TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN DECEMBER - 2017 CONTENTS Page No 1. PART - I NEWS & NOTES ... ... ... 2 2. PART - II GENERAL ADMINISTRATION & SERVICES ... ... ... 8 3. PART - III FINANCE ... ... ... 11 4. PART - IV TECHNICAL ... ... ... 13 5. INDEX ... ... ... 23 6. CONSOLIDATED INDEX ... ... ... 25 A request With the present issue of the TANGEDCO Bulletin for December 2017 Volume XXXVI (36) which completed. The recipients of the Bulletin are request to have the 12 issues of Volume XXXVI bound in one part from January 2017 to December 2017. A consolidated Index for volume XXXVI has been included in this issue for reference.

Upload: others

Post on 15-Feb-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

TNEB LIMITED TANGEDCO TANTRANSCO

BULLETIN

DECEMBER - 2017

CONTENTS Page No

1. PART - I

NEWS & NOTES ... ... ... 2

2. PART - II

GENERAL ADMINISTRATION & SERVICES ... ... ... 8

3. PART - III

FINANCE ... ... ... 11

4. PART - IV

TECHNICAL ... ... ... 13

5. INDEX ... ... ... 23

6. CONSOLIDATED INDEX ... ... ... 25

A request

With the present issue of the TANGEDCO Bulletin for December2017 Volume XXXVI (36) which completed.

The recipients of the Bulletin are request to have the 12 issuesof Volume XXXVI bound in one part from January 2017 toDecember 2017.

A consolidated Index for volume XXXVI has been included in thisissue for reference.

NEWS & NOTESPART – I

I. GENERATION / RELIEF PARTICULARS:The Generation / Relief particulars for the month of December 2017 were as follows:

Sl.No. Particulars In Million UnitsI. TNEB GENERATION (Gross)

Hydro 437.990Thermal 1720.950Gas 131.913Wind 0.150TNEB TOTAL 2291.003

II NETT PURCHASES FROM CGS 2946.535III PURCHASES

IPP 163.706Windmill Private 332.876CPP, Co-generation & Bio-Mass (Provisional) 58.500Solar (Private) 223.518Through Traders (nett purchase) 1790.701TOTAL PURCHASES 2569.301

IV Total Wheeling Quantum by HT consumers 702.142Total Wheeling Quantum to Other States by Pvt. Generators 18.751Total TNEB Power generation for sale 0.000Total Wheeling 720.893Power Sale by TANGEDCO (Exchange) 0.000Power Sale by TANGEDCO(STOA under Bilateral) 0.000Power Sale by Private Generators (Exchange) (-) 8.753Power Sale by Private Generators (Bilateral) (-) 9.998Power balance under SWAP 14.595

V TOTAL (TNEB Own Gen+Purchase + wheeling quantum + SWAP) 8523.576VI Load shedding & Power cut relief (Approx) 0VII Less energy used for Kadamparai pump 59.120

Less Aux. consumption for Hydro, Thermal & Gas 155.546VIII AVERAGE PER DAY REQUIREMENT 275IX DETAILS OF NETT PURCHASES FROM CGS & OTHER REGIONS:

Neyveli TS-I 210.571Neyveli TS-I Expansion 99.613Neyveli TS-II Expansion 43.173NTPL 200.942Neyveli TS-II Stage-1 58.905Neyveli TS-II Stage-2 118.995MAPS APS 216.463Kaiga APS 113.485Kudankulam NPCIL Unit 1 & 2 603.697Ramagundam NTPC (Stage 1 & 2) 261.156Ramagundam NTPC (Stage 3) 78.349Eastern region 19.774Talcher Stage-II NTPC 318.520Kudgi STPS, NTPC 38.635

3

X DETAILS OF PURCHASES FROM IPPsPPN Power Generating Company Pvt. Ltd., (-) 0.527TAQA Neyveli Power Company Pvt. Ltd., (STCMS) 81.486Lanco Tanjore Power Company Ltd., (ABAN) 50.460Pioneer Power Ltd., (Penna) 32.287

TOTAL 163.706

XI DETAILS OF OTHER PURCHASESThrough Traders 1790.701CPPs 2.500Co-generation 52.000Bio-Mass 4.000Wind Mill (Pvt.) 332.876Solar (Pvt.) 223.518TOTAL 2405.595

XII SWAP POWER RETURN / BANKING BY TNEB 14.595XIII Maximum Sustained Grid demand met in MW/Date 13890 21.12.2017

Maximum consumption reached in M.U./Date 296.998 14.12.2017

XIV. STORAGE POSITION:The Storage equivalent in M.U.as on 01.01.2018 is compared with that of the storage

equivalent as on the same day last year as below (Figs. In MU):-Sl. Name of the Group As on 1st of As on 1st ofNo. the month this the month Difference

year (2017) previous year(2016)

1. Nilgiris 917.468 553.327 364.1422. P.A.P. 93.811 66.853 26.9583. Periyar 48.370 6.000 42.3704. Papanasam & Servalar 39.878 1.109 38.7685. Suruliyar 28.181 2.128 26.0536. Kodayar 174.361 75.343 99.0187. Total Excluding Mettur 1,302.070 704.761 597.3098. For Mettur 37.540 7.720 29.820

Superintending Engineer/LD & GO.

Simhadri Stage-II NTPC 107.615Vallur NTECL 377.127Solar bundled NVVN Power from NTPC stations 2.452Inter State Deviation Settlement Mechanism (Provisional) 79.065Intra State Deviation Settlement Mechanism (Provisional) (-) 2.000TOTAL NET PURCHASES 2946.535

4

PERFORMANCE OF THERMAL STATIONS FOR DECEMBER 2017.i) TUTICORIN TPS (5 x 210 MW):

The details of generation at Tuticorin T.P.S. during December 2017 were as follows:Unit Availability Factor (%) Generation in MU Plant Load Factor (%)

I (210 MW) 20.63 27.080 17.33 II (210 MW) 47.29 60.620 38.80III (210 MW) 50.04 61.940 39.64

IV (210 MW) 38.85 50.550 32.35V (210 MW) 100.00 125.320 80.21

STATION 51.36 325.510 41.67

ii) METTUR TPS - I (4 x 210 MW):The details of generation at Mettur T.P.S. during December 2017 were as follows:

Unit Availability Factor (%) Generation in MU Plant Load Factor (%) I (210 MW) 88.93 126.742 81.12 II (210 MW) 50.11 70.303 45.00III (210 MW) 56.63 81.019 51.86

IV (210 MW) 88.63 134.192 85.89STATION 71.08 412.256 65.97

iii) NORTH CHENNAI TPS - I (3 x 210 MW):The details of generation at North Chennai T.P.S. during December 2017 were as follows:

Unit Availability Factor (%) Generation in MU Plant Load Factor (%) I (210 MW) 98.1 131.98 84.47II (210 MW) 94.98 130.325 83.41III (210 MW) 61.5 91.445 58.53

