brent d brent a pierce - shell.co.uk · pdf filepierce infrastructure information entry...

2
Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021570 January 2015 KEY FACTS Block Approx distance to land Water Depth Hydrocarbons Produced Export Method Operated / Non-Operated 23/22a & 23/27a 265km (165 miles) East of Aberdeen 262ft (85m) Oil Oil offloaded from FPSO to tanker Operated Sector Central North Sea PIERCE PIERCE PIERCE The Haewene Brim is a purpose built, double hull Floating Production Storage and Offtake vessel (FPSO). Bluewater Energy Services are the duty holder of this facility. It is located in licence blocks 23/22a and 23/27a. The purpose of the FPSO is the extraction, processing, storage and offloading of crude oil from the Pierce North and South fields. The FPSO extracts crude oil via subsea wells, processes the crude and stores it in cargo tanks prior to offloading to a shuttle tanker. Produced gas is compressed and dried for gas reinjection. There is also a subsea tie-back being developed known as Brynhild - operated by Lundin Petroleum. The Field is located in the Norwegian sector of the North Sea. FULMAR GAS LINE TO FORTIES CATS (BP) SEAL HOWE NELSON SOUTH ANASURIA GUILLEMOT TEAL SOUTH TEAL COOK NELSON GOLDENEYE GANNET CURLEW CURLEW HAEWENE BRIM BITTERN TRITON SHEARWATER SCOTER ETAP STARLING MERGANSER SKUA EGRET HERON PIERCE

Upload: phungdat

Post on 06-Mar-2018

225 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: BRENT D BRENT A PIERCE - shell.co.uk · PDF filePIERCE INFRASTRUCTURE INFORMATION Entry Specification: Exit Specification: Outline details of Primary separation processing facilities:

Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021570 January 2015

KEY FACTS Block

Approx distance to land

Water Depth

Hydrocarbons Produced

Export Method

Operated / Non-Operated

23/22a & 23/27a

265km (165 miles) East of Aberdeen

262ft (85m)

Oil

Oil offloaded from FPSO to tanker

Operated

Sector Central North Sea

PIERCE

PIERCE

PIERCE The Haewene Brim is a purpose built, double hull Floating Production Storage and Offtake vessel (FPSO). Bluewater Energy Services are the duty holder of this facility. It is located in licence blocks 23/22a and 23/27a.

The purpose of the FPSO is the extraction, processing, storage and offloading of crude oil from the Pierce North and South fields. The FPSO extracts crude oil via subsea wells, processes the crude and stores it in cargo tanks prior to offloading to a shuttle tanker. Produced gas is compressed and dried for gas reinjection.

There is also a subsea tie-back being developed known as Brynhild - operated by Lundin Petroleum. The Field is located in the Norwegian sector of the North Sea.

FULMAR GAS LINETO FORTIES

CATS

(BP)

FLAG

S

SEA

L

INTERC

ON

NEC

TOR

BBLLA

NG

ELED

ST FERGUS

ABERDEEN

BRAEFOOT BAY

BACTON

STANLOW

TEESSIDE

ORKNEY ISLANDS

SHETLAND ISLANDS

SULLOM VOETERMINAL

DEN HELDER ASSEN

BERGEN

PARIS

LONDON

MOSSMORRAN

THE HAGUE

SEAN FIELD

INDE FIELD

SCHIEDAM

STAVANGER

GRIJPSKERK

LANGELO/NORG

EMMEN

ZEEBRUGGE

BALGZANDGREAT YARMOUTH

EASINGTON

HOWE

NELSON SOUTH

BRENT A

BRENT BBRENT C

BRENT D

ANASURIA

GUILLEMOTTEAL SOUTHTEALCOOK

NELSON

GOLDENEYE

GANNET

CURLEW

CURLEW

HAEWENE BRIM

BITTERN

TRITON

SHEARWATER

SCOTER

BARQUE

BRIGANTINECLIPPER

GALLEON

SKIFF

INDE

SEAN

LEMAN

CORVETTE

AMELAND

ETAP

CARAVEL

SHAMROCK

STARLING

MERGANSER

SKUA

EGRETHERON

KEY

PIERCE

Page 2: BRENT D BRENT A PIERCE - shell.co.uk · PDF filePIERCE INFRASTRUCTURE INFORMATION Entry Specification: Exit Specification: Outline details of Primary separation processing facilities:

PIERCE

INFRASTRUCTURE INFORMATION

Entry Specification:

Exit Specification:

Outline details of Primary separation processing facilities:

Outline details of gas treatment facilities:

Sweet crude oil and associated gas. 2 mol% CO2, H2S<5ppm.

Production Manifolds, Subsea flowlines, Crude oil heater. 1st and 2nd stage separation, test separator. 2 x 100% crude oil heaters, 3 x 50% crude oil export pumps.

BS&W: 0.5% Vol, Re-injection gas: 5000 psi, Water Injection: 95kbbls/d @ 5000 psi, oil storage 600 kbbls.

Production Manifolds, Subsea flowlines, Crude oil heater. 1st and 2nd stage separation, test separator. 2x 100% crude oil heaters, 3 x 50% crude oil export pumps.

HIGH LEVEL CAPACITY INFORMATION

>25% 5% to 25% <5%

The basic capacity information is portrayed by colour coded 'traffic lights' that reflect thresholds of availability over the next 5 years

Available Capacities

Pierce firm processing capacity available

Oil export capacity - 60kbbls/d

Gas compression capacity - 116MMscf/d

Gas export capacity - N/A

Gas lift capacity - N/A

Produced water handling capacity - 40kbbls/d

H2S removal capacity - N/A

Water injection capacity - 95kbbls/d

Comment

Dehydration capacity - 116 MMscf/d

2015 2016 2017 2018 2019

CONTACT INFORMATIONShell For further enquiries regarding the above please contact Charles Cole

+44 1224 88 2606 [email protected]

Last update: January 2015

Disclaimer: All the above information is provided by Shell U.K. Limited (for itself, and other Shell group companies including Enterprise Oil U.K. Limited);- In good faith and without any liability- Without warranty, implied or express to its accuracy or relevance of use to any other party- That in any agreement or arrangement with Shell U.K. Limited its use shall be “Subject to Contract” Shell U.K. Limited reserves the right to update and change the data at any time

Unknown

All gas currently injected or used for gas lift

For gas injection

Tanker loading, no export pipeline

All gas currently injected or used for gas lift

Ullage as % of system capacity