bsnl phase ii

Upload: mahesh-kumar

Post on 04-Apr-2018

228 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 Bsnl Phase II

    1/47

    PHASE 2

  • 7/29/2019 Bsnl Phase II

    2/47

  • 7/29/2019 Bsnl Phase II

    3/47

    Introduction to the project

    Project is based on the installation of WiMAX

    equipments in rural areas of North India.

    The project is in 2 phases

    South phase (already done)North phase ( on process)

  • 7/29/2019 Bsnl Phase II

    4/47

    What is the need of WiMAX? To extend reach and coverage ,WiMAX

    purpose is to provide voice, video and data

    service requirements of customers.

    To extend wire free coverage to pockets withlimited or no wire-line coverage.

    To provide IP services.

    For providing mobility to broadband users.

  • 7/29/2019 Bsnl Phase II

    5/47

    Roles and Responsibility Understanding of BTS site details.

    Preparing BTS survey schedule with coordinator.

    Site survey report cross checking &

    verification(QC). Learning RF planning to finalize BTS location and

    optimization of the network.

    Randomly BTS site visit with circle projectmanager.

    Installation of BTS sites with companies technicalengineer.

  • 7/29/2019 Bsnl Phase II

    6/47

    GENERAL ARCHITECTURE OF

    BSNL CONNECTIVITYIN INDIA

  • 7/29/2019 Bsnl Phase II

    7/47

  • 7/29/2019 Bsnl Phase II

    8/47

    MPLSCLOUD

    OROFC

    ASN /CSNBNGVLAN

    ID

    SWITCH

    GEI

    TX

    WIMAX

    LINK

    TOWER

    CONNECTIVITY OF USER WITH INTERNET

  • 7/29/2019 Bsnl Phase II

    9/47

    SITE SURVEY

  • 7/29/2019 Bsnl Phase II

    10/47

    Site survey1) Check for basic Infra material like tower,

    specification of pole, presence of electricity.

    2) Existing Radiation Patterns (Height anddiameter of Antenna, Microwave) .

    3) Space in the BS site, parabolic photo, cablelength ,CPE survey ,LOS, place for CPEmounting.

    4) Making of site survey Report, with building ,shelter , lay out diagrams.

    5) Pole at CPE and Tower extension at BS ifrequired

  • 7/29/2019 Bsnl Phase II

    11/47

  • 7/29/2019 Bsnl Phase II

    12/47

    RF-Planning

  • 7/29/2019 Bsnl Phase II

    13/47

  • 7/29/2019 Bsnl Phase II

    14/47

    Steps for RF-Planning Area Survey to check hot spots.

    Details of clutter of area.

    Location of BS.

    Sectorial orientation

    Location of CPE.

    Link feasibility.

  • 7/29/2019 Bsnl Phase II

    15/47

  • 7/29/2019 Bsnl Phase II

    16/47

  • 7/29/2019 Bsnl Phase II

    17/47

  • 7/29/2019 Bsnl Phase II

    18/47

  • 7/29/2019 Bsnl Phase II

    19/47

  • 7/29/2019 Bsnl Phase II

    20/47

  • 7/29/2019 Bsnl Phase II

    21/47

  • 7/29/2019 Bsnl Phase II

    22/47

    SELECTION OF THE DLC METHOD

  • 7/29/2019 Bsnl Phase II

    23/47

    PROVIDING CLUTTER DETAILS

  • 7/29/2019 Bsnl Phase II

    24/47

  • 7/29/2019 Bsnl Phase II

    25/47

  • 7/29/2019 Bsnl Phase II

    26/47

    ANTENNA CARRIER ADJUSTMENT

  • 7/29/2019 Bsnl Phase II

    27/47

  • 7/29/2019 Bsnl Phase II

    28/47

  • 7/29/2019 Bsnl Phase II

    29/47

  • 7/29/2019 Bsnl Phase II

    30/47

  • 7/29/2019 Bsnl Phase II

    31/47

    DIFFERENT LAYERS IN WIMAX

  • 7/29/2019 Bsnl Phase II

    32/47

  • 7/29/2019 Bsnl Phase II

    33/47

  • 7/29/2019 Bsnl Phase II

    34/47

  • 7/29/2019 Bsnl Phase II

    35/47

  • 7/29/2019 Bsnl Phase II

    36/47

  • 7/29/2019 Bsnl Phase II

    37/47

    INSTALLATION OF FEEDER CABLES

  • 7/29/2019 Bsnl Phase II

    38/47

  • 7/29/2019 Bsnl Phase II

    39/47

  • 7/29/2019 Bsnl Phase II

    40/47

    INSTALLATION OF FEEDER CABLES INTO BTS

  • 7/29/2019 Bsnl Phase II

    41/47

    BATTERY INSTALLATION

  • 7/29/2019 Bsnl Phase II

    42/47

  • 7/29/2019 Bsnl Phase II

    43/47

  • 7/29/2019 Bsnl Phase II

    44/47

  • 7/29/2019 Bsnl Phase II

    45/47

    INSERTING MODULES INTO BTS

  • 7/29/2019 Bsnl Phase II

    46/47

  • 7/29/2019 Bsnl Phase II

    47/47