california bearing ratio (cbr) analysis · california bearing ratio (cbr) analysis 1. project 2....

5
CALIFORNIA BEARING RATIO (CBR) ANALYSIS 1. PROJECT 2. DATE 3. SOIL CLASSIFICATION 4. LOCATION OF SOIL 5. GROUP NUMBER 6. TECHNICIAN (Signature) 7. COMPUTED BY (Signature) 8. CHECKED BY (Signature) DD FORM 2463, DEC 1999 PREVIOUS EDITION IS OBSOLETE. MOLD NUMBER BLOWS PER LAYER MOISTURE CONTENT, W (percent) DRY DENSITY CORRECT- ED CBR (percent) SWELL (percent) Page 1 of 5 Pages DATA SUMMARY CBR - MOISTURE C O R R E C T E D C B R I N P E R C E N T MOLDING WATER CONTENT (w) (IN PERCENT) OF DRY WEIGHT DENSITY - MOISTURE D R Y D E N S I T Y I N P O U N D S P E R C U F T MOLDING WATER CONTENT (w) (IN PERCENT) OF DRY WEIGHT

Upload: hakhanh

Post on 12-Apr-2018

234 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: CALIFORNIA BEARING RATIO (CBR) ANALYSIS · california bearing ratio (cbr) analysis 1. project 2. date 3. soil classification 4. location of soil 5. group number 6. technician (signature)

CALIFORNIA BEARING RATIO (CBR) ANALYSIS

1. PROJECT 2. DATE

3. SOIL CLASSIFICATION 4. LOCATION OF SOIL 5. GROUP NUMBER

6. TECHNICIAN (Signature) 7. COMPUTED BY (Signature) 8. CHECKED BY (Signature)

DD FORM 2463, DEC 1999 PREVIOUS EDITION IS OBSOLETE.

MOLDNUMBER

BLOWSPER

LAYER

MOISTURECONTENT,W (percent)

DRYDENSITY

CORRECT-ED CBR(percent)

SWELL(percent)

Page 1 of 5 Pages

DATA SUMMARY CBR - MOISTURE

CORRECTED

CBR

IN

PERCENT

MOLDING WATER CONTENT (w)(IN PERCENT) OF DRY WEIGHT

DENSITY - MOISTURE

DRY

DENSITY

IN

POUNDS

PER

CU

FT

MOLDING WATER CONTENT (w)(IN PERCENT) OF DRY WEIGHT

Page 2: CALIFORNIA BEARING RATIO (CBR) ANALYSIS · california bearing ratio (cbr) analysis 1. project 2. date 3. soil classification 4. location of soil 5. group number 6. technician (signature)

CBR FAMILY OF CURVES

DD FORM 2463, DEC 1999 Page 2 of 5 Pages

W (Percent)

DRY DENSITY,in pcf

CORRECTED CBR,in percent

DRY DENSITY,in pcf

CORRECTED CBR,in percent

DRY DENSITY,in pcf

CORRECTED CBR,in percent

DRY DENSITY,in pcf

CORRECTED CBR,in percent

DRY DENSITY,in pcf

CORRECTED CBR,in percent

DRY DENSITY,in pcf

CORRECTED CBR,in percent

DRY DENSITY,in pcf

CORRECTED CBR,in percent

DRY DENSITY,in pcf

CORRECTED CBR,in percent

DRY DENSITY,in pcf

CORRECTED CBR,in percent

DRY DENSITY,in pcf

CORRECTED CBR,in percent

DRY DENSITY,in pcf

CORRECTED CBR,in percent

DRY DENSITY,in pcf

CORRECTED CBR,in percent

DRY DENSITY,in pcf

CORRECTED CBR,in percent

DRY DENSITY,in pcf

CORRECTED CBR,in percent

BLOWS/LAYER BLOWS/LAYER BLOWS/LAYER

Page 3: CALIFORNIA BEARING RATIO (CBR) ANALYSIS · california bearing ratio (cbr) analysis 1. project 2. date 3. soil classification 4. location of soil 5. group number 6. technician (signature)

DD FORM 2463, DEC 1999 Page 3 of 5 Pages

CBR FAMILY OF CURVESCORRECTEDCBRPERCENT

MOLDED DRY DENSITY, in pcf

Page 4: CALIFORNIA BEARING RATIO (CBR) ANALYSIS · california bearing ratio (cbr) analysis 1. project 2. date 3. soil classification 4. location of soil 5. group number 6. technician (signature)

DD FORM 2463, DEC 1999 Page 4 of 5 Pages

DESIGN CBR

COMPACTION RANGE

% TO %

LBS/FT TO LBS/FT3 3

W (Percent) LOWEST CBR W PERCENT RANGE ASSURED CBR

% TO

% TO

% TO

% TO

% TO

% TO

% TO

% TO

% TO

% TO

% TO

% TO

%

%

%

%

%

%

%

%

%

%

%

%

DESIGN CBR

(HIGHEST ASSURED)

DESIGN MOISTURE

RANGE % TO %

Page 5: CALIFORNIA BEARING RATIO (CBR) ANALYSIS · california bearing ratio (cbr) analysis 1. project 2. date 3. soil classification 4. location of soil 5. group number 6. technician (signature)

DD FORM 2463, DEC 1999 Page 5 of 5 Pages

CBR SWELL DATAPERCENTSWELL(byvolume)

MOISTURE CONTENT, w (percent of dry weight)

NOTE: Maximum acceptable swell is 3 percent.