Page 1: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Building Committee Updateto the COD - Nov 11 2015

Prepared by Don Fruit

Agenda

bull COD Directives to Building Committeebull Design Measured Against our Prioritiesbull Site and Building Designsbull Updated Budgetary Construction Costbull Whatrsquos been spent to datebull Possible Time Line

2

COD Directives to Building Committee

bull The Building Committee was directed in May 2015 to develop a detailed design with updated cost for Phases 1 2 amp 3 of the Master Plan

bull Approval was also given for the construction of an outdoor Storage Building and the remodeling of the old AUX Gym locker rooms with bathrooms

bull Catalyst Construction was selected in June as our Construction Management Company

bull RFP for Architectural Design Services were sent to 5 firms in July 3 firms submitted proposals

bull Excel Engineering was selected as Design Firm with the kick-off meeting being held 8172015

3

Designs Measured Against Priorities

bull The Committee has been continually comparing the building and site designs to the needs identified during the Master Planning processndash Are we including the highest priority spaces ndash Does the design address the safety issues identifiedndash Do the spaces include enough square footage and in the right

configuration to meet our current and future curriculum needsndash Are we taking desired adjacencies into considerationndash Will the proposed layouts improve our faculty and staff efficiencyndash How does the new space tie in with the existing buildingsite ndash Does it leave us options in the futurendash Is there a less expensive solution to meet the current need And can it be

upgraded in the future as funding allowsndash Will the new design be more energy efficient than other options and

reduce future building maintenance

4

Site and Building Designs

bull Quick Review of the Master Planbull The Latest Site and Building Designs

5

Current LHS Campus

6

Past LHS Building Phases

7

Site Plan Phases

8

9

Building Plan Phases ndash 1st Floor

10

Building Plan Phases ndash 2nd Floor

Site and Building Designs

bull The Latest Site and Building Designs

Please note Drawings are not final and are still being fine tuned

11

Outdoor Storage Building Design

12

Possible Future Loft for Added Space

- Cleary Building - 40W x 80L x 16H- Insulated Doors- Walls and Ceiling could be insulated later- Located North of FB Field- Concrete to be added in the spring- Plans for a batting cage down the middle during the spring baseball season

Outdoor Storage Building Site Plan

13

Outdoor Storage Building Site Prep

14

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 2: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Agenda

bull COD Directives to Building Committeebull Design Measured Against our Prioritiesbull Site and Building Designsbull Updated Budgetary Construction Costbull Whatrsquos been spent to datebull Possible Time Line

2

COD Directives to Building Committee

bull The Building Committee was directed in May 2015 to develop a detailed design with updated cost for Phases 1 2 amp 3 of the Master Plan

bull Approval was also given for the construction of an outdoor Storage Building and the remodeling of the old AUX Gym locker rooms with bathrooms

bull Catalyst Construction was selected in June as our Construction Management Company

bull RFP for Architectural Design Services were sent to 5 firms in July 3 firms submitted proposals

bull Excel Engineering was selected as Design Firm with the kick-off meeting being held 8172015

3

Designs Measured Against Priorities

bull The Committee has been continually comparing the building and site designs to the needs identified during the Master Planning processndash Are we including the highest priority spaces ndash Does the design address the safety issues identifiedndash Do the spaces include enough square footage and in the right

configuration to meet our current and future curriculum needsndash Are we taking desired adjacencies into considerationndash Will the proposed layouts improve our faculty and staff efficiencyndash How does the new space tie in with the existing buildingsite ndash Does it leave us options in the futurendash Is there a less expensive solution to meet the current need And can it be

upgraded in the future as funding allowsndash Will the new design be more energy efficient than other options and

reduce future building maintenance

4

Site and Building Designs

bull Quick Review of the Master Planbull The Latest Site and Building Designs

5

Current LHS Campus

6

Past LHS Building Phases

7

Site Plan Phases

8

9

Building Plan Phases ndash 1st Floor

10

Building Plan Phases ndash 2nd Floor

Site and Building Designs

bull The Latest Site and Building Designs

Please note Drawings are not final and are still being fine tuned

11

Outdoor Storage Building Design

12

Possible Future Loft for Added Space

- Cleary Building - 40W x 80L x 16H- Insulated Doors- Walls and Ceiling could be insulated later- Located North of FB Field- Concrete to be added in the spring- Plans for a batting cage down the middle during the spring baseball season

