building design challenge moonee ponds central school is getting a new building. while the design...

52
Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this term you and your team have the opportunity to present an alternative vision.

Upload: milton-derick-cox

Post on 18-Dec-2015

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Building Design Challenge Moonee Ponds Central School is getting a new building.

While the design and plans for our new building have been finalised this term you and your team have the opportunity to present an alternative vision.

Page 2: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Modern buildings come in many shapes and forms…

Page 3: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

The Ørestad High School in Copenhagen

... both inside …

Page 4: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

…and outside.

The School of Art, Design and Media at Nanyang Technological University in Singapore.

Page 5: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

School buildings also have a variety of purposes.

THE CENTRE FOR IDEAS, VICTORIAN COLLEGE OF THE

ARTS, MELBOURNE

Page 6: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

A visual and performing arts high school in Los Angeles, USA. This campus has seven buildings: four classroom

buildings, a library, a cafeteria and a

professional performing arts

theatre.

Page 7: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Your presentation must include…

Page 8: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

… a timeline of how your group will work on this term’s project.Include jobs to be done and who is to do them.

Page 9: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

… two plans and one elevation drawn to scale. (The first plan is to be of the whole building on the site while the second is to be a close-up of a special element of the project)

Page 10: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

… detailed costing of one aspect of your plan.

Page 11: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

… a graph showing the results of a survey you’ve carried out connected to the project.

Page 12: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

… some tessellation you’ve included somewhere within your finished design.

Page 13: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

… a concept web detailing all the maths your group used while doing this project.

Page 14: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

… a model of your design with detail added to one main feature.

Page 15: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

… loan repayment details of your building costs.

Your building budget is $2 400 000.

Each team member will look for a loan from either a bank, co-op or credit union.

How much will you have to pay back if you do it over 15, 20 or 50 years?

Use a Comparison Matrix to present your results.

Page 16: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Some questions to consider are …

… What is the building going to be used for ?

… What materials are to be used in it’s construction ?

… What special features will it include ?

Page 17: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

• A plan is a view of a building from straight above.

• An elevation is a view of how the front, sides or back of a building will look.

• A section is like an elevation, only it’s a slice of the inside of a building - which you could never see in real life – lets you see what the structures inside the walls will look like.

• Architects use different scales to share different kinds of information: a close-up of an important design detail or a broad view of how a building fits into the landscapes around it.

Some terms to remember are …

Page 18: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

What Architects do …

Like mathematicians they break down a complicated job and do it one step at a time.

What they design must both look good and work well, inside and outside, and it can’t cost more than the client can afford to pay.

A design isn’t only about looks it’s also about how it fits together.

Page 19: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

For your project use the following Design Planner

Page 20: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Building Design Brief Planner Investigate and design • What information do you need to develop your design? • Make a list of questions you need to research.• Use simple mind maps, sketches and labelled diagrams to explore different design solutions.• Choose one design solution, draw a more detailed plan and make a list of materials required.

Record a list of design goals that’ll you use to evaluate your completed design.   

Produce • Using your plan and list of materials construct your model.• Make ongoing modifications to your design and develop alternative solutionsto fix any problems in your design.   

Analysis and Evaluate • Present your finished plan and model to the rest of the class.Explain its various features and why you have included them into your design.• Explain the difficulties or problems that you had andhow you worked to overcome them.

Evaluate your completed product using your list of design goals.

Page 21: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Useful Websites• 15 cool school buildings from around the world http://weburbanist.com/2009/04/21/15-cool-high-school-college-and-university-building-designs/

• Building a School from Recycled Materialshttp://www.globalgiving.com/projects/build-a-school-from-recycled-materials-for-50-maya/updates/

• Sites for making timelines http://www.readwritethink.org/materials/timeline/

http://www.teach-nology.com/web_tools/materials/timeline/

http://www.xtimeline.com/

http://www.microsoft.com/education/timelinesword.mspx

Page 22: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Our Project

Page 23: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

The information we need to develop our design:

Page 24: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Our list of questions we need to research:

Page 25: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Our list of design goals that we’ll use to evaluate our completed design:

Page 26: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Time line(created on inspiration)

Page 27: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this
Page 28: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Survey and graphs

Page 29: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this
Page 30: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

My Prototype

Page 31: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this
Page 32: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

My Partners’ Prototypes

Page 33: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this
Page 34: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Initial drafts of our building

Page 35: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this
Page 36: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

My drawing of what our building will look like

Page 37: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this
Page 38: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

My partners’ drawings of what our building will look like

Page 39: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this
Page 40: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Floor plan drawn to scale

Page 41: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this
Page 42: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

www.smallblueprinter.com plan

Page 43: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this
Page 44: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Tessellation to feature on project

Page 45: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this
Page 46: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Detail costing of one element

Page 47: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this
Page 48: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Quotes (interest rates)

Page 49: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this
Page 50: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Concept web (on inspiration) [Detailing all the maths our group used while doing this project.]

Page 51: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this
Page 52: Building Design Challenge Moonee Ponds Central School is getting a new building. While the design and plans for our new building have been finalised this

Evaluation of our completed design.(Using our recorded design goals)