Index of Sheets A.1: Cover Sheet B.1: Project Narrative and Work Sequence Plan C.02: Existing Conditions C.02: Proposed Conditions - Support Stage C.06: Plan and Profile Interim and Temporary Support D.1: Construction Details D.2: Construction Details Seabeck Creek Fish Barrier Removal CenturyLink Conflict Mitigation Cover Sheet Sheet A.1 Scale: N/A N.662594 Date: 06/04/2020 Prepared by: Prepared for: In coordination with: Not for Construction Designed by: Drawn by: Checked by: All methods, materials, content and form contained in this document are the intellectual property of Terra Technologies LLC, and may not be copied, reproduced, distributed or displayed without the express written consent of Terra Technologies LLC. The technology presented in this document is protected under various U.S. and International patents and patent pending applications, including without limitation, U.S. Patent Nos. 7,771,140; 8,016,518; and 8,061,934. All existing and proposed conditions are based upon information provided by others. Terra Technologies LLC cannot be responsible for the accuracy of information and/or plans provided by outside parties. MO/DAY/YEAR| REV. # | Description 06/05/2020 REV. #1 | Pile location to avoid tree dripline Kitsap County Dept. of Public Works, Tetra Tech, and Loving Engineering & Consulting City of Seabeck, Kitsap County, Washington Seabeck Creek Fish Barrier Removal CenturyLink Duct Relocation, Protection, & Placement Plans LOCATION MAP NOT TO SCALE N PROJECT LOCATION Seabeck Holly Rd Larson Ln. Northwoods Rd Note: Supporting background plans and images were provided by Tetra Tech and Loving Engineering and Consulting for use in developing this drawing set. The plan set provided by Tetra Tech for this drawing set was titled "Hood Canal Salmon Enhancement Group Seabeck Creek Fish Barrier Removal" dated May 2020 and denoted as 100% Design - Bid Set".

Upload: others

Post on 09-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: C.02: Existing Conditions Seabeck Holly Rd C.02: Proposed ... · control points revisions no.bydate description of sheet aes glw glw ka/gg/js ... bench mark #1 73.23' set "mag" nail

Index of SheetsA.1: Cover SheetB.1: Project Narrative and Work Sequence PlanC.02: Existing ConditionsC.02: Proposed Conditions - Support StageC.06: Plan and Profile Interim and Temporary SupportD.1: Construction DetailsD.2: Construction Details

Seabeck Creek Fish Barrier RemovalCenturyLink Conflict Mitigation

Cover Sheet

SheetA.1

Scale:N/A

N.662594 Date:

06/04/2020

Prepared by: Prepared for: In coordination with:Not for Construction Designed by:

Drawn by:

Checked by:

All methods, materials, content and form contained in this document are the intellectual property of Terra Technologies LLC, and may not be copied, reproduced, distributed or displayed withoutthe express written consent of Terra Technologies LLC. The technology presented in this document is protected under various U.S. and International patents and patent pending applications,including without limitation, U.S. Patent Nos. 7,771,140; 8,016,518; and 8,061,934.

All existing and proposed conditions arebased upon information provided byothers. Terra Technologies LLC cannot beresponsible for the accuracy ofinformation and/or plans provided byoutside parties.

MO/DAY/YEAR| REV. # | Description06/05/2020 REV. #1 | Pile location to avoid tree dripline

Kitsap County Dept. of PublicWorks, Tetra Tech, and LovingEngineering & Consulting

City of Seabeck, Kitsap County, Washington

Seabeck Creek Fish Barrier RemovalCenturyLink Duct Relocation, Protection, & Placement PlansCenturyLink Civil Base Map

ns Prepared By:

LOCATION MAPNOT TO SCALE N

TT Eng: Todd BrinerPhone: 630-800-9596E-mail: [email protected] TT #: WACLhttp://www.terratechllc.net

PROJECT LOCATION

Sea

beck

Hol

ly R

d

Lars

on L

n.

Northwoods Rd

Note:

Supporting background plans and images were providedby Tetra Tech and Loving Engineering and Consulting foruse in developing this drawing set. The plan set provided byTetra Tech for this drawing set was titled "Hood CanalSalmon Enhancement Group Seabeck Creek Fish BarrierRemoval" dated May 2020 and denoted as 100% Design -Bid Set".

Page 2: C.02: Existing Conditions Seabeck Holly Rd C.02: Proposed ... · control points revisions no.bydate description of sheet aes glw glw ka/gg/js ... bench mark #1 73.23' set "mag" nail

SheetB.1

Designed by:

Drawn by:

Checked by:

All methods, materials, content and form contained in this document are the intellectual property of Terra Technologies LLC, and may not be copied, reproduced, distributed or displayed withoutthe express written consent of Terra Technologies LLC. The technology presented in this document is protected under various U.S. and International patents and patent pending applications,including without limitation, U.S. Patent Nos. 7,771,140; 8,016,518; and 8,061,934.

MO/DAY/YEAR| REV. # | DescriptionSeabeck Creek Fish Barrier Removal

CenturyLink Conflict Mitigation Project Narrative

Scale:N/A

N.662594 Date:

06/04/2020

Not for Construction Prepared by: Prepared for: In coordination with:All existing and proposed conditions arebased upon information provided byothers. Terra Technologies LLC cannot beresponsible for the accuracy ofinformation and/or plans provided byoutside parties.

Kitsap County Dept. of PublicWorks, Tetra Tech, and LovingEngineering & Consulting

Project Narrative and Work Sequence:

This drawing set is adapted from plans provided by and developed by Tetra Tech for Kitsap CountyDept. of Public Works and they are intended to demonstrate how the existing CenturyLink facilities will besupported and protected in place during the proposed construction of the bridge carrying SeabeckHolly Road NW over Seabeck Creek. The following is a summary of CenturyLink's intended plan torelocate, support and protect its facilities.

