Page 1: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BURIED EXPLOSION MODULE (BEM) Proven Technology

Providing Current Benefits

Paul Greene USACE Baltimore District Environmental and Explosive Safety Chief

Page 2: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

§  Engineering Control §  Use at Camp Edwards MA §  BEM vs BIP §  Construction of BEM §  Shot Preparation and Demolition §  BEM Post Demolition §  Unacceptable to Move Items

2

Page 3: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

Buried Explosion Module

•  An authorized DoD Engineering Control to prevent fragmentation from traveling great distances and can be used to significantly reduce the exclusion zone.

• Reduces the energy release from rapidly venting into the atmosphere to limit the spread of residual explosives contamination.

• Reduces noise of detonation.

3

Page 4: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

Joint Base Cape Cod (JBCC) Camp Edwards, MA

Location: • Western Cape Cod, MA • Sits over the top of a sole source aquifer

Brief History:

• Military training on Cape Cod began around 1911 • Training on JBCC began at the start of WWII • Most active during WWII – training continues to present day • Certain range firing activities in the Central Impact Area (CIA) suspended by EPA Administrative Order under the Safe Drinking Water Act (SDWA)

Firing of all military munitions into CIA discontinued in 1997 (Firing of high explosive artillery had been discontinued by the Guard in 1989)

• Investigation and cleanup of the CIA source area started in 1997 and continues today.

4

Page 5: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM vs BIP §  Blow in Place (BIP)/Open Detonation

► Exclusion Area is dependent on the munition with the greatest fragmentation distance (MGFD). Approximately 2900 ft Maximum Fragmentation Distance (MFD) for intentional detonation of a 155mm high explosive round

§  BEM ► Exclusion Area based on depth of cover

material. 200-500 feet is typically used for general safety purposes

5

Page 6: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Comparing Disposal Methods

•  BIP/Open Detonation

• Exclusion Area approximately 2900 ft MFD for 155mm

• Crater 5ft x 15ft

• Dispersion of residual explosives up to 200 ft radius

• Crater soil removed for disposal and back filled with clean soil • Costly sampling requirements

6

Page 7: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Comparing Disposal Methods

•  Buried Explosion Module

• Exclusion Area 200-500 ft is typically used for safety

• Crater 3ft x 10ft

• Dispersion of residual explosives 3 ft radius (99% reduction from open detonation)

• Burial material remains on poly liner for reuse

7

Page 8: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

Design Concept •  Capabilities

• Can be permanent

•  Designed for 40 lbs max Net Explosive Weight

• Reduce dispersion of secondary explosive residue

• Reusable burial material (sand)

• Poly Lined to prevent contamination of clean soil underneath and around site

BEM Construction

8

Page 9: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Construction

9

Page 10: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Construction

10

Page 11: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Construction

11

Page 12: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Construction

12

Page 13: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Construction

13

Page 14: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Construction

14

Page 15: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Construction

15

Page 16: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Shot Prep

16

Page 17: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Shot Prep

17

Page 18: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Shot Prep

18

Page 19: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BIP Demolition

19

Page 20: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Demolition

20

Page 21: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Demolition

21

Page 22: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Post Demo

22

Page 23: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

BEM Post Demo

23

Page 24: BURIED EXPLOSION MODULE (BEM) Proven Technology … · Unacceptable to Move Item BEM • Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

BUILDING STRONG®

Unacceptable to Move Item BEM

•  Procedure can be scaled down and applied to UXO that are “unacceptable to move” items

•  6 to 8 feet of sand placed over item •  Item detonated. •  Sand removed and underlying soil excavated in

a 5 x 5 foot area 1 foot deep. •  Sampling indicates soil cleanup goals met.