Outdoor Storage Building Site Plan

13

Outdoor Storage Building Site Prep

14

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 3: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

COD Directives to Building Committee

bull The Building Committee was directed in May 2015 to develop a detailed design with updated cost for Phases 1 2 amp 3 of the Master Plan

bull Approval was also given for the construction of an outdoor Storage Building and the remodeling of the old AUX Gym locker rooms with bathrooms

bull Catalyst Construction was selected in June as our Construction Management Company

bull RFP for Architectural Design Services were sent to 5 firms in July 3 firms submitted proposals

bull Excel Engineering was selected as Design Firm with the kick-off meeting being held 8172015

3

Designs Measured Against Priorities

bull The Committee has been continually comparing the building and site designs to the needs identified during the Master Planning processndash Are we including the highest priority spaces ndash Does the design address the safety issues identifiedndash Do the spaces include enough square footage and in the right

configuration to meet our current and future curriculum needsndash Are we taking desired adjacencies into considerationndash Will the proposed layouts improve our faculty and staff efficiencyndash How does the new space tie in with the existing buildingsite ndash Does it leave us options in the futurendash Is there a less expensive solution to meet the current need And can it be

upgraded in the future as funding allowsndash Will the new design be more energy efficient than other options and

reduce future building maintenance

4

Site and Building Designs

bull Quick Review of the Master Planbull The Latest Site and Building Designs

5

Current LHS Campus

6

Past LHS Building Phases

7

Site Plan Phases

8

9

Building Plan Phases ndash 1st Floor

10

Building Plan Phases ndash 2nd Floor

Site and Building Designs

bull The Latest Site and Building Designs

Please note Drawings are not final and are still being fine tuned

11

Outdoor Storage Building Design

12

Possible Future Loft for Added Space

- Cleary Building - 40W x 80L x 16H- Insulated Doors- Walls and Ceiling could be insulated later- Located North of FB Field- Concrete to be added in the spring- Plans for a batting cage down the middle during the spring baseball season

Outdoor Storage Building Site Plan

13

Outdoor Storage Building Site Prep

14

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 4: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Designs Measured Against Priorities

bull The Committee has been continually comparing the building and site designs to the needs identified during the Master Planning processndash Are we including the highest priority spaces ndash Does the design address the safety issues identifiedndash Do the spaces include enough square footage and in the right

configuration to meet our current and future curriculum needsndash Are we taking desired adjacencies into considerationndash Will the proposed layouts improve our faculty and staff efficiencyndash How does the new space tie in with the existing buildingsite ndash Does it leave us options in the futurendash Is there a less expensive solution to meet the current need And can it be

upgraded in the future as funding allowsndash Will the new design be more energy efficient than other options and

reduce future building maintenance

4

Site and Building Designs

bull Quick Review of the Master Planbull The Latest Site and Building Designs

5

Current LHS Campus

6

Past LHS Building Phases

7

Site Plan Phases

8

9

Building Plan Phases ndash 1st Floor

10

Building Plan Phases ndash 2nd Floor

Site and Building Designs

bull The Latest Site and Building Designs

Please note Drawings are not final and are still being fine tuned

11

Outdoor Storage Building Design

12

Possible Future Loft for Added Space

- Cleary Building - 40W x 80L x 16H- Insulated Doors- Walls and Ceiling could be insulated later- Located North of FB Field- Concrete to be added in the spring- Plans for a batting cage down the middle during the spring baseball season

Outdoor Storage Building Site Plan

13

Outdoor Storage Building Site Prep

14

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 5: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Site and Building Designs

bull Quick Review of the Master Planbull The Latest Site and Building Designs

5

Current LHS Campus

6

Past LHS Building Phases

7

Site Plan Phases

8

9

Building Plan Phases ndash 1st Floor

10

Building Plan Phases ndash 2nd Floor

Site and Building Designs

bull The Latest Site and Building Designs

Please note Drawings are not final and are still being fine tuned

11

Outdoor Storage Building Design

12

Possible Future Loft for Added Space

- Cleary Building - 40W x 80L x 16H- Insulated Doors- Walls and Ceiling could be insulated later- Located North of FB Field- Concrete to be added in the spring- Plans for a batting cage down the middle during the spring baseball season