1. It is assumed that the Kitsap County contractor ("contractor") will close Seabeck Holly Road NW andimplement a detour route for the duration of the project.2. Following the roadway closure, CenturyLink will place new handholes on opposite ends of theproposed bridge in which CenturyLink will intercept some existing cables and splice in additional slack toallow the cable to be relocated temporarily to a catenary support system that will remain in placeduring the construction of the bridge.3. CenturyLink will relocate its existing facilities to the north side of the bridge, temporarily supportingthem with Terra Technologies' proprietary Terra Shield support system cantilevered to a position 3-feetfrom the north face of the proposed wing walls.4. CenturyLink will then construct a 105-foot catenary support system as depicted in this plan set and willremove the interim Terra Shield support system.5. Following bridge deck construction and prior to construction of traffic barrier, CenturyLink will provideutility brackets and duct hanger system depicted on Sheet D.2 to be installed by contractor on thedownstream face of the traffic barrier. 6. Prior to opening the roadway to construction, CenturyLink will relocate the supported facilities to theinstalled utility hanger on the downstream face of the traffic barrier, and remove the catenary supportsystem. The piles from the catenary support system will be cut 6" below finished grade and upper portionremoved leaving the embedded section in place.

Page 3: C.02: Existing Conditions Seabeck Holly Rd C.02: Proposed ... · control points revisions no.bydate description of sheet aes glw glw ka/gg/js ... bench mark #1 73.23' set "mag" nail

MAILBOX

SIGN

72" CONC.

IE=61.33

12" CONC.

IE=69.29

72" CONC.

IE=60.83

12" CONC.

IE=70.93

GUY POLE

12" ADS

IE=72.05

12" ADS

IE=71.81

12" CONC.

IE=71.55

12" ADS

IE=71.88

12" ADS

IE=71.54

3" DIA. CONC. WELL

28"

28"

28"

24"

19"

17"

32"

24"

32"

17"

15"

15"

24"

42"

22"

32"

72"

48"

18"

8"

8"

FAVIER

032

033

CRAMER

078

SCLOSSER

073

KEMPTON

006

RIPLINGER

072

COMMON

AREA

047

S

E

A

B

E

C

K

H

O

L

L

Y

R

O

A

D

N

W

EXISTING

SHED

R

I

G

H

T

-

O

F

-

W

A

Y

R

I

G

H

T

-

O

F

-

W

A

Y

POINT #3

EL = 72.42 FT

RED REBAR AND CAP

POINT #1

EL = 73.23 FT

MAG NAIL

EXISTING ROCK

RETAINING WALL

EXISTING TIMBER

FISHWAY (TYP OF 4)

CONCRETE WELL

ROCK LINED

STORMWATER DITCH

ROCK LINED

STORMWATER DITCH

8" DI WATER MAIN

UPSTREAM

IE 61.33'

DOWNSTREAM

IE = 60.83'

EXISTING ROCK

RETAINING WALL

KPUD STREAM

GAGE

P

R

I

V

A

T

E

D

R

I

V

E

W

A

Y

P

R

I

V

A

T

E

D

R

I

V

E

W

A

Y

P

R

I

V

A

T

E

D

R

I

V

E

W

A

Y

EXISTING 72"

CONCRETE

CULVERT

7

0

6

6

6

7

6

8

6

9

7

0

6

66

76

86

9

71

6

5

6

5

7

0

6

6

6

4

6

8

6

5

6

3

6

4

6

7

6

9

70

7

0

7

1

7

2

7

3

7

0

68

6

9

7

1

7

2

6

0

6

5

6

1

6

2

6

3

6

4

6

6

6

7

6

0

6

5

5

7

5

8

5

9

6

1

6

2

6

3

6

4

6

0

6

5

5

75

85

9

6

16

26

36

4

6

5

6

36

4

6

6

66

67

6

8

6

26

0

6

4

6

0

65

6

1

62

6

3

6

4

66

7

2

7

2

7

2

7

2

7

3

7

3

7

3

7

0

7

17

2

73

7

0

7

0

7

1

7

1

7

2

7

2

7

3

7

3

7

2

7

1

7

2

7

2

6

0

6

0

57

5

6

5

7

5

7

5

6

EXISTING CREEK

CENTERLINE

S

E

A

B

E

C

K

C

R

EE

K

55

5

6

6

2

6

0

5

9

6

1

6

2

6

3

6

4

DRIP LINE

7

3

7

3

7

4

7

4

7

4

7

4

6

5

6

6

65

KITSAP COUNTY, WASHINGTON

SECTION 29, TOWNSHIP 25 NORTH, RANGE 1 WEST, W.M.

KITSAP COUNTY

DEPT. OF PUBLIC WORKS

614 DIVISION STREET MS-26

PORT ORCHARD, WA 98366

TEL:(360) 337-5777 FAX:(360) 337-4867

CRP No.

DATE:

DRAWN:

CHECKED:

SURVEYED:

DESIGNED:

CONTROL POINTS REVISIONS

DESCRIPTIONDATEBYNo.

OF

SHEET

AES

GLW

GLW

KA/GG/JS

3693

C:\Use

rs\G

reg.W

olov

eke\

Des

ktop

\Sea

beck

Res

tora

tion

\CAD\S

heet

Files

\C-0

2 E

XIS

T S

ITE S

URVEY C

NTRL.d

wg

wol

ovek

e, g

reg

4:2

2 P

M 5/2

4/2

020

34

BEFORE YOU DIG

BUSINESS DAYS

CALL TWO

811

HOOD CANAL SALMON ENHANCEMENT GROUP

SEABECK CREEK FISH BARRIER REMOVAL

100% DESIGN - BID SET

SURVEY AND EXISTING CONDITIONS

04

C-02

N

0

SCALE:

10' 20' 40'

1'' = 20'

NAVD 88

SURVEY NOTES

1. HORIZ: NAD83 (2011) WASHINGTON STATE PLANE COORDS, NORTH ZONE.

VERT: NAVD88 DATUMS BASED UPON WASHINGTON STATE REFERENCE

NETWORK GPS READINGS.