STATION 84.86 353.750 75.47

V) METTUR TPS - II (1 x 600 MW):The details of generation at Mettur T.P.S.-II during December 2017 were as follows:

Unit Availability Factor (%) Generation in MU Plant Load Factor (%) I (600 MW) 100.00 270.85 60.67

STATION 100.00 270.85 60.67

VI) NORTH CHENNAI TPS - II (2 x 600 MW):The details of generation at North Chennai T.P.S.-II during December 2017 were as follows:

Unit Availability Factor (%) Generation in MU Plant Load Factor (%) I (600 MW) 99.37 358.584 80.33II (600 MW) - --- ---

STATION 49.69 358.584 40.17

5

GENERAL :S.No. Details T.T.P.S. M.T.P.S.-I N.C.T.P.S.-I M.T.P.S-II N.C.T.P.S.-II1. Specific Coal

Consumption (Kg./kwhr.) 0.848 0.714 0.741 0.701 0.7502. Specific Oil

Consumption (ml/kwhr.) 1.58 0.793 1.030 0.0181 0.2803. Auxiliary Consumption (%) 8.90 8.61 9.06 7.74 6.68

Superintending Engineer/Betterment Thermal.

COAL PARTICULARS FOR DECEMBER 2017 : S.No. Particulars TTPS. MTPS. M.T.P.S. NCTPS. NCTPS. ETPS.

I II (1x600 I II (2x600MW) MW)

(in lakh tonnes)1. Coal to be supplied (*) (Ind. coal) 4.12 3.32 1.83 2.47 3.67 1.382. Coal receipt (Ind. coal) 2.86 2.96 2.31 2.97 2.37 --

(Imp coal) 0.00 0.07 0.11 0.10 0.25 --(SCCL coal) -- 0.00 -- -- -- --

3. Coal consumption (Ind. coal) 2.66 2.82 1.69 2.61 2.37 --(Imp coal) 0.10 0.13 0.21 0.10 0.25 --(SCCL coal) -- 0.00 0.00 -- --

4. Coal stock as on (Ind. coal) 0.99 1.13 1.21 1.06 0.0631.12.2017 (Imp coal) 0.00 0.00 0.00 0.00 --

(SCCL coal) 0.00 0.00 0.00 -- --

(*) As per Fuel Supply Agreement signed by TANGEDCO with MCL, ECL & WCL.Note: Ind coal - Indigenous coal , imp coal - Imported coal SCCL coal : Singareni coal collieriesLtd., coal.

Superintending Engineer/Mechl./Coal.

6

STA

TEM

EN

T-A

STA

TEM

ENT

SH

OW

ING

TH

E D

ETA

ILS

OF

PO

STS

CR

EATE

D D

UR

ING

TH

E M

ON

TH O

F D

ECEM

BER

20

17

.

For

a pe

riod

of

one

year

fro

mth

e d

ate

of

uti

liza

tion

of

post

s.Period

(8)

For

a pe

riod

of

one

year

fro

mth

e d

ate

of

uti

lisa

tion

of

post

s.

For

a pe

riod

of

one

year

fro

mth

e d

ate

of

uti

lisa

tion

of

post

s.

Cre

atio

n of

pos

ts to

the

new

ly fo

rmed

33

/11

K

V

(Ou

tdoor)

S

S

at

Kon

daya

mpa

tty

in M

adur

ai E

DC.

Purp

ose

(7)

Cre

atio

n of

pos

ts t

o th

e Po

osal

akud

i11

0/22

kV

(Non

-Grid

) SS

in S

ivag

anga

EDC.

Cre

atio

n of

pos

ts t

o th

e Th

irun

agar

110/

11 k

V (

Non

-Grid)

SS

in T

irup

pur

EDC.

For

a pe

riod

of

one

year

fro

mth

e d

ate

of

uti

lisa

tion

of

post

s.

Cre

atio

n of

pos

ts t

o th

e K

adai

yur

110/

11 k

V (N

on-G

rid) SS

in P

alla

dam

EDC.

1 4 1 2 1 2 11

AE/

Elec

tric

alJE

/Ele

cl.I

I Gr.

FM I G

rade

Line

Ins

pect

orW

irem

anFA

/Maz

door

Nam

e of

the

Post

No.

of

Post

Line

Ins

pect

orW

irem

anFi

eld

Ass

t.

4 2 2 8

(5)

(6) 1 4 1 2 1 2 11

AE/J

E/El

ecl.I

Gr.

JE/E

lecl

.II G

r.FM

I G

rade

Line

Ins

pect

orW

irem

anFA

/Maz

door

1 4 1 2 1 2 11

AE/J

E/El

ecl.I

Gr.S

JE/E

lecl

.II G

r.FM

I G

rade

Line

Ins

pect

orW

irem

anFA

/Maz

door

Cl.I

I-Te

ch.

Cl.I

II-P

ro.

Cl.I

II-R

WE

Cl.I

V-RW

E

Cl.I

I-Te

ch.

Cl.I

II-P

ro.

Cl.I

II-R

WE

Cl.I

V-RW

E

Cla

ss /

Cad

re

Cl.I

II-R

WE

Cl.I

V-RW

E

(4)

Cl.I

I-Te

ch.

Cl.I

II-P

ro.

Cl.I

II-R

WE

Cl.I

V-RW

E

Palla

dam

ED

C(P

er.)

CM

DTA

NG

EDCO

Pro

.No

.194

,(Ad

m.B

r)D

t.04

.12.

2017

.

Siva

gang

a ED

C

Nam

e of

the

Circ

le

Mad

urai

ED

C

(3)

Tiru

ppur

ED

C

(Per

.) C

MD

TAN

GED

CO

Pro

.No

.192

,(Ad

m.B

r)D

t.01

.12.

2017

.

Ref

eren

ce in

whi

ch t

hepo

sts

wer

ecr

eate

d

(Per

.) C

MD

TAN

GED

CO

Pro

.No

.191

,(Ad

m.B

r)D

t.01

.12.

2017

.

(2)

(Per

.) C

MD

TAN

GED

CO

Pro

.No

.193

,(Ad

m.B

r)D

t.04

.12.

2017

4.2.Sl.

No. 1.(1)

3.

7

**

*

(8)

(7)

For

a

per

iod

upto

28.

02.2

018

from

the

dat

e of

uti

lisa

tion

of

post

.

Cre

atio

n of

one

pos

t of

EE/

Elec

tric

alde

sign

ated

as

EE/M

RT

in th

e O

/o. S

E/N

amak

kal E

DC.

(5)

(6) 1

EE/E

lect

rica

l(4

)(3

)C

l.I-

Tech

.N

amak

kal E

DC

(2)

(1)

(Per

.) C

MD

TAN

GED

CO

Pro

.N

o.27

7,(S

.B)

Dt.

