businees proposal

16

Upload: waqas-ahmad

Post on 13-Apr-2017

122 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Businees Proposal
Page 2: Businees Proposal

Submitted by Mr Waqas Ahmad Submitted To Mam Sajjida M.Sc (applied chemistry) 3rd Semester Roll no 7627

Proposal title.

Up gradation of Bwp Airport from national to inter national level

Page 3: Businees Proposal

Submitted to Department of Infrastructure and regional development

Broad Subject Aviation Engineering Duration 1 Year Cost 2 Billion Principal in charge Mr. Waqas Ahmad Designation Project Manager Department civil Aviation Contact [email protected]

Draft ContractUp gradation of Bwp Airport from national to inter national level

Page 4: Businees Proposal

EXECUTIVE SUMMERY OF PROJECT

To up grade the BWP airport from national to international level is a unique idea. Bahawalpure is the longest division of Pakistan which consist 3 distt Bahawalpure, Bahawalnagar, and Rahim yar khan. Bwp also attach with Indian border.

I get this idea when I personally realized that in my area there is no international airport. We have to go to Lahore or Karachi which are at so long distance from us almost 1000 km.

So an international air port is exactly a need of BwpThe outcome of this project is firstly the facilitation of area’s population.Second the progress of BWP and also Pakistan by competing international standard

Page 5: Businees Proposal

Up gradation of Bwp Airport from national to inter national level

Pic

Problem Statement

Page 6: Businees Proposal

BACKGROUND STUDY

To complete this project I study a lot of literature about construction like these projects. I specially study the project of construction of Jaddah Airport Saudi Arabia.

Page 7: Businees Proposal

OBJECTIVE OF PROPOSAL

To facilitate area’s population with modern technology

To take part in progress of Pakistan To promote and develop my area BWP

to international level

Page 8: Businees Proposal

PROJECT TEAM

In charge Project Manager Co coordinator Construction Head Budget Controller Audit Officer All worker in all project wings

Page 9: Businees Proposal

Method and Resources

To complet this project I shell adopt most suitable method presently used in this age. This is tested by ISO.

Page 10: Businees Proposal

Literature survey Collection of material Scripting Developing strategies Construction work Contract with air lines audit

Methodology

Page 11: Businees Proposal

The schedule activates

Literature survey 30 daysCollection of material 20 daysScripting 10 daysDeveloping strategies 10 daysConstruction work 8 monthContract with air lines 30 daysAudit 20 days

Page 12: Businees Proposal

THE SCHEDULE ACTIVATES BAR DIAGRAM

Literature survey

Collection of material and scripting

construction work

contract with air lines and aduit

0 2 4 6

Series 3

Series 3

Page 13: Businees Proposal

Total 2 billion Construction work 60% Salaries and other costs 20% Travel 10% Air lines contract 10%

Budget summery

Page 14: Businees Proposal

BUDGET ESTIMATE DIAGRAM

Trave

l

air lin

es con

tract

salari

es an

d othe

r cost

s

constr

uction

01.5

34.5

Series 3

Series 3

Page 15: Businees Proposal

OUT COME PRODUCT OF PROPOSAL

Page 16: Businees Proposal