2. CONTOUR INTERVALS ARE 1-FOOT AND ARE COMPUTER GENERATED FROM

GROUND FIELD TOPOGRAPHY.

3. THE LOCATION OF EXISTING UTILITIES SHOWN ON THESE PLANS IS BASED

ON THE PROJECT SURVEY AND UTILITY RECORD MAPS. THIS INFORMATION

SHALL NOT BE RELIED UPON AS BEING EXACT OR COMPLETE. THE

CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS

PRIOR TO THE START OF CONSTRUCTION.

4. AES ASSUMES NO LIABILITY FOR ANY SUBSURFACE CONDITIONS OR

FEATURES THAT MAY EXIST THAT ARE UNDETECTABLE AND/OR NOT

VISIBLE. NO UNDERGROUND UTILITIES WERE LOCATED FOR THIS SURVEY.

AES CONSULTANTS BENCH MARKS

AES CONSULTANTS CONTROL TABLE

235849.47 1146478.54

235678.75 1146259.40

BENCH MARK #1 73.23' SET "MAG" NAIL

BENCH MARK #3 72.42' SET REBAR & RED I.D. CAP

POINT NORTHING EASTING ELEV. DESCRIPTION

DESCRIPTION NORTHING EASTING POSITION

DNR MONUMENT

RAILROAD IRON

4" x 4" CONC. MON.

238211.10 1150597.26 NE SEC. COR.

238326.18 1145367.67 NW SEC. COR.

235694.64 1145311.58 W 1/4 COR.

AESAES

EX OH ELECEX OH ELEC

PSE Pole P03

EX OH ELEC

EX OH ELEC

EX OH ELEC

EX OH ELEC

EX OH ELEC

EX OH ELEC

PSE Existing Pole P02

CenturyLink existing 6-ductstructure

CenturyLink existing buriedcable

CenturyLink existingpedestal

CenturyLink existingpedestal

EX O

H ELEC

EX O

H ELEC

EX O

H ELEC

Page 4: C.02: Existing Conditions Seabeck Holly Rd C.02: Proposed ... · control points revisions no.bydate description of sheet aes glw glw ka/gg/js ... bench mark #1 73.23' set "mag" nail

MAILBOX

SIGN

72" CONC.

IE=61.33

12" CONC.

IE=69.29

72" CONC.

IE=60.83

12" CONC.

IE=70.93

GUY POLE

12" ADS

IE=72.05

12" ADS

IE=71.81

12" CONC.

IE=71.55

12" ADS

IE=71.88

12" ADS

IE=71.54

3" DIA. CONC. WELL

28"

28"

28"

24"

19"

17"

32"

24"

32"

17"

15"

15"

24"

42"

22"

32"

72"

48"

18"

8"

8"

FAVIER

032

033

CRAMER

078

SCLOSSER

073

KEMPTON

006

RIPLINGER

072

COMMON

AREA

047

S

E

A

B

E

C

K

H

O

L

L

Y

R

O

A

D

N

W

EXISTING

SHED

R

I

G

H

T

-

O

F

-

W

A

Y

R

I

G

H

T

-

O

F

-

W

A

Y

POINT #3

EL = 72.42 FT

RED REBAR AND CAP

POINT #1

EL = 73.23 FT

MAG NAIL

EXISTING ROCK

RETAINING WALL

EXISTING TIMBER

FISHWAY (TYP OF 4)

CONCRETE WELL

ROCK LINED

STORMWATER DITCH

ROCK LINED

STORMWATER DITCH

8" DI WATER MAIN

UPSTREAM

IE 61.33'

DOWNSTREAM

IE = 60.83'

EXISTING ROCK

RETAINING WALL

KPUD STREAM

GAGE

P

R

I

V

A

T

E

D

R

I

V

E

W

A

Y

P

R

I

V

A

T

E

D

R

I

V

E

W

A

Y

P

R

I

V

A

T

E

D

R

I

V

E

W

A

Y

EXISTING 72"

CONCRETE

CULVERT

7

0

6

6

6

7

6

8

6

9

7

0

6

66

76

86

9

71

6

5

6

5

7

0

6

6

6

4

6

8

6

5

6

3

6

4

6

7

6

9

70

7

0

7

1

7

2

7

3

7

0

68

6

9

7

1

7

2

6

0

6

5

6

1

6

2

6

3

6

4

6

6

6

7

6

0

6

5

5

7

5

8

5

9

6

1

6

2

6

3

6

4

6

0

6

5

5

75

85

9

6

16

26

36

4

6

5

6

36

4

6

6

66

67

6

8

6

26

0

6

4

6

0

65

6

1

62

6

3

6

4

66

7

2

7

2

7

2

7

2

7

3

7

3

7

3

7

0

7

17

2

73

7

0

7

0

7

1

7

1

7

2

7

2

7

3

7

3

7

2

7

1

7

2

7

2

6

0

6

0

57

5

6

5

7

5

7

5

6

EXISTING CREEK

CENTERLINE

S

E

A

B

E

C

K

C

R

EE

K

55

5

6

6

2

6

0

5

9

6

1

6

2

6

3

6

4

DRIP LINE

7

3

7

3

7

4

7

4

7

4

7

4

6

5

6

6

65

KITSAP COUNTY, WASHINGTON

SECTION 29, TOWNSHIP 25 NORTH, RANGE 1 WEST, W.M.

KITSAP COUNTY

DEPT. OF PUBLIC WORKS

614 DIVISION STREET MS-26

PORT ORCHARD, WA 98366

TEL:(360) 337-5777 FAX:(360) 337-4867

CRP No.