16.1

2.20

17

5.

Chi

ef E

ngin

eer/

Pers

onne

l*

**

STA

TEM

ENT-

BS

TATE

MEN

T S

HO

WIN

G T

HE

DET

AIL

S O

F P

OS

TS A

BO

LIS

HED

DU

RIN

G T

HE

MO

NTH

OF

DEC

EMB

ER 2

01

7.

Purp

ose

Period

No.

ofPo

stN

ame

of t

hePo

st

-NIL

-

Cla

ss /

Cad

reN

ame

of t

heCirc

le

Ref

eren

ce in

whi

ch t

hepo

sts

wer

eab

olis

hed

Sl.

No.

GENERAL ADMN. & SERVICESPART – II

Memo.(Per) No.5924/A18/A181/2016-13, (BOSB) dated.07.12.2017.

Sub : TANGEDCO – Establishment - Consideration of requesttransfer application during the currency of punishment -Instructions - Issued.

-----

It has been brought to the notice that the request transfer application of theemployees, who are undergoing punishment are not being considered by the competentauthorities. Representation has been received to issue a common order in this regard.The same has been examined in detail and decided to issue necessary instructions.

2. On completion of the disciplinary proceedings and on issue of final ordersthereon, necessary entires would be made in the Service Register and the currencyof punishment commenced would also reflect in the Service Register as well as in theother records. Even on transfer to the other stations, the punishment ordered willdefinitely continue till its completion.

3. Therefore, all the competent authorities are herby instructed that the requesttransfer applications during the currency of the punishment shall be considered.

(By Order of the Chairman-cum-Managing Director)R. Balaji,

Secretary.* * *

Holidays - TANGEDCO - Holidays for the employees of the TANGEDCO, TANTRANSCOand TNEB Limited for the Calender year 2018 - Orders - Issued.

(Secretariat Branch)

(Per.) CMD TANGEDCO Proceedings No.275 Dated the 11th December 2017.Karthigai 25, Heyvilambi Varudam,Thiruvalluvar Aandu 2048.

-----PROCEEDINGS:

The TANGEDCO directs that the employees of the TANGEDCO, TANTRANSCOand TNEB Limited on time scale of pay, be granted holidays during the year 2018 asdetailed in the Annexure.

2. The number of holidays allowed will not be a precedent for future years. Ifany one of the occasions mentioned in the Annexure, for which a holiday is declaredhappens to fall on normal holiday like Sunday in the future year, no substitute holidayon that account will be allowed. Besides, the TANGEDCO, TANTRANSCO and TNEBLtd shall also follow any other order that may be issued by the Government ofTamil Nadu, declaring holidays on special occasions and compensatory working daysin lieu thereof, during the year 2018.

9

3. The monthly rated employees of the Corporation may also have holidays onSundays or any other days in the week in lieu of Sundays.

4. The TANGEDCO also directs that the employees of the TANGEDCO,TANTRANSCO and TNEB Limited in a particular office or other unit, who have beenallowed a holiday on Second Saturday of each month during the previous years, maybe granted a holiday on the Second Saturday of each month during the year 2018also, if they continue to work in the same office or unit in the year 2018.

5. The TANGEDCO further directs that in addition to the holidays mentioned inthe Annexure, Pongal on 14.01.2018, Telugu New Year’s Day on 18.03.2018 andKrishna Jayanthi on 02.09.2018 which falls on Sunday shall be the holiday for theshift operation staff for whom those days are not holidays.

(By Order of the Chairman - cum - Managing Director)

R. Balaji,Secretary.

ANNEXURELIST OF HOLIDAYS FOR THE YEAR 2018 DECLARED BY THE GOVERNMENT

OF TAMIL NADU TO THEIR EMPLOYEES

Sl.No. Public Holidays Date Day(1) (2) (3) (4)1. New Year's Day 01.01.2018 Monday2. Pongal 14.01.2018 Sunday3. Thiruvalluvar Day 15.01.2018 Monday4. Uzhavar Thirunal 16.01.2018 Tuesday5. Republic Day 26.01.2018 Friday6. Telugu New Year's Day 18.03.2018 Sunday7. Mahaveer Jayanthi 29.03.2018 Thursday8. Good Friday 30.03.2018 Friday9. Tamil New Year's Day and

Dr. B.R. Ambedkar's Birthday 14.04.2018 Saturday10. May Day 01.05.2018 Tuesday11. Ramzan (Idu’I Fitr) 15.06.2018 Friday12. Independence Day 15.08.2018 Wednesday13. Bakrid 22.08.2018 Wednesday14. Krishna Jayanthi 02.09.2018 Sunday15. Vinayakar Chathurthi 13.09.2018 Thursday16. Muharram 21.09.2018 Friday17. Gandhi Jayanthi 02.10.2018 Tuesday18. Ayutha Pooja 18.10.2018 Thursday19. Vijaya Dasami 19.10.2018 Friday20. Deepavali 06.11.2018 Tuesday21. Milad - un- Nabi 21.11.2018 Wednesday22. Christmas 25.12.2018 Tuesday

//True Copy//* * *

10

TANGEDCO - Public Holiday - Election - Bye-Election to Tamil Nadu Legislative Assemblyfrom 11.Dr. Radhakrishnan Nagar Assembly Constituency - Paid holiday to workersand other employees of all categories in TANGEDCO, TANTRANSCO and TNEB Limitedon 21.12.2017 (Thursday) for the areas comprised in the Assembly Constituency -Orders - Issued.

(Secretariat Branch)

(Per.) CMD TANGEDCO Proceedings No.278 Dated the 16th December 2017.Margazhi 1, Heyvilambi Varudam,Thiruvalluvar Aandu 2048.

READ:-

G.O.Ms.No.992 Public (Misc) Department,dated 05.12.2017.

-----PROCEEDINGS:

The TANGEDCO hereby directs that Thursday 21st December 2017, the dateon which the poll for the Bye-election to Dr. Radhakrishnan Nagar AssemblyConstituency will take place, shall be a public holiday to all the employees of TANGEDCO,TANTRANSCO and TNEB Limited, who are electors of the above Assembly Constituencylying in Chennai District.

2. However, all the essential Service and Distribution network of the TANGEDCOwill function on 21.12.2017 with necessary minimum staff required to run thoseunits.

(By Order of the Chairman - cum - Managing Director)

R. Balaji,Secretary.

* * *Memo. No.64685/A18/A182/2017-1, (BOSB) dated.26.12.2017.

Sub : TANGEDCO – Secretariat Branch - Establishment - Class IService - Earned Leave on Medical Certificate applied bycertain Class I Officers - Avoidance of - Instructions - Issued.

