Greer Company Page 1 of 27 Crane Systems Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard ® 510 Retrofit Calibration Manual PN W450256- 05/19/03 MicroGuard ® 510 Retrofit Rated Capacity Indicator System Calibration and Testing for: Machine Model Serial Number Tester Date

Upload: phamduong

Post on 01-Apr-2018

223 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 1 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

MicroGuard® 510 Retrofit

Rated Capacity Indicator System

Calibration and Testing for:

Machine Model Serial Number

Tester Date

Page 2: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 2 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

Notice This document and all associated data are confidential. Copies of this document may not be distributed to third parties in any form without the prior written consent of the Greer Company and the crane manufacturer.

Page 3: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 3 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

MicroGuard® 510 Retrofit Rated Capacity Indicator System

Table of Contents

Introduction ..................................................................................................................................5 Preliminary Checks ......................................................................................................................6 Boom Hoist Geometry..................................................................................................................6 Miscellaneous Main Boom Data ..................................................................................................7 Installation Checks.......................................................................................................................8 Pre-Tension Routine ....................................................................................................................8 Entering the Calibration Mode and Calibration Routines .............................................................8 00. Error Codes.........................................................................................................................9 01. Crane Data..........................................................................................................................9 02. Dimensions ................................................................................................................... 9-10 03. Extension Sensor ...............................................................................................................10 04. Angle Sensor......................................................................................................................10 05. Swing Potentiometer .........................................................................................................10 06. Pressure ...........................................................................................................................11 07. Radius/Moment........................................................................................................... 11-12 08. Boom Deflection................................................................................................................13 09. Compensation....................................................................................................................14 10. Erected Attachments...........................................................................................................15 11. Auxiliary Head...................................................................................................................15 12. Stowed Attachments .........................................................................................................16 13. Digital Inputs ......................................................................................................................17 14. Enable Attachments ..........................................................................................................17 15. Enable Winches ................................................................................................................17 16. Data Retrieval ...................................................................................................................17 17. Language Switch...............................................................................................................17 18. Internal Data.......................................................................................................................17

Page 4: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 4 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

MicroGuard® 510 Retrofit Rated Capacity Indicator System

Table of Contents continued

Worksheets Main Boom Testing Worksheet................................................................................................... 18 Attachment Testing Worksheet...................................................................................................19 Attachment Tests ...................................................................................................................20-26

Page 5: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 5 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

D

ORs Full 9.7Klb Ctwt ERECTED 60' TELEJIB 17 AUXHD ONPICK FROM MAIN BOOM FRONT WINCH

TEST

MAX

SET 360o

6

23,500

i2,300

44.8

62.7

26.4

o

Introduction

Congratulations on purchasing the new MicroGuard® 510 Retrofit Rated Capacity Indicator System.

This manual describes the calibration process for the MicroGuard® 510 Retrofit System in an on-site situation, assuming that there is no prior knowledge of the geometry of the crane. This document also assists the calibration personnel in accurately obtaining the relevant measurements for the initial calibration and in developing a clear record of the measured dimensions and test results for review and/or comparison when changes are made. Recording this important data during the calibration process will ensure a structured, easy to follow calibration. Required Tools Digital volt/ohmmeter Inclinometer – accurate to 0.1 ° (preferably a calibrated, digital style) Measuring tape (graduated in ft + 1/10 surveyor’s tape) Hand tools

The MicroGuard® 510 Display

The keys that are identified above as A, B, C, and D will be used many times in the following procedures. Keys A and B are used to select from menus and to increase and decrease numeric values on the display. Key C is usually used to enter a finished number or enter a function via a menu. Key D is regularly used to exit a routine.

A B C

Page 6: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 6 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

Preliminary Checks The following pages provide a list of measurements that must be double-checked for accuracy, if already in the MicroGuard® 510 Retrofit System or if non-existent must be newly entered into the System. Any crane data supplied by the crane manufacturer in the crane application data sheet and stored in the crane capacity chip must be validated before calibration begins.