DATE:

DRAWN:

CHECKED:

SURVEYED:

DESIGNED:

CONTROL POINTS REVISIONS

DESCRIPTIONDATEBYNo.

OF

SHEET

AES

GLW

GLW

KA/GG/JS

3693

C:\Use

rs\G

reg.W

olov

eke\

Des

ktop

\Sea

beck

Res

tora

tion

\CAD\S

heet

Files

\C-0

2 E

XIS

T S

ITE S

URVEY C

NTRL.d

wg

wol

ovek

e, g

reg

4:2

2 P

M 5/2

4/2

020

34

BEFORE YOU DIG

BUSINESS DAYS

CALL TWO

811

HOOD CANAL SALMON ENHANCEMENT GROUP

SEABECK CREEK FISH BARRIER REMOVAL

100% DESIGN - BID SET

SURVEY AND EXISTING CONDITIONS

04

C-02

N

0

SCALE:

10' 20' 40'

1'' = 20'

NAVD 88

SURVEY NOTES

1. HORIZ: NAD83 (2011) WASHINGTON STATE PLANE COORDS, NORTH ZONE.

VERT: NAVD88 DATUMS BASED UPON WASHINGTON STATE REFERENCE

NETWORK GPS READINGS.

2. CONTOUR INTERVALS ARE 1-FOOT AND ARE COMPUTER GENERATED FROM

GROUND FIELD TOPOGRAPHY.

3. THE LOCATION OF EXISTING UTILITIES SHOWN ON THESE PLANS IS BASED

ON THE PROJECT SURVEY AND UTILITY RECORD MAPS. THIS INFORMATION

SHALL NOT BE RELIED UPON AS BEING EXACT OR COMPLETE. THE

CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS

PRIOR TO THE START OF CONSTRUCTION.

4. AES ASSUMES NO LIABILITY FOR ANY SUBSURFACE CONDITIONS OR

FEATURES THAT MAY EXIST THAT ARE UNDETECTABLE AND/OR NOT

VISIBLE. NO UNDERGROUND UTILITIES WERE LOCATED FOR THIS SURVEY.

AES CONSULTANTS BENCH MARKS

AES CONSULTANTS CONTROL TABLE

235849.47 1146478.54

235678.75 1146259.40

BENCH MARK #1 73.23' SET "MAG" NAIL

BENCH MARK #3 72.42' SET REBAR & RED I.D. CAP

POINT NORTHING EASTING ELEV. DESCRIPTION

DESCRIPTION NORTHING EASTING POSITION

DNR MONUMENT

RAILROAD IRON

4" x 4" CONC. MON.

238211.10 1150597.26 NE SEC. COR.

238326.18 1145367.67 NW SEC. COR.

235694.64 1145311.58 W 1/4 COR.

AESAES

3.00 ft

6

5

7

0

7

0

7

0

M

A

T

C

H

E

X

I

S

T

-

4

.

6

%

±

M

A

T

C

H

E

X

I

S

T

-

6

.

3

%

±

M

A

T

C

H

E

X

I

S

T

-

1

.

8

%

±

M

A

T

C

H

E

X

I

S

T

-

4

.

4

%

±

P

R

O

P

O

S

E

D

-

5

.

2

%

±

P

R

I

V

A

T

E

D

R

I

V

E

W

A

Y

B

R

I

D

G

E

,

S

E

E

S

T

R

U

C

T

U

R

A

L

S

H

E

E

T

S

S

E

A

B

E

C

K

H

O

L

L

Y

R

O

A

D

N

W

Y

E

L

L

O

W

D

O

U

B

L

E

C

E

N

T

E

R

L

I

N

E

,

S

E

E

N

O

T

E

6

P

A

I

N

T

E

D

W

H

I

T

E

L

I

N

E

,

S

E

E

N

O

T

E

7

P

A

I

N

T

E

D

W

H

I

T

E

L

I

N

E

(

T

Y

P

)

,

S

E

E

N

O

T

E

7

S

T

A

5

+

2

5

.

0

0

(

1

2

.

2

8

'

±

L

T

)

S

T

A

5

+

2

5

.

0

0

(

1

1

.

5

5

'

±

R

T

)

S

T

A

3

+

3

9

.

2

5

(

1

2

.

2

4

'

±

R

T

)B

E

G

I

N

P

A

V

I

N

G

S

T

A

3

+

3

9

.

2

5

M

A

T

C

H

E

X

I

S

T

E

L

7

1

.

7

±

S

T

A

3

+

3

9

.

2

5

(

-

1

6

.

0

4

'

±

L

T

)

B

E

G

I

N

B

R

I

D

G

E

S

T

A

3

+

9

0

.

2

7

E

N

D

B

R

I

D

G

E

S

T

A

4

+

5

5

.

5

4

S

T

A

4

+

8

1

.

0

5

E

L

7

2

.

6

'

E

N

D

N

O

N

-

F

L

A

R

E

D

T

E

R

M

I

N

A

L

S

T

A

5

+

4

6

.

6

2

(

-

2

1

.

3

9

'

±

L

T

)

B

E

G

I

N

T

R

A

N

S

I

T

I

O

N

S

E

C

T

I

O

N

C

O

N

N

E

C

T

T

O

B

A

R

R

I

E

R

S

T

A

4

+

7

1

.

9

2

L

T

E

N

D

T

R

A

N

S

I

T

I

O

N

S

E

C

T

I

O

N

C

O

N

N

E

C

T

T

O

B

A

R

R

I

E

R

S

T

A

3

+

9

2

.

3

5

L

T

B

E

G

I

N

B

E

A

M

G

U

A

R

D

R

A

I

L

S

T

A

3

+

3

4

.