-----

It has been brought to the notice that certain Class I Officers keep applying forEarned Leave on Medical Certificate. If an employee applies leave based on MedicalCertificate, it should be dealt in accordance with regulation 17(2) of Tamil NaduElectricity Board Leave Regulations and the said leave has to be debited from his/herUnearned Leave on Medical Certificate Account only and not on Earned Leave onMedical Certiifcate. Regulation 16 of Tamil Nadu Electricity Board Leave Regulationsspecifically deals with sanction of Earned Leave to the employees/officers and thereis no provision for sanction of Earned Leave based on Medical Certificate.

2. All the leave sanctioning authorities are therefore instructed that theapplications for sanction of Earned Leave based on the Medical Certificate shall not beentertained.

3. Any deviation in this regard will be viewed seriously.

R. Balaji,Secretary.

* * *

Memo. No.CFC/REV/FC/R/DFC/R1/AO/F.E.O.T/D.816/17, (Accts.Br.)

dated.05.12.2017.

Sub : OCKHI Cyclone - Heavy rain fall in the Kanniyakumari District- LT Billing & Collection - Time extension for payment ofC.C. Charges - Instructions - Issued - Regarding.

Ref : i) Dir. (Fin)/TANGEDCO Note Order dated 05.12.2017.-----

Due to OCKHI Cyclone and heavy rain fall, in the Kanniyakumari District, thepeople are suffering and their normal life is very much affected. The TANGEDCO’s LTConsumers are unable to make their LT CC bills on the due dates.

2. Hence, the last date of the collection of L.T. Service C.C. Charges fallingbetween 30.11.2017 to 16.12.2017 is fixed on 18.12.2017 without collecting theBPSC and DC RC fees.

3. The Superintending Engineer/Kanniyakumari EDC is instructed to takenecessary action in this regard.

(By Order of the Director/Finance/TANGEDCO)K.Malarvizhi,

Chief Financial Controller/Revenue* * *

Memo. No.CFC/REV/FC/R/DFC/R1/AO/F.E.O.T/D.816-1/17, (Accts.Br.)

dated.07.12.2017.

Sub : OCKHI Cyclone - Heavy rain fall in the Kanniyakumari District- LT Billing & Collection - Time extension for payment ofC.C. Charges - Instructions - Issued - Regarding.

Ref : 1) Memo.No. CFC/REV/FC/R/DFC/R1/AO/F.E.O.T/D.816/17, (Accts.Br.) Dt.05.12.2017.

2) CMD/TANGEDCO Note Order dated 07.12.2017.-----

In the reference 1st cited above, it was intimated that due to OCKHI Cycloneand heavy rain in the Kanniyakumari District, the last date of the collection of C.C.charges for the LT consumers in Kanniyakumari/EDC, falling between 30.11.2017and 16.12.2017 is fixed on 18.12.2017 without collecting the BPSC and DC RC fees.

2. In continuation to the above, it is informed that for the LT consumers ofKanniyakumari/EDC, the last date of the collection of C.C. charges falling between30.11.2017 and 30.12.2017 is further extended and is fixed on 31.01.2018 withoutcollecting the BPSC and DC RC fees.

FINANCEPART – III

12

3. The Superintending Engineer/Kanniyakumari EDC is instructed to takenecessary action in this regard and wide publicity may be arranged through medias.

(By Order of the Chairman - cum - Managing Director/TANGEDCO)K.Malarvizhi,

Chief Financial Controller/Revenue* * *

Lr. No.CFC/GL/FC/GL/DFC/CP/F.PFMS/D.No.736/17, (Accts.Br.)

dated.15.12.2017.

Sub : TANGEDCO - implementation under PFMS Portal - DDUGJY& IPDS Scheme - instructions for payment throughM/s. ICICI Bank - Regarding.

Ref : 1) Lr.No.CE/R-APDRP/SE-1/EE/IPDS/AEE4/F.Gen/D.268/17, Dt.28.06.2017.

2) Lr.No.CE/R-APDRP/SE/Sch/EE/DDUGJY/F.PFMS/D.No.13/2017, Dt.1.7.2017.

3) CMD Note approval dated 11.12.2017.-----

The payment for the Suppliers and Contractors under the DDUGJY & IPDSSchemes have been facilitated through the centralized Public Financial ManagementSystem (PFMS) Portal of Government of India.

2. At present the bill passing authorities inthe Circles of TANGEDCO andTANTRANSCO were instructed during the training programme at Chennai to chooseIOB for making payment under these schemes through PFMS portal. As per thereference 3 cited M/s. ICICI Bank has replaced M/s. IOB as sponsor Bank for carryingout the payment facility through the PFMS portal.

3. Hence all the bill passing authorities of TANGEDCO and TANTRANSCO shallensure that the Bank to be selected for payment in the PFMS portal shall be as

ICICI A/c.No. 000905028671 for “IPDS”and

ICICI A/c.No.000105031105 for “DDUGJY”from 16.12.2017 onwards.

4. All Bill payments for which payment through IOB has been selected upto15.12.2017 shall be honored through IOB from 16.12.2017 the PFMS portal paymentwill be operated only through M/s. ICICI Bank.

5. Hence, the Chief Engineer of all Distribution Circles and TANTRANSCO Circlesare requested to instruct the official concerned to adhere to time line as mentionedabove and ensure smooth transition of payment in the PFMS portal through ICICIBank account from the existing IOB account.

K. Sundaravadhanam,Chief Financial Controller/General.

* * *

TECHNICAL PART – IV

TANGEDCO - Project - Requirement of 1 No. of PC’s & printer for CE/Projects-I &1No. of PC’s (replacement for old one) & printer for SE/E/T&H (P) and replacementof existing PC for EA to CE/Project - I - Approval Accorded - Regarding.

(Technical Branch)

(Per.) CMD TANGEDCO Proceedings No.637, Dated the 01st December 2017.Karthigai -15, Heyvilambi Varudam,Thiruvalluvar Aandu 2048.

READ:

CMD/TANGEDCO’s Note approval dated 27.11.2017.-----

PROCEEDINGS:

After careful consideration of the proposal submitted by CE/Project-I, the CMD/TANGEDCO hereby accorded approval for the proposals as detailed below:- For theprocurement of the following:-

Sl. Description Required for Qty Price/Unit Amount ReplacementNo. (All inclusive) (in Rs.) for old one to

(in Rs.)1. Desk top PC 1 no. for CE/Proj.-I 3 41,000/- 1,23,000/- 1 no. of

(DGS & D item No.30) 1 no. for SE/E/THP-I SE/E/THP-11 no. for EA to CE/P - 1 1 no. of

EA to CE/P-12. Multi Functional Printer 1 no. for CE/Proj-I 2 20,000/- 40,000/- .... Nil ......

(Scanner, Copier & Printer) 1 no. for SE/E/THP-ITotal Cost ... 1,63,000/-

(By Order of the Chairman - cum - Managing Director/TANGEDCO)R. Kamaraj,

Chief Engineer/Project - I.

