E.C.R. BUILDERS Company z ENGINEERS z CONTRACTORS z BUILDERS Profile OFFICE: Kehrani Zone RIICO Industrial Area BHIWADI, Distt. Alwar (Rajasthan)– 301 019 Cell : 9314013781, 9414013781, 09813688003 Telephones : 01493-514186 (Office), 01493-222293 (Resi.) Fax No:- 01493-512477, E-mail : [email protected]

Upload: others

Post on 13-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

E.C.R. BUILDERS

ENGINEERS CONT ENGINEERS ENGINEERS CONTRACTORS BUILDERS

Company Profile

OFFICE: Kehrani Zone RIICO Industrial Area BHIWADI, Distt. Alwar

(Rajasthan)– 301 019 Cell : 9314013781, 9414013781, 09813688003

Telephones : 01493-514186 (Office), 01493-222293 (Resi.) Fax No:- 01493-512477, E-mail : [email protected]

Page 2: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

INTORDUCTION

We avail this opportunity to introduce ourselves as one of the leading civil

construction company for civil and structural engineering work including

infrastructure and development (work).

E.C.R. builder is a concern set up by Mr. Esab Khan at Bhiwadi working since

last two decades in national capital region. ECRB is a team of leading

professionals and fully equipped with latest construction machinery as required

for civil and mechanical constructions and having a team of highly qualified &

experienced civil and structural engineers to deliver good quality workmanship

and high quality output. Our staff is well versed with most modern construction

techniques to suit the project requirement and time schedule.

For over 20 years, we have delivered top quality products on time and with in

budget by consistently utilizing communication coordination and planning.

Together the ECRB executive staff brings decades of combined experience to

every project. We strive to provide our clients with superior satisfaction,

unmatched quality, aggressive scheduling and most competitive price.

(IMRAN KHAN) Managing Director

Page 3: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

CHAIRMAN VIEW

Our every step is dedicated to development and for development there should be

arduous work blended with quality and time punctuality. Our main aim is to

achieve the development for everyone associated with us whether our self, our

valuable client or third one because development of us endivisouly is a golden

brick mortared in national development. This is why we have chosen to create a

wealth for future through constructing an infrastructure unique in quality without

costing on environment and to conservate our planet from starvation. This means

that we are going to adopt a policy named as ecco—friend, a burning

requirement of present time.

Our past experience of 25 years have taught us that construction is arena

where fighter clinging to honesty wins. We have to win the trust of our client by

hard & quality product. We have to win the soul of our team by free & developing

environment and these all can be achieved by sincere & endless efforts by all of

us.

In short our chant is to gain our goal coated with swept by honest,

arduous & quality work of our team not by alluding words.

(ESAB KHAN) Chairman

Page 4: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

OUR GOAL

Quality VISION MISSION

QUALITY

We achieve quality by our experienced engineering team.

: Customer Problem is our challenge. : Our Solution is customer relief. : Customer demands are our flexibility.

VISION

To Consciously face bigger challenges and continuously contribute growth and progress in order to build a meaningful world.

No one likes to consciously face challenges… But we do. We believe this world is full of challenges and life continuously provides the most challenging of situations when they are least expected….

It is in times of crises that we must gather our strengths to get the best out of a difficult situation or a challenging task and hence, our vision is to consciously face bigger challenges through innovative ideas in order to get the best results out of the same… The more challenging tasks we accept, the more bigger difficult situations we willingly face, the faster will be our growth and hence, ECR BUILDERS WORKS believes that in order to truly create a benchmark in one's life or field, one must consciously and deliberately develop the habit of facing the most biggest and difficult of challenges.

MISSION To be Honest in all our activities, dealings, and to consciously introspect our work and action on daily basis… ECR BUILDERS WORKS is a company that would consciously like to channel its resources, energy and activities towards building a world that is free of artificiality and low standard work. We will question every action of ours on minute-to-minute basis and see to it that we continuously take on bigger challenges and we must grow and progress on a daily basis in every thing that we do. We must progress as individuals, as a company and as a truly meaningful organization that is honest, fair in all its dealings.

Page 5: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

PROJECT MANAGEMENT

CONTROL

Sub contractors/ Labour shall be briefed b ECRB about the safety policy and site rules at an initial safety meeting, Decisions on all other matters affecting health and safety shall be taken so that the responsibilities of all parties are made clear before the commencement of work. Such matters include, inter alia.

1. Appropriate precautions and work methods for identified hazards or hazardous work.

2. Necessary plant and equipment and arrangements for its provision, maintenance, use and inspection.

3. Work force safety. 4. Arrangements for some form of induction training for new-starters on site. 5. Arrangements for promulgating health and safety information e.g. on site

notice board.

Health and safety arrangements shall be reviewed at the first project meeting, where the site management can set the tone for the conduct of work by resolving, at an early state, any difficulties which may raise.

CO-ORDINATION

The ECRB representative shall be totally responsible for compliance with health and safety codes, ECRB shall appoint a Safety Officer who will be sitting once a week and shall report to the Site in charge. ECRB’s representative shall make suitable arrangements to ensure the effective co-ordination of the work on site. He shall ensure that he is kept informed on a day-to-day basis of the progress and problems, which may arise. Clear lines of communication shall be established between the Client and the Safety Officer and sub-contractors and/or other contractors on site. Operatives will be made known whom to contact regarding health and safety matters. Such effective co-ordination will be enhanced by ensuring that “health and safety” figures show prominently on the agenda of regular project meetings the Safety Officer shall provide a weekly report to the Client.

MONITORING

Arrangements shall be made for health and safety monitoring on the Site on a regular basis. This will include not only ensuring the safety of such items as scaffolding, excavations and plant but also environmental matters such as hazardous dust, fumes, noise, etc.

RECORDS

The ECRB shall ensure that all statutory notifications, examinations and inspections are carried out and all records in relation thereto shall be maintained on site by the Safety Officers.

Page 6: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

QUALITY FEATURES OF OUR MANAGEMENT With motto of quality service upto satisfaction of our valuable clients, we are working in the field of residential & Industrial building construction. Our silent features are-

A highly qualified group of 45 engineers with wide range of experience.

Solid financial capacity having annual turn over of Rs. 450 million for

financial Year 2010-11.

Excellence managing power through 15 capable project managers.

Promise to timely delivery with each & every own machinery.

Assurance to safely completion with large group of safety persons.

Quick decision by decentralization of power to our staff.

Mid & Co-operative behavior

Innovative & Endeavourus nature.

Through above mentioned features, we are able to create trustable & friendly

relationship with our valuable clients. We understand the value of time & we

believe in the anecdote time & chance wait for non. This is why our every project

in past have been completed within reasonable time limit without bulging from

quality.

Our theme is timely delivery & quality products brings satisfaction to our clients

who ultimately declare us successful winner.

Page 7: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

OUR TESTIMIONALS

Page 8: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

OUR TESTIMIONALS

Page 9: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

OUR TESTIMIONALS

Page 10: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

OUR TESTIMIONALS

Page 11: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

Required Registration available for contract: PAN No. : AACFE 2602G

Service Tax No. : AACFE 2602GST 001

Sales Tax Tin No. : 08790854300

E.P.F. No. : RJ-16585

E.S.I. No. : 15/24614/101

H.S.T. No. : 06372707361

TAN No. : JPRE01679G

Page 12: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

ORGANIZATION CHART

Managing Director

Director Finance Director Projects Director Technical

Administration Accounts Purchase Tendering Billing Quality Engineer Engineer Engineer Time Keeper General Manager Project Manager

Deputy Project Manager Site Engineer

Supervisor Foreman Store Keeper

Page 13: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

BOARD OF DIRECTORS

Mr. ESAB KHAN (CHAIRMAN) The founder of ECR BUILDERS and guardian. By whose blessing, We are able to win in adverse condition. He is our real director inspiring us to be unique & successful in constructions industries. Having experience of 30 Years in construction, he is an idol for us. Er. IMRAN KHAN (MANAGING DIRECTOR) He has passed diploma in civil and B.Tech (Civil). Presently guiding us as MD. During past seven years restless effort, he has made us able to be successful in any adverse condition. Presently, he is looking after the marketing, co-ordination, project management teams & company policy. He is 28 years age wise but have taken the challenges tuff for experienced person. Mr. SUBADEEN KHAN (DIRECTOR FINANCE) The finance department is being handling by his guidance since past 17 years. The educational qualification of his is B.Com. He makes policy for administration & financial management. He has lead us to successful completion of Kirsh City. (A mega project at Tapukara, Bhiwadi). Mr. ALAM KHAN (DIRECTOR EXECUTION)

All projects are being executed under his guidance since 10 years. He is very experienced person. The successful completion of our past projects like Supreme Group (STPL & SNIPL), Dynamic Shells, Pearl Global, Springewel, Revex & Uttam Strips are attributed to his hard work.

Page 14: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

BOARD OF DIRECTORS

Mr. TABIB KHAN (VICE PRESIDENT EXECUTION)

He has rich experience of construction industries mainly in Mega Projects like – Bridge, Roads, & Multistory Building etc. He has 25 years experience in construction and B. Tech & MCE in civil. The smoothly running of all our projects is being coordinated by him.

Mr. N.K. BANSAL (ASSISTANT GENERAL MAANGER)

He has experience in construction of 16 years and qualification of B.Tech with expertization in project management, he is leading us toward successfully completion of Krish City despite of many hardles in way on.

Mr. N.K. SINGH (PROJECT MANAGER)

He has joined us on June 2008 as project manager. He has experience of 16 years industrials project execution and B.tech degree. He has executed successfully the projects likes Springwel, Victor Cable & New Adarsh etc.

Mr. WASIM AKRAM (PROJECT MANAGER)

He has joined us in 2005 as site engineer. He has seven year experience of site management. He has diploma in Architect & B.Tech in civil. He has given effortful constitution in execution of our major projects like Supreme Group, Pearl Global, Dynamic Shells, Toyzone, Eskay Nonwoven, Orange & SPA Hotel, expertality in execution & time punctuality are virtue.

Mr. SAMARJEET RATHI (MANAGER BILLING)

He has joined as on Sept. 2008 as billing Engineer. Having 15 years Experience in billing is a master of bills. He has B-Tech qualification. Accurate calculation of bills of Dynamic Shells, Uttam Strips, Kirsh Vatika has added a feather on our crown.

Mr. SAKIL AHMAD (PROJECT MANAGER)

He has joined us on Sept. 2008 as project manager. He has B-Tech (Civil) degree and 18 years rich experience of Industrial Project. He is expert in quantity surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable.

Mr. N.N. PANDEY (TENDERING ENGERING)

He has joined us in Nov 2008 as billing engineer. He has experience of 12 years of construction industrial buildings. He has worked for a Supreme Treves, Supreme Nonwovens, Dynamic Shells, & Bhavik Terryfab presently working us tender engineer.

Page 15: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

Mr. MAQSOOD AHMAD (PROJECT MANAGER)

He has diploma in civil engineering and 13 years of experience in civil construction. Presently handling our McCoy Soudal site at Bawal.

Er. PUNIT RAI (SENIOR MANAGER)

He has diploma in civil & six years of professional experience. He is a dynamic and growing member of our team. Presently working for our “dream project-Krish City”.

Page 16: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

WORKING GROUP E.C.R. Builders is a team of Construction Professionals having wide experience of construction work. E.C.R. Builders has been completed various projects in it’s short tenure within stipulated time. Brief Bio data of its key personals are as here under: S.No. Name Designation Qualification Experien

ce 1. Er. Mohd. Tabib Executive Vice President B.Tech MCE (Civil) 27 Years 2 Er. Jaspal Singh Advisor (Technical) B.Tech (Civil) 20 Years 3. Er. Shakeel Ahmad General Manager Diploma (Civil) 20 Years 4. Er. Jai Kishan Choud. General Manager B.E. (Civil) 22 Years 5 Er. N.K. Bansal Assist. General Manager B.Tech. (Civil) 20 Years 6. Er. N.K. Singh Project Manager B.Tech. (Civil) 15 Years 7. Er. M.P. Singh Project Manager Diploma (Civil) 10 years 8. Er. Shyam Singh Saini Project Manager Diploma (Civil) 10 Years 9. Er. Shashi Kant Project Manager B.Tech. (Civil) 13 Years 10. Er. Wasim Akram Project Manager B.Tech. (Civil) 6 Years 11. Er. Nagendera Pandey Tendering Engineer Diploma (Civil) 9 Years 12. Er. Samarjeet Rathi Project Manger (Billing) Diploma (Civil) 17 Years 13. Er.Triveni Gupta Engineer (Billing) B.Tech. (Civil) 15 Years 15. Er. Punit Rai Quality Engineer Diploma (Civil) 7 Year 16. Er. Ankit Deputy Project Manager B.Tech (Civil) 5 Years 17. Er. Srivastav Deputy Project Manager Diploma (Civil) 4 Years 18. Er. Arif Site Engineer B.Tech. (Civil) 5 Years 19. Er. Pawan Kr. Yadav Site Engineer Diploma (Civil) 9 Years 20. Er. Deepak Site Engineer Diploma (Civil) 5 Years 21. Er. Sakir Site Engineer Diploma (Civil) 3 Years 22. Er. Balwant Singh Site Engineer Diploma (Civil) 2 Years 23. Er. Hardeep Site Engineer Diploma (Civil) 3 Years 24. Shiv Prakash Site Engineer Diploma (Civil) 2 Years 25. Mr. Vineet Purchase Manager MBA 3 Years 26. Jafruddin Sr. Foreman B.Sc. 18 Years 27. Virender Kumar Sr. Foreman B.A. 18 Year 28. Devdutt Sr. Foreman B.A. 18 Year 29 Rakesh Sr. Foreman B.A 6 Year 30. Jyoti Shankar Tirpathi Sr. Foreman B.A 7 Year 31. Rajesh Kumar Sr. Foreman B.Sc 7 Year 32. Gautam Sr. Foreman B.Sc 18 Year 33. Mr. Arif Foreman B.A. 3 Years 34. Shankar Singh Foreman B.A. 5 Years 35. Ramesh Foreman B.A. 5 Years 36. Harender Foreman B.Sc. 5 Years 37. Parmod Foreman Intermediate 10 Years 38. Suresh Foreman Intermediate 8 Years

Page 17: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

39. Nasim Foreman Intermediate 6 Years 40. Mukesh Kumar Foreman B.A. 12 Years 41. Dayanand Foreman B.A. 15 Years 42. Mubarik Foreman B.A. 5 Years 43. Jagdish Foreman B.A. 8 Years 44. Sanjeev Foreman B.Com 12 Years 45. S.Pandey Foreman B.Sc. 6 Years 46. Rakesh Foreman B.Sc 5 Years 47. Nasir Foreman B.A. 5 Years 48. Sanjeev Foreman M.Sc 6 Years 49. Bans Bahadur Foreman B.Sc 5 Years 50. Ramswaroop Foreman B.A. 7 Years 51. Tirpathi Foreman B.Sc 13 Years 52. Mahipal Foreman B.A. 4 Years 53. Jang bahadur Supervisor Intermediate 3 Years 54. Yadunath Singh Supervisor Intermediate 3 Years 55. Beer Singh Supervisor High School 5 Years 56. Babu Lal Supervisor High School 10 Years 57. Vijay Supervisor B.A. 2 Years 58. Sudheer Supervisor B.A. 3 Years 59. Manoj Supervisor Intermediate 2 Years 60. Mr. Jaswant Supervisor B.A. 3 Years 61. Mr. Imran Supervisor Intermediate 3 Years 62. Mr. Jaswant Singh Supervisor Intermediate 3 Years 63. Mr. Sarfaraj Superivisor B.A. 3 Years 64. Mr. Pramod Supervisor B.A. 2 Years 65. Mr. Pankaj Yadav Supervisor Intermediate 2 Years 66. Mr. Sarfraj Supervisor Intermediate 2.5 Years 67. Mr. Sikandar Ali Supervisor B.A 1 Years 68. Mr. Ravinder Supervisor B.A 3 Years 69. Mohd. Tariq Supervisor Intermediate 2 Years 70. Mr. Ravi Supervisor Intermediate 3 Years 71. Mr. Suraj Supervisor Intermediate 4 Years 72. Mr. Mithe Lal Supervisor Intermediate 2 Years 73. Mr. Ibrahim Supervisor B.Sc 2 Years 74. Mr. Rajdev Supervisor High School 2 Years 75. Mr. Abdul Supervisor B.A. 3 Years 76. Chandan Sr.Store Incharge B.Sc. 4 Years 77. Subedeen Store Incharge High School 2 Years 78. Shahid Khan Store Keeper B.A. 4 Years 79. Alam Store Keeper Intermediate 2 Years 80. Sher Singh Jr. Store Keeper High School 2 Years 81. Javed Electrician ITI 2 Years 82. Jitender Mechinaci ITI 2 Years 83. Mr. Mohan Mechanic ITI 3 Years 84. Mohd. Izhar Material & Safety

officer B.Sc. 11 Years

Page 18: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

SERVICES: Drivers : 15 Nos.

Watchman : As required

Office Boy : 10 Nos.

AUDITORS: M/s Brijmohan & Associates Chartered Accountants BHIWADI (Raj.) ACCOUNT DEPARTMENT: B. L Garg G.M. Commercial

Vinod Kumar Manager Accounts

Manoj Kumar Bhardwaj Accountant

Page 19: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

LIST OF MACHINERY OWNED BY THE COMPANY

The Type of machinery we use for construction is of the dale of the art technology and also the best in quality. The following segment includes a list of all the types of machines we posses. Each and every employee of our company is thought how to operate these machines with ease and what is to be done if a problem arises in the operation of these machines. S.No. Name of Equipment Quantity

1. Vacuum De-watering Flooring Trimix Machine 4 Nos.

2. Mixer with hopper 12 Nos.

3. Mixture without Hopper 25 Nos.

3. Vibrator 60 Nos.

4. Surface Vibrator 12 Nos.

5. Theo-dolite 15 Nos.

6. Dumpy Level 18 Nos.

7. Welding Set 15 Nos.

8. Bar Cutting Machine 10 No.

9. Marble Cutter 8 Nos.

10. Floor Grinding Machine 8 Nos.

11. Big Kota Stone Cutter 5 Nos.

12. Groove Cutting Machine in Floors 6 Nos.

13. Mono Block Pumps 15 Nos.

14. Mould Cube 120 Nos.

15. 15 KVA Generator Set 5 No.

16. 62.5 KVA Generator 2 No.

17. Tractor with trolley 7 Nos.

18. Drill Machine (Pedestal) 10 Nos.

19. Concrete Demolishing Hammer 8 Nos.

20. Hammer Drill 4 Nos.

21. Earth Compactor 8 No.

22. Concrete Cutter 3 No.

23. Vehicle (Jeep) 6 Nos.

24. Syntex PVC Water Tanks 20 Nos. 25. Safety accessories (Helmets, Shoes, Gloves, Nets

etc Adequate

26. Shuttering Material and scaffolding Adequate

Page 20: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

27. Poclain, JCB, Doser & Hoisting Arrangement for

High rise activities Two JCB Rest

Available to us on demand

28. Pneumatic Hammers 10 Nos 29. Hand Grinders 15 Nos 30. Cube Testing Machines 20 Nos 31. Sieve Sets 15 Set 32. Digital Balance 7 Nos 33. Slump Cones 16 Sets

Page 21: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

PROJECTS (Under Progress)

Client : M/s Krish City Architect : Shilpaakar Cost of Project : 5000 Lacs Completion Period : 14 Month Client : M/s Uttam Strips Pvt. Ltd., Bhiwadi Architect : Shilpaakar Cost of Project : 700 Lacs Completion Period : 270 Days Client : M/s Spring Wel Mattresses (P) Ltd Architect : Shilpaakar Cost of Project : 600 Lacs Completion Period : 6 Months Client : M/s Asahi India Glass Ltd, Bawal Architect : Anma Architect Cost of Project : 650 Lacs Completion Period : 180 Days Client : M/s McCoy Soudal Sealants Adhesives & Foam (P) Ltd, Bawal Architect : Shilpaakar Cost of Project : 600 Lacs Completion Period : 180 Days Client : M/s Krish Mall Architect : Shilpaakar Cost of Project : 1200 Lacs Completion Period : 12 Months Client : M/s BASF India Ltd Architect : Spectrum Pharma Tech Consultants (P) Ltd Cost of Project : 150 Lacs Completion Period : 3 Months Contact No. : ………………………………. Client : M/s Om Shree Ram Packaging (P) Ltd Architect : Shilpaakar Cost of Project : 200 Lacs Completion Period : 3 Months

……………

Page 22: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

PROJECTS (COMPLETED)

Client : M/s Revex Enterprises (P) Ltd Architect : S.N. Engineers Cost of Project : 300 Lacs Completion Period : 5 Months Client : M/s Krish vatika Architect : Cost of Project : 200 Lacs Completion Period : 5 Months Client : M/s Supreme Group (STPL & SNIPL), Bawal (Expansion) Architect : Architect Nook Pvt. Ltd. Cost of Project : 200 Lacs Completion Period : 90 Days Client : M/s Uttam Galwa India Ltd Architect : Shilpaakar Cost of Project : 800 Lacs Completion Period : 8 Months Client : M/s New Adarsh Re-Rolling Rolls, Chopanki Architect : Shilpaakar Cost of Project : 250 Lacs Completion Period : 120 Days Client : M/s Orange Hotel Spa & Resorts Pvt. Ltd. Architect : Genesiss Cost of Project : 150 Lacs Completion Period : Continuing Client : M/s Eskay Nonwoven Industries Ltd. Architect : Shilpaakar Cost of Project : 100 Lacs Completion Period : 6 Months Client : M/s Pearl Global Limited, Bawal (Haryana) Architect : Aura Cost of Project : 400 Lacs Completion Period : 6 Months Client : M/s Bhavic Terry Fab. (P) Ltd Architect : S.S. & Associates Cost of Project : 500 Lacs Completion Period : 8 Months

Page 23: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

Client : M/s Dynamic Shells (India) Pvt. Ltd., Bawal Architect : The Novarch Cost of Project : 250 Lacs Completion Period : 120 Days Client : M/s Supreme Group (STPL & SNIPL), Bawal Architect : Architect Nook Pvt. Ltd. Cost of Project : 500 Lacs Completion Period : 180 Days

Client : M/s XL Laboratories Pvt. Ltd., Bhiwadi Architect : Ahuja & Associates, GK-I, Delhi Cost of Project : 340 Lacs Completion Period : 365 Days Client : M/s Asatic Electricals & Switchgears Pvt. Ltd. Architect : Shilpaakar Cost of Project : 125 Lacs Completion Period : 150 Days Client : M/s Toy Zone Impex., Bhiwadi Architect : Shilpaakar Cost of Project : 100 Lacs Completion Period : 55 Days Client : M/s Victor Cables (P) Ltd Architect : Shilpaakar Cost of Project : 150 Lacs Completion Period : 4 Months Client : M/s Mukut Bihari & Sons (P) Ltd, Chopanki Architect : Shilpaakar Cost of Project : 80 Lacs Completion Period : 120 Days Client : M/s Slick Helmets Unit-II, Bhiwadi Architect : Structural Design Group Cost of Project : 210 Lacs Completion Period : 240 Days Client : M/s Dhawan Box Sheet Containers, Chopanki Architect : Structural Design Group Cost of Project : 110 Lacs Completion Period : 150 Days Client : M/s Waves Aircon Pvt. Ltd. (Expansion Work) Architect : Shilpaakar Cost of Project : 300 Lacs Completion Period : Continuing

Page 24: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

Client : M/s Waves Aircon Pvt. Ltd. Architect : ………………………….. Cost of Project : 25 Lacs Completion Period : 120 Days Client : M/s Asiatic Industries, Chopanki Architect : Sagoo & Associates Cost of Project : 90 Lacs Completion Period : 5 Months Client : M/s M. J. Structure Pvt. Ltd., Bhiwadi Architect : ………………………….. Cost of Project : 50 Lacs Completion Period : 90 Days Client : M/s Hardesh Dhingra, Khushkhera Architect : Shilpaakar Cost of Project : 150 Lacs Completion Period : 150 Days Client : M/s Vijay Dhingra, Khushkhera Architect : Shilpaakar Cost of Project : 150 Lacs Completion Period : 150 Days Client : M/s Bharat Bhushan Wadhva, Khushkhera Architect : Shilpaakar Cost of Project : 50 Lacs Completion Period : 90 Days Client : M/s Richlook Apparels Architect : Shilpaakar Cost of Project : 55 Lacs Completion Period : Continuing Client : M/s Paragon Autotech, Bhiwadi Architect : Structural Design Group Cost of Project : 190 Lacs Completion Period : 210 Days Client : M/s Himskaf Systems Pvt. Ltd., Bhiwadi Architect : Shilpaakar Cost of Project : 135 Lacs Completion Period : 120 Days Client : M/s Pavish Textiles, Bhiwadi Architect : Structural Design Group Cost of Project : 315 Lacs Completion Period : 365 Days

Page 25: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

Client : M/s Slick Helmets Unit-I, Bhiwadi Architect : Structural Design Group Cost of Project : 90 Lacs Completion Period : 120 Days Client : M/s Rishab Plastopack Pvt. Ltd., Bhiwadi Architect : Inder & Associates Cost of Project : 170 Lacs Completion Period : 210 Days Client : M/s PTC Industries Architect : Shiplaakar Cost of Project : 60 Lacs Completion Period : 120 Days Client : M/s Shaheed Anant Filling Station, Shimla (Rampur) Architect : Bharat Petroleum Cost of Project : 80 Lacs Completion Period : 120 Days Client : M/s M. I. Cables, Bhiwadi Architect : ------- Cost of Project : 25 Lacs Completion Period : 60 Days Client : M/s M. J. Structure (An ISO:9002 Certified Co.) Architect : Structural Design Group Cost of Project : 95 Lacs Completion Period : 120 Days Client : M/s Puran Sons & Alloys Architect : Structural Design Group Cost of Project : 90 Lacs Completion Period : 120 Days Client : M/s Deepak Industries Architect : Shilpkaar Cost of Project : 20 Lacs Completion Period : 120 Days Client : M/s Satyam Industries Architect : Shilpkaar Cost of Project : 25 Lacs Completion Period : 120 Days Client : M/s Krishana Hammer Architect : Structural Design Group Cost of Project : 90 Lacs Completion Period : 120 Days

Page 26: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

Client : M/s Flowell Profiles Pvt. Ltd. Architect : ……………………………… Cost of Project : 30 Lacs Completion Period : 60 Days Client : M/s Dipin Chemicals Architect : …………………….. Cost of Project : 25 Lacs Completion Period : 120 Days Client : M/s Apex Plastics Pvt. Ltd. Architect : Shilpkaar Cost of Project : 25 Lacs Completion Period : 80 Days Client : M/s Golden Bottling Pvt. Ltd. Architect : Structural Design Group Cost of Project : 200 Lacs Completion Period : 240 Days Client : M/s Bajrang Bali Polymers Architect : Structural Design Group Cost of Project : 20 Lacs Completion Period : 60 Days Client : M/s Abhishak Impax Pvt. Ltd. Architect : ………………………………. Cost of Project : 20 Lacs Completion Period : 60 Days Client : M/s Kamdhenu Ispat Ltd. (Expansion) Architect : ………………………….. Cost of Project : 15 Lacs Completion Period : 60 Days Client : M/s Bhiwadi Polymers Pvt. Ltd., Manesar (Hr.) Architect : ……………………………… Cost of Project : 15 Lacs Completion Period : 50 Days Client : M/s Kaenat Glass Pvt. Ltd. Architect : Shilpaakar Cost of Project : 70 Lacs Completion Period : 100 days. Client : M/s Kailash Bobbins Pvt. Ltd., Chopanki Architect : Shilpaakar Cost of Project : 30 Lacs Completion Period : 65 Days

Page 27: BUILDERS Company Profile2.imimg.com/data2/IG/QV/MY-/profile-1.pdf · surveying & project costing. His sincere effort for timely completion of Krish Mall & Pearl Global is really admirable

ECR BUILDERS BETTER PEOPLE BETTER WORK

Client : M/s Dhawan Box Sheet Containers Pvt. Ltd. (Expansion)

Architect : Akhil & Associates Cost of Project : 110 Lacs Completion Period : 140 Days Client : M/s BMP Metals Pvt. Ltd., Bhiwadi Architect : Akhil & Associates Cost of Project : 35 Lacs Completion Period : 60 Days Client : M/s Rishabh Plastopack, Bhiwadi Architect : Inder & Associates Cost of Project : 50 Lacs Completion Period : 75 Days Client : M/s K. K. Metals Pvt. Ltd., Bhiwadi Architect : Cost of Project : 30 Lacs Completion Period : 140 Days Client : M/s Gagan Chauhan, Khushkhera Architect : Shilpaakar Cost of Project : 60 Lacs Completion Period : 75 Days Client : M/s Vivek Bhambhani Architect : Cost of Project : 50 Lacs Completion Period : Continuing

……………