
22.0 22.0 22.0 - 13.3 14.2 13.7 -
22.0 22.0 22.0 - 17.9 19.1 18.5 -
22.0 22.0 22.0 - 13.0 13.6 17.3 -
22.0 22.0 22.0 - 13.3 13.8 17.6 -
22.0 22.0 22.0 - 5.3 5.6 7.0 -
- 22.0 22.0 22.0 - 9.9 11.9 12.9
- 22.0 22.0 22.0 - 9.9 11.9 13.0
- 22.0 22.0 22.0 - 9.9 11.9 12.9
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Mawaleh A-B-P070 60.4% 64.5% 62.3% -
Mawaleh A-C-P070 81.5% 87.0% 84.0% -
Al Khoud PH-6-B-P049 56.3% 43.2% 33.8% 37.8%
Mawaleh A-A-P070 76.5% 81.7% 78.9% -
AL Hail South 1-B-P030 50.1% 50.3% 39.2% 40.5%
Al Khoud PH-6-A-P049 75.1% 57.3% 33.2% 37.1%
%Loading
AL Hail South 1-A-P030 73.0% 73.1% 56.7% 58.6%
Mawaleh South 5-B-P148 - 45.0% 54.3% 59.0%
Mawaleh South 5-C-P148 - 44.8% 54.2% 58.8%
Mawaleh B-C-P071 24.3% 25.3% 32.0% -
Mawaleh South 5-A-P148 - 44.8% 54.2% 58.8%
Mawaleh B-A-P071 59.2% 61.7% 78.5% -
Mawaleh B-B-P071 60.4% 62.9% 80.0% -
* Mawaleh A – P070 and Mawaleh B – P071 are having split feeder source arrangement with their Feeders 1&3 for each primary connected from
Mawaleh South B Grid and Feeder 2 for each from Mawaleh South A grid. By 2020, By 2019, all the incoming feeders for both primaries will be
connected from one source i.e. Al Khoudh Grid.
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Mawaleh A P070
Mawaleh B P071
SQU 1 P122
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMawaleh A P070 - - - 40.0 - - - - - - - - - 51.6 128.9 -11.6
Mawaleh B P071 - - - 40.0 - - - - - - - - - 43.7 109.3 -3.7
SQU 1 P122 - - - 32.0 - - - - - - - - - 24.9 77.8 7.1
Mawaleh A-A P070
Mawaleh A-B P070
Mawaleh A-C P070
Mawaleh B-A P071
Mawaleh B-B P071
Mawaleh B-C P071
SQU 1-A P122
SQU 1-B P122
SQU 1-C P122
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Mawaleh A-A P070 - - - 25.0 - - - 18.4 - - - - - - 18.7 9.6
Mawaleh A-B P070 - - - 25.0 - - - 18.4 - - - - - - 23.1 9.6
Mawaleh A-C P070 - - - 25.0 - - - 25.0 - - - - - - 24.0 10.4
Mawaleh B-A P071 - - - 25.0 - - - 18.4 - - - - - - 20.7 9.9
Mawaleh B-B P071 - - - 25.0 - - - 18.4 - - - - - - 20.6 9.6
Mawaleh B-C P071 - - - 25.0 - - - 25.0 - - - - - - 20.5 9.0
SQU 1-A P122 - - - 25.0 - - - 18.4 - - - - - - 15.8 13.7
SQU 1-B P122 - - - 25.0 - - - 18.4 - - - - - - 15.8 13.7
SQU 1-C P122 - - - 25.0 - - - 18.4 - - - - - - 15.6 7.4
2017 2018 2019 2020 MVA MVA MVA MVA
- - - 22.0 - - - 18.9
- - - 22.0 - - - 14.9
- - - 22.0 - - - 20.1
- - - 22.0 - - - 21.4
- - - 22.0 - - - 16.5
- - - 22.0 - - - 7.6
- - - 22.0 - - - 8.7
- - - 22.0 - - - 8.7
- - - 22.0 - - - 8.5
Al Khoudh Grid Network ResultsPrimary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
21.2 13.1
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
- - - - - -
49.0 16.1
- - - - - - 41.5 13.7
- - - - - -
MW MVAr MW MVAr MW MVAr
101.7
- - - - - - 100.4 100.5
- 100.1 100.2
- - - - - - 100.4
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
- - - - -
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
100.1 101.2
- - - - - - 100.1 101.3
- - - - - -
100.4 103.4
- - - - - - 100.1 101.2
- - - - - -
100.2 99.6
- - - - - - 100.3 101.1
- - - - - -
Mawaleh A-B-P070 - - - 67.6%
Mawaleh A-C-P070 - - - 91.3%
%Loading
Mawaleh A-A-P070 - - - 85.8%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
SQU 1-B-P122-Pvt - - - 39.5%
SQU 1-C-P122-Pvt - - - 38.4%
Mawaleh B-C-P071 - - - 34.5%
SQU 1-A-P122-Pvt - - - 39.5%
Mawaleh B-A-P071 - - - 97.3%
Mawaleh B-B-P071 - - - 75.1%
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
Al Hail North 1 P027
Mawaleh North P069
Mawaleh North Grid GP01Mawaleh North
Grid[re-configure]GP01
City Centre P073