5

0

A

N

C

H

O

R

T

Y

P

E

1

0

S

E

E

N

O

T

E

1

3

,

R

=

8

.

5

'

E

N

D

N

O

N

-

F

L

A

R

E

D

T

E

R

M

I

N

A

L

S

T

A

5

+

2

5

.

0

7

(

2

0

.

5

5

'

±

R

T

)

B

E

G

I

N

T

R

A

N

S

I

T

I

O

N

S

E

C

T

I

O

N

T

Y

P

E

2

4

C

O

N

N

E

C

T

T

O

B

A

R

R

I

E

R

S

T

A

4

+

5

6

.

2

0

R

T

E

N

D

T

R

A

N

S

I

T

I

O

N

S

E

C

T

I

O

N

C

O

N

N

E

C

T

T

O

B

A

R

R

I

E

R

S

T

A

3

+

7

1

.

4

6

R

T

B

E

G

I

N

N

O

N

-

F

L

A

R

E

D

T

E

R

M

I

N

A

L

S

T

A

3

+

1

1

.

3

9

(

1

3

.

8

8

'

±

R

T

)

E

N

D

P

A

V

I

N

G

S

T

A

5

+

2

5

.

0

0

M

A

T

C

H

E

X

I

S

T

E

L

7

3

.

0

±

E

N

D

N

O

N

-

F

L

A

R

E

D

T

E

R

M

I

N

A

L

B

E

G

I

N

B

E

A

M

G

U

A

R

D

R

A

I

L

S

T

A

3

+

4

2

.

2

2

(

1

7

.

0

6

'

±

R

T

)

R

=

3

5

'

E

N

D

T

R

A

N

S

I

T

I

O

N

S

E

C

T

I

O

N

B

E

G

I

N

B

E

A

M

G

U

A

R

D

R

A

I

L

S

T

A

4

+

9

3

.

0

5

(

-

2

5

.

4

4

'

±

L

T

)

E

N

D

T

R

A

N

S

I

T

I

O

N

S

E

C

T

I

O

N

B

E

G

I

N

B

E

A

M

G

U

A

R

D

R

A

I

L

S

T

A

4

+

7

7

.

6

5

(

2

0

.

3

2

'

±

R

T

)

S

T

A

3

+

6

2

.

7

8

'

E

L

7

1

.

6

'

E

N

D

B

E

A

M

G

U

A

R

D

R

A

I

L

B

E

G

I

N

T

R

A

N

S

I

T

I

O

N

S

E

C

T

I

O

N

S

T

A

3

+

4

9

.

3

9

(

1

7

.

7

0

'

±

R

T

)

E

N

D

B

E

A

M

G

U

A

R

D

R

A

I

L

B

E

G

I

N

T

R

A

N

S

I

T

I

O

N

S

E

C

T

I

O

N

S

T

A

3

+

7

2

.

1

6

(

-

2

4

.

2

9

'

±

L

T

)

R

=

3

5

'

E

N

D

B

E

A

M

G

U

A

D

R

A

I

L

B

E

G

I

N

N

O

N

-

F

L

A

R

E

D

T

E

R

M

I

N

A

L

S

T

A

5

+

1

6

.

6

8

(

-

2

3

.

9

2

'

±

L

T

)

R

=

3

5

'

E

N

D

B

E

A

M

G

U

A

R

D

R

A

I

L

B

E

G

I

N

N

O

N

-

F

L

A

R

E

D

T

E

R

M

I

N

A

L

S

T

A

4

+

9

5

.

0

3

(

2

0

.

2

5

'

±

R

T

)

R

=

3

5

'

S

E

E

S

H

E

E

T

C

-

0

9

F

O

R

G

R

A

D

I

N

G

R

E

L

O

C

A

T

E

8

-

I

N

W

A

T

E

R

M

A

I

N

A

C

R

O

S

S

C

O

N

C

R

E

T

E

B

A

R

R

I

E

R

S

E

E

S

H

E

E

T

C

-

0

9

F

O

R

G

R

A

D

I

N

G

7

0

6

7

6

8

6

9

7

1

7

2

7

3

7

0

6

9

7

1

7

2

7

0

7

0

7

1

7

2

60

6

0

65

6

5

6

1

6

1

6

2

6

2

6

3

6

3

64

6

4

6

6

65

6

5

7

0

6

2

62

63

63

64

64

6

6

66

67

6

7

6

8

68

6

9

3

0

0

+

3

5

0

+

4

0

0

+

4

5

0

+

5

0

0

+

5

5

0

+

L

7

C

4

P

T

:

4

+

5

9

.

8

5

EX D

UCT

EX D

UCT

EX DUCT

EX DUCT

EX DUCT

EX DUCT

EX DUCT

EX DUCT

EX DUCT

EX DUCT

EX DUCT

EX DUCT

EXIST TEL

EXIST TEL

EXIST TEL

EXIST TEL

EXIST TEL

EXIST TEL

EXIST TEL

EXIST TEL

EXIST T

EL

PROP

DUCT

PROP

DUCT

PROP

DUCT

PROP

DUCT

PROP

DUCT

PROP DUCTPROP DUCT

PROP DUCTPROP DUCT

PROP DUCT

PROP DUCTPROP DUCT

PROP DUCTPROP DUCT

102.26 ft

Set new 264-TA handhole (seedetail sheet D-1) over existing6-MPD, splice 400-feet new1800-pr. to new 264-TA

22.22 ft

Set new 264-TA handhole (seedetail sheet D.1) over existing6-MPD, splice 400-feet new1800-pr. to new 264-TA

Relocated CenturyLink duct to beplaced 5-feet from edge of proposedbridge and supported in place withcantilever Terra Shield support systemduring catenary structure construction(see Sheet C.3), direct bury cable to beeliminated during construction ofbridge