* * *Vehicle - Procurement of 1 No. New, Diesel driven, Mahindra Bolero Power + LX 2WD7 Seater non AC BS IV, PS vehicle towards replacement of the condemned Jeepbearing Regn.No.TN-01-L-4322 for the use of Superintending Engineer/CEDC/NorthOffice under the control of Chief Engineer/Distribution/Chennai/North Region - ApprovalAccorded.

(Technical Branch)

(Per.) CMD TANGEDCO Proceedings No.638, Dated the 01st December 2017.Karthigai -15, Heyvilambi Varudam,Thiruvalluvar Aandu 2048.

READ:

Chairman cum Managing Director Note Orderdt. 29.11.2017.

-----

14

PROCEEDINGS:

“Administrative approval is hereby accorded for Procurement of 1 No. New,Diesel driven, Mahindra Bolero Power + LX 2WD 7 Seater non AC BS IV, Powersteering vehicle at a cost of Rs.6.25 Lakhs (approximate) at GeM rates throughGeM/GeM rates outside GeM/rates as applicable to Government/Ex-show room withwaiver of EMD, SD and LD clauses towards replacement of the condemned Jeepbearing Regn.No.TN-01-L-4322 for the use of Superintending Engineer/CEDC/NorthOffice under the control of Chief Engineer/Distribution/Chennai/North”.

(By Order of the Chairman - cum - Managing Director)

V.Gopalakrishnan,Chief Engineer/Material Management.

* * *TANGEDCO - Computer Based Power Failure Redressal Centre - Administrative approvalaccorded for Enhancing complaints registering facility by Increasing the outsourcedcall centre operators from the present 23 persons per shift to 30 persons per shiftand to procure new computers with necessary accessories for the operators.

(Technical Branch)

(Rt.) CMD/TANGEDCO Proceedings No.79, Dated the 07th December 2017.Karthigai -21, Heyvilambi Varudam,Thiruvalluvar Aandu 2048.

READ:

CMD/TANGEDCO’s Note approval dated 20.11.2017.-----

PROCEEDINGS:

Approval has been accorded by CMD/TANGEDCO for the following proposalssubmitted by the Chief Engineer/(Distribution)/Chennai North Region:

i. To enhance the sanctioned strength of the call centre outsourced operatorsfrom 23 per shift to 30 per shift on par with the sanctioned staff strength of theCustomer Care Centre vide (Per.) CMD/TANGEDCO’s Proceedings No.314, (TechnicalBranch) dated 06.10.2012 in the subsequent tenders.

ii. To procure 30 Nos. new Personal Computers with necessary accessoriesfor the enhanced strength of 30 operators at a cost of Rs. 12,00,000/- (Rupeestwelve lakh only) for use in new servers and software applications environment.

(By Order of the Chairman - cum - Managing Director)P. Rani,

Chief Engineer/R-APDRP.

* * *

15

MM-II Circle - e-tender Specification No: M-21/2017-18-Two Part Open Tender System- Procurement of 3000 Nos. of 250 KVA/11KV/433V Energy Efficient Level-2Distribution Transformers - Award of Purchase Orders - Approval - Accorded bycirculation.

(Technical Branch)

(Per.) F.B. TANGEDCO Proceedings No.82, Dated the 13th December 2017.Karthigai -27, Heyvilambi Varudam,Thiruvalluvar Aandu 2048.

READ:

Approval of the TANGEDCO Board by circulation on13.12.2017.

-----PROCEEDINGS:

The Tamil Nadu Generation and Distribution Corporation Ltd., accorded approvalby circulation for the following proposals:

I. To place the order for a quantity of 300 Nos on the 1 No evaluated L1tenderer under new entrant category at an all - inclusive price of Rs.421909.00 astabulated below:

Sl Name of the firm Quantity All Inclusive Total Value inNo Proposed Price/Unit Rs. P.

to be Rs. Pallocated in

Nos.

1. M/s. Cylex Equiments, Chennai 300 421909.00 126572700.00Total 300 126572700.00

II. To place the orders for a remaining quantity of 2700 Nos on 33 Nos. evaluatedL2-L32 tenderers under regular category at an all - inclusive price of Rs.421909.00as tabulated below:

Sl Name of the firm Quantity All Inclusive Total Value inNo Proposed Price/Unit Rs. P.

to be Rs. Pallocated in

Nos.

1. M/s. Bala Industries, Chennai 82 421909.00 34596538.002. M/s. Supreme Power Equipments P Ltd,

Chennai 82 421909.00 34596538.003. M/s. Hindusthan Transformers, Chennai 82 421909.00 34596538.004. M/s. IPL Products, Chennai 82 421909.00 34596538.005. M/s. Associated Transformers Pvt Ltd, 82 421909.00 34596538.00

Dindigul6. M/s.Ascott Electricals Pvt Ltd., Chennai 82 421909.00 34596538.007. M/s. S.L. Electricals, Chennai 82 421909.00 34596538.00

16

8. M/s.Sarayu Engineering, Dindigul 82 421909.00 34596538.009. M/s. SAP Industries, Chennai 82 421909.00 34596538.00

10. M/s. Sri Thirumala Fabricators, Chennai 82 421909.00 34596538.0011. M/s. Danya Electric Company, Chennai 81 421909.00 34174629.0012. M/s. Paramount Industries, Chennai 81 421909.00 34174629.0013. M/s. Senthil Engineering Company,

Chennai 82 421909.00 34596538.00

14. M/s. Venkateswara ElectricalIndustries Pvt, Ltd, Chennai 82 421909.00 34596538.00

15. M/s Sri Ramakrishna Transformers,Tindivanam 81 421909.00 34174629.00

16. M/s Tamil Nadu Transformers, Ranipet 82 421909.00 34596538.0017. M/s Sri Vinayaga Star Electricals, Chennai 81 421909.00 34174629.0018. M/s Lavanya Industries, Chennai 82 421909.00 34596538.0019. M/s Voltech Manufacturing Company

Limited, Chennai 82 421909.00 34596538.00

20. M/s Vinai Electric Co, Chennai 82 421909.00 34596538.0021. M/s. Sri Perfect Engineering, Chennai 82 421909.00 34596538.0022. M/s. Shree Abirami Engineering Works,

Chennai23. M/s. Hindusthan Heavy Electricals (P) Ltd,

Coimbatore 82 421909.00 34596538.00

24. M/s. Electro Mech Industries, Coimbatore 82 421909.00 34596538.0025. M/s. Durga Transformers (P) Ltd, 81

Coimbatore 421909.00 34596538.00

26. M/s. Vivin Industries, Coimbatore 82 421909.00 34596538.0027. M/s. Industrial Heaters & Transformers,

Coimbatore 82 421909.00 34596538.00

28. M/s Mohini Transformers P Ltd, Indore 81 421909.00 34174629.0029. M/s Fairdeal Transformers and

switchgears Pvt Ltd, Guna 82 421909.00 34596538.00

30. M/s. Balaji Electrical works, Chennai. 82 421909.00 34596538.0031. M/s. Sakthi Transformers, Chennai 82 421909.00 34596538.0032. M/s. EVR Electrical Pvt. Ltd., Chennai. 82 421909.00 34596538.0033. M/s. SunTech Transformers, Ranipet. 82 421909.00 34596538.00

Total 2700 1139154300.00

Total value of the order: L1+L2-L32 = Rs.126572700.00+Rs.1139154300.00= Rs.126,57,27,000.00 (Rupees one hundred twenty six crores fifty sevenLakhs twenty seven thousand only)Total ordered Quantity : 300 + 2700 = 3000 Nos.

