![Page 1: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/1.jpg)
BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER,
ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY)
SOUTHEAST KANSASConstructed May-July 2000 Using Bendway Weirs for thalweg
realignment & bank erosion reduction
![Page 2: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/2.jpg)
Neosho River Project Specifications• River is 260 ft wide
• Gravel-sand bed
• Project is 2,200 ft long, Outer bank is 25 ft tall, it eroded 178 ft laterally in 6 years time
• 11 Bendway Weirs, are all 70 ft long, spaced 210 ft apart & constructed of “shot rock”, 400 lb max.
• First set of velocities (March 15, 2001) water was 6 ft over the weirs, second set of velocities (Mar 16, 2001) water was a measured 12 ft over the top of the weirs!!
• Velocities were measured with floating oranges
![Page 3: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/3.jpg)
Pre-Project. Looking upstream at the near vertical eroded bank
PRE-PROJECT-NEOSHO RIVER @ GEFFERT’S-PIX BY PHIL BALCH 8/25/99
![Page 4: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/4.jpg)
Keyway for Bendway Weir doubling as a haul road.
CONSTRUCTION-NEOSHO RIVER @ GEFFERT’S- PIX BY PHIL BALCH 5/23/00
![Page 5: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/5.jpg)
Placing key stone in the keyway.
CONSTRUCTION-NEOSHO RIVER @ GEFFERT’S- PIX BY PHIL BALCH 5/23/00
![Page 6: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/6.jpg)
Dozier pushing stone to form Bendway Weir #3. Note the thalweg is already being moved toward the center of the channel by the upstream weirs.
CONSTRUCTION-NEOSHO RIVER @ GEFFERT’S- PIX BY PHIL BALCH 5/30/00
![Page 7: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/7.jpg)
1 YEAR LATER-NEOSHO RIVER @ GEFFERT’S-PIX BY PHIL BALCH 5/01
1 year later. Looking DS at the Neosho River on the flood
![Page 8: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/8.jpg)
2 YEARS LATER-NEOSHO RIVER @ GEFFERT’S-PIX BY PHIL BALCH 9/2002
2 years later. Looking US @ Bendway Weirs & stable bank
![Page 9: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/9.jpg)
2 YEARS LATER-NEOSHO RIVER @ GEFFERT’S-PIX BY PHIL BALCH 9/2002
2 years later. Looking US at Bendway Weirs & stable bank
![Page 10: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/10.jpg)
3 YEARS LATER-NEOSHO RIVER @ GEFFERT’S-PIX BY PHIL BALCH 9/6/2003
3 years later. Looking US at stable bank
![Page 11: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/11.jpg)
HIGH WATER – LET’S GET SOME
VELOCITIES(We have a sack of oranges
& time on our hands)
![Page 12: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/12.jpg)
Mini case study: 1 of 3
Neosho River, Allen County, Kansas 6 ft of
water over weirs (estimated) Top water velocities within the weir field never exceeded
1.00 ft/second
BW #7
BW #3
BW #11
1.61
0.602.041.03
0.332.792.72
Data collected March 15, 2001
The Thalweg left the bank a measured 200
ft US of BW#1
The Thalweg hit the bank a measured
150 ft DS of BW#11
![Page 13: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/13.jpg)
Looking US at weirs at low water on the Neosho River, KS. This is not when the velocity data was taken.
Mini case study: 2 of 3
![Page 14: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/14.jpg)
Mini case study: 3 of 3
Neosho River, Allen County, Kansas 12 ft of
water over weirs (measured) Top water
velocities within the weir field never exceeded 3.00
ft/second
BW #7
BW #3
BW #11
2.886.47
6.08
2.924.074.97
2.634.544.64
Data collected March 15, 2001
![Page 15: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/15.jpg)
SINCE PROJECT CONSTRUCTION THE
RIVER HAS BEEN OUT OF BANK SEVERAL TIMES - IN JULY 2007 THE RIVER
EXPERIENCED THE 100 YEAR FLOOD
![Page 16: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/16.jpg)
7 YEARS LATER-NEOSHO RIVER @ GEFFERT’S-PIX BY PHIL BALCH 11/9/2007
7 years later. Looking US. Note deposition between weirs.
![Page 17: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/17.jpg)
AFTER A 100 YEAR FLOOD-NEOSHO RIVER - PIX BY DERRICK 12/11/2008
8 years later. After a 100 year flood. Looking US @ the Bendway Weirs & snow
![Page 18: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/18.jpg)
AFTER A 100 YEAR FLOOD-NEOSHO RIVER - PIX BY DERRICK 12/11/2008
8 years later. After a 100 year flood. Looking DS @ the Bendway Weirs
![Page 19: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/19.jpg)
AFTER A 100 YEAR FLOOD-NEOSHO RIVER - PIX BY DERRICK 12/11/2008
8 years later. After a 100 year flood. Looking DS @ lower end of the bend
![Page 20: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/20.jpg)
AFTER A 100 YEAR FLOOD-NEOSHO RIVER - PIX BY DERRICK 12/11/2008
8 years later. After THE 100 YEAR FLOOD. Looking DS. Erosion has laid the bank back to a stable angle. Note how flat the bank is at the toe
![Page 21: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/21.jpg)
AFTER A 100 YEAR FLOOD-NEOSHO RIVER - PIX BY DERRICK 12/11/2008
After a 100 year flood. Looking DS. Large Woody Debris is indicative of slower velocities & good for aquatic habitat.
![Page 22: BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bf701a28abf838c7d3df/html5/thumbnails/22.jpg)
This PowerPoint presentation was developed & built by Dave Derrick.