P

R

O

P

-

O

H

-

E

L

E

C

P

R

O

P

-

O

H

-

E

L

E

C

P

R

O

P

-

O

H

-

E

L

E

C

P

R

O

P

-

O

H

-

E

L

E

C

P

R

O

P

-

O

H

-

E

L

E

C

P

R

O

P

-

O

H

-

E

L

E

C

P

R

O

P

-

O

H

-

E

L

E

C

P

R

O

P

-

O

H

-

E

L

E

C

P

R

O

P

-

O

H

-

E

L

E

C

P

R

O

P

-

O

H

-

E

L

E

C

P

R

O

P

-

O

H

-

E

L

E

C

P

R

O

P

-

O

H

-

E

L

E

C

P

R

O

P

-

O

H

-

E

L

E

C

New PSE pole by others

Existing PSE pole to beremoved by others

EX O

H ELEC

EX O

H ELEC

EX O

H ELEC

EX OH ELEC

EX OH ELEC

EX OH ELEC

EX OH ELEC

EX OH ELEC

EX OH ELEC

P

R

O

P

-

O

H

-

E

L

E

C

Proposed pile by others(typical)

Proposed excavated and groutedpile (see roadway profile page fordetail)

Proposed excavated and grouted pile (seeroadway profile page for detail)

Proposed bridge by others

12.00 ft

15.00 ft

Proposed pole by PSE

3.00 ft

Page 5: C.02: Existing Conditions Seabeck Holly Rd C.02: Proposed ... · control points revisions no.bydate description of sheet aes glw glw ka/gg/js ... bench mark #1 73.23' set "mag" nail

65

70

70

70

M

A

T

C

H

E

X

IS

T

-4

.6

%

±

M

A

T

C

H

E

X

IS

T

-6

.3

%

±

MA

TC

H

EX

IS

T

-1.8%

±

MA

TC

H

EX

IS

T

-4.4%

±

PR

OP

OS

ED

-5.2%

±

PRIVATE

DRIVEWAY

BRIDGE, SEE STRUCTURAL SHEETS

SEABECK HOLLY ROAD NW

YELLOW DOUBLE

CENTERLINE,

SEE NOTE 6

PAINTED WHITE

LINE, SEE NOTE 7

PAINTED WHITE LINE (TYP),

SEE NOTE 7

STA 5+25.00 (12.28'± LT)

STA 5+25.00 (11.55'± RT)

STA 3+39.25 (12.24'± RT)

BEGIN PAVING

STA 3+39.25

MATCH EXIST EL 71.7±

STA 3+39.25 (-16.04'± LT)

BEGIN BRIDGE

STA 3+90.27

END BRIDGE

STA 4+55.54

STA 4+81.05

EL 72.6'

END NON-FLARED TERMINAL

STA 5+46.62 (-21.39'± LT)

BEGIN TRANSITION SECTION

CONNECT TO BARRIER

STA 4+71.92 LT

END TRANSITION SECTION

CONNECT TO BARRIER

STA 3+92.35 LT

BEGIN BEAM GUARDRAIL STA 3+34.50

ANCHOR TYPE 10

SEE NOTE 13, R = 8.5'

END NON-FLARED TERMINAL

STA 5+25.07 (20.55'± RT)

BEGIN TRANSITION SECTION TYPE 24

CONNECT TO BARRIER

STA 4+56.20 RT

END TRANSITION SECTION

CONNECT TO BARRIER

STA 3+71.46 RT

BEGIN

NON-FLARED TERMINAL

STA 3+11.39 (13.88'± RT)

END PAVING

STA 5+25.00

MATCH EXIST EL 73.0±

END NON-FLARED TERMINAL

BEGIN BEAM GUARDRAIL

STA 3+42.22 (17.06'± RT)

R = 35'

END TRANSITION SECTION

BEGIN BEAM GUARDRAIL

STA 4+93.05 (-25.44'± LT)

END TRANSITION SECTION

BEGIN BEAM GUARDRAIL

STA 4+77.65 (20.32'± RT)

STA 3+62.78'

EL 71.6'

END BEAM GUARDRAIL

BEGIN TRANSITION SECTION

STA 3+49.39 (17.70'± RT)

END BEAM GUARDRAIL

BEGIN TRANSITION SECTION

STA 3+72.16 (-24.29'± LT)

R = 35'

END BEAM GUADRAIL

BEGIN NON-FLARED TERMINAL

STA 5+16.68 (-23.92'± LT)

R = 35'

END BEAM GUARDRAIL

BEGIN NON-FLARED TERMINAL

STA 4+95.03 (20.25'± RT)

R = 35'

SEE SHEET C-09 FOR

GRADING

RELOCATE 8-IN

WATER MAIN ACROSS

CONCRETE BARRIER

SEE SHEET C-09 FOR

GRADING

70

67

68

69

71

72

73

70

69

71

72

70

70

71

72

6

0

6

0

6

5

65

6

1

6

1

6

2

6

2

6

3

6

3

6

4

6

4

6

6

6

5

6

5

7

0

6

2

6

2

6

3

6

3

6

4

6

4

6

66

6

6

7

6

7

6

8

6

8

6

9

3

0

0

+

3

5

0

+

400+

450

+

500

+

550

+

L7

C

4

PT

: 4+

59.85

AP

PR

OA

CH

S

LA

B

ST

A 3+

62.78

EL =

71.6'±

BE

GIN

P

AV

IN

G

ST

A 3+

39.25

EL =

71.7±

AP

PR

OA

CH

S

LA

B

ST

A 4+

81.05

EL =

72.6'±

EN

D B

RID

GE

ST

A 4+

55.54

BE

GIN

B

RID

GE

ST

A 3+

90.27

EN

D P

AV

IN

G

ST

A 5+

25.00

EL =

73.0±

186' ±

0.76%

FINISHED GRADE , SEE SHEET

C-09 FOR STREAM GRADING

TRANSITION

0.76%

EXIST

1%±

EXIST

0.4%±

TRANSITION

HMA PAVING

PER SHT 2/C-07

MATCH EXISTING

SLOPE

MATCH EXISTING

SLOPE

HMA PAVING

PER SHT 2/C-07

60

65

70

75

80

85

60

65

70

75

80

85

3+00 3+20 3+40 3+60 3+80 4+00 4+20 4+40 4+60 4+80 5+00 5+20 5+40

ROADWAY CONSTRUCTION CENTERLINE CURVE DATA

NUMBER

C4

L7

START STA

0+00.00

4+59.85

START

NORTHING/EASTING (FT)

