![Page 1: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”](https://reader031.vdocuments.us/reader031/viewer/2022030423/5aab022f7f8b9aa06a8b6be3/html5/thumbnails/1.jpg)
© TSenergyGroup | 2014 1
BTS Biogas Srl/GmbH Company Overview
![Page 2: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”](https://reader031.vdocuments.us/reader031/viewer/2022030423/5aab022f7f8b9aa06a8b6be3/html5/thumbnails/2.jpg)
© TSenergyGroup | 2014 2
BTS Biogas, is active in the design, engineering and construction of turnkey or modular biogas power plants with a rated capacity of 50 kW to 1.5 MW+. With an experience of more than twenty years, BTS has built 170 plants with a total capacity of 134 MW. With its full-service contracts, the company offers a complete package for operators comprising maintenance, servicing and biological optimization. BTS’s activities cover the entire value chain, from biomass cultivation to the use of digestate. BTS Biogas engineers plants that make exclusive use of agricultural residues such as wheat, rice or corn straw, manure, landscaping material and organic wastes. The company has 120 employees (biologists, technicians, chemists and agronomists) committed to product development and enhancement at BTS Biogas. Their competence and over twenty years of experience in the energy sector make TS energy GROUP, to which BTS Biogas and GTS Syngas are affiliated, Italy’s biggest operator for one-stop shopping in the field of biogas.
Short description
![Page 3: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”](https://reader031.vdocuments.us/reader031/viewer/2022030423/5aab022f7f8b9aa06a8b6be3/html5/thumbnails/3.jpg)
© TSenergyGroup | 2014 3
Development of Revenue Engineering + Monitoring of plants
31,497,272 €
46,426,368 €
74,804,969 €
0 €
10,000,000 €
20,000,000 €
30,000,000 €
40,000,000 €
50,000,000 €
60,000,000 €
70,000,000 €
80,000,000 €
2010 2011 2012 2013
60% growth in 2012, continues for 2013, especially in Asia. Since beginning of 2014 active in USA, 120 academic co-workers; engineers, chemists and technicians.
![Page 4: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”](https://reader031.vdocuments.us/reader031/viewer/2022030423/5aab022f7f8b9aa06a8b6be3/html5/thumbnails/4.jpg)
© TSenergyGroup | 2014 4
The Group
BIOGAS SYNGAS AGRICULTURE
![Page 5: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”](https://reader031.vdocuments.us/reader031/viewer/2022030423/5aab022f7f8b9aa06a8b6be3/html5/thumbnails/5.jpg)
© TSenergyGroup | 2014 5
1992 - 2002 2002 - 2007 2007 - 2011 2002 - 2007 1992 - 2002 2007 - 2011 2011
• UTS Umwelt Technik Süd GmbH • 1996 first biogas power plant in Italy
• UTS Italia Tecnologie Ambientali srl • 2006 first Info Biogas
• 2007 new owner • 2008 B.T.S. Italia • 2009 BTS Biogas GmbH
• 2011 GTS Syngas GmbH • 2012 International Centre Affi • 2013 BTS goes Japan
UTS Umwelt Technik Süd GmbH
UTS Italia Tecnologie Ambientali srl
BTS Biogas GmbH
TS energy Group goes abroad
Our company in a glance
Growth in 2012 – 60%
![Page 6: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”](https://reader031.vdocuments.us/reader031/viewer/2022030423/5aab022f7f8b9aa06a8b6be3/html5/thumbnails/6.jpg)
© TSenergyGroup | 2014 6
Our company: subsidiaries
Logistics & International Training Centre Affi (VR) – Italy 800 m² offices 3500 m² warehouse 18500 m² surface
METANlab laboratory Porto Mantovano (MN) Italy
First company in Italy with an own
biogas laboratory - METANlab
![Page 7: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”](https://reader031.vdocuments.us/reader031/viewer/2022030423/5aab022f7f8b9aa06a8b6be3/html5/thumbnails/7.jpg)
© TSenergyGroup | 2014 7
Products
• Turnkey biogas power plants (modules from 50 kW up to 1.5 MW+)
which can flexibly be combined and multiplied
• Possible use of various types of biomass
• Costumized solutions (for the farmers, industrial agronomists,
communities and investors in many countries)
• Software development for our customers
![Page 8: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”](https://reader031.vdocuments.us/reader031/viewer/2022030423/5aab022f7f8b9aa06a8b6be3/html5/thumbnails/8.jpg)
© TSenergyGroup | 2014 8
Integrated technologies
![Page 9: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”](https://reader031.vdocuments.us/reader031/viewer/2022030423/5aab022f7f8b9aa06a8b6be3/html5/thumbnails/9.jpg)
© TSenergyGroup | 2014 9
• By means of our own laboratory "METANlab" we’re able to optimize the seed, the harvest, the silage and the biochemical operation of the biogas power plants of our customers
• An occupancy rate of at least 8,000 full-load hours per year • Automation and software development
Control of complete value chain
![Page 10: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”](https://reader031.vdocuments.us/reader031/viewer/2022030423/5aab022f7f8b9aa06a8b6be3/html5/thumbnails/10.jpg)
© TSenergyGroup | 2014 10
Plants
• Over 20 years of experience in agriculture – in the design, construction and operation of biogas power plants (modules from 50 KW up to 1.5 MW)
• A “Repowering” of biogas power plants with the BIOaccelerator technology (accelerated fermentation and increase of the methane yield thanks to the pre-treatment of the biomass)
• Full Service - maintenance, technical service and biological support
![Page 11: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”](https://reader031.vdocuments.us/reader031/viewer/2022030423/5aab022f7f8b9aa06a8b6be3/html5/thumbnails/11.jpg)
© TSenergyGroup | 2014 11
BTS Bio Gas Plants are Superior to Other Bio Gas Plants
• 20 years of experience in building and operating a large numbers of plants
• Pre treatment of substrates (raw materials) with BTS “BIOaccelerator” allows to use various different substrates at high yield
• Continuous monitoring (online) of the digestion parameters in combination with the use of the Dina METAN software allows at any time to calculate the optimum available feed stock addition to the reaction in process
• This allows to guarantee performance of 8000 hours per year production at full capacity
![Page 12: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”](https://reader031.vdocuments.us/reader031/viewer/2022030423/5aab022f7f8b9aa06a8b6be3/html5/thumbnails/12.jpg)
© TSenergyGroup | 2014 12
BTS Technology Highlights
Profitability of a bio gas plant depends on the productivity level of such a difficult bio gas process • BIOseparator • BIOaccelerator • METANmax • ɳ[ETA]max • NITROstripp & BIOdry
![Page 13: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”](https://reader031.vdocuments.us/reader031/viewer/2022030423/5aab022f7f8b9aa06a8b6be3/html5/thumbnails/13.jpg)
© TSenergyGroup | 2014 13
Average: 8.667 h
kWh % of Pos. [kW] Jan-Dec 2012 Full production
Full running hours
Soresina 1 634 5.538.512 99,46 8.736 Zambelli 2 996 8.651.679 98,88 8.686
AGT 1 3 999 8.671.338 98,82 8.680 BMZ 4 995 8.634.566 98,75 8.678
Finato 5 700 6.064.662 98,65 8.664 Volpi 6 998 8.640.561 98,58 8.658
Gallmann 7 997 8.626.082 98,49 8.652 Grazioli 8 250 2.162.177 98,44 8.649
Martinoni 9 526 4.543.925 98,28 8.639 Ghione 10 990 8.539.829 98,20 8.626
Top Ten Best Performance Plant
![Page 14: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”](https://reader031.vdocuments.us/reader031/viewer/2022030423/5aab022f7f8b9aa06a8b6be3/html5/thumbnails/14.jpg)
© TSenergyGroup | 2014 14
Thank you for your patience