8 East Broadway 24 EAST BROADWAY & 2520 ONTARIO ST. | VANCOUVER Page 12 Applicable Policies and Guidelines May 2018 City of Vancouver Land Use and Development Policies and Guidelines Planning, Urban Design and Sustainability Department 453 West 12th Avenue, Vancouver, BC V5Y 1V4 | tel: 3-1-1, outside Vancouver 604.873.7000 | fax: 604.873.7100 website: vancouver.ca | email: [email protected] | app: VanConnect GREEN BUILDINGS POLICY FOR REZONINGS Adopted by City Council on July 22, 2010 Amended June 25, 2014, February 7, 2017 and May 2, 2018 (Applies to rezoning applications after May 1, 2018) All rezonings must meet the following requirements of either: A. Near Zero Emissions Buildings, or B. Low Emissions Green Buildings. This policy is effective immediately, and shall be mandatory for all Rezoning Applications received on or after May 2, 2018, with exceptions permitted at the discretion of the Director of Planning. For rezoning Applications received prior to May 2, 2018 that have not yet been approved by Council, applicants may choose to meet this updated version of the Policy or the preceding version. REQUIREMENTS A. Near Zero Emissions Buildings (1) Near Zero Emissions Building Standard Projects shall be designed to meet Passive House requirements and apply for certification, or to an alternate near zero emissions building standard, such as the International Living Future Institute’s Zero Energy Building Certification, as deemed suitable by the Director of Sustainability. AND (2) Energy System Sub-Metering and Reporting Projects shall meet the requirements for Energy System Sub-Metering and Reporting, as described in B.5 of this policy. AND (3) Low-Emitting Materials Projects shall be designed to minimize emissions from interior materials containing volatile organic compounds (VOCs) or added urea formaldehyde, as described in B.8 of this policy. OR WHAT IS AN AREA PLAN? Area plans are policy documents that provide guidance and direction on a variety of topics, including: land use, urban design, housing, transportation, parks and public spaces, cultural infrastructure, social planning, heritage features and community facilities. WHY IS AN AREA PLAN IMPORTANT? The City seeks to leverage the opportunity of the Broadway Subway by coordinating comprehensive planning for the Broadway area with the delivery of the rapid transit project. The Broadway Plan will provide for a coordinated review of land use, amenities, housing, services, transportation and infrastructure throughout the study area. FIRST NATIONS The Broadway Plan area is a significant area of land, and is central within the unceded traditional homelands of the Musqueam, Squamish and Tsleil-Waututh Nations. WHO CREATES AN AREA PLAN? Throughout the planning program, staff look to engage the broadest range of people in the Broadway study area, including those of different cultural backgrounds, ages, incomes, renters and owners, and businesses. HOW LONG WILL IT TAKE TO DEVELOP THE PLAN? The Broadway Plan is expected to be completed for Council’s consideration in late 2020. Clark Drive Vine Street Broadway 16th Avenue 1st Avenue Granville St Burrard St Arbutus St 4th Ave Oak St Main St Kingsway Cambie St False Creek Cambie Br Granville Br Great Northern Way Broadway Plan Study Area Millennium Line Broadway Subway Project Potential Future extension Elevated SkyTrain Tunneled SkyTrain and Station Locations BROADWAY PLAN Phase 1 Background Phase Phase 2 Phase 3 Phase 4 Engagement DEC DEC JAN JUN MAY APR MAR FEB AUG NOV 2019 SEP OCT JUL JAN JUN MAY APR MAR FEB JUL DEC AUG NOV SEP OCT JUL AUG SEP NOV OCT 2018 2020 Engagement Engagement Engagement Engagement Engagement Guiding Principles Background Phase Emerging Directions Refining Directions Finalizing Plan we are here APPROVED BY CITY COUNCIL NOVEMBER 18, 2010 Mount Pleasant Community Plan Current Situation, Planning & Next Steps VANCOUVER’S INNOVATION ECONOMY JESSIE ADCOCK | Chief Digital Officer CORY DOBSON | Planning & Development Services The proposal has been designed within the current framework of City policies, Official Community Plans, and Planning Guidelines, specifically: - Broadway Plan (Ongoing) - Metropolitan Core Jobs & Economy Land Use Plan (2007) - Mount Pleasant Community Plan (2010) - Mount Pleasant Implementation Policy (2013) - Mount Pleasant Public Realm Plan and Public Benefits Strategy (2013) - Vancouver’s Innovation Economy Plan (2009) - Green Buildings Policy for Rezonings (2012) - Culture Plan: Strategic Directions (2014) - Plaza Design Guidelines (1992) - Central Broadway C-3A Urban Design Guidelines (1976) 02 Planning Context

Upload: others

Post on 19-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BROADWAY PLAN Mount Pleasant Community Plan€¦ · The Broadway Plan area is a significant area of land, and is central within the unceded traditional homelands of the Musqueam,

8 Eas t B roadway 2 4 E A S T B R O A D WAY & 2 5 2 0 O N TA R I O S T. | VA N C O U V E R

Page 12

Applicable Policies and Guidelines

May 2018

City of Vancouver Land Use and Development Policies and Guidelines

Planning, Urban Design and Sustainability Department 453 West 12th Avenue, Vancouver, BC V5Y 1V4 | tel: 3-1-1, outside Vancouver 604.873.7000 | fax: 604.873.7100 website: vancouver.ca | email: [email protected] | app: VanConnect

GREEN BUILDINGS POLICY FOR REZONINGS

Adopted by City Council on July 22, 2010Amended June 25, 2014, February 7, 2017 and May 2, 2018

(Applies to rezoning applications after May 1, 2018)

All rezonings must meet the following requirements of either:

A. Near Zero Emissions Buildings, orB. Low Emissions Green Buildings.

This policy is effective immediately, and shall be mandatory for all Rezoning Applications received on or after May 2, 2018, with exceptions permitted at the discretion of the Director of Planning. For rezoning Applications received prior to May 2, 2018 that have not yet been approved by Council, applicants may choose to meet this updated version of the Policy or the preceding version.

REQUIREMENTS

A. Near Zero Emissions Buildings(1) Near Zero Emissions Building Standard

Projects shall be designed to meet Passive House requirements and apply for certification, or to an alternate near zero emissions building standard, such as the International Living Future Institute’s Zero Energy Building Certification, as deemed suitable by the Director of Sustainability.

AND

(2) Energy System Sub-Metering and ReportingProjects shall meet the requirements for Energy System Sub-Metering and Reporting, as described in B.5 of this policy.

AND

(3) Low-Emitting MaterialsProjects shall be designed to minimize emissions from interior materials containing volatile organic compounds (VOCs) or added urea formaldehyde, as described in B.8 of this policy.

OR

vancouver.ca/broadwayplan

WHAT IS AN AREA PLAN?

Area plans are policy documents that provide guidance and direction on a variety of topics, including: land use, urban design, housing, transportation, parks and public spaces, cultural infrastructure, social planning, heritage features and community facilities.

WHY IS AN AREA PLAN IMPORTANT?

The City seeks to leverage the opportunity of the Broadway Subway by coordinating comprehensive planning for the Broadway area with the delivery of the rapid transit project. The Broadway Plan will provide for a coordinated review of land use, amenities, housing, services, transportation and infrastructure throughout the study area.

FIRST NATIONSThe Broadway Plan area is a significant area of land, and is central within the unceded traditional homelands of the Musqueam, Squamish and Tsleil-Waututh Nations.

WHO CREATES AN AREA PLAN?

Throughout the planning program, staff look to engage the broadest range of people in the Broadway study area, including those of different cultural backgrounds, ages, incomes, renters and owners, and businesses.

HOW LONG WILL IT TAKE TO DEVELOP THE PLAN?

The Broadway Plan is expected to be completed for Council’s consideration in late 2020.

HOW CAN I GET INVOLVED?Over the next 15 months there will be ongoing opportunities to share your thoughts.

To stay up to date with upcoming Broadway Plan updates and engagement opportunities, we encourage you to join our email listserv, which can be found on our webpage.

Cla

rk D

riv

e

Vin

e S

tre

et

Broadway

16th Avenue

1st Avenue

Gra

nv

ille

St

Bu

rra

rd S

t

Arb

utu

s S

t

4th Ave

Oa

k S

t

Ma

in S

t King

sway

Ca

mb

ie S

t

False Creek

Ca

mb

ie B

r

Gra

nville B

r

Great Northern Way

vancouver.ca/broadwayplan

[email protected]

Millennium Line

Legend

Broadway Plan Study Area

Broadway Subway Project

Potential Future extension

Elevated SkyTrain

Tunneled SkyTrain and Station Locations

Millennium Line

Legend

Broadway Plan Study Area

Broadway Subway Project

Potential Future extension

Elevated SkyTrain

Tunneled SkyTrain and Station Locations

Millennium Line

Legend

Broadway Plan Study Area

Broadway Subway Project

Potential Future extension

Elevated SkyTrain

Tunneled SkyTrain and Station Locations

Millennium Line

Legend

Broadway Plan Study Area

Broadway Subway Project

Potential Future extension

Elevated SkyTrain

Tunneled SkyTrain and Station Locations

Millennium Line

Legend

Broadway Plan Study Area

Broadway Subway Project

Potential Future extension

Elevated SkyTrain

Tunneled SkyTrain and Station Locations

Millennium Line

Legend

Broadway Plan Study Area

Broadway Subway Project

Potential Future extension

Elevated SkyTrain

Tunneled SkyTrain and Station Locations

BROADWAY PLAN

Phase 1

BackgroundPhase

Phase 2

Phase 3

Phase 4

Engagement

DEC DECJAN JUNMAYAPRMARFEBAUG NOV

2019SEP OCT JULJAN JUNMAYAPRMARFEB JULDECAUG NOVSEP OCTJUL AUG SEP NOVOCT

2018 2020

Engagement Engagement Engagement Engagement Engagement

Guiding Principles

Background Phase

Emerging Directions

Refining Directions

Finalizing Plan

we are here

In Coordination with City-wide Plan

APPROVED BY CITY COUNCIL NOVEMBER 18, 2010

Mount Pleasant Community Plan

Current Situation, Planning & Next StepsVA N C O U V E R ’ S I N N O VAT I O N E C O N O M Y

JESSIE ADCOCK | Chief Digital Officer CORY DOBSON | Planning & Development Services

The proposal has been designed within the current framework of City policies, Official Community Plans, and Planning Guidelines, specifically:

- Broadway Plan (Ongoing)- Metropolitan Core Jobs & Economy Land Use Plan (2007)- Mount Pleasant Community Plan (2010)- Mount Pleasant Implementation Policy (2013)- Mount Pleasant Public Realm Plan and Public Benefits Strategy (2013)- Vancouver’s Innovation Economy Plan (2009)- Green Buildings Policy for Rezonings (2012)- Culture Plan: Strategic Directions (2014)- Plaza Design Guidelines (1992)- Central Broadway C-3A Urban Design Guidelines (1976)

02 Planning Context

Page 2: BROADWAY PLAN Mount Pleasant Community Plan€¦ · The Broadway Plan area is a significant area of land, and is central within the unceded traditional homelands of the Musqueam,

8 Eas t B roadway 2 4 E A S T B R O A D WAY & 2 5 2 0 O N TA R I O S T. | VA N C O U V E R

2020-03-16

Page 13

Metro Core Jobs & Economy Land Use PlanThis plan addresses the predicted shortage of commercial employment zoned area in the Vancouver Metro Core.

One of the general conclusions of the study is that residential uses have consistently outbid commercial uses in the core commercial areas, thus increasing the land values to make commercial office development unaffordable.

Several areas throughout the City core have been identified as locations where densities could be increased to encourage commercial office development. The subject site is located in a sub-area identified as desirable to increase commercial density.

The project site is located in an area identified for increased job space.

02 Planning Context

PROPOSAL SITE 8 East Broadway

Page 3: BROADWAY PLAN Mount Pleasant Community Plan€¦ · The Broadway Plan area is a significant area of land, and is central within the unceded traditional homelands of the Musqueam,

This plan shows the continuing progress of the employment district planning by the City, which most recently has been the creation of the Mount Pleasant Quebec Innovation Corridor. A logical area to consider next - The Broadway Corridor adjacent to the Mount Pleasant Light Industrial Area.

Downtown + 2009Mt Pleasant - Main Street + 2010Mt Pleasant - Light Industrial Area + 2013Historic Rail town + 2014False Creek Flats + 2015 - 2017Downtown East Side Strachcona + 2015 - 2017Mount Pleasant Industrial Area + 2016 - 2017

Broadway Corridor Plan + 2020

8 Eas t B roadway 2 4 E A S T B R O A D WAY & 2 5 2 0 O N TA R I O S T. | VA N C O U V E R

Page 14

Vancouver’sInnovationEconomyPlan

TRILLIUM PARK

ANDYLIVINGSTONE

PARK

CREEKSIDEPARK

MACLEANPARK

GUELPHPARK

JONATHANROGERS

PARK

THORNTONPARK

SCIENCE WORLD

STRATHCONA PARK

FALSECREEK

VANCOUVERHARBOUR

MOUNT PLEASANTMAIN STREET

COMMUNITYECONOMICDEVELOPMENTSTRATEGY(CEDS)

HISTORIC RAILTOWN

FALSE CREEK FLATS

CHINATOWNSTRATHCONA

MOUNT PLEASANTCOMMUNITY

NORTHEASTFALSE CREEK

GASTOWNDOWNTOWN EASTSIDE/OPPENHEIMER DISTRICT

DOWNTOWN

YALETOWN

BROADWAY

NewSt. Paul’sHospital

312 Main

Emily CarrArt + Design

University

Centre forDigital Media

MA

IN S

TR

EE

T

COMPLETED 2013

COMPLETED 2009

PLANNING IN THE ‘INNOVATION DISTRICT’

Planning in The ‘Innovation District’

Next step:Broadway Corridor Evolution

PROPOSAL SITE 8 East Broadway

Skytrain Station

Skytrain Station Proposed

Historic Railtown District

Community Economic Development Strategy

False Creek Flats

Mount Pleasant Main Street & Quebec Street

02 Planning Context