N: 235386.7', E: 1146159.8'

N: 235767.8', E: 1146387.2'

END STA

4+59.85

6+50.00

END

NORTHING/EASTING (FT)

N:235767.8, E: 1146387.2

N: 235870.9, E: 1146547.0

DELTA

52°42'

RADIUS

500.0

TANGENT

247.63

PI STA

2+47.63

LENGTH

459.85

190.15

INCOMING BEARING AT STA 0+00: N 4°28'49" E

KITSAP COUNTY, WASHINGTON

SECTION 29, TOWNSHIP 25 NORTH, RANGE 1 WEST, W.M.

KITSAP COUNTY

DEPT. OF PUBLIC WORKS

614 DIVISION STREET MS-26

PORT ORCHARD, WA 98366

TEL:(360) 337-5777 FAX:(360) 337-4867

CRP No.

DATE:

DRAWN:

CHECKED:

SURVEYED:

DESIGNED:

CONTROL POINTS REVISIONS

DESCRIPTIONDATEBYNo.

OF

SHEET

AES

GLW

GLW

KA/GG/JS

3693

C:\Use

rs\G

reg.W

olov

eke\

Des

ktop

\Sea

beck

Res

tora

tion

\CAD\S

heet

Files

\C-0

5 R

OAD P

LAN A

ND P

ROFIL

E.d

wg

wol

ovek

e, g

reg

4:2

4 P

M 5/2

4/2

020

34

BEFORE YOU DIG

BUSINESS DAYS

CALL TWO

811

HOOD CANAL SALMON ENHANCEMENT GROUP

SEABECK CREEK FISH BARRIER REMOVAL

100% DESIGN - BID SET

GENERAL NOTES:

1. ANY DAMAGE TO THE ROADWAY OUTSIDE OF THE

CONSTRUCTION LIMITS DURING CONSTRUCTION WILL

BE AT THE CONTRACTORS EXPENSE AND MUST BE

RESTORED AT THE DIRECTION OF THE ENGINEER.

2. ROADWAY PROPOSED CONTOURS ARE NOT SHOWN.

3. SEE SHEET C-07 FOR ROADWAY DETAILS.

4. SEE WSDOT STD PLAN C-25.30-00 FOR BEAM GUARDRAIL

(TYPE 31) TRANSITION SECTION TYPE 24.

5. SEE WSDOT STD PLAN C-22.45-04 BEAM GUARDRAIL

TYPE 31 NON-FLARED TERMINAL.

6. SEE WSDOT STD PLAN C-23.60-04 FOR BEAM GUARDRAIL

(TYPE 31) ANCHOR TYPE 10.

7. SEE WSDOT STD PLAN M-20.10-02 FOR PAINTED YELLOW

DOUBLE CENTERLINE.

8. SEE WSDOT STD PLAN M-20.10-02 FOR PAINTED WHITE

EDGE LINE.

9. SEE WSDOT STD PLAN A-50.10-00 FOR EMBANKMENT

GRADING AT BRIDGE END WITH WING WALL.

10. CONTRACTOR TO MATCH EXISTING SUPERELEVATION

TRANSITION.

11. RAISED PAVEMENT MARKER TYPE 2YY PER WSDOT STD

PLAN M-20.30.04, MATCH EXISTING LOCATION.

12. CONNECT GUARDRAIL TO TRAFFIC BARRIER PER SHT

S-13.

13. SEE WSDOT STD PLAN C-20.10-05 FOR BEAM GUARDRAIL

TYPE 31.

14. HMA PAVING PER SHEET C-07

15. SEE WSDOT STD PLAN C-20.42-05 FOR GUARDRAIL

PLACEMENT STRONG POST - TYPE 31 INTERSECTION

DESIGN.

16. SEE SHEET C-08 FOR WATER LINE PLAN AND PROFILE.

ROAD PLAN AND PROFILE

08

C-06

N

0

SCALE:

5' 10' 20'

1'' = 10'

NAVD 88

LEGEND

HMA PAVING

BEAM GUARDRAIL

TYPE 31

3.00

ft

3.00

ft

PROP DUCT PROP DUCT PROP DUCT PROP DUCT

PROP DUCT PROP DUCT PROP DUCTPROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT

15.00 ft12.00 ft

Excavated and grouted pile placed 15 from end ofwing wall and 3-feet outside of wing wall face

Blue line is abutment andexcavation limits at the northface of bridge as projected

102.13 ftCatenary Sytem Supported Span

12.00 ft 22.52 ft

5.00

ft

15.0

0 ft

5.00

ftPROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT

PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCTPROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT PROP DUCT

Temporary Terra Shield support cantilevered to supportrelocated duct during cantenary system construction (30-footbeams at 30-foot spacing) embedded in ground with ecologyblock counterweight.