III) To cancel the order of the tenderer who fails to keep up the delivery scheduleand to re-allocate the same quantity on such firms who successfully complete theirsupply within schedule.

(By Order of TANGEDCO Board)

V.Gopalakrishnan,Chief Engineer/Material Management.

* * *

17

MM-II Circle - e-tender Specification No: M-18/2017-18 - Procurement of 10000Nos. of 100 KVA/11KV/433V Distribution Transformers Energy Efficient Level-2 underTwo Part Open Tender Rate Contract System - Award of Purchase Orders - Approval- Accorded.

(Technical Branch)

(Per.) F.B. TANGEDCO Proceedings No.83, Dated the 18th December 2017.Margazhi -3, Heyvilambi Varudam,Thiruvalluvar Aandu 2048.

READ:

The approval of TANGEDCO Board, accorded by circulationon 15.12.2017.

-----PROCEEDINGS:

The Tamil Nadu Generation and Distribution Corporation Ltd., accorded approvalfor the following proposals:

I. To place the orders for a quantity of 1000 Nos of DTs. on L1 quoted/evaluatednew entrant local tenderer at an all - inclusive price of Rs.2,59,600 each DT asoriginally offered by the firm as tabulated below:

Sl Name of the firm Quantity All Inclusive Total Value inNo Proposed Price/Unit Rs. P.

to be Rs. Pallocated in

Nos.

1. M/s. Sri Venkateshwara EngineeringWorks, Chennai 1000 2,59,600.00 259600000.00Total 1000 259600000.00II. To place the orders for balance quantity of 9000 Nos. on the following 11

tenderers at an all - inclusive price of Rs.2,59,600/- each DT as tabulated below:

Sl Name of the firm Quantity All Inclusive Total Value inNo Proposed Price/Unit Rs. P.

to be Rs. Pallocated in

Nos.

1. M/s. Kerala Electrical and AlliedEngineering Co. Ltd, Kochi. 3300 2,59,600.00 856680000.00

2. M/s. Voltech Manufacturing CompanyLtd, Kanchipuram 2700 2,59,600.00 700920000.00

3. M/s. Balaji Electrical Works, Chennai 300 2,59,600.00 77880000.004. M/s. Electro Meck Industries,

Coimbatore 500 2,59,600.00 129800000.005. M/s. Hindusthan Heavy Electricals 500 2,59,600.00 129800000.00

Pvt. Ltd, Cimbatore6. M/s.Industrial Heaters and

Transformers, Coimbatore 500 2,59,600.00 129800000.00

B.B.2 (Dec 17)

18

7. M/s. Fairdeal Transformers &Switchgears P Ltd, Guna 150 2,59,600.00 38940000.00

8. M/s.Mohini Transformers P Ltd, Indore 150 2,59,600.00 38940000.009. M/s. Sun-Tech Transformers, Ranipet 300 2,59,600.00 77880000.00

10. M/s. Sri Ramakrishna Transformers,Villupuram 300 2,59,600.00 77880000.00

11. M/s. Tamil Nadu Transformers, Ranipet 300 2,59,600.00 77880000.00Total 9000 2336400000.00

Total Quantity : 10000 Nos.

Total value of order : Rs. 259,60,00,000 (Rupees Two hundred and Fifty Nine Crores and Sixty Lakh only)

C) To cancel the order of the tenderer who fails to keep up the delivery schedule and to re-allocate the same quantity on such firms who successfully complete their supply within schedule.

(By Order of TANGEDCO Board)

V.Gopalakrishnan,Chief Engineer/Material Management.

* * *Specification No : M 65/2016-2017 Procurement of 9 items of line materials forIPDS and UDAY schemes - Award of Purchase Orders - Approved.

(Technical Branch)

(Per.) F.B. TANGEDCO Proceedings No.84, Dated the 18th December 2017.Margazhi - 3, Heyvilambi Varudam,Thiruvalluvar Aandu 2048.

READ:

Note approved by the Board of TANGEDCO by circulationon 15.12.2017.

-----PROCEEDINGS:

The Board of Tamil Nadu Generation and Distribution Corporation Ltd., hasaccorded approval to place orders on the 42 eligible tenderers for supply of 9 itemsof line materials for IPDS and UDAY schemes at a total all inclusive price ofRs. 49,99,62,371/- (Rupees Forty nine crores ninety nine lakhs sixty two thousandthree hundred and seventy one only) with Board’s Commercial terms.

(By Order of the Board)V.Gopalakrishnan,

Chief Engineer/Material Management.

* * *

19

MMII - Vehicle - Procurement of 1 No. New, Petro driven, Toyota Corolla Altis modelJ+BS-IV, super white AC car for the use of VVIP and attached to the VIP Pool underthe control of CPRO/TANGEDCO/ Chennai by short tender - Administrative ApprovalAccorded.

(Technical Branch)

(Per.) CMD TANGEDCO Proceedings No.647, Dated the 23rd December 2017.Margazhi -8, Heyvilambi Varudam,Thiruvalluvar Aandu 2048.

READ:

Approval of BLTC by circulation on 22.12.2017.-----

PROCEEDINGS:

Administrative approval is hereby accorded for Procurement of 1 No. New,Petrol driven, Toyota Corolla Altis model J+ BS-IV, super white AC car at a cost ofRs.17.00 Lakhs (Approximate) for the use of VVIP and attached to the VIP Poolunder the control of Chief Public Relations Officer/Headquarters/Chennai at rates asapplicable to Govt./Ex-show room price with waiver of EMD., SD and LD clauses.

(By Order of the BLTC of TANGEDCO)

V.Gopalakrishnan,Chief Engineer/Material Management.

* * *TANGEDCO - CE/Mechanical Thermal Stations - SE/R&M Circle - Procurement of anew Computer and Multifunction Printer to the Executive Engineer/R&M/Mechanical/Thermal Stations, Replacement of the old outdated desktop PC of Assistant ExecutiveEngineer 3/R&M with a new one, Allotment of the existing computer with the simplexlaser printer of EE/R&M to the newly created post of Assistant Executive Engineer 4/R&M at the O/o The SE/R&M/MTS at Head Quarters - Administrative Approval -Accorded - Regarding.

