brent dev history
DESCRIPTION
HW reservoirTRANSCRIPT
-
The Brent Field.
Early development history.
Getting to understand the reservoir
-
Shetland Islands
-
1966-67 first seismic reconnaissance
-
Mar 1970Blocks released211/29potential 2 B bbl
-
West-East Section Through the Brent Oilfield
-
Logs from initial wellMay 1971
-
Initial interpretation from well 1
-
August 71
-
Brent Spar
-
Revised plan view of reservoir
-
Compositional gradientJuly 72
-
Simulation studyJan-June 73
-
After water injection and gas injection
-
Brent Reservoir Early 1975
-
Characteristics of Brent Development
-
Statistical Aspect of Formation Evaluation