Cantilever system to be removed following catenary systemsupport placement

Catenary support strand wire withdrop stand to carry CenturyLinkfacility over excavation limits (SeeDetail Sheet D.1)

Relocated CenturyLink duct

Excavated and grouted pile placed 12-feet fromend of wing wall and 3-feet outside of wing wallface

Proposed split 6" ADS pipe to carry CenturyLinkfacilities (See detail for hanger assembly Sheet D.1)

Permanent CenturyLink duct locationto be attached to outside face oftraffic barrier with pre-fabricatedhanger (See Detail Sheet D.2)

Page 6: C.02: Existing Conditions Seabeck Holly Rd C.02: Proposed ... · control points revisions no.bydate description of sheet aes glw glw ka/gg/js ... bench mark #1 73.23' set "mag" nail

Prepared by: Prepared for: In coordination with:All existing and proposed conditions arebased upon information provided byothers. Terra Technologies LLC cannot beresponsible for the accuracy ofinformation and/or plans provided byoutside parties.

Kitsap County Dept. of PublicWorks, Tetra Tech, and LovingEngineering & Consulting

HANGER DETAIL

SheetD.1

Designed by:

Drawn by:

Checked by:

All methods, materials, content and form contained in this document are the intellectual property of Terra Technologies LLC, and may not be copied, reproduced, distributed or displayed withoutthe express written consent of Terra Technologies LLC. The technology presented in this document is protected under various U.S. and International patents and patent pending applications,including without limitation, U.S. Patent Nos. 7,771,140; 8,016,518; and 8,061,934.

MO/DAY/YEAR| REV. # | DescriptionSeabeck Creek Fish Barrier Removal

CenturyLink Conflict Mitigation Construction Details

Scale:N/A

N.662594 Date:

06/04/2020

Not for Construction

Hanger Assembly

HANGER DETAIL

JAW END FITTING

EYE FITTING

TURNBUCKLE BODY

JAW END FITTING

WIRE ROPE THIMBLE

SWAGING SLEEVEFLEMISH EYE WITH STEEL

CLOSED SPELTER SOCKET

BRIDGE CLAMP

)BRIDGE ROPE

GALVANIZED STRUCTURE

6" Pipe Roller

3/4" threaded rod

COVER withADJUSTABLE FRAMENo. 264P ASSEMBLY

BASENo. 264-BT

oldcastleprecast.com/wilsonville

File Name:

PO Box 323, Wilsonville, Oregon 97070-0323Tel: (503) 682-2844 Fax: (503) 682-2657

Issue Date:

264-TA

2016

020-264TA

264-TA2 x 6 x 4

COMMUNICATIONS

Page 7: C.02: Existing Conditions Seabeck Holly Rd C.02: Proposed ... · control points revisions no.bydate description of sheet aes glw glw ka/gg/js ... bench mark #1 73.23' set "mag" nail

Prepared by: Prepared for: In coordination with:All existing and proposed conditions arebased upon information provided byothers. Terra Technologies LLC cannot beresponsible for the accuracy ofinformation and/or plans provided byoutside parties.

Kitsap County Dept. of PublicWorks, Tetra Tech, and LovingEngineering & Consulting

UTILITY BRACKET ANCHORAGE,

SEE NOTE 3 (TYP)

TOP OF BRIDGE DECK

9"

UTILITY

BRACKET

ANCHOR (TYP)

L4x4x5/16

10

"

8"

1 1/2" (TYP)

1 1

/2

" (T

YP

)

1/4

PL 1/2

BEFORE YOU DIG

BUSINESS DAYS

CALL TWO

811

S1 #5

1'-1"

UTILITY HANGER NOTES

1. 7/8" Ø ROCKET/KOHLER F-50, LANCASTER MALLEABLE, OR DAYTON/RICHMOND

F-62 FLARED THIN SLAB FERRULE INSERTS OR APPROVED EQUAL (TYP).

RESIN-BONDED ANCHORS MAY BE SUBSTITUTED.

2. UTILITY BRACKETS PROVIDED ON THE UPSTREAM SIDE OF BRIDGE.

SEE CIVIL SHEET C-08 FOR WATER PLAN AND PROFILE.

3. ANCHORS FOR WELDED STEEL BRACKET ARE HOT-DIP GALVANIZED

FERRULE LOOP INSERTS WITH CLOSED-BACK FERRULE THREADED TO

RECEIVE HOT-DIP GALVANIZED 3/4" DIAMETER BOLTS (ASTM A307).

RESIN-BONDED ANCHORS MAY BE SUBSTITUTED.

MINIMUM INSERT LENGTH = 6"

MINIMUM SAFEWORKING LOAD IN TENSION = 4,000 POUNDS

MINIMUM SAFEWORKING LOAD IN SHEAR = 3,000 POUNDS

4. BRACKET SHALL BE HOT DIP GALVANIZED FOLLOWING FABRICATION.

TYPICAL SECTION

TRAFFIC BARRIER ON BRIDGE

SCALE: NO SCALE

E

S-13

UTILITY BRACKET ON TYPICAL

SECTION OF TRAFFIC BARRIER

SCALE: " = 1'

A

S-13

BRACKET SECTIONA

_

SCALE: 1" = 5'

1'-2"

1'-4"

1'-7"

Galvanized 1/2" x 3" top plate

SheetD.2

Designed by:

Drawn by:

Checked by:MO/DAY/YEAR| REV. # | Description

Seabeck Creek Fish Barrier RemovalCenturyLink Conflict Mitigation

Utility Bracket Detail

Scale:As NotedN.662594

Date:06/04/2020

Not for Construction

Galvanized 1/2" x 3" top plate

Notes 1 and 2 apply only to water installationattachment by others

1

Galvanized 1/2" threaded bar

4" ID SCH 40 Split Duct for existingfacilities (2), 4" ID SCH 40 PVC Ductfor future facilities (4)

Note:

Supporting background plans and images were providedby Tetra Tech and Loving Engineering and Consulting foruse in developing this drawing set. The plan set provided byTetra Tech for this drawing set was titled "Hood CanalSalmon Enhancement Group Seabeck Creek Fish BarrierRemoval" dated May 2020 and denoted as 100% Design -Bid Set".