(Technical Branch)

(Per.) TANGEDCO Proceedings (CMD) No.654, Dated the 26th December 2017.Margazhi-11, Heyvilambi Varudam,Thiruvalluvar Aandu 2048.

READ:

Note approved by CMD on 13.12.2017.-----

PROCEEDINGS:

Administrative approval is hereby accorded for the provision of 2 Nos. of i3desktop PCs, 1 No. Multifunctional printer (Scan, Copy & Print) at an approximatecost of Rs. 1,32,000/- (Rupees One Lakh and thirty two thousand Only) for use ofEE/R&M and AEE-3/R&M in the SE/Renovation & Modernisation Circle at theO/o. CE/MTS.

20

Sl Description Qty Price/Unit (all TotalNo inclusive in Rs Amount (Rs)1. Core i3 Desktop PC 2 Nos. 46,000.00 92,000.002. Multifunctional printer (Scan, Copy 1 No. 40,000.00 40,000.00

& Print)Total 1,32,000.00

(By Order of the CMD/TANGEDCO)P. Sundar,

Chief Engineer/Mechanical /Thermal Stations (i/c).

* * *TANGEDCO - Hydro - Erode Generation Circle - Barrage Power House - 2/Nirinjipettai- Manufacture, Supply, Testing, Erection & Commissioning of additional One set newstop log gate as per the technical specifications - Administrative Approval - Accorded.

(Technical Branch)

(Per.) CMD TANGEDCO Proceedings No.657, Dated the 26th December 2017.Margazhi-11, Heyvilambi Varudam,Thiruvalluvar Aandu 2048.

READ:

Administrative approval note approved by CMD/TANGEDCOon 13.12.2017.

-----PROCEEDINGS:

CMD/TANGEDCO has accorded administrative approval on the proposal formanufacture, supply, testing, erection & commissioning of additional One setnew stop log gate for Barrage Power House-2/Nerinjipettai at a cost ofRs.1,52,67,150/- (Rupees One crore fifty two lakhs sixty seven thousand one hundredand fifty only) including EPF @ 13.36%, ESI @4.75% on labour portion and includingGST at 18% under open tender two part system for safe operation of gates duringflood condition.

(By Order of the Chairman-cum- Managing Director/TANGEDCO)K.Subash Chandra Bose,Chief Engineer/Hydro.

* * *TANGEDCO - Hydro Project - Bhavani Kattalai Barrage Power House III (2x15 MW) -Rectification works to the damaged Crest and Apron of the Barrage U/s and D/s ofBKB Power House III at Solasiramani, Erode - Administrative Approval - Accorded -Regarding.

(Technical Branch)

Per. (CMD) TANGEDCO Proceedings No.662, Dated the 26th December 2017.Margazhi -11, Heyvilambi Varudam,Thiruvalluvar Aandu 2048.

READ:

21

Chief Engineer/Civil Designs note approved by the CMD/TANGEDCO on 12.12.2017.

-----PROCEEDINGS:

Administrative Approval is hereby accorded for the Permanent Rectificationworks to the damaged Crest and Apron of the Barrage U/s and D/s of BhavaniKattalai Barrage III (2x15 MW) Power House at Solasiramani, Erode for an amountof Rs.11,25,96,000/- (Rupees Eleven crores Twenty five lakhs Ninety six thousandOnly) including GST, EPF, ESI, LWF and Contingencies as per annexure enclosed.

(By Order of the Chairman - cum - Managing Director/TANGEDCO)C.Ramesh,

Chief Engineer/Civil Designs.

ANNEXUREABSTRACT

Sl.No Description of Work Amount in Rs.1. Geo-Technical investigation by conducting soil

testing by approved Government EngineeringCollege/Anna university/Indian institute of 5,00,000.00technology/chennai and obtaining ‘N’ value fordesign, Safe Bearing Capacity of soil andrecommendation of foundation type suitable forBarrage cum Bridge Piers & Weirs hydraulic structures etc.

2. The detailed design and drawing for Rectificationworks to the damaged Crest and Apron of the Barrage 5,00,000.00U/s and D/s of BKB III Power House at Solasiramani,Erode on the report of Geo Technical Investigation.

3. BKB III (2x15 MW) Power House - Conducting FreeFlow Pattern of River study by engaging Survey and 1,50,00,000.00Leveling Team on U/s and D/s of river and execution ofallied remedial measure works.

4. Bhavani Kattalai Barrage III (2x15 MW) Power House -Rectification works to the damaged Crest and Apron of 7,36,64,113.00the Barrage U/s and D/s of BKB Power House III atSolasiramani in Erode Generation Circle.Total value of work 8,96,64,113.00LWF @ 1% 8,96,641.13EPF 13.36% on Labour portion only 35,62,142.56ESI 4.75% on Labour Portion only 12,66,480.33GST @ 18% 1,63,00,935.74Contingencies @ 1% 9,05,607.54Total 11,25,95,920.30

(or)Say11,25,96,000/-

(Rupees Eleven Crores Twenty five lakhs Ninety six thousand only)

//True Copy//

* * *

22

Hydro - Kadamparai Generation Circle - Estimate for outsourcing Gauge Readers forobserving Kadamparai Dam Level and to communicate the levels to the ControlRoom of Kadamparai Underground Power House for a period of one year from thedate of utilization for the year 2017-2018 - Administrative Approval - Accorded.

(Technical Branch)

(Rt.) CMD TANGEDCO Proceedings No.80, Dated the 27th December 2017.Margazhi -12,Heyvilambi Varudam,Thiruvalluvar Aandu 2048.

READ:

Chief Engineer/Hydro’s note approved by theCMD/TANGEDCO dated 14.12.2017.

-----PROCEEDINGS:

Administrative Approval is accorded for “Outsourcing Gauge Readers (as all thesanctioned Gauge Reader Posts are vacant) for observing Kadamparai Dam Leveland to communicate the levels to the Control Room of Kadamparai UndergroundPower House for a period of one year from the date of utilization for the year 2017-2018 at an estimated cost of Rs. 6,81,300/- (Gross & Nett) (Rupees six lakhseighty one thousand and three hundred only) including Goods and Service Tax @18% based on the Revised PWD Schedule of Rates for the year 2017-2018”.

(By Order of the Chairman - cum - Managing Director)K.Subash Chandra Bose,Chief Engineer/Hydro.

* * *

INDEXPage No.

News & Notes (Part-I) 2

General Administration and Services (Part-II)1) Memo.(Per) No.5924/A18/A181/2016-13, (BOSB) dated.07.12.2017. 8

TANGEDCO – Establishment - Consideration of request transfer applicationduring the currency of punishment - Instructions - Issued.