Outdoor Storage Building Site Plan

13

Outdoor Storage Building Site Prep

14

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 6: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Current LHS Campus

6

Past LHS Building Phases

7

Site Plan Phases

8

9

Building Plan Phases ndash 1st Floor

10

Building Plan Phases ndash 2nd Floor

Site and Building Designs

bull The Latest Site and Building Designs

Please note Drawings are not final and are still being fine tuned

11

Outdoor Storage Building Design

12

Possible Future Loft for Added Space

- Cleary Building - 40W x 80L x 16H- Insulated Doors- Walls and Ceiling could be insulated later- Located North of FB Field- Concrete to be added in the spring- Plans for a batting cage down the middle during the spring baseball season

Outdoor Storage Building Site Plan

13

Outdoor Storage Building Site Prep

14

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 7: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Past LHS Building Phases

7

Site Plan Phases

8

9

Building Plan Phases ndash 1st Floor

10

Building Plan Phases ndash 2nd Floor

Site and Building Designs

bull The Latest Site and Building Designs

Please note Drawings are not final and are still being fine tuned

11

Outdoor Storage Building Design

12

Possible Future Loft for Added Space

- Cleary Building - 40W x 80L x 16H- Insulated Doors- Walls and Ceiling could be insulated later- Located North of FB Field- Concrete to be added in the spring- Plans for a batting cage down the middle during the spring baseball season

Outdoor Storage Building Site Plan

13

Outdoor Storage Building Site Prep

14

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 8: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Site Plan Phases

8

9

Building Plan Phases ndash 1st Floor

10

Building Plan Phases ndash 2nd Floor

Site and Building Designs

bull The Latest Site and Building Designs

Please note Drawings are not final and are still being fine tuned

11

Outdoor Storage Building Design

12

Possible Future Loft for Added Space

- Cleary Building - 40W x 80L x 16H- Insulated Doors- Walls and Ceiling could be insulated later- Located North of FB Field- Concrete to be added in the spring- Plans for a batting cage down the middle during the spring baseball season

Outdoor Storage Building Site Plan

13

Outdoor Storage Building Site Prep

14

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 9: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

9

Building Plan Phases ndash 1st Floor

10

Building Plan Phases ndash 2nd Floor

Site and Building Designs

bull The Latest Site and Building Designs

Please note Drawings are not final and are still being fine tuned

11

Outdoor Storage Building Design

12

Possible Future Loft for Added Space

- Cleary Building - 40W x 80L x 16H- Insulated Doors- Walls and Ceiling could be insulated later- Located North of FB Field- Concrete to be added in the spring- Plans for a batting cage down the middle during the spring baseball season

Outdoor Storage Building Site Plan

13

Outdoor Storage Building Site Prep

14

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 10: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

10

Building Plan Phases ndash 2nd Floor

Site and Building Designs

bull The Latest Site and Building Designs

Please note Drawings are not final and are still being fine tuned

11

Outdoor Storage Building Design

12

Possible Future Loft for Added Space

- Cleary Building - 40W x 80L x 16H- Insulated Doors- Walls and Ceiling could be insulated later- Located North of FB Field- Concrete to be added in the spring- Plans for a batting cage down the middle during the spring baseball season

Outdoor Storage Building Site Plan

13

Outdoor Storage Building Site Prep

14

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 11: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Site and Building Designs

bull The Latest Site and Building Designs

Please note Drawings are not final and are still being fine tuned

11

Outdoor Storage Building Design

12

Possible Future Loft for Added Space

- Cleary Building - 40W x 80L x 16H- Insulated Doors- Walls and Ceiling could be insulated later- Located North of FB Field- Concrete to be added in the spring- Plans for a batting cage down the middle during the spring baseball season

Outdoor Storage Building Site Plan

13

Outdoor Storage Building Site Prep

14

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 12: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Outdoor Storage Building Design

12

Possible Future Loft for Added Space

- Cleary Building - 40W x 80L x 16H- Insulated Doors- Walls and Ceiling could be insulated later- Located North of FB Field- Concrete to be added in the spring- Plans for a batting cage down the middle during the spring baseball season

Outdoor Storage Building Site Plan

13

Outdoor Storage Building Site Prep

14

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 13: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Outdoor Storage Building Site Plan

