Brian D. Palmer 294 Pleasant Street, Marlborough, MA 01752 | 508.826.8864 | [email protected] Summary · Challenger space shuttle disaster sparked a career of breaking SW/HW products applying learning to improve product reliability. HW experience with a side of SW QA: experience in Design Verification & Test (DVT) to Manufacturing Environmental Stress Screening (ESS). Product experiences are vary from analog RF Communications satellite HW subsystems to enterprise digital data storage SW/HW system and IT infrastructure; Hands-on even when in Management roles. Skills & Abilities MANAGEMENT/LEADERSHIP · Recognizing and applying people’s true strengths & talents with proper placement is highly useful and where I have excelled as a manager. I have lead several teams at EMC (direct and cross functional) in 18 years including remote (Global) team members. · Maintained high employee satisfaction ratings even when restructurings changes have taken place. · QA is typically a grind of code regressions; fostering innovation and individual growth is always a complimentary focus of mine regarding my staff. · I have also managed/run test facilities, some sales/demos while providing clients with environmental tested expertise. TECHNICAL · Quality Assurance of SW/HW Data Storage Systems (EMC Corp/18 years) · Championed Fault Insertion techniques for resiliency checks of product redundancy and/or system recovery function/feature recovery. · Analog & Digital HW background; RF Communications design, development validation testing, Highly Accelerated Life Testing (HALT) for product reliability. · Applied “Accelerated Life” principles learned in QUALMARK below to help drive Developers to improve product in subsystem software & hardware, system, High Availability Data Center IT Solutions/features running applications in customer like environment. Experience ENGINEERING MANAGER | EMC CORPORATION | 03/98 – 03/16 · Worked to improve our Enterprise Data Storage System Availability from a 3’9s availability product to a 5’9s product · Developed 3-Data Center Lab for all EMC products to work together and push to 7’9s “Solution” Availability · Created EMC’s predictive availability methodology deriving a HA Infrastructure solution’s availability expectations for Customer Service and Engineering teams using small product sample size (millions saved) · Automated data recovery SW tools drastically improving tested coverage of these tools critical tools

Upload: brian-palmer

Post on 07-Jan-2017

17 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Brian D Palmer Resume 0817

‍‍Brian‍D.‍Palmer294‍Pleasant‍Street,‍Marlborough,‍MA‍01752 | 508.826.8864 | [email protected]

Summary· Challenger‍space‍shuttle‍disaster‍sparked‍a‍career‍of‍breaking‍SW/HW‍products‍applying‍learning‍to‍improve‍product‍reliability.‍

HW‍experience‍with‍a‍side‍of‍SW‍QA:‍experience‍in‍Design‍Verification‍&‍Test‍(DVT)‍to‍Manufacturing‍Environmental‍Stress‍Screening‍(ESS).‍Product‍experiences‍are‍vary‍from‍analog‍RF‍Communications‍satellite‍HW‍subsystems‍to‍enterprise‍digital‍data‍storage‍SW/HW‍system‍and‍IT‍infrastructure;‍Hands-on‍even‍when‍in‍Management‍roles.

Skills & AbilitiesMANAGEMENT/LEADERSHIP· Recognizing‍and‍applying‍people’s‍true‍strengths‍&‍talents‍with‍proper‍placement‍is‍highly‍useful‍and‍where‍I‍have‍excelled‍as‍a‍

manager.‍I‍have‍lead‍several‍teams‍at‍EMC‍(direct‍and‍cross‍functional)‍in‍18‍years‍including‍remote‍(Global)‍team‍members.‍‍· Maintained‍high‍employee‍satisfaction‍ratings‍even‍when‍restructurings‍changes‍have‍taken‍place.‍· QA‍is‍typically‍a‍grind‍of‍code‍regressions;‍fostering‍innovation‍and‍individual‍growth‍is‍always‍a‍complimentary‍focus‍of‍mine‍

regarding‍my‍staff.‍· I‍have‍also‍managed/run‍test‍facilities,‍some‍sales/demos‍while‍providing‍clients‍with‍environmental‍tested‍expertise.

TECHNICAL· Quality‍Assurance‍of‍SW/HW‍Data‍Storage‍Systems‍(EMC‍Corp/18‍years)‍· Championed‍Fault‍Insertion‍techniques‍for‍resiliency‍checks‍of‍product‍redundancy‍and/or‍system‍recovery‍function/feature‍

recovery.

· Analog‍&‍Digital‍HW‍background;‍RF‍Communications‍design,‍development‍validation‍testing,‍Highly‍Accelerated‍Life‍Testing‍(HALT)‍for‍product‍reliability.

· Applied‍“Accelerated‍Life”‍principles‍learned‍in‍QUALMARK‍below‍to‍help‍drive‍Developers‍to‍improve‍product‍in‍subsystem‍software‍&‍hardware,‍system,‍High‍Availability‍Data‍Center‍IT‍Solutions/features‍running‍applications‍in‍customer‍like‍environment.

Experience ENGINEERING MANAGER | EMC CORPORATION | 03/98 – 03/16· Worked‍to‍improve‍our‍Enterprise‍Data‍Storage‍System‍Availability‍from‍a‍3’9s‍availability‍product‍to‍a‍5’9s‍product‍· Developed‍3-Data‍Center‍Lab‍for‍all‍EMC‍products‍to‍work‍together‍and‍push‍to‍7’9s‍“Solution”‍Availability· Created‍EMC’s‍predictive‍availability‍methodology‍deriving‍a‍HA‍Infrastructure‍solution’s‍availability‍expectations‍for‍Customer‍

Service‍and‍Engineering‍teams‍using‍small‍product‍sample‍size‍(millions‍saved)· Automated‍data‍recovery‍SW‍tools‍drastically‍improving‍tested‍coverage‍of‍these‍tools‍critical‍tools· Thermal‍&‍Vibration‍DVT‍and‍MFG‍Production‍Stress‍Screen‍(ESS)‍profile‍design;‍Thermal‍airflow‍and‍thermal‍analysis,‍

tolerance‍and‍production‍efficiency/cost‍reductions‍efforts‍

TECHNICAL & FACLITIES MANAGER | QUALMARK CORPORATION | 03/94 – 03/98· Environmental‍Stress‍Chamber;‍Highly‍Accelerated‍Life‍Test‍(HALT)‍–‍Thermal‍and‍multi‍axis‍vibration‍stress‍testing· Develop‍product‍specific‍fixtures‍for‍clients‍visiting‍the‍facility‍to‍stress‍their‍product‍for‍exposing‍weaknesses· Exposed‍many‍useful‍issues‍for‍clients‍not‍easily‍seen‍in‍conventional‍testing‍-‍Recreated‍a‍number‍of‍product‍issues‍only‍seen‍in‍

the‍field‍-‍‍have‍used‍my‍skills‍to‍save‍corporations‍their‍Military‍contracts‍that‍were‍at‍risk.

OTHER EMPLOYERS: ARRAY TECHNOLOGY CORP/SEMFLEX INC/HUGHES AIRCRAFT, SPACE & COMM | 03/84 – 03/94

EducationBSEET | 02/84 | DEVRY INSTITUTE OF TECHNOLOGY, PHOENIX, ARIZONA