2017 2018 2019 2020 MVA %N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareMVA %
N-1
SpareAl Hail North 1 P027 - 20.0 20.0 20.0 - - - 18.0 89.9 2.0 18.6 92.9 1.4 19.2 95.9 0.8
Mawaleh North P069 - 20.0 20.0 20.0 - - - 15.4 77.2 4.6 15.9 79.7 4.1 16.5 82.3 3.5
Mawaleh North Grid GP01 100.0 - - - 30.2 30.2 69.8 - - - - - - - - -Mawaleh North
Grid[re-configure]GP01 - 40.0 40.0 40.0 - - - 29.0 72.4 11.0 29.0 72.4 11.0 29.0 72.4 11.0
City Centre P073 20.0 20.0 20.0 20.0 - - - 18.4 91.8 1.6 19.9 99.4 0.1 21.5 107.6 -1.5
Al Hail North 1-A P027
Al Hail North 1-B P027
City Centre-A P073
City Centre-B P073
Mawaleh North-A P069
Mawaleh North-B P069
Mawaleh North Grid-A GP01
Mawaleh North Grid-B GP01
Mawaleh North Grid-C GP01
2017 2018 2019 2020 2017 2018 2019 2020 33kV 11kV 33kV 11kV 33kV 11kV 33kV 11kV
Al Hail North 1-A P027 - 25.0 25.0 25.0 - 20.0 20.0 20.0 - - 17.9 15.6 17.9 15.6 18.0 15.7
Al Hail North 1-B P027 - 25.0 25.0 25.0 - 20.0 20.0 20.0 - - 17.9 15.6 17.9 15.6 18.0 15.7
City Centre-A P073 - 25.0 25.0 25.0 - 20.0 20.0 20.0 - - 17.8 14.5 17.8 14.7 17.8 8.2
City Centre-B P073 - 25.0 25.0 25.0 - 20.0 20.0 20.0 - - 17.8 14.5 17.8 14.7 17.8 8.2
Mawaleh North-A P069 - 25.0 25.0 25.0 - 18.4 18.4 18.4 - - 20.7 14.6 20.7 14.6 20.8 14.7
Mawaleh North-B P069 - 25.0 25.0 25.0 - 18.4 18.4 18.4 - - 20.7 14.6 20.7 14.6 20.8 14.7
Mawaleh North Grid-A GP01 - 31.5 31.5 31.5 31.5 - 26.8 20.8 17.1 20.8 17.1 20.9 17.1
Mawaleh North Grid-B GP01 - 31.5 31.5 31.5 31.5 - 26.8 20.8 9.4 20.8 9.4 20.9 9.4
Mawaleh North Grid-C GP01 - 31.5 31.5 31.5 31.5 - 26.8 20.8 17.1 20.8 17.1 20.9 17.1
Mawaleh North Grid Network ResultsPrimary Substations Peak Demand
Primary Substation P.No.2017 2018 2019 2020
MW MVAr
- -
- - 27.5 9.0 27.5 9.0 27.5 9.0
27.5 12.4 - - - -
18.2 6.0
- - 14.7 4.8 15.1 5.0 15.6 5.1
- - 17.1 5.6 17.6 5.8
MW MVAr MW MVAr MW MVAr
11kV(%) 33kV (%) 11kV(%) 33kV (%) 11kV(%)
- - 100.3 102.9 100.2
Primary Substations Bus Voltages
Primary P.No.2017 2018 2019 2020
33kV (%) 11kV(%) 33kV (%)
20.4 6.7
Percentage Loading of Primary Substations
Primary P.No.Firm Capacity(MVA) Load'2017 Load'2018 Load'2019 Load'2020
- - 17.4 5.7 18.9 6.2
100.1 101.9
- - 100.4 103.1 100.3 103.0 100.2 102.8
- - 100.3 102.6 100.2 102.2
102.5
- - 100.3 102.6 100.2 102.2 100.0 101.8
102.7 100.1 102.5
- - 100.3 102.9 100.2 102.7 100.1
Primary Substation 3-Phase Fault Current Levels
Primary P.No.33kV -Rated SC Capacity(kA) 11kV -Rated SC Capacity(kA) 2017 2018 2019 2020
100.2 102.3
- 105.2 100.4 102.6 100.3 102.5 100.2 102.3
- 105.2 100.4 102.6 100.3 102.5
100.2 102.8
- 105.2 100.4 102.6 100.3 102.5 100.2 102.3
- - 100.4 103.1 100.3 103.0
MEDC Distribution Capability Statement (2018-2020)-V2.2
Muscat Electricity Distribution Company S.A.O.C
2017 2018 2019 2020 MVA MVA MVA MVA
- 22.0 22.0 22.0 - 9.3 9.6 9.9
- 22.0 22.0 22.0 - 9.1 9.4 9.7
- 22.0 22.0 22.0 - 9.3 10.1 11.2
- 22.0 22.0 22.0 - 9.3 10.1 10.8
- 22.0 22.0 22.0 - 7.8 8.1 8.4
- 22.0 22.0 22.0 - 7.9 8.1 8.4
- 22.0 22.0 22.0 - 9.9 9.9 9.9
- 22.0 22.0 22.0 - 9.9 9.9 9.9
- 22.0 22.0 22.0 - 9.9 9.9 9.9
Mawaleh North Grid-F2-GP01 - 44.9% 44.9% 44.9%
Mawaleh North Grid F3-GP01 - 44.9% 44.9% 44.9%
Mawaleh North-F2-P069 - 35.8% 37.0% 38.2%
Mawaleh North Grid-F1-GP01 - 45.0% 45.0% 45.0%
City Centre-F2-P073 - 42.4% 46.1% 49.2%
Mawaleh North-F1-P069 - 35.6% 36.8% 38.1%
Al Hail North 1-F2-P027 - 41.3% 42.7% 44.1%
City Centre-F1-P073 - 42.4% 46.0% 50.8%
%Loading
Al Hail North 1-F1-P027 - 42.1% 43.6% 45.0%
33kV Feeder Loads
PrimaryCircuit Rating(MVA) 2017 2018 2019 2020
%Loading %Loading %Loading