The first framing rails are fixed to the roof of Shed 10 at Shoreham Port Project Update: Installaion under way at Phase 1 – now fundraising for Phase 2! Join Brighton Energy Coop! We have several big community-owned solar projects in development. Members receive a 5% return on their in- vestment plus the potential for a 30% tax break on the amount invested. www.brightonenergy.org.uk

Upload: brighton-energy-coop

Post on 08-Mar-2016

217 views

Category:

Documents


1 download

DESCRIPTION

Brighton Energy Coop project update - 9th December 2013

TRANSCRIPT

Page 1: Brighton Energy Coop project update - 9th December 2013

The first framing rails are fixed to the roof of Shed 10 at Shoreham Port

Project Update: Installaion under way at Phase 1 – now

fundraising for Phase 2!

Join Brighton

Energy Coop!

We have several big

community-owned

solar projects in

development.

Members receive a

5% return on their in-

vestment plus the

potential for a 30%

tax break on the

amount invested.

www.brightonenergy.org.uk

Page 2: Brighton Energy Coop project update - 9th December 2013

Eventually the system will look like this, but first...

Project Update: Installaion under way at Phase 1 – now

fundraising for Phase 2!

Join Brighton

Energy Coop!

We have several big

community-owned

solar projects in

development.

Members receive a

5% return on their in-

vestment plus the

potential for a 30%

tax break on the

amount invested.

www.brightonenergy.org.uk

Page 3: Brighton Energy Coop project update - 9th December 2013

...the complete framing system is installed, composed of more than a mile of

framing rods.

Project Update: Installaion under way at Phase 1 – now

fundraising for Phase 2!

Join Brighton

Energy Coop!

We have several big

community-owned

solar projects in

development.

Members receive a

5% return on their in-

vestment plus the

potential for a 30%

tax break on the

amount invested.

www.brightonenergy.org.uk

Page 4: Brighton Energy Coop project update - 9th December 2013

Meanwhile, our Fronius inverters are installed, ready to switch the Direct Current

output of the solar panels to mains AC

Project Update: Installaion under way at Phase 1 – now

fundraising for Phase 2!

Join Brighton

Energy Coop!

We have several big

community-owned

solar projects in

development.

Members receive a

5% return on their in-

vestment plus the

potential for a 30%

tax break on the

amount invested.

www.brightonenergy.org.uk

Page 5: Brighton Energy Coop project update - 9th December 2013

Materials are hoisted onto the roof via a large cherry picker.

Project Update: Installaion under way at Phase 1 – now

fundraising for Phase 2!

Join Brighton

Energy Coop!

We have several big

community-owned

solar projects in

development.

Members receive a

5% return on their in-

vestment plus the

potential for a 30%

tax break on the

amount invested.

www.brightonenergy.org.uk

Page 6: Brighton Energy Coop project update - 9th December 2013

The cabling to connect panels to inverters - more than 6 miles of 4mm cable will be

used to connect all the panels together

Project Update: Installaion under way at Phase 1 – now

fundraising for Phase 2!

Join Brighton

Energy Coop!

We have several big

community-owned

solar projects in

development.

Members receive a

5% return on their in-

vestment plus the

potential for a 30%

tax break on the

amount invested.

www.brightonenergy.org.uk

Page 7: Brighton Energy Coop project update - 9th December 2013

MC4 connectors - these clip to the panels to harvest the solar electricty and send it

on its way to the inverters

Project Update: Installaion under way at Phase 1 – now

fundraising for Phase 2!

Join Brighton

Energy Coop!

We have several big

community-owned

solar projects in

development.

Members receive a

5% return on their in-

vestment plus the

potential for a 30%

tax break on the

amount invested.

www.brightonenergy.org.uk

Page 8: Brighton Energy Coop project update - 9th December 2013

Our installers stringing out the cabling across the framing system.

Project Update: Installaion under way at Phase 1 – now

fundraising for Phase 2!

Join Brighton

Energy Coop!

We have several big

community-owned

solar projects in

development.

Members receive a

5% return on their in-

vestment plus the

potential for a 30%

tax break on the

amount invested.

www.brightonenergy.org.uk

Page 9: Brighton Energy Coop project update - 9th December 2013

Cabling is then collected together in gutering systems, which draw together the

output of the panel and channel it off the roof

Project Update: Installaion under way at Phase 1 – now

fundraising for Phase 2!

Join Brighton

Energy Coop!

We have several big

community-owned

solar projects in

development.

Members receive a

5% return on their in-

vestment plus the

potential for a 30%

tax break on the

amount invested.

www.brightonenergy.org.uk

Page 10: Brighton Energy Coop project update - 9th December 2013

The gutering leads off two sides of the Shed, to two grid connecion points.

Project Update: Installaion under way at Phase 1 – now

fundraising for Phase 2!

Join Brighton

Energy Coop!

We have several big

community-owned

solar projects in

development.

Members receive a

5% return on their in-

vestment plus the

potential for a 30%

tax break on the

amount invested.

www.brightonenergy.org.uk

Page 11: Brighton Energy Coop project update - 9th December 2013

Next stage is the installaion of the panels, currently awaiing paiently by

the side of the Shed. Stay posted for more updates next week!

Project Update: Installaion under way at Phase 1 – now

fundraising for Phase 2!

Join Brighton

Energy Coop!

We have several big

community-owned

solar projects in

development.

Members receive a

5% return on their in-

vestment plus the

potential for a 30%

tax break on the

amount invested.

www.brightonenergy.org.uk