2) (Per.) CMD TANGEDCO Proceedings No.275, (BOSB)Dt. 11.12. 2017. 8Holidays - TANGEDCO - Holidays for the employees of the TANGEDCO,TANTRANSCO and TNEB Limited for the Calender year 2018 - Orders -Issued.

3) (Per.) CMD TANGEDCO Proceedings No.278, (BOSB)Dt.16.12.2017. 10TANGEDCO - Public Holiday - Election - Bye-Election to Tamil Nadu LegislativeAssembly from 11.Dr. Radhakrishnan Nagar Assembly Constituency - Paidholiday to workers and other employees of all categories in TANGEDCO,TANTRANSCO and TNEB Limited on 21.12.2017 (Thursday) for the areascomprised in the Assembly Constituency - Orders - Issued.

4) Memo. No.64685/A18/A182/2017-1, (BOSB) dated.26.12.2017. 10TANGEDCO – Secretariat Branch - Establishment - Class I Service - EarnedLeave on Medical Certificate applied by certain Class I Officers - Avoidanceof - Instructions - Issued.

Finance (Part - III)

5) Memo. No.CFC/REV/FC/R/DFC/R1/AO/F.E.O.T/D.816/17, (Accts.Br.)dt. 05.12.2017. 11

OCKHI Cyclone - Heavy rain fall in the Kanniyakumari District - LT Billing &Collection - Time extension for payment of C.C. Charges - Instructions -Issued - Regarding.

6) Memo. No.CFC/REV/FC/R/DFC/R1/AO/F.E.O.T/D.816-1/17, (Accts.Br.)dt.07.12.2017. 11

OCKHI Cyclone - Heavy rain fall in the Kanniyakumari District - LT Billing &Collection - Time extension for payment of C.C. Charges - Instructions -Issued - Regarding.

7) Lr. No.CFC/GL/FC/GL/DFC/CP/F.PFMS/D.No.736/17, (Accts.Br.)dt. 15.12.2017. 12

TANGEDCO - implementation under PFMS Portal - DDUGJY & IPDS Scheme -instructions for payment through M/s. ICICI Bank - Regarding.

Technical (Part - IV)

8) (Per.) CMD TANGEDCO Proceedings No.637,(Techl.Br.)Dt. 01.12. 2017. 13TANGEDCO - Project - Requirement of 1 No. of PC’s & printer for CE/Projects-I & 1No. of PC’s (replacement for old one) & printer for SE/E/T&H (P) andreplacement of existing PC for EA to CE/Project - I - Approval Accorded -Regarding.

9) (Per.) CMD TANGEDCO Proceedings No.638,(Techl.Br.)Dt.01.12. 2017. 13Vehicle - Procurement of 1 No. New, Diesel driven, Mahindra Bolero Power +LX 2WD 7 Seater non AC BS IV, PS vehicle towards replacement of thecondemned Jeep bearing Regn.No.TN-01-L-4322 for the use of SuperintendingEngineer/CEDC/North Office under the control of Chief Engineer/Distribution/Chennai/North Region - Approval Accorded.

24

Technical(Contd...) Page No.

10) (Rt.) CMD/TANGEDCO Proceedings No.79,(Techl.Br.)Dt.07.12. 2017. 14TANGEDCO - Computer Based Power Failure Redressal Centre - Administrativeapproval accorded for Enhancing complaints registering facility by Increasingthe outsourced call centre operators from the present 23 persons per shiftto 30 persons per shift and to procure new computers with necessaryaccessories for the operators.

11) (Per.) F.B. TANGEDCO Proceedings No.82,(Techl.Br.)Dt.13.12.2017. 15MM-II Circle - e-tender Specification No: M-21/2017-18-Two Part OpenTender System - Procurement of 3000 Nos. of 250 KVA/11KV/433V EnergyEfficient Level-2 Distribution Transformers - Award of Purchase Orders -Approval - Accorded.

12) (Per.) F.B. TANGEDCO Proceedings No.83,(Techl.Br.)Dt.18.12.2017. 17MM-II Circle - e-tender Specification No: M-18/2017-18 - Procurement of10000 Nos. of 100 KVA/11KV/433V Distribution Transformers Energy EfficientLevel-2 under Two Part Open Tender Rate Contract System - Award ofPurchase Orders - Approval - Accorded By Circulation.

13) (Per.) F.B. TANGEDCO Proceedings No.84,(Techl.Br.)Dt.18.12.2017. 18Specification No : M 65/2016-2017 Procurement of 9 items of line materialsfor IPDS and UDAY schemes - Award of Purchase Orders - Approved.

14) (Per.) CMD TANGEDCO Proceedings No.647,(Techl.Br.)Dt.23.12. 2017. 19MMII - Vehicle - Procurement of 1 No. New, Petro driven, Toyota CorollaAltis model J+BS-IV, super white AC car for the use of VVIP and attached tothe VIP Pool under the control of CPRO/TANGEDCO/ Chennai by short tender- Administrative Approval Accorded.

15) (Per.) TANGEDCO Proceedings (CMD) No.654,(Techl.Br.)Dt.26.12. 2017. 19TANGEDCO - CE/Mechanical Thermal Stations - SE/R&M Circle - Procurementof a new Computer and Multifunction Printer to the Executive Engineer/R&M/Mechanical/Thermal Stations, Replacement of the old outdated desktopPC of Assistant Executive Engineer 3/R&M with a new one, Allotment of theexisting computer with the simplex laser printer of EE/R&M to the newlycreated post of Assistant Executive Engineer 4/R&M at the O/o The SE/R&M/MTS at Head Quarters - Administrative Approval - Accorded - Regarding.

16) (Per.) CMD TANGEDCO Proceedings No.657,(Techl.Br.)Dt.26.12.2017. 20TANGEDCO - Hydro - Erode Generation Circle - Barrage Power House - 2/Nirinjipettai - Manufacture, Supply, Testing, Erection & Commissioning ofadditional One set new stop log gate as per the technical specifications -Administrative Approval - Accorded.

17) Per. (CMD) TANGEDCO Proceedings No.662,(Techl.Br.)Dt.26.12.2017. 20TANGEDCO - Hydro Project - Bhavani Kattalai Barrage Power House III(2x15 MW) - Rectification works to the damaged Crest and Apron of theBarrage U/s and D/s of BKB Power House III at Solasiramani, Erode -Administrative Approval - Accorded - Regarding.

18) (Rt.) CMD TANGEDCO Proceedings No.80,(Techl.Br.)Dt.27.12.2017. 22Hydro - Kadamparai Generation Circle - Estimate for outsourcing Gaugereaders for observing Kadamparai Dam Level and to communicate the levelsto the Control Room of Kadamparai Underground Power House for a periodof one year from the date of utilization for the year 2017-2018 -Administrative Approval - Accorded.

* * *