Building Information Modeling
6 March 2008
Breakfast Seminar6 March 2008
Building Information Modeling
Alberto Cavallero AIA LEEDDesign PrincipalKlingStubbins
Douglas Palladino AIAPrincipalRTKL Associates Inc.
Ray Doyle PE LEEDEngineering Design Principal KlingStubbins
Alex ZolotovTechnical Lead, BIMClark Construction
Dirk HairePartnerHolland + Knight
2
Building Information Modeling
6 March 2008
DIVISION 1 – 3D Design Coordination
DIVISION 2 – Design Optimization
DIVISION 3 – Construction Implementation
DIVISION 4 – Long-Term Building Operation
3
Building Information Modeling
6 March 2008
DIVISION 1 – 3D Design Coordination
DIVISION 2 – Design Optimization
DIVISION 3 – Construction Implementation
DIVISION 4 – Long-Term Building Operation
Douglas Palladino AIAPrincipalRTKL Associates Inc.
Ray Doyle PE LEEDEngineering Design Principal KlingStubbins
Alex ZolotovTechnical Lead, BIMClark Construction
Dirk HairePartnerHolland + Knight
4
Building Information Modeling
6 March 2008
Division 1 – 3D Modeling and Coordination
The Master Builder Concept
5
Building Information Modeling
6 March 2008
DIVISION 1 – 3D Design Coordination
DIVISION 2 – Design Optimization
DIVISION 3 – Construction Implementation
DIVISION 4 – Long-Term Building Operation
Douglas Palladino AIAPrincipalRTKL Associates Inc.
Ray Doyle PE LEEDEngineering Design Principal KlingStubbins
Alex ZolotovTechnical Lead, BIMClark Construction
Dirk HairePartnerHolland + Knight
6
Building Information Modeling
6 March 2008
Project Time Line
`
Cost of C
hangeAbility to Change
Architect Effort
Architect Effort – BIM process
Division 2 – Design Optimization
7
Building Information Modeling
6 March 2008
DIVISION 1 – 3D Design Coordination
DIVISION 2 – Design Optimization
DIVISION 3 – Construction Implementation
DIVISION 4 – Long-Term Building Operation
Douglas Palladino AIAPrincipalRTKL Associates Inc.
Ray Doyle PE LEEDEngineering Design Principal KlingStubbins
Alex ZolotovTechnical Lead, BIMClark Construction
Dirk HairