bringing the pmbok guide to life

288
BRINGING THE PMBOK ® GUIDE TO LIFE ffirs.indd i ffirs.indd i 2/23/09 10:33:36 AM 2/23/09 10:33:36 AM Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO Not for Resale, 09/08/2016 09:18:12 MDT No reproduction or networking permitted without license from IHS --``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Upload: rodriguezavr

Post on 11-Aug-2021

1 views

Category:

Leadership & Management


0 download

DESCRIPTION

Bringing The PMBOK Guide to Life, A Comparision for the Practicing Project Manager Saldis F.; Kerzner H. 2009 Canada John Wiley & Sons, Inc.

TRANSCRIPT

Page 1: Bringing The PMBOK Guide to Life

BRINGING THE PMBOK ® GUIDE TO LIFE

ffirs.indd iffirs.indd i 2/23/09 10:33:36 AM2/23/09 10:33:36 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 2: Bringing The PMBOK Guide to Life

ffirs.indd iiffirs.indd ii 2/23/09 10:33:36 AM2/23/09 10:33:36 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 3: Bringing The PMBOK Guide to Life

BRINGING THE PMBOK ® GUIDE

TO LIFE

A Companion for the Practicing Project Manager

Frank P. Saladis, PMPHarold Kerzner, Ph.D.

JOHN WILEY & SONS, INC.

ffirs.indd iiiffirs.indd iii 2/23/09 10:33:36 AM2/23/09 10:33:36 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 4: Bringing The PMBOK Guide to Life

This book is printed on acid-free paper.

Copyright © 2009 by John Wiley & Sons, Inc. All rights reserved.

Published by John Wiley & Sons, Inc., Hoboken, New JerseyPublished simultaneously in Canada

No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, scanning, or otherwise, except as permitted under Section 107 or 108 of the 1976 United States Copyright Act, without either the prior written permission of the Publisher, or authorization through payment of the appropriate per-copy fee to the Copyright Clearance Center, 222 Rosewood Drive, Danvers, MA 01923, (978) 750-8400, fax (978) 646-8600, or on the Web at www.copyright.com. Requests to the Publisher for permission should be addressed to the Permissions Department, John Wiley & Sons, Inc., 111 River Street, Hoboken, NJ 07030, (201) 748-6011, fax (201) 748-6008, or online at www.wiley.com/go/permissions.

Limit of Liability/Disclaimer of Warranty: While the publisher and the author have used their best efforts in preparing this book, they make no representations or warranties with respect to the accuracy or completeness of the contents of this book and specifi cally disclaim any implied warranties of merchantability or fi tness for a particular purpose. No warranty may be created or extended by sales representatives or written sales materials. The advice and strategies contained herein may not be suitable for your situation. You should consult with a professional where appropriate. Neither the publisher nor the author shall be liable for any loss of profi t or any other commercial damages, including but not limited to special, incidental, consequential, or other damages.

For general information about our other products and services, please contact our Customer Care Department within the United States at (800) 762-2974, outside the United States at (317) 572-3993 or fax (317) 572-4002.

Wiley also publishes its books in a variety of electronic formats. Some content that appears in print may not be available in electronic books. For more information about Wiley products, visit our Web site at www.wiley.com.

Library of Congress Cataloging-in-Publication Data:Saladis, Frank P. Bringing the PMBOK guide to life: a companion for the practicing project manager/ Frank P. Saladis, Harold Kerzner. p. cm. Includes bibliographical references and index. ISBN 978-0-470-19558-1 (cloth) 1. Project management. I. Kerzner, Harold. II. Title. HD69.P75.S25 2009 658.4'04—dc22 2008052044

Printed in the United States of America

10 9 8 7 6 5 4 3 2 1

ffirs.indd ivffirs.indd iv 2/23/09 10:33:36 AM2/23/09 10:33:36 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 5: Bringing The PMBOK Guide to Life

Contents

Foreword viiAcknowledgments ixIntroduction xi

Chapter One Why Do Project Managers Need This Book? 1

Chapter Two The Big Picture 27

Chapter Three Project Plan SWOT Analysis 49

Chapter Four Developing a Project Methodology 57

Chapter Five Defi ning Project Success 65

Chapter Six Developing Performance Measures 77

Chapter Seven Monitoring and Control Simplifi ed 93

Chapter Eight The Change Control Process 105

Chapter Nine Establishing Roles and Responsibilities 119

Chapter Ten Risk Management—A Project Imperative 129

Chapter Eleven A PMBOK® Guide Strategy for Success 151

v

ftoc.indd vftoc.indd v 2/23/09 10:34:42 AM2/23/09 10:34:42 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 6: Bringing The PMBOK Guide to Life

Chapter Twelve Rapid Knowledge Development (RKD) for Project Managers: Tips, Tools, and Techniques 163

Chapter Thirteen Bringing the PMBOK® Guide to Life through Templates 233

References 259Index 261

vi Contents

ftoc.indd viftoc.indd vi 2/23/09 10:34:43 AM2/23/09 10:34:43 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 7: Bringing The PMBOK Guide to Life

vii

Foreword

Every company has projects that are uniquely characterized by the size and nature of the business, the length of the project, whether for internal or external clients, whether or not a profi t margin is included, and the project ’ s strategic importance. Creating a project management methodology to encompass all of these characteristics is diffi cult, and even more complex is the attempt to create an enterprise project management meth-odology capable of use on all projects.

Most companies do not have the resources to research/bench-mark other companies on what works and what fails, and this holds true even if the company possesses a project management offi ce (PMO). As such, companies must rely on established project management standards.

The PMBOK ® Guide provides the necessary framework and standards for project management. The real value in the use of the PMBOK ® Guide lies in the guidance it provides companies in how to manage projects, irrespective of the characteristics. The PMBOK ® Guide is also invaluable as the primary source for creating project management methodologies.

There are three ways to manage projects; the right way, the wrong way, and the PMBOK ® Guide way. Not all of the informa-tion contained in the PMBOK ® Guide will be applicable to all companies, nor should a company force all of the material to apply. The value in the PMBOK ® Guide is that — it is just a “ guide. ”

flast.indd viiflast.indd vii 2/23/09 10:34:10 AM2/23/09 10:34:10 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 8: Bringing The PMBOK Guide to Life

Every three or four years, hundreds of PMI members pool their intellectual knowledge to update the PMBOK ® Guide based on current best practices. Companies should rely on the PMBOK ® Guide for both current and future applications of project management best practices.

Harold Kerzner, Ph.D. Executive Director for Project Management

The International Institute for Learning

viii Foreword

flast.indd viiiflast.indd viii 2/23/09 10:34:10 AM2/23/09 10:34:10 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 9: Bringing The PMBOK Guide to Life

ix

Acknowledgments

My sincere thanks to my many mentors and friends in project management for their continued support — especially Dr. Harold Kerzner for his continued encouragement and my associates at the New York City Chapter of the Project Management Institute, my colleagues in the PMI Leadership Institute, the staff members at the International Institute for Learning, and my family for their support and understanding while dealing with the challenging life of a project manager.

Frank P. Saladis, PMP

flast.indd ixflast.indd ix 2/23/09 10:34:10 AM2/23/09 10:34:10 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 10: Bringing The PMBOK Guide to Life

flast.indd xflast.indd x 2/23/09 10:34:10 AM2/23/09 10:34:10 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 11: Bringing The PMBOK Guide to Life

xi

Introduction

The fi eld of project management is actually a collection of skills, tools, knowledge, techniques, lessons learned, insights, and observations gained from just about every industry and profession. Project managers develop skills in communica-tions, fi nancial management, confl ict resolution, negotiation, planning, organizing, leading, and much more. There is a huge base of knowledge available for project managers. That base of knowledge is referred to as the body of knowledge of project management . This is such a large base of information that it would be impossible to include every element of project man-agement in one book. Project managers are involved in stra-tegic planning, disaster recovery, research, green technology, information technology, construction, and pretty much any-thing that involves people and plans. Most project managers are in a constant search for best practices and lessons learned that will help them improve how projects are implemented and to increase the probability of success.

The continued search for information has generated book after book about the subject. Each author is looking to introduce a new technique or fi nd some new way to manage projects more effectively. Some new ideas are introduced, but much of the material that is available is a reissue of what is already known, just packaged slightly differently. The importance here is that project managers continue to develop the profession through

flast.indd xiflast.indd xi 2/23/09 10:34:10 AM2/23/09 10:34:10 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 12: Bringing The PMBOK Guide to Life

new books, articles, and presentations, and they are using their creativity, innovation, and passion for the profession to add to the existing and ever - growing body of knowledge.

This vast collection of information and knowledge handed down year after year, with a continuous stream of new data coming in, requires some type of organized system or standard. The Project Management Institute, utilizing project managers from a wide range of industry including government, the private sector, and nonprofi t organizations, have developed a standard from which project managers can create project management methodologies and benefi t from the knowledge of others in the profession. That standard is known as A Guide to the Project Management Body of Knowledge . The standard, ANSI/PMI 99 - 001 - 2004, is currently in its 4th Edition. The next version was issued on December 2008.

The PMBOK ® Guide , as it is commonly known, was developed and will continue to be developed by volunteers who offer their time and expertise in the continuing pursuit of higher levels of quality and improvement. The PMBOK ® Guide can be found in the libraries of thousands of project managers worldwide, and has been translated into at least eight languages. It is used as part of the study and preparation for the PMP exam (Project Management Professional) offered by the Project Management Institute ( PMI) and as reference for planning projects or to develop customized project management methodologies for hun-dreds of organizations and project management offi ces (PMOs).

The PMBOK ® Guide is extremely useful to project managers at any level of an organization and for any type of project — from short - term, limited deliverable type projects to large, complex undertakings. It is important to note that it is a guide and is not all - inclusive. The PMBOK ® Guide provides a solid basis for plan-ning, and it introduces key processes and provides a framework

xii Introduction

flast.indd xiiflast.indd xii 2/23/09 10:34:11 AM2/23/09 10:34:11 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 13: Bringing The PMBOK Guide to Life

for understanding project management. There are many views and perspectives about the PMBOK ® Guide, and there is prob-ably a fair amount of disagreement about how it should be used, and even some of its contents. Regardless of viewpoint, it is a valuable addition to any project manager ’ s library.

THE PMBOK ® GUIDE — THE BASICS

The PMBOK ® Guide provides a foundation from which project plans and project management offi ce (PMO) methodologies or enterprise wide processes can be developed. The fi rst step is to become PMBOK ® oriented. This means to become famil-iar with how the information in the document is presented and what the specifi c terminology used in the PMBOK ® Guide means. This is particularly important because, although the terminology is used commonly across many industries, there are differences in meanings that could cause some confu-sion and miscommunication. An important item to remember is that the PMBOK ® Guide is just that, a guide. It is not the entire project management body of knowledge condensed into about four hundred pages. The PMBOK ® Guide is a represen-tation of many best practices in project management that have evolved over the years and may, let me emphasize may, be used (meaning that there are many options, depending on the type of project) to manage a project successfully.

Chapters One through Three of the PMBOK ® Guide provide an introduction to the reader and establish the basic frame-work from which the remaining chapters have been developed. These chapters introduce the forty - two project management processes that are mapped to the nine knowledge areas and fi ve process groups. The remaining chapters describe the nine knowledge areas of project management.

Introduction xiii

flast.indd xiiiflast.indd xiii 2/23/09 10:34:11 AM2/23/09 10:34:11 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 14: Bringing The PMBOK Guide to Life

A BRIEF DESCRIPTION OF THE PROJECT MANAGEMENT KNOWLEDGE AREAS

Integration management. This knowledge area empha-sizes the generally accepted role of a project manager — coordination and bringing all the pieces (the deliverables of the project) together.

Scope management . Defi ning and determining what work must be done. It includes setting clearly defi ned project objectives, defi ning major project deliverables, and controlling changes to those deliverables. Scope management includes creating the work breakdown structure (a breakdown of the major project elements to improve planning and to assist in overall project control) to understand the complexity of the project.

Time management . The project is further defi ned through activity defi nition, sequencing of activities, estimating the duration of activities, determining the critical path, schedule development and managing schedule and time issues effectively.

Cost management . This involves estimating all project costs, budgeting costs over time, and controlling costs throughout the project life cycle.

Quality management . This area includes developing plans to ensure that requirements are met, establish-ing a quality policy, understanding quality principles introduced by quality experts, developing quality assur-ance processes, and controlling the quality of all project deliverables.

Human resource management . This involves identifying project stakeholders, developing the project team, moti-vating the team, understanding management styles, and organizational structure.

xiv Introduction

flast.indd xivflast.indd xiv 2/23/09 10:34:11 AM2/23/09 10:34:11 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 15: Bringing The PMBOK Guide to Life

Communications management . This involves planning for and distributing information correctly and to the appropriate stakeholders, performance reporting, man-aging stakeholders, and developing processes to ensure effective transfer of information. Communications man-agement includes developing an understanding of the communications sender – receiver model (transmitting messages, possible message distortion, and feedback loops).

Risk management . This area includes identifying poten-tial project risk events, using qualitative analysis (expert judgment and experience) or quantitative analysis (using mathematical models and computer simulations) to pri-oritize potential risks, respond to risk situations, and develop risk monitoring and controlling processes.

Procurement management . This includes determining what goods and services should be purchased or developed internally by an organization, planning purchases and, developing procurement documentation such as requests for proposals (RFP). It also involves determining appro-priate contract types, negotiating terms, selecting sellers, managing contracts through implementation, and then managing project closure and contractual closure.

The purpose of this book is to create a bridge between the larger, broader project management body of knowledge, the PMBOK ® Guide , and the practicing project manager. This book is not all - inclusive regarding the subject of project man-agement, but will provide some additional knowledge, clari-fi cation of terms, suggested approaches for the use of project management tools and techniques, and templates developed directly from information provided in the PMBOK ® Guide . The book also provides suggestions and study tips that will assist

A Brief Description of The Project Management xv

flast.indd xvflast.indd xv 2/23/09 10:34:11 AM2/23/09 10:34:11 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 16: Bringing The PMBOK Guide to Life

in preparing for the PMP exam and includes a Project Plan Accelerator (PPA) that can be used with the PMBOK ® Guide by project managers and project teams to develop plans that are specifi cally tailored to meet the needs of the client or spon-soring organization.

xvi Introduction

flast.indd xviflast.indd xvi 2/23/09 10:34:12 AM2/23/09 10:34:12 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 17: Bringing The PMBOK Guide to Life

1

Chapter One

Why Do Project Managers Need This Book?

The main purpose of this book is to create a connection between what is referred to as “ the body of knowledge of project man-agement, ” the Project Management Institute ’ s A Guide to the Project Management Body of Knowledge ® (better known as the PMBOK ® Guide ), and the needs of the practicing project manager. The book is not specifi c to any industry. It is intended to provide additional information regarding the processes asso-ciated with managing projects and offer the reader other per-spectives about the discipline including a practical and useful explanation of many of the tools, techniques, and processes described in the PMBOK ® Guide . There are countless other books about project management that include suggested meth-odologies, templates, defi ned processes and procedures, and best practices — and many are excellent sources of reference. The focus of this book is on the practitioner, especially those who manage projects of moderate complexity.

c01.indd 1c01.indd 1 2/23/09 10:09:24 AM2/23/09 10:09:24 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 18: Bringing The PMBOK Guide to Life

This book is intended to make a direct connection between many of the terms and specifi c tools, techniques, inputs, and out-puts described in the PMBOK ® Guide and the common needs of today ’ s practicing project managers. The objective is to provide a quick reference and a source of information that translates tools and techniques into useful templates, actionable steps, clarifi ed processes, and common - sense approaches to managing a project.

The material and references in this are designed to be of interest to the newly appointed project manager as well as the seasoned professional. Experienced project managers may fi nd the material helpful in further developing well - defi ned practices they are currently using, or the material may spark a new level of creativity and innovation that will take project management to a new level of effi ciency. This book will help project managers and students of project management differentiate between gen-erally practiced processes and those processes that are specifi c to a particular organization.

I have heard many people refer to the PMBOK ® Guide as the “ PMI Way ” or refer to project management methodology in terms of “ the Right Way, the wrong way, and the “ PMBOK ® way. ” The PMBOK ® Guide does not suggest a right or wrong way and, in my opinion, there is no specifi c “ PMI Way ” or “ PMBOK ® Way. ” Everything in the PMBOK ® Guide originates from the knowledge of hundreds of project managers who have decided to share their experiences across a very broad spectrum of projects and industries. This shared knowledge has been organized into the nine knowledge areas and 5 processes which provide the basis for developing organizational project manage-ment methodologies. Simply stated, there are projects that are managed well and those that are not managed well regardless of preferred methodology. If the methodology was developed using logic, common sense and the basic principles of project

2 Why Do Project Managers Need This Book?

c01.indd 2c01.indd 2 2/23/09 10:09:24 AM2/23/09 10:09:24 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 19: Bringing The PMBOK Guide to Life

management along with a connection to the organization ’ s culture, work ethic, business goals and capabilities then that would be the “ right ” methodology for the organization. Chances are that many of the project management steps and processes found in any organizational methodology can also be found in the PMBOK ® Guide or can be directly related to PMBOK ® Guide processes. I believe that most project managers will agree that in the discipline of, or if you prefer, the profession of project management the general principles are the same, regardless of what type of project is being managed. These general princi-ples are then modifi ed and combined with different approaches specifi c to the organization that can be used to achieve the com-mon goals of on time completion, remaining within budget, and according to specifi cations. (there are other goals to consider but these are the goals most people associate with project success). The PMBOK ® Guide provides a solid framework for developing a methodology that would have a high probability of being accepted by the stakeholders of an organization. It may not provide the extreme levels of detail that may be needed to develop a complete methodology, but it does provide the project manager with a ref-erence point developed through the experience of hundreds of project managers over many years.

The purpose of this book is to bridge the needs of the project manager with the vast stores of knowledge about project man-agement and to encourage project managers to expand their knowledge about the profession, challenge some of the proc-esses in place and develop newer, more effi cient ways of man-aging projects in a world fi lled with complex projects and new opportunities. This book will, I hope, encourage more thought about how to manage projects more effectively and open up the creative minds of project managers who can widen the project management information highway.

Why Do Project Managers Need This Book? 3

c01.indd 3c01.indd 3 2/23/09 10:09:25 AM2/23/09 10:09:25 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 20: Bringing The PMBOK Guide to Life

4 Why Do Project Managers Need This Book?

THE PMBOK ® GUIDE , THE BODY OF KNOWLEDGE OF PROJECT MANAGEMENT, AND THE

CONNECTION TO MANAGING PROJECTS

The PMBOK ® Guide is a collection of tools, techniques, and processes developed by project managers engaged in projects across every type of business and industry. Project manag-ers have offered their time and their expertise voluntarily to produce a consensus - based standard for managing a project. It is a valuable source of information for project managers, project management professionals, and future project manag-ers, regardless of discipline. The PMBOK ® Guide provides the basis for developing project management methodologies and can be found in the library of literally thousands of project management offi ces and practicing project managers. The chal-lenge is to take the information provided in the PMBOK ® Guide and apply it most effectively and appropriately to an actual project environment. This book focuses on specifi c tech-niques, explanations of terms, and application of tools that will enable project managers to effectively adapt the principles and processes described in the PMBOK ® Guide to the practical world of project management. These techniques transform the PMBOK ® Guide from a framework and standards reference to a sharpened tool in the project manager ’ s toolbox.

Project management and the processes included within it defi nition is actually a collection of knowledge from every business discipline, and that knowledge base is in a continu-ous state of growth. This knowledge encompasses what has been learned through years of managerial experience, studying human behavior, analyzing relationships between organizations, engaging in strategic planning, managing confl ict, performing fi nancial planning, and understanding organizational struc-ture and overall organizational performance. The greater, more complex, project management body of knowledge is basically a

c01.indd 4c01.indd 4 2/23/09 10:09:25 AM2/23/09 10:09:25 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 21: Bringing The PMBOK Guide to Life

The First Step 5

repository of information and best practices gathered from and covering every aspect of business and organizational manage-ment. The PMBOK ® Guide organizes that knowledge in a logi-cal format that is not intended to be viewed as a set of rules and regulations. It provides a basis for developing customized methods that will assist in meeting an organization ’ s project and strategic objectives through an effective project manage-ment process. The lessons learned from completed projects are documented and shared (whenever possible) through network-ing with other practitioners, articles, books, and other forms of knowledge transfer and are added to the larger body of knowl-edge in a continuous and ever expanding cycle.

THE FIRST STEP: UNDERSTANDING HOW THE PMBOK ® GUIDE WORKS

Many project managers consider the PMBOK ® Guide to be the method for managing projects and carry it around as if it were some type of project management law book that must be fol-lowed. They profess that failure to follow the PMBOK ® Guide will result in certain project failure and costly customer dis-satisfaction. This type of thinking may result in a very infl ex-ible approach to the management of the project and an attempt to force a technique or a process that is inappropriate for the project or that will cause unneeded work and possibly team frustration. This approach will, in many cases, result in resist-ance or even rejection of the PMBOK ® Guide by management and the project team.

The fi rst step in bringing the PMBOK ® Guide to life is to understand that it is a guide (see Figure 1.1 ). The processes, tools, and techniques described in the document are meant to be considered and applied when appropriate . An infl exible atti-tude and approach in the use of the information provided in the PMBOK ® Guide may result in considerable resistance by

c01.indd 5c01.indd 5 2/23/09 10:09:25 AM2/23/09 10:09:25 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 22: Bringing The PMBOK Guide to Life

6 Why Do Project Managers Need This Book?

the project team or other stakeholders, a perception of infl exibil-ity among team members about the project manager, challenges about the process, and possibly some undesired assistance from upper management or the project sponsor. To prevent this, it is important for the project manager and team to develop an understanding of how the PMBOK ® Guide has been developed and structured and to review each input, tool and technique, and output within each process group described in each knowledge area and to understand their relationships and interdependen-cies during project planning and implementation:

Inputs . For all practical purposes, inputs are “ things. ” They are generally deliverables (tangible work outputs) and are, in many cases, the outputs of other business or

Interpersonal Skills

General Management Skills

LeadershipFinancialManagement

ProcessManagement

StrategicManagement

ProjectManagement

Body of Knowledge

Project Management Framework • Interrelationships • Interdependencies • Process groups

Specific Knowledge Areas • Further emphasis on process and interrelationships • Emphasis on specific inputs and tools and techniques

Scope Management

Estimating Scheduling

Change Management

Project Scope, Human Resources,Time, Communications, Cost, Risk,Quality, and Procurement Management

PMBOK® Guide

Project Integration (Emphasis of relationships of knowledge areas)

Figure 1.1 Project Management Life Cycle.

c01.indd 6c01.indd 6 2/23/09 10:09:25 AM2/23/09 10:09:25 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 23: Bringing The PMBOK Guide to Life

The First Step 7

project management processes. Let ’ s consider these to be nouns . They describe something tangible. These deliver-ables have specifi c names and were developed through the efforts of one or more people. It ’ s important to under-stand what these inputs are, why they are required, and where they originate. Referring to Figure 1.2 , enterprise environmental factors and organizational process assets are inputs to scope planning. Enterprise environmental factors include but are not limited to organizational cul-ture, government standards, and infrastructure. Organi-zational Process assets include such items as policies, communication requirements, templates, project closure guidelines, and change control procedures. The project team should become aware of all environmental factors and organizational process assets that may affect the planning and control of the project. As an example, awareness of the organization ’ s approach to risk— risk averse or aggressive risk taker (an environmental factor)—will impact how a plan is developed and how decisions about critical project issues will be made. This example

INPUTSTOOLS and

TECHNIQUES OUTPUTS

1. Enterprise environmental factors

2. Organizational process assets

3. Project charter

4. Preliminary project scope statement

5. Project management plan

1. Expert judgment

2. Templates, forms, standards

1. Project scope management plan

Figure 1.2 Process Flow for Scope Planning. PMBOK ® Guide—Third Edition.

c01.indd 7c01.indd 7 2/23/09 10:09:26 AM2/23/09 10:09:26 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 24: Bringing The PMBOK Guide to Life

8 Why Do Project Managers Need This Book?

emphasizes the importance of having a thorough knowl-edge of all inputs to each process group.

Tools and techniques . These are the specifi c actions and supporting items that allow us to utilize the identifi ed inputs required to meet project needs. To further explain the tools and techniques component of the process a sim-ple analogy would be that these tools and techniques are what you would fi nd in a project manager ’ s toolbox. They are a set of enablers and are used to shape and from the inputs into useful outputs when handled correctly. Consider tools and techniques to be input processors , very much like a blender or food processor in a kitchen. Once you have determined what your objective is — a cake, a tossed salad, or a special sauce — the appropriate inputs or “ ingredients ” are gathered. The reason why the inputs are needed should be clearly understood — you should know why they are being used. The inputs are processed using the selected tools or techniques to produce a desired result (the outputs). This is a relatively simple explanation, but the objective of a project methodology should be to keep it as simple as possible, use the appropriate tools (making sure you know how to use them) and avoid processes that will overwhelm the project team or cause confusion.

Outputs . The results produced through the use of the tools and techniques become outputs. Outputs become tan-gible items or deliverables that will be used as inputs to another process or will be fi nalized for handoff and use by the intended customer or stakeholder.

The PMBOK ® Guide , through these processes, emphasizes that in the project environment, the customer is actually the next per-son in the process and not just the organization or entity that will receive and pay for the product of the project. The inputs, tools

c01.indd 8c01.indd 8 2/23/09 10:09:27 AM2/23/09 10:09:27 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 25: Bringing The PMBOK Guide to Life

The First Step 9

and techniques, and outputs create a project customer – supplier model . This model (Figure 1.3 ) refers to the fact that outputs of a process, the deliverables that are created using the tools and tech-niques, may be handed off to another project team member for further processing. This makes that particular team member or functional manager a customer. This handoff starts the next cycle of inputs, tools and techniques, and outputs. Maintaining focus on this model throughout the project life cycle will improve overall quality and planning effi ciency, and should reduce project rework, resulting in improved overall performance and greater probabil-ity of success. It is important to note that each knowledge area in the PMBOK ® Guide includes an overview of the inputs, tools and techniques, and outputs associated with that specifi c knowl-edge area. These overview charts present a type of “ roadmap ” of processes and illustrate relationships between process groups and other knowledge areas. The inputs, tools and techniques, and outputs found in one knowledge area may be included in the processes associated with other knowledge areas as part of a dif-ferent process and different targeted result. This is a further indication of the integration of processes, and that concurrent planning of each project element or knowledge area is the norm for most projects. These overview charts also provide a means to

In the project life cycle, the customeris the next person in the process.

For each customer supplierinteraction:

• Set expectations • Define deliverables• Set and agree on acceptance criteria

90% of project problems,are caused by people notmaterials, machines,or equipment – H. Kerzner

Customer SupplierSupplier Customer Supplier Customer Supplier

Figure 1.3 Project Customer – Supplier Model.

c01.indd 9c01.indd 9 2/23/09 10:09:27 AM2/23/09 10:09:27 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 26: Bringing The PMBOK Guide to Life

10 Why Do Project Managers Need This Book?

demonstrate clearly how each knowledge area is connected and integrated within the entire project management planning proc-ess and create a true systems approach to planning and executing the project.

KNOWLEDGE AREAS AND PROCESS GROUPS

Project managers are aware that most organizations achieve their objectives through operations, programs, and the comple-tion of projects. Strategic goals are established, operations pro-cedures are formed, and the resources of the organization are assigned to specifi c responsibilities — either to complete projects or to keep the organization operating. Programs are developed for managing long - term services, applications, and other essen-tial elements for the business. Projects are approved and char-tered to support programs, create new or update products or services and at some point in time to replace a program that has outlived its usefulness.

Projects and programs are a part of everyday life. Although many people don ’ t realize it, project management in some form is used by almost everyone, regardless of profession or occu-pation. Projects include planning a vacation or remodeling a home, developing a new vehicle, constructing a new building, or sending a team of astronauts to the international space sta-tion. Governments utilize formal project management to update infrastructure, the military uses project management to plan battle campaigns, private businesses use project management to improve their competitive edge. Regardless of type of project or industry, the basic principles of project management are the same: Determine what must be accomplished or what problem must be solved, select the best, most cost - effective approach, pick a team, obtain funding, plan the project, execute the plan, manage variances, and eventually close out the project.

c01.indd 10c01.indd 10 2/23/09 10:09:31 AM2/23/09 10:09:31 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 27: Bringing The PMBOK Guide to Life

Knowledge Areas and Process Groups 11

It sounds simple when stated like that, but any experienced project manager will tell you that it is much more involved. The challenge is to manage projects, especially large, complex under-takings, with smoothness, control, and without the bureaucracy and complications that seem to be included in the perceptions of some people when project management is discussed.

The ideas and principles of project management date back thousands of years. In the past fi fty to sixty years, project man-agement has become modernized and more formalized, and new tools have been added to manage projects as they became more complex. Today, there are dozens of planning software tools to choose from, training programs to hone skills, and systems that can be used at the enterprise level to more effectively integrate project activities with the operations of the organization. Project management processes are now becoming more and more com-mon at the higher management levels of organizations and are considered by many to be a key component of strategic planning.

Project Management Processes

Strategic planning is used to determine the direction an organization should be moving in, create scenarios about the future of a business, and forecast out the condition or health of an organization one to three years. In some cases, it may be a longer view. The strategic plan is used to explain how the organ-ization is going to achieve its desired goals and how it will know if it actually reached them. The focus of a strategic plan is usu-ally on the entire organization, while the focus of a project plan is usually on a particular product, service, or program that will support the higher - level strategic plan. It is important to have a process in place that will provide the organization with the means to achieve the goals of the strategic plan. That means of achieve-ment is project management. An organized approach with a

c01.indd 11c01.indd 11 2/23/09 10:09:31 AM2/23/09 10:09:31 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 28: Bringing The PMBOK Guide to Life

12 Why Do Project Managers Need This Book?

specifi c and defi ned process that is communicated to the stake-holders within the organization, supported by management, and followed through with minimal deviation should result in success at the project level and the organizational level.

Trying to start from the ground level and attempting to develop internal processes that can be used to achieve objec-tives is a long and challenging process. Many organizations start with an ad hoc approach, meaning “ for the specifi c pur-pose, case, or situation at hand and not for any other reason. ” For unexpected situations and items that require a quick turn-around, the ad hoc approach may be appropriate and is prob-ably used frequently within many companies. But the ad hoc approach does not address the longer - term needs of an organi-zation and certainly does not promote the development of more stabilized and consistent processes. As companies mature in the management of projects, they begin to seek best practices that will help them reduce the learning curve and produce results at a faster pace. The PMBOK ® Guide provides a basis for improved project planning by explaining key principles of project man-agement and organizing project planning into a logical system that is integrated by processes. The nine knowledge areas of the PMBOK ® Guide — integration, scope management, time management, cost management, quality management, Human Resources Management, communications management, risk management, and procurement management — are integrated through fi ve processes — initiating, planning, executing, monitoring and controlling, and closing. The basic process groups are generally included in every phase of a project and provide the following:

1. Initiating . The purpose of the project is defi ned, the project is authorized, project managers are selected and teams are formed. The subprocesses within this group

c01.indd 12c01.indd 12 2/23/09 10:09:31 AM2/23/09 10:09:31 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 29: Bringing The PMBOK Guide to Life

Knowledge Areas and Process Groups 13

are utilized in all project phases and serve as a way to determine if a project should proceed to the next phase.

2. Planning . The project objectives are established and developed through a progressive process of defi nition sometimes referred to as progressive elaboration . The project scope is defi ned in more detail, schedules are developed, procurement plans are defi ned, risks are iden-tifi ed, resource needs are identifi ed, quality measures are determined, and communications plans are agreed upon.

3. Executing . The work defi ned in the project plan is ini-tiated. The project manager coordinates activities, man-ages resources and subcontractors, procures goods and services, and observes project and team performance.

4. Monitoring and Controlling . The project team and project manager observe the work, analyze results, identify vari-ances, and determine solutions and implement corrective action when necessary.

5. Closing. As each phase of a project is completed, a clos-ing process is utilized to ensure that all deliverables have been completed to the satisfaction of the client and other stakeholders. At project completion, an analysis of project performance is conducted to ensure that all contractual obligations have been met, all work orders are completed, and any lessons learned are documented for use on future projects. The closing processes ensure formal acceptance of the project deliverables and that all project activities are fi nalized. The closing of a successful project should also include some type of recognition event for the project team. Recognition in some way is essential to maintain team loy-alty. Project managers in many organizations will work with the same team members on multiple projects, and a good relationship with the team members will help to

c01.indd 13c01.indd 13 2/23/09 10:09:32 AM2/23/09 10:09:32 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 30: Bringing The PMBOK Guide to Life

14 Why Do Project Managers Need This Book?

minimize confl ict and assist in infl uencing and motivating team members throughout the project life cycle.

These processes generally overlap in each phase of a project and interact throughout a project or phase, bridging and inte-grating elements of the nine knowledge areas. Process interac-tions are described in terms of the following:

Inputs are documents, plans, designs, deliverables — generally something tangible. Tools and techniques are actions and approaches that are applied to the inputs. Outputs are documents, products, deliverables — tangible results of the applied actions. The outputs of many of these process interactions become inputs to other processes.

The PMBOK ® Guide discusses inputs, tools and techniques, and outputs in each knowledge area chapter. As you proceed from chapter to chapter you will see many of the same inputs and tools and techniques being used in different processes. This is a clear indication of the integrated nature of projects. The inputs and tools and techniques described in the PMBOK ® Guide may not be used in every project, but developing an understanding of why they may be needed will assist a project manager in mini-mizing the omission of critical project elements and planning components.

The Purpose of Inputs

Project managers should have an understanding about why an input is needed. Each input is basically an ingredient that is needed to complete a process and bring about a result. It is important to have some general knowledge of the origin of the

c01.indd 14c01.indd 14 2/23/09 10:09:32 AM2/23/09 10:09:32 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 31: Bringing The PMBOK Guide to Life

Knowledge Areas and Process Groups 15

input, how it was developed, and why it is needed. To further clarify, let ’ s examine the inputs listed in Figure 1.4 :

Contract . This is a legal document, the terms of which have been or will be agreed upon by the buyer and seller involved in a project. The contract may be an input in the project chartering process if the work to be done involves a supplier or vendor. The terms and conditions of the con-tract must be considered when making decisions about whether to approve a project. The risks, costs, and gen-eral terms and conditions should be reviewed in detail by the project manager and decision makers.

Project statement of work . The statement of work gen-erally describes the specifi c work that will be done by a contractor. This information is also necessary when mak-ing project approval decisions.

Enterprise environmental factors . These factors are critical in the decision process and should be considered when determining which projects should be approved.

INPUTSTOOLS and

TECHNIQUES OUTPUTS

1. Contract (if applicable)

2. Project statement of work

3. Enterprise environmental factors

4. Organizational process assets

1. Project charter1. Project selection methods

2. Project management methodology

3. Project management information system

4. Expert judgment

Figure 1.4 PMBOK ® Guide 2004 Edition, Page 82.

c01.indd 15c01.indd 15 2/23/09 10:09:32 AM2/23/09 10:09:32 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 32: Bringing The PMBOK Guide to Life

16 Why Do Project Managers Need This Book?

Enterprise environmental factors include the culture of the organization, government regulations and accepted business standards, the infrastructure and capabilities of the organization and many other factors. Any organ-ization that is adopting formal project management methodologies should analyze the environmental factors that are specifi c to its company and industry and make sure these factors are considered throughout the plan-ning and implementation of a project.

Organizational process assets . As organizations grow and mature, they will develop processes for doing busi-ness. These processes become part of the general opera-tion for the organization and, in most cases, must be followed within the project environment as well. These process assets include safety procedures, purchasing processes, fi nancial controls, and change control proce-dures. The project manager and team must be familiar with these processes to ensure compliance with internal rules and regulations and to prevent improper behavior that could result in injury, fi nancial loss, or unnecessary expense.

Tools and Techniques

Project managers should possess some knowledge about the many tools and techniques that can be used to work with the inputs and process them to produce the desired outputs. The tools and techniques describe the necessary actions the team members or project manager will take and the specifi c items (the mechanism or device) needed to effectively process the inputs and produce a deliverable:

Project selection methods . These are the methods that may be used to determine which projects should be

c01.indd 16c01.indd 16 2/23/09 10:09:35 AM2/23/09 10:09:35 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 33: Bringing The PMBOK Guide to Life

Knowledge Areas and Process Groups 17

approved and authorized for funding and use of organi-zational resources. Project selection methods include techniques such as determining payback period of an investment, the present value of a future investment, net present value, internal rate of return, and break - even analysis. The use of decision trees and other forms of mathematical analysis may be used to determine which projects will be approved by the organization. Project selection methods analyze the tangible as well as intan-gible benefi ts of a project.

Project management methodology . The use of an approved methodology (a particular procedure or set of procedures) will generally promote consistency and effi -ciency. Organizations that manage projects on a regular basis and as part of their business when dealing with clients will develop a project methodology and promote its use throughout the organization. Sometimes, meth-odologies are developed by reviewing the processes and steps taken by project managers and teams on previous projects.

Project management information system . This is a system of systems working together and used by the project manager and project team to gather, store, ana-lyze, and disseminate information about the project. These systems may include time reporting systems, fi nancial tracking systems, project management software, resource management systems, and any others that may be used to manage information.

Expert judgment . There are many ways to describe the reference to expert judgment. The experts, generally the functional managers and technical experts, are the subject matter experts that are consulted or included in the project team and provide suggestions, guidance,

c01.indd 17c01.indd 17 2/23/09 10:09:35 AM2/23/09 10:09:35 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 34: Bringing The PMBOK Guide to Life

18 Why Do Project Managers Need This Book?

estimates, and insights about risk, resource productivity, skills levels, and many other areas of importance.

Output

An output is the product of processing the inputs through the use of the tools and techniques. Outputs are deliverables and in many cases become inputs to several other processes. In this case, the output is a project charter:

Project charter . The charter is generally recognized as the document that authorizes the project to proceed, assigns the project manager, and begins the use of organ-izational resources. The project charter may be defi ned differently across industries. Any organization utilizing a project management methodology should have some type of document and/or process that clearly shows that a project has been authorized. An executive signature on a project charter or the project approval document can be a major infl uencing factor when it comes to obtaining resources and additional funding during negotiations.

As you can see, the PMBOK ® Guide provides the basis for planning and presents a logical approach to produce an out-put or deliverable. In this example, using the process Develop Project Charter from the Integration Management chapter of the PMBOK ® Guide , each input, tool and technique, and output is described in specifi c terms and from a project manager ’ s per-spective. In succeeding chapters the processes, tools and tech-niques, and other items that will help to accelerate planning will be explained in greater detail and through templates that are designed to effi ciently expedite how a project is planned and managed.

c01.indd 18c01.indd 18 2/23/09 10:09:36 AM2/23/09 10:09:36 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 35: Bringing The PMBOK Guide to Life

THE PMBOK ® GUIDE : LIFE FORCE FOR PROJECTS

The PMBOK ® Guide can be used to assist in developing project plans and methodologies, but it is important to remember that it is a framework from which more detailed and customized project plans can be developed. If you try to use the PMBOK ® Guide as the only means to manage a project, you will experi-ence many challenges in your attempt to achieve project suc-cess. The PMBOK ® Guide is arranged by knowledge areas and includes an explanation of the processes within each knowledge area. The knowledge areas are reviewed separately for expla-nation and learning purposes only. We don ’ t manage projects by planning scope, time, cost, quality, risk, procurement, commu-nications, and human resources separately. We all know that many planning processes are conducted concurrently, and there is a great deal of overlap in the processes we use. Using the combined information provided in the PMBOK ® Guide along with some personal experience, logic, common sense and a touch of innovation — provides the basic formula for success. Let ’ s call it “ PMBOK ® - based success. ”

You want your project to “ live, ” to be seen for its value, to add to organizational effectiveness and the results to be used by the intended customers. If you think about it, your mission as a project manager is to bring your project to life, to obtain enthu-siasm and commitment from your project team, and to achieve a feeling of accomplishment from your organization and gasps of awe from your customers. The PMBOK ® Guide doesn ’ t provide the excitement and drama experienced by novels such as Mary Shelley ’ s Frankenstein. Nevertheless, your goal is to bring your project to life, just as Dr. Frankenstein proclaimed his project to be “ alive! ” His elation as he made this proclamation was, in a way, an indication of project success (or was it?). We certainly

The PMBOK® GUIDE: Life Force for Projects 19

c01.indd 19c01.indd 19 2/23/09 10:09:36 AM2/23/09 10:09:36 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 36: Bringing The PMBOK Guide to Life

20 Why Do Project Managers Need This Book?

don ’ t want our projects to result in mayhem, fear, and a gener-ally unhappy stakeholder group (the townspeople, in the novel). We are looking for success from the customer point of view — and team member satisfaction, as well. The PMBOK ® Guide , if used properly and with the appropriate techniques applied, will provide a foundation for success and can bring your project to life in a logical and effective manner and bring about a true sense of accomplishment for all stakeholders.

THE PMBOK ® GUIDE PROJECT PLAN ACCELERATOR ( PPA )

The PMBOK ® Guide provides a description and brief explanation of numerous tools techniques, and processes that may be utilized to develop a project methodology or to improve existing organi-zational processes intended to guide project teams and project leaders. This Project Plan Accelerator can be used to assist you in developing best practices for your organization by elaborating in more detail on the elements of the PMBOK ® Guide . Using the PMBOK ® Guide as a reference, you can create customized proc-esses, identify essential tools and techniques your organization would benefi t from using, and create templates that will improve overall project performance. The PMBOK ® Guide is an excel-lent source for developing customized processes and methodolo-gies that will bring consistency to the planning and execution of projects within an organization. The PPA basically connects the higher level, broader project management body of knowledge with the PMBOK ® Guide and can easily become the foundation for cre-ating processes that are specifi c and customized to an organization but relate to the standards described in the PMBOK ® Guide .

How to Use the Project Plan Accelerator

The Project Plan Accelerator will create a bridge between the PMBOK ® Guide , the greater project management body of

c01.indd 20c01.indd 20 2/23/09 10:09:36 AM2/23/09 10:09:36 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 37: Bringing The PMBOK Guide to Life

knowledge, and an actual project plan. Each item (input, tool or technique, output, process, etc.) discussed in the PMBOK ® Guide that is targeted to be included in a project plan can be analyzed and further developed to ensure that the item is clearly documented, explained, and fully understood by the project team and other stakeholders.

Answering the Question: Why Do Project Managers Need This Book?

Here are some questions to consider for plan development and management of the project life cycle:

Which elements of the PMBOK ® Guide can be used to assist in developing a project plan or a subsidiary project plan for your project? Each chapter contains process information, descriptions of tools and techniques, defi -nitions, lists, inputs, and outputs that could become key components of a project plan. Determine which elements, process groups, tool and techniques are most appropriate for your project. Which elements require additional research to ensure complete understanding and proper utilization? What tools or techniques are not applicable to the project? Why?

Consider the fi ve process groups and the integration of the nine knowledge areas when developing your project plans and other project documentation. The emphasis should be on the relationships and interdependencies of the nine knowledge areas and how the fi ve processes — initiating, planning, execut-ing, monitoring and controlling, and closing — bring the knowl-edge areas together to form a systems approach to managing your project. Basically, every item in the PMBOK ® Guide can be analyzed for inclusion in a project plan. Take any section of

The PMBOK® GUIDE Project Plan Accelerator (PPA) 21

c01.indd 21c01.indd 21 2/23/09 10:09:36 AM2/23/09 10:09:36 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 38: Bringing The PMBOK Guide to Life

22 Why Do Project Managers Need This Book?

the PMBOK ® Guide and select an item. As an example, let ’ s use the initiating process group:

Initiating process group . Determine the specifi c actions or processes that should be applied to ensure that projects and project phases are authorized to proceed. Think of your current project work environment. Think of the enterprisewide factors that will infl uence these deci-sions. Identify the organization ’ s processes that must be followed by the project team. Who are the key stakehold-ers that will make the decisions? What are the benefi ts associated with this project? Is there a business case with detailed information about the anticipated results? If the project is in progress, is it worth continuing to the next phase? Are the risks acceptable? Do you have enough funding? Are the variances acceptable?

For each component that has been selected, an analysis is completed to ensure that all major issues and questions have been identifi ed. Once the questions have been asked or the issues raised, the next step to take action to resolve the issue. In some cases, additional research is required before a decision can be made. This process can be scaled to meet the specifi c needs of the project. We know that each project is unique, and it may not be necessary to use all of the proc-esses, tools, and techniques that are available. However, using an approach like this actually helps to accelerate the planning process by organizing the elements that should be considered, analyzing each element to the appropriate level of detail and documenting the fi ndings for reference later. This process will also create a very useful lessons - learned fi le and may help to improve many existing organizational processes. Think about projects you are currently engaged in. Where are the obstacles?

c01.indd 22c01.indd 22 2/23/09 10:09:36 AM2/23/09 10:09:36 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 39: Bringing The PMBOK Guide to Life

What project components or planning issues require additional detail or research? Make a note of these items for reference later.

Notes: ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

The Project Plan Accelerator can effectively identify the main issues a project manager and team may encounter during project initiation and through project execution and closure. As you can see in the example, the components necessary for project plan-ning have been identifi ed and listed. The component is then analyzed, actions are assigned, and the supporting detail is obtained. The complexity of the project will determine how much detail is needed to develop a solid, workable plan. The byproduct of the Project Plan Accelerator is that it will become a lessons - learned library or a series of supporting documents that will fur-ther improve the effi ciency of the planning process.

The PMBOK® GUIDE Project Plan Accelerator (PPA) 23

c01.indd 23c01.indd 23 2/23/09 10:09:37 AM2/23/09 10:09:37 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 40: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

P

MB

OK

® G

uid

e C

ompo

nen

t/T

ool/

Tec

hn

iqu

e/P

roce

ss

An

alys

is, I

mpl

emen

tati

on A

ctiv

itie

s, a

nd

R

esea

rch

Req

uir

ed

Per

son

R

espo

nsi

ble

Dat

e R

equ

ired

Exa

mpl

e : E

nte

rpri

se

envi

ron

men

tal f

acto

rs

Defi

ne

the

fact

ors

wit

hin

th

e or

gan

izat

ion

’ s

envi

ron

men

t th

at w

ill h

ave

an im

pact

on

th

e pr

ojec

t pl

ann

ing

proc

ess.

Exa

mpl

e: W

hat

de

part

men

ts o

r or

gan

izat

ion

s w

ill b

e in

volv

ed in

th

e pr

ojec

t? W

hat

cro

ss - c

ult

ura

l iss

ues

mu

st b

e co

nsi

dere

d (w

ith

in t

he

orga

niz

atio

n a

nd

exte

rnal

to

th

e or

gan

izat

ion

)? W

hat

gov

ern

men

t or

indu

stry

sta

nda

rds

or

regu

lati

ons

mu

st b

e co

nsi

dere

d du

rin

g th

e pl

ann

ing

proc

ess?

H

ow w

ell w

ill t

he

orga

niz

atio

n ’ s

infr

astr

uct

ure

su

ppor

t th

e pr

ojec

t?

Wh

at is

th

e or

gan

izat

ion

’ s t

oler

ance

for

ris

k?

How

doe

s th

is t

oler

ance

aff

ect

proj

ect

plan

nin

g?

Iden

tify

spe

cifi

c te

am m

embe

rs o

r st

akeh

olde

rs w

ho

wil

l res

earc

h

the

requ

ired

in

form

atio

n.

Set

exp

ecta

tion

s ab

out

how

th

e in

form

atio

n w

ill

be p

repa

red

and

deli

vere

d .

Exa

mpl

e :

Org

aniz

atio

nal

pro

cess

as

sets

Iden

tify

th

e pr

oces

ses

that

exi

st w

ith

in t

he

orga

niz

atio

n t

hat

mu

st b

e fo

llow

ed—

Incl

ude

bu

sin

ess

rela

ted

proc

esse

s th

at m

ay a

ffec

t pl

ann

ing .

Wh

at s

afet

y pr

oced

ure

s m

ust

be

in p

lace

for

th

e pr

ojec

t?

24

c01.indd 24c01.indd 24 2/23/09 10:09:37 AM2/23/09 10:09:37 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 41: Bringing The PMBOK Guide to Life

Wh

at q

ual

ity

assu

ran

ce p

roce

sses

are

cu

rren

tly

in u

se a

nd

mu

st b

e in

clu

ded

in t

he

proj

ect

plan

-n

ing

proc

ess?

Wh

at is

th

e or

gan

izat

ion

’ s Q

ual

ity

Pol

icy?

A

re p

roje

ct p

lan

nin

g te

mpl

ates

ava

ilab

le?

Wh

ere

are

they

fi le

d?

Wh

at fi

nan

cial

con

trol

s ar

e in

pla

ce w

ith

in t

he

orga

niz

atio

n f

or t

ime

repo

rtin

g, t

rack

ing

cost

s,

prog

ress

pay

men

ts, a

nd

allo

cati

on o

f fu

nds

?

Exa

mpl

e : T

he

Pro

ject

m

anag

emen

t of

fi ce

(P

MO

)

Defi

ne

the

curr

ent

resp

onsi

bili

ties

of

you

r or

gan

i-za

tion

’ s P

MO

. W

hat

pro

cess

es h

ave

been

defi

ned

? W

hat

tra

in-

ing

is a

vail

able

to

proj

ect

man

ager

s? W

hat

is

the

leve

l of

supp

ort

prov

ided

by

the

PM

O?

Wh

at

addi

tion

al b

enefi

ts

may

be

gain

ed b

y ex

pan

din

g (o

r cr

eati

ng)

a P

MO

? W

hat

key

mea

sure

s of

su

cces

s h

ave

been

id

enti

fi ed

by

the

PM

O o

r sh

ould

be

trac

ked

by t

he

PM

O?

Exa

mpl

e : P

roje

ct

con

stra

ints

W

hat

are

the

spec

ifi c

con

stra

ints

ass

ocia

ted

wit

h th

e pr

ojec

t (s

ched

ule,

res

ourc

e av

aila

bili

ty,

fund

ing,

ski

ll le

vels

, con

trac

tual

item

s et

c.)?

(c

onti

nu

ed)

25

c01.indd 25c01.indd 25 2/23/09 10:09:37 AM2/23/09 10:09:37 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 42: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

(C

onti

nued

) P

MB

OK

® G

uid

e C

ompo

nen

t/T

ool/

Tec

hn

iqu

e/P

roce

ss

An

alys

is, I

mpl

emen

tati

on A

ctiv

itie

s, a

nd

R

esea

rch

Req

uir

ed

Per

son

R

espo

nsi

ble

Dat

e R

equ

ired

Exa

mpl

e : P

roje

ct m

an-

agem

ent

info

rmat

ion

sy

stem

Wh

at a

uto

mat

ed s

yste

ms

wil

l be

use

d to

man

age

proj

ect

info

rmat

ion

(pr

ojec

t so

ftw

are,

en

terp

rise

- le

vel s

oftw

are,

tim

e re

port

ing

syst

ems,

fi n

anci

al

repo

rtin

g sy

stem

s, d

ocu

men

t m

anag

emen

t sy

s-te

ms,

rep

osit

orie

s)?

Ad

d c

ompo

nen

ts a

s n

eed

ed a

nd

com

plet

e th

e co

lum

ns

and

row

s by

dev

elop

ing

and

th

en

answ

erin

g qu

esti

ons

abou

t th

e pr

ojec

t an

d

the

plan

usi

ng

the

ter-

min

olog

y d

escr

ibed

in

th

e P

MB

OK

® G

uid

e.

Ask

you

rsel

f w

hy

this

pla

nn

ing

com

pon

ent

is

impo

rtan

t, a

nd

dete

rmin

e h

ow m

uch

you

sh

ould

kn

ow a

bou

t it

. It

is n

eces

sary

? W

hy?

How

wil

l yo

u u

se it

? D

o yo

u f

ull

y u

nde

rsta

nd

wh

at it

is, a

s w

ell a

s it

s ov

eral

l im

port

ance

? R

emem

ber:

Th

e P

MB

OK

® G

uid

e pr

ovid

es in

for-

mat

ion

th

at c

ould

be

use

d in

pro

ject

pla

nn

ing

but

som

e co

mpo

nen

ets

may

not

be

nec

essa

ry f

or y

our

proj

ect.

26

c01.indd 26c01.indd 26 2/23/09 10:09:37 AM2/23/09 10:09:37 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 43: Bringing The PMBOK Guide to Life

Chapter Two

The Big Picture

Project management has been practiced since the days of the pyramids and project methodologies have been evolving for dec-ades. This evolution includes everything from resource man-agement to network diagram development to leadership and motivation techniques. I like to think that project management has evolved into an essential element of overall business man-agement and includes a very unique and desirable skill set. I see it as a fi eld where leadership and management skills become balanced and provide an essential element for overall organiza-tional success not only at the project level but at the strategic level as well. Project managers are trained to look at the larger picture and focus on things such as vision, objectives, goals, coor-dination, and integration. When the PMBOK ® Guide was origi-nally developed, the main focus was on eight knowledge areas:

1. Scope management . What must be done? 2. Time management . When should it be done? 3. Cost management . How much will it cost? 4. Quality management . How good should it be? 5. Human resource management . Who will do the work?

27

c02.indd 27c02.indd 27 2/23/09 10:10:37 AM2/23/09 10:10:37 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 44: Bringing The PMBOK Guide to Life

6. Communications management . How will information be delivered?

7. Risk management. What problems may be encountered? 8. Procurement management . What material, supplies,

talent, and equipment must be obtained?

The ninth knowledge area, Integration management was added in the 1996 edition of the PMBOK ® Guide. These knowl-edge areas were defi ned in terms of their specifi c lower - level components and process groups and were described independ-ently for learning purposes. The connection between scope and time management or human resource and quality management was not clearly defi ned, although the areas were very much linked in the overall planning processes. As we look at how projects are managed today, we can see that we do not focus fi rst on scope, then on time management, then on risk man-agement, and so on. Project managers consider the linkages between each area of knowledge and create integrated plans with the input and expertise of the project team members (the representatives of the functional groups) and other key project stakeholders. This integrated approach ensures the develop-ment of a more complete project plan.

In the ideal project management world, the project manager would be given the opportunity to review, select and arrange to have the appropriate resources assigned to a project and would then manage the planning process from a facilitator/leader per-spective. The project manager would not be the technical expert, but would have a suffi cient understanding of the technology involved to coordinate activities, discuss issues with clients and subject matter experts, manage interfaces with functional groups, and make decisions regarding project performance or changes in the project plan. This is what can be referred to as the big pic-ture view . In actual project practice, the project manager is often

28 The Big Picture

c02.indd 28c02.indd 28 2/23/09 10:10:37 AM2/23/09 10:10:37 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 45: Bringing The PMBOK Guide to Life

required to manage the overall project, and will also be respon-sible for a portion of the technical work and some deliverables. In these cases, the project manager must be able to shift from a managerial role to a technical role and back again. This presents somewhat of a challenge to the project manager as there will always be a need to observe the project from a higher - level or cross organizational viewpoint. An understanding of how projects are managed from start to fi nish, how the project may impact an organization ’ s daily operations, and how all of the components of the project are integrated is essential for success. If we exam-ine the relationship between the knowledge areas and the fi ve process groups, we can see how the overall project management process comes together.

The fi ve processes (Initiating, Planning, Executing, Monitoring and Controlling, and Closing), which contain subsets of lower - level processes associated with the nine knowledge areas, can be used to manage a specifi c project phase or the entire project life cycle. Identifying the subprocesses, activities, and deliv-erables associated with each major process group will provide project teams and stakeholders with a fairly complete picture of what is required to plan and complete a project successfully. This approach can be used by any organization to develop a universal project methodology and can be customized, changed, and updated relatively easily. Relating the fi ve process groups to each phase of the project as well as at the project life cycle level provides a greater foundation for more effective planning and overall project control.

Figure 2.1 shows how the fi ve process groups integrate the subprocesses associated with each knowledge area to create a basic fl ow of how a project is managed from start to fi nish. This higher - level process can be customized to meet the spe-cifi c project planning requirements of any organization. These are not phases of a project but a logical fl ow of the work that

The Big Picture 29

c02.indd 29c02.indd 29 2/23/09 10:10:38 AM2/23/09 10:10:38 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 46: Bringing The PMBOK Guide to Life

30

Init

iati

ng

Pla

nn

ing

Map

to

busi

nes

sst

rate

gies

an

dob

ject

ives

Pro

ject

Sel

ecti

on

Bu

sin

ess

case

N

eeds

an

alys

is

Fea

sibi

lity

C

ost/

ben

efit

an

alys

is

tan

gibl

e an

d in

tan

gibl

e C

apab

ilit

y

Dev

elop

sco

pe o

f w

ork

Sco

pe s

tate

men

t W

BS

S

ched

ule

B

udg

et

Con

trol

pla

ns/

proc

esse

s R

oles

an

d re

spon

sibi

liti

es(R

AM

) R

isk

plan

nin

gP

rior

itiz

e

Bu

sin

ess

requ

irem

ents

n

eeds

iden

tifi

ed

Ch

ange

man

date

d A

ddit

ion

s to

Bu

sin

ess

New

Bu

sin

ess

Com

plia

nce

/ R

egu

lato

ry

Th

e B

egin

nin

g

Pro

ject

app

rove

d P

urp

ose

defi

ned

Fu

ndi

ng

requ

irem

ents

Hig

h-l

evel

sch

edu

leR

esou

rce

requ

irem

ents

Pro

ject

man

ager

sel

ecte

dS

pon

sor

expe

ctat

ion

sC

onst

rain

ts id

enti

fied

Ass

um

ptio

ns

esta

blis

hed

Ris

ks id

enti

fied

Ch

arte

r S

ign

ed

Su

bsid

iary

Pla

ns

Qu

alit

y C

omm

un

icat

ion

sTe

stin

g A

ccep

tan

ce

Saf

ety

Ch

ange

con

trol

Figu

re 2

.1

Flow

Cha

rt o

f th

e Ty

pica

l Act

iviti

es a

nd D

eliv

erab

les

Ass

ocia

ted

with

a P

roje

ct M

anag

emen

t Pr

oces

s.

c02.indd 30c02.indd 30 2/23/09 10:10:38 AM2/23/09 10:10:38 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 47: Bringing The PMBOK Guide to Life

Figu

re 2

.1

(Con

tinu

ed )

Go

to n

ext

proj

ect

Ch

ange

con

trol

bo

ard

(CC

B)

Res

olve

issu

es

Mak

e co

nti

nge

ncy

pla

ns

Off

er r

ewar

d an

d re

cogn

itio

n

Con

duct

pro

ject

rev

iew

s S

eek

inn

ovat

ion

Exe

cute

pla

n

En

gage

res

ourc

es

Trac

k pe

rfor

man

ce

Rep

ort

stat

us

Imp

lem

enta

tion

Ope

rato

rs

Cu

stom

ers

En

d u

sers

Han

d-o

ff T

o:

Tran

siti

on

Rev

iew

del

iver

able

s C

lear

/res

olve

pu

nch

list

O

btai

n a

ccep

tan

ce

Clo

se f

inan

cial

acc

oun

tsF

inal

ize

docu

men

tati

on

• T

rain

ing

• P

roto

cols

Adm

inis

trat

ion

Mai

nte

nan

ce

Con

duct

pro

ject

rev

iew

Cu

stom

er •

Ext

ern

al •

Les

son

s le

arn

ed

• R

ewar

d an

d re

cogn

itio

n

Clo

se-O

ut

CE

LE

BR

AT

E!!

Exe

cuti

ng

Con

trol

lin

g

Clo

sin

g

31

c02.indd 31c02.indd 31 2/23/09 10:10:39 AM2/23/09 10:10:39 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 48: Bringing The PMBOK Guide to Life

32 The Big Picture

would be performed to complete a project. The PMBOK ® Guide associates the fi ve process groups with the sub processes found in each knowledge area to create a more integrated planning process where many planning activities are actually imple-mented concurrently.

Using the fl owchart as a basis for discussion, a project man-ager can clearly explain to a project team or to stakeholders who are not familiar with formal project management proce-dures how a project is planned, executed, and eventually closed. This fl owchart is the basis for Bringing the PMBOK ® Guide to Life . The intention is not to compete or replace the PMBOK ® Guide but to provide an enhancement and a convenient refer-ence and support resource that is especially useful for organiza-tions where formal project management may be resisted.

THE INITIATING PROCESS

All projects go through some type of initiating process. Sometimes the process is very quick, especially for small, mini-mally complex, and short - duration project. In other cases, the process can become tedious, lengthy, and challenging to the peo-ple involved. Regardless of the type of project, even if the project involves moving a person from one offi ce to another, replacing a computer, or painting a room in your home, some type of reason-ing and validation for the project is required.

The Beginning

Most projects begin with some type of need or problem to be solved. Things to consider during the process of initiating a project include the business objectives, business requirements (what would be needed to achieve the business objectives), a change that is mandated by management and may require

c02.indd 32c02.indd 32 2/23/09 10:10:39 AM2/23/09 10:10:39 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 49: Bringing The PMBOK Guide to Life

The Initiating Process 33

signifi cant effort to accomplish, additions to the business such as new products or services, creating a new business division and a new product line, or compliance with a government regu-lation. The initiating process should include some dialog about why a project may be necessary.

Project Selection

During this part of the process, projects that are being consid-ered are analyzed for value to the organization. Project selec-tion may include several different techniques, and the rationale for selection may also vary. Selection includes analysis of several factors:

Is there a business case for the project? How well does the business case explain the project? Does the project map to the organization ’ s overall strat-egy and long - term plan? What are the organizational limitations — available fund-ing, resources, current workload? Does the organization have the capability to perform the work? Is it feasible? What is the benefi t of performing the project in terms of the tangible (example: return on investment) and intan-gible benefi ts (affect on reputation, employee morale, social acceptance)? What are the specifi c capabilities required and does the organization have those capabilities? Examples: skills, machinery and capacity of production groups, expertise in the product or service.

As projects are selected and included in a project portfolio, the organization should arrange projects in order of priority. Organizations generally do not have unlimited resources, and

c02.indd 33c02.indd 33 2/23/09 10:10:39 AM2/23/09 10:10:39 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 50: Bringing The PMBOK Guide to Life

34 The Big Picture

there will be occasional decisions to sacrifi ce a less - important project for a more critical project in terms of use of human and other resources.

Project Charter Signed

The project charter is generally defi ned and accepted as the document that authorizes the project to use organizational resources. The charter indicates that the project has gone through the selection process and that a sponsor sees the value of the project, or there is agreement that the project is neces-sary. The purpose of the project is defi ned, a high - level estimate of the project budget is prepared, there is some information about the schedule, mainly in terms of milestones, the resources and various functional groups are identifi ed, and the project manager is assigned. (Resource requirements and other factors will change as the project is further defi ned.) The project char-ter may also defi ne the specifi c expectations of the project spon-sor and the level of authority of the project manager. An initial set of project assumptions and project constraints may also be included in the document.

Sample Outline of a Project Charter

There are many examples of project charters available for ref-erence. In some organizations the project charter, statement of work, and scope statement are included in one document. The charter is not a project plan but becomes part of the planning process. Typical components of a project charter include:

Project Name and unique identifi er . Some organizations assign specifi c project numbers for ease of tracking.

Business need . Why the project has been approved. Product or service description . What the project will pro-

duce in the form of deliverables.

c02.indd 34c02.indd 34 2/23/09 10:10:39 AM2/23/09 10:10:39 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 51: Bringing The PMBOK Guide to Life

The Initiating Process 35

Stakeholder identifi cation . The organizations and individu-als that will be assigned to the project or affected by the project. This includes business units, individuals, func-tional groups, customers, contractors, and people nega-tively affected by the project results.

Summary schedule . Milestones and contractual dates. Assumptions. Planning items that are based on an assess-

ment of the organization ’ s environment, resource avail-ability, organizational capabilities, and other factors.

Constraints . Limitations that must be considered during the planning and execution of the project.

Budget . High - level estimate (rough order of magnitude) of the cost of the project. The budget will be defi ned in greater detail as the planning process is engaged.

Project Charter Table of Contents *

A project charter may appear in the form of a detailed docu-ment that includes a well - organized table of contents. This depends on the organization and the level of maturity of the project management methodology. The charter document may include the following items:

Section 1. Project Overview 1.1 Problem Statement 1.2 Project Description 1.3 Project Goals and Objectives 1.4 Project Scope 1.5 Critical Success Factors 1.6 Assumptions 1.7 Constraints

* Sample from Texas Department of Resources, www.dir.state.tx.us/pubs/framework/gate1/projectcharter .

c02.indd 35c02.indd 35 2/23/09 10:10:40 AM2/23/09 10:10:40 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 52: Bringing The PMBOK Guide to Life

36 The Big Picture

1.8 Assumptions 1.9 Constraints

Section 2. Project Authority and Milestones 2.1 Funding Authority 2.2 Project Oversight Authority 2.3 Major Project Milestones

Section 3. Project Organization 3.1 Project Structure 3.2 Roles and Responsibilities 3.3 Project Facilities and Resources

Section 4. Points of Contact Section 5. Glossary Section 6. Revision History Section 7. Appendices

This example clearly shows the major elements associated with a project charter and can be used as a model for develop-ing a customized charter document for many organizations.

THE PLANNING PROCESS

The planning process includes elements from several project management knowledge areas. The process is based on an integration of these elements to develop a well - organized and complete project plan. During the planning process, the project scope is defi ned in more detail (this is referred to as the scope defi nition process). A project scope statement is created and defi nes the project in much more detail than the project char-ter. The general understanding of a scope statement is that it answers the following questions about the project: Who is involved? Why it is needed? When must it be done? Where will it be done? How will it be done? How much will it cost? How many deliverables must be produced? Who will do the work?

c02.indd 36c02.indd 36 2/23/09 10:10:40 AM2/23/09 10:10:40 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 53: Bringing The PMBOK Guide to Life

The Planning Process 37

The scope statement is not a plan but it is a document that will help the project team develop a comprehensive plan by basically providing enough detail for the team and other stakeholders to fully understand what the project is all about. During the plan-ning process, the project team and project manager will use sev-eral tools and techniques and spend a signifi cant amount of time asking questions, gathering data, reviewing lessons learned, and revising the scope of work to ensure that all stakeholders fully understand what must be accomplished. Typically, the planning process includes activities associated with the following items:

Scope statement development. The scope is defi ned in detail. In some cases the scope statement is derived from the project contract or statement of work. Work breakdown structure (WBS). Decomposition of the project in steps and layers to display the project in increasing levels of detail. Work Breakdown Structure Dictionary. This document is sometimes used to provide stakeholders with additional information and details about project tasks and activities Project schedule. The arrangement of project activities in predecessor/successor relationships to create a network diagram that shows the logical fl ow of work and the esti-mated duration of project activities to indicate the total duration of the project. The project ’s critical tasks are also defi ned. The project schedule is the result of a coor-dinated effort by the project manager and the team. Project budget. The total estimated costs of the project, including human resources, equipment, tools, materials, and other costs such as travel, rent, supplies, conference facilities, and recurring project costs. Control plans and processes. These are the processes that will help the project team to control changes, identify

c02.indd 37c02.indd 37 2/23/09 10:10:40 AM2/23/09 10:10:40 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 54: Bringing The PMBOK Guide to Life

38 The Big Picture

variances to the plan, escalate issues, and identify project jeopardy situations. Control procedures should be well doc-umented, mutually agreed upon by the stakeholders, and enforced to minimize project disruptions and unauthor-ized changes. Without controlling processes, the project team may experience a common problem known as scope creep — the uncontrolled addition of work into the project. Roles and responsibilities. The planning process includes the identifi cation of key project stakeholders and the ability to align these stakeholders with the project tasks identifi ed during the WBS development. Clearly defi ned roles and responsibilities will reduce confl icts, promote more effi cient use of resources, and help to develop a high - performing team. A common approach and tool for defi ning roles and responsibilities is the responsibility assignment matrix (RAM) that aligns the major project tasks identifi ed in the WBS with the functional managers assigned to the project. This is shown in Table 2.1 . Risk planning. During the planning process, the project stakeholders will assess potential threats and opportuni-ties, identify potential risk events, and plan strategies to respond to identifi ed risks. Risk responses are associated with the following actions:

Avoidance . Attempting to fi nd an alternative to a risk situation that is unacceptable and potentially danger-ous or could have severe consequences. Mitigation . Attempting to reduce the probability and impact of the identifi ed risk. Transfer . Identifying a resource that can manage the risk more effectively and handing over the risk situa-tion to that resource. This is not avoidance of the risk; the risk has been identifi ed and a qualifi ed resource or

c02.indd 38c02.indd 38 2/23/09 10:10:41 AM2/23/09 10:10:41 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 55: Bringing The PMBOK Guide to Life

The Planning Process 39

organization will assume the responsibility of manag-ing the risk. Acceptance . The acceptance of a risk indicates that the project team understands the nature of the risk situ-ation and has either developed a plan to manage the risk situation if it occurs or it is confi dent that the risk will be handled effectively if it does occur. Additionally, there are responses for managing risks that are consid-ered to have a positive effect on the project: Exploiting a risk situation — Actually attempting to encourage the situation to happen due to its potential positive impact; Enhancing — working to obtain the greatest benefi t of the situation; Sharing — advising others in the organi-zation about the positive impact of the risk event. It is important to note that project risk management may also be associated with opportunities or positive

Table 2.1 Responsibility Assignment Matrix WBS Element

Team Member Name (Project manager)

Team Member Name (Client)

Team Member Name (Engineer)

Team Member Name (Quality Assurance Mgr)

1.1 R I C C

1.2 C I R C

2.1 C R I C

R � Responsible—This identifi es the person responsible for the completion of the task or WBS elementI � Inform—This person must be informed of task statusC � Contribute—This person is involved in the delivery of the WBS element and may provide resources or effort to assist in the comple-tion of the element.

c02.indd 39c02.indd 39 2/23/09 10:10:41 AM2/23/09 10:10:41 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 56: Bringing The PMBOK Guide to Life

40 The Big Picture

outcomes. In situations where opportunity exists the project manager and team should focus on exploiting the opportunity (making it happen), enhancing the opportu-nity (maximizing the benefi ts) and sharing the opportu-nity (improving overall organizational performance)

Subsidiary plans . Depending on the type of project and its complexity, the project team may develop supporting plans for the overall project management plan. These plans pro-vide guidance about control procedures and decision mak-ing and a more detailed level of information for elements of the project plan that are generally directly connected to a specifi c knowledge area of the PMBOK ® Guide . Subsidiary plans are developed based on the needs of the project. Examples of subsidiary plans:

Scope management plan Cost management plan Risk management plan Quality management plan Communications management plan Procurement management plan Schedule management plan Human resource management plan Safety management plan Change control and confi guration management plans Testing and acceptance plan Cutover and handoff plans Reward and recognition plan Project close - out plans

Subsidiary plans will vary, depending on the project type, the methodology being used, the culture or the organization, the managerial styles of the organization and the urgency associated with the project. The detail of

•••••••••••••••

c02.indd 40c02.indd 40 2/23/09 10:10:41 AM2/23/09 10:10:41 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 57: Bringing The PMBOK Guide to Life

Executing, Monitoring and Controlling 41

each of these plans depends on the project type and the project management maturity level of the organization.

EXECUTING, MONITORING AND CONTROLLING, AND CLOSING PROCESSES

Executing

At the completion of the planning process, the project manager and team will begin to execute the tasks and activities that have been planned. The assigned resources are obtained, engaged in the project and begin to perform their specifi c project activi-ties. Procurement activities such as RFP submissions and seller selection begin and contracts are negotiated. As work is per-formed, results will be produced that must be analyzed. The project manager obtains status from the project team and tracks performance against the plan. Status reports are generated as described in the communications plan (a subsidiary plan defi n-ing the process in which progress, status, and forecast informa-tion is developed and distributed) and the project manager uses techniques such as earned value analysis to determine where variances are occurring.

Changes are introduced by project stakeholders during execution and are managed through the change control plan developed in the planning processes. Quality assurance man-agers assess the work and compare it to standards and defi ned requirements. Issues are raised by the project stakeholders and are analyzed for impact on the project, and solutions are developed. As risk situations are encountered, the project team utilizes contingency plans or develops responses to manage the issue. During execution of the plan, the project manager should exercise a reward and recognition process and actively acknowledge team members for excellent work and the achieve-ment of milestones. This regular, and sincere, acknowledgment will help to maintain team morale and loyalty.

c02.indd 41c02.indd 41 2/23/09 10:10:42 AM2/23/09 10:10:42 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 58: Bringing The PMBOK Guide to Life

42 The Big Picture

Project reviews are conducted throughout the project life cycle. These reviews help the team to determine what addi-tional actions may be necessary to correct a variance or deter-mine if the project should continue into the next phase. During execution, project teams may be required to innovate and use creativity to resolve issues, especially in an environment where funding, time, and resources are extremely limited. While the project is being executed the project manager and the team will engage in monitoring and control activities that will identify where variances are unacceptable. The use of control charts, Pareto diagrams, root cause analysis, change control systems, confi guration management processes, and earned value analy-sis will provide the data to minimize risks and identify symp-toms that could result is serious project problems in the form of schedule delays, cost overruns or safety issues.

Closing Process and Project Closeout

The closing of the project is a critical part of the overall project life cycle. The project team, as part of the planning process, should have developed a plan for closing out the project. There is a very specifi c and important need to determine what is required to actually achieve acceptance of the project. During the closing process, the project deliverables are reviewed to ensure compli-ance with the scope statement and the project contract. Often, the project team will be provided with a punch list (a list of unac-ceptable items that must be corrected) from the client. A carefully developed plan and a strong and well - executed monitoring and control process will help to minimize the size of the punch list.

The objective of the closing process is to obtain formal accept-ance from the client or intended user of the product or service. Formal acceptance criteria are developed in the planning proc-ess as a subsidiary plan (as needed).

c02.indd 42c02.indd 42 2/23/09 10:10:42 AM2/23/09 10:10:42 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 59: Bringing The PMBOK Guide to Life

A Word about Recognition and Acknowledgment 43

As the project progresses through the close - out process, any open fi nancial accounts should be updated and then closed as soon as possible to prevent additional charges to the accounts. The team reviews all project documentation and prepares all required fi nancial statements, training procedures, administra-tive processes, protocols, maintenance procedures, and any other items identifi ed in the contract or other project agreements.

THE PROJECT REVIEW

The project plan should include the scheduling of project reviews throughout the lifecycle of the project. Ideally, a project review should be conducted at the end of each phase. The review process will assist in identifying best practices, as well as areas where additional improvement is needed. Project reviews may be completed in stages. Customer reviews are scheduled to obtain information from the user ’ s perspective, and internal team reviews may be scheduled to discuss what the team accomplished well and where the team should focus attention for improvement. During the review process, the team identifi es lessons learned and improved ways of perform-ing work. These lessons learned may be used to update the organization ’ s processes and procedures and improve the capa-bility of the organization to manage projects successfully.

A WORD ABOUT RECOGNITION AND ACKNOWLEDGMENT

The closing procedure should include some type of reward and recognition event. The type of project, the available funding, and other factors must be considered, but regardless of project size, recognition of work well done is critical and an absolute neces-sity. People do like to receive an acknowledgment occasionally,

c02.indd 43c02.indd 43 2/23/09 10:10:42 AM2/23/09 10:10:42 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 60: Bringing The PMBOK Guide to Life

44 The Big Picture

and lack of acknowledgment has many negative side affects. It is important to note that culture will be a factor to consider when determining an appropriate recognition process. Project managers should, whenever possible, include in the project plan a budget for recognition. If funding is not available or organiza-tional procedures do not create an opportunity for formal rec-ognition, the project manager should at least take the time to recognize the team for the success through letters, certifi cates of appreciation, or other activities. A well delivered and sincere acknowledgment will generally pay off in terms of greater loy-alty, strengthened relationships, and a willingness to step up to the next project with confi dence.

THE PMBOK ® GUIDE PROJECT PLAN ACCELERATOR ( PPA )

Using information from this chapter and the PMBOK ® Guide for additional reference, make a note of any specifi c planning items that should become components of your project plan. Describe the component and develop questions around the component that will enable you to effectively use the component in the plan.

The Big Picture

Developing a high - level Project Plan Accelerator document requires the project manager and project team to view the project from an “ executive ” or strategic viewpoint. To develop the big picture, you might ask yourself these questions:

Which elements of the overall planning process will be used in the management of the project? Use the PMBOK ® Guide as your reference source. How complex is the project? What do you know about it?

c02.indd 44c02.indd 44 2/23/09 10:10:43 AM2/23/09 10:10:43 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 61: Bringing The PMBOK Guide to Life

Who are the stakeholders and what are their respective roles? What planning documents are available within the organization? What lessons learned and best practices have been documented? What training may be needed for the functional managers and team members?

Consider how the fi ve process groups and the knowledge areas will be used during planning and execution. Determine what is missing from your process by analyzing your organiza-tion ’ s internal processes and lessons learned fi les. Remember that planning is an iterative process and plans will change as more project details emerge.

Notes:

The PMBOK ® GUIDE Project Plan Accelerator (PPA) 45

c02.indd 45c02.indd 45 2/23/09 10:10:43 AM2/23/09 10:10:43 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 62: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

P

MB

OK

® G

uid

e C

ompo

nen

t/T

ool/

T

ech

niq

ue/

Pro

cess

Act

ion

Pla

n fo

r Im

plem

enta

tion

(D

evel

op q

ues

tion

s th

at c

ould

be

rese

arch

ed b

y te

am

mem

bers

.)

Per

son

R

espo

nsi

ble

Dat

e R

equ

ired

Exa

mpl

e: T

he

begi

nn

ing

How

do

proj

ects

beg

in in

you

r or

gan

izat

ion

? R

efer

to

the

fl ow

char

t fo

r id

eas.

Wh

at a

ctio

ns

are

typi

call

y ta

ken

as

a pr

ojec

t be

gin

s?

Wh

o is

invo

lved

an

d w

hat

are

th

ey r

espo

nsi

ble

for?

Lis

t th

ese

step

s or

act

ivit

ies .

Exa

mpl

e: I

nit

iati

ng

Wh

at a

re t

he

step

s u

sed

to in

itia

te a

pro

ject

in y

our

orga

niz

atio

n?

Th

is w

ould

incl

ude

a r

evie

w o

f pr

ojec

t se

lect

ion

cri

teri

a. (

Wh

at s

elec

tion

cri

teri

a is

use

d?)

How

is t

he

proj

ect

form

ally

au

thor

ized

?

Wh

at a

re t

he

busi

nes

s n

eeds

an

d re

quir

emen

ts t

he

proj

ect

wil

l add

ress

?

Wh

at a

re t

he

proj

ect

obje

ctiv

es?

Wh

at is

th

e co

nn

ecti

on b

etw

een

th

e pr

ojec

t an

d th

e st

rate

gic

plan

?

Is a

pro

ject

ch

arte

r av

aila

ble?

Has

a p

reli

min

ary

scop

e st

atem

ent

been

pre

pare

d?

46

c02.indd 46c02.indd 46 2/23/09 10:10:43 AM2/23/09 10:10:43 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 63: Bringing The PMBOK Guide to Life

Exa

mpl

e: P

lan

nin

g O

utl

ine

you

r pl

ann

ing

proc

ess.

Wh

at c

an b

e ad

ded

or o

mit

ted?

Wh

at a

re t

he

proj

ect

risk

s?

Wh

at p

roje

ct d

epen

den

cies

hav

e be

en id

enti

fi ed

?

Wh

at o

ppor

tun

itie

s ex

ist?

Wh

at a

re t

he

proj

ect

con

stra

ints

?

Wh

at a

ssu

mpt

ion

s h

ave

been

iden

tifi

ed?

How

wil

l cos

t an

d ac

tivi

ty d

ura

tion

be

esti

mat

ed?

Exa

mpl

e: E

xecu

tin

g H

ow w

ill t

he

orga

niz

atio

ns

invo

lved

rec

eive

dir

ecti

on?

How

wil

l th

e pr

ojec

t te

am b

e ac

quir

ed?

Wh

o w

ill p

erfo

rm q

ual

ity

assu

ran

ce?

How

wil

l pro

ject

info

rmat

ion

be

dist

ribu

ted?

Exa

mpl

e:

Mon

itor

ing

and

Con

trol

lin

g

Wh

at c

ontr

ol p

roce

dure

s h

ave

been

dev

elop

ed?

Is a

n in

tegr

ated

ch

ange

con

trol

pro

cess

in p

lace

?

How

wil

l del

iver

able

s be

rev

iew

ed a

nd

acce

pted

? (S

cope

ve

rifi

cati

on.)

Wh

at is

th

e pr

oces

s fo

r m

anag

ing

scop

e, c

ost,

an

d sc

hed

-u

le c

han

ges?

Wh

at is

th

e pr

oces

s fo

r m

anag

ing

con

trac

t ad

min

istr

atio

n?

(c

onti

nu

ed)

47

c02.indd 47c02.indd 47 2/23/09 10:10:43 AM2/23/09 10:10:43 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 64: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

(C

onti

nued

) P

MB

OK

® G

uid

e C

ompo

nen

t/T

ool/

T

ech

niq

ue/

Pro

cess

Act

ion

Pla

n fo

r Im

plem

enta

tion

P

erso

n

Res

pon

sibl

e D

ate

Req

uir

ed

Exa

mpl

e: C

losi

ng

Wh

at is

th

e pr

oces

s fo

r cl

osin

g ou

t yo

ur

proj

ects

? H

ow e

ffec

tive

are

you

r pr

ojec

t re

view

s? D

o yo

u h

ave

a de

fi n

ed a

ccep

tan

ce p

roce

ss?

How

do

you

rec

ogn

ize

you

r pr

ojec

t te

am?

Wh

at is

th

e pr

oces

s to

en

sure

com

plia

nce

wit

h c

ontr

ac-

tual

obl

igat

ion

s?

Is t

her

e a

form

al p

roje

ct c

losi

ng

proc

ess

to fi

nal

ize

all

acti

viti

es?

48

c02.indd 48c02.indd 48 2/23/09 10:10:44 AM2/23/09 10:10:44 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 65: Bringing The PMBOK Guide to Life

Chapter Three

Project Plan SWOT Analysis

“The fi rst casualty in any battle is the plan.”—Napoleon

Project managers, especially those who work in organizations where risk management is a high priority or where strategic planning is emphasized, will be familiar with a SWOT analy-sis (strengths, weaknesses, opportunities, threats). With just a bit of imagination, the SWOT analysis technique can be applied to the development of a project plan. Managers view the SWOT Analysis as a strategic planning method used to evaluate the S trengths, W eaknesses, O pportunities, and T hreats involved in a project or in a business venture. It involves specifying the objective of the business venture or project and identifying the internal and external factors that are favorable and unfavorable to achieving that objective. From a project manager ’ s perspective a SWOT anal-ysis is also associated with risk planning. Regardless of viewpoint the technique is a useful planning technique. There is a quote most project managers are familiar with: “ If you fail to plan, then you plan to fail. ” I also refer to a quote attributed to Napoleon: “ The fi rst casualty in any battle is the plan, ” and a quote by General Dwight D. Eisenhower: “ In preparing for battle, I have always found that plans are useless, but planning is indispensable. ”

49

c03.indd 49c03.indd 49 2/23/09 10:11:23 AM2/23/09 10:11:23 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 66: Bringing The PMBOK Guide to Life

Clearly, planning is critical to success, and having a plan pro-vides the basis for decision making, control and effectively man-aging the project. We go through a planning process to develop plans that will set the direction of the project and keep the project team on track. The approved plan is executed and, inevi-tably, change occurs. We can expect change, mainly because all plans are based on estimates (guesses) and knowledge or lessons learned from the past. The uncertainty of the project ’ s future and the inability to actually predict a defi nitive outcome will require us to continually update and change plans to meet the desired objectives. With uncertainty in mind, we can use the SWOT analysis process to develop a plan framework, and eventually a project plan that addresses project risk at the appropriate level. A project plan SWOT analysis will not eliminate the need for changes or remove uncertainty, but it can reduce many unneces-sary changes and minimize, to some extent, the probability that some important planning components will be omitted. Refer to Table 3.1 for an example of a plan SWOT analysis.

Table 3.1 Project Plan SWOT Analysis Strengths Opportunities What specifi c components are included in the plan that will clearly assist the team in achieving the project objectives? Consider what can be done (if anything) to further strengthen the plan.

Examples:

Is a clearly defi ned Communication plan in place?

Has the team developed an effective and agreed upon Change management plan?

What opportunities have been identifi ed during the development of the plan or as a result of the completed plan (at the project level and the organizational level)?

Examples:

A more streamlined and effi -cient planning process can be documented from lessons learned.

50 Project Plan SWOT Analysis

c03.indd 50c03.indd 50 2/23/09 10:11:23 AM2/23/09 10:11:23 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 67: Bringing The PMBOK Guide to Life

A project plan SWOT analysis will assist the project man-ager in identifying where additional plan development work is required. The key is to enhance strengths, resolve and strengthen weaknesses, exploit opportunities, and remove or minimize threats. The action items developed to address these

Is a Risk management process in place and communicated to all stakeholders?

Are Contingencies included in cost and schedule estimates?

Is the plan concise and written in a format that will be understood by the stakeholders?

Does The plan include specifi c measurable objectives?

Is the administrative burden (extra paperwork, reports, excessive meeting requirements, approval processes) minimized?

The PMO will be able to develop a more consistent organizational planning process.

The plan approval process can be accelerated.

There will be greater levels of customer and key stakeholder satisfaction.

Weaknesses Threats

What weaknesses can be detected during plan reviews?

Examples:

Language is unclear.

Technical information is ambiguous.

Input from functional units is incomplete.

The plan does not address the full scope of the project.

Information is not provided at the appropriate level of detail.

What threats exist that should be removed or mitigated?

Examples:

Pressure for action from management may result in incomplete plans.

Lack of a clearly defi ned plan may result in loss of support from management.

Lack of input from end users may result in signifi cant resistance to the plan.

Planning is not a priority of the organization.

Project Plan SWOT Analysis 51

c03.indd 51c03.indd 51 2/23/09 10:11:23 AM2/23/09 10:11:23 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 68: Bringing The PMBOK Guide to Life

52 Project Plan SWOT Analysis

areas, when properly executed, will result in a strong, well doc-umented, and more complete project plan.

PROJECT PLAN ACCELERATOR

Using information from this chapter and the PMBOK ® Guide for additional reference, make a note of any specifi c planning items that should become components of your project plan. Describe the component and develop questions around the com-ponent that will enable you to effectively use the component in the plan.

Project Plan SWOT Analysis

Discuss the swot analysis process with your team mem-bers. Explain the technique and the desired outcome. Provide examples of strengths, weaknesses, opportuni-ties, and threats. Using examples to explain the process will accelerate the learning curve and produce a more complete and usable document. Use the Project Plan Accelerator template to identify the project plan components. (Refer to the fi ve process groups and nine knowledge areas to further identify plan components.)

Consider how the fi ve process groups and the knowledge areas can be used during the SWOT analysis. As an example: The planning process group includes scope planning, create the WBS, activity defi nition, activity resource estimating and cost estimating. The SWOT analysis can be used to determine if these items have been developed to the appropriate detail or if they have actually been included in the plan. Review the planning process in use by your organization. What are your

c03.indd 52c03.indd 52 2/23/09 10:11:24 AM2/23/09 10:11:24 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 69: Bringing The PMBOK Guide to Life

Project Plan Accelerator 53

planning strengths? How do you know they are your strengths? (Performance information provided by a PMO can assist in sup-porting identifi ed strengths.) What are the performance met-rics and measurements that support your observations? What are your weak areas? Why are they weak? What can be done to strengthen them? What opportunities are possible if the plan is well defi ned and the project is successful? If your plan is not well organized and complete what threats exist that can dis-rupt the planning process and the execution of the plan? What threats may develop that can impact the reputation and well being of the organization?

Notes:

c03.indd 53c03.indd 53 2/23/09 10:11:24 AM2/23/09 10:11:24 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 70: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

P

MB

OK

® G

uid

e C

ompo

nen

t/T

ool/

T

ech

niq

ue/

Pro

cess

Act

ion

Pla

n fo

r Im

plem

enta

tion

P

erso

n

Res

pon

sibl

e D

ate

Req

uir

ed

SW

OT

an

alys

is

Rev

iew

th

e pr

ojec

t pl

an a

t se

vera

l sta

ges

duri

ng

its

deve

lopm

ent

and

con

duct

a S

WO

T a

nal

ysis

to

dete

rmin

e w

her

e ad

diti

onal

eff

ort

is r

equ

ired

.

Arr

ange

to

hav

e th

e pl

an r

evie

wed

by

a re

cogn

ized

, ex

peri

ence

d pl

ann

ing

expe

rt.

Cre

ate

a S

WO

T a

nal

ysis

tem

plat

e an

d di

scu

ss e

ach

co

mpo

nen

t of

th

e an

alys

is w

ith

th

e pr

ojec

t te

am o

r ot

her

sta

keh

olde

rs.

Exa

mpl

e: S

tren

gth

s P

lan

s ar

e de

velo

ped

thro

ugh

th

e in

put

of t

he

proj

ect

stak

ehol

ders

. Ass

ess

the

plan

an

d id

enti

fy w

her

e th

e pl

an is

wel

l wri

tten

, cle

arly

defi

ned

, an

d w

her

e ri

sks

hav

e be

en m

inim

ized

.

Exa

mpl

e: W

eakn

esse

s Id

enti

fy e

lem

ents

of

the

plan

th

at a

re a

mbi

guou

s or

u

se c

ompl

ex s

ente

nce

s th

at a

re d

iffi

cult

to

inte

rpre

t or

can

lead

to

con

fusi

on o

r co

nfl

ict .

54

c03.indd 54c03.indd 54 2/23/09 10:11:24 AM2/23/09 10:11:24 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 71: Bringing The PMBOK Guide to Life

Exa

mpl

e:

Opp

ortu

nit

ies

Iden

tify

ele

men

ts o

f th

e pl

an t

hat

can

be

com

mu

ni-

cate

d to

oth

er p

roje

ct t

eam

s an

d pl

ann

ing

grou

ps t

o im

prov

e ov

eral

l org

aniz

atio

nal

pla

nn

ing.

Ide

nti

fy

brea

kth

rou

gh t

hin

kin

g an

d st

ream

lin

ed t

ech

niq

ues

th

at m

ay b

enefi

t t

he

enti

re o

rgan

izat

ion

.

Iden

tify

wh

ere

orga

niz

atio

nal

pro

cess

ass

ets

hav

e be

en im

prov

ed a

nd

shou

ld b

e sh

ared

.

Exa

mpl

e: T

hre

ats

Iden

tify

poo

rly

wor

ded

para

grap

hs

that

may

be

inte

rpre

ted

diff

eren

tly

by p

roje

ct s

take

hol

ders

.

Iden

tify

am

bigu

ous

phra

ses,

un

clea

r or

un

fam

ilia

r te

rmin

olog

y.

Det

erm

ine

if t

her

e is

lan

guag

e th

at c

ould

be

dam

ag-

ing

to t

he

orga

niz

atio

n o

r w

her

e u

nre

ason

able

con

-di

tion

s h

ave

been

defi

ned

.

55

c03.indd 55c03.indd 55 2/23/09 10:11:25 AM2/23/09 10:11:25 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 72: Bringing The PMBOK Guide to Life

c03.indd 56c03.indd 56 2/23/09 10:11:25 AM2/23/09 10:11:25 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 73: Bringing The PMBOK Guide to Life

57

Chapter Four

Developing a Project Methodology

A methodology is defi ned as a system of practices, techniques, procedures, and rules used by those who work in a discipline. Establishing a methodology and ensuring its consistent use pro-vides an organization with many benefi ts including consistency, greater predictability or outcomes, and better management of costs and resources. The PMBOK ® Guide provides a basis for developing an organized approach to managing a project and has been used by many organizations to develop a methodology that works effectively for their specifi c enterprise. The processes and procedures described in the PMBOK ® Guide have been developed and written by project managers from a wide range of industries, including nonprofi t organizations and government agencies. They can be used to create a framework for manag-ing projects in a consistent manner that is acceptable for use by all business units and work entities within an enterprise. The important thing to remember is that the PMBOK ® Guide is a collection of best practices. The processes and procedures defi ned in the document many not work for every project and some modifi cation will be required. Using common sense and

c04.indd 57c04.indd 57 2/23/09 10:17:44 AM2/23/09 10:17:44 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 74: Bringing The PMBOK Guide to Life

58 Developing a Project Methodology

appropriate application of tools and techniques is the most effec-tive and preferred approach of the successful project manager.

PROJECT METHODOLOGY QUESTIONS

Before developing a project management methodology, it would be benefi cial to analyze the current environment of the organi-zation using a series of questions and a detailed needs analysis. The following is a list of twenty questions that may be consid-ered during a project management methodology needs analysis:

1. What benefi ts can be gained by implementing a for-mal project management methodology within the organization?

2. How would you describe the current project manage-ment process or methodology? If there is no formal methodology, try to determine what processes seem to be common or repeated.

3. What is the greatest challenge encountered by the project manager during project planning and execution? There may be a few of these challenges, so make sure you include the ones that seem to be most prevalent.

4. What metrics or performance measures are currently being used to determine project performance levels? If there are no offi cial metrics used, identify the metrics you use to determine performance. These metrics may include: schedule progress, completed deliverables, activities that have begun, activities in progress, quality (number of defects or repairs), actual cost, percent com-plete of an activity, effi ciency in the use of resources.

5. What metrics are missing and should be included in the process of managing project performance? Compare with other project - based organizations.

c04.indd 58c04.indd 58 2/23/09 10:17:44 AM2/23/09 10:17:44 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 75: Bringing The PMBOK Guide to Life

Project Methodology Questions 59

6. How would you describe the effi ciency of the project sta-tus meetings that are scheduled and conducted within your organization? How well are your meetings managed? What information is included in project status reports?

7. How does a project team identify all of the project stakeholders? Do project team members understand the true defi nition of a stakeholder?

8. How are project stakeholder requirements determined and documented? This includes requirements about information distribution.

9. How often is project status communicated to project stakeholders? What criteria are used to determine who should receive information and when?

10. How are projects selected for implementation? What is the specifi c selection process used for determining which projects are most benefi cial for the organization?

11. What is the process for reviewing/auditing project performance?

12. What formal project management training is available for the organization? What percentage of the organiza-tion has attended some form of project training?

13. How are changes to project plans and project baselines managed? What are the organization ’ s policies or proc-esses for managing change?

14. How is a project team selected? 15. What is the role of the project manager? 16. How are project risks identifi ed and managed? 17. What criteria are being used to determine project

success? 18. When is a project considered to be complete? 19. What is the process for closing out a completed project? 20. What is the process for project reviews?

c04.indd 59c04.indd 59 2/23/09 10:17:44 AM2/23/09 10:17:44 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 76: Bringing The PMBOK Guide to Life

60 Developing a Project Methodology

A review of the Big Picture fl owchart described in Chapter Two (see Figure 2.1 ) and the use of the PMBOK ® Guide will provide the essential information needed to develop a project management methodology. Generally, the development of a project management methodology is associated with a project management offi ce (PMO). Lessons learned from the devel-opment of PMOs in the mid – to–late 1990s indicate that the introduction of a project management methodology should be gradual, with emphasis on engaging the managers and exec-utives of the organization. Explanations about the benefi ts of project management — such as consistency of delivery, higher quality, and more effi cient use of resources — should be provided through studies, reports, and presentation by enthusiastic pro-moters. Attempting to introduce a project methodology through force and by using and demanding extensive administrative tools and procedures will generally result in resistance.

Caution should be taken to avoid introducing too much in the form of formal procedures and standard forms, which may cause a backlash from a perceived increase in administrative work. A project methodology should be designed with the peo-ple who will use it in mind. I and many other projects manag-ers have heard a familiar cry, “ Don ’ t make a project out of it! ” This statement of anguish is an indication that project man-agement is not universally accepted as a key success factor for business and must be introduced through a series of predeter-mined steps and with signifi cant emphasis on the successes achieved along the way.

The project management offi ce is generally the main driver of project methodologies within an organization. Figure 4.1 illustrates the many elements required to develop a PMO, cre-ate accepted methods, and provide opportunities for continued growth. Remember, caution should be exercised when attempt-ing to create a methodology and a project offi ce. Additional

c04.indd 60c04.indd 60 2/23/09 10:17:44 AM2/23/09 10:17:44 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 77: Bringing The PMBOK Guide to Life

Project Methodology Questions 61

lessons learned from the mid – to–late 1990s indicate that an aggressive approach to developing a project management proc-ess or creating a Project Management Offi ce can result in sig-nifi cant resistance by the project managers, project teams, and managers or executives whose resources may be affected by the introduction of new methods and procedures. An approach that appears to work effectively is to schedule focus groups and needs analysis sessions to identify the concerns of the various business entities and functional groups that may be affected by the new methodology. Communication is essential for any meth-odology to be developed and accepted by the organization. The purpose of introducing a project methodology within an organi-zation is to improve effi ciency, not to create resistance. Patience is the key here. Take the time to create a plan for introducing or rolling out a new methodology. Obtain feedback and com-ments from the people who will be affected. Maintain a mes-sage of “ continuous improvement ” and focus on gaining support through logic and with the organization ’ s well being in mind.

Career path

Successfulexperience

Complimentary management philosophy

Standardized process/tools

Qualification matrix

Compatible relatedbusiness processes

PMI’s PMPcertification

Compensation

PM mentorship/ coaching

Continuing education/training

Basic education/training

Top personnel

Continuousimprovement

Project Management

Office

Informal Network

Project evaluation review process

Formal Network

Figure 4.1 Environment for Project Success.

c04.indd 61c04.indd 61 2/23/09 10:17:45 AM2/23/09 10:17:45 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 78: Bringing The PMBOK Guide to Life

62 Developing a Project Methodology

PROJECT PLAN ACCELERATOR

Using information from this chapter and the PMBOK ® Guide for additional reference, make a note of any specifi c planning items that should become components of your project plan. Describe the component and develop questions around the component that will enable you to effectively use the component in the plan.

Project Plan Methodology — Development Steps

Discuss the existing project management methodology in use by your organization with other project managers and potential stakeholders. Look for gaps and areas for improvement Schedule focus group sessions and needs analysis meet-ings to identify the specifi c concerns, requirements, and priorities of people and business entities that may be affected by the methodology. Gather information from other project - based organiza-tions and identify lessons learned. Examine successful projects within your organization and identify the factors of success Create presentations to explain the benefi ts of a methodology.

Consider how the fi ve process groups and the knowledge areas of the PMBOK ® Guide can be used during the develop-ment of the methodology. Review and analyze the planning process in use by your organization. How well does the proc-ess work? Where can you make adjustments to improve overall effi ciency? Look for models and procedures in use within your organization, including project dashboards, status reports, and planning procedures. In many cases you will fi nd very useful, sometimes ingenious techniques created by a project manager

c04.indd 62c04.indd 62 2/23/09 10:17:45 AM2/23/09 10:17:45 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 79: Bringing The PMBOK Guide to Life

Project Plan Accelerator 63

or a project team for a specifi c project. These techniques could be adapted for use on the enterprise level. The items listed in the Project Plan Accelerator are provided as examples and to assist you with the development of actions that can be taken to achieve the desired results.

Notes:

c04.indd 63c04.indd 63 2/23/09 10:17:46 AM2/23/09 10:17:46 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 80: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

P

MB

OK

® G

uid

e C

ompo

nen

t/T

ool/

Tec

hn

iqu

e/P

roce

ss

Act

ion

Pla

n fo

r Im

plem

enta

tion

P

erso

n

Res

pon

sibl

e D

ate

Req

uir

ed

Pro

ject

man

age-

men

t m

eth

odol

ogy

Cre

ate

a fl

owch

art

of t

he

curr

ent

met

hod

olog

y or

iden

tify

com

mon

pro

cess

es t

hat

app

ear

to b

e re

peat

ed. I

den

tify

gap

s, w

eakn

esse

s, r

edu

nda

nci

es o

r ot

her

defi

cie

nci

es. S

impl

ify

wh

enev

er p

ossi

ble.

S

ched

ule

foc

us

grou

ps a

nd

nee

ds a

nal

ysis

ses

sion

s to

id

enti

fy c

once

rns

and

prio

riti

es.

O

btai

n le

sson

s le

arn

ed f

rom

est

abli

shed

pro

ject

man

-ag

emen

t of

fi ce

s.

Id

enti

fy t

he

ben

efi t

s of

an

en

terp

rise

wid

e pr

ojec

t m

eth

odol

ogy.

An

alyz

e ex

isti

ng

tool

s av

aila

ble

com

-m

erci

ally

. Exp

lain

wh

at is

att

empt

ing

to b

e ac

hie

ved

thro

ugh

th

e in

trod

uct

ion

of

a pr

ojec

t m

eth

odol

ogy.

C

reat

e a

chan

ge p

roce

ss a

nd

com

mu

nic

ate

the

nee

d fo

r co

nti

nu

ous

impr

ovem

ent .

64

c04.indd 64c04.indd 64 2/23/09 10:17:46 AM2/23/09 10:17:46 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 81: Bringing The PMBOK Guide to Life

Chapter Five

Defi ning Project Success

Money, achievement, fame and success are important, but they are bought too dearly when acquired at the cost of health.

— Anonymous

Six essential qualities that are key to success: sincerity, personal integrity, humility, courtesy, wisdom, charity.

— Dr. William Menninger

If you ask project manager to defi ne the criteria for project success, the response would be, in most cases, “ on time, on budget, and within scope or performance specifi cations. These criteria are often referred to as the triple constraint , shown in Figure 5.1 . It is generally depicted as a triangle with cost, schedule, and scope representing each side. The Triple Constraint is intended to show the continuing challenge of managing these often competing project demands. Changes to any side of the triangle will impact one or both of the other sides. A quick example would be an increase in project scope. If the scope is increased, the cost and schedule sides should also increase proportionally (in a perfect world of course). But exactly how important are these three factors?

65

c05.indd 65c05.indd 65 2/23/09 10:20:57 AM2/23/09 10:20:57 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 82: Bringing The PMBOK Guide to Life

66 Defi ning Project Success

Certainly these items need attention regardless of project size and complexity, and should be considered as part of the larger, more comprehensive view of success. It is important, however, for project managers and teams, and especially the sponsors and senior executives supporting the project, to iden-tify the many other factors that defi ne success. An important item to consider from every stakeholder ’ s perspective — especially sponsors and project executives — is that projects are fi nancial investments that should produce value to the organization and to the intended recipients. This value should be experienced immediately upon project completion and should continue to be experienced for a considerable time after the project has been closed. Projects should also be recognized as key elements when planning the strategies for achieving business excellence. This understanding of the fi nancial implications, the possible benefi ts a project may provide, and the connection between projects and the organization ’ s bottom line will help to defi ne project management as an indispensable and critically impor-tant factor for success.

Cost Time

Scope/Quality

Triple Constraint

Understanding the relationships between each sideof the triangle is a key element in managing projects.

Figure 5.1 Triple Constraint.

c05.indd 66c05.indd 66 2/23/09 10:20:58 AM2/23/09 10:20:58 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 83: Bringing The PMBOK Guide to Life

Typical Success Factors for Projects 67

TYPICAL SUCCESS FACTORS FOR PROJECTS

Success factors vary by organization and may be defi ned in terms of key performance indicators (KPIs) or critical success factors (CSFs). There are probably at least a dozen acronyms used to describe success factors. Here is a list of success factors that should be considered when initiating a project:

A strong and well - enforced planning process and a plan Clearly defi ned expectations and project scope A motivated team The willingness to say no (to unneeded changes, unrea-sonable requirements, unrealistic expectations) A well - defi ned and well - managed change - control process (to avoid scope creep and unauthorized changes) A risk management process that is supported by the entire project team and is engaged during the entire project life cycle A specifi c method for project closure to ensure that all project deliverables have been provided and accepted

The Standish Group, based in West Yarmouth, Massachusetts, is a research fi rm that focuses on mission - critical project man-agement applications. It includes a defi nition of success in its studies about project management:

The successful project is a project that is completed on time and on budget, with all features and functions originally specifi ed. (This defi nition is common among project managers but we can defi ne success in many other ways.)

•••

c05.indd 67c05.indd 67 2/23/09 10:20:58 AM2/23/09 10:20:58 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 84: Bringing The PMBOK Guide to Life

68 Defi ning Project Success

The Standish Group also defi nes a challenged project and a failed project:

Challenged: The project is completed and operational, but over budget, late, and with fewer features and func-tions than initially specifi ed. Failed: The project is canceled before completion, or never implemented.

Considering all of the potential reasons a project can fail is a good idea. It focuses the attention of the project team on risk management and creates a sense of urgency. However, it is extremely important to maintain a concentrated effort on the many factors that are associated with success. This will help to keep team motivated to achieve objectives and will generally keep morale high. (A winning attitude is essential.)

Besides studying project failures, the Standish Group has also developed a recipe for success. Examining this list, you will notice that it includes many of the items described in Chapter Two , “ The Big Picture ” :

Executive support—this means visible and sustained support throughout the project User involvement—obtaining input and creating buy - in An experienced project manager—to create confi dence within the team and with the other stakeholders Clearly defi ned business objectives—connecting projects to business objectives is critical for success Defi ned scope (minimized to the essential items)—Know what you are tasked to deliver A standard software infrastructure—the infrastruc-ture should be well known by the project team and used consistently Firm basic requirements—a solid and well communi-cated requirements management process will minimize

••

c05.indd 68c05.indd 68 2/23/09 10:20:58 AM2/23/09 10:20:58 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 85: Bringing The PMBOK Guide to Life

Typical Success Factors for Projects 69

issues and improve the probability of success delivery of project objectives A formal methodology Reliable estimates—Estimates developed by the actual performers of the work activities are generally the most reliable *

In the book The World Class Project Manager, by Robert Wysocki and James P. Lewis, the authors created a project man-ager profi le to assist project managers in further developing their project management skills and competency. A strong set of project management skills can also be included in the list of suc-cess factors for a project. These skills include but are not limited to the following:

Fundamental project management . Sizing and scoping of a project, scope statement development, understand-ing the process for activity duration and cost estimating, critical path development and management, developing and managing change control processes, monitoring and controlling tools and techniques Personal skills . Creativity, decision making, problem solving, team building and infl uencing skills, negotiating skills I nterpersonal skills . Confl ict management, balancing stakeholder needs, collaboration, communications skills— listening, writing, presenting Business skills . Developing budgets, assessing business needs and performance, understanding business proc-esses, communicating between multiple business entities

••

* Source: Jim Johnson, Karen D. Boucher, Kyle Connors, and James Robinson, “ Collaborating on Project Success, ” www.softwaremag.com/archive/2001feb/collaborativemgt.html.

c05.indd 69c05.indd 69 2/23/09 10:20:59 AM2/23/09 10:20:59 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 86: Bringing The PMBOK Guide to Life

70 Defi ning Project Success

Management skills . Delegation, managing change, man-aging multiple priorities, organizing, time management, performance feedback Testing . Verifying and validating system performance, quality assurance

If you compare this list to the “ Organization Process Assets and Enterprise Environmental Factors ” described in the Project Management Institute ’ s PMBOK ® Guide — 3 rd and 4 th Edition, you will notice a very close relationship to the critical success fac-tors discussed in this chapter. Enterprise environmental factors include:

Organizational or company culture—understanding the unique culture or an organization at the enterprise level and at the business unit level is a major factor in developing methodologies and plans for communicating information. Government or industry standards—an awareness of standards is essential in any planning process. Human resources—the skills, disciplines, and knowledge of the organization ’ s people must be considered during project selection activities, planning, and determining outsourcing need. Organizational risk tolerances—an understanding of the organizations policies regarding risk management is another critical area for consideration when developing a methodology and determining plans for success. The risk adverse organization will defi ne success differently from an organization that encourages signifi cant risk taking.

Very fundamentally speaking, project managers are considered to be “ general managers ” (meaning they have a broad knowledge

c05.indd 70c05.indd 70 2/23/09 10:20:59 AM2/23/09 10:20:59 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 87: Bringing The PMBOK Guide to Life

Typical Success Factors for Projects 71

of many business processes besides project management) and therefore should possess a wide range of managerial skills that will ensure project success.

It is absolutely essential for project managers to understand that success is no longer limited to the Triple Constraint or “ On time, within budget, and according to scope. ” Client satisfaction, profi tability, impact on strategic objectives, reduction in costs, relationship to other projects and company operations, increased market share, and opportunities for new products are all part of project success. It is worth mentioning that project success may also be measured by a few additional items that are not always discussed during project reviews and closure meetings (but prob-ably should be). While discussing a project with a group of project managers who recently completed a project and proclaimed it to be successful, I asked them to describe project success from their perspective. The observations were interesting and provided additional proof that success is measured in many ways and explained sometimes very creatively. One team ’ s description of project success:

The product or service is actually being used by the cus-tomer (a strong indication of success!). The project team survived (meaning they are all still employed). The project didn ’ t make the papers (in other words: sometimes no news is good news). This particular project was a government project, and there was much sensitiv-ity about failed projects fi nding a place on the front page of the local newspaper. The team is willing to work together on a new project. That is, the team worked together as a cohesive unit and managed to solve problems effectively, and they sup-ported each other through the project life cycle.

c05.indd 71c05.indd 71 2/23/09 10:20:59 AM2/23/09 10:20:59 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 88: Bringing The PMBOK Guide to Life

72 Defi ning Project Success

The team members are willing to work with the project manager again. This means the project manager dem-onstrated strong leadership skills and managerial skills and was able to gain the trust and respect of the project team.

In additional to these success factors we can add:

Add on business as a result of the project New clients through references and reputation for success Clients will to provide their names willingly as a reference The new lessons learned and inspiring stories we hear about our projects. The wealth of new knowledge shared within an organization The willingness of team members to support each other The focus of a team working together to fi nd solutions instead of looking for who is to blame

Today ’ s measures of project success are signifi cantly different than just a few years ago and the responsibilities of the project manager and the skills needed to achieve success have also changed considerably. Of all the success criteria and factors for success that have been discussed in this chapter, the greatest factor, in my opinion, is to truly listen to the client. When I was assigned my fi rst large complex project, I followed the process developed by my company. It was a great process, and made a lot of sense. Afterall it was written by experts. I held the prescribed kickoff meeting, I defi ned the project deliverables, and I created a project binder and included all of the essential items that should be in a project plan. I met with the customer and proudly proclaimed, “ Here ’ s your plan! ” The client gazed

••

c05.indd 72c05.indd 72 2/23/09 10:21:00 AM2/23/09 10:21:00 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 89: Bringing The PMBOK Guide to Life

Project Plan Accelerator 73

at me with a puzzled look and said, “ Let me review this and I ’ ll get back to you. ” The next day, the client said, “ I can ’ t use this, it ’ s not what I need so now let me tell you what I want. ” I was shocked. I had followed all of the processes to the letter. How could the customer fi nd a problem with it? I believed that I fol-lowed the process for guaranteed success. Or had I? The les-son learned here is that the greatest and most important factor that will increase your chances for project success is to ask the customer what success means to his or her organization. Failure to do this could certainly nullify any predefi ned defi ni-tion of success you may have adopted and create an adversarial relationship with your customer. As Stephen Covey said “ Seek fi rst to understand, then to be understood. ” Excellent advice.

PROJECT PLAN ACCELERATOR

Using information from this chapter and the PMBOK ® Guide for additional reference, make a note of any specifi c planning items that should become components of your project plan. Describe the component and develop questions around the com-ponent that will enable you to effectively use the component in the plan.

Defi ning Project Success

Obtain or develop a list of success factors common to the projects your organization is involved with. Obtain the defi nition of success from a variety of stakeholders . Prioritize these factors from your perspective and from your team ’ s perspective. Ask your client how success is defi ned and then validate the success factors you gathered from your organization from the client ’ s viewpoint.

c05.indd 73c05.indd 73 2/23/09 10:21:00 AM2/23/09 10:21:00 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 90: Bringing The PMBOK Guide to Life

74 Defi ning Project Success

Update the success factors you have developed to include the client ’ s input and then communicate the new set of success factors with your team .

Consider how the fi ve process groups and the knowledge areas can be used during the development of success factors for your projects. Make sure you obtain input from all key stake-holders to ensure you have a clearly defi ned view of success from a 360 - degree perspective (the client, yourself, the team, the sponsor, and other stakeholders).

Notes:

c05.indd 74c05.indd 74 2/23/09 10:21:00 AM2/23/09 10:21:00 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 91: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

P

MB

OK

® G

uid

e C

ompo

nen

t/T

ool/

Tec

hn

iqu

e/P

roce

ss

Act

ion

Pla

n fo

r Im

plem

enta

tion

P

erso

n

Res

pon

sibl

e D

ate

Req

uir

ed

Pro

ject

su

cces

s fa

ctor

s O

rgan

izat

ion

al o

f en

terp

rise

vie

w

Lis

t th

e fa

ctor

s of

su

cces

s fr

om e

ach

key

sta

keh

olde

r ’ s

pers

pect

ive.

G

o be

yon

d on

tim

e, w

ith

in b

ud

get,

and

acc

ord

ing

to s

peci

fi -

cati

ons

to id

enti

fy w

hat

su

cces

s re

ally

is.

Pro

ject

su

cces

s fa

ctor

s: T

he

clie

nt ’ s

vi

ew

Mee

t w

ith

th

e cl

ien

t. D

evel

op q

ues

tion

s th

at w

ill h

elp

un

cove

r al

l of

the

elem

ents

for

su

cces

s.

Att

empt

to

iden

tify

hid

den

age

nda

s an

d u

nst

ated

ex

pect

atio

ns.

Pro

ject

su

cces

s fa

ctor

s: T

he

team

’ s

view

Sch

edu

le a

mee

tin

g to

dis

cuss

su

cces

s fa

ctor

s. U

se p

revi

-ou

s pr

ojec

ts a

s ex

ampl

es.

Un

cove

r th

e h

idde

n e

xpec

tati

ons

and

pers

onal

age

nda

s of

th

e te

am m

embe

rs .

Pro

ject

su

cces

s fa

ctor

s: T

he

spon

sor ’

s vi

ew

Obt

ain

an

exe

cuti

ve o

r sp

onso

r ’ s

view

of

proj

ect

succ

ess.

C

onn

ect

the

proj

ect

to s

trat

egic

obj

ecti

ves

and

ensu

re t

hat

al

l exp

ecta

tion

s h

ave

been

com

mu

nic

ated

. Bec

ome

awar

e of

pol

itic

al is

sues

th

at m

ay b

e a

fact

or in

th

e pl

ann

ing

proc

ess .

Th

e T

ripl

e C

onst

rain

t C

omm

un

icat

e th

e ba

sic

elem

ents

of

the

trip

le c

onst

rain

t an

d h

ow t

hey

aff

ect

proj

ect

exec

uti

on. U

se t

his

as

a ba

sis

for

defi

nin

g to

tal p

roje

ct s

ucc

ess.

En

sure

th

at y

ou d

iscu

ss

proj

ect

succ

ess

from

sev

eral

per

spec

tive

s an

d go

wel

l be

yon

d th

e T

ripl

e C

onst

rain

t .

75

c05.indd 75c05.indd 75 2/23/09 10:21:00 AM2/23/09 10:21:00 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 92: Bringing The PMBOK Guide to Life

c05.indd 76c05.indd 76 2/23/09 10:21:01 AM2/23/09 10:21:01 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 93: Bringing The PMBOK Guide to Life

Chapter Six

Developing Performance Measures

The process of developing performance measures is closely linked to the development and management of a project plan. It is important for the project manager and all key stakehold-ers to reach agreement about what will be measured and then how to actually measure performance. A vision and mission statement is developed at the organizational level, which pro-vides a view of the bigger picture and a direction for the organ-ization. Projects are formed and aligned to support and assist the organization in achieving the higher - level goals.

The PMBOK ® Guide defi nes work performance information as follows:

Schedule progress Project deliverables Activities in progress Completed activities Quality standards Project costs Estimates to complete activities Percent complete of activities

••••••••

77

c06.indd 77c06.indd 77 2/23/09 10:20:18 AM2/23/09 10:20:18 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 94: Bringing The PMBOK Guide to Life

Documentation of lessons learned Resource utilization

Other measures may include:

Error rates Output per unit or through - put Compliance

Developing and communicating performance measures can be diffi cult for some organizations. There must be agreement about what will be measured, what is important, how to actu-ally measure performance, and how to accurately and effectively communicate performance information. To facilitate the process, performance measures can be defi ned and placed into categories that align with the inputs, tools and techniques, and outputs of each project management process. Each element of the process can be measured by determining what inputs are needed and how much will be needed (when applicable, what was produced through the process), and how well the outputs were produced.

Examples:

Input measures . Materials, equipment, staff time, and resources are inputs. Output measures . Products produced, services provided, (the deliverables) are the outputs to be measured. Outcome measures . The score associated with the outcome will refl ect results in terms of accuracy or variance from actual target. Before the output is produced, the team involved in its development should have some specifi c criteria to refer to. This will minimize variances and keep the entire team focused on what should be deliv-ered. Establishing outcome or output measures should be included in the planning process.

••

•••

78 Developing Performance Measures

c06.indd 78c06.indd 78 2/23/09 10:20:18 AM2/23/09 10:20:18 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 95: Bringing The PMBOK Guide to Life

Effi ciency measures . These measures include the cost per unit produced, the number of outputs over time, number of outputs based on inputs. The team and the project man-ager should be aware of the effort required to produce the deliverables. This includes the resources, how the resources are used, what has been produced in terms of volume, use of available funds, unused material, or scrap. Quality measures . Reliability, safety, availability, main-tainability, performance, fi tness for use, and social accept-ability (in some cases). Mapping out all key processes used in your project will assist in developing quality measures.

After the measures have been defi ned, the next step is to control them by monitoring, measurement, and analysis. This will help to ensure that product quality objectives are met. If you can ’ t monitor a process by measurement, the process should be reviewed to determine why meas-urements are not defi ned. Processes produce results, and results can be measured if a baseline has been estab-lished. The process itself can also be reviewed to deter-mine if the appropriate steps are being followed and where adjustments are necessary.

The project management process has been defi ned as a series of processes that bring about a result. The results may be prod-ucts or services or some type of deliverable that will be handed off to a customer or the next person in the process. (Refer to the customer supplier model in Chapter One .) Discuss the desired level of performance with the customer or stakeholder involved and determine levels of performance that are attainable and real-istic. Providing examples of performance measures during the discussion about the deliverables produced during the process will facilitate the discussion and help to reach agreement about the fi nal set of performance measures.

Developing Performance Measures 79

c06.indd 79c06.indd 79 2/23/09 10:20:19 AM2/23/09 10:20:19 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 96: Bringing The PMBOK Guide to Life

80 Developing Performance Measures

SETTING OBJECTIVES

Setting objectives is a critical element of the planning proc-ess. The project scope statement includes the specifi c objectives of the product and the project (see the project scope template in Chapter Twelve ). Many organizations struggle to defi ne clear, measurable objectives. Executives develop strategies and higher - level goals, which are then communicated downward to the various business units and departments. These goals are defi ned in increasing levels of detail as they descend through organizational levels, and eventually projects are created to sup-port the higher - level goals. Specifi c, measurable project objec-tives are established to meet the higher - level goals. The actual development and communication of the detailed objectives often presents a problem for the project team, the client, or other stakeholders. The following information will provide some assist-ance in the development and refi nement of project objectives.

Defi nition of Project Objectives

Project objectives are a series of specifi c accomplishments designed to address the stated problems or needs of the stake-holders and achieve the desired results or goals. An objective is an endpoint, the actual result, and not a process . It is a descrip-tion of what will exist at the end of a project or phase of a project.

Ensuring the clarity and completeness of the objectives will enable the team to plan and implement activities that will lead to attainment of these objectives. Writing clear objectives also makes it easier to monitor progress and evaluate the success of projects.

When writing objectives, the project manager and team should avoid using process words. Process words are associ-ated with an action that must be taken; instead, use endpoint

c06.indd 80c06.indd 80 2/23/09 10:20:19 AM2/23/09 10:20:19 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 97: Bringing The PMBOK Guide to Life

Setting Objectives 81

words. Endpoint words focus specifi cally on what will be accom-plished through a series of actions. Examples:

Process Words Endpoint Words assist train

improve distribute

strengthen increase

promote reduce

coordinate organize

defi ne establish

assess return

compare design

analyze

describe

explain

Objectives must be specifi c (what will be provided and when) measurable (how much, how many), and must describe what is desirable (what will be suitable and appropriate for the client, the organization, the situation) and obtainable (realistic; it can actually be accomplished with the resources and capabilities available).

The acronym SMART sums up the key components of a well - written objective. Table 6.1 describes SMART objectives.

Goals

A project goal describes at a high level the intended state to be achieved. This is basically what the environment or desired state will be at the project completion:

A goal is the solution to the problems you described during analysis or in high - level planning sessions . The problem

c06.indd 81c06.indd 81 2/23/09 10:20:19 AM2/23/09 10:20:19 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 98: Bringing The PMBOK Guide to Life

82 Developing Performance Measures

statement is generally limited to those specifi c problems that could be solved by the project. Your goal statement represents the solution. A goal is realistic . It is not intended to state more than the project can possibly achieve.

It is important to develop a goal statement before developing and defi ning the scope of the project.

Process for Developing Performance Measures

This process can be used during discussions with a project team or stakeholders to defi ne the performance measures for

Table 6.1 SMART Objectives Letter Meaning Purpose S Specifi c Is the objective clear in terms of what,

how, when, and where the situation will be changed?

M Measurable Are the targets measurable? For example, how much of an increase or reduction is desired? How many items should be pro-duced, or how many people will be trained?

A Action - oriented

Does the objective specifi cally state what actions are required to achieve the desired result? In some cases the A refers to “ attain-able. ” Is the objective something that can be reached by the performers?

R Realistic Are the desired results expressed in a way that the team will be motivated and believe that the required level of involvement will be obtained? Is the description accurate?

T Time - bound Does the objective refl ect a time period in which it will be accomplished (e.g., end of the fi rst quarter or by end of year)?

c06.indd 82c06.indd 82 2/23/09 10:20:20 AM2/23/09 10:20:20 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 99: Bringing The PMBOK Guide to Life

Setting Objectives 83

a project and to ensure that the correct items are being meas-ured using the appropriate criteria. Be sure to review exist-ing documentation about performance measures. These may be found in your Organizational Process Assets. Don ’ t try to rewrite processes that are actually working very well. At some point, you may want to analyze these processes for potential improvement. You may also fi nd that one department in an organization has a well - defi ned process that has not been com-municated to other departments. The amount of information available within an organization that has been developed by the employees and has not been distributed can be surprising and can be extremely useful (and time saving). Project manag-ers should routinely seek information from other areas in the organization or other project managers. Undocumented les-sons learned are in abundance in most organizations. A com-mon practice is to schedule “ lunch and learn sessions, ” where project managers gather to share information about projects, specifi c experiences, and the occasional “ war story. ”

Defi nition of Performance Measures

Performance measures are quantitative descriptions of the quality and capability of products and services offered by an organization.

The process of defi ning performance measures varies by organization, but there are a number of similarities. The follow-ing summarizes the typical steps used to defi ne and document project or other organizational performance measures: This process was adapted from the Sandia National Laboratories approach. A six step process that provides a straightforward and logical process for defi ning performance measures. The approach was used as a model to create a process for develop-ing project performance measures. Performance measures in

c06.indd 83c06.indd 83 2/23/09 10:20:20 AM2/23/09 10:20:20 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 100: Bringing The PMBOK Guide to Life

84 Developing Performance Measures

the PMBOK ® Guide 3 rd and 4 th Edition include such items as schedule and cost data, deliverable completion, percent physi-cally complete of in progress activities

Step 1 . Describe the desired outcomes or the outputs . In the project environment, there will most likely be several targeted outcomes or deliverables. The question associ-ated with this step is: Why are we doing this work?

Step 2 . Describe the major processes involved . Review organizational process assets and determine which of these processes must be included in the planning and execution of the project. Defi ne clearly what will be done and how it should be done, including which organizations will be involved. Review the nine knowledge areas of the PMBOK ® Guide and the associated processes. Which processes will be used during the project life cycle?

Step 3 . Identify the desired results . What should be pro-duced in terms of products, services, or other delivera-bles? These may also include the outputs of a specifi c process, if there is a need for very detailed planning. Extreme detail may be required for very - high - risk projects. The targeted stakeholders must be able to describe what the desired results are in order to ensure that the team focuses on the real needs and will be able to produce them or improve them.

Step 4 . Establish performance goals . The team should be able to determine when the desired result has been achieved. A quote that comes to mind here is “ projects progress quickly until they are 90 percent complete and then they stay 90 percent complete forever. ” The team should know when they have achieved their objec-tives. Without a clear understanding of what completed means, it will be diffi cult to actually reach the point of

c06.indd 84c06.indd 84 2/23/09 10:20:20 AM2/23/09 10:20:20 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 101: Bringing The PMBOK Guide to Life

Setting Objectives 85

closure. Make sure you defi ne the acceptance criteria for the project from the client ’ s perspective and the team ’ s perspective

Step 5 . Defi ne the measures for the objectives that have been set . What will be used to track and measure progress? Organizations that have established project management offi ces will have a set of standardized measures for projects. These measures will have certain characteristics that make them useful, discussed next.

Examples of Performance Measures

Depending on the project and the goal, various performance measurements can be used:

Income compared with previous year / quarter Volume — Increase or decrease in output Funding — Comparison with budget requests and actual costs Cost savings — Percent of reduction in cost Spending (comparison with previous year) Revenue increase Customer satisfaction levels Quality levels or effectiveness of services or programs Physical facilities — Expansion to meet attendance and to improve services and networking or member – stakeholder interaction Number of publications produced Awards received Number of educational hours provided Number of scholarships granted Expansion of services Participation increases

•••

••••••

••••••

c06.indd 85c06.indd 85 2/23/09 10:20:20 AM2/23/09 10:20:20 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 102: Bringing The PMBOK Guide to Life

86 Developing Performance Measures

Number of initiatives in progress Number of projects cancelled Number of projects completed late

Step 6 . Determine the required metrics . What specifi c inputs, processes, or outputs should be measured? Also consider the baselines that will be needed for compari-son. Baselines provide the reference points that can be used to determine where variances are developing and whether or not the variance is within acceptable toler-ance levels. Failure to establish baselines creates a situation where comparisons between actual perform-ance and planned performance can not be accomplished resulting in a lack of useful data to gauge project per-formance or overall project health.

Characteristics of Performance Measures

Measures are selected to track progress and provide indica-tors about where changes must be implemented to improve a process or correct an undesirable variance. Measures will also assist in identifying processes that are not producing results at an acceptable rate and determining actions that can be taken to improve the rate of performance. These are the characteris-tics of performance measures:

They refl ect results, not the activities used to produce the results. They relate directly to a performance goal. They are based on measurable data. They use normalized metrics for benchmarking. They are easy to understand. They create an opportunity for continuous improvement. They are cost effective. They are accepted by the stakeholders and have owners.

•••

•••••••

c06.indd 86c06.indd 86 2/23/09 10:20:21 AM2/23/09 10:20:21 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 103: Bringing The PMBOK Guide to Life

Setting Objectives 87

Performance Metrics

Many organization use key performance metrics as tools to determine whether performance measures are being met:

Stakeholder confi dence Stakeholder expectations met Board of directors ’ acceptance of short - and long - term directions Strategic objectives and goals attained/fulfi lled Strategic objectives ’ progress toward goals Organizational goals and targets defi ned Employee satisfaction/motivation Shareholder perception of strategy effectiveness SWOT analysis Residual risks determined from audits Comparisons of internal strategy development process to leading external strategy development processes Planning process objectives supported by benchmarks and comparisons Supplier and partner capabilities Information technology capability to support strategic objectives Conformance audits Accumulated performance measures related to the stra-tegic action plans

Examples of Metrics

Number of programs this year compared with the number of programs last year Funding available compared to funding requested Customer satisfaction this year and customer satisfac-tion last year

•••

••••••••

••

••

••

c06.indd 87c06.indd 87 2/23/09 10:20:21 AM2/23/09 10:20:21 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 104: Bringing The PMBOK Guide to Life

88 Developing Performance Measures

Number of projects completed on time compared with the number scheduled Total actual score compared against the total possible score (this could be used for measuring quality, customer satisfaction, or other evaluations) Amount spent to date compared with amount budgeted (earned value analysis) *

PROJECT PLAN ACCELERATOR

Using information from this chapter and the PMBOK ® Guide for additional reference, make a note of any specifi c planning items that should become components of your project plan. Describe the component and develop questions around the component that will enable you to effectively use the component in the plan.

Developing Performance Measures

Research the performance measures that currently exist in your organization. How is project success determined? What tools are used to measure actual performance? How well are processes for measuring performance docu-mented and understood? Where is performance informa-tion stored or archived? Develop a check list for determining the “ health of your project. ” How do you determine how well your project and the project team are performing? How do you know when a project is beginning to show signs of problems? What are the warning signs?

* Source: “ Developing Performance Measures — A Systematic Approach, ” www.assess.sdes.ucf.edu and www.orau.gov

c06.indd 88c06.indd 88 2/23/09 10:20:21 AM2/23/09 10:20:21 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 105: Bringing The PMBOK Guide to Life

Project Plan Accelerator 89

Determine what performance indicators and indexes are in use. What additional indicators are needed? If you were to develop a project performance dashboard what gauges or indicators would you include? Identify the customers (the receivers of the products, serv-ices, or deliverables). Customers are a great source for defi ning success factors and performance expectations. Decide on the outcomes desired, and discuss how these outcomes will be achieved. Make sure you consider the desired outcome and the planned outcome. Sometimes these can be quite different. Place emphasis on the people involved. They should have a voice in the development of performance measures and should be included in the formal approval and acceptance of these measures.

Consider how the fi ve process groups and the knowledge areas can be used during the development of performance measures. Review existing documentation. Determine what really should be measured.

Notes:

c06.indd 89c06.indd 89 2/23/09 10:20:22 AM2/23/09 10:20:22 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 106: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

P

MB

OK

® G

uid

e C

ompo

nen

t/T

ool/

Tec

hn

iqu

e/P

roce

ss

Act

ion

Pla

n fo

r Im

plem

enta

tion

P

erso

n

Res

pon

sibl

e D

ate

Req

uir

ed

Wor

k pe

rfor

man

ce

Info

rmat

ion

D

eter

min

e w

ho

wil

l be

invo

lved

in t

he

mea

sure

-m

ent

proc

ess.

E

xam

ples

of

wor

k pe

rfor

man

ce in

form

atio

n:

• S

ched

ule

pro

gres

s •

Com

plet

ed d

eliv

erab

les

• D

eliv

erab

les

not

com

plet

ed

• M

iles

ton

es a

chie

ved

or m

isse

d •

Qu

alit

y—n

um

ber

of d

efec

ts, s

ervi

ce le

vel

fl u

ctu

atio

ns

• C

osts

pla

nn

ed a

nd

incu

rred

Per

cen

t co

mpl

ete

• C

ompa

riso

n o

f es

tim

ates

aga

inst

act

ual

res

ult

s

W

hat

are

th

e it

ems

that

sh

ould

be

mea

sure

d fo

r th

e pr

ojec

t? W

hat

are

th

e ex

pect

atio

ns

of t

he

spon

sor

or p

roje

ct e

xecu

tive

? W

hat

info

rmat

ion

or

less

ons -

lear

ned

doc

um

ents

are

ava

ilab

le?

Sch

edu

le in

terv

iew

s w

ith

key

sta

keh

olde

rs t

o id

en-

tify

per

form

ance

mea

sure

s.

90

c06.indd 90c06.indd 90 2/23/09 10:20:22 AM2/23/09 10:20:22 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 107: Bringing The PMBOK Guide to Life

H

ow w

ill t

he

outc

omes

be

mea

sure

d an

d w

ho

wil

l m

easu

re t

hem

? W

hen

wil

l per

form

ance

be

mea

s-u

red

and

how

wil

l th

e re

sult

s be

com

mu

nic

ated

?

W

hat

are

th

e cr

iter

ia f

or s

ucc

ess?

• F

rom

th

e te

am ’ s

per

spec

tive

Th

e cl

ien

t ’ s p

ersp

ecti

ve

• T

he

spon

sor ’

s pe

rspe

ctiv

e •

Th

e E

nd

use

r ’ s

pers

pect

ive

91

c06.indd 91c06.indd 91 2/23/09 10:20:22 AM2/23/09 10:20:22 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 108: Bringing The PMBOK Guide to Life

c06.indd 92c06.indd 92 2/23/09 10:20:22 AM2/23/09 10:20:22 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 109: Bringing The PMBOK Guide to Life

Chapter Seven

Monitoring and Control Simplifi ed

Project monitoring and control is an essential element of the project management process. Without control, there would be confusion, scope creep, scope drift, and scope “ leap ” and a considerable amount of confl ict among project stakeholders. Chaos would become the norm throughout the project life cycle. Measuring and monitoring project progress using a specifi c process increases the ability to identify symptoms of problems and trends toward unacceptable variances. Failure to do this on a regular basis could result in project delays, poor quality, safety risks, and increased costs just to name a few. The moni-toring and control process is part of the overall project planning process and begins with the development of mutually agreed upon performance measures and procedures for tracking and managing the project. These mutual agreements between the functional entities involved and other key stakeholders should be established early in the project life cycle and reviewed and updated on a regular basis. The closing of a project phase is an ideal time to review the project ’ s current condition and update the existing monitoring and control procedures. The lessons learned from each phase can help to prevent the re - occurrence

93

c07.indd 93c07.indd 93 2/23/09 10:21:43 AM2/23/09 10:21:43 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 110: Bringing The PMBOK Guide to Life

of issues and problems and prevent unnecessary confl ict and stress. During each phase, the project team should be con-tinually assessing results and making comparisons with the original plan looking for symptoms and potential problems. Of course the project manager should also be looking the positive indications as well. Project managers should plan to recognize their teams when variances are minimized and projects appear to be in control. This is a critically important factor. Project managers will, regardless of how well planned a project may be, experience unexpected situations. The monitoring and con-trol procedures will assist in developing appropriate responses. The team and the project manager will also make daily deci-sions about work activities and how resources will be used to overcome potential threats. The monitoring and control proc-ess, when properly managed will generate some very important lessons learned for future use.

Figure 7.1 illustrates in a very simple, straightforward man-ner how the monitoring and control process works. It may seem like an oversimplifi cation of the process, but a close look will reveal that it shows very clearly what typically occurs as a project is monitored and controlled.

The fi rst step in the process is to have an agreed upon, approved, and supported project plan. The plan is the result of a collaborative effort between the key stakeholders with emphasis on the desired deliverable as well as the impact to other stakeholders not directly involved in the project. When the project plan is approved and the go ahead is given, the project plan is executed and the process of monitoring and con-trol begins. The process is actually cyclical in nature. It repeats itself throughout the project life cycle.

Execute the plan . The resources are engaged, contractors are selected and contracts are signed, Goods and services

94 Monitoring and Control Simplifi ed

c07.indd 94c07.indd 94 2/23/09 10:21:43 AM2/23/09 10:21:43 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 111: Bringing The PMBOK Guide to Life

are procured and the work force (performers) begin their assigned activities.

Obtain results . The execution of the plan will, after a short period, begin to produce results. As work is completed, data are provided for analysis.

Analyze results . Compare the results against the plan baselines. The objective is to determine if there are any variances to the plan.

Identify variances . During the analysis, the reviewer (the project manager) identifi es any variances during the anal-ysis process. Variances are deviations from the plan and could develop into very serious project situations.

Acceptable variance . The variance is within acceptable lev-els. Monitoring and controlling should continue.

Executeplan

Obtain results

Analyze results

Identifyvariances

Analyze results

Unacceptable variance

Identify root cause

Consider optionsTake correctiveaction

Implement

Analyze results

Lessons Learned

MonitoringandControllingProcess

Acceptable results

Unacceptableresults

Acceptablevariance; Continueto monitor

Figure 7.1 Monitoring and Controlling Flow Chart.

Monitoring and Control Simplifi ed 95

c07.indd 95c07.indd 95 2/23/09 10:21:44 AM2/23/09 10:21:44 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 112: Bringing The PMBOK Guide to Life

96 Monitoring and Control Simplifi ed

Unacceptable variance . The variance is outside accept-able levels. and additional action is required. Failure to act on this variance could jeopardize the project in several areas. Project results are generally integrated. and interdependent and problems in one area could have an effect at the project level. Identify root cause . A common approach when a prob-

lem or variance is detected is to immediately apply a solution. This “ jump to solutions ” approach can lead to inappropriate or less than optimal actions to solve a problem. Taking the time to identify the root causes of a variance will generally lead to better decisions regarding how the problem will be solved. Use of a fi shbone or cause and effect diagram is extremely helpful in narrowing the key root causes.

Consider options . Before deciding on a response, the project manager and project team should identify and discuss options. Encourage some innovation and crea-tivity and think about the alternatives. There is usu-ally more than one way to solve a problem. Consider the risks, the cost, the type of resources that may be needed, the time required, and the effect the solution may have on the project as a whole and on the organ-izations involved. Be sure to keep the stakeholders in mind during the decision process. Remember, the best solution may not be the most obvious. Use what-ever available time you have to generate solutions. Even during crisis situations it is a good practice to look at options fi rst before making decisions.

Determine the corrective action . The process of deter-mining options will result in a choice of actions that may be taken to resolve the variance. The team selects the option that has the greatest chance of

c07.indd 96c07.indd 96 2/23/09 10:21:44 AM2/23/09 10:21:44 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 113: Bringing The PMBOK Guide to Life

resolving the problem, taking into consideration the risks and costs associated with the decision. Careful review of the options will result in the selection of the best approach to resolve the situation. A defi ned set of measurements should also be developed in this process.

Implement corrective action. The selected option is exe-cuted through a specifi c agreed upon plan. How will it be executed, who will do it, and who is responsi-ble for completion of the actions are questions that should be reviewed.

Analyze results . During and after execution of the approved corrective action, the results of the action are reviewed to determine if the desired condition has been achieved. Clearly defi ned metrics and measures of success should be in place and utilized when ana-lyzing the results. Unacceptable results . Occasionally, the outcome of a

corrective action will not be acceptable. The vari-ance may not be reduced to satisfactory levels and additional action is required. This may require a return to root - cause analysis to ensure that the true root cause has been identifi ed.

Acceptable results . If the analysis of the corrective action indicates that the problem has been solved, the variance has been reduced to acceptable lev-els, or the issue has been eliminated, the corrective action process for the situation is closed.

Lessons learned . It is generally considered a best prac-tice to review the fi ndings of a corrective action and document what has been learned for use on future projects or if the situation should occur again during project execution.

Monitoring and Control Simplifi ed 97

c07.indd 97c07.indd 97 2/23/09 10:21:44 AM2/23/09 10:21:44 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 114: Bringing The PMBOK Guide to Life

98 Monitoring and Control Simplifi ed

Monitoring and controlling is a critical process in the project life cycle. It involves Integrated Change Control the larger more comprehensive view of change management and confi gu-ration management that includes the relationships and impact of change between all project management knowledge areas. Integrated change control assures the team is aware of how a change in one area may have an impact on several, if not all of the major knowledge areas of project management. The subsets of Integrated change control include: scope control, scope veri-fi cation (the acceptance of the work performed), schedule con-trol, cost control, quality control, managing the performance of the team, reporting status, managing risk and risk responses, and contract administration. Developing a simplifi ed approach to monitoring project performance or any other process asso-ciated with managing a project should be part of the overall planning process. Simplifi ed does not mean “ simply ” encourag-ing risky short cuts. It means analyzing a process and working with a team to determine the best approach with the most effi -cient steps that will produce the desired outcome without add-ing burdensome administrative work.

Mature project management is associated with the develop-ment of processes that make sense for all stakeholders while minimizing the administrative burden that sometimes accom-panies a formal project management process. The use of fl ow-charts, systems mapping, and other techniques reduce the need for wordy, complicated documents that are often ignored by the project team and stakeholders. The common - sense approach to project management processes is to discuss what is needed, fi nd an effective way to communicate the need, assign people to do it, give them the tools they need, defi ne acceptance criteria for any deliverables that will be produced, and then enable the resources to perform. Putting in place clearly defi ned roles, a good plan, and agreed - upon processes will help to reduce the

c07.indd 98c07.indd 98 2/23/09 10:21:45 AM2/23/09 10:21:45 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 115: Bringing The PMBOK Guide to Life

Project Plan Accelerator 99

effort associated with monitoring a control and increase the probability of successfully completing the project.

PROJECT PLAN ACCELERATOR

Using information from this chapter and the PMBOK ® Guide for additional reference, make a note of any specifi c planning items that should become components of your project plan. Describe the component and develop questions around the component that will enable you to effectively use the component in the plan.

Monitoring and Controlling

The monitoring and control process should be developed in steps. An ideal time to develop these procedures is during the project kick – off meeting. This meeting provides the key stake-holders with an opportunity to obtain detailed information about the project, learn about the roles and responsibilities of the other team members, and reach agreement about how changes to the project plans will be managed. The following are possible steps that may be taken in the development of agreed upon monitoring and control procedures.

Identify existing control procedures. Review the organi-zational process assets currently in place. The PMBOK ® Guide 3 rd and 4 th Edition provide a very useful list of typical organizational process assets. Determine what tools will be used for monitoring and controlling the project:

Project software Earned value analysis Control charts Pareto diagrams Cause and effect analysis

•••••

c07.indd 99c07.indd 99 2/23/09 10:21:45 AM2/23/09 10:21:45 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 116: Bringing The PMBOK Guide to Life

100 Monitoring and Control Simplifi ed

Product sampling Project reviews Team reviews Status reports Audits Walk - throughs

Determine stakeholder needs. Stakeholder requirements regarding status will vary, and it will be necessary to iden-tify the priorities of the key stakeholders and their specifi c expectations associated with monitoring and controlling. Conduct a stakeholder assessment to ensure that all stake-holders have been identifi ed. Determine the infl uence level of each stakeholder and their interest in the project.

Consider how the fi ve process groups and the knowledge areas can be used to develop and then manage the monitoring and controlling process. Identify what will be monitored, deter-mine acceptable variance levels, and decide what tools will be used for monitoring and controlling. Establish an escalation process that is acceptable to all stakeholders, and make sure the process is followed.

Notes:

••••••

c07.indd 100c07.indd 100 2/23/09 10:21:45 AM2/23/09 10:21:45 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 117: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

P

MB

OK

® G

uid

e C

ompo

nen

t/T

ool/

Tec

hn

iqu

e/P

roce

ss

Act

ion

Pla

n fo

r Im

plem

enta

tion

P

erso

n

Res

pon

sibl

e D

ate

Req

uir

ed

Mon

itor

ing

and

con

trol

lin

g Id

enti

fy t

he

spec

ifi c

con

trol

nee

ds f

or t

he

proj

ect.

C

onsi

der

the

expe

ctat

ion

s of

th

e sp

onso

r an

d th

e cl

ien

t.

Dev

elop

a c

ontr

ol p

roce

ss f

or t

he

proj

ect

base

d on

or

gan

izat

ion

al n

eeds

, pro

ject

spe

cifi

c n

eeds

, an

d th

e pr

oces

ses

curr

entl

y in

pla

ce. U

se t

he

proj

ect

team

or

sel

ect

indi

vidu

als

from

eac

h e

nti

ty in

volv

ed t

o as

sure

bu

y - in

to

the

proc

ess .

Com

mu

nic

ate

the

proc

ess

for

mon

itor

ing

and

con

trol

lin

g th

e pr

ojec

t. O

btai

n f

eedb

ack

on t

he

proc

ess

and

revi

se a

s n

eces

sary

to

obta

in

stak

ehol

der

appr

oval

an

d en

sure

com

plia

nce

.

An

alyz

e cu

rren

t pr

oced

ure

s an

d de

term

ine

wh

ere

impr

ovem

ent

is n

eces

sary

.

Rev

iew

pas

t pr

ojec

t pe

rfor

man

ce t

o id

enti

fy c

riti

cal

mon

itor

ing

and

con

trol

are

as.

Rev

iew

cu

rren

t or

gan

izat

ion

al p

roce

ss a

sset

s.

(c

onti

nu

ed)

101

c07.indd 101c07.indd 101 2/23/09 10:21:46 AM2/23/09 10:21:46 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 118: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

(C

onti

nued

) P

MB

OK

® G

uid

e C

ompo

nen

t/T

ool/

Tec

hn

iqu

e/P

roce

ss

Act

ion

Pla

n fo

r Im

plem

enta

tion

P

erso

n

Res

pon

sibl

e D

ate

Req

uir

ed

Pro

ject

man

agem

ent

plan

Esc

alat

ion

pla

n

Th

e pr

ojec

t m

anag

emen

t pl

an d

ocu

men

ts t

he

set

of o

utp

uts

for

m t

he

plan

nin

g pr

oces

s an

d pr

ovid

es

guid

ance

abo

ut

how

th

e pr

ojec

t w

ill b

e ex

ecu

ted,

m

onit

ored

an

d co

ntr

olle

d.

Det

erm

ine

how

wel

l th

e pr

ojec

t m

anag

emen

t pl

an

is d

efi n

ed. I

den

tify

gap

s an

d po

ten

tial

wea

knes

ses

and

deve

lop

addi

tion

al in

put.

(C

auti

on—

don

’ t fa

ll in

to t

he

trap

of

a sp

iral

ing

plan

nin

g pr

oces

s.

Foc

us

on t

he

proj

ect

nee

ds a

nd

deve

lop

the

plan

ac

cord

ingl

y.

Dev

elop

a p

lan

for

esc

alat

ing

issu

es t

hat

can

not

be

reso

lved

at

the

proj

ect

leve

l. E

nsu

re s

take

hol

der

agre

emen

t an

d co

mm

itm

ent

to t

his

pro

cess

.

Per

form

ance

M

easu

rem

ents

D

eter

min

e w

hat

mu

st b

e m

easu

red,

defi

ne

acce

ptab

le v

aria

nce

leve

ls, a

nd

sele

ct t

he

tool

s an

d te

chn

iqu

es a

ppro

pria

te f

or t

he

type

of

proj

ect.

102

c07.indd 102c07.indd 102 2/23/09 10:21:46 AM2/23/09 10:21:46 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 119: Bringing The PMBOK Guide to Life

Inte

grat

ed c

han

ge

con

trol

R

evie

w t

he

exis

tin

g co

ntr

ol p

roce

ss. E

nsu

re t

hat

an

inte

grat

ed, s

yste

ms

type

app

roac

h f

or m

anag

ing

chan

ge is

in p

lace

.

Dev

elop

an

y ad

diti

onal

item

s to

mee

t th

e n

eeds

of

the

proj

ect.

Det

erm

ine

how

th

e ch

ange

con

trol

pro

cess

wil

l be

com

mu

nic

ated

.

Sco

pe V

erifi

cat

ion

D

eter

min

e h

ow s

cope

ver

ifi c

atio

n w

ill b

e im

plem

ente

d. S

cope

ver

ifi c

atio

n is

ass

ocia

ted

wit

h

revi

ewin

g an

d ac

cept

ing

the

wor

k an

d re

sult

s th

at

hav

e be

en p

rodu

ced.

Dev

elop

a p

roce

ss f

or

com

pari

ng

resu

lts

wit

h e

xpec

tati

ons

and

the

defi

ned

an

d ap

prov

ed p

roje

ct s

cope

of

wor

k.

En

sure

th

at t

he

team

un

ders

tan

ds t

he

nee

d fo

r sc

ope

veri

fi ca

tion

.

En

sure

th

at a

pro

cess

for

for

mal

ly a

ccep

tin

g al

l pr

ojec

t th

e de

live

rabl

es h

as b

een

dev

elop

ed a

nd

com

mu

nic

ated

.

103

c07.indd 103c07.indd 103 2/23/09 10:21:46 AM2/23/09 10:21:46 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 120: Bringing The PMBOK Guide to Life

c07.indd 104c07.indd 104 2/23/09 10:21:46 AM2/23/09 10:21:46 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 121: Bringing The PMBOK Guide to Life

Chapter Eight

The Change Control Process

Stakeholders, especially clients, often change their mind about requirements, project scope, and just about anything that is planned to be delivered. Changes in the business environment, such as mergers, changes in strategies, cost cutting programs, and reorganizations after a project has been initiated will gen-erally have a signifi cant impact on the initial set of planning assumptions and can be very traumatic to the project and the project team in cases of mergers/acquisitions or changes in the executive management team. These types of changes often require the project manager and team to reexamine the scope of work and original agreed - upon deliverables and then work with other stakeholders to reach agreement on a new set of deliverables and assumptions. A process is needed to ensure that only those changes that are necessary and benefi cial (sometimes regulatory changes do not translate into benefi ts) are introduced into the project plan. Generally speaking, if all changes were accepted, the project would quickly overrun its budget and schedule and might never actually come to an end.

105

c08.indd 105c08.indd 105 2/23/09 12:35:02 PM2/23/09 12:35:02 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 122: Bringing The PMBOK Guide to Life

106 The Change Control Process

Consider this: “ If change is allowed to fl ow freely, the rate of change

will exceed the rate of progress ” . (source unknown)

This quote pretty much sums up the need for a change control process. Without a process to manage change, there would be no appreciable progress and basically an unending project. Control of the project simply would not exist.

The PMBOK ® Guide introduces change control in several ways: integrated change control, confi guration management, scope change control, schedule change control, quality control, risk mon-itoring and control, and contract change control. Basically these change control elements are subsets of Integrated Change Control and are often referred to as subsidiary plans to the project management plan.

All change control processes are associated with the need for an integrated process for managing change. Each change control process within a project is linked, and the project man-ager and project team should be aware that changes in one area, as an example a change in the scope of work, may impact several other areas, such as schedule and cost. This is a direct relationship to the concept of the triple constraint . Project man-agement is an integration of systems in the form of the nine knowledge areas and fi ve process groups. The linkages between the knowledge areas must be monitored to maintain awareness of the impact of decisions made as the project progresses. There is a relationship between change control and risk management in that the consequences of a decision should be understood before the decision is implemented.

The very core of a change control process is the impact analy-sis component. It is closely related to project risk management. In risk management, the project team assesses the probability

c08.indd 106c08.indd 106 2/23/09 12:35:02 PM2/23/09 12:35:02 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 123: Bringing The PMBOK Guide to Life

that a risk event will occur and impact of that event if it actually occurs. Similarly, impact analysis is intended to carefully assess how the change may affect the project implementation process, the deliverables of the project, the organization sponsoring the project, other projects, and the general operations of an organiza-tion. When engaging the change control process, the project team assesses the impact of the change across all levels, phases, and major project components. This is important to provide assurance that the change will produce the desired effect and minimize any negative results.

There are eight basic elements of a change control process:

1. Establishing and using baselines to determine if changes have occurred. Examples would be schedule slippages and budget overruns or scope unauthorized scope increase.

2. Understanding the factors that may introduce change—these factors include changes in strategic direction, funding constraints, economic uncertainty.

3. Identifying the potential sources of change—change can originate from most project stakeholders and also from external factors such as government or changes in industry standards.

4. Reviewing and approving submitted changes—this is where impact analysis is engaged. All change requests are analyzed for value as well as need. Some changes will be required to satisfy compliance issues and regulations.

5. Managing approved changes—approval of the changes by some type of steering committee or change control board.

6. Updating the project plan after a change has been approved. The project management plan will change several times as the project progresses through each phase. This does not necessarily mean that the scope of

The Change Control Process 107

c08.indd 107c08.indd 107 2/23/09 12:35:02 PM2/23/09 12:35:02 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 124: Bringing The PMBOK Guide to Life

108 The Change Control Process

the project will change, but the method to achieve the result may change many times.

7. Documenting the lessons learned associated with the change—an often forgotten step in the change manage-ment process. Documenting lessons learned can save the project team and the organization a signifi cant amount of time and funding when planning future projects.

8. Rejecting changes that are not considered benefi cial, cost - effective, or that have other negative impacts. This is another area that is not generally well managed. A record of rejected changes is necessary to prevent them from being resubmitted. The rationale behind the rejec-tion should be documented, communicated, and retained for future reference.

Change control also includes confi guration management. This is generally associated with the features, functions, and physical characteristics of a product. Changes to a product ’ s confi guration should follow a specifi c process to ensure that changes are com-municated and to prevent damage to equipment and unsafe con-ditions for people performing the work. Changes in the actual confi guration of a product will typically impact a number of other areas such as scope, time, quality and budget. A careful assessment of the confi guration change can save a substantial amount of unneeded additional work or rework.

The integrated change control system as described in the PMBOK ® Guide 3 rd and 4 th Edition is a collection of formal documented procedures that defi ne how project deliverables are controlled, changed, and approved. To be more specifi c, it is a system that provides a process for stakeholders to intro-duce a change, have a team analyze the change for benefi ts and approve or deny the change, track the change through imple-mentation, and then analyze the results of the change.

c08.indd 108c08.indd 108 2/23/09 12:35:03 PM2/23/09 12:35:03 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 125: Bringing The PMBOK Guide to Life

Managing Project Changes 109

By establishing a change control process, the project man-ager and project team (or the change control board, if one has been established) can make decisions about whether a change should be approved and implemented. If the change is rejected, the process explains how to communicate why the change was not accepted. The system provides the means to document approved or rejected changes for future reference.

The change control process, if communicated effectively and practiced, increases the probability of project success by mini-mizing (hopefully eliminating) unnecessary changes, providing a means of analyzing the rationale behind a change, and then communicating that information to the stakeholders.

MANAGING PROJECT CHANGES

For the best chance of buy - in from the project team, the change control process should be introduced during the early stages of the project, preferably at the kickoff meeting. The kick - off meeting, by my defi nition, is the formal beginning of the project planning process and where the key stakeholders and project functional managers or technical experts meet to discuss issues and collabo-rate about the most effective methods and processes for achiev-ing project objectives. Many organizations do not have a formal and documented change control process. In keeping with the goal of providing simplifi ed techniques, the following is a list of items that can be considered when developing a change control process or modifying an existing process:

Assess the project team ’ s change readiness. How does the team respond to changes? You are likely to fi nd some resist-ers within the team or among the population of project stakeholders. Attempt to uncover the main reasons for their resistance before forcing changes upon them.

c08.indd 109c08.indd 109 2/23/09 12:35:03 PM2/23/09 12:35:03 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 126: Bringing The PMBOK Guide to Life

110 The Change Control Process

Develop a change management strategy for the project. Review organizational change processes and modify as needed to meet the need of the project and its stake-holders. Identify and train (as needed) the change control team or change control board—the training may be associated with decision making skills, analysis techniques, effec-tively communicating ideas for change, updating people about organizational strategies, developing a “ big pic-ture ” view when assessing changes. Provide an overview or training session for the sponsor or managers—make sure the sponsors and executives associated with the project are aware of the change proc-ess and its rationale. Document the change process (use fl owcharts and dia-grams whenever possible). Visual examples are often easier to explain and to comprehend. Plan to audit the process to ensure compliance—regular reviews to encourage process improvement are always a good idea.

The change control process is basically a step - by - step fl ow of information and actions (see Figure 8.1 ). The change con-trol team receives a change, analyzes it, determines the risks and the benefi ts, makes a decision, and if approved, monitors the change for the desired result. Figure 8.1 shows the proc-ess that may be followed to document changes and ensure that the appropriate or required changes are introduced into the project. The following is a brief review of each step:

Step 1. Identify the source of the change . Changes may be initiated by the client, the government, the project team, the team, sponsors, functional groups, and other entities.

c08.indd 110c08.indd 110 2/23/09 12:35:03 PM2/23/09 12:35:03 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 127: Bringing The PMBOK Guide to Life

Managing Project Changes 111

It ’ s a good idea to become familiar with each source of change and their specifi c biases and priorities.

Step 2. Log in the change . All changes requests should be documented, using some type of offi cial change request form. Verbal change requests should be discouraged if not completely prohibited. In this step, the requestor of the change provides a form or some type of offi cial document that includes the name, contact information, description of the change, and rationale behind the change.

Step 3. Analyze the change request . This is actually an optional step in the process. For some projects, especially large, complex projects, the stakeholders will generate several changes throughout the project life cycle. Some changes will be trivial and others will involve work that is outside the scope of the project. During this analysis, the

Continue

Document File Inform

ImpactApprove

Source Log In Analyze

?

No

Yes

EarlyReject

?

No

Yes

Update Communicate Implement Analyze

Reject

Lessons

Figure 8.1 Typical Change Control Process.

c08.indd 111c08.indd 111 2/23/09 12:35:03 PM2/23/09 12:35:03 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 128: Bringing The PMBOK Guide to Life

112 The Change Control Process

change request is reviewed from a high level. The focus is on who will be involved, the benefi ts of the change, the risks, and the cost of the change. It is basically a screen-ing of the change requests to determine which changes should be considered for more detailed analysis. The yes decision indicates that the change should go forward for a more detailed analysis. The no decision indicates that the change is too risky, too costly, or not necessary, and resources and time should not be allocated to the change. The change request received an early reject. The reason for the rejection is documented, the source is informed, and the request and the details around the request are fi led for future reference. The question mark indicates that more information is needed and is sent back for more analysis.

Step 4. Determine if the change should continue or decide to deny the change before any detailed analysis is con-ducted. Some changes will be determined to offer very little in terms of benefi ts and may be very risky or costly. This early deny of a change should be documented for future reference. If the change control team cannot decide, they would go back into the process for further analysis. If the change control team decides that the change has potential benefi t, the change request follows the next step in the process—Impact analysis.

Step 5. Conduct impact analysis . This step is the heart of the change control process. The change request is ana-lyzed in detail to determine the following:

Risks associated with the change Cost of the change Impact on quality if implemented Effect on customer satisfaction Impact to the organization if the change is implemented

•••••

c08.indd 112c08.indd 112 2/23/09 12:35:04 PM2/23/09 12:35:04 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 129: Bringing The PMBOK Guide to Life

Managing Project Changes 113

Impact on team morale Effect on other projects Effect on organizational operations Impact on schedule

When the analysis is completed, another decision step is required. This decision step involves the following: A “ No decision ” . This indicates that the change will not

benefi t the project or has too many negative possibili-ties. It is denied. The reasons are documented, the source of the change is informed, and the information is fi led for future reference.

Question mark . The change control team cannot make a decision and additional analysis is required. The proc-ess goes back to impact analysis for further discussion.

Yes decision . This indicates that the change request should be approved and the change control team feels that the change is necessary or benefi cial and has the supporting detail behind the decision.

Step 6. Update the plan . The approval of the change requires an update of the plan itself. The documents asso-ciated with the approved change are revised to include the change decision and other supporting information.

Step 7. Communicate the change . The decision about the change does not always include input from the project team or other affected stakeholders. Changes are often resisted and require explanation and an attempt to gain buy - in from the stakeholders who will have to imple-ment the change or will be affected by the change.

Step 8. Implement the change . The change is implemented in a coordinated manner to ensure minimal disruptions to other activities. The change control process should include some guidelines about the actual implementation

••••

c08.indd 113c08.indd 113 2/23/09 12:35:04 PM2/23/09 12:35:04 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 130: Bringing The PMBOK Guide to Life

114 The Change Control Process

of the change. This is required to reduce the probability of introducing a problem into the project.

Step 9. Monitor the results of the change . As it is imple-mented, the change is observed to determine the actual results. The focus is on what has been accomplished, what benefi ts have been gained, and whether the change succeeded in correcting a problem. If the desired results are not attained, the change control team will analyze the results and modify its strategy. A careful analysis of the change and the potential outcomes will minimize probability that the change will not be successful.

Step 10. Lessons learned . Anytime a change is implemented or an action is taken to correct a problem, the team should analyze the process and document what has been learned. This may seem like an optional, even trivial, part of the process, but the value of lessons learned has been proven time and again. Take the time to review what has been learned and share with your organization.

PROJECT PLAN ACCELERATOR

Using information from this chapter and the PMBOK ® Guide for additional reference, make a note of any specifi c planning items that should become components of your project plan. Describe the component and develop questions around the com-ponent that will enable you to effectively use the component in the plan.

The Change Control Process

It is always a good idea to review what is currently available before initiating the development of a new process. The current process may be completely satisfactory or may only need some

c08.indd 114c08.indd 114 2/23/09 12:35:04 PM2/23/09 12:35:04 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 131: Bringing The PMBOK Guide to Life

Project Plan Accelerator 115

minor adjustments. Always work form a point of facts and reli-able data.

Obtain information from other projects or from organi-zational process assets about how change is managed. Is there a standard change control process in place? Determine if it will work for you project or if revisions are necessary. Remember, every project is unique so make sure the process fi ts the project. Develop a change control fl owchart or modify an existing process and communicate the process to the team. Flow charts can be very effective when communicating how a process works. Change control is basically a common sense component of the project plan and a straightforward, uncluttered process will be much easy to “ sell ” to the team. Emphasize the importance of a change control process and revisit the process on a regular basis during project status meetings.

Consider how the fi ve process groups and the knowledge areas can be used during the development and implementa-tion of the change control process. Attempt to involve and gain support from the stakeholders involved in the project. Explain the change process in terms the team will readily understand and accept. As you progress through the project life cycle iden-tify, on a regular basis, the condition of the project in rela-tion to its baselines. Stakeholders should know where the project is, in terms of status, at any particular moment. If a change is introduced, determine what the change is intended to accomplish and how the results of the change will be meas-ured. Finally, communicate information about the change to the people involved. Include stakeholders in discussions about change whenever possible, encourage feedback from the people

c08.indd 115c08.indd 115 2/23/09 12:35:04 PM2/23/09 12:35:04 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 132: Bringing The PMBOK Guide to Life

116 The Change Control Process

involved, and share information openly. Take the mystery and the anxiety out of change control. The whole process is really just common sense

Notes:

c08.indd 116c08.indd 116 2/23/09 12:35:05 PM2/23/09 12:35:05 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 133: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

P

MB

OK

® G

uid

e C

ompo

nen

t/T

ool/

Tec

hn

iqu

e/P

roce

ss

Act

ion

Pla

n fo

r Im

plem

enta

tion

P

erso

n

Res

pon

sibl

e D

ate

Req

uir

ed

Sco

pe c

ontr

ol

Sch

edu

le c

ontr

ol

Cos

t co

ntr

ol

Qu

alit

y co

ntr

ol

Ris

k m

onit

orin

g an

d co

ntr

ol

Con

trac

t A

dmin

istr

atio

n

Com

mu

nic

atio

ns

Man

agem

ent

(Th

ese

are

or c

ould

be

con

sid-

ered

su

bsid

iary

pla

ns

to t

he

proj

ect

man

agem

ent

plan

)

Rev

iew

exi

stin

g pr

oces

ses

for

con

trol

lin

g ch

ange

.

Iden

tify

ava

ilab

le c

han

ge d

ocu

men

ts a

nd

proc

edu

res .

If t

her

e is

a P

MO

wit

hin

th

e or

gan

izat

ion

, ob

tain

an

y st

anda

rd p

roce

dure

s fo

r m

an-

agin

g ch

ange

.

Obt

ain

bes

t pr

acti

ces

and

less

ons

lear

ned

fr

om p

revi

ous

proj

ects

.

Con

duct

a c

han

ge m

anag

emen

t be

st p

rac-

tice

s m

eeti

ng

to u

nco

ver

tech

niq

ues

th

at

hav

e be

en e

ffec

tive

for

a p

roje

ct t

eam

bu

t h

ave

not

bee

n c

omm

un

icat

ed .

Inte

grat

ed C

han

ge C

ontr

ol

Ver

ify

that

bas

elin

es h

ave

been

est

ab-

lish

ed f

or u

se in

man

agin

g an

d de

tect

ing

chan

ge.

(con

tin

ued

)

117

c08.indd 117c08.indd 117 2/23/09 12:35:05 PM2/23/09 12:35:05 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 134: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

(C

onti

nued

) P

MB

OK

® G

uid

e C

ompo

nen

t/T

ool/

Tec

hn

iqu

e/P

roce

ss

Act

ion

Pla

n fo

r Im

plem

enta

tion

P

erso

n

Res

pon

sibl

e D

ate

Req

uir

ed

Con

fi gu

rati

on M

anag

emen

t R

evie

w a

nd

docu

men

t h

ow c

han

ges

are

appr

oved

an

d w

hat

th

e pr

oces

s is

for

im

plem

enti

ng

appr

oved

ch

ange

s.

Con

trac

t A

dmin

istr

atio

n

Det

erm

ine

how

to

man

age

reje

cted

ch

ange

s to

en

sure

th

at t

hey

are

not

im

plem

ente

d.

Pro

ject

Man

agem

ent

Met

hod

olog

y D

efi n

e a

chan

ge c

ontr

ol p

roce

ss f

or t

he

curr

ent

proj

ect.

* R

ecom

men

dati

on—

Avo

id d

evel

opin

g de

tail

ed, l

engt

hy

text

doc

um

ents

if p

os-

sibl

e. U

se c

har

ts a

nd

grap

hic

s to

exp

lain

th

e pr

oces

s.

118

c08.indd 118c08.indd 118 2/23/09 12:35:05 PM2/23/09 12:35:05 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 135: Bringing The PMBOK Guide to Life

119

Chapter Nine

Establishing Roles and Responsibilities

The PMBOK ® Guide chapter about the knowledge area: “ Human Resource Management ” and Chapter Two : “ Project Life Cycle and Organization ” address the need for the project manager to understand the roles and infl uence levels of a project ’ s key stakeholders, the importance of developing the project team, and the generally accepted roles and authority levels of the project manager. The Human Resources Chapter (Chapter 9 in the 3 rd and 4 th Edition of the PMBOK ® Guide focuses attention to the staffi ng, development and manage-ment of the project team. There is great emphasis on roles and responsibilities and the connection to project success. Interviews with project managers indicate that one of the major reasons for project failure is the lack of clearly defi ned roles for each project team member and key stakeholder. A failure to assign roles and obtain agreement from all team members about assignments and responsibilities will lead to confusion, confl ict, and in many cases, a total breakdown of the team. In addition to assigning roles, the project manager must develop an understanding of how team members interact with each other and with other

c09.indd 119c09.indd 119 2/23/09 10:23:34 AM2/23/09 10:23:34 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 136: Bringing The PMBOK Guide to Life

120 Establishing Roles and Responsibilities

stakeholders and to recognize how personality and communica-tion styles impact the effectiveness of the team.

To manage the many types of personalities and to ensure suc-cessful project completion, the project manager must assume a number of different roles and could possibly wear several “ hats ” on any given day. Changes from role to role daily and during the various stages of the project is quite common for project managers. There are at least twenty generally accepted roles and responsibilities of the project manager:

1. Demonstrating accountability for overall project success— the project manager accepts accountability for the success or failure of the project. Accountability can not be dele-gated. The project manager must commit to the project.

2. Planning for, acquiring, developing, and managing the project team—this includes coaching, mentoring, teach-ing, and providing feedback.

3. Assuring compliance with all conditions of the project— knowledge of the contractual items, when applicable and other defi ned and documented expectations and criteria.

4. Scheduling and managing project meetings and ensur-ing preparation of agendas and meeting minutes.

5. Scheduling and chairing the project kickoff meeting—this is a critical step in the overall project management process and, when effectively managed, creates a solid planning foundation.

6. Facilitating the development of the following: scope statement, work breakdown structure, responsibility assignment matrix, master schedule, escalation process, and processes for monitoring and controlling the project.

7. Negotiating with and obtaining approval from the cli-ent regarding scope of work, schedule, and client responsibilities.

c09.indd 120c09.indd 120 2/23/09 10:23:34 AM2/23/09 10:23:34 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 137: Bringing The PMBOK Guide to Life

8. Establishing teams or committees to develop project man-agement subsidiary plans when applicable:

Implementation plan Quality assurance plan Change management plan Escalation plan Project budget Training plan Testing and acceptance plan Cutover plan (depending on type of project) Client acceptance plan Operations, administration, and maintenance plan (These are the specifi c written directions and support information that will be provided to the user of the product or service. They are the post project environ-ment guidelines that ensure a smooth transition and continued performance of the product after acceptance.) Safety plan Disconnect plan (This is associated with projects that involve the replacement of equipment and systems.)

9. Implementing formal project management processes and utilizing tools and techniques to manage project performance:

Use of project management software and enterprise systems Integration of the major components of the project including subprojects Development and management of a time - phased budget Development of contingency plans

10. Monitoring project activities through project team meet-ings, obtaining project status and current health of the project, and reporting project status to sponsors, clients, and key stakeholders.

••••••••••

••

••

Establishing Roles and Responsibilities 121

c09.indd 121c09.indd 121 2/23/09 10:23:34 AM2/23/09 10:23:34 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 138: Bringing The PMBOK Guide to Life

122 Establishing Roles and Responsibilities

11. Verifying adherence to project plans and successful com-pletion of milestones.

12. Reviewing contract implications and maintaining aware-ness of contract risk items, including penalty clauses and other terms and conditions.

13. Promoting the identifi cation of problems and issues, and promoting organized and effective methods to solve those problems and confl icts.

14. Escalating issues as necessary to support project team members and issues that require executive attention.

15. Serving as the single point of contact for project changes, communication of major developments, and issues that may impact the progress of the project.

16. Scheduling and conducting formal reviews with the client during project execution and at completion of the project to confi rm acceptance of project deliverables and to obtain feedback about overall team and project performance.

17. Scheduling and conducting formal project reviews in each phase of the project to identify strengths and weaknesses, analyze team performance, and verify the use of standard project management processes.

18. Assuring compliance with the approved organization project management processes.

19. Assuring completion of acceptable project deliverables. 20. Arranging for and assuring an organized close - out

process at project completion and managing the hand-off of the project deliverables to the client or receiving organization.

This listing of roles describes what project managers are typi-cally expected to do during their assignment. The actual roles of the project manager will vary by organization, depending on the size of the organization, the types of projects, the organization ’ s

c09.indd 122c09.indd 122 2/23/09 10:23:34 AM2/23/09 10:23:34 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 139: Bringing The PMBOK Guide to Life

enterprise environmental factors and approved processes, and the project management maturity of the organization.

The project team roles are generally assigned through the use of a responsibility assignment matrix. The RAM aligns major project components in the work breakdown structure (WBS) with the project core team members. This defi nes the responsi-bilities in connection with the technical aspects of the project.

There are additional roles that the project manager should be aware of, as well. In Dr. Harold Kerzner ’ s book Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 10th Edition , Kerzner identifi es several team member roles that a project manager may encounter. Team members may demonstrate characteristics defi ned as destruc-tive roles or supportive roles, and every project manager should be aware of their existence and potential impact on the behav-iors of other team members, the morale of the team, and how these roles affect the project. The project manager ’ s goal is to emphasize the need for, and encourage team members to ful-fi ll, the supportive roles, while discouraging the behaviors asso-ciated with destructive roles. An awareness of these roles is important, and although these destructive roles may be unde-sirable, they are sometimes necessary. These roles may result in some confl ict among team members, and possibly between a team member and the project manager. Confl ict, when man-aged effectively, can lead to breakthroughs, new ideas, and greater respect and trust within the project team. Project man-agers should develop techniques to manage confl ict effectively and should understand the benefi ts or positive side of confl ict.

Table 9.1 describes the team member roles that a project manager may encounter as team members are acquired and during the execution of the project activities.

It is clear by the descriptions of these destructive roles that they would be undesirable on any project team. By taking the

Establishing Roles and Responsibilities 123

c09.indd 123c09.indd 123 2/23/09 10:23:35 AM2/23/09 10:23:35 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 140: Bringing The PMBOK Guide to Life

124 Establishing Roles and Responsibilities

time to introduce and explain these roles during the project kickoff meeting and creating an awareness about their negative impact on the project, the project manager can set expectations about what behaviors should not be displayed during the project life cycle. It is important to note that although the destructive roles may be undesirable in most situations, there is actually some benefi t to be found when these roles are being engaged. Some confl ict may be helpful in the project environment and could uncover new and better ideas for solving problems or increasing the probability for success. Don ’ t use an iron fi st approach and set rules and expectations that are totally infl ex-ible. Allow some open discussion and push back. Explaining

Table 9.1 Destructive Team Members The Aggressor Openly and continuously criticizes team

members, challenges ideas, defl ates egos, and tries to eliminate innovation

The Dominator Manipulates the team, seeks out weak-nesses, and tries to take over

The Devil ’ s Advocate Finds fault in everything and challenges any idea

The Topic Jumper Switches from one idea to another, creates imbalance and inability to focus

The Recognition Seeker

Always argues for his or her position, attempts to take credit for successes, thinks he or she has the best ideas

The Withdrawer Does not participate, withholds information, and does not get involved in team discussions and activities

The Blocker Provides multiple reasons why ideas won ’ t work

Source: Harold Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 9th ed. (Hoboken, NJ: Wiley, 2006), pp. 180–181.

c09.indd 124c09.indd 124 2/23/09 10:23:35 AM2/23/09 10:23:35 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 141: Bringing The PMBOK Guide to Life

what is not desired is only a part of the expectation setting proc-ess. The project manager should, upon reviewing the undesired destructive roles, immediately focus on the supportive roles, as highlighted in Table 9.2 .

Working with a team that is actively displaying and practic-ing the supportive roles described in Table 9.2 will signifi cantly increase the chances for project success. By explaining these roles at project start - up, the project manager effectively sets expectations for overall performance and proactively encour-ages the team to establish an environment that will make the work of the project more enjoyable and possibly fun.

The key here is for the project manager, as the leader, to pre-vent the destructive roles from developing by actively displaying

Table 9.2 Supportive Project Team Member Roles The Initiator Looks for new ideas, uses phrases like, “ Let ’ s

try this! ” or “ I ’ m sure we can come up with a solution if we work together ”

The Information Seeker

Tries to become more informed, looks for resources and supportive data. Offers to research for the benefi t of the team

Information Givers Shares what they know, increases the knowl-edge of the team

The Encouragers Shows visible support for other people ’ s ideas. Uses phrases like, “ That ’ s a great idea, ” or, “ I can support what you are suggesting ”

The Clarifi er Helps make sure that everyone understands and issue or a decision

The Harmonizer Creates a unifi ed feeling among the team

The Gate Keeper Ensures that all information is relevant and the team stays focused on the issue at hand

Source: Harold Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 9th ed. (Hoboken, NJ: Wiley, 2006), pp. 180–181.

Establishing Roles and Responsibilities 125

c09.indd 125c09.indd 125 2/23/09 10:23:35 AM2/23/09 10:23:35 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 142: Bringing The PMBOK Guide to Life

126 Establishing Roles and Responsibilities

the supportive roles and acknowledging team members when they display the desired characteristics of the supportive roles. Knowledge of confl ict management techniques will also create opportunities to use the behaviors associated with destructive roles to develop better, more effective methods for managing the project and the team.

PROJECT PLAN ACCELERATOR

Using information from this chapter and the PMBOK ® Guide for additional reference, make a note of any specifi c planning items that should become components of your project plan. Describe the component and develop questions around the component that will enable you to effectively use the component in the plan.

Establishing Roles and Responsibilities

The project kick - off meeting provides an excellent opportunity for discussing and agreeing upon project team member roles and responsibilities. This important part of the project plan-ning process should not be overlooked or treated lightly. To ensure that your projects needs have been addressed effectively and the right people are assigned to the right activities:

Review the roles and responsibilities of the project man-ager that have been established in your organization. Determine if there are any gaps or ambiguous descrip-tions. Take the necessary steps to adjust these roles. Obtain sponsor support as needed. Assess the project team members and determine their strengths in terms of technical and interpersonal skills. One on one discussions would be a great way to obtain this information.

c09.indd 126c09.indd 126 2/23/09 10:23:36 AM2/23/09 10:23:36 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 143: Bringing The PMBOK Guide to Life

Project Plan Accelerator 127

Develop a set of expectations to be communicated to the project team. Make sure your expectations are clear and intentionally set. Do not make assumptions about expec-tations and how they are communicated

Consider how the fi ve process groups and the knowledge areas can be used to defi ne project roles and responsibilities. Refer to the planning processes – Initiating, planning, execut-ing, monitoring and controlling to determine who would be involved in an activity and who would be responsible for its completion. Refer to the inputs, tools and techniques, and out-puts provided in each chapter of the PMBOK ® Guide 3 rd or 4 th Edition. The 4 th Edition provides fl ow charts that effectively illustrate how these process interactions work. It is also impor-tant for each team member to be aware of who their specifi c internal project customers are. Refer to the Project Customer supplier model and emphasize the importance of knowing who will receive each internal project deliverable.

Notes:

c09.indd 127c09.indd 127 2/23/09 10:23:36 AM2/23/09 10:23:36 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 144: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

P

MB

OK

® G

uid

e C

ompo

nen

t/T

ool/

Tec

hn

iqu

e/P

roce

ss

Act

ion

Pla

n fo

r Im

plem

enta

tion

P

erso

n

Res

pon

sibl

e D

ate

Req

uir

ed

Hu

man

res

ourc

e pl

ann

ing

Det

erm

ine

the

nec

essa

ry r

esou

rces

for

th

e pr

ojec

t.

Acq

uir

ing

proj

ect

team

Id

enti

fy o

rgan

izat

ion

al p

roce

ss a

sset

s th

at a

re a

ssoc

iate

d w

ith

acq

uir

ing

the

proj

ect

team

.

Dev

elop

ing

the

proj

ect

team

D

eter

min

e th

e te

chn

iqu

es t

hat

can

be

use

d to

cre

ate

a h

igh

- pe

rfor

min

g te

am.

Defi

ne

team

an

d in

divi

dual

exp

ecta

tion

s . S

ched

ule

tea

m b

uil

din

g ac

tivi

ties

. P

lan

rec

ogn

itio

n e

ven

ts a

nd

sch

edu

le t

hem

th

rou

ghou

t th

e pr

ojec

t li

fe c

ycle

.

Man

agin

g th

e pr

ojec

t te

am

Com

mu

nic

ate

perf

orm

ance

req

uir

emen

ts .

Det

erm

ine

how

tea

m p

erfo

rman

ce w

ill b

e m

anag

ed .

Dev

elop

a p

roce

ss f

or c

omm

un

icat

ing

proj

ect

perf

orm

ance

. D

evel

op s

kill

s to

man

age

con

fl ic

ts .

Iden

tify

typ

ical

con

fl ic

ts t

hat

may

occ

ur .

Dev

elop

res

pon

se p

lan

s fo

r th

ese

con

fl ic

ts.

Lea

ders

hip

D

evel

opm

ent

Det

erm

ine

effe

ctiv

e m

etho

ds fo

r m

otiv

atin

g th

e pr

ojec

t te

am.

Ass

ess

lead

ersh

ip s

kill

s an

d de

velo

p a

plan

for

per

son

al

impr

ovem

ent .

128

c09.indd 128c09.indd 128 2/23/09 10:23:36 AM2/23/09 10:23:36 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 145: Bringing The PMBOK Guide to Life

Chapter Ten

Risk Management — A Project Imperative

Risk management is one of the most important project plan-ning factors. It is often talked about but is not always included in the actual project management plan. Most project managers would agree that potential risk situations should be identifi ed and assessed at the start of the project planning process, and also throughout the project life cycle. Many organizations see value in identifying and managing risk but fall short of devel-oping risk planning processes because of the perceived lengthy time required to develop a plan and then the perceived effort associated with implementing the plan. There is an underly-ing notion that risk management costs more to implement than the actual savings that may be realized. In many organi-zations, risk management is given cursory attention and then basically is handled in a “ let ’ s wait and see what happens ” type of approach. This often results in disaster and a signifi cant amount of additional work to recover from the risk event.

Risk management should be scaled to meet the needs of the project and to address the specifi c risk tolerances of the

129

c10.indd 129c10.indd 129 2/23/09 10:24:39 AM2/23/09 10:24:39 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 146: Bringing The PMBOK Guide to Life

stakeholders and especially the organization sponsoring the project. The core planning process group in the PMBOK ® Guide 3 rd and 4 th Edition includes risk management plan-ning. It is an important factor during planning because it has a direct connection to activity duration estimating, cost esti-mating, procurement management, contract development and scope management, In fact, risk is something that can be easily associated with each project management knowledge area. The entire risk management process includes planning for risk, risk identifi cation, qualitative risk analysis, quantitative risk anal-ysis, risk response planning, and risk monitoring and control. These six processes basically describe the outline of a risk man-agement plan and are arranged in a logical sequence that can easily be explained to project team members and stakeholders. It is important to note that the PMBOK ® Guide emphasizes the linkages between the fi ve process groups and the nine knowl-edge areas. The point is to clearly show that the entire project planning process is a combination of activities and processes from all knowledge areas. As an example, during the schedul-ing process the project team members consider factors that may impact the completion of an activity and add an appropri-ate contingency reserve to provide a buffer intended to absorb potential risk events. Most of the risk management processes are associated with the planning process group , and risk moni-toring and control is found as a subprocess under the monitor-ing and controlling process group .

Risk management certainly is, at least it should be, a project planning imperative, but it can become diffi cult to communi-cate the value of risk management to key stakeholders and even more diffi cult to actually implement. During my research about risk management I read several articles that link risk management to disaster recovery planning. A consistent mes-sage within each of these articles is this simple statement “ If

130 Risk Management—A Project Imperative

c10.indd 130c10.indd 130 2/23/09 10:24:40 AM2/23/09 10:24:40 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 147: Bringing The PMBOK Guide to Life

you don ’ t practice the plan, you don ’ t have a plan. ” That is very true about risk management. The team should understand why the risk management plan is necessary and also understand how to implement the plan. I believe that any project where human life may be at risk must have a risk management plan — not just safety plans and procedures, but actual detailed plans that will minimize the probability of unfortunate events. These projects include constructing large buildings, space shuttle launches, offshore oil rig construction, pyrotechnic projects, and tunnel construction, to name a few. These types of projects utilize highly skilled experts with sophisticated tools and equipment, and there is no doubt that they take risk very seriously.

There are many projects that are not as complex as those just mentioned, but the need for a risk management plan is very much justifi ed. People generally associate risk with nega-tive events and undesirable occurrences and avoid discussing these situations for fear of being perceived as pessimists or as overly cautious resistors to progress. The idea is to look at risk with a positive mindset. Thinking about risk is actually good for the project and for the organization and can lead to great ideas and innovation about preventing negative occurrences while promoting and enhancing positive situations.

I have been to many seminars and discussions about risk management, and I believe the best strategy is to engage the project team in risk management planning at the early stage of the project — preferably during the project kickoff meet-ing. (You should have noticed by now that the kick - off meeting is a key element of effective planning). I will focus on the qualitative risk analysis process to remain within the scope of this book. The topic of risk management can certainly fi ll vol-umes, and the tools and techniques can be very sophisticated and complex. They require a signifi cant amount of information

Risk Management—A Project Imperative 131

c10.indd 131c10.indd 131 2/23/09 10:24:40 AM2/23/09 10:24:40 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 148: Bringing The PMBOK Guide to Life

and explanation. The assumption here is that any project requires some type of risk management process, and therefore a simplifi ed approach is provided in this chapter.

In the February 1998 issue of PM Network magazine distrib-uted by PMI, an article written by Paula Martin and Karen Tate, PMP, described what I believe to be a straightforward and easily communicated process for managing risk using a qualitative analysis approach. The article, entitled “ Team Based Risk Assessment — Turning Naysayers and Saboteurs into Supporters, ” describes a process that most project teams, especially those working on small to midsize projects with a schedule duration of under a year will fi nd easy and very effec-tive. The process minimizes the administrative burden asso-ciated with detailed risk planning documents and processes. Team - based risk assessment is a classic example of how to bring the PMBOK ® Guide to life by providing a process that takes the key elements described in the PMBOK ® Guide and applying them to an actual project environment.

The basic process is described as follows:

1. Make sure the team has been provided with a detailed scope statement and each member fully understands the complexity of the project. The scope statement and a well - developed work breakdown structure will facilitate the risk management process.

2. The team identifi es the major deliverables associated with the project . This step provides a description of what specifi cally will be provided in terms of tangible items to meet the client ’ s needs to achieve the project objectives.

3. The team uses typical identifi cation processes to list the potential risks associated with each deliverable . These risks are documented on a chart associated with each deliverable. Project phases can also be used to identify

132 Risk Management—A Project Imperative

c10.indd 132c10.indd 132 2/23/09 10:24:40 AM2/23/09 10:24:40 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 149: Bringing The PMBOK Guide to Life

risks by identifying the deliverables associated with each project phase. Risk identifi cation includes:

Brainstorming — a group discussion in which a mul-titude of ideas are offered regardless of whether they fi t a preconceived image, in order to generate creative solutions. Nominal group technique — a face - to - face group judg-ment technique in which participants are provided with a problem or a situation that needs attention. The team generates ideas silently, in writing and anonymously. Responses are collected by a facilitor and posted for review. Delphi technique — a decision - making process that uses the opinions of experts, generally anonymous, gathered on a dispersed or face - to - face basis, and the guidance and direction of a facilitator to reach either group consensus or a clear defi nition of alternatives. This technique is used, in part, to minimize bias or infl uence between subject matter experts. SWOT analysis — a review of the strengths, weak-nesses, opportunities, and threats associated with a project or an organization ’ s goals (see Chapter Three ).

4. The risk events identifi ed by the team are assessed for impact . This process utilizes the technique known as the probability/impact matrix. The team develops a risk rating by using expert judgment to estimate the probability that the risk event will occur and the impact if it does occur. Risk probability and impact can be determined using a high, medium, low scale (ordinal scale) or a numerical scale (cardinal scale), where high risk may be translated into scores from 8 to 10, medium risks are translated as having a value of 4 to 7, and low risks are rated as 1 to 3.

Risk Management—A Project Imperative 133

c10.indd 133c10.indd 133 2/23/09 10:24:41 AM2/23/09 10:24:41 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 150: Bringing The PMBOK Guide to Life

The probability and impact are multiplied together to produce a risk rating. The higher the risk rating, the greater the need for attention. This process helps the team to prioritize each risk and determine the level of effort and the resources that will be needed to address and resolve the risk situation. Urgency is another factor that should be considered. Some risks that are lower in risk rating value may be more urgent in terms of when they may occur, and in some cases, should be addressed before higher rated risks.

5. The team assesses the risks . Team members place the risk events in priority order based on rating and urgency, dis-cuss the reasons for each risk, and begins to plan responses.

6. The team determines the possible responses or counter-measures for each risk event. During this process the team discusses possible solutions and or preventive measures. The goal is to generate options for considera-tion. More effective decisions can be made when more information and alternatives are available.

This process is very easy to use and can greatly improve the overall project management plan. Easy does not mean ineffec-tive, This is a very useful risk management process and can be used in any project phase or at any level of the work breakdown structure. The process also encourages team interaction and helps the team to gain a greater understanding of the project scope and a much better understanding of the value of a risk management process. A by-product of this process is the devel-opment of a list of documented risk events that can be added to the organization ’ s lessons - learned fi les. Continued additions to this list will improve the overall organizational project man-agement process, minimize the occurrence of several potential risk events, and effectively communicate the importance of a risk management plan to all project stakeholders.

134 Risk Management—A Project Imperative

c10.indd 134c10.indd 134 2/23/09 10:24:41 AM2/23/09 10:24:41 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 151: Bringing The PMBOK Guide to Life

Risk Management Lessons Learned

Professional project managers are aware of the value of doc-umenting and sharing lessons learned. Most of the process outputs in the PMBOK ® Guide include “ lessons learned doc-umentation ” and experienced and effective leaders continuously add to the ever expanding list of project lessons learned. The following is just a small sample of the knowledge shared by conscientious project professionals:

Set priorities and revisit them regularly. Things change. What is true today may not have any relevance in the not to distant future. Continue to learn. Education never stops. Surround yourself with great people. You personally will not have all of the answers. Create teams of people who will seek out the answers and solutions. Whenever possible, listen fi rst, decide later. Obtain as much intelligence as possible. Consider other viewpoints. Keep your commitments. Establish a clear vision and communicate goals and objectives. Remain consistent. Don ’ t change your values and your message based on your audience. Demonstrate loyalty to your team members and employees. Retain your agility and adaptability. Learn new skills and technologies. Coach, don ’ t control, your team. Create an environment where people trust their leaders. Narrow the knowledge gap between worker and manage-ment. Encourage workers to assume greater responsibil-ity by empowering them. Assess the skills of the people on your team. Know each team member ’ s capabilities.

••

••

••

•••

Risk Management—A Project Imperative 135

c10.indd 135c10.indd 135 2/23/09 10:24:41 AM2/23/09 10:24:41 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 152: Bringing The PMBOK Guide to Life

Sometimes the best way to lead is to get up and do it. Sometimes you have to change the rules. First impressions can be deceiving. Hope is not a plan. Leaders are the ones in the “ loop ” (stay informed). There is no such thing as too much information. Err on the side of giving too much information (I know of sev-eral people who would disagree with this one!). Remain visible to your organization ’ s people. Talk to them. People appreciate visits from their leaders. It establishes a “ connective ” environment.

IDENTIFYING PROJECT RISKS — RISK CATEGORIES

The PMBOK ® Guide refers to the use of a Risk Breakdown Structure (RBS) to assist in the identifi cation of project risk situations. Breaking a project into categories such as technical, external, organizational and project management can assist in further defi ning project risk events. The knowledge areas of the PMBOK ® Guide also provide categories that may be used to identify risk situations. Here are some examples:

Scope management — Risks may include scope creep or failure to defi ne the scope in suffi cient detail. Time management — Risks may include schedule slip-page, lack of resources, and optimistic estimates. Human resource management — Risks may include loss of a key team member, confl ict between functional groups, and incapable leadership.

Table 10.1 indicates how risk categories can be defi ned and then further elaborated. Templates such as this are easy to cre-ate and provide a framework for project teams to build on.

••••••

136 Risk Management—A Project Imperative

c10.indd 136c10.indd 136 2/23/09 10:24:41 AM2/23/09 10:24:41 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 153: Bringing The PMBOK Guide to Life

Table 10.1 Template for Defi ning Risk Categories Risk Category Sources of Risk Technical — evolv-ing design, reli-ability, operability, maintainability

Examples of sources of risk: Physical properties of the deliverable— size shape, weight etc. Changing Requirements—approved requirements are changes frequently and the changes may cause additional problems Material Properties—density, strength Unstable Technology—unpredictable outcomes Testing Untested Technology—the actual testing process could be a risk Modeling System Complexity—potential for missing key steps or components Integration—failure to ensure design compatibility for multiple components Design—unproven, faulty, no design review Safety—potential for injury during technical testing

Program / Organizational — processes for obtaining resources, enterprise environmental factors, organizational process assets

Material Availability—material may not be available when needed Contractor Stability—potential for a contrac-tor to fail due to fi nancial issues Personnel Availability—critical resources are not available Regulatory changes—government changes regulations Personal Skills—lack of qualifi ed people Organizational Process—faulty or incom-plete processes Security processes—missing or incomplete processes Communications processes—ineffi cient communications techniques, faulty equip-ment or infrastructure

(continued)

Identifying Project Risks—Risk Categories 137

c10.indd 137c10.indd 137 2/23/09 10:24:42 AM2/23/09 10:24:42 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 154: Bringing The PMBOK Guide to Life

Table 10.1 (Continued) Risk Category Sources of Risk Supportability — maintaining systems, operating procedures

Product reliability—products fails to meet specifi cations Training—training is insuffi cient System safety—safety procedures are not in place Documentation—documentation is missing, incomplete, inaccurate Technical data—data is incorrect, corrupted, lost Interoperability—components do not function with other systems Transportability—inability to move the technology from one system to another

Cost — limited budgets, estimating processes, constraints

Administrative rates—excessive cost for administrative support Overhead costs—additional costs for services or indirect costs Estimating errors—fault data, padding, inac-curate records Cost of quality—repairs, rework, scrap Reliability of estimating resources—techniques used to estimate resources are unreliable

Schedule — estimat-ing processes, reliability of planning processes, methods and procedures

Estimating errors—functional managers provide overly optimistic estimates Number of critical path items—multiple critical paths, large number of critical path items and lack of skilled resources Degree of concurrency—number of items in progress concurrently Unrealistic schedule baseline—schedule based on unreliable estimates, forced end date, contractual obligations

138 Risk Management—A Project Imperative

c10.indd 138c10.indd 138 2/23/09 10:24:42 AM2/23/09 10:24:42 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 155: Bringing The PMBOK Guide to Life

Risk management should be included in any project, regardless of a size. More complicated projects will require more detailed analysis using quantitative techniques such as sensitivity analy-sis, Monte Carlo simulation, and decision tree analysis: The fol-lowing is a brief description of each of these techniques

Sensitivity analysis . This compares the relative impor-tance of variables on project outcomes. This type of analysis examines the extent to which the uncertainty of each project element affects the objective being meas-ured when all other uncertain elements are held to their baseline values. The use of a tornado diagram is com-mon in sensitivity analysis. The technique arranges in priority order those items that have the greatest range of impact either positive or negative when compared to the baseline. The image produced resembles the shape of a tornado.

Monte Carlo simulation. This method estimates possi-ble outcomes using a set of random variables and run-ning simulations of the process several times and then observing the outcomes.

Decision tree analysis. A decision tree is a graph of deci-sions and their possible consequences, (including resource costs and risks) used to create a plan to reach a goal. The decision tree diagram includes the features described in Table 10.2 .

These techniques require additional information, data, and specialized tools to produce the desired results. The project team and project manager must assess the appropriate tools to meet the needs of the project and then determine how to implement and manage the tools and the process selected.

One more interesting technique, which is basically a qualita-tive approach, is a very creative method. I am not sure where

Identifying Project Risks—Risk Categories 139

c10.indd 139c10.indd 139 2/23/09 10:24:42 AM2/23/09 10:24:42 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 156: Bringing The PMBOK Guide to Life

this idea was generated, but it makes sense for use on many small to midsize projects:

Step 1. Provide the team with a detailed scope statement. Make sure the team understands the objectives of the project. Everyone on the team should fully understand the purpose of the project and the deliverables to be produced.

Step 2. Ask the team to think into the future and to imag-ine the project has failed.

Step 3. Then ask the team to list all of the reasons why the project failed.

Table 10.2 Features of a Decision Tree Decision Defi nition

Decision Node

Chance Node Net Path Value

What is the deci-sion to be made? Build or upgrade? Purchase or fabricate? Test or not test?

What are the possible choices and the costs of the choice?

What are the possible outcomes of the decision, generally in terms of a positive side and a negative side? The probability of each side is determined, including the reward if the outcome actu-ally occurs. The probability of each branch must equal 100 percent when added together.

What is the payoff minus the costs? This information is then used to calculate the expected monetary value (EMV) of the decision.

140 Risk Management—A Project Imperative

c10.indd 140c10.indd 140 2/23/09 10:24:43 AM2/23/09 10:24:43 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 157: Bringing The PMBOK Guide to Life

Step 4. When the team has exhausted all potential risk reasons, ask the team to return their thinking and focus to the present.

Step 5. Finally, ask the team to develop plans to address the listed risks and make sure that everything on the list they created will not happen.

This approach is another way to gain team buy - in and can be very useful in developing interest in risk management, while increasing the team ’ s knowledge about the project.

RISK MANAGEMENT — CYA STRATEGY

There is no shortage of acronyms in the business environment and especially in the project management world. Some acro-nyms are common across all industries and require no addi-tional explanation. I will make an assumption here that the acronym mentioned here is one that can stand alone.

There will be times when a project manager or team faces a situation in which, despite overwhelming evidence and support-ing detail to avoid a high risk project or a bad decision, a direc-tive will be given to plan and execute the project anyway. In these cases, a strategy for action will be required. The following information may be useful if you are faced an assignment that could be described as a “set up for failure”. (This would never happen! Or would it?) In these situations, the project manager may not have a choice and must move forward, even though the chances for success seem nearly impossible. This strategy may seem a bit unusual, but I am sure many project managers have been placed in this uncomfortable predicament.

Imagine this situation: You are assigned to manage a project that has been determined by the decision makers of your organization (sponsors or management) to be necessary and

Risk Management—CYA Strategy 141

c10.indd 141c10.indd 141 2/23/09 10:24:43 AM2/23/09 10:24:43 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 158: Bringing The PMBOK Guide to Life

or benefi cial to your organization. One or more of the following may apply to this project:

The project has signifi cant risks and an unrealistic imposed completion date. The project includes new technology that has not been previously implemented and a contractual completion date has been determined, with severe penalties for missed milestones. The contract was negotiated without the input of a project manager or functional managers. All decisions were made at the executive level with no fi eld input. The sponsor is aware of the risks, has seen a detailed risk analysis, and the probability of success is low, but has decided to move forward due to what are perceived to be potential benefi ts (whether real or imagined). The sponsor is a real risk taker and is also very well con-nected politically. It may be a pet project (a project that actually has no direct connection to the organization ’ s strategic direction). The project has been turned down or in some way avoided by all of the “ seasoned ” and experienced project managers in your organization, who conveniently are far too busy to accept it (or they have political contacts that they are using for a shield). All of the above.

The following is a list of project manager activities that could or should be considered in this type of situation. There may be many more actions to add to this list. Use your imagination.

It is absolutely critical for the project manager to defi ne the expectations of the sponsor or executive management. Make sure expectations are clearly stated. Use diplomacy, but obtain

142 Risk Management—A Project Imperative

c10.indd 142c10.indd 142 2/23/09 10:24:43 AM2/23/09 10:24:43 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 159: Bringing The PMBOK Guide to Life

and document these expectations. Be persistent. Defi ne and obtain agreement about your personal expectations of the spon-sor or manager.

Project Actions/Activities: 1. Meet with project team . Explain the project in detail

(use a well written scope statement, if possible). Do not complain to the team. Stay focused on facts and the key issues. Avoid getting emotional.

2. Document feedback from the team . Do not promote com-plaints. Work with the team to use their expertise and knowledge when discussing the project. Share this input with your sponsor or manager.

3. Discuss the project with peers . Obtain lessons learned, use their insight and expertise. Again, don ’ t complain, just obtain data and support.

4. Develop what - if scenarios. What are the consequences of not accomplishing the objectives? (best case/worst case) Discuss and identify other potential risks. Document the results. Conduct what - if scenario sessions frequently.

5. Prepare status reports . Depending on the situation, pro-vide status updates weekly, daily, or hourly. This depends on the project and on the expectations of management.

6. Develop a risk reduction process . It should include: Preventive measures—minimizing risk occurrences Mitigation plans—actions that will reduce risk probabil-

ity and impact Work - arounds—temporary responses to risk situations

7. Keep a daily project log . Include details such as weather conditions, daily emergencies, extra hours worked, envi-ronment issues, out of the ordinary occurrences.

8. Prepare management summaries. Provide them daily, weekly or monthly, depending on the situation. Good judgment is a key factor here.

Risk Management—CYA Strategy 143

c10.indd 143c10.indd 143 2/23/09 10:24:44 AM2/23/09 10:24:44 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 160: Bringing The PMBOK Guide to Life

9. File all documentation, including e - mail . Keep it easily accessible. You may need this so keep your fi ling system organized.

10. Establish a vendor management process to ensure com-mitments are met . Set expectations with all vendors and suppliers.

11. Establish a clearly defi ned communications process for all stakeholders . Minimize the possibility of mis - communicating information.

12. Record all project work time. Include nonpaid overtime and weekends. Document all of your project work time.

13. Prepare a detailed project review at the end of each phase and at project completion. Include an executive summary.

14. Obtain benchmarking information from other industry experts and consultants . Having supporting data from reli-able sources and unbiased sources will be helpful during reviews and audits and especially during performance reviews.

15. Do not use warning phrases . Comments like, “ I told you so, ” or, “ you were warned, ” can really become career damagers.

Regardless of technique used, a risk management process is essential for project success. The team should review tech-niques that have been used within the organization to deter-mine the best, most effective, and most effi cient process for the type of project or situation. Engage project team members in risk management at the start of the project, and make it a point to emphasize its importance throughout the project life cycle.

PROJECT PLAN ACCELERATOR

Using information from this chapter and the PMBOK ® Guide for additional reference, make a note of any specifi c planning items that should become components of your project plan. Describe

144 Risk Management—A Project Imperative

c10.indd 144c10.indd 144 2/23/09 10:24:44 AM2/23/09 10:24:44 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 161: Bringing The PMBOK Guide to Life

the component and develop questions around the component that will enable you to effectively use the component in the plan. The PMBOK ® Guide is a resource and can be a great memory jogger during the planning process. Keep it handy for reference.

Risk Management

A risk management process is essential for project success and should be included in any project plan regardless of size or complexity. Take the time to “ sell ” risk management to your team and project stakeholders. A positive, upfront approach to project risk will reap huge benefi ts later. The following actions will assist in the development of a risk strategy and process.

Analyze the culture of the organization as it relates to risk. What is the organization ’ s tolerance for risk? Obtain information from other projects about how risks have been managed or check existing organizational processes for information that may facilitate the planning process. Are there any standards in place? Check with other project managers. There may be techniques being used that have a direct connection to risk management. What type of analysis is most appropriate? Qualitative or quantitative? This depends on the type of project. Communicate the importance of risk management to the project team. Provide examples of projects that became troubled due to a lack of attention to risk. Emphasize the importance of discussing possible risks on a regular basis during project status meetings. Discuss potential “ show stoppers .” Create a “ contingency prepped ” team.

Consider how the fi ve process groups and the knowledge areas can be used during the development and implementation

Project Plan Accelerator 145

c10.indd 145c10.indd 145 2/23/09 10:24:44 AM2/23/09 10:24:44 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 162: Bringing The PMBOK Guide to Life

of the risk management plan. Consider the methods that may be used to identify risks, rank the risks, determine responses to the risks, and monitor and control new risks. Each knowledge area of the PMBOK ® Guide can be considered a category for risk. Use these knowledge areas to generate discussions about risk.

Notes:

146 Risk Management—A Project Imperative

c10.indd 146c10.indd 146 2/23/09 10:24:44 AM2/23/09 10:24:44 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 163: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

PM

BO

K ®

Gu

ide

Com

pon

ent/

Too

l/T

ech

niq

ue/

Pro

cess

Act

ion

Pla

n fo

r Im

plem

enta

tion

P

erso

n

Res

pon

sibl

e D

ate

Req

uir

ed

Ris

k m

anag

emen

t pl

an

Det

erm

ine

wh

o w

ill b

e re

spon

sibl

e fo

r de

velo

pin

g th

e ri

sk

man

agem

ent

plan

or

con

trib

uti

ng

to t

he

plan

. D

eter

min

e th

e ri

sk t

oler

ance

of

you

r or

gan

izat

ion

(R

isk

Ave

rse,

Ris

k N

eutr

al, R

isk

See

ker)

. R

evie

w t

he

ente

rpri

se e

nvi

ron

men

tal f

acto

rs a

ssoc

iate

d w

ith

you

r or

gan

izat

ion

.

Ris

k id

enti

fi ca

tion

D

eter

min

e th

e m

ost

appr

opri

ate

tech

niq

ues

for

ris

k id

enti

-fi

cati

on t

o be

use

d on

th

e pr

ojec

t:

Bra

inst

orm

ing

Nom

inal

gro

up

tech

niq

ue

Del

phi t

ech

niq

ue

SW

OT

an

alys

is

Iden

tify

, rat

e, a

nd

ran

k th

e pr

ojec

t ri

sks.

Use

a p

roba

bili

ty/

impa

ct m

atri

x an

d te

am b

ased

ris

k as

sess

men

t .C

reat

e a

risk

reg

iste

r. E

duca

te a

nd

trai

n t

he

proj

ect

team

abo

ut

thes

e te

chn

iqu

es.

(con

tin

ued

)

147

c10.indd 147c10.indd 147 2/23/09 10:24:45 AM2/23/09 10:24:45 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 164: Bringing The PMBOK Guide to Life

Proj

ect

Plan

Acc

eler

ator

(C

onti

nued

) P

MB

OK

® G

uid

e C

ompo

nen

t/T

ool/

Tec

hn

iqu

e/P

roce

ss

Act

ion

Pla

n fo

r Im

plem

enta

tion

P

erso

n

Res

pon

sibl

e D

ate

Req

uir

ed

Qu

alit

ativ

e an

alys

is

Qu

anti

tati

ve

anal

ysis

Cre

ate

a ri

sk b

reak

dow

n s

tru

ctu

re .

Init

iate

a t

eam

bas

ed r

isk

asse

ssm

ent

for

the

proj

ect .

Det

erm

ine

prob

abil

ity

and

impa

ct o

f ea

ch r

isk

iden

tifi

ed .

Dev

elop

ris

k re

spon

ses .

Qu

anti

tati

ve A

nal

ysis

tec

hn

iqu

es in

clu

de:

Mon

te C

arlo

Sim

ula

tion

D

ecis

ion

Tre

e A

nal

ysis

S

ensi

tivi

ty A

nal

ysis

D

eter

min

e w

hic

h a

ppro

ach

qu

alit

ativ

e or

qu

anti

tati

ve o

r if

bo

th s

hou

ld b

e u

sed

to a

nal

yze

and

prio

riti

ze r

isks

. R

evie

w t

he

tool

s an

d te

chn

iqu

es u

sed

for

thes

e pr

oces

ses.

C

ondu

ct t

rain

ing

sess

ion

s fo

r th

e te

am o

r ob

tain

exp

eri-

ence

indi

vidu

als .

Ris

k re

spon

se

plan

nin

g D

eter

min

e th

e m

ost

appr

opri

ate

resp

onse

s to

eac

h r

isk

iden

tifi

ed :

Avo

id—

fi n

d an

alt

ern

ativ

e . T

ran

sfer

—h

and

off

to a

qu

alifi

ed

expe

rt .

Mit

igat

e—re

duce

pro

babi

lity

an

d im

pact

.E

xplo

it—

crea

te a

n e

nvi

ron

men

t w

her

e a

posi

tive

ris

k ev

ent

can

like

ly o

ccu

r .

148

c10.indd 148c10.indd 148 2/23/09 10:24:45 AM2/23/09 10:24:45 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 165: Bringing The PMBOK Guide to Life

En

han

ce—

obta

in t

he

grea

test

ben

efi t

fro

m t

he

posi

tive

ev

ent.

Sh

are—

incl

ude

oth

er o

rgan

izat

ion

al e

nti

ties

in p

osit

ive

risk

eve

nts

. A

ccep

t—ac

cept

th

e ri

sk e

ven

t an

d pr

epar

e an

app

ropr

i-at

e ba

ck u

p pl

an o

r co

nti

nge

ncy

in c

ase

the

risk

eve

nt

occu

rs.

It is

impo

rtan

t to

en

sure

th

at d

etai

led

expl

anat

ion

s fo

r ea

ch r

espo

nse

to

an id

enti

fi ed

ris

k ar

e do

cum

ente

d by

th

e in

divi

dual

s in

volv

ed. T

his

info

rmat

ion

wil

l bec

ome

use

ful

less

ons

lear

ned

for

fu

ture

pro

ject

s.

Ris

k m

onit

orin

g an

d co

ntr

ol

Ass

ess

resp

onse

s to

th

e id

enti

fi ed

ris

ks. D

eter

min

e if

th

e re

spon

se is

app

ropr

iate

an

d pr

ovid

es t

he

mos

t ef

fect

ive

solu

tion

. R

evie

w p

rim

ary

risk

s—ob

viou

s ri

sks

that

may

hav

e a

seri

-ou

s n

egat

ive

impa

ct o

n t

he

proj

ect .

Iden

tify

sec

onda

ry r

isks

—ri

sks

that

may

occ

ur

as a

res

ult

of

th

e de

cisi

ons

mad

e to

add

ress

pri

mar

y ri

sks.

Id

enti

fy n

ew r

isks

—ri

sks

that

are

not

iden

tifi

ed d

uri

ng

the

plan

nin

g pr

oces

s. M

onit

or r

esid

ual

ris

ks—

risk

s th

at h

ave

been

red

uce

d bu

t h

ave

not

bee

n e

lim

inat

ed.

Man

age

the

cum

ula

tive

eff

ect

of r

isks

(th

e ef

fect

exp

eri-

ence

d w

hen

man

y ri

sks

appe

ar t

o be

impa

ctin

g a

proj

ect

at

the

sam

e ti

me,

cre

atin

g th

e ap

pear

ance

of

a gr

eat

or v

ery

seve

re t

hre

at) .

149

c10.indd 149c10.indd 149 2/23/09 10:24:45 AM2/23/09 10:24:45 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 166: Bringing The PMBOK Guide to Life

c10.indd 150c10.indd 150 2/23/09 10:24:45 AM2/23/09 10:24:45 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 167: Bringing The PMBOK Guide to Life

Chapter Eleven

A PMBOK ® Guide Strategy for Success

Understanding the project environment is a key factor for suc-cess. The PMBOK ® Guide identifi es and emphasizes the need to become aware of the cultural and social environment of the business and the project, the international and political envi-ronment, and the physical environment that may affect the project outcome. Signifi cant emphasis on general management skills such as planning, organizing, and staffi ng, along with a need to become familiar with the operating environment, is also critical. An understanding of fi nancial management and accounting, purchasing and procurement, and the legal issues associated with managing an organization are also a major part of the project environment.

A review of Chapter 4 of the PMBOK ® Guide, 3rd Edition and 4th Edition , “ Integration Management, ” which was added to the PMBOK ® in 1996, will indicate that integration is the key to a successful project and that the project manager must combine and coordinate all of the elements of the other eight knowledge areas into a high - level view of the entire project process. It is not an all - inclusive view, (many of the details

151

c11.indd 151c11.indd 151 2/23/09 6:23:53 PM2/23/09 6:23:53 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 168: Bringing The PMBOK Guide to Life

152 A PMBOK® Guide Strategy for Success

associated with integration are discussed in other chapters) but it is intended to demonstrate the systems approach to managing a project.

Each knowledge area is part of a system. There are no stand - alone components. Every knowledge area is equally important. One missing piece could easily send the project into chaos. In this author ’ s opinion, the “ Integration Management ” chapter should have been placed as the fi nal chapter of the PMBOK ® Guide . The rationale behind this opinion is that each of the knowledge areas is explained in detail after the “ Integration Management ” chapter. Key terms used to explain each knowl-edge area are used in the “ Integration Management ” chapter, which may require the reader to read other chapters and then come back to the “ Integration Management ” chapter. (I believe there is an assumption that a reader of the PMBOK ® Guide already has an in - depth knowledge of project management but discussions with hundreds of project managers indicates this is not the case.) A brief introduction about the relationships of all knowledge areas and an explanation about how all processes are integrated should be inserted where Chapter 4 currently exists. The project context and the major process groups are explained in Chapters 1 to 3, but some type of “ systems ” view would be helpful to explain how the knowledge areas are integrated and support each other through the process groups. The reader can then review each chapter, understand the key elements of each knowledge area, and then conclude the review and or study of the PMBOK ® Guide by reading the fi nal chapter about integra-tion which would tie all knowledge areas together as a system.

A suggested strategy for reading and using the PMBOK ® Guide 3rd and 4th Edition is as follows:

1. Read Chapters 1 through 3 in one sitting. These three chapters are linked and provide an explanation of key

c11.indd 152c11.indd 152 2/23/09 6:23:54 PM2/23/09 6:23:54 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 169: Bringing The PMBOK Guide to Life

terms, as well as an introduction to the process groups found in each knowledge area. You need this informa-tion to fully understand how the PMBOK ® Guide is written and the logic that is used. Remember, it is not the body of knowledge of project management, but it is an excellent foundation for understanding, developing, and utilizing formal project management processes and methodologies.

2. Read the PMBOK ® Guide glossary. This may seem an unusual suggestion, but the glossary does provide an enor-mous amount of useful information about project man-agement and establishes a common language that most project managers should be familiar with. The terms in the glossary appear frequently throughout the document. This is also a good idea for project managers preparing for the PMP exam. Many of the terms are more clearly defi ned in the glossary than in the actual chapters.

3. Next, briefl y review Chapter 4 . Examine the overview chart for integration. There are a few differences between the 3 rd and 4 th Editions of the PMBOK ® Guide . The 4 th Edition places more emphasis on the actual integration of the knowledge areas and the coordination steps that are used to manage a project and not as much on the details of each of the knowledge areas. Focus on the project char-ter and review the list of enterprise environmental fac-tors and organizational process assets. These items can have a profound impact on the project planning process. Enterprise environmental factors include such items as the organization ’ s culture, the infrastructure, and the capabilities of the organization ’ s human resources. Organization process assets are associated with inter-nal procedures and processes that have been established such as purchasing, obtaining contractors, and managing

A PMBOK® Guide Strategy for Success 153

c11.indd 153c11.indd 153 2/23/09 6:23:54 PM2/23/09 6:23:54 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 170: Bringing The PMBOK Guide to Life

154 A PMBOK® Guide Strategy for Success

change. The integrated change control process explained in Chapter 4 of the PMBOK ® Guide is basically a sum-mary of the change control processes found in each of the other chapters. Change control is a critical factor in project planning and execution and gaining an appreciation of how change in one area can have a signifi cant impact in many other areas of the project planning process is extremely important. The Integration Management chapter provides the “ big picture ” view of the project management process. Refer to the integration overview chart frequently as you read about and develop an understanding of each knowl-edge area. The objective here is to ensure the connection and interdependencies of each knowledge area.

4. Read each succeeding chapter from Chapter 5 through Chapter 12 . Read each chapter thoroughly, and make notes or highlight key information and terms. It ’ s best to schedule some buffer time between each chapter. This allows you to refl ect on the information presented and prevents the feeling of becoming overwhelmed by the enormous amount of data. There is a very large amount of information provided, and it is important to make con-nections between the chapter you are currently reading and the previous chapters. Each chapter builds on infor-mation from the previous chapters. Once you have com-pleted reading and reviewing Chapter 6 , you will notice a signifi cant repetition of terms. This repetition actually provides a means to demonstrate how the knowledge areas and processes are integrated.

5. Upon completion of a chapter, review the overview chart provided within the fi rst three pages of each chapter. These overview charts describe the generally accepted inputs, tools and techniques, and outputs associated with the processes for each knowledge area. Use the

c11.indd 154c11.indd 154 2/23/09 6:23:54 PM2/23/09 6:23:54 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 171: Bringing The PMBOK Guide to Life

overview charts to test your knowledge. You should be able to explain each input, tool or technique, and output. You should know why each input is important, and its source of origin. You should be able to explain the vari-ous tools and techniques and why each one could be used to produce the desired results and how outputs become inputs to other processes. (There is no need to memorize the detailed information in the PMBOK ® Guide but you should be able to explain reasonably well what each item on the chart is and why it is important.) Remember the PMBOK ® Guide is a reference document and should be referred to frequently during the project life cycle.

As an example, if you review the inputs to 5.1 of “ Project Scope Management — Scope Planning in the 3 rd Edition or 5.2 Defi ne Scope in the 4 th Edition, ” you will see the following inputs: enterprise environmental factors, organizational process assets, and project charter, or tools and techniques: expert judgment and product anal-ysis. You should be able to explain each of these inputs or tools and techniques and why they are needed (or not needed) in the overall scope planning process.

You will notice that the input enterprise environmental fac-tors is included in many of the processes explained in the PMBOK ® Guide . These factors are associated with organizational culture, industry standards that may affect your organization or the project you are assigned to, organizational infrastructure and support systems, and stakeholder risk tolerances. These environmental factors are key items to consider during the project plan-ning process. They will impact how the project manager, team, and project sponsor make decisions and determine what tools or techniques may be selected to achieve the

A PMBOK® Guide Strategy for Success 155

c11.indd 155c11.indd 155 2/23/09 6:23:54 PM2/23/09 6:23:54 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 172: Bringing The PMBOK Guide to Life

156 A PMBOK® Guide Strategy for Success

desired project results. Organizational process assets is also found as an input in many process groups. These process assets are the formal and informal policies, proc-esses, and standards used by an organization for general operation. Project managers and teams should become aware of these process assets and how they may impact project planning and decisions during implementation. Process assets include safety and health policies, tem-plates for planning, change control procedures, and fi nan-cial controls.

6. Continue to review each succeeding chapter and then make a connection with each previous chapter by review-ing and comparing information. Look for new terms, new tools and techniques, and other processes that have been introduced. Make sure you are aware of the purpose of these items and how they relate to your projects. Refer to the glossary for assistance and also use other project management resources for further, more detailed expla-nations. Look for items that have been discussed in previ-ous chapters. Continually ask yourself, “ How can I apply this process to my current project? ” Why isn ’ t this process applicable to my projects? How can I adapt this process to work within my project? This continuous review will drive you toward a deeper understanding of the PMBOK ® Guide and the larger project management body of knowl-edge. It will enable you to manage your team more effec-tively and produce better, more acceptable project plans for your stakeholders.

The PMBOK ® Guide has probably been analyzed by count-less project managers, and I am sure there is a huge range of opinions, from, “ I can ’ t use this, it ’ s too infl exible, ” to, “ My organization is fully PMBOK ® compliant. ” The key is common

c11.indd 156c11.indd 156 2/23/09 6:23:54 PM2/23/09 6:23:54 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 173: Bringing The PMBOK Guide to Life

Project Plan Accelerator 157

sense. After all, it does say guide . I think the PMBOK ® Guide is a great source of information, and it will continue to evolve and improve. I see it as a tool, and like any tool, you have to become familiar with it and how it can be used. Most tools have more than one function and the PMBOK ® Guide is no differ-ent. As you use it, you will fi nd that it can provide you with far more than the basics of project management and can actually sharpen other tools in your project manager ’ s tool box.

PROJECT PLAN ACCELERATOR

Using information from this chapter and the PMBOK ® Guide for additional reference, make a note of any specifi c planning items that should become components of your project plan. Describe the component and develop questions around the component that will enable you to effectively use the component in the plan.

The PMBOK ® Guide as a Planning Tool

The PMBOK ® Guide is a great tool for planning projects. The 3 rd or 4 th Edition can be used to greatly improve any project planning process and help to establish a workable project man-agement methodology. As I have stated several times common sense is the best approach to project planning and proper use of the tools will certainly improve the overall quality of any plan or methodology. To use the PMBOK ® Guide effectively the following steps should be considered:

Review the fi ve major process groups and how they inte-grate the entire project management process. Identify the similarities between these processes and the proc-esses in use within your organization. Look for areas where you can improve your process or where process gaps may exist.

c11.indd 157c11.indd 157 2/23/09 6:23:55 PM2/23/09 6:23:55 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 174: Bringing The PMBOK Guide to Life

158 A PMBOK® Guide Strategy for Success

Develop a PMBOK ® Guide learning plan for your organ-ization. How can the information provided in the docu-ment improve how your organization manages projects? Consider a gradual approach if your plan is to create a formalized enterprise process. Read the document frequently. You will probably fi nd something that you didn ’ t read before. (It ’ s easy to miss something.) Review each knowledge area and analyze the inputs, tools and techniques, and outputs. Discuss these items with your team. Determine which of the inputs, tools and techniques, and outputs are most applicable to your projects.

Consider the types of projects you are likely to be assigned to. Use the PMBOK ® Guide as a tool. It ’ s not a one - size - fi ts - all type of tool. Customize your processes to meet your organi-zational needs. The PMBOK ® Guide is a collection of generally accepted best practices and will help you to create your own set of best practices.

Notes:

c11.indd 158c11.indd 158 2/23/09 6:23:55 PM2/23/09 6:23:55 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 175: Bringing The PMBOK Guide to Life

Porje

ct P

lan

Acc

eler

ator

PM

BO

K ®

Gu

ide

Com

pon

ent/

Too

l/T

ech

niq

ue/

Pro

cess

Act

ion

Pla

n fo

r Im

plem

enta

tion

P

erso

n

Res

pon

sibl

e D

ate

Req

uir

ed

Pro

cess

gro

up

inte

ract

ion

R

evie

w h

ow t

he

proc

ess

grou

ps in

tera

ct in

th

e pr

ojec

t li

fe c

ycle

.

Rev

iew

you

r or

gan

izat

ion

’ s p

roje

ct li

fe c

ycle

an

d co

mpa

re it

wit

h t

he

proc

ess

inte

ract

ion

s.

Loo

k fo

r ov

erla

ppin

g pr

oces

ses

and

how

kn

owle

dge

area

s ar

e in

te-

grat

ed in

eac

h p

has

e.

Init

iati

ng

Defi

ne

the

spec

ifi c

init

iati

ng

proc

esse

s th

at a

re u

sed

for

you

r pr

ojec

ts, a

t th

e pr

ojec

t le

vel a

nd

in e

ach

ph

ase.

Ref

er t

o th

e P

roje

ct M

anag

emen

t P

roce

ss I

nte

ract

ion

s de

scri

bed

in t

he

PM

BO

K ®

Gu

ide

and

com

pare

wit

h o

rgan

izat

ion

al p

roce

sses

. Id

enti

fy a

reas

for

impr

ovem

ent.

Pla

nn

ing

Rev

iew

th

e pl

ann

ing

proc

ess

grou

p. Y

ou w

ill n

otic

e th

at t

her

e is

sig

-n

ifi c

ant

inte

grat

ion

of

know

ledg

e ar

ea p

roce

sses

wit

hin

th

e pl

ann

ing

proc

ess

grou

p.

Defi

ne

the

proj

ect

plan

nin

g pr

oces

s fo

r yo

ur

proj

ect

or f

or y

our

orga

niz

atio

n.

Rev

iew

th

e pl

ann

ing

proc

esse

s de

scri

bed

in t

he

PM

BO

K ®

Gu

ide .

D

eter

min

e w

hic

h p

roce

sses

are

nec

essa

ry f

or t

he

assi

gned

pro

ject

.

(c

onti

nu

ed)

159

c11.indd 159c11.indd 159 2/23/09 6:23:55 PM2/23/09 6:23:55 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 176: Bringing The PMBOK Guide to Life

Porje

ct P

lan

Acc

eler

ator

(C

onti

nued

)

PM

BO

K ®

Gu

ide

Com

pon

ent/

Too

l/T

ech

niq

ue/

Pro

cess

Act

ion

Pla

n fo

r Im

plem

enta

tion

P

erso

n

Res

pon

sibl

e D

ate

Req

uir

ed

Exe

cuti

ng

Rev

iew

th

e ex

ecu

tin

g pr

oces

ses

and

dete

rmin

e w

hic

h p

roce

sses

are

ap

plic

able

to

you

r pr

ojec

ts. E

xecu

tion

incl

ude

s pe

rfor

min

g qu

alit

y as

sura

nce

, acq

uir

ing

the

team

, dev

elop

ing

the

team

, an

d re

ques

tin

g se

ller

res

pon

ses.

Ide

nti

fy w

ho

is r

espo

nsi

ble

for

thes

e ac

tivi

ties

.

Cre

ate

a pr

ojec

t ex

ecu

tion

str

ateg

y .

Mon

itor

ing

and

con

trol

lin

g E

stab

lish

mu

tual

ly a

gree

d u

pon

mon

itor

ing

and

con

trol

pro

cedu

res.

T

his

incl

ude

s es

cala

tion

pla

ns,

inte

grat

ed c

han

ge c

ontr

ol, a

nd

obse

rvin

g pr

ojec

t pe

rfor

man

ce.

Det

erm

ine

wh

ich

su

bsid

iary

pla

ns

are

nee

ded

for

you

r pr

ojec

t (s

ub-

sidi

ary

plan

s ar

e de

tail

ed s

upp

ort

plan

s fo

r sp

ecifi

c a

reas

). D

evel

op

the

foll

owin

g pl

ans

as n

eede

d:

Sco

pe c

ontr

ol p

lan

Cos

t co

ntr

ol p

lan

Sch

edu

le c

ontr

ol p

lan

Qu

alit

y co

ntr

ol p

lan

Ris

k m

onit

orin

g an

d co

ntr

ol p

lan

Saf

ety

plan

Cu

tove

r pl

an

Dis

con

nec

t P

lan

Tra

nsi

tion

pla

n

160

c11.indd 160c11.indd 160 2/23/09 6:23:55 PM2/23/09 6:23:55 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 177: Bringing The PMBOK Guide to Life

Ass

ign

res

pon

sibi

lity

for

dev

elop

men

t of

th

e re

quir

ed s

ubs

idia

ry

plan

s. (

Avo

id u

nn

eces

sary

adm

inis

trat

ive

wor

k. F

ocu

s on

wh

at is

n

eede

d an

d co

ach

tea

m m

embe

rs t

o de

velo

p ef

fect

ive

but

sim

plifi

ed

plan

s w

hen

ever

pos

sibl

e.)

Clo

sin

g E

nsu

re t

hat

you

hav

e a

proc

ess

for

clos

ing

the

proj

ect.

Iden

tify

th

e ac

cept

ance

cri

teri

a fo

r al

l del

iver

able

s.

Cre

ate

an o

rgan

ized

app

roac

h t

o en

sure

a c

ompl

ete

clos

e - ou

t an

d ac

cept

ance

by

the

cust

omer

.

Cre

ate

a cl

ose -

out

wor

k br

eakd

own

str

uct

ure

.

Dev

elop

a c

ust

omer

sat

isfa

ctio

n in

terv

iew

pro

cess

.

Sch

edu

le a

pro

ject

rev

iew

an

d le

sson

s - le

arn

ed s

essi

on. P

lan

for

tea

m

reco

gnit

ion

.

Pre

pare

all

doc

um

ents

for

han

doff

.

Pre

pare

a fi

nal

exe

cuti

ve r

epor

t.

Rev

iew

an

d ve

rify

com

plet

ion

of

all c

ontr

actu

al d

eliv

erab

les.

Per

form

a v

endo

r/su

ppli

er a

nal

ysis

.

Com

mu

nic

atio

ns

man

agem

ent

Det

erm

ine

stak

ehol

der

info

rmat

ion

an

d co

mm

un

icat

ion

s re

quir

e-m

ents

an

d de

velo

p a

met

hod

for

info

rmat

ion

dis

trib

uti

on.

Det

erm

ine

wha

t in

form

atio

n w

ill b

e co

mm

unic

ated

to

each

sta

keho

lder

.

Dev

elop

a m

eth

od t

o en

sure

th

at in

form

atio

n is

rec

eive

d an

d u

nde

r-st

ood

by a

ll s

take

hol

ders

(fe

edba

ck lo

op) .

Est

abli

sh a

pro

cess

to

reco

rd p

roje

ct c

omm

un

icat

ion

s fo

r fu

ture

ref

-er

ence

( b

ack

up

fi le

s fo

r co

mm

un

icat

ion

s) .

En

sure

th

at t

arge

ted

stak

ehol

ders

rec

eive

an

d ac

t u

pon

info

rmat

ion

in

a t

imel

y m

ann

er (

set

expe

ctat

ion

s).

161

c11.indd 161c11.indd 161 2/23/09 6:23:56 PM2/23/09 6:23:56 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 178: Bringing The PMBOK Guide to Life

c11.indd 162c11.indd 162 2/23/09 6:23:56 PM2/23/09 6:23:56 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 179: Bringing The PMBOK Guide to Life

163

Chapter Twelve

Rapid Knowledge Development (RKD) For Project Managers: Tips, Tools,

and Techniques

The PMBOK ® Guide provides project managers with an organized view of the higher, broader, and much more complex project management body of knowledge. As previously men-tioned, the nine knowledge areas are integrated by using the fi ve major process groups to create a logical arrangement of tasks and activities and to develop the appropriate subsidiary plans that will support the project plan. The knowledge areas pro-vide details about the specifi c inputs, tools and techniques, and outputs that may be used to progressively elaborate the project plan and to integrate the process groups (initiating, planning, executing, monitoring and controlling, and closing). The process groups also create an awareness among the project manager and team that many project related planning activities are developed concurrently. The integration of the knowledge areas through the major process groups ensures a connection and systems approach to create a plan that is fully defi ned and articulated to the required level of detail. The defi ned and continued emphasis on the relationship between the knowledge areas and the fi ve process groups effectively ensures the integration of each project

c12.indd 163c12.indd 163 2/23/09 6:21:49 PM2/23/09 6:21:49 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 180: Bringing The PMBOK Guide to Life

164 Rapid Knowledge Development (RKD) for Project Managers

planning element and supports a systems approach to manag-ing the entire project life cycle. The systems approach will create a project plan and a methodology based on three key factors: Every element of the project is

Integrated Inter - related Inter - dependent

This means that there are no separate, “ dangling ” elements in the project plan. There is one main set of objectives and all planning components are connected to meet those objectives. Dangling components (components that are not connected to an end task or milestone and appear to be “ fl oating ” in the plan) could create risk situations, undesired outcomes, or fail-ure to deliver a key project component. The systems approach will ensure that the entire team fully understands the need to clearly defi ne all project components, and then connect them in a logical and effi cient manner to produce a complete, fi nal deliverable. This includes how the team will be organized and the inter - relationships between team members.

An analogy of the systems approach is the familiar table-top puzzle. A puzzle contains hundreds of pieces (maybe thou-sands), and each one is equally important. When all of the pieces have been placed in the correct location and all inter-faces have been established, the fi nal product (the picture or image) is presented. Just one missing piece or a piece that is not placed correctly will be noticed immediately. This missing or incorrectly placed piece can create a system wide problem, and the deliverable will be noticeably fl awed. In most cases, it will not be accepted until the problems are corrected. The familiar triple constraint (on time, within budget, and accord-ing to specifi cations) that is generally associated with project plans is a good example of the interrelationships that must be

•••

c12.indd 164c12.indd 164 2/23/09 6:21:49 PM2/23/09 6:21:49 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 181: Bringing The PMBOK Guide to Life

understood and balanced during planning and execution. Each component of the triple constraint is part of the greater sys-tem and changes to one element of the triple constraint will have an immediate affect on another element and probably the project as a whole.

The PMBOK ® Guide is one of the many tools that should be included in that ever - expanding project manager toolbox. The information in the PMBOK ® Guide is actually a catalog of information for use by project managers and teams to organize the planning process and to determine what tools and techniques should be used to create an appropriate plan for the project. The best practices identifi ed and explained in the PMBOK ® Guide should be analyzed to determine which practices are needed for the project that is being planned. We know that all projects are unique, and therefore, each plan will be unique. Treating each project plan as unique (even if the project is nearly identical to a previously completed project) helps to minimize complacency and keep the team focused.

A key element not always mentioned in literature about project management is something very simple: common sense. Common - sense project management, explained in simple terms, means this: Use a proven methodology whenever possible, plan the project only to the detail required, minimize administra-tive tasks, avoid over planning, use the knowledge of the team, verify all assumptions, make a big deal out of freeze dates and the change process, and, as my mentor in project management, Dan Ono, always said, “ Go slow now so you can go faster later. ” Managing a project can be a very challenging assignment and the intent here is not to create a perception that it ’ s a “ walk in the park. ” The emphasis should be on smart, common sense planning and a managerial approach that will motivate, not inhibit the team members and activity performers.

Rapid Knowledge Development (RKD) for Project Managers 165

c12.indd 165c12.indd 165 2/23/09 6:21:50 PM2/23/09 6:21:50 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 182: Bringing The PMBOK Guide to Life

166 Rapid Knowledge Development (RKD) for Project Managers

CONNECTING THE PMBOK ® GUIDE AND THE PROJECT MANAGEMENT BODY OF KNOWLEDGE

As discussed in Chapter One of this book, the PMBOK ® Guide provides the project manager with an organized view of the higher - level, more - comprehensive project management body of knowledge. We know the true body of knowledge of project man-agement is a complex, highly integrated collection of informa-tion gathered over hundreds of years. It includes elements of people management, engineering, fi nancial management, time management, leadership, motivation, managing confl icts, diver-sity, and much more. The actual project management body of knowledge is something that may not ever be truly defi ned in one document. A good model of what could be considered one example of the project management body of knowledge can be found at the Web site www.npd - solutions.com/bok.html . This Web site is the home of the New Product Development Body of Knowledge and is a great example of just how extensive a body of knowledge about a specifi c discipline can be. This Web site addresses strategic planning, product development, competi-tive analysis, innovation management, technology deployment, business cases, R & D, managing teams, leadership, and much more. Project managers, especially those who are just begin-ning to experience the challenges of the profession, will fi nd this Web site extremely useful and a signifi cant source of detailed information. It is just one of the many gateways available to the ever - expanding project management body of knowledge.

THE BODY OF KNOWLEDGE COMPRESSED

In this new century marked by fast - paced and evolving tech-nology, worldwide competition, and an uncertain economic environment, sources of summary information, quick data, and key points about planning and implementation are useful for

c12.indd 166c12.indd 166 2/23/09 6:21:50 PM2/23/09 6:21:50 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 183: Bringing The PMBOK Guide to Life

Project Integration Management 167

newly assigned project managers or people who are assigned to manage a project but are primarily involved in operations - type work. Due to the often high - pressure and hectic nature of the project management position, there may be little time available to attend a training program or skills development course about the fundamentals of project management. Time constraints, competitive pressures, the multiproject environ-ment, and impatient sponsors or executives require an accel-erated learning curve. There certainly is no substitute for a well - executed project management training curriculum and the experience gained by managing a project, but having a summa-rized reference of key points, tools, formulas, and processes can be very helpful when managing through the daily challenges experienced from beginning to end of a project cycle.

The following information is a digested view of the key items generally associated with the nine project management knowledge areas and their relationship to the fi ve major proc-ess groups. These memory joggers may assist in developing a greater understanding the complexity involved in developing and executing project plans and the importance of using an integrated and coordinated approach. Each knowledge area is summarized and includes a brief description of terms, tools, techniques, and other items that are part of the overall project management planning process. This summary information will also be helpful for project managers who are planning to study for the Project Management Institute PMP ® exam.

PROJECT INTEGRATION MANAGEMENT

Integration management is the one area in the PMBOK ® Guide that I believe needed some extensive additional work in the 3 rd Edition to meet its objective of tying all of the knowledge areas and process groups together. I see this knowledge area as

c12.indd 167c12.indd 167 2/23/09 6:21:50 PM2/23/09 6:21:50 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 184: Bringing The PMBOK Guide to Life

168 Rapid Knowledge Development (RKD) for Project Managers

the key element that connects all project components and sets a foundation for project success. Integration management is about coordinating, unifying, and managing each major process to successfully complete the project. It ’ s the big picture view, and it requires the skills and knowledge of a project manager who understands the technical elements of project planning as well as the human side. To effectively integrate all of the com-ponents of a project plan, the project manager must also be familiar with the skills associated with that of a general man-ager. The project manager becomes the integrator of the major processes, the stakeholders, and all of the subprocesses and activities required to plan, execute, and control the project. In many ways, the project manager position is similar to a CEO. There is a need for leadership, a technical understanding of the major elements of the project, vision, and the ability to bring a work force and management team together to complete the agreed - upon objectives.

The chapter “ Integration Management ” in the PMBOK ® Guide 3 rd Edition includes the following:

Develop the project charter Develop the Preliminary Project Scope Statement Develop project management plan Direct and manage project execution Monitor and control project work Integrate change control Close the project

There appeared to be a few gaps in this chapter regarding how all of the parts are actually being integrated and how to view the larger picture. The contributors of the 4 th Edition must have noticed the need for some adjustments and have created a more realistic and logical view of Integration management. The 4 th Edition includes:

•••••••

c12.indd 168c12.indd 168 2/23/09 6:21:50 PM2/23/09 6:21:50 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 185: Bringing The PMBOK Guide to Life

Project Integration Management 169

Develop the project charter Develop project management plan Direct and manage project execution Monitor and control project work Perform integrated change control Close project or phase

It is important to note that the processes listed in the PMBOK ® Guide are not necessarily sequential. There will be some degree of overlap between these processes especially the processes of: develop project plan, direct and manage project execution, monitor and control project work, and per-form integrated change control.

Integration management should be viewed as the overarch-ing knowledge area, or the umbrella knowledge area under which all of the other knowledge areas exist. For example, in the 3 rd Edition the “ Integration Management ” chapter includes the processes associated with the development of the project charter (Note: One of the reasons why charters were created was because the project manager was brought on board after the project was approved and was not privileged to the rationale concerning the approval. Therefore, the charter was created to document the assumptions) and the development of the prelimi-nary scope statement. There is no mention of the fi nalized scope statement in the process group “ Develop Project Management Plan. ” It seems logical under “ Integration Management ” to show that scope defi nition includes the processes for developing the preliminary and the fi nalized scope statement. These activities will lead to the integration of all elements of the project plan through the fi ve major processes.

I see integration management to include an understanding of the chartering process, the contract terms and conditions when applicable, and the progressively elaborated scope statement.

••••••

c12.indd 169c12.indd 169 2/23/09 6:21:51 PM2/23/09 6:21:51 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 186: Bringing The PMBOK Guide to Life

170 Rapid Knowledge Development (RKD) for Project Managers

These items are, in my opinion, the key inputs to the project management plan. There should be no question or debate about the need to understand how enterprise environmental factors and organizational process assets affect decisions about project selection and planning processes, but the integration of each of the processes, subprocesses, and knowledge areas requires a clear scope defi nition and a clear understanding of how all of the parts come together to achieve project success.

It should be understood that the PMBOK ® Guide provides an outline of what is commonly included in a project plan and the best practices associated with plan development, but there is a need for the “ Integration Management ” chapter to provide a summary that is more consistent with the information pro-vided in each of the other eight knowledge areas. Integration management is what project managers do, and this subject should be a reasonably detailed summary of the key elements required to successfully develop a plan, manage a team, con-trol changes, and deliver a completed set of deliverables. The PMBOK ® Guide 4 th Edition address integration management in a sensible manner that actually demonstrates how each knowledge area is connected and provides a more realistic view of how all of the components of the project life cycle work together to achieve the desired results.

Key Terms and Processes Associated with Integration Management

Contract. A legal document that may be remedied in a court of law. It provides the details that constitute an offer, acceptance, and a consideration (something of value) regarding services between two or more entities. Generally, the terms and conditions of a statement of work and a contract will provide the basis for the project charter and scope statement.

c12.indd 170c12.indd 170 2/23/09 6:21:51 PM2/23/09 6:21:51 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 187: Bringing The PMBOK Guide to Life

Project Integration Management 171

Historical records. Archives of information from previ-ous projects. The idea here is to learn from past projects and prevent mistakes and issues from recurring. Use documented lessons learned and the experience of the team to assist in project plan development. Project selection methods. The project selection proc-ess is usually conducted prior to approval of the project charter. These methods include techniques such as net present value, discounted cash fl ow, payback period, break - even analysis, and other benefi t measurement methods. Project sponsors and steering committees should be provided with information about the business value of a project to ensure the most effective use of organizational resources. Mathematical modeling such as decision tree analysis where probability and outcomes are predicted using available fi nancial data and predictions about per-formance may also be used. Enterprise environmental factors. These factors will be found as inputs in many processes described in the PMBOK ® Guide . Examples of these factors are: orga-nizational culture, tolerance for risk, human resources and capability, infrastructure, government regulations, and compliance issues. Organizational process assets. Consider the policies and procedures defi ned by your organization and how they can impact the planning of your projects. These might include the hiring process, budget policies, vendor selection process, and so on. Constraints. The limitations you must operate within. Examples include predetermined project end dates, con-tractual milestones, funding, and resource availability. Assumptions. Assumptions are defi ned as those items that can be considered true, real, or certain for planning

c12.indd 171c12.indd 171 2/23/09 6:21:51 PM2/23/09 6:21:51 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 188: Bringing The PMBOK Guide to Life

172 Rapid Knowledge Development (RKD) for Project Managers

purposes. Consider the assumptions that can be made about the project. Examples of an assumption set: There will be dedicated management support for the project, the resources required for the project will be available, suffi cient funding is available, and the appropriate tech-nical knowledge is in place. Project charter. This document formally authorizes the project to use organizational resources and is used to assign the project manager and describe the project man-agers level of authority. The project charter documents the business needs, high level risks associated with the project, initial set of stakeholders, and can include a summary schedule and milestones. Stakeholders. There generally accepted defi nition of a stakeholder is “ anyone directly involved in or in some way impacted either positively or negatively as a result of the project. Consider who the key stakeholders are, and also other stakeholders who may view your project as a threat or an obstacle to their project (negative stakeholders). Determine who the negative stakeholders are and what risks they may introduce to the successful completion of your project. Key stakeholders generally include the project manager, sponsor, project team, cus-tomer, and end user. Organizational strategies. Consider the goals and objectives of your organization and how your project impacts or supports them. Make sure you can link your project to the organizational goals. Project management information system. This is any system or group of systems working together to gather, store, and distribute information about your project.

c12.indd 172c12.indd 172 2/23/09 6:21:51 PM2/23/09 6:21:51 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 189: Bringing The PMBOK Guide to Life

Project Integration Management 173

Examples include time reporting system, accounting system, and project software. Project management plan. You will be document-ing the collection of planning outputs that will guide project execution. The project management plan gener-ally includes the subsidiary plans such as a change con-trol plan, communications plan, scope control plan, and so on. The plan is expected to change as the project is progressively elaborated and as risk situations develop requiring the project team to replan their approach. Project management methodology. A methodology is defi ned as a “ way of doing something. ” The organiza-tion develops a consistent approach for managing project planning and execution. Corrective and preventive actions. Corrective actions are those actions reviewed and decided upon by the project team to resolve a problem such as an unac-ceptable variance or an authorized scope addition. Preventive actions are those actions taken to minimize errors, risks, and other negative factors. Earned value technique. This is a process that is used to analyze project performance by observing and manag-ing three main factors: Planned Value or BCWS (budg-eted cost of work scheduled). It can be translated as the estimated cost of the work that should be accomplished at the time of measurement, Earned Value or BCWP (budgeted cost of work performed), the estimated cost of the work that has been completed at the time of measure-ment, and Actual Cost or ACWP (actual cost of work per-formed), which is the dollar amount paid for the work that has been completed at the time of measurement. Earned

c12.indd 173c12.indd 173 2/23/09 6:21:52 PM2/23/09 6:21:52 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 190: Bringing The PMBOK Guide to Life

174 Rapid Knowledge Development (RKD) for Project Managers

value analysis is basically an early warning system for your project and will assist in identifying performance trends and managing variances. Work authorization system. The processes that ensure the right work is done at the right time, in the right sequence, form the work authorization system. This sys-tem is designed to prevent work that is not authorized and assures that work is done safely and according to the plan. It may reduce or eliminate many project risk situations. Integrated change control. The nine knowledge areas are managed in an integrated manner with an under-standing that a change in one area can affect any or all of the other knowledge areas. Consider the impact of the change before implementing the change and obtain approval for the change. Establish and refer to project baselines frequently to determine if a change has occurred through comparison of the baseline with actual results. Include in the process a method to determine when to make a change and how to introduce the change to minimize the impact on project performance, ongoing operations or other projects. Change Control Board. This board is a team or group of designated decision makers (possibly a steering commit-tee designated or empowered to review and determine the value of a change and to approve or deny change requests. Confi guration management. This process will ensure that confi guration changes (changes to features, func-tions, physical characteristics) are managed and approved to prevent or reduce the risks of additional cost, scope changes, or other impacts to the project. Subsidiary plans. Detailed plans should support the project management plan. They may include the scope

c12.indd 174c12.indd 174 2/23/09 6:21:52 PM2/23/09 6:21:52 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 191: Bringing The PMBOK Guide to Life

Project Scope Management 175

change control plan, schedule change control plan, cost change control plan, and so on. Deliverables. These are tangible, verifi able work out-puts. Projects generally produce several deliverables that will support the fi nal or ultimate objective of the project. Examples include the product of the project, the major components of the product, training manuals, and trans-fer documents. Administrative closure. These are the processes associ-ated with closing all open project records, such as fi nancial accounts, work orders, training documents, and change requests. Contract closure. This includes verifi cation that all conditions of the contract have been fulfi lled and each party involved agrees to formal acceptance. Work performance information. This includes sched-ule status, cost information, level of quality, percent com-plete, completed activities, and resource utilization.

A comparison of the 3 rd and 4 th Editions of the PMBOK ® Guide will show some changes in the process groups that comprise Integration Management. The 4 th Edition provides a more straightforward and more appropriately arranged view of the key elements associated with effective Integration Management.

PROJECT SCOPE MANAGEMENT

The major process groups for scope management in the 3 rd Edition of the PMBOK ® Guide are: scope planning, scope defi -nition, Create WBS, scope verifi cation, and scope control. In the 4th Edition Scope planning has been replaced by “ Collect Requirements. ” Scope Defi nition is now “ Defi ne Scope ” , Scope

c12.indd 175c12.indd 175 2/23/09 6:21:52 PM2/23/09 6:21:52 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 192: Bringing The PMBOK Guide to Life

176 Rapid Knowledge Development (RKD) for Project Managers

Verifi cation is renamed Verify Scope, and Scope control is now “ Control Scope. These are not signifi cant changes but they help improve the overall readability of the document. These major groupings within scope management provide the foundation for planning the project in detail and ensuring that the project team members understand the complexity of the project. It is important to note that, although scope management and other knowledge areas are shown separately, they are actually inte-grated into the larger project planning process through the fi ve major process groups. Each knowledge area is described separately for learning purposes, and it should not be assumed that the processes described must be followed in the sequences shown.

It is important to review and understand the inputs, tools and techniques, and outputs of each process within each knowl-edge area. Ask yourself why each input is an input and where it originated. Why is it important? Understand what each tool and technique will produce and how each is used. You may not need each tool or technique listed, but it is important to learn about how they are used for possible application in a future project. Tools and techniques produce outputs, and the outputs of each process generally become inputs to other processes. This pattern is consistent throughout the PMBOK ® Guide and is intended to promote the systems approach to planning, exe-cuting, and controlling a project.

Scope Planning

In the 3 rd Edition of the PMBOK ® Guide the key inputs to scope planning are project charter, preliminary project scope statement, and the project management plan. Remember that enterprise environmental factors and organizational process assets are common inputs to many process groups.

c12.indd 176c12.indd 176 2/23/09 6:21:53 PM2/23/09 6:21:53 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 193: Bringing The PMBOK Guide to Life

Project Scope Management 177

Scope planning tools and techniques include expert judgment (generally the functional managers and subject matter experts), templates, and standards. Templates, in many cases, may be obtained by utilizing information from previous projects such as task lists, work breakdown structures, and other project documentation.

The 4 th Edition of the PMBOK ® Guide replaces Scope plan-ning with “ Collect Requirements. ” In this sub process group there is more attention to the requirements process including the use of focus groups, facilitated workshops, and prototypes. This is more closely related to the actual practices in many organizations. A generally accepted process of requirements management includes: Elicitation, Analysis, and Specifi cation. The 4 th edition provides a closer alignment to the requirements process and includes a brief description of widely used techniques for gathering requirements. These techniques include:

Interviewing Focus groups Group decision making techniques such as Delphi, Nominal Group, and brainstorming

Requirements collection and management also requires a specifi c process to ensure that the real requirements are docu-mented. A typical requirements planning process includes the following steps:

1. Identify the team to be assigned to the requirements process.

2. Document team member roles and responsibilities. 3. Defi ne requirements collecting deliverables and time

frames. 4. Defi ne the process and determine which techniques will

be used: interviews, meetings, workshops, etc.

•••

c12.indd 177c12.indd 177 2/23/09 6:21:53 PM2/23/09 6:21:53 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 194: Bringing The PMBOK Guide to Life

178 Rapid Knowledge Development (RKD) for Project Managers

5. Outline existing operational needs. Obtain or produce workfl ow and operations charts and other process arti-facts. (Review organizational process assets for require-ments management.)

6. Schedule workshops and requirements collection ses-sions to begin the initial requirements collection process.

7. Schedule requirements review sessions to ensure the collection of the real requirements.

8. Establish a change control process for requirements. 9. Establish a requirements traceability matrix or system

for traceability.

According to Ralph R. Young, author of Effective Requirements Practices, Addison - Wesley Information Technology Series, attributes of a well written requirement should include the following:

Requirements should be

Necessary Verifi able Attainable Unambiguous Complete Consistent Traceable Concise Implementation free Include a unique identifi er

Scope Defi nition or Defi ne Scope

The project scope management plan, an output of scope planning in the PMBOK ® Guide 3 rd Edition provides guidance about how

••••••••••

c12.indd 178c12.indd 178 2/23/09 6:21:53 PM2/23/09 6:21:53 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 195: Bringing The PMBOK Guide to Life

Project Scope Management 179

the scope is defi ned, documented, verifi ed, managed, and control-led. Scope defi nition further elaborates the project and provides more detail for planning purposes. This includes stakeholder analysis, product analysis, and alternatives identifi cation. The 4 th edition includes requirements documentation as a major input to defi ning the scope. The tools and techniques remain basically the same and include the addition of facilitated workshops where stakeholders are brought together to discuss requirements and specifi c individual needs.

The scope defi nition process produces the project scope statement. The scope statement basically answers the ques-tions: What will be done? Who will do it? When must it be done? Why are we doing it? Where will the work be performed? How much will it cost? A well defi ned scope statement will cre-ate a stronger planning process and facilitate the development of a well organized project plan and committed team.

A note about the scope statement—The scope statement is actually a re - writing of the customer ’ s statement of work in such a language that the project team can understand it and use it to develop the more detailed plans. The PMBOK ® Guide does not make this clear, but the project manager prepares the scope statement, not the customer.

Create WBS

The WBS (Work Breakdown Structure) is defi ned as a deliverable - oriented hierarchical decomposition of the work to be executed by the project team. The WBS (work breakdown structure) is created using the process known as decomposition. The process of decomposition, a PMBOK ® Guide term, breaks the project down into smaller elements. The term decomposition actually refers to the break down of tissue of a formerly living organism into simpler forms of matter. You can see the analogy.

c12.indd 179c12.indd 179 2/23/09 6:21:54 PM2/23/09 6:21:54 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 196: Bringing The PMBOK Guide to Life

180 Rapid Knowledge Development (RKD) for Project Managers

The PMBOK ® Guide defi nes decomposition as the subdivision of project deliverables into smaller, more manageable compo-nents. To facilitate the process of creating a WBS Templates may be obtained from previous projects or established stand-ards developed by a PMO (Project Management Offi ce). The WBS breaks down the project into smaller, more manageable components and allows for more effective and accurate time and cost estimating. The WBS is also used to identify project risks and can be a very useful team - building tool.

WBS development is concerned with the grouping of tasks and activities and is not intended to display the sequence of tasks and activities. Avoid attempting to sequence tasks in a WBS and focus on grouping the tasks. The objective is to iden-tify the tasks that must be completed to produce the fi nal project deliverables.

A WBS dictionary is a document that provides the team and other stakeholders with more detail about WBS components and tasks. This can be a separate document included within the project plan. The level of detail and completeness of the WBS dictionary depends on the complexity of the project and the specifi c needs of the team members assigned to the tasks and activities.

The scope baseline is produced during the process of creat-ing the WBS. The baseline provides the basis for more detailed planning and a more complete view of the project to be implemented.

Scope Verifi cation or Verify Scope

Scope verifi cation is about acceptance of the actual result of the work. Verifi cation is accomplished through inspections, reviews, and audits. It is the actual review of the deliverables produced during the execution of the project plan.

c12.indd 180c12.indd 180 2/23/09 6:21:54 PM2/23/09 6:21:54 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 197: Bringing The PMBOK Guide to Life

Project Time Management 181

Scope Control or Control Scope

Scope control includes the scope change control system, vari-ance analysis, replanning processes, and confi guration man-agement process. An effective scope control plan will help to minimize scope creep (the unauthorized additions to the approved project scope of work). Variance analysis is the main technique used for controlling project scope. The defi ned and approved scope statement becomes the baseline and the project manager and team review project performance on a regular basis to detect any changes to the baseline.

Confi guration management is concerned with managing changes to the features, functions, and physical characteris-tics of the deliverables of the project. Confi guration manage-ment is actually a component of the integrated change control process. Additionally, confi guration management is associated with more than the common understanding that it is about the controlling of scope changes. The real defi nition has two main parts: (1) the prevention of unnecessary changes and (2) main-taining traceability of all approved changes.

PROJECT TIME MANAGEMENT

An important item to remember is that t organizational proc-ess assets and enterprise environmental factors are inputs to many processes in each of the PMBOK ® Guide knowledge areas. These items appear several times within the Project Time Management sub processes. Project Time Management includes: activity defi nition, activity sequencing, activity resource estimat-ing, activity duration estimating, schedule development, and schedule control. The 4 th Edition lists them as defi ne activities, sequence activities, estimate activity resources, estimate activ-ity durations, develop schedule, control schedule. The general principles have not changed. These processes are not necessarily

c12.indd 181c12.indd 181 2/23/09 6:21:54 PM2/23/09 6:21:54 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 198: Bringing The PMBOK Guide to Life

182 Rapid Knowledge Development (RKD) for Project Managers

listed to be performed in sequence, although there is some logic to how they have been arranged in the PMBOK ® Guide .

Activity Defi nition

The major inputs to activity defi nition are the, scope baseline, enterprise environmental factors and organizational process assets. The 3 rd Edition included the project scope statement, the WBS, WBS dictionary, and the project management plan. The scope baseline includes all of these items.

Keep in mind that inputs to one process can also be inputs to other processes in the same or other knowledge areas.

Activity Defi nition Tool and Techniques

The process of decomposition, as previously explained breaks the WBS down further into smaller components and eventually into work packages. A work package is the lowest level deliver-able in a branch of the WBS and is comprised of activities that will be assigned to performers. These activities will be placed in a logic sequence that will be used to develop the project schedule.

Rolling wave planning is also listed under tools and tech-niques and is a form of progressive elaboration where the near term work is planned at the work package level and later work is planned at a higher task level. Planning components — these are important elements of a project plan that require more detail and should be included in the plan basically as a place holder. As more information is obtained the planning component is further elaborated and through the decomposition process, the work packages are defi ned.

c12.indd 182c12.indd 182 2/23/09 6:21:54 PM2/23/09 6:21:54 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 199: Bringing The PMBOK Guide to Life

Project Time Management 183

Activity Sequencing or Sequence Activities

There are three basic types of dependencies: mandatory, also known as hard logic (due to physical requirements or limita-tions it must be done in this sequence); discretionary or soft logic (generally associated with best practices), and external factors outside of the project including other projects, govern-ment regulations and non project activities that may impact your project. Activity sequencing is a major part of the project scheduling process and produces the network diagram. The network diagram shows predecessor/successor relationships, logical relationships and the fl ow of the project work.

The precedence diagramming method (PDM) creates a network diagram of the project and displays the logical relationships of each activity. The four logic relationships in PDM are:

1. Finish to start—this is the most common form of logic relationship. Most project activities will be displayed as FS (fi nish to start) meaning the previous activity must be completed before the next activity in the sequence may start.

2. Start to start—This relationship indicates that two or more activities are related and may start at the same time. In some cases the plan requires some lag or delay before the start of the related activity.

3. Finish to fi nish—This relationship indicates that two activities may complete at the same time. There may be special considerations that drive this logical relation-ship. Again, some lag or delay may be involved.

4. Start to fi nish—A rare type of logical relationship in which the completion of an activity depends on the start of a predecessor. An example might be: The completion of a training program (fi nish part of the relationship) depends

c12.indd 183c12.indd 183 2/23/09 6:21:55 PM2/23/09 6:21:55 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 200: Bringing The PMBOK Guide to Life

184 Rapid Knowledge Development (RKD) for Project Managers

on the start of a system installation. In other words, training can not be completed until after the system has begun to be installed. There may be some lag associated with this relationship also.

Activity Resource Estimating or Estimate Activity Resources

To effectively estimate activity resources the project manager and team may use their expert judgment, conduct an alterna-tives analysis (determining if there are other options to con-sider), review published estimating data (information that is available from previous projects, PMO records, or commercial data bases), and bottom - up estimating. The bottom - up estimat-ing technique utilizes the WBS as a means of developing reli-able estimates. The work packages are defi ned to the desired level of detail through the decomposition process. This level of detail enables the person or group responsible for submit-ting the estimates to develop a realistic estimate of resource requirements. Generally the work packages are defi ned to a level of detail where they require 40 or 80 hours of effort to complete. Reminder—many of the planning processes are done concurrently or overlap to some extent. The processes described in the PMBOK ® Guide are not necessarily meant to be performed sequentially. Developing the WBS, estimating resource requirements and developing duration estimates may be accomplished in one planning session.

It is also important to consider the resource calendar to deter-mine availability. Many organizations maintain a “ resource pool ” that provides project managers with a view of the organization ’ s resources, skill levels and availability. In the International environment, the resource calendar becomes an even greater planning factor.

c12.indd 184c12.indd 184 2/23/09 6:21:55 PM2/23/09 6:21:55 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 201: Bringing The PMBOK Guide to Life

Project Time Management 185

Activity Duration Estimating

To estimate activity duration, it is important to determine resource requirements fi rst and to determine the skills and capability required of each resource. Remember to consider the availability of the resources, the type of organizational structure, and any historical estimating information (lessons learned) when developing estimates. In a matrix organizational structure there is almost a certainty that the resources will be interrupted from completing their assigned work due to other priorities. The inability to complete work in a continuous man-ner generally leads to additional time required or something commonly referred to as ramp - up and ramp - down time. In the early stages of a project life cycle an analogous estimate may be developed using previous, similar, projects as a basis for the estimate. Analogous estimates are referred to as top down esti-mates and should not be considered to be reliable or realistic. Analogous estimates should be considered as a starting point only. It is extremely rare that two projects would be identi-cal. A parametric estimate using historical data and quantifi -able information may be used for some projects. As an example this type of estimate may use the number of labor hours per unit of work multiplied by the rate for the labor (12 hours x 4 resources at $ 100 per hour). Other factors to consider when developing activity duration estimates include, reserve time (contingency for possible risks and uncertainty), calendars (local and worldwide) for availability, resource skill levels, and the general attitude of the work force. The use of mathemati-cal equations may also be used. Three point estimating using optimistic, most likely, and pessimistic estimates provided by the functional managers assigned to the activities can provide estimates that have some degree of reliability. The use of a weighted average estimate where the most likely time is given

c12.indd 185c12.indd 185 2/23/09 6:21:55 PM2/23/09 6:21:55 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 202: Bringing The PMBOK Guide to Life

186 Rapid Knowledge Development (RKD) for Project Managers

a weighting of 4 times its value may be applicable for use on some projects.

The formulas for three point estimating are expressed as:

a) Triangular distribution: Optimistic time � Most likely time � Pessimistic time. The sum is divided by 3. This will result in the average time for completion.

a � ml � b ����� 3

b) Beta Distribution: Optimistic time � 4 times the most likely time � pessimistic time. The sum is then divided by 6 to produce a weighted average time

a � 4 ( ml ) � b ������ 6

where a � optimistic, b � pessimistic and ml � most likely

Schedule Development or Develop Schedule

When developing the actual project schedule, you must consider availability of resources, capability of the resources, number of resources required, the work calendar of the resources (consider international issues such as holidays and local customs), skill levels, vacation time, possible sick time, external issues (such as weather), lead or lag requirements, and the need for resource leveling (balancing work among resources when an over alloca-tion of work exists. Schedule compression techniques may also be applied to meet predetermined project end dates or changes in the expectations of stakeholders. The two most common forms of schedule compression are fast tracking (the overlap-ping of work normally done in a series or in a mandatory logi-cal relationship) and crashing (adding resources to an activity to reduce the activity duration).

During the schedule development process the critical path method may be utilized. In this process a network diagram is

c12.indd 186c12.indd 186 2/23/09 6:21:55 PM2/23/09 6:21:55 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 203: Bringing The PMBOK Guide to Life

Project Time Management 187

created through a team effort to display the logical relationship of all activities. The estimated activity durations are applied to the network. Project software will calculate the longest path through the network. This path, known as the critical path, will have no fl exibility regarding changes in activity duration, Slipping a completion date of an activity on the critical path will cause the project end date to slip. The process of perform-ing a forward pass and a backward pass through the network will indicate the early start and fi nish and latest start and fi n-ish for each activity. This will identify where fl oat (or slack) exists. Float provides some fl exibility in completing activities that are not on the critical path and could be used to re - plan the network and move resources to protect critical activities.

It is also helpful, during schedule development, to conduct “what - if” scenarios (an exercise designed to create possible situations that could affect the activity of the project in gen-eral) to assist in managing potential risk events and to plan contingencies.

Critical chain or theory of constraints is another technique that may be used for schedule development. This method focuses on the resource constraints associated with the project. Identifying the weakest links (the resource issues), then strengthening the weak areas and managing through - put (the work processes that produce results) will, in theory, reduce overall project duration.

Schedule development produces the schedule baseline— this is the approved project schedule and becomes part of the project management plan.

Schedule Control or Control Schedule

Schedule control, a subset of integrated change control, involves reviewing project performance, analyzing schedule variances, and determining if corrective action is required.

c12.indd 187c12.indd 187 2/23/09 6:21:56 PM2/23/09 6:21:56 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 204: Bringing The PMBOK Guide to Life

188 Rapid Knowledge Development (RKD) for Project Managers

Earned value management is a common technique used to assess the project in terms of schedule and cost performance to identify variance from the baseline. If the schedule variance is considered to be unacceptable, the project manager and team may use schedule compression, what – if scenarios, and resource leveling to return the project to acceptable perform-ance levels. Some variance from the plan can be expected. An acceptable level of variance is usually established during the planning process and is based on the type of estimating tech-niques practiced by the project team.

Terms and Acronyms Used with a Network Diagram

At the completion of the “ sequence activities ” process a network diagram is produced. The network diagram displays the logical relationships of all project activities and become and input the “ develop schedule ” process. There are a number of terms and acronyms associated with the network diagram.

PDM . The precedence diagramming method has four logical relationships: FS – fi nish to start, FF – fi nish to fi nish, SF – start to fi nish, and SS – start to start. The FS relationship is the most common relationship in the project network. AOA . Activity on the arrow. This type of network dia-gram is rarely used today, the PDM method is prevalent in today ’ s project software. The AOA method uses only a fi nish to start relationship and may use dummy activi-ties . The dummy activity indicates that a logical relation-ship exists between two activities but does not consume resources or have duration. It may be a factor in deter-mining the critical path.

c12.indd 188c12.indd 188 2/23/09 6:21:56 PM2/23/09 6:21:56 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 205: Bringing The PMBOK Guide to Life

Project Time Management 189

CPM . Critical path method: Determines early or late start and fi nish times by completing a forward and backward pass through the network. The process will determine the critical path or longest path through the project network. Slack . Also known as fl oat . It basically means fl exibility. This is the amount of time an activity can slip without affecting the project end date. There is generally no fl oat or slack on the critical path. Critical path . This is the longest path through the net-work that determines the earliest completion date of the project. The critical path is determined by performing a forward pass and a backward pass through the project network. Generally speaking, there is no fl oat or slack on the critical path and any slippage of an activity on the critical path with affect the project end date. Forward pass . Determines early start and fi nish dates. The forward pass starts at the beginning of the project and moves through each activity (left to right in the net-work diagram, identifying the early start and early fi n-ish of each activity). Where there are converging points (several activities converging on one activity), the early start of the activity at which the other activities converge is determined by the greatest value of the early fi nish calculations of the converging activities (use the larger number at points of convergence). Backward pass . This process determines the late start and fi nish dates. The backward pass begins at the end of the project and moves backward (right to left) through the network, identifying the latest fi nish and latest start of each activity. Use the lowest number of points of con-vergence during the backward pass process.

c12.indd 189c12.indd 189 2/23/09 6:21:56 PM2/23/09 6:21:56 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 206: Bringing The PMBOK Guide to Life

190 Rapid Knowledge Development (RKD) for Project Managers

PERT — Program evaluation review technique. Uses a weighted average formula: (Optimistic � 4 Most Likely � Pessimistic)/6. This formula is used to determine the range of an estimate and a likely outcome based on the input of the functional managers who provide the values for use with the formula (use of expert judgment and previous experience).

PROJECT COST MANAGEMENT

Cost management involves the development of estimates, in terms of dollars or currency, for the work to be completed and for the resources that will be used on the project. The resources include equipment, materials, supplies and the people who will perform the work. There are three main processes for cost management:

1. Cost estimating (Estimate Costs as shown in the 4 th Edition). This is the process used to determine the approximate costs of all project resources and project work. Project costs may also include travel, rent, leases, and support services.

2. Cost budgeting (Determine budget). Aggregating the estimated project costs to develop the project cost baseline. In this process the estimated costs for each work package and element of the WBS are summed up to produce the project budget. The costs are then allo-cated across the project life cycle and assigned to each phase as needed to support the scheduled work. This creates a time phased budget.

3. Cost control (Control costs). This process is used to monitor project cost performance and manage variances and changes to the cost baseline.

c12.indd 190c12.indd 190 2/23/09 6:21:57 PM2/23/09 6:21:57 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 207: Bringing The PMBOK Guide to Life

Project Cost Management 191

The PMBOK ® Guide includes an overview chart for each knowledge area. These overview charts provide an “ at a glance ” view of the processes associated with each knowledge area. Review and become familiar with inputs, tools and techniques, and outputs of each process. Remember, as you review the PMBOK ® Guide you will notice that many of the inputs, tools and techniques, and outputs are used in processes found in sev-eral chapters and in sub processes within a specifi c knowledge area. This further indicates the importance of an integrated or systems approach to managing projects.

The cost management processes will produce the cost man-agement baseline. During the planning process the desired precision level of cost estimates (example: rounded off to the nearest dollar) will be determined, the units of measure (type of currency as an example) that will be used will be agreed upon and the links to organizational procedures will be defi ned (accounting and fi nancial processes, established reporting and control procedures, industry standards).

Cost Estimating or Estimate Costs

Effective cost estimating requires the appropriate inputs such as the scope baseline, the project schedule, the human resources to be engaged and a risk register. A risk register is an organized and prioritized list of potential risk events. Estimating the cost of the project may involve the use people from various functional entities (functional managers) who provide expert judgment through experience. Analogous, para-metric, and bottom up estimating may also considered.

Analogous estimating – comparing the current project to previously completed similar projects (a top down esti-mating technique).

c12.indd 191c12.indd 191 2/23/09 6:21:57 PM2/23/09 6:21:57 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 208: Bringing The PMBOK Guide to Life

192 Rapid Knowledge Development (RKD) for Project Managers

Parametric estimating—a technique that uses a statistical relationship between historical data and other variables (square footage, lines of code, to calculate an estimate for activity parameters such as scope, cost, and duration. Bottom - up estimating—the WBS is used to create a desired level of detail. The costs are then summed up from the work packages to develop a project cost esti-mate. This type of estimating is also known as grass roots or engineering estimates. Incremental estimates—high level or rough estimates are produced in the early stages of the project. As plan-ning details emerge task based estimates are produced creating more reliable estimates. This may also be referred to as progressive elaboration.

It is important to consider the accuracy of the estimat-ing technique, the level of effort required to produce the esti-mate and the phase in which the estimate is being developed. Analogous estimates are considered to be high level and not accurate but can provide a “ ball park ” or rough order of mag-nitude type estimate. Parametric estimates are generally considered top down but can produce a high level of accuracy depending on the quality and sophistication of the data built into the model. Bottom - up estimates produce a more “ defi ni-tive ” estimate depending on the level of detail developed in the WBS. It is always a good idea to consider the risks, advantages and disadvantages of each technique when engaged in the project cost estimating process.

Estimating tools and techniques such as analogous, paramet-ric, and bottom - up estimating will produce various accuracy levels in cost estimates. A general rule most project managers follow is to engage people who actually do the work to develop cost estimates.

c12.indd 192c12.indd 192 2/23/09 6:21:57 PM2/23/09 6:21:57 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 209: Bringing The PMBOK Guide to Life

Project Cost Management 193

In addition to analogous, parametric, and bottom up estimat-ing there are a number of other tools and techniques that may be utilized in the cost estimating process. These include:

Vendor bid analysis . Cost estimates provided by con-tractors may be verifi ed through vendor bid analysis. Reviewing and analyzing estimates received from ven-dors and suppliers will assist in determining a more reli-able overall project cost estimate. This technique will help to determine if an estimate is fair and reasonable when compared with previous projects or other bids. Cost of quality . Consider the investment in quality when determining estimates. The cost of quality is divided into two main parts:

1. Cost of conformance—preventing defects, training, and inspections. These may all increase the cost of the project depending on the level of quality desired in the product.

2. Cost of non - conformance—repairs, defects, rework and scrap. These items may result in greater project costs through recovery efforts and poor quality outputs.

Reserve analysis . Reserve analysis is a process used to analyze the contingencies that have been added to an esti-mate. Adding a schedule contingency reserve or adding additional funding to a task to manage possible risk events will increase overall project cost. Reserve analysis is used to ensure that the appropriate reserve has been added. Life cycle costing . This process includes the total costs associated with the product from conception to retirement of the product. The project life cycle is included within the total life cycle costs. Project managers are generally

c12.indd 193c12.indd 193 2/23/09 6:21:57 PM2/23/09 6:21:57 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 210: Bringing The PMBOK Guide to Life

194 Rapid Knowledge Development (RKD) for Project Managers

concerned with the project life cycle costs. Maintenance costs and other costs incurred after project completion and hand - off considered part of the total life cycle costs of the delivered product.

Cost Budgeting or Determine Budget

In this process, the project manager applies or allocates cost estimates across project phases to create a cost baseline. This is creates a time phased budget and is used to monitor project cost performance.

During the process of determining the budget the project manager may be required to address the fact that there may be a funding limitation applied to the project. If the project cost estimate is greater than the funding planned by the sponsor or executive decision makers the project manager may become involved in a process known as funding limit reconciliation. In this situation the project managers negotiates with key stake-holders to attain a solution.

The cost baseline is the approved project budget and is used to monitor project cost performance by comparing actual cost to the baseline and determining where variances may be developing.

Cost Control

During project execution the project manager and team will monitor project performance examining variances and ensur-ing that results are within planned parameters. Some changes in plans can also be expected during the project life cycle. Managing change requests is done through a cost change control system. Cost control includes the use of performance data to identify variances and may also include project reviews,

c12.indd 194c12.indd 194 2/23/09 6:21:58 PM2/23/09 6:21:58 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 211: Bringing The PMBOK Guide to Life

Project Cost Management 195

variance management, and project performance reviews. Earned value management is commonly used to identify vari-ances and positive or negative trends in project performance and to determine appropriate corrective actions.

Cost estimate updates are an output of cost control. You will notice that updates to many items (such as organizational proc-ess assets updates) will be found in the outputs section of each major knowledge area process group. This is just a reminder that a continuous learning process should be in place and new lessons learned may be discovered as each process is executed and managed. These lessons learned can provide the organiza-tion with useful changes to existing procedures and should be communicated regularly.

Key Terms to Remember

Work performance information—Progress of the project including completed deliverables, deliverables in progress, incurred costs. Variance analysis Earned value measurement—a Performance meas-urement method that integrates scope, schedule, and cost. There are three key dimensions involved in earned value measurement—Planned Value, Earned Value, and Actual Cost. Forecasting— Determining the probable outcome of the project in terms of budget. An analysis of current performance and trends may produce an Estimate and Completion (EAC) which is compared to the original budget to determine a project cost variance. Learning curves refl ect improvement with repeti-tion. The basic premise of the learning curve is that

••

c12.indd 195c12.indd 195 2/23/09 6:21:58 PM2/23/09 6:21:58 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 212: Bringing The PMBOK Guide to Life

196 Rapid Knowledge Development (RKD) for Project Managers

productivity improves through repetition. The rate of improvement decreases during the process as productivity is measured. Each time an activity is completed, there will be an improvement in productivity, but the rate of produc-tivity will decrease as the activity is repeated. Eventually, the rate of improvement will level off, but these data can be used to estimate overall production output.

Cost Management Formulas and Related Terms

Project cost management is associated with the development of a project budget but also includes the techniques utilized to select projects or make decisions about whether or not a project should continue into the next phase. The following formulas may be used in the decision processes for selection or approval to continue:

Future value, FV � PV (1 � r ) n — Used to determine the future value of an investment. FV � Future value, PV � Present Value, R � Interest rate, n � number of years

Present value, PV � FV / (1 � r ) n — Used to determine the present value of a future investment. This formula dis-counts the value of the investment to refl ect present dollar value

Net Present Value, NPV � the sum of all terms Rt (1 � i) t Where t � time of the cash fl ow, I � discount rate R t � net cash fl ow (infl ow – outfl ow) NPV is the sum of all present values minus the initial

investment. The formula is commonly expressed as:

NPVFV

II=⎡

⎣⎢⎢

⎦⎥⎥

−=

∑ t

t

n

( )11 + rt

If NPV is greater than or equal to zero, the project is generally considered acceptable. A NPV of greater than zero is desirable. To determine the NPV, you must calculate the present value of

c12.indd 196c12.indd 196 2/23/09 6:21:58 PM2/23/09 6:21:58 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 213: Bringing The PMBOK Guide to Life

Project Cost Management 197

cash fl ows for each year of the project. The present values are summed up and then the initial investment is subtracted from the sum. This will indicate if the project is actually going to pro-duce revenue.

IRR is the internal rate of return. This is an iterative process to determine the actual rate of return of an invest-ment. The IRR is the rate at which the NPV becomes zero. The IRR generally must meet or exceed a predetermined “ hurdle rate ” established as part of the organization ’ s project selection criteria. It requires additional effort but will pro-vide more accurate data about the projects being considered for investment.

Payback period is the time period required to recover the ini-tial investment. This method does not generally consider the time value of money.

Break - even analysis is the point at which cash outfl ow and in fl ow are equal.

Sunk costs are money already spent. Sunk costs are not considered when making decisions about continuing to fund a project or to move into the next phase of a project.

Project managers have to consider indirect costs ver-sus direct costs — Labor and material are considered direct costs to the project. Indirect costs may be associated with the costs of maintaining a building, such as rent, electric power, and offi ce support. Indirect costs are those costs that are incurred for common or joint objectives and therefore cannot be identifi ed readily and specifi cally with a particu-lar project.

Opportunity Cost—an economic opportunity that is lost as a result of a decision by an organization. Generally an opportu-nity cost is associated with the loss of possible revenue in one area when funding is allocated to another area or held back for other business reasons.

c12.indd 197c12.indd 197 2/23/09 6:21:59 PM2/23/09 6:21:59 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 214: Bringing The PMBOK Guide to Life

198 Rapid Knowledge Development (RKD) for Project Managers

Earned Value Formulas and Related Terms

Earned value analysis or earned value management provides the project manager and team with a “ point in time ” view of a projects performance. Earned value analysis allow the project manager to calculate project variances by comparing planned performance against actual performance. There are three main factors to consider in earned value analysis:

1. EV or earned value also expressed as BCWP or budgeted cost of work performed – This is the estimated cost of the work that has been completed.

2. PV or Planned Value also expressed as BCWS or budg-eted cost of work scheduled – This is the estimated cost of the work that should have been done , according to the plan, at the time of measurement.

3. AC or actual cost, also expressed as ACWP or actual cost of work performed – This is the actual amount paid for the work that has been completed at the time of measurement.

The commonly used earned value formulas include:

EV or BCWP – AC ( ACWP ) � Cost variance or, CV

A negative cost variance generally considered to be unfavora-ble and undesirable. Example: EV � 1000, AC � 1200. The cost variance is � 200.

EV ( BCWP ) – PV ( BCWS ) = Schedule variance, SV

A negative schedule variance indicates the project is behind schedule: Example ” EV = 1000, PV � 1200, The schedule vari-ance is � 200 or 200 units of measurement behind schedule

EV or BCWP / AC � Cost performance index or CPI

This formula will provide an indication of the effi ciency in the management of project costs. A cost performance index equal to of 1 indicates that the project has no variance in cost and is

c12.indd 198c12.indd 198 2/23/09 6:21:59 PM2/23/09 6:21:59 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 215: Bringing The PMBOK Guide to Life

Project Quality Management 199

being managed to the plan. Example EV � 500 and AC � 500. 500/500 � 1

EV or CWP / BCWS � Schedule performance index, SPI

This is an indication of effi ciency in managing schedule per-formance. A schedule performance index (SPI) of 1 indicates that there is no schedule variance and the project schedule is being managed effectively.

A performance index equal to 1 means the project is on plan with no variance. An index greater than 1 means the project is performing better than the plan; an index less than 1 means that the project is not performing as well as had been planned. This information must be interpreted in the context of the plan to determine where variances may be acceptable and what the vari-ance tolerances are for the project and or the organization.

PROJECT QUALITY MANAGEMENT

The main objective of quality management is customer sat-isfaction. Quality, for the purposes of defi ned project suc-cess, is always defi ned by the customer. The project manager and the team may be required to work very closely with the customer to defi ne the specifi c needs of the customer and to develop and then refi ne project requirements. There are three major processes in quality management: Quality Planning or Plan Quality as expressed in the PMBOK ® Guide 4 th Edition, Perform Quality Assurance, Perform Quality Control.

Quality Planning or Plan Quality

Quality planning is focused mainly on achieving customer satisfaction. In addition the project manager and team should attempt to manage quality by preventing errors from affecting the project deliverables, instill a working environment of continuous improvement, and ensure that responsibility for

c12.indd 199c12.indd 199 2/23/09 6:21:59 PM2/23/09 6:21:59 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 216: Bringing The PMBOK Guide to Life

200 Rapid Knowledge Development (RKD) for Project Managers

quality is delegated to the appropriate individuals. It is the responsibility of the supporting management team to ensure that the project team and project performers have the neces-sary training, tools, and equipment to meet quality objectives and achieve project success.

Project managers and team members must maintain an awareness of the cost of quality. The cost of quality includes the cost of conformance (prevention and appraisal) and the cost of nonconformance (internal failure, or rework, and external fail-ure, or customer dissatisfaction). It is less costly to prevent errors than to inspect and identify errors that must be corrected. Thus, organizations need to have a policy of quality — higher - level guiding principles of quality within an organization. A project quality policy may be developed based on the organiza-tion ’ s overarching quality policy.

The quality planning process produces a quality management plan, quality metrics, quality checklists, a process improve-ment plan, a quality baseline, and updates to the project management plan. Inputs to quality planning include the scope statement and project management plan. Remember to con-sider organization process assets and enterprise environmen-tal factors, as well. A quality plan is a subsidiary of the project management plan.

Project Quality management includes but is not limited to the following:

Continuous improvement. Quality is about continu-ous improvement. The Plan, Do, Check, Act cycle known as the Shewhart Chart forms the basis for the fi ve major project management processes. The contributions of quality experts :

Deming—Statistical analysis to encourage continuous improvement and management ’ s responsibility to support

••

c12.indd 200c12.indd 200 2/23/09 6:22:00 PM2/23/09 6:22:00 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 217: Bringing The PMBOK Guide to Life

Project Quality Management 201

the workforce and provide the necessary tools and training to ensure high levels of quality. Juran—Fitness for use and safety of products. Crosby—The pursuit of zero defects and avoiding the cost of non conformance.

ISO 9000/2000. The International Organization of Standardization sets international standards that often become law. Establishing and then adhering to processes approved by IOS will produce a consistent output. Six Sigma. First introduced at Motorola in 1986, Six Sigma sets a standard of allowing only 3.4 defects per million opportunities for failure. The methodology for meeting those standards is to follow a procedure refereed to as DMAIC: defi ne, measure, analyze, improve, control. TQM, Total quality management. TQM is an organi-zational approach to quality that starts at the top man-agement level and includes all levels of employees. The focus is on continuous improvement and everyone is responsible for quality.

It is management ’ s responsibility to provide the resources for effective quality planning. The right tools, equipment, and training are needed to ensure the appropriate level of quality for the project deliverable is attained. The following are tools and techniques that may be used in quality planning:

Cost / benefi t analysis. Determine the level of quality to be included in the product or service and return on the investment. This is a ratio of the costs of the improve-ment to its expected benefi ts. Benchmarking. This process uses the best in class as the standard against which to measure existing

••

c12.indd 201c12.indd 201 2/23/09 6:22:00 PM2/23/09 6:22:00 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 218: Bringing The PMBOK Guide to Life

202 Rapid Knowledge Development (RKD) for Project Managers

performance. Use benchmarking to identify gaps and to target areas for improvement. Flowcharting. Diagramming a process can defi ne the steps in the process and identify gaps and redundant work. Flowcharts provide an understanding the overall operation or fl ow of work. Design of experiments. This is generally associ-ated with GenichiTaguchi. Quality should be built or designed into a product, not inspected into it. The fur-ther away from the desired target (level of performance or quality) the more expensive it will be to return to the target area. Control Charts. used to determine if a process is stable by plotting measurements and comparing with a deter-mined mean value and pre - determined upper and lower control limits. Cost of Quality. The costs incurred over the life of the product associated with correcting non conformance issues as well as well prevention and appraisal costs.

Quality Assurance

Quality assurance is the implementation of systematic activi-ties to ensure that the project will satisfy quality standards. Quality assurance tools includes:

Audits—independent reviews of project activities and related work to determine if organizational poli-cies and standards are being observed and utilized appropriately. Process analysis— examination of process steps to iden-tify gaps and areas for improvement.

c12.indd 202c12.indd 202 2/23/09 6:22:00 PM2/23/09 6:22:00 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 219: Bringing The PMBOK Guide to Life

Project Quality Management 203

Quality Control

Quality control involves monitoring project results to determine if they comply with quality standards. The focus is on preven-tion — keeping errors from the customer.

The PMBOK ® Guide 3 rd and 4 th Editions list ten common quality control tools: page 169 of the 4 th Edition draft and page 192 of the 3 rd Edition.

1. Inspections. Inspections are a key tool for verifying an output. Inspections may also include walk - throughs of an area, testing, and periodic reviews.

2. Statistical Sampling. Selecting a specifi c part of a prod-uct population and submitting that part for testing. There are two common forms of sampling: Attribute sampling which is a pass or fail approach. There is no fl exibility, the product either conforms to specifi cations or it does not. Variable sampling allows for some variance from specifi -cations and products or outputs are graded on a scale to determine acceptance. In addition, the sampling process may produce the following results: Producer ’ s risk or Alpha risk—the risk to the producer

that a good lot may be rejected. Consumer ’ s risk or Beta risk—the risk that the con-

sumer or buyer may purchase a bad lot. 3. Control charts. Control charts are used to determine if

a process is in control or out of control. Data points are observed to determine if they meet requirements and are with upper and lower control limits. The rule of 7/21 is commonly used in interpreting control chart data. The rule of 7 states that it takes 7 consecutive data points to indi-cate a trend or a run. An example of a process out of con-trol would be seven data points in a row above the mean. The rule of 21 states that 21 data points are needed for

c12.indd 203c12.indd 203 2/23/09 6:22:00 PM2/23/09 6:22:00 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 220: Bringing The PMBOK Guide to Life

204 Rapid Knowledge Development (RKD) for Project Managers

the sampling to be statistically valid. These are basic rules and easy to remember but may not be acceptable criteria for many organizations.

4. Pareto diagrams (80/20 rule). This tool is based on the principle, as described by Pareto, that 20 percent of the issues cause 80 percent of the problems. By charting the frequency of quality issues, the most prob-lematic quality issues can be identifi ed and addressed.

5. Cause and Effect Diagrams (fi shbone diagrams). These diagrams help project teams defi ne specifi c prob-lems and then provide a means to identify several potential causes of the problem. The major causes are pri-oritized and corrective action is determined. The diagram resembles the skeleton of a fi sh and was developed by Kaoru Ishikawa in the 1960 ’ s.

6. Flowcharts. Using symbols to represent actions or deci-sions, a fl owchart walks the process through stages. This can help identify weaknesses in the process by showing how parts of the system interrelate.

7. Histograms. These bar charts show distribution frequencies.

8. Run charts. These are line graphs that show trends or variations over time.

9. Scatter diagrams. These are charts that plot the rela-tionship between two variables. The closer the points on the diagram cluster along a straight line, the more direct the relationship is between the two variables.

10. Defect repair review. This is an action taken to make sure quality defects are fi xed and brought into compli-ance with the standards.

It should become a matter of standard practice for project managers to document the lessons learned at the completion of the quality control process. This practice will benefi t the

c12.indd 204c12.indd 204 2/23/09 6:22:01 PM2/23/09 6:22:01 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 221: Bringing The PMBOK Guide to Life

Human Resource Management 205

project team as well as the organization supporting the project. Lessons learned are considered to be part of a project manag-er ’ s professional responsibility.

HUMAN RESOURCE MANAGEMENT

The human resource (HR) management knowledge area includes what is considered to be the “ soft side ” of project management. This includes organizational structure, planning for human resources, acquiring the project team, developing the team, and managing the team. Human resource management is associated with leadership, motivation, team building, managing confl ict, establishing relationships with functional groups, communicat-ing effectively, and providing useful feedback regarding project performance and individual performance. For many project man-agers, the skills necessary to manage the project team present the greatest challenges. Dealing with the human side of project management and the emotional issues requires patience, good listening skills, good judgment and strong leadership.

Human resource management includes an understanding of organizational infl uences and the difference between project - based and non – project - based organizations. The project - based organization generally provides goods and services to clients through a project management methodology. The non – project - based organization does not have a project management meth-odology in place and may not require a formalized project approach due to the nature of the business.

Organizational structure

There are three main types of organizational structure:

1. Functional (also known as stove pipe, chimney, and silo). A manager is assigned responsibility for employees with a specifi c set of skills or expertise.

c12.indd 205c12.indd 205 2/23/09 6:22:01 PM2/23/09 6:22:01 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 222: Bringing The PMBOK Guide to Life

206 Rapid Knowledge Development (RKD) for Project Managers

2. Matrix (there are three types of matrix environments — weak, balanced, and strong). In the weak matrix the project manager has very little authority and must rely on interpersonal skills and infl uence to achieve objec-tives. The balanced matrix may create a competing environment where the project managers and the func-tional managers have equal levels of authority. There is a potential to be exposed to the two - boss syndrome where resources may be receiving direction from the project manager and the functional manager. This could cause some confl icts regarding priorities and the assign-ment of resources.

3. Projectized. In this form, projects are separated and have distinct teams that report directly to an assigned project manager. In the projectized structure, the project man-ager has a signifi cant level of authority. The project stake-holders are generally defi ned as anyone involved in or directly impacted (positively or negatively) as a result of the project. Key stakeholders include the project manager, sponsor, customer, user, and project team.

Types of Power

There are fi ve general types of power: Formal or legitimate (given in connection with a person ’ s position in the organiza-tion), reward power—the power of infl uence one may posses by having the ability to offer items of value to infl uence another person, penalty power—the ability to discipline or in other ways create an uncomfortable environment if the employee does not follow directions, expert power (associated with knowledge and experience), and referent power. Referent power is individual power based on a high level of identifi -cation with, admiration of, or respect and connection to the

c12.indd 206c12.indd 206 2/23/09 6:22:01 PM2/23/09 6:22:01 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 223: Bringing The PMBOK Guide to Life

Human Resource Management 207

actual power holder. This is sometimes translated into “ power by association. ”

Tools and Techniques in HR Management

Project managers will experience confl ict during the life of a project. It is important to develop an understanding of types of confl ict and how to manage confl ict effectively. Confl ict in the project environment may involve grievances, schedule disa-greements, funding requirements, resource availability, qual-ity standards and many other issues. Project managers will be required to manage confl ict effectively and develop confl ict res-olution skills. Confl ict resolution may include mediation, arbitra-tion, negotiation or litigation.

Confl ict management. There are fi ve basic approaches to managing confl ict commonly found in project manage-ment literature:

1. Withdrawal, or stepping away from and avoiding the issue

2. Smoothing, an attempt to minimize the severity of the confl ict. This approach can be described as “ play-ing down ” the differences while focusing on common interests.

3. Compromise, a win – lose, lose – win approach where each side must give up something of value to reach an agreement.

4. Forcing, or using position power to solve a problem, usually results in later confl ict that can be more severe. This is known as a win/lose approach.

5. Collaboration, which is a win – win strategy of problem solving by confronting the issue with a view that will benefi t both sides. This form of con-fl ict handing is often associated with confrontation

c12.indd 207c12.indd 207 2/23/09 6:22:02 PM2/23/09 6:22:02 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 224: Bringing The PMBOK Guide to Life

208 Rapid Knowledge Development (RKD) for Project Managers

where the parties involved “ confront ” the problem together.

Other tools and techniques associated with Human Resource Management include:

Responsibility assignment matrix (RAM). This tool links project team members with WBS tasks. The RAM is used to defi ne clear responsibility for the completion of project tasks. It is not a tool for determining resource requirements. Project interfaces. There are several types of project interfaces: organizational (business unit), technical (design group and production group), and interper-sonal (formal and information personal relationships). The project manager must be aware of the interfaces and establish effective relationships with each. Most project managers depend on other organizations to ful-fi ll resource requirements, and it is essential for the project manager to create an environment of mutual trust and respect. This will help to ensure a smooth implementation and to facilitate the process of acquir-ing resources. Staffi ng the project. The use of a staffi ng pool or resource pool will assist in staffi ng a project team. The goal is to obtain the best resources available. In most cases, the project team is composed of resources com-monly classifi ed as “ competent ” performers who will require some coaching, training, and mentoring from the project manager. The project manager can develop a high - performing team from an initial group of compe-tent performers with the appropriate balance of effective management and leadership.

c12.indd 208c12.indd 208 2/23/09 6:22:02 PM2/23/09 6:22:02 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 225: Bringing The PMBOK Guide to Life

Human Resource Management 209

Negotiating. Project managers must develop effective negotiating skills to achieve project objectives. Items that may require negotiation include obtaining resources, schedule development, activity duration esti-mating, and obtaining project funding. Negotiating involves knowing your objectives, preparing for discus-sions, willingness to listen, and an appreciation for the other party ’ s position. Team development. The project manager is a team leader and should continuously use existing techniques as well as develop new and effective methods to enhance the perform-ance of the team. Teambuilding activities such as reward and recognition events, offsite meetings, motivation building sessions, team training events, feedback sessions, perform-ance appraisals, co - location of the team whenever possible, and joint activities that encourage support among team members can improve a project ’ s probability of success.

Stages of Team Confl ict and Team Development

There are four general phases in the team development process:

1. Forming. In this phase of bringing the team together, the team members are cautious and unsure of their roles. The project manager plays a dominant role here and pro-vides direction to the forming team. Roles and responsi-bilities of the team members are not clearly defi ned.

2. Storming. In this phase, there is great focus on their individual needs and to be protective of their own inter-ests. There may be some “ jockeying for position and a high degree of confl ict. The project manager provides

c12.indd 209c12.indd 209 2/23/09 6:22:02 PM2/23/09 6:22:02 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 226: Bringing The PMBOK Guide to Life

210 Rapid Knowledge Development (RKD) for Project Managers

direction and support and acts as a facilitator in this phase.

3. Norming. In this phase, individual assignments have been defi ned and team members focus on their specifi c tasks.

4. Performing. In this phase, the project team is working as a collaborative and supportive team, with a focus on the higher level set of project objectives and a shared vision of success.

Motivation

Project managers face a signifi cant challenge. In many organi-zations they must compete for resources, manage teams they have no direct authority over, and work with other internal or external entities that may have a different set of priorities. The project manager must become motivated, sustain that moti-vation, and motivate others to achieve the objectives of the project. To accomplish this, the project manager must develop and continuously enhance his or her leadership skills.

Leadership involves developing a vision, mission, and objec-tives and then creating a motivated team that will achieve the vision and objectives of the project. The project manager is, in most cases, considered to be the leader of the project team, whether or not he or she possesses actual legitimate power. So how does the manager go about motivating the team? An understanding of motivational theory is a good starting point.

Abraham Maslow might be considered the father of moti-vational theory. Maslow ’ s hierarchy of needs is prob-ably the most well known of the motivational theories. The basic premise is that as each motivating factor is achieved, it is no longer a motivator, and the person reaches higher up in a hierarchy of needs. The levels of the hierarchy include:

c12.indd 210c12.indd 210 2/23/09 6:22:02 PM2/23/09 6:22:02 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 227: Bringing The PMBOK Guide to Life

Human Resource Management 211

physiological needs, safety and security, social needs, self - esteem, self - actualization.

Douglas McGregor thought motivation could be associated with managerial styles. He defi ned two different styles he called Theory X and Y. In Theory X , managers distrust employees and believes employees do not want to work and will do only what is minimally required. A high degree of supervision is associated with Theory X. In Theory Y, managers trust the employees. This is a partici-pative style of management and is more trusting and supportive. This type of manager believes people want to work and contribute to the well being of the project and the organization.

According to Frederick Herzberg, it is important to identify and remove items that causes dissatisfaction. These items are referred to as — hygiene factors and include compensation, level of supervi-sion, the work environment and peer relationships. Problems in these areas may cause a severe loss of motivation among employ-ees. Correcting these problem areas may not create a motivat-ing environment. Once the problem areas have been resolved the focus should shift to motivating factors such as greater chal-lenges, more responsibility, advancement, reward and recognition. According to Herzberg, it is important to remove the “ pain points ” from the environment before you can motivate the work force.

Leadership and motivation are key factors in project man-agement and can have a major effect on a project ’ s outcome. Project managers step into a leadership position when they accept a project assignment and should dedicate some of their time to the enhancement of leadership skills.

Leadership skills include but are not limited to the following items:

Problem solving Facilitating the integration of new team members into the team

••

c12.indd 211c12.indd 211 2/23/09 6:22:03 PM2/23/09 6:22:03 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 228: Bringing The PMBOK Guide to Life

212 Rapid Knowledge Development (RKD) for Project Managers

Managing interpersonal confl ict Facilitating group decisions Communicating effectively Presentation skills Creativity and innovation Ability to develop and articulate a vision Motivation and infl uencing skills

PROJECT COMMUNICATIONS MANAGEMENT

Project communications is about effective communication between the project manager and stakeholders. This means developing a plan and the processes to ensure that the right information is provided to the right people at the right time. Projects stakeholders may require different types of commu-nication and in varying degrees of detail. In addition, today ’ s project environment requires an understanding of cultural dif-ferences, technological factors, and the ability to communicate effectively with dispersed or virtual teams.

There are many forms of communication including internal organizational communications, project communications, commu-nication with the media, formal reports, informal unstructured communication, written, verbal and non verbal communications. The project manager ’ s role demands strong communication skills and the ability to interface with stakeholders at every level within an organization and externally.

The elements of communications management are integrated across all project management knowledge areas and with a strong set of communications skills the project manager will fi nd it diffi cult to accomplish any project objectives.

In the project environment project managers communi-cate primarily in a horizontal or cross - organizational mode.

•••••••

c12.indd 212c12.indd 212 2/23/09 6:22:03 PM2/23/09 6:22:03 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 229: Bringing The PMBOK Guide to Life

Project Communications Management 213

Transferring and receiving information from the functional groups and business entities involved in the project. The project manager position also requires communication with manage-ment (known as upward communication) and to subordinates or employees (downward communications).

Project communications is successfully achieved through an understanding of the sender – receiver model . In the model, the critical elements are the region of experience of the sender and receiver. This region of experience defi nes the knowledge, credibility, confi dence, and overall experience of the sender and the receiver. (An overlap of the regions of experience where there is a shared knowledge or familiarity about a sub-ject between sender and receiver or where each has developed similar backgrounds will facilitate the communications proc-ess.) The sender prepares or encodes a message to transmit to a receiver. The message passes through the sender ’ s personal-ity screen, which defi nes the style of the sender and could have an impact on how the message is actually transmitted. This message travels across the region of experience to the receiver. The message passes through the receiver ’ s perception screen, where the receiver may analyze the message, the credibility of the sender, and other factors about the sender. The message is then received and decoded. To ensure that the message was received as intended, the receiver will feed back the message by encoding the message, passing it through the receiver ’ s person-ality screen, through to region of experience, then through the sender ’ s perception screen. The message is decoded by the origi-nal sender to determine if the message was sent and received as intended. Because there is a potential for some distortion of the message, this process may be repeated a few times to ensure that the message was clearly communicated.

The complexity of project communications can be determined through the use of the communications channel formula.

c12.indd 213c12.indd 213 2/23/09 6:22:03 PM2/23/09 6:22:03 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 230: Bringing The PMBOK Guide to Life

214 Rapid Knowledge Development (RKD) for Project Managers

This formula provides the project manager with a view of the potential for communications problems or breakdowns that may occur during the project life cycle., When working with a large team of people the project manager may apply this for-mula to assess the number of communications channels and therefore the number of possible areas for miscommunication. The formula is expressed as:

N ( N – 1) / 2 N � Number of people on the project team Example: Project team members total 10. Applying the

formula the number of communications channels is 10(10 � 1) / 2 or 45 channels.

Increasing the number of people on a project team rapidly increases the number of channels of communication that will exist between project team members. As the number of chan-nels increases, the ability to manage communications effec-tively and to minimize communications breakdowns becomes more diffi cult. The use of smaller core teams and sub - teams may help to reduce the potential of communications breakdown while managing a project team.

Project communications planning is an essential part of the overall integrated project plan. It includes the processes that are required to be followed by the project team to effectively generate, collect, store, analyze, and distribute project - related information. Effective communication to project stakeholders is a key item in the successful achievement of project objectives. The PMBOK ® Guide defi ned four major subprocesses associ-ated with project communications: communications planning, information distribution, performance reporting, and man-aging stakeholders. The 4 th Edition has been revised to indi-cate 5 processes: Identify Stakeholders, Plan Communications,

c12.indd 214c12.indd 214 2/23/09 6:22:03 PM2/23/09 6:22:03 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 231: Bringing The PMBOK Guide to Life

Project Communications Management 215

Distribute Information, Manage Stakeholder Expectations, and Report Performance.

Identify Stakeholders

As stated previously in the Human Resource Management section, stakeholder are the organizations or individu-als either involved in the project or affected by the project. Identifying each project stakeholder and determining their specifi c infl uence level and their interest in the project is an important factor to consider in the overall planning process. Stakeholders can affect decisions about requirements and change requests and each may have their own specifi c com-munications needs and expectations.

Communications Planning or Plan Communications

Two key tools in communications planning are communica-tions requirements analysis and communications technology. Communications requirements analysis looks at the spe-cifi c needs of the stakeholders in terms of type of information to be provided and format of the information (depending on the responsibility and involvement of the stakeholder).

Communications technology . The type of technology used by stakeholders may vary tremendously. Technology factors include how information will be transferred to stakeholders in terms of information systems, infrastructure, and the capabili-ties of the stakeholders to access and send information.

The major output of the communications planning process is the communications management plan, another subsidiary plan to the project management plan. When developing a com-munications plan, consider the needs of the stakeholders, the urgency of the information that will be shared, the availability

c12.indd 215c12.indd 215 2/23/09 6:22:04 PM2/23/09 6:22:04 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 232: Bringing The PMBOK Guide to Life

216 Rapid Knowledge Development (RKD) for Project Managers

and reliability of the technology, and complexity of the project. Consider the constraints (limitations) that may affect the abil-ity to communicate, especially in a virtual or international project environment.

Project communication is often affected by the assumptions made by the project team. Assumptions are things that are con-sidered true, real, or certain fro planning purposes. Any time a list of assumption is developed, the project manager and team should take the time to review and validate these assumptions to avoid communications errors, risk situations and surprises later in the project.

Information Distribution or Distribute Information

Information distribution focuses on providing the appropriate information to the stakeholders in a timely manner. Written and oral communication, listening and speaking, presenta-tions, memos, formal meetings, and informal meetings may be utilized to distribute information. The project manager should be aware of the different requirements associated with inter-nal and external communication and formal and informal communication.

Major inputs to information distribution:

The project management plan which will, in most cases, include the communications management plan. Perform ance reports—information about the progress of the project and its current condition. The tools and techniques for information distribution include the project manager ’ s communications skills, an under-standing of the communications sender – receiver model, feedback loops and the ability to communicate verbally and through written messages. Tools and techniques

c12.indd 216c12.indd 216 2/23/09 6:22:04 PM2/23/09 6:22:04 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 233: Bringing The PMBOK Guide to Life

Project Communications Management 217

also include electronic systems, internal organizational networks, other forms of technology and types of media. An effective information distribution process will pro-duce: Reports, lessons learned, project records, important project information such as memos, meeting minutes, and other documents.

Manage Stakeholder Expectations

The project manager should clearly establish the expectations of the key stakeholders. The expectations will vary among stakeholders but the project manager should make the effort to intentionally defi ne and establish them and review them on a regular basis. This will help to prevent misunderstandings and disappointments later and help to maintain a good work-ing relationship with all stakeholders. The interpersonal skills of the project manager, an understanding of organizational pro-tocol, and some diplomacy are essential when managing stake-holder expectations.

Managing stakeholders is also associated with the area or domain known as professional and social responsibility . In this domain of project management, the project manager must balance the needs of the project stakeholders through an understanding of their specifi c infl uence and concern about the project. Project - related decisions should be made with con-sideration for the larger community of project stakeholders to minimize confl icts and manage bias.

Performance Reporting or Report Performance

Performance reporting involves collecting, reviewing, analyz-ing, and then disseminating the information to the appropriate

c12.indd 217c12.indd 217 2/23/09 6:22:04 PM2/23/09 6:22:04 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 234: Bringing The PMBOK Guide to Life

218 Rapid Knowledge Development (RKD) for Project Managers

stakeholders. Project status reports are generated to indicate the health of projects. S ometimes this report uses colors to dif-ferentiate project status conditions: red for a troubled project, yellow for a project that is experiencing some serious problems, and green for projects in relatively good shape.

The project management plan, work performance informa-tion and budget forecasts are major inputs when developing project information. Common tools for assessing and report-ing project performance include earned value analysis or variance analysis. These tools enable the project manager and team to assess the project using mathematical formulas S - curve charts to indicate variances to the plan and assist in developing strategies to correct unacceptable variances or cost to return a project to the appropriate performance level.

RISK MANAGEMENT

Risk management is something that should be included among the activities of the project manager and the project team from the beginning of the project during initial plan-ning through completion and closeout of the project. Effective project planning includes continuous focus on the threats, as well as the opportunities associated with the project. A proac-tive approach to risk management in which the project team and the project manager actively discuss potential risk situa-tions will make the difference between a smooth - fl owing project and a project fi lled with surprises and potential disasters.

Companies face two basic types of risk situations: insur-able and business. Insurable risk is a calculable risk that can be spread over the many participants who purchase the insur-ance. With insurance risk, there is only a chance for loss. This would include damages to property or equipment and workman ’ s compensation, for example. Business risk is the potential that a

c12.indd 218c12.indd 218 2/23/09 6:22:05 PM2/23/09 6:22:05 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 235: Bringing The PMBOK Guide to Life

Risk Management 219

company ’ s fortunes may rise or fall based on outside events such as competition or economics factors. When developing risk man-agement plans the project manager should consider both types of risk. It is also important to view risk not just from a negative perspective that focuses on threats to the project or organization but on potential opportunities as well. Another equally impor-tant factor in risk management is the need to ensure that risk management is budgeted into the project as you would with any other activity. However, the amount of time and money spent performing risk management activities should be commensurate with the risk management budget and the needs of the project.

Project risk management includes planning for risk, identi-fying risks, performing qualitative analysis, performing quan-titative analysis, planning risk responses, and monitoring and controlling risks. These processes are all part of the risk management plan. The sequence of these processes appears to a logical approach to managing risk. When the risk have been identifi ed by the project team, the potential risks are assessed in terms of probability and impact to determine a risk rating. This is accomplished through qualitative analysis. This form of analysis is largely based on expert judgment. The risk events are prioritized and may be assessed in greater detail with more comprehensive tools and techniques in the process of quantita-tive analysis. The prioritized risks are analyzed and responses are developed. A risk monitoring and control process assists the project team in managing new risks or residual risks.

Some key elements of risk management that should be con-sidered include the following:

Risk is a measure of uncertainty and is determined by assessing probability and impact . Project managers deal mainly in an area or segment of the risk spectrum known as relative uncertainty. There are very few items

c12.indd 219c12.indd 219 2/23/09 6:22:05 PM2/23/09 6:22:05 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 236: Bringing The PMBOK Guide to Life

220 Rapid Knowledge Development (RKD) for Project Managers

that have a 0 percent chance of occurring and there are very few items that are considered to be 100 percent cer-tain. Relative uncertainty basically means that some information is known but there is also some degree of uncertainty that requires the development of a risk man-agement strategy to respond to the uncertainty. Risk includes factors that may be categorized as known unknowns and unknown unknowns . A risk in the known unknown category can be planned for to some extent. These are risks events that have occurred previously and there is some data available to work with. Risks in the category of unknown are those risks for which no information is available. This type of risk cannot be anticipated, because there are no data or indication that it could actually happen. You cannot plan for something that is not known at all. Many organizations establish Management reserves (a back up reserve of funding) to address these types of risks. An example would be a company that keeps an amount of money equivalent to their operating budget in reserve in case or a cata-strophic event. There are two primary components of risk: probabil-ity and impact. A probability / impact matrix is used to rate risks by using previous data and expert judgment to determine the probability that an event may occur and the impact to the project if the event actually occurs. This technique may use scales to determine low, moder-ate, high ratings for probability and impact. Some organ-izations may have numerical values from probability and impact. This process will assist in determining which risk events have the greatest priority in terms of their urgency and potential effect on the project.

c12.indd 220c12.indd 220 2/23/09 6:22:05 PM2/23/09 6:22:05 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 237: Bringing The PMBOK Guide to Life

Risk Management 221

Risk Tolerance the organizational culture may have an effec t on risk tolerance. The risk tolerance of an organiza-tion or an individual may be indicated through a utility factor. The utility factor associated with risk tolerance is generally defi ned as follows: Utility, level of comfort or the satisfaction level associated with risk rises at a decreas-ing rate for the risk - averse person. This means that as risk increases, the risk - averse person becomes more and more uncomfortable with the situation. The utility fac-tor or level of comfort associated with risk increases for the risk seeker when greater levels of risk are experi-enced. Risk seekers thrive on risk opportunities and feel very comfortable in risk situations. Simply put, they like taking risks. Consider the culture of an organization as it relates to risk management. A risk adverse executive team will infl uence the employees of the organization to minimize their willingness to take risks. This is actually an enterprise environmental factor to consider. Hurwitz and Wald criteria. The Hurwitz and Wald criteria (maximax and maximin) describe the risk toler-ances and behaviors of an organization regarding risk. The Hurwitz, or maximax, criterion is associated with a “ Go for broke ” approach where there is a belief that the outcome will be very positive. It is an optimistic outlook. The Wald, or maximin, criterion is associated with people or organizations that are primarily concerned with loss. They are considered to be risk averse.

Risk Identifi cation

Risk identifi cation is the process of determining which risks might affect the project and documenting the risk characteristics.

c12.indd 221c12.indd 221 2/23/09 6:22:06 PM2/23/09 6:22:06 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 238: Bringing The PMBOK Guide to Life

222 Rapid Knowledge Development (RKD) for Project Managers

During the risk identifi cation process the project team may observe risk triggers. These are symptoms that may lead to a risk event. It is important to identify and react to triggers before a risk event occurs.

Tools associated with risk identifi cation include the following:

Brainstorming. Managers generate risk data from the project team by encouraging open discussion of ideas. Delphi technique. This is the use of subject matter experts in an anonymous setting to eliminate bias. Nominal group technique. This is basically a combi-nation of the Delphi and brainstorming techniques. The information is gathered anonymously, but the partici-pants are known to all. SWOT analysis. This technique involves the identifi ca-tion of an organization ’ s strengths, weaknesses, oppor-tunities, and threats. It involves specifying the objective of the business venture or project and identifying the internal and external factors that are favorable and unfavorable to achieving that objective. The technique is credited to Albert Humphrey, who led a research project at Stanford University in the 1960s and 1970s using data from Fortune 500 companies.

Tools and Techniques for Risk Management

Decision trees. Decision trees are associated with quan-titative risk analysis. This tool assists in determining the most appropriate solution or strategy based on available data and forecast information. Expected monetary value. EMV is the total of the weighted outcomes (payoffs) associated with a decision,

c12.indd 222c12.indd 222 2/23/09 6:22:06 PM2/23/09 6:22:06 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 239: Bringing The PMBOK Guide to Life

Risk Management 223

the weights refl ecting the probabilities of the alter-native events that produce the possible payoff. It is expressed mathematically as the product of an event ’ s probability of occurrence and the gain or loss that will result. Calculating the EMV will help decision mak-ers determine which approach is most benefi cial to the organization. Monte Carlo process. This is a technique that creates a simulation of a project using specifi cally designed soft-ware. The project is simulated many times using variable data obtained from reliable sources to determine possible outcomes and probability of task completions, schedules, and costs. This is a form of quantitative risk analysis. Probability distribution. There are several types of dis-tribution curves: normal distribution (bell - shaped curve), triangular distribution, and beta distribution, for example. Standard Deviation. This is a statistic used to measure confi dence level. It is generally calculated by the formula:

Pessimistic � Optimistic 6

In association with the PERT Weighted Average Formula.

Risk Response Strategies

There are seven risk response strategies: avoidance, transference, mitigation, exploitation, enhancement, sharing, and acceptance:

1. Avoidance. The risk is too great and alternatives must be identifi ed.

2. Transference. Identify a subject matter expert that can deal effectively with the potential risk and handoff the risk to that person.

c12.indd 223c12.indd 223 2/23/09 6:22:06 PM2/23/09 6:22:06 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 240: Bringing The PMBOK Guide to Life

224 Rapid Knowledge Development (RKD) for Project Managers

3. Mitigation. Attempt to reduce the effect of the risk by reducing the probability or impact.

4. Exploitation. Create situations that will actually cause a positive result to occur.

5. Enhancement. Obtain the greatest benefi t of the posi-tive occurrence.

6. Sharing. Inform other organizational entities about the positive results.

7. Acceptance. The risk has been identifi ed and will be managed by the project team if it occurs. Passive accept-ance means no special action will be taken. Active acceptance means that a specifi c action will be devel-oped to manage the accepted risk.

PROCUREMENT MANAGEMENT

Procurement management is a set of processes designed to obtain the resources, products, services, and materials needed to complete the project objectives. It involves developing a strategy determining what products and services can be devel-oped internally by the organization based on capability and resource availability and what must be obtained through sup-pliers, contractors or vendors. The organizational process assets and enterprise environmental factors (previously discussed) will affect decisions made during the project procurement proc-ess. Generally, procurement involves a buyer and a seller. The buyer attempts to obtain material and equipment or products at the best possible price while the seller seeks to optimize a sale for profi t. Negotiation skills become of critical importance when procuring goods and services and the type of contract agreed upon by the buyer and seller will be a major factor dur-ing execution of the project plan.

c12.indd 224c12.indd 224 2/23/09 6:22:07 PM2/23/09 6:22:07 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 241: Bringing The PMBOK Guide to Life

The procurement processes described in the PMBOK ® Guide 3 rd Edition include the following:

Plan purchases and acquisitions Plan contracting Request seller responses Select seller Contract administration Contract closure

The 4 th Edition of the PMBOK ® Guide includes the follow-ing processes that are basically slight variations from the 3 rd Edition.

Plan procurements Conduct procurements Administer procurements Close procurements

The basic concepts of procurement management remain the same in the 3 rd and 4 th Editions.

As seen in other knowledge areas the sequence of these processes seems to be logical, but the actual use of these proc-esses and the subprocesses within them depend on the type of project and the organizational policies and practices that have been defi ned and communicated.

The procurement planning process requires the project manager and team to consider a number of inputs. These inputs are associated with most of the other knowledge areas of the PMBOK ® Guide . Project requirements must be iden-tifi ed, risk must be assessed, the type of resources required must be determined, and project scope, schedule, and cost information should be available. The project manager, if authorized, will conduct a make or buy analysis to determine what must be procured and what can be fabricated internally

••••••

••••

Procurement Management 225

c12.indd 225c12.indd 225 2/23/09 6:22:07 PM2/23/09 6:22:07 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 242: Bringing The PMBOK Guide to Life

226 Rapid Knowledge Development (RKD) for Project Managers

by the organization. There are several different types of con-tracts that may be considered and each contract has a set of advantages, disadvantages and risks. A knowledge of contract types is extremely important when managing the procure-ment process.

Types of Contracts

The key elements that form a contract are generally considered to be: an offer, an acceptance, and consideration (something of value). Contracts are legal documents and disputes and issues about the contract between the buyer and seller may be subject to remedy in a court of law.

There are many types of contracts and the terms and con-ditions will vary greatly depending upon the objectives of the buyer and seller. The most cases the appropriate type will be negotiated between buyer and seller in a mutually benefi cial approach. Instead of opposing view points a partnership will be created that will enable each side to achieve their objectives. There are fi ve common types of contracts associated with the project procurement process:

1. Firm fi xed price (FFP) or lump sum. The contractor or seller estimates the cost of the project work and submits the bid. This type of contract can introduce a signifi cant amount of risk to the seller and it is therefore essential to for the contractor to do a very thorough job of estimat-ing. Expected profi t and contingencies to deal with unex-pected issues are included in offer made to the customer in this type of contract.

2. Cost plus fi xed fee. This type of contract provides the seller with a fi xed fee that is not tied to project costs. The costs, as they accumulate, are assumed by the buyer.

c12.indd 226c12.indd 226 2/23/09 6:22:07 PM2/23/09 6:22:07 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 243: Bringing The PMBOK Guide to Life

3. Cost plus percentage of cost. This type of contract cre-ates an advantage for the contractor or seller. As the cost of the project increases due to changes in require-ments and increase in project scope the amount paid to the seller for services increases proportionally based on the agreed upon percentage. In this arrangement there is signifi cant risk to in the buyer.

4. Cost plus incentive fee. The buyer and seller agree to a sharing ratio where the buyer and seller both benefi t if the seller manages costs effectively. The incentive is realized as a percentage of the cost savings.

5. Fixed price incentive fee. In this arrangement the project requirements are fi rmly set. Specifi c target costs, a ceiling price and a sharing ratio are negotiated. The contractor has an incentive to reduce costs when-ever possible as the project is executed. A reduction in costs may lead to a greater profi t. Failure to control costs or reduce costs may result in a signifi cant loss of anticipated profi t and may possibly result in further fi nancial loss as project costs are assumed by the seller for any amount above the agreed upon ceiling price.

Other types of contracts include time and material, purchase order, letter contract, or letter of intent. The letter of intent provides an opportunity to move forward with the project while the details of the main contract are reviewed. This approach may help to avoid late starts, especially where critical environ-mental factors may impact the project (e.g., weather, location, resource availability).

Upon completion of contract negotiations a defi nitive con-tract is approved. The defi nitive contract includes all of the terms, conditions, and deliverables that have been negotiated between the buyer and seller.

Procurement Management 227

c12.indd 227c12.indd 227 2/23/09 6:22:07 PM2/23/09 6:22:07 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 244: Bringing The PMBOK Guide to Life

228 Rapid Knowledge Development (RKD) for Project Managers

Tools and Techniques of Procurement Management

Procurement documents. Procurement documents will vary, depending on the type of project and the organiza-tions involved. Typical documents include request for pro-posal (RFP), request for information (RFI), request for bid, and request for quote. Statement of work. This is a narrative description of work to be completed under contract. The statement of work in many cases precedes the project charter and the contract. It describes the work to be done and provides and opportunity for the contractor to determine if the work can be successfully performed. Make or buy decisions. These decisions are associated with whether or not the buying organization should make the required goods internally using available capacity and ability or to purchase goods and services externally. Cost, capability, and security issues are considered when mak-ing these decisions. The advantages and disadvantages of making or buying goods and services is an important part of the plan procurements process. Rent vs. lease analysis. This analysis is used to deter-mine the break - even point in terms of cost. The project manager considers the best, most cost effective option based on the time an item is needed and the cost of each option. This is generally associated with the make or buy decision process. Bidder conference. This is an important activity in the procurement process. In the Conduct Procurements proc-ess, the bidder conference is a technique used to ensure that there is a level playing fi eld for potential contractors.

c12.indd 228c12.indd 228 2/23/09 6:22:08 PM2/23/09 6:22:08 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 245: Bringing The PMBOK Guide to Life

Procurement Management 229

This process includes the scheduling of a question - and - answer session about the project and provides the bid-ders with additional information that may be needed in their decision process. Negotiation. There are many tactics used for negotia-tion. In the project environment, the negotiation should be focused on a partnership arrangement where both sides can maximize the outcome to meet their needs. Location of the negotiation and the environment are critical ele-ments. Consider the needs of each party when scheduling a negotiation meeting. The hygiene issues such as room size, table shape, location, and positioning of each partici-pant are considered to be important to successful negotia-tion. Understanding the opposing viewpoint, using confl ict management, and including problem solving strategies, is very important during negotiation. Consider the mini-mums that will be accepted or the maximum that will be offered when developing a strategy. Remember that fair and reasonable negotiation is expected. Weighting system. This technique is used to select a seller. Sellers are scored using various criteria, generally established by the buying organization ’ s management, such as on - time performance, previous performance or track record, fi nancial stability, quality, and cost. A weighting factor is used for each specifi c criteria. The seller is scored using the criteria, and then the weight-ing factor is multiplied with the score to determine a fi nalized score. This process provides a more balanced approach to seller selection. Screening. This process is used to ensure minimum qualifi cations of the seller. Failure to demonstrate the

c12.indd 229c12.indd 229 2/23/09 6:22:08 PM2/23/09 6:22:08 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 246: Bringing The PMBOK Guide to Life

230 Rapid Knowledge Development (RKD) for Project Managers

minimum qualifi cations will eliminate the seller from further involvement in the selection process. Special terms and conditions. Pay special attention to penalty clauses. Failure to meet an agreed upon deliverable or achieve objectives on time may result in fi nes payable to the buyer. A clause for liquidated damages might say that failure to complete the project on time may result in pay-ment to the buyer for lost revenue. A force majeure clause covers acts of God, strikes, and terrorism, for example. Incentives. Contracts may have provisions that will provide incentives to the buyer and the seller. An exam-ple is a fi xed price plus incentive (FFPI). In these con-tracts, a sharing ratio is established between the buyer and seller that will provide some type of monetary incen-tive to keep costs down and to complete the project early. Termination for convenience. The buyer decides there is no longer a need for the product or service. There will gen-erally be some contractual requirement for the buyer to pay for work completed, and these conditions will be expressed specifi cally in the terms and conditions of the contract. Termination due to default. The failure of the con-tractor to provide a satisfactory deliverable may result in a decision by the buyer to end the contract and seek an alternative supplier. Administrative changes. These are records only type changes and do not affect the actual work of the project. This might include a change of billing address or change of account from which funding is obtained. Constructive change. This type of change actually impacts the project work. An example would be customer - supplied equipment or property that is not available on the date scheduled. This situation usually requires replanning

c12.indd 230c12.indd 230 2/23/09 6:22:08 PM2/23/09 6:22:08 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 247: Bringing The PMBOK Guide to Life

Procurement Management 231

and changes to the work schedule and other activities. Additional costs may result from constructive changes, and schedule negotiation may be necessary. A change process is usually included in the contract conditions. Project reviews. Regular assessment of project progress. These reviews include procurement audits where the buyer assesses the work performed by the seller and the resulting deliverables. A fi nal review is also schedule upon project completion to ensure that all contractual deliverables have been completed and provided. Contract closure. Bringing the project to an organized close. This may include the preparation of a punch list— a list of items that has been generated by the buyer and documents any items that have not been produced satis-factorily by the seller. These items must be resolved before closure can be completed. Project closure also includes verifi cation of contracted deliverables, formal acceptance and sign - off, a post - project review, fi nal contract reviews, and, when appropriate, a team recognition event.

This summary of the nine knowledge areas is not meant to be a 100 percent complete listing of every item necessary to plan a project successfully. The list is designed to provide a quick ref-erence of key items associated with the PMBOK ® Guide.

An approach that works well when studying for the PMP exam or to just gain additional knowledge about project manage-ment is to review the overview charts of each knowledge area in the PMBOK ® Guide . These overview charts actually provide a very thorough listing of the things project managers and project teams should be aware of. Regularly reviewing these overview charts will increase your ability to plan effectively and to deter-mine which inputs, tools and techniques, and outputs will be needed in the particular project to which you are assigned.

c12.indd 231c12.indd 231 2/23/09 6:22:08 PM2/23/09 6:22:08 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 248: Bringing The PMBOK Guide to Life

c12.indd 232c12.indd 232 2/23/09 6:22:09 PM2/23/09 6:22:09 PM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 249: Bringing The PMBOK Guide to Life

Chapter Thirteen

Bringing the PMBOK ® Guide to Life

Through Templates

The PMBOK ® Guide is a great resource for developing tem-plates. The lists, descriptions, and explanations in the PMBOK ® Guide, along with some project management knowledge and some creativity, will assist in producing customized templates for most projects and for many of the start - up deliverables asso-ciated with a well - defi ned and established project management offi ce.

As an example, if there is a need to precisely defi ne enter-prise environmental factors (the higher level and unique fac-tors internal or external to an organization that may impact how the organization is managed) for planning purposes, a table can be created. The following table shows that each item can be described in the detail required to meet the needs of the organization. These factors will vary by organization, and it is a good practice to take the time to identify and review each factor and determine how each factor may affect the project planning process.

233

c13.indd 233c13.indd 233 2/23/09 10:41:39 AM2/23/09 10:41:39 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 250: Bringing The PMBOK Guide to Life

234 Bringing the PMBOK ® Guide to Life Through Templates

Enterprise Environmental Factors Planning Template Factor Description

Organizational culture Describe the high - level culture of the organization. How is the organization structured? What are the key items the team should be aware of? Describe the typical management style, openness of communication, trust, and infl uence of the government. Analyze the culture of each business unit and determine how the business units interact with each other. As an example consider how an engineer-ing unit communicates and works with a sales or marketing department.

Government or indus-try standards

Identify the specifi c standards that may be associated with the project: electrical, regulatory, quality, tooling, metric, SAE, materials precision requirements, voltage, methods etc.

Infrastructure Defi nition — The architectural elements, organizational support, corporate stand-ards, methodology, data, processes, and physical hardware/network, etc.

How well does the current infrastruc-ture support project efforts? Where are the potential problems? What equip-ment is available? Determine the limita-tions of the infrastructure as well as the strengths.

Human resources What are the skills required for the project?

What is the availability of required project resources? What level of expertise exists?

How well are the people performing their work? Are there morale issues to consider?

c13.indd 234c13.indd 234 2/23/09 10:41:40 AM2/23/09 10:41:40 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 251: Bringing The PMBOK Guide to Life

Project Charter Template 235

Personnel administration

What is the process for obtaining project team resources? How will team members be assessed for performance? What is the hiring and employee termination process?

How is a reporting structure arranged? Who directly reports to whom?

Stakeholder risk tolerance

Describe the general view of risk man-agement and dealing with risk within the organization. Is the organization risk averse, or does management encourage a high degree of risk taking?

Determine the nature of the organization in terms of tolerance to risk issues.

PROJECT CHARTER TEMPLATE

Using the PMBOK ® Guide description of a project charter, create an outline that will defi ne, at a high level, the intended purpose of the project, the risks, and key planning elements of the project. The charter is usually the fi rst step in the planning process and provides the authority to engage organizational resources. The following table shows the typical elements of a charter.

Project Charter Template Project name

Business need

Product or service description

Project justifi cation. What is the rationale for approving the project?

Project manager assigned. Name, location, contact information, background, and experience (as needed).

Milestones (contractual milestones or executive agreements). The use and purpose of a project charter will vary. In many cases a con-tract is agreed upon that generates the preparation and release of a charter. In some organizations, the charter and the contract are considered to be the same document.

c13.indd 235c13.indd 235 2/23/09 10:41:40 AM2/23/09 10:41:40 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 252: Bringing The PMBOK Guide to Life

236 Bringing the PMBOK ® Guide to Life Through Templates

Stakeholders and infl uences. Who are the key players and why are they involved?

Functional organizations and business units involved. This helps to prepare the organization regarding resource needs.

Assumptions. Organizational, Environmental and external. Assumptions are defi ned as those items that can be considered true, real, or certain for planning purposes.

Examples:

The organization will provide the required funding for the project.

The organization has the resources capable of completing the project work.

Suffi cient time will be available to complete the project successfully.

Constraints. Organizational, environmental, and external. What are the known limitations? Examples:

Organizational resource limitations

Available funding

Contractual milestones

Reference to the business case that supports the selection and jus-tifi cation of the project. This section can be used to describe some of the key items in the business case that resulted in the approval of the project.

Summary budget (high - level estimates). This estimate is generally an order of magnitude estimate and must be further developed dur-ing the planning process.

Approvals and Authorizations. Who will sign and approve the project and authorize the use of organizational resources?

CHECKLIST FOR MANAGING PROJECTS

Checklists are a great tool for making sure that important items have not been omitted. The PMBOK ® Guide is actually a great checklist for a project. A review of the fi ve process groups

c13.indd 236c13.indd 236 2/23/09 10:41:40 AM2/23/09 10:41:40 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 253: Bringing The PMBOK Guide to Life

Checklist for Managing Projects 237

and overview charts for each knowledge area can provide a well - developed project planning checklist.

Create a project planning checklist by referencing the components of the PMBOK ® Guide . Customize the checklist based on your organization ’ s project management maturity. The details of the checklists will depend on the type and com-plexity of the project. The idea behind a checklist is to help to minimize the omission of critical items. A basic rule to follow is that a checklist should never be considered to be 100 per-cent complete. There is always something that can be added or improved.

Sample Project Planning Checklist

A clear, concise project charter defi ning the project has been prepared. A stakeholder analysis has been completed (defi nes who the stakeholders are including key stakeholders and their level of infl uence). Performance objectives using SMART criteria have been written (Specifi c, Measurable, Attainable, Realistic, Time based). A project scope statement clearly defi ning the bounda-ries and constraints has been developed. A project kick - off meeting has been scheduled and completed. A work breakdown structure (WBS) has been developed to the required level of detail. Deliverables have been identifi ed by phase and at the project level. Roles and responsibilities have been defi ned using a RAM (Responsibility Assignment Matrix or RACI chart (Responsible, Accountable, Consult, Inform).

c13.indd 237c13.indd 237 2/23/09 10:41:40 AM2/23/09 10:41:40 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 254: Bringing The PMBOK Guide to Life

238 Bringing the PMBOK ® Guide to Life Through Templates

A network diagram has been developed to ensure logi-cal dependencies have been defi ned. A project schedule has been prepared. A project budget has been prepared using reliable esti-mating techniques and data. A risk management plan or process has been estab-lished for the project. Project activity durations do not exceed the 80 hour (or 40 hour) rule. Mutually agreed upon monitoring and control proce-dures have been established. A plan for integrating all project components has been established. A change control process has been developed and communicated. The necessary subsidiary plans have been developed – change control, communications, quality management, safety, cut - over, etc. Expectations have been defi ned and documented for each stakeholder. Acceptance criteria for the project deliverables has been clearly defi ned. A recognition plan has been established for the team. (celebration of successes is a key factor in sustaining team performance).

PROJECT REVIEW OR HEALTH CHECK

Regardless of project type or complexity, it is important to con-duct project reviews on a regular basis. A basic rule is to conduct a review at the end of each project phase. A template for a project review can be developed by defi ning the project life cycle clearly,

c13.indd 238c13.indd 238 2/23/09 10:41:40 AM2/23/09 10:41:40 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 255: Bringing The PMBOK Guide to Life

Project Review or Health Check 239

specifying the deliverables associated with each phase, identify-ing any contractual agreements, and comparing project perform-ance with existing organizational standards.

Project Name: Project Review or Health CheckSCORING FACTORS – 4 = Strongly Disagree

– 2 = Disagree

0 = Neutral 2 = Agree 4 = Strongly Agree

No. Question Score:

1. A well organized and sound business case supporting the need for the project has been developed and approved.

2. The project is clearly aligned with organizational strategy.

3. Senior management support has been commu-nicated and is clearly visible for the project.

4. The objectives of the project are well defi ned using SMART criteria and have been documented and communicated to all project stakeholders.

5. The main project deliverable has been defi ned and a clear set of deliverables have been iden-tifi ed for each phase of the project.

6. The customer has participated in the project planning process, reviewed the project plans, understands his or her assigned tasks and has accepted responsibility for the assigned tasks assigned to the.

7. The customer has formally agreed to the scope of the project and has signed off on the plan. (Specifi c Project boundaries have been established to minimize scope creep and substantial change.)

8. Critical success factors, expectations, and performance measurement processes have been identifi ed and agreed with the key stakeholders and the customer.

c13.indd 239c13.indd 239 2/23/09 10:41:41 AM2/23/09 10:41:41 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 256: Bringing The PMBOK Guide to Life

240 Bringing the PMBOK ® Guide to Life Through Templates

– 4 = Strongly Disagree

– 2 = Disagree

0 = Neutral 2 = Agree 4 = Strongly Agree

No. Question Score:

9. An escalation process has been established and communicated to all key stakeholders to ensure proper identifi cation and resolution of project issues.

10. A detailed project plan, including required subsidiary plans, has been developed with input from all key stakeholders.

11. Contractual milestones and critical terms and conditions, including penalty clauses have been described in the project plan.

12. Resource estimates have been carefully deter-mined to ensure that there are suffi cient resources available for each project phase through project completion.

13. Roles and responsibilities have been clearly assigned using a responsibility assignment matrix (RAM). Changes and updates in responsibility have been recorded on a regular basis.

14. All materials required for the project have been identifi ed and ordered to ensure availability when needed. A risk assessment has been completed to minimize potential risk events.

15. A risk management plan and risk register have been developed jointly with all key stakeholders to track project risks effectively.

16. A project communications plan has been developed and clearly defi nes the specifi c com-munications requirements of the project stake-holders including technology requirements and expectations regarding project status reports, format, and frequency of delivery.

c13.indd 240c13.indd 240 2/23/09 10:41:41 AM2/23/09 10:41:41 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 257: Bringing The PMBOK Guide to Life

Project Review or Health Check 241

17. A realistic project schedule has been developed using proven and effective planning tech-niques (reliable estimates, paralleling tasks, fast tracking, crashing use of experts).

18. Project success factors have been identifi ed and communicated to all key stakeholders (success criteria has been defi ned beyond on time, within budget, and according to specifi cations.

19. Project status meetings are conducted on a regular basis using a standard process for meeting control – agenda, time limitations, meeting minutes distribution.

20. A quality assurance process is in place to verify correctness and completeness of each project deliverable.

21. A project team recognition plan has been established to ensure continued high performance.

Score

Project Health Check – Scoring Criteria Score Probability

of Success Action Required

– 84 to – 42 Project suc-cess is e unlikely; there are signifi cant issues and risk situa-tions that require immediate attention.

Identify and Analyze all issues and risk areas. Escalate issues that require executive attention. Obtain suggestions from peers and others who may have experience with the identifi ed issues. Prioritize the major issues and identify root causes. Prepare a report for project execu-tives, explain the issues and a plan for recovery .

c13.indd 241c13.indd 241 2/23/09 10:41:42 AM2/23/09 10:41:42 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 258: Bringing The PMBOK Guide to Life

242 Bringing the PMBOK ® Guide to Life Through Templates

Score Probability of Success

Action Required

> – 42 to –0 Low There is signifi cant uncertainty about this project. Important information may not be available or has not been discussed. Assess each low scored item and develop a specifi c response. Identify areas of strength and con-fi dence to communicate these items to the project team. Develop plans to address weak areas and threats.

> 0 to 42 Moderate Project performance can be improved. Identify and assess risks associated with each item that received a low score determine the appropriate response, obtain input and support from the project team or functional units, and communicate the condi-tion of the project to the sponsor and project team.

> 42 to –84 High The project manager has established a strong cohesive team, a well organ-ized plan is in place, project status is reported in a timely manner and with effi ciency. Continue to monitor the project, schedule recognition events for the team to maintain morale, discuss opportunities for continuous improve-ment, ensure that the project sponsor is aware of the project condition.

PROJECT SCOPE STATEMENT

A project scope statement is a critical element of the project planning process. The PMBOK ® Guide provides a detailed list of the key elements of a project scope statement. A template

c13.indd 242c13.indd 242 2/23/09 10:41:42 AM2/23/09 10:41:42 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 259: Bringing The PMBOK Guide to Life

Project Scope Statement 243

can be developed for use by the project team, project manager, or the specifi c person or group designated and assigned to write the scope statement, The scope statement, as a general rule, should be a document that clearly defi nes the project in suffi -cient detail, and provides the basis for more complete planning of the project. The scope statement is not a plan, but it is essen-tial in the planning process.

Project Scope Statement Example Project Name: Project Start Date: Project Manager: Customer / Client: Project Sponsor:

Executive Summary is a brief description of the project. This information may be obtained from the project charter.

Executive Summary Project Objectives: Measurable success criteria. (What must be accomplished? When? What is the cost?)

Examples: Deliver system, train end users, distribute software, deploy new methodology, build new test lab.

Use endpoint words: train, distribute, increase, reduce, organize.

Product scope defi nition: Specifi c characteristics of the product that the project was initiated to produce. (What will be produced? Features, functionality, physical character-istics. Provide information about the amount of work that will be required.

c13.indd 243c13.indd 243 2/23/09 10:41:42 AM2/23/09 10:41:42 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 260: Bringing The PMBOK Guide to Life

244 Bringing the PMBOK ® Guide to Life Through Templates

Project requirements. Who will be involved in the project? Who will receive the deliverables or fi nal product?

(Needs of the stakeholders, conditions that must be met, capabilities required to meet a contractual specifi cation.) In this context, the project require-ments are those items needed by the team to deliver the fi nal product. Requirements may include—ability to report project resource time, ability to track project budget, training pro-grams for the team, appropriate tools and equipment, and support systems .

Project boundaries. What is included in the project and what is excluded from the project? These are not constraints or limitations. Project boundaries are those items that will be produced as a result of the project. Items not included in the scope of the project may be described in the project documentation to clarify the project scope of work and mini-mize the possibility of miscommuni-cation and misinterpretation.

Project deliverables. The product or products that will be produced and other ancillary items such as reports and documentation. Defi ne or explain the fi nal product or products of the project.

(These are the tangible items that will be produced.) Examples: a new system with all peripherals, a book, and training course with all support-ing materials .

c13.indd 244c13.indd 244 2/23/09 10:41:43 AM2/23/09 10:41:43 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 261: Bringing The PMBOK Guide to Life

Project Scope Statement 245

Product acceptance criteria. (What specifi cally must be provided for the intended customer to accept the product?) The process for accepting project deliverables. This may include the desired quality of the product, appearance, packaging, functionality, ease of use, availability, maintainability, and others.

Project constraints. Examples of constraints include Budget limitations, schedule milestones, imposed dates, and agreed - upon contractual .

Project assumptions. Assumptions are those items that can be considered to be real, true, or certain for planning purposes. An assumption set may be provided during the project start up process. These assumptions should be reviewed and validated. Determine the potential risks and impact to the project if assumptions are found to be false or incorrect. Examples of assumptions:

Suffi cient resources will be available .

The project budget will be fully supported by management .

There will be suffi cient management support for the project.

Project organization.

How will the project staff and team be organized? Include Project team and other stakeholders.

c13.indd 245c13.indd 245 2/23/09 10:41:43 AM2/23/09 10:41:43 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 262: Bringing The PMBOK Guide to Life

246 Bringing the PMBOK ® Guide to Life Through Templates

Initial defi ned risks. Identify potential risk events that may impact planning and execution. Consider technical risks, environ-mental risks, staffi ng issues, resource capability, other projects in progress.

Project funding limitations. This is the total allowable amount authorized for the project. Identify differences between the amount of funding made available for the project and the actual amount that may be required .

Cost Estimate. This is the Initial cost estimate for the project that is pre-pared prior to detailed planning.

Project confi guration management requirements. These are the change control processes that will be imple-mented through the project life cycle to manage product characteristics (size, features, functions).

Project Specifi cations – The com-pliance requirements associated with the product to be delivered. Examples: certifi cations, contractual testing specifi cations, safety testing.

Approval requirements. Processes for approval of project objectives, deliv-erables, documents, work results. The conditions that must be met to obtain approval, including testing, reviews and who is authorized to approve project related work.

c13.indd 246c13.indd 246 2/23/09 10:41:43 AM2/23/09 10:41:43 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 263: Bringing The PMBOK Guide to Life

PROJECT JEOPARDY REPORT — REPORTING THE “ TROUBLED PROJECT ”

Occasionally, projects become troubled . This means that things did not go according to plan, there is a slippage in schedule, an overrun of the budget, or some unplanned situation has devel-oped that requires immediate attention by executive manage-ment or sponsors. Part of the monitoring and control process that is usually communicated at the start of the project includes developing some type of escalation plan or process for involving management when problems arise. A project jeopardy report can be developed to facilitate the process. This form is especially useful in the virtual project environment. Again, the PMBOK ® Guide provides the foundation for developing a process to iden-tify and resolve project problem situations.

Managing Projects in Trouble

The project manager at team should have a plan in place to manage projects that deviate from approved plans. A project jeopardy reporting process is useful in managing the communi-cation and escalation of project issues.

Jeopardy is defi ned as follows, based on how the situation affects the project. Generally, there are different levels of severity:

Level 1 jeopardy. The project due date is in immediate danger. A signifi cant problem exists.

Level 2 jeopardy. The project due date may be impacted. This type of jeopardy frequently is elevated to level.1

Commitment jeopardy. A noncritical task may not be completed as planned. The project due date is not affected (at this time).

Project Jeopardy Report—Reporting 247

c13.indd 247c13.indd 247 2/23/09 10:41:47 AM2/23/09 10:41:47 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 264: Bringing The PMBOK Guide to Life

248 Bringing the PMBOK ® Guide to Life Through Templates

Sample Jeopardy Report

Project name: Project manager: Project sponsor: Brief project description: Report Submitted by: Description of jeopardy item: Action required to relieve or resolve the jeopardy: Ramifi cation if the jeopardy situation is not relieved:

Required response date: ____________________________________ Person responsible and organization: ________________________

Responsible 3 rd level mgr.: Telephone: Responsible 2 nd level mgr.: Telephone: Project manager: Telephone:

When you distribute the report, include only those stakehold-ers who have a need to know about the project jeopardy situ-ation or will be involved in resolving the issue. Minimize the distribution to avoid involvement by unneeded parties.

c13.indd 248c13.indd 248 2/23/09 10:41:48 AM2/23/09 10:41:48 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 265: Bringing The PMBOK Guide to Life

Closure Work Breakdown Structure 249

CLOSURE WORK BREAKDOWN STRUCTURE

Closing a project can be a project in itself. A WBS can be devel-oped and added to the project plan to ensure a smooth and well - managed transition from the project environment to the operations environment. Review the inputs, tools and tech-niques, and outputs of the contract closure process in the PMBOK ® Guide and create a WBS that will guide the project team through to a successful project closeout.

Example Project Closure WBS

1.0 PROJECT CLOSURE 1.1 CONTRACTUAL

1.1.1 Internal Verify and validate completed project deliverables. Identify remaining deliverables. Close open change requests. Finalize project fi nancials. Identify certifi cation requirements. Close open work orders. Communicate closures. Obtain client punch list. Resolve client punch list. Prepare as - built drawings. Finalize as - built drawings. Resolve approved work - arounds. Clean up physical facilities. Hand back to client. Conduct post implementation review.

1.1.2 External Confi rm remaining deliverables with client. Obtain closure of open contract changes and

billing.

c13.indd 249c13.indd 249 2/23/09 10:41:48 AM2/23/09 10:41:48 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 266: Bringing The PMBOK Guide to Life

250 Bringing the PMBOK ® Guide to Life Through Templates

Obtain closure of open contractor work orders. Obtain closure of open change orders.

1.2 ORGANIZATIONAL 1.2.1 Technical

Critique system or hardware performance. Critique system or hardware technical effort.

1.3 ADMINISTRATIVE Identify physical facilities for disconnect or disposal. Dispose of or redeploy physical facilities/equipment. Complete and distribute project fi nancials and project

documentation. Provide project documentation to customer, sales, or serv-

ices organization. Provide training materials to client or receiving

organization.

PROJECT QUALITY PLAN OUTLINE

All projects should include a quality plan to ensure consist-ent levels of performance in each phase and to ensure accept-able completion of project deliverables. Quality plans will vary, depending of the culture of the organization, the type of product involved, and the general quality policy of an organization. Before developing a quality plan for the project, make sure the team is aware of and understands the quality policy that has been devel-oped and communicated by the leaders of the organization.

Quality Policy Example We, the employees of ______ (company or organization name), are committed to understand, meet and, when possible, exceed our Customer ’ s Requirements and expectations through the con-tinuous improvement of our processes. We are dedicated to deliv-ering defect - free products and services on - time at a competitive cost, and with customer satisfaction as our driving principle.

c13.indd 250c13.indd 250 2/23/09 10:41:48 AM2/23/09 10:41:48 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 267: Bringing The PMBOK Guide to Life

Quality Plan Outline 251

A project quality policy, based on the organization ’ s overarch-ing policy could be developed by the project team during the project start up or kickoff meeting. This establishes the impor-tance of delivering high quality products and creates a greater sense of overall pride and commitment to the project.

QUALITY PLAN OUTLINE

Customer—Provide the name of the main customer (Identify the individual or organization receiving the product.) Stakeholders—identify the key stakeholders? (Key stakeholders may also be considered customers if they will be receiving some type of deliverable during the project life cycle. The key stake-holders should be clearly documented and agreed upon.

Examples of Stakeholders: Product manager Technical planners SITE Managers Business unit – representatives End - users (users of the products and services) Project team members Project manager Sponsor Suppliers / vendors Customers

Document the expectations of the main customer (In terms of deliverables, performance, communications, service levels, etc.)

Examples of Customer Expectations: Transparency of service (no noticeable disruptions in operations) Minimal down time of systems Appropriate Training provided to users

••••••••••

••

c13.indd 251c13.indd 251 2/23/09 10:41:48 AM2/23/09 10:41:48 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 268: Bringing The PMBOK Guide to Life

252 Bringing the PMBOK ® Guide to Life Through Templates

No increase in “ normal ” volume of trouble reports Project completed on schedule Project manager and team maintains sensitivity to changing needs of the customer Back up or Contingency plans in place Regularly scheduled and effective status reports

How will the customer ’ s expectations be identifi ed and addressed?

Methods for defi ning Expectations: Conduct a needs analysis to identify concerns and criti-cal performance areas Defi ne and manage interface agreements between busi-ness entities Provide training in the use of quality processes Establish acceptance criteria for all deliverables End of phase reviews Walkthroughs and inspections

How will the project team measure quality and project success?

Examples of Measures: Service levels Error rate / defect rate Product sampling Security levels System response time Percent of defects Timeliness of corrective actions

Identify the key elements that could affect the quality of the project

Organizational — Environmental factors and process assets National — Quality norms at the national level (industry standards, benchmarks

•••

••

••••

•••••••

••

c13.indd 252c13.indd 252 2/23/09 10:41:48 AM2/23/09 10:41:48 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 269: Bringing The PMBOK Guide to Life

Risk Management 253

Regional — Quality norms at the regional or local level International — Customs, interpretation of quality, politi-cal issues Project quality goals — Specifi c project quality goals that will defi ne the success of the project:

100 percent customer satisfaction Continuous process improvement through lessons learned Reduction in failure rate Reduction in scrap and rework Reduction in setup time Manufacturing cycle time

RISK MANAGEMENT

Risk management is a critical factor in the pursuit of project success. There are many ways to identify potential project risks, and the PMBOK ® Guide can be a great source for developing templates that will assist in the identifi cation and management of project risks.

Project Risk Checklist Category Description Investigate

Yes No Requirements Are there any TBDs in the

specifi cations?

Are the external interfaces completely defi ned?

Do you and the client have the same understanding about features and functionality? Is a requirements management proc-ess in place?

Is a requirements change management plan in place?

••

••

••••

c13.indd 253c13.indd 253 2/23/09 10:41:49 AM2/23/09 10:41:49 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 270: Bringing The PMBOK Guide to Life

254 Bringing the PMBOK ® Guide to Life Through Templates

Category Description Investigate Design Are there phase overlaps or is fast

tracking applied?

Are design reviews scheduled in the project plan?

What are the potential design problems?

What could go wrong with the design?

What incompatibilities may exist?

Resources Are the required resources available?

Quantity Competency levels

••

Integration and Testing

What integration issues may create problems?

How well is the integration testing process defi ned?

What are the specifi c integration test requirements?

Does the team have the capability to perform the required tests?

Management Methods

Is the appropriate training available for the project team and end users?

What is the quality assurance process?

Are control procedures in place for changes?

Quality Is a quality plan in place?

Subcontractors and suppliers

How has each contractor been assessed for capability and fi nancial stability?

Technology What technology problems may be expected?

Interface with existing systems Legacy systems Inter - operability Ease of use Reliability

•••••

c13.indd 254c13.indd 254 2/23/09 10:41:49 AM2/23/09 10:41:49 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 271: Bringing The PMBOK Guide to Life

Proj

ect

Ris

k R

egis

ter

Tem

plat

e D

eliv

erab

le,

Ph

ase

or

Com

pon

ent

Pot

enti

al

Ris

k E

ven

ts

Impa

ct

Pro

b.

Ris

k R

atin

g R

easo

ns

For

Ris

ks

Urg

ency

R

espo

nse

or

C

oun

ter -

Mea

sure

s

Per

son

A

ssig

ned

S

tatu

s/F

inal

R

esol

uti

on

and

Dat

e

255

c13.indd 255c13.indd 255 2/23/09 10:41:49 AM2/23/09 10:41:49 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 272: Bringing The PMBOK Guide to Life

256 Bringing the PMBOK ® Guide to Life Through Templates

Establishing categories for risks facilitates the risk identifi -cation process and helps to create an ongoing and continuously developing list of risks that can help the project team respond to risk effectively and confi dently.

Source of Risk Template Risk Category Sources of Risk Technical — Evolving design, reliability, operability, maintainability

Physical properties of the prod-uct or system Changing requirements Material properties Unstable technology Unreliable testing methods for new technology Modeling system complexity Integration testing Design fl aws Safety issues due to untested technology

Program level and Organizational — Processes for obtaining resources.

Enterprise environmental fac-tors, Organizational process assets

Material availability Contractor stability Personnel availability Regulatory changes Personal skills Organizational process Security processes Communications processes

Supportability — ability to maintain systems

Operating procedures

Product reliability Training effectiveness System safety Documentation—quality and availability Technical data—quality and availability Interoperability Transportability

c13.indd 256c13.indd 256 2/23/09 10:41:50 AM2/23/09 10:41:50 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 273: Bringing The PMBOK Guide to Life

Risk Management 257

Cost — Limited budgets, effec-tiveness of estimating processes, project constraints

Administrative rates

Unplanned Overhead costs

Estimating errors

Cost of quality—cost of repairs and rework

Reliability of estimating resources

Schedule — Estimating processes, reliability of planning processes, methods and procedures

Estimating errors

Number of critical path items

Degree of Concurrency

Unrealistic schedule baseline

The PMBOK ® Guide is a great source for obtaining the information needed to develop project templates. The amount of detail included in a template depends on the project and the needs of the project stakeholders. Templates are useful tools and can signifi cantly improve the quality of the planning process and can accelerate project planning. Templates create excellent lessons - learned fi les and can always be improved. Virtually any item in the PMBOK ® Guide can be used to cre-ate a template. Just select the planning item needed for the project, make sure you understand why the item is needed and how it will be used as the plan is developed

Example: Monitoring and Control Template: Work Performance Measures

1. Schedule progress. 2. Deliverables produced to date. 3. Activities in progress. 4. Activities scheduled but not started. 5. Activities completed. 6. Level of quality achieved. 7. Costs planned and costs incurred. 8. Estimate to complete.

c13.indd 257c13.indd 257 2/23/09 10:41:50 AM2/23/09 10:41:50 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 274: Bringing The PMBOK Guide to Life

258 Bringing the PMBOK ® Guide to Life Through Templates

9. Percent complete—activity level, task level, summary task level, project level.

10. Resource utilization. 11. Project performance forecasts—Estimate at complete

(EAC).

Determine what you wish to accomplish, create an outline that provides a description of what is needed, determine the actions required to achieve the desired result, and you have a template.

Creating templates will broaden your knowledge of project management, facilitate the development of a well - organized and complete project plan, minimize confusion among project stake-holders, and create an excellent repository of information for the entire enterprise. Templates accelerate the planning process and will defi nitely help to bring the PMBOK ® Guide to life!

c13.indd 258c13.indd 258 2/23/09 10:41:50 AM2/23/09 10:41:50 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 275: Bringing The PMBOK Guide to Life

259

References

CHAPTER 1

Project Management Institute. A Guide to the Project Management Body of Knowledge . Newtown Square, PA: Project Management Institute, 1996.

Project Management Institute. A Guide to the Project Management Body of Knowledge, 2nd ed. Newtown Square, PA: Project Management Institute, 2000.

Project Management Institute. A Guide to the Project Management Body of Knowledge , 3rd ed. Newtown Square, PA: Project Management Institute, 2004.

CHAPTER 2

State of Texas Department of Information Resources. “ Project Charter. ” www.dir.state.tx.us/pubs/framework/gate1/projectcharter , accessed November 2008.

CHAPTER 4

Johnson, Jim, Karen D. Boucher, Kyle Connors, and James Robinson. “ Collaborating on Project Success. ” Softwaremag.com (February/March 2001). www.softwaremag.com/archive/2001feb/collabora-tivemgt.html , accessed October 2008.

Project Management Institute. A Guide to the Project Management Body of Knowledge , 3rd ed. Newtown Square, PA: Project Management Institute, 2004.

bref.indd 259bref.indd 259 2/23/09 10:32:53 AM2/23/09 10:32:53 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 276: Bringing The PMBOK Guide to Life

260 References

Wysocki, Robert, James P. Lewis, and Doug DeCarlo. The World Class Project Manager, New York: Perseus Publishing, 2001.

CHAPTER 5

Wysocki, Robert, James P. Lewis, and Doug DeCarlo. The World Class Project Manager . New York: Perseus Publishing, 2001.

Developing Performance Measures — A Systematic Approach.

CHAPTER 8

Kerzner, Harold. A Systems Approach to Planning, Scheduling, and Controlling . 9th ed. Hoboken, NJ: John Wiley & Sons, 2006.

CHAPTER 9

Kerzner, Harold. A Systems Approach to Planning, Scheduling, and Controlling . 9th ed. Hoboken, NJ: John Wiley & Sons, 2006.

Project Management Institute. A Guide to the Project Management Body of Knowledge , 3rd ed. Newtown Square, PA: Project Management Institute, 2004.

Martin, Paula, and Karen Tate. “ Team - Based Risk Assessment — Turning Naysayers and Saboteurs into Supporters. ” PM Network magazine (February 1998).

CHAPTER 10

DRM Associates and PD - Trak Solutions. “ New Product Development Body of Knowledge. ” www.npd-solutions.com/bok.html , accessed March 2008.

Project Management Institute. A Guide to the Project Management Body of Knowledge ® , 4th ed. Project Management Institute, 2008.

Martin, Paula, and Karen Tate. “ Team - Based Risk Assessment — Turning Naysayers and Saboteurs into Supporters. ” PM Network magazine (February 1998).

bref.indd 260bref.indd 260 2/23/09 10:32:54 AM2/23/09 10:32:54 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 277: Bringing The PMBOK Guide to Life

261

AAcceptance criteria, 42Acceptance of risk, 39, 224Accountability, 120Activities, 29

defi nition of, 182duration estimation for,

185–186resource estimation for, 184sequencing of, 183–184

Activity on the arrow (AOA), 188Actual cost, 198Actual cost of work

performed, 198Ad hoc approach, 12Administrative changes

( procurement), 230Administrative closure

( integration management), 175

The Aggressor role, 124Alpha risk, 203Analogous estimates, 185,

191, 192ANSI/PMI 99-001-2004.

See PMBOK® GuideAOA (activity on the arrow), 188Assumptions, 171–172, 216Audits, quality, 202Avoidance of risk, 38, 223

BBackward pass, 187, 189Benchmarking, 144, 201–202Best practices, 12, 165Beta risk, 203Bidder conference, 228–229Big picture view, 28, 44–48The Blocker role, 124Body of knowledge of project

management, xi–xii, 4–5compressed, 166–167connecting PMBOK® Guide

and, 166in project management life

cycle, 6Bottom-up estimating technique,

184, 192Brainstorming, 133, 222Break-even analysis, 197Budgeting, cost, 190Business risk, 218–219Business skills, 69

CCause and effect diagrams,

96, 204Challenged projects, 68Change control process,

105–118basic elements of, 107–108

Index

bindex.indd 261bindex.indd 261 2/23/09 10:32:11 AM2/23/09 10:32:11 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 278: Bringing The PMBOK Guide to Life

262 Index

Change control process (continued)

confi guration management in, 108

developing, 109–110in executing process, 41integrated, 98, 106, 108, 174in PMBOK® Guide, 154in Project Plan Accelerator,

114–118scope control in, 181steps in, 110–114

Change control team/board, 110, 174

Change management, 109–110, 194

Change management plan, 121Checklist for managing projects

template, 236–238The Clarifi er role, 125Client acceptance plan, 121Closing process, 13–14, 42–43Closure work breakdown

structure template, 249–250

Collaboration (in managing confl ict), 207–208

Common sense, 165Communications management,

xv, 212–218identifying stakeholders, 215information distribution,

216–217managing stakeholder

expectations, 217performance reporting,

217–218planning communications,

215–216possible areas for problems

in, 214in risk situations, 144

Communications requirements analysis, 215

Communications technology, 215Company culture, 70Compromise (in managing

confl ict), 207Confi guration management, 108,

174, 181Confl ict management, 123, 126,

207–208Constraints, 171. See also Triple

constraintConstructive change, 230–231Consumer’s risk, 203Continuous improvement, 200Contracts, 15, 170, 226–227Contract closure, 175, 231Control. See Change control

process; Monitoring and control process

Control charts, 202–204Control plans and processes,

37–38Corrective actions (integration

management), 173Cost baseline, 194Cost/benefi t analysis, 201Cost budgeting, 190, 194Cost control, 190, 194–195Cost estimating, 190–194Cost management, xiv,

190–199cost budgeting, 194cost control, 194–195cost estimating, 191–194earned value formulas, 198–

199formulas for, 196–197key terms associated with,

195–199main processes for, 190

Cost of quality, 193, 200, 202

bindex.indd 262bindex.indd 262 2/23/09 10:32:11 AM2/23/09 10:32:11 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 279: Bringing The PMBOK Guide to Life

Index 263

Cost plus fi xed fee contracts, 226Cost plus incentive fee

contracts, 227Cost plus percentage of cost

contracts, 227Cost variance, 198Covey, Stephen, 73CPM. See Critical path methodCrashing, 186Critical chain, 187Critical path, 189Critical path method (CPM),

186–187, 189Critical success factors (CSFs),

67. See also SuccessCrosby, Phillip B., 201CSFs (critical success factors),

67. See also SuccessCulture, 70Customer-supplier model, 9Cutover plan, 121CYA strategy, 141–144

DDaily project log, 143Decisions, about changes, 113Decision tree analysis, 139,

140, 222Decomposition, 179, 180,

182, 184Defect repair review, 204Deliverables, 8, 9, 29

in closing process, 42in integration

management, 175risks associated with, 132–133

Delphi technique, 133, 222Deming, W. Edwards, 200–201Dependencies, 183Design of experiments, 202Destructive team roles, 123–126The Devil’s Advocate role, 124

Direct costs, 197Disaster recovery planning, 130Disconnect plan, 121Discretionary dependencies, 183Documentation

of lessons learned, 108, 135procurement, 228in risk management, 144

The Dominator role, 124Dummy activities, 188

EEarned value management

(analysis), 173–174, 188, 198–199

Earned value measurement, 195Effi ciency measures, 7980/20 rule, 204Eisenhower, Dwight D., 59EMV (expected monetary value),

222–223The Encourager role, 125Endpoints, objectives as, 80Endpoint words, 80–81Enhancement of risk, 224Enterprise environmental

factors, 7, 70defi ned, 153as input, 15–16in integration

management, 171in PMBOK® Guide

discussion of processes, 155–156

template for, 233–235Environment, project, 151.

See also Enterprise environmental factors

Escalation plan, 121Escalation process, project

manager’s responsibility for, 120

bindex.indd 263bindex.indd 263 2/23/09 10:32:11 AM2/23/09 10:32:11 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 280: Bringing The PMBOK Guide to Life

264 Index

Estimation, 185of activity duration, 185–186of activity resources, 184cost, 190–194

Executing process, 13, 41–42Expected monetary value

(EMV), 222–223Expert judgment, 17–18Expert power, 206Exploitation of risk, 224External factor dependencies, 183

FFailed projects, 68Fast tracking, 186Feedback, from project team, 143FFP (fi rm fi xed price)

contracts, 226Financial investments, projects

as, 66Firm fi xed price (FFP)

contracts, 226Fishbone diagrams, 96, 204Fixed price incentive fee

contracts, 227Float, 187, 189Flowcharts, 204Flowcharting, 202Forcing (in managing

confl ict), 207Forecasting, 195Formal power, 206Forming (teams), 209Forward pass, 187, 189Functional organizations, 205Future value, 196

GThe Gate Keeper role, 125Goals, 11–12, 81, 82,

84–85Government standards, 70

A Guide to the Project Manage-ment Body of Knowledge. See PMBOK® Guide

HHard logic dependencies, 183The Harmonizer role, 125Herzberg, Frederick, 211Hierarchy of needs, 210–211Histograms, 204Historical records, in integration

management, 171Human resources, as enterprise

environmental factor, 70Human resource management,

xiv, 205–212motivation, 210–212organizational structure,

205–206risks in, 136team development, 209–210tools and techniques for,

207–209types of power, 206–207

Hurwitz criteria, 221

IImpact analysis, 106–107,

112–113Implementation plan, 121Incentives (procurement), 230Incremental estimates, 192Indirect costs, 197Industry standards, 70Information distribution, 216–217The Information Giver role, 125The Information Seeker role, 125Initiating process, 12–13, 32–36The Initiator role, 125Inputs, 6–8, 14–16, 78Inspections, quality, 203Insurable risk, 218

bindex.indd 264bindex.indd 264 2/23/09 10:32:12 AM2/23/09 10:32:12 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 281: Bringing The PMBOK Guide to Life

Index 265

Integrated change control, 98, 106, 108, 174

Integrationin change management,

106, 108PMBOK® Guide overview

chart for, 153in project management life

cycle, 6of subprocesses, 29–32through processes, 12–14,

163–164Integration management, xiv,

28, 167–175as key to success, 151as overarching knowledge

area, 169PMBOK® Guide chapter on,

152, 154terms/processes associated

with, 170–175Internal rate of return (IRR), 197Interpersonal skills, 69IRR (internal rate of return), 197ISO 9000/2000, 201

JJeopardy report template,

247–248Juran, Joseph M., 201

KKerzner, Harold, 123Key performance indicators

(KPIs), 67. See also SuccessKickoff meeting, 120, 126Knowledge areas, xiv–xv. See

also Body of knowledge of project management

inputs, tools and techniques, and outputs associated with, 9–10

integration of, 9, 10as parts of a system, 152in PMBOK® Guide, xiii–xiv,

4–5, 19, 27–28processes for integration of,

12–14in project management life

cycle, 6relationship of process groups

and, 163–164KPIs (key performance

indicators), 67. See also Suc-cess

LLeadership skills, 210–212Learning curves, 195–196Legitimate power, 206Lessons learned

for change control, 114documenting, 108, 135for methodologies and PMO, 61in monitoring and control

process, 97in review process, 43in risk management, 135–136

Letters of intent, 227Lewis, James P., 69Life cycle, project management, 6Life cycle costing, 193–194Listening, as greatest success

factor, 72–73Lump sum contracts, 226

MMcGregor, Douglas, 211Make or buy decisions, 228Management skills, 69–70, 151Management summaries, 143Managing stakeholder

expectations, 217Mandatory dependencies, 183

bindex.indd 265bindex.indd 265 2/23/09 10:32:12 AM2/23/09 10:32:12 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 282: Bringing The PMBOK Guide to Life

266 Index

Martin, Paula, 132Maslow, Abraham, 210Maslow’s hierarchy of needs,

210–211Master schedule, project

manager’s responsibility for, 120

Matrix organizations, 206Meetings, 120, 126Menninger, William, 65Methodologies, 2–3, 57–64

development of, 60–61in integration management, 173in Project Plan Accelerator,

62–64questions for needs analysis,

58–59tools and techniques for, 16–17

Mitigation of risk, 38, 224Mitigation plans, 143Monitoring and controlling

process group, 130Monitoring and control process,

13, 93–103for cost control, 190, 194–195process of, 94–99project manager’s responsibil-

ity for, 120, 121in Project Plan Accelerator,

99–103Monte Carlo simulations, 139, 223Motivation, 210–212Motorola, 201

NNapoleon, 59Needs analysis, 58–59Negotiation, 120, 209, 229Net present value, 196–197Network diagrams, 186–187New Product Development Body

of Knowledge, 166

Nominal group technique, 133, 222

Norming (teams), 210

OObjectives, 13, 80–82Ono, Dan, 165Operations, administration, and

maintenance plan, 121Opportunity cost, 197Organizational culture, 70Organizational process assets,

7, 153as input, 16in integration management, 171in PMBOK® Guide discussion

of processes, 156Organizational risk tolerances,

as enterprise environmental factor, 70

Organizational strategies, in integration management, 172

Organizational structure, 205–206Outcomes measures, 78Outputs, 8, 14, 18, 78Overview charts (in PMBOK®

Guide), 154–155, 191

PParametric estimates, 185, 192Pareto diagrams, 204Payback period, 197PDM. See Precedence

diagramming methodPeers, discussing projects

with, 143Penalty power, 206Performance measures, 77–91

characteristics of, 86defi ning, 83–85development of, 82–88effi ciency, 79

bindex.indd 266bindex.indd 266 2/23/09 10:32:12 AM2/23/09 10:32:12 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 283: Bringing The PMBOK Guide to Life

Index 267

examples of, 85–86input, 78outcome, 78output, 78and performance metrics,

87–88in Project Plan Accelerator,

88–91quality, 79and setting of objectives, 80–82

Performance metrics, 58, 87–88Performance reporting, 217–218Performing (teams), 210Personal skills, 69PERT (program evaluation

review technique), 190Planned value, 198Planning process, 13, 36–41,

49–50Planning process group, 130PMBOK® Guide, xii–xiii

communications management in, 212–218

cost management in, 190–199fourth edition, 168–170as framework for plans, 19human resource management

in, 205–212integration management in,

167–174knowledge areas in, xiii–xiv,

4–5, 27–28as planning tool, 157–161. See

also Project Plan Acceleratorprocesses, tools, and techniques

in, 5–10procurement management in,

224–231quality management in,

199–205risk management in, 219–224scope management in, 175–181

strategy for reading and using, 152–157

third edition, 168time management in, 181–190

PMBOK® orientation, xiii“PMBOK® Way,” 2PMI Way, 2PM Network magazine, 132PMO (project management

offi ce), 60–61PMP exam. See Project

Management Professional exam

Power, types of, 206–207PPA. See Project Plan

AcceleratorPrecedence diagramming method

(PDM), 183–184, 188Present value, 196Preventive actions, in integration

management, 173Preventive measures

(risk), 143Probability distributions, 223Probability/impact matrix,

133, 220Processes (process groups),

11–14, 29–32. See also Specifi c processes

ad hoc approach to, 12closing, 42–43executing, 41–42initiating, 32–36integration of, 9interactions among, 14planning, 36–41in PMBOK® Guide, 5–6relationship of knowledge

areas and, 163–164Process analysis, 202Procurement documents, 228

bindex.indd 267bindex.indd 267 2/23/09 10:32:13 AM2/23/09 10:32:13 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 284: Bringing The PMBOK Guide to Life

268 Index

Procurement management, xv, 224–231

contract types, 226–227processes in, 225tools and techniques of,

228–231Producer’s risk, 203Professional and social responsi-

bility domain, 217Programs, 10Program evaluation review

technique (PERT), 190Progressive elaboration, 13Projects, 10Project budget, 37, 121Project charter, 18, 34–36,

235–236Project closeout, 42–43Project environment, 151.

See also Enterprise environmental factors

Project interfaces, 208Projectized organizations, 206Project management

checklist template for, 236–238common sense in, 165general principles of, 3knowledge base for, 4. See also

Body of knowledge of project management

methodologies for, 17principles of, 10–11

Project Management (Harold Kerzner), 123

Project management information system, 17, 172–173

The Project Management Insti-tute, xii

Project management life cycle, 6Project management offi ce

(PMO), 60–61Project management plan, 173

Project Management Profession-al (PMP) exam, xii, xvi, 167

Project management skills, 69–70Project managers

as “general” managers, 70–71in ideal world vs. in practice,

28–29roles and responsibilities of,

120–123Project Plan Accelerator (PPA),

xvi, 20–26big picture in, 44–48change control process in,

114–118function of, 20–21methodologies in, 62–64monitoring and control in,

99–103performance measures in, 88–91and PMBOK® Guide as

planning tool, 157–161risk management in, 144–149roles and responsibilities in,

126–128success in, 73–75SWOT analysis in, 52–55

Project plansintegration of elements in, 164in monitoring and control

process, 94strategic plans vs., 11as unique, 165

Project reviews, 42, 43, 231for risk management, 144template for, 238–242

Project schedule, 37Project scope statement. See

Scope statementProject selection

in initiating process, 33–34in integration management, 171methods for, 16–17

bindex.indd 268bindex.indd 268 2/23/09 10:32:13 AM2/23/09 10:32:13 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 285: Bringing The PMBOK Guide to Life

Index 269

Project teamproject manager’s

responsibility for, 120in risk management planning,

131, 143roles and responsibilities of,

123–126Punch list, 42

QQualitative analysis, 219Quality assurance, 202Quality assurance plan, 121Quality control, 203–205Quality management, xiv,

199–205planning quality, 199–202quality assurance, 202quality control, 203–205

Quality measures, 79Quality planning, 199–202Quality plan template, 250–253

RRAM. See Responsibility

assignment matrixRamp-up/down time, 185Rapid knowledge development

(RKD), 163–231communications management,

212–218cost management, 190–199human resource management,

205–212integration management,

167–175procurement management,

224–231quality management, 199–205risk management, 219–224scope management, 175–181time management, 181–190

RBS (Risk Breakdown Structure), 136

Recognition, 13, 41, 43–44The Recognition Seeker role, 124Referent power, 206–207Rejected changes, 108, 112Rent vs. lease analysis, 228Requirements collection and

management, 177–178Reserve analysis, 193Resource calendar, 184Resource leveling, 188Resource pools, 184Responsibility assignment

matrix (RAM), 38, 39, 208project manager’s

responsibility for, 120team roles assigned through,

123Reviews. See Project reviewsReward and recognition events,

41, 43–44Reward power, 206Risk Breakdown Structure

(RBS), 136Risk categories, 136–138Risk management, xv, 129–149,

219–224basic process of, 132–134best strategy for, 131–132categories of risk, 136–138CYA strategy for, 141–144key elements of, 219–221lessons learned in, 135–136in Project Plan Accelerator,

144–149risk identifi cation process,

221–222risk response strategies,

223–224techniques used in, 139–141template for, 137–138, 253–258

bindex.indd 269bindex.indd 269 2/23/09 10:32:14 AM2/23/09 10:32:14 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 286: Bringing The PMBOK Guide to Life

270 Index

Risk management (continued)tools and techniques for,

222–223value of, 130–131

Risk management plan, 131Risk planning

in planning process, 38–41SWOT analysis in, 49

Risk ratings, 133–134Risk reduction process, 143Risk responses, 38–39Risk tolerances, 70, 221RKD. See Rapid knowledge

developmentRoles and responsibilities,

119–128assigning, 119–120obtaining agreement on, 119in planning process, 38of project manager, 120–123in Project Plan Accelerator,

126–128of project team, 123–126

Rolling wave planning, 182Run charts, 204

SSafety plan, 121Sandia National Laboratories, 83Scatter diagrams, 204Schedules

control of, 187–188development of, 186–187project manager’s

responsibility for, 120Schedule baseline, 187Schedule compression, 188Schedule performance index

(SPI), 199Schedule variance, 198Scope creep, 38Scope defi nition, 178–179

Scope management, xiv, 175–181

control of scope, 181defi nition of scope, 178–179process fl ow for, 7risks in, 136scope planning, 176–178verifi cation of scope, 180WBS creation, 179–180

Scope planning, 176–178Scope statement, 36–37, 179

objectives in, 80project manager’s

responsibility for, 120template for, 242–246

Screening (procurement), 229–230

Sender-receiver model, 213Sensitivity analysis, 139Sharing of risk, 224Six Sigma, 201Slack, 187, 189SMART objectives, 81, 82Smoothing (in managing

confl ict), 207Soft logic dependencies, 183Special terms and conditions

(procurement), 230SPI (schedule performance

index), 199Sponsors, 110Staffi ng of projects, 208Stakeholders, 212

defi ned, 172identifying, 215managing expectations of, 217

Standards, 70Standard deviation, 223Standish Group, 67–68Statement of work, 15, 228Statistical sampling, 203Status reports, 143

bindex.indd 270bindex.indd 270 2/23/09 10:32:14 AM2/23/09 10:32:14 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 287: Bringing The PMBOK Guide to Life

Index 271

Storming (teams), 209–210Strategic planning, 11–12, 49Subprocesses, 29–32Subsidiary plans, 40–41, 121,

174–175Success, 65–75

customer-defi ned, 73defi nition of, 67factors in, 67–73, 151formula for, 19–20integration for, 151–152measuring, 71PMBOK® Guide as foundation

for, 20and project constraints, 65–66and project environment, 151in Project Plan Accelerator,

73–75Standish Group recipe for, 68–69

Sunk costs, 197Supportive team roles, 123,

125–126SWOT analysis, 49–55

example of, 50–52in Project Plan Accelerator,

52–55in risk management, 133, 222

Systems approach to project management, 152, 164

TTaguchi, Genichi, 202Task level planning, 182Tate. Karen, 132Team-based risk assessment,

132–134“Team Based Risk Assessment”

(Paula Martin and Karen Tate), 132

Team development, 209–210Templates, 233–258

charter, 235–236

checklist for managing projects, 236–238

closure work breakdown structure, 249–250

enterprise environmental factors, 233–235

jeopardy report, 247–248quality plan, 250–253reviews, 238–242risk management, 137–138,

253–258scope statement, 242–246

Termination due to default, 230Termination for convenience, 230Testing and acceptance plan, 121Testing skills, 70Theory of constraints, 187Theory X, 211Theory Y, 211Three point estimating, 185, 186Time management, xiv, 181–190

activity defi nition, 182activity duration estimating,

185–186activity resource estimation, 184activity sequencing, 183–184network diagram terms and

acronyms, 188–190risks in, 136schedule control, 187–188schedule development,

186–187Tools and techniques, 8, 16–18

for defi ning activities, 182in describing process

interactions, 14in PMBOK® Guide, 5–6

Top down estimates, 185The Topic Jumper role, 124Total quality management

(TQM), 201Training plan, 121

bindex.indd 271bindex.indd 271 2/23/09 10:32:14 AM2/23/09 10:32:14 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---

Page 288: Bringing The PMBOK Guide to Life

272 Index

Transfer of risk, 38, 39, 223Triple constraint, 65–66, 106,

164–165Two-boss syndrome, 206

UUncertainty, 219–220Unknowns, 220

VVariances, monitoring and

control of, 95–97Variance analysis, 181, 195Vendor bid analysis, 193Verifi cation of scope, 180

WWald criteria, 221WBS (work breakdown

structure), 37Weighted average estimates,

185–186Weighting system

( procurement), 229What-if scenarios, 143, 187, 188Withdrawal (in managing

confl ict), 207

The Withdrawer role, 124Work-arounds (for risk

situations), 143Work authorization system, 174Work breakdown structure

(WBS), 37in bottom-up estimating

technique, 184closure work breakdown

structure template, 249–250creating, 179–180decomposition of, 182project manager’s

responsibility for, 120Work breakdown structure

dictionary, 37Work packages, 182, 184Work performance information,

77–78, 175, 195Work time, recording, 144The World Class Project

Manager (Robert Wysocki and James P. Lewis), 69

Wysocki, Robert, 69

YYoung, Ralph R., 178

bindex.indd 272bindex.indd 272 2/23/09 10:32:15 AM2/23/09 10:32:15 AM

Copyright Wiley Provided by IHS under license with WILEY Licensee=PDVSA - Los Teques site 6/9986712011, User=RODRIGUEZ, ALVARO

Not for Resale, 09/08/2016 09:18:12 MDTNo reproduction or networking permitted without license from IHS

--``,`,,,,````,,,,,,,,`,,```,`,,-`-`,,`,,`,`,,`---