13

Outdoor Storage Building Site Prep

14

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 14: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Outdoor Storage Building Site Prep

14

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 15: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

15

Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 16: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

16

Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 17: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

17

Auditorium ndash Cross Section

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 18: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

18

Auditorium ndash Interior View

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 19: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

19

Auditorium ndash View from Stage

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 20: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

20

Remodeled ACE (West) Entrance

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 21: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

21

Auditorium External View

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 22: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

22

Remodel AUX Gym LockerBath Rooms

Unisex Visitor Locker Room

New Boys Bath Roomreplace current east wing facilities

Unisex Visitor Locker Room

Custodial Closet and Drinking Fountains

New Girls Bath Room

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 23: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

23

Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 24: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

24

Future New Front Entrance - Phase 3

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 25: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

25

Future New Front Entrance - Phase 3

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 26: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

26

Future New Front Entrance - Phase 3

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 27: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

27

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 28: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Site and Building Designs

bull The Latest Site Designs

Please note Drawings are not final and are still being fine tuned

28

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 29: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

29

Parking Lot and Entrance Changes

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 30: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

30

Parking Lot Changes - Option 1

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 31: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

31

Parking Lot Changes - Option 2

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 32: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

32

Football Practice Field Relocation

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 33: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

33

Overall Site Plan (Draft)

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 34: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Priority Evaluation CriteriaA priority system was developed to evaluate future needs campus wide (from highest to lowest)bull Health amp Life SafetyADA Needsbull Curriculum SupportImproved Worship or Learning

Environmentbull BuildingEnergy Efficiency and Maintenance Reductionbull Improved Event Quality and TimeEffort Savingsbull Classroom Interior Upgrades and Infrastructurebull AestheticsSite Development and Landscapingbull Expansion of FacilitiesOther criteria used were Frequency of Use and the Urgency of the Time Frame when needed

34

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 35: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Needs Metbull Home Maint Shop with RoboticsCAD Design Classroombull 2D and 3D Art Rooms (with running water)

bull ChapelPerforming Arts Auditorium (550 to 650 seats)bull Indoor AthleticDramaMusic Storagebull Outdoor Athletic Storagebull Parking (New EntranceExit ImprovedSafer Traffic Flow)bull New ADASenior Friendly Entrance Doorsbull New Science LabsClassroomsbull Athletic Facility Upgrades(Renovated Visitor Locker Rooms

Weight Room Ventilation Football Bleachers)bull Parking (ADASeniorVisitor Increased Lot Size) bull New Exterior amp Interior Signage especially for visitorsbull Plan for Future Large Capital Maintenance Projects

35

Maybe

Remodel

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 36: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Updated Budgetary Construction Cost

bull Budget for Complete Projectbull Phased Budget

36

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 37: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

37

Construction Cost Budgetary CostCore amp Shell

Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 983000Classroom Wing - 1st Floor (12205sf) 352000Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000

Site WorkParking Lot ReconstructionNetting for Varsity Softball 525000Storm Water Plan FB Practice Field New Fire Road etc 244000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Outdoor Storage Building (3200sf) 96000Add Weight Room Ventilation 37000External Heated Maitenance Garage (approx 24 x 36) 108000Additional Soft Treatments and Signage 50000

Construction Cost Sub-Total 7606000$

Updated Budgetary Construction Costfor Phases 1 2 amp 3 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 38: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Updated Budgetary Construction Cost ndash Cont

38

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 8030000$

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000Existing Building Maintenance Fund 250000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 1046000$

Total Project Cost for Phases 12 amp 3 9076000$

Updated Budget

Phased Budget

Sheet3

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 39: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

39

Project Cost for Year 1Construction Cost Budgetary Cost

Core amp ShellAuditorium amp Classroom Wing Core amp Shell (38448sf) 3600000Firewall between sprinkled and non-sprinkled building 203000

Interior BuildoutAuditorium - Construction Seats AVRigging etc(13933sf) 933000Classroom Wing - 1st Floor (12205sf) 352000

Site WorkStorm Water Plan FB Practice Field New Fire Road etc 244000

Misc Scope ItemsRenovate Existing AUX Gym Locker Room (1824sf) 201000Add Weight Room Ventilation 37000Outdoor Storage Building (3200sf) 9600012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 75000

Construction Cost Sub-Total 5766000$

Construction Requirements amp FeesConstruction Contingency 500 314000 Owner Direct Purchase Savings -115 (77000) Insurance 100 67000 Catalyst Construction Management Fee 200 120000

Total Construction Cost 6190000$

Phased Budgetary Costfor Year 1 amp 2 based on Detailed Designs

Updated Budget

Phased Budget

Sheet3

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 40: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Phased Budgetary Cost ndash Cont

40

Additional Design and Site Fees other Owner ItemsExcel Engineering - ArchitecturalStructuralMEPs 305000Additional Engineering and Design Consultants 60000Owner Building Requirements 31000DataTelecomSecurityTech Hardware 50000UtilitiesMunicipal Fees 45000Owner Contingency - Design amp Soft Cost 500 305000

Design and Site Fees other Owner Items Sub-Total 796000$

Total Project Cost for Year 1 6986000$

Project Cost for Year 2Core amp Shell

Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000Interior Buildout

Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000Site Work

Parking Lot ReconstructionNetting for Varsity Softball 525000FootballTrack Bleachers (500 seats) 75000

Misc Scope ItemsAdditional AVRiggingTheatrical Equipment 50000External Heated Maitenance Garage (approx 24 x 36) 10800012 Additional Soft Treatments and Signage 25000Existing Building Maintenance Fund 175000

Total Project Cost for Year 2 2090000$

Total Years 1 amp 2 9076000$

Updated Budget

Phased Budget

Sheet3

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Phased Budgetary Cost
for Year 1 amp 2 based on Detailed Designs
Project Cost for Year 1
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 933000
Classroom Wing - 1st Floor (12205sf) 352000
Site Work
Storm Water Plan FB Practice Field New Fire Road etc 244000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Add Weight Room Ventilation 37000
Outdoor Storage Building (3200sf) 96000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 75000
Construction Cost Sub-Total $ 5766000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 6190000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 796000
Total Project Cost for Year 1 $ 6986000
Project Cost for Year 2
Core amp Shell
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Additional AVRiggingTheatrical Equipment 50000
External Heated Maitenance Garage (approx 24 x 36) 108000
12 Additional Soft Treatments and Signage 25000
Existing Building Maintenance Fund 175000
Total Project Cost for Year 2 $ 2090000
Total Years 1 amp 2 $ 9076000
Updated Budgetary Construction Cost
for Phases 1 2 amp 3 based on Detailed Designs
Construction Cost Budgetary Cost
Core amp Shell
Auditorium amp Classroom Wing Core amp Shell (38448sf) 3600000
Firewall between sprinkled and non-sprinkled building 203000
Demo West WingNew Front EntranceNew Exterior amp Insulate Office Area 710000
Interior Buildout
Auditorium - Construction Seats AVRigging etc(13933sf) 983000
Classroom Wing - 1st Floor (12205sf) 352000
Classroom Wing - 2nd Floor wbathrooms (12205sf) 422000
Site Work
Parking Lot ReconstructionNetting for Varsity Softball 525000
Storm Water Plan FB Practice Field New Fire Road etc 244000
FootballTrack Bleachers (500 seats) 75000
Misc Scope Items
Renovate Existing AUX Gym Locker Room (1824sf) 201000
Outdoor Storage Building (3200sf) 96000
Add Weight Room Ventilation 37000
External Heated Maitenance Garage (approx 24 x 36) 108000
Additional Soft Treatments and Signage 50000
Construction Cost Sub-Total $ 7606000
Construction Requirements amp Fees
Construction Contingency 500 314000
Owner Direct Purchase Savings -115 (77000)
Insurance 100 67000
Catalyst Construction Management Fee 200 120000
Total Construction Cost $ 8030000
Additional Design and Site Fees other Owner Items
Excel Engineering - ArchitecturalStructuralMEPs 305000
Additional Engineering and Design Consultants 60000
Owner Building Requirements 31000
DataTelecomSecurityTech Hardware 50000
Existing Building Maintenance Fund 250000
UtilitiesMunicipal Fees 45000
Owner Contingency - Design amp Soft Cost 500 305000
Design and Site Fees other Owner Items Sub-Total $ 1046000
Total Project Cost for Phases 12 amp 3 $ 9076000
Page 41: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Building MaintenanceUtilities

bull $250000 allowance for future capital maintenance projects (ACE Gym Roof ACE HVAC Replacement)

bull Temporary increase in utility cost during construction and until west wing is removed

bull New construction will be considerably more efficientthan west wing and more efficient than the ACE Gym

bull Janitorial costs are being studied by the BOC Building and Grounds Committee

bull Event setup and takedown time will be greatly reducedbull Increase in property insurance unknown at this time

41

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Page 42: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Updated Storage Building CostWednesday November 11 2015

CONSTRUCTION COST CURRENT ESTBuilding Permit $ 1000 Site Plan Development Not Included 40 x 80 Building - Cleary $ 54382 Earthwork $ 4110 Electrical - Installation $ 14350 Electrical - Lighting Fixtures $ 2430

SUBTOTAL CONSTRUCTION COSTS $ 7627200

Concrete - Spring 2016 $ 15820 Landscaping (GrassShrubs)

42

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Page 43: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Whatrsquos been spent to dateBalance in Accounts

10312015 Luther High Phase II Chapel 12795553510312015 Luther High Building Funds 51700827 building and chapel accounts were combined into one

812011 Funds still committed to wireless and computers -2235201 Total Funds 177421161

Expenses Paid out of building funds1172014 I + S Group Master Plan Building Expenses 700000

112015 I + S Group Master Plan Building Expenses 8000005192015 City of Onalaska - conditional use permit athletic shed 150006302015 Cornerstone Awareness and readiness 4166008112015 La Crosse Mail and Print Building mailings 23804

982015 Cornerstone Awareness and readiness 4166009102015 Cleary Building 20 down on Athletic shed 10729009182015 Excel Engineering architectural and structural 13289459282015 Food for Cornerstone meetings 36665

10162015 Excel Engineering architectural and structural 214607010212015 City of Onalaska - building permit 1000010282015 City of Onalaska - building permit 90000

1142015 Cornerstone Awareness and readiness 416800

Total Expenses 7473384

Contracts Total Paid Remaining CommentsCornerstone Ministries 1250000 1250000 000PSI GeoTec (Soil Borings) 394500 394500 000Paragon - Site Survey Work 565000 565000 Waiting for InvoiceParagon - Civil Work (Storm WaterSite Design) 2760000 2760000Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until SpringTravis Zenke - Storage Building Rock 411000 411000 Waiting for InvoiceElectrical Contractor - Storage Building 1435000 1435000Electrical Fixtures - Storage Building 243000 243000Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial InvoiceCleary Buildings - Storage Building 5364500 1072900 4291600Excel Engineering 29749570 3475015 26274555

Totals 46532570 6192415 4034015543

Sheet1

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
LHS Building Project Financial Report
Last Updated 1182015
Balance in Accounts
93015 Luther High Phase II Chapel 125541197
93015 Luther High Building Funds 14484485
93015 Luther High Chapel Funds 40268783
8111 Funds still committed to wireless and computers -2235201
Total Funds 178059264
Balance in Accounts
103115 Luther High Phase II Chapel 127955535
103115 Luther High Building Funds 51700827 building and chapel accounts were combined into one
8111 Funds still committed to wireless and computers -2235201
Total Funds 177421161
Expenses Paid out of building funds
11714 I + S Group Master Plan Building Expenses 700000
1115 I + S Group Master Plan Building Expenses 800000
51915 City of Onalaska - conditional use permit athletic shed 15000
63015 Cornerstone Awareness and readiness 416600
81115 La Crosse Mail and Print Building mailings 23804
9815 Cornerstone Awareness and readiness 416600
91015 Cleary Building 20 down on Athletic shed 1072900
91815 Excel Engineering architectural and structural 1328945
92815 Food for Cornerstone meetings 36665
101615 Excel Engineering architectural and structural 2146070
102115 City of Onalaska - building permit 10000
102815 City of Onalaska - building permit 90000
11415 Cornerstone Awareness and readiness 416800
Total Expenses 7473384
Contracts Total Paid Remaining Comments
Cornerstone Ministries 1250000 1250000 000
PSI GeoTec (Soil Borings) 394500 394500 000
Paragon - Site Survey Work 565000 565000 Waiting for Invoice
Paragon - Civil Work (Storm WaterSite Design) 2760000 2760000
Wieser Brothers - Storage Building Concrete 1582000 1582000 Delayed Until Spring
Travis Zenke - Storage Building Rock 411000 411000 Waiting for Invoice
Electrical Contractor - Storage Building 1435000 1435000
Electrical Fixtures - Storage Building 243000 243000
Commercial AV - AVLightingRigging Design 2778000 2778000 Waiting for 1st Partial Invoice
Cleary Buildings - Storage Building 5364500 1072900 4291600
Excel Engineering 29749570 3475015 26274555
Totals 46532570 6192415 40340155
Anticipated Payments By Month
Nov 2015 PSI Zenke Commercial AV Paragon Cleary Excel
Dec 2015 Commercial AV Paragon Excel Electrical Klick
Jan 2016 Commercial AV Paragon Excel
Feb 2016 Excel
Page 44: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Possible Time Linebull Nov 11 2015 ndash Building Committee seeks approval to continue the process of

completing the Detailed DesignConstruction Documents for Phase 1 2 amp 3

bull Feb 3 2016 - Present COD with Fine Tuned Budget and seek approval to put out Phase 1 for bids

bull MarApr 2016 ndash Break Ground on Phase 1

bull Aug 2016 ndash Move into new 1st floor classrooms

bull Aug 2016 thru Aug 2017 ndash Solicit ldquodonations in kindrdquo to buildout 2nd floor classroom space

bull Dec 2016 ndash Dedicate New ChapelAuditorium

bull Mar 2017 ndash Put out Phase 2 amp 3 for bids

bull June 2017 ndash Remove West Wing Build New Entrance

bull Aug 2017 ndash Pave Redesigned Parking Lot after construction is completed

44

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line
  • Questions
Page 45: Building Committee Update - Luther High School Up/bldg_up… · 10/16/2015Excel Engineering architectural and structural 21,460.70 10/21/2015City of Onalaska - building permit 100.00

Questions

2 This is what the LORD Almighty says ldquoThese people say lsquoThe time has not yet come to rebuild the LORDrsquoS housersquordquo

3 Then the word of the LORD came through the prophet Haggai 4 ldquoIs it a time for you yourselves to be living in your paneled houses while this house remains a ruinrdquo

5 Now this is what the LORD Almighty says ldquoGive careful thought to your ways 6 You have planted much but harvested little You eat but never have enough You drink but never have your fill You put on clothes but are not warm You earn wages only to put them in a purse with holes in itrdquo

Haggai 12-6

45

  • Building Committee Updateto the COD - Nov 11 2015
  • Agenda
  • COD Directives to Building Committee
  • Designs Measured Against Priorities
  • Site and Building Designs
  • Current LHS Campus
  • Past LHS Building Phases
  • Site Plan Phases
  • Building Plan Phases ndash 1st Floor
  • Building Plan Phases ndash 2nd Floor
  • Site and Building Designs
  • Outdoor Storage Building Design
  • Outdoor Storage Building Site Plan
  • Outdoor Storage Building Site Prep
  • Building Plan Phase 1 ndash 1st FloorAuditoriumShopRoboticsArt
  • Building Plan Phase 1 ndash 2nd Floor Shelled In for Future ClassroomsStorage
  • Auditorium ndash Cross Section
  • Auditorium ndash Interior View
  • Auditorium ndash View from Stage
  • Remodeled ACE (West) Entrance
  • Auditorium External View
  • Remodel AUX Gym LockerBath Rooms
  • Future Front Entrance Changes as Funding Allows Currently Not Included in Phase 1
  • Future New Front Entrance - Phase 3
  • Slide Number 25
  • Slide Number 26
  • Slide Number 27
  • Site and Building Designs
  • Parking Lot and Entrance Changes
  • Parking Lot Changes - Option 1
  • Parking Lot Changes - Option 2
  • Football Practice Field Relocation
  • Overall Site Plan (Draft)
  • Priority Evaluation Criteria
  • Needs Met
  • Updated Budgetary Construction Cost
  • Slide Number 37
  • Updated Budgetary Construction Cost ndash Cont
  • Slide Number 39
  • Phased Budgetary Cost ndash Cont
  • Building MaintenanceUtilities
  • Updated Storage Building Cost
  • Whatrsquos been spent to date
  • Possible Time Line