To save time and ensure accuracy, two persons should carry out these measurements and should establish clear reference points during the measuring process. Measurements should be made using a tape graduated in 1/10 ft. Measured values should be entered in the boxes provided.

Boom Hoist Geometry The boom should be in a horizontal position when measuring the distances shown below.

Dimension “L” is the distance parallel to the boom centerline between the center of the Boom pivot and the center of the upper Boom Hoist cylinder pivot. Dimension “J” is the distance at 90 ° to the boom centerline between the center of the Boom pivot and the center of the upper Boom Hoist cylinder pivot.

J is negative when the Boom pivot is above the upper Boom Hoist cylinder pivot and positive when it is below. Dimension “G” is the horizontal distance between the center of the Boom Pivot and the center of the lower Boom Hoist cylinder pivot. Dimension “H” is the vertical distance between the center of the Boom pivot and the center of the lower Boom Hoist pivot. * If the boom foot pin is above the Boom Hoist cylinder Upper Pivot (as shown in this illustration), dimension “J” is negative. Clearly indicate “+” or “-”.

HJ

GBoom Hoist Cylinder

Boom

Boom Pivot

Lower Pivot

Upper Pivot

L

*

Boom Center Line

Page 7: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX: (714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

GREER COMPANY Page 7 of 27 Crane Systems

Boom Hoist Cylinder

Boom

Boom Pivot

Swing Offset

Hd Shv radius

Top Sheave

Head Sheave

Center of Rotation

Miscellaneous Main Boom Data The following checks are for the main boom head sheave radius and swing offset. Swing offset is positive when the boom pivot is in front of the center of rotation, and negative when behind, as shown here.

Measure the circumference of the boom hoist cylinder rod by wrapping a tape around the rod and reading the value. Enter the measured values in the boxes provided.

(negative) Winch Data Winch dimensions are required for compensation of moment arm created by the winch position. For winches mounted on the boom, dimensions are not required.

Radius

Page 8: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX: (714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

GREER COMPANY Page 8 of 27 Crane Systems

Installation Checks • Check wiring and EPROM installations.

• Check swing switches, if fitted. Use the digital input monitor routine on the MicroGuard® display to ensure that the switches operate correctly.

• Check the extension reel to ensure that the power spring clutch is engaged. If not, perform the pre-tension procedure below.

Pre-Tension Routine Pre-Tensioning the cable ensures a steady, controlled cable line from the extension reel to the boom head.

1. Fully retract the boom. 2. Slowly rotate the Extension Reel clockwise until a “click’ is heard, indicating that the

power spring clutch inside the reel is engaged. 3. Turn the extension reel counterclockwise for 5 complete rotations. A temporary marker

placed on the Extension Reel can facilitate the rotation count. 4. Physically prevent the Extension Reel from rotating until the cable is tied off on the boom

head tie-off post. Entering the Calibration Mode and Calibration Routines To access the calibration routines, it is necessary to enter the Calibration Mode.

To Enter the Calibration Mode, hold down the TEST and the ALARM SET keys for about 4 seconds. A message requesting the calibration entry code will appear. Use the keys to enter the following calibration code :ADBC Calibration entry is complete. If incorrectly entered, the display will return to the normal working screen.

Once in the Calibration Mode, the following options are available. Use the left selection keys to display the desired option. Use the top right key to start the routine. To exit the calibration menu at any time, press the bottom right key, which will return the display to the normal working screen. 00 Error Codes Displays system information and error codes. 01 Crane Data Reset crane “Personality” data. 02 Dimensions Enter crane geometry and dimensions. 03 Ext’n Sensor Set “Zero” and “Span” for extension sensor. 04 Angle Sensor Set “Zero” and “Span” for angle sensor. 05 Swing Potentiometer Set “Zero” and “Direction” for swing potentiometer. 06 Pressure Calibrate “Lift Cylinder” dimensions. 07 Radius/Moment Calibrate “Radius” and “Moment” of main boom. 08 Boom Defl’n Calibrates “Deflections” for booms and attachments. 09 Compensation Sets “Pressure Compensation” when booming down. 10 Erected Attachments Calibrates “Attachment Radii,” “Moments,” and “Dimensions.” 11 Auxiliary Head Enter data for the “Auxiliary Head.” 12 Stowed Attachments Set dimensions for stowed attachments. 13 Digital Inputs View status of the digital inputs. 14 Enable Attachments Enable/disable attachments. 15. Enable Winches Enable/disable winches. 16 Data Retrieval View “Radius/Moment,” “Attachment” and “Pressure” data. 17 Language Set “Language” for main display. 18 Internal Data View internal System data and variables.

Page 9: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 9 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

00. Error Codes This section allows viewing of several system operations. 1. System Error Codes (see Appendix for description). 2. Computer Serial Number (should match the number on the computer box). 3. The Crane Specific Applications File (created when the RESET key was pressed).

01. Crane Data From the calibration menu, this selection will display the status of the personality. If the system has been reset and is functionally correct, the Display will read: “Personality is good.” To recalibrate the entire system, the crane data Reset key MUST be pressed. This function will erase the personality memory, which stores crane specific data and dimensions; it will also copy any known data from the on-board ROM applications file to the working personality memory for use by the system. To reset crane data, simply enter the routine and confirm the reset command by pressing the keys indicated.

02. Dimensions This procedure will provide the current values for the crane dimensions listed below. Use the UP and DOWN keys to modify the displayed values.

Procedure: 1. Enter Swing Offset value from worksheet. 2. Enter Ram L value from worksheet. 3. Enter Ram J value from worksheet. 4. Enter Ram G value from worksheet. 5. Enter Ram H value from worksheet.

6. Enter Rope Dimension L - winch [0] from worksheet

7. Enter Rope Dimension J - winch [0] from worksheet 8. Enter Rope Dimension G - winch [0] from worksheet 9. Enter Rope Dimension H - winch [0] from worksheet 10. Enter Rope Dimension L - winch [1] from worksheet 11. Enter Rope Dimension J - winch [1] from worksheet 12. Enter Rope Dimension G - winch [1] from worksheet 13. Enter Rope Dimension H - winch [1] from worksheet For winch dimensions, reference “winch data diagram,” page 7. 14. Enter Head Shv.Rad.value from worksheet. 15. Enter Rope Lim [0] maximum line pull for a single part-of-line.

Enter Rope Lim [1] 16. Enter Max POL maximum parts-of-line allowed on the main boom.

Page 10: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 10 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

17. Enter Load Scale a load multiplier, usually set to 1.0. 18. Set Offset Length between displayed value versus true value.

19. Enter New Root Length [0] Enter New Root Length [1]

03. Extension Sensor This routine is used to set the Zero and Span of the extension sensor.

1. Fully retract the boom and press the DOWN arrow key. The number next to the “Zero Sensor” label should go to Zero.

2. Fully extend the boom and measure the actual extension.

3. Press the “UP” arrow key to set the SPAN. Enter the actual extension when prompted.

04. Angle Sensor

This routine is used to set the Zero and Span of the angle sensor.

1. Position the boom at 0 ° and press the DOWN arrow key. The number next to the “Zero Sensor” label should go to Zero.

2. Angle the boom up to 65-70 °. Press the “UP” arrow key to see the SPAN. Measure the actual angle with an inclinometer. Enter the new SPAN when prompted.

05. Swing Potentiometer The operator can zero the swing, set the direction, or remove the swing pot. When a duty chart cannot be found, it is usually due to an improperly calibrated swing.

Page 11: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 11 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

06. Pressure The following routine uses a calibration load to compute the diameter of the hoist cylinder. Pick up calibration loads from the main boom with the computer correctly configured (i.e., winch in use, main boom, parts-of-line, etc.). If the diameter is already known or is easily measured, skip the calibration option and enter the value at the end of this routine.

THIS DIMENSION IS CRITICAL AND MUST BE MEASURED TO WITHIN 1/10th OF AN INCH. NOTE: Pressure cannot be calibrated until L, J, G, and H have been calibrated, otherwise an error message will flash on the screen during calibration.

Calibration Routine

1. Examine the piston and rod-side pressures before entering the routine. Pressures can be reviewed in routine 15 ‘Data Retrieval.’ The readings should show positive numbers from around 20 to 3000 PSI with the boom out of its cradle. When booming up, the piston-side reading should increase in value and the rod side value should not move. If this is not the case, switch the hydraulic hoses.

2. Enter the rod circumference from the worksheet.

3. The question, “Perform Piston Dimension Calibration?” will appear. If “NO” is selected, the system will ask for a manual entry of the piston diameter and then exit the calibration routine.

4. Enter the calibration load that will be lifted, including all shackles and hook weights. The load should be as large a mass as is safe for the crane to pick at a boom angle of around 60 ° and as far retracted as possible. If only small test loads are available, use a longer boom length. Example: 15550 lbs. should be entered as 15.55.

5. Pick up the calibration load and hold it steady to settle any fluctuations. Confirm the calibration.

6. Measure and enter the radius of the suspended load.

7. Set down the calibration load, allow it to settle, and then confirm the calibration. The routine will exit automatically.

8. Pick up the weight again. Check that the displayed load rises by the correct amount. The load may adjust itself a little for a few seconds.

9. Reenter the Calibration Mode and adjust, as appropriate. 07. Radius/Moment

The Radius/Moment routine below calibrates the natural moment of the boom and the radius, taking into account its deflection under its own weight.

Ensure that the boom configuration is set correctly, without erected attachments and the correct stowed attachments selected.

If calibrating with a stowed attachment, check the relevant stowed data entered into the system via the 12-Stowed Attachments routine BEFORE calibrating the main boom.

Page 12: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 12 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

07. Radius/Moment continued

Up to seven points may be stored; these points must include fully retracted and fully extended booms. Intermediate points should identify individual sections of the boom starting to telescope and/or other sections of the boom that stop telescoping as the boom is extended.

For booms that exhibit an appreciable amount of flexibility or droop, it may be necessary to include an extra point to improve accuracy, especially if there is a long distance between obvious points of calibration. This is usually pertinent for long proportional booms, which may require a fully retracted and fully extended calibration.

Some booms exhibit a sudden droop when nearing full expansion. Such a response may be due to the design and fitting of wear pads inside the boom, which allow sections to hang on each other when nearing the fully telescoped limit. Though this has little affect on main boom radius accuracy, the radius of a fly or jib may be affected by this characteristic. It is essential, therefore, to add an extra calibration point at about 90% of the boom extension.

For each extension calibration, the system requires a stable measurement of the moment (via its own pressure sensors) and radius (via the calibration personnel measurements) at both high and low boom angles. Try to pick angles of 60 ° to 70 ° for high angles and angles as close to 0 ° as possible for low angles.

Take care to accurately measure the radius at each calibration point. Using a single part-of-line will aid this.

When entering the Tare load in the calibration routine, it is beneficial to add a little weight to the hook. Adding 100 pounds (or 50 Kilos) will help guarantee a slightly positive load reading in all operating configurations.

Calibration Routine for Radius/Moment

1. Determine if this will be a brand new calibration or an existing calibration with changes. A new calibration will destroy all radius moment data previously calibrated.

2. Enter the tare-load, i.e. the weight of extras added to the boom like the hook-block, and rope and shackles. If there is a block and ball hanging, add both to tare.

3. Telescope to the required length and angle. Press the “OK” key when ready. Enter measured radius at these points of calibration.

4. Boom to the other desired angle and confirm, as above.

5. Store the calibration using the OK key.

6. Move to the next extension or exit using the bottom right key. 08. Boom Deflection

The following procedure is used to quantify the amount that a boom or attachment bends when under load. The boom has its own bending factor called “F” and each jib combination can have its own independent “F” value. Before starting the procedure, the display will show the angle of the boom head under no load and under the current load.

Page 13: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 13 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

Calibration Procedure

The following procedure can be used for each fly/jib combination. Simply select the combination for calibration, reenter the routine, and follow the steps below.

If direct entry of the F value is desired, simply press the key next to the “Edit” caption, enter the number, and skip to the next section.

1. Ensure that:

• the crane is configured to pick off the main boom.

• all stowed attachments are set correctly.

• there are no erected or unused attachments.

2. Fully extend the boom at a high angle greater than 60 °.

3. Lift a suitable calibration load. The load should induce significant deflection in the boom.

4. Begin the calibration by pressing the key next to the current F value.

5. Measure the loaded main boom radius and enter the value. It is helpful to add 0.1 ft or 0.1 m to the radius when entering the radius for boom deflection. This will create a slightly positive radius in most operating conditions.

6. Ensure that the new displayed radius matches (or slightly exceeds) the actual measured radius.

7. For attachment calibrations, have the attachment erected and used but with the boom fully retracted. Then follow the above procedure.

Page 14: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 14 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

09. Compensation

Often loads will change drastically when booming down; this can be compensated for in this routine.

Two compensation speeds are allowed: ”Slow” rate compensation and ”Fast” rate compensation. The actual rate of boom movement is displayed when in this routine.

1. Enter the routine. Use the Next and Previous keys to select the desired compensation rate.

2. Select the rate using the “Edit” key and adjust the offset value by using the “Increase,” and “decrease” key. To see the effect, move the boom down. If the effect is too small, increase the compensation. It is customary to leave the slow rate compensation as zero, or a very small number and adjust the fast rate compensation to counter the booming down effect.

3. Press the Edit Activate key again to toggle back to the rate selection mode.

4. Exit the routine using the Exit key when finished.

Note: “Compensation ONLY” switches in when booming down.

Page 15: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 15 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

10. Erected Attachments For systems without pre-calibrated fly’s, perform a calibration routine on each jib configuration.

Upon starting the procedure, it is possible to enter the fly parameters manually, using an editor. This method of entry can be used to enter supplied pre-calibration data and may avoid the need to perform full calibrations; it can also be used to trim calibrations that are less than perfect.

For each fly/jib combination, the system must gather data about the jib moment (through the pressure sensors) and the jib radius (taken from radius measurements by crane personnel). Data must be gathered at high and low angles and for a retracted and extended main boom for EACH configuration.

Calibration Routine

1. Make sure the crane is configured to be picking off the jib to be calibrated.

2. Enter the main hook weight, if there is an unused hook picking off the main boom; otherwise enter 0.0.

3. Enter the weight of the fly hook and any other shackles and rope weights suspended from the fly pick point.

4. Telescope and boom the crane to the in/out and high/low angle positions. The system should display what it thinks the configuration is e.g. Tele’d IN, Low Degs indicating that the system is gathering data with a retracted boom at a low angle. If this is incorrect, use the “B” key to bump the system into the correct configuration.

5. Each setting will display “[not calibrated] next to it if it has not been calibrated and [calibrated] if it has.

6. For each of the 4 regions, enter the measured radius.

7. After all four data regions have been mapped; use the Calibrate key to store the calibration. The system will exit to the calibration menu automatically.

11. Auxiliary Head This routine allows the critical dimensions of the auxiliary head to be entered and viewed. Press the “edit” key to enter the following four values in the sequence below.

Auxiliary Weight The weight of the auxiliary head.

Offset Angle The auxiliary weight offset angle from the boom centerline.

Center of G Approximate distance along the auxiliary head to its center of gravity.

Auxiliary Length The length of the auxiliary head.

Page 16: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 16 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

JIB

CENTER OF GRAVITY

G BOOM PIVOT

T

12. Stowed Attachments

Use this routine to enter data for stowed attachments. Note that this information should be entered before performing a main boom radius/moment calibration, if it is to be calibrated with an attachment stowed!

The required stowed jib data can be gathered as follows:

Stowed Deduction Should be written on the chart or cab plate.

Jib Weight Weigh it! Use weight gathered during the erected attachment calibration. Refer to Data Retrieval, Item 16 in this manual. Follow the steps in the Data Retrieval Routine.

Stowed G Balance jib on hook to find center point, compute distance from boom pivot to this center point when jib is stowed. As an approximation, use the halfway point along the jib. See diagram below.

Stowed T Measure from boom pivot to the centerline of jib when stowed. This should be a few inches. The number will be negative when the jib centerline is above the boom pivot (most likely). See diagram below.

Horizontal ((G) and vertical (T) distances from boom pivot to center of gravity of jib.

BOOM

Calibration Routine

1. Enter the routine. Using the Next Jib and Previous Jib keys, select the stowed attachment to be calibrated.

2. Use the Edit key to enter new values for the stowed jib.

3. Press Exit key to exit the modify routine; calibrate the additional attachment.

Page 17: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX: (714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

GREER COMPANY Page 17 of 27 Crane Systems

13. Digital Inputs Allows operator to view only the digital input status of the system.

14. Enable Attachments Allows the operator to enable or disable any attachment.

15. Enable Winches Allows the operator to enable or disable any winch.

16. Data Retrieval Allows operator to view or edit pressure, radius/moment and fly variables. The routine will ask the operator if he wants to edit each type of data.

17. Language Switch

Switches language of main display from English to Spanish. Use the NEXT and PREVIOUS keys to make a selection.

18. Internal Data Allows the Engineer to view internal variables.

Page 18: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 18 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

Main Boom Testing Worksheet Following each main boom calibration, perform a series of tests that will sufficiently show the accuracy of the calibration in all working areas of the main boom.

Test the unloaded boom, two different loads at three different lengths and three different angles for each length of main boom. Boom ________ Displayed Length

Displayed Angle

Displayed Radius

Measur’d Radius

Radius Error

Displayed Load

Actual Load

Load Error

Notes

Page 19: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 19 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

Attachment Testing Worksheet

Attachment & Offset

Main Boom

Test #

Test #

Displayed Length

Displayed Angle

Displayed Radius

Measur’d Radius

Radius Error

Displayed Load

Actual Load

Load Error

Page 20: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 20 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

Attachment Tests

Attachment & Offset

Main Boom

Test #

Test #

Displayed Length

Displayed Angle

Displayed Radius

Measur’d Radius

Radius Error

Displayed Load

Actual Load

Load Error

Page 21: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 21 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

Attachment Tests

Attachment & Offset

Main Boom

Test #

Test #

Displayed Length

Displayed Angle

Displayed Radius

Measur’d Radius

Radius Error

Displayed Load

Actual Load

Load Error

Page 22: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 22 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

Attachment Tests

Attachment & Offset

Main Boom

Test #

Test #

Displayed Length

Displayed Angle

Displayed Radius

Measur’d Radius

Radius Error

Displayed Load

Actual Load

Load Error

Page 23: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 23 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

Attachment Tests

Attachment & Offset

Main Boom

Test #

Test #

Displayed Length

Displayed Angle

Displayed Radius

Measur’d Radius

Radius Error

Displayed Load

Actual Load

Load Error

Page 24: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 24 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

Attachment Tests

Attachment & Offset

Main Boom

Test #

Test #

Displayed Length

Displayed Angle

Displayed Radius

Measur’d Radius

Radius Error

Displayed Load

Actual Load

Load Error

Page 25: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 25 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

Attachment Tests

Attachment & Offset

Main Boom

Test #

Test #

Displayed Length

Displayed Angle

Displayed Radius

Measur’d Radius

Radius Error

Displayed Load

Actual Load

Load Error

Page 26: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 26 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03

Attachment Tests

Attachment & Offset

Main Boom

Test #

Test #

Displayed Length

Displayed Angle

Displayed Radius

Measur’d Radius

Radius Error

Displayed Load

Actual Load

Load Error

Page 27: Calibration and Testing for - Giuffregiuffre.com/manuals/greer/rc510/RCI510-Calibration.pdf · MicroGuard® 510 Retrofit Calibration Manual PN ... measurements for the initial calibration

Greer Company Page 27 of 27

Crane Systems

Greer Company 1918 E. Glenwood Place, Santa Ana, CA 92705 Tel: (714) 259-9702 FAX:(714) 259-7626 MicroGuard® 510 Retrofit Calibration Manual PN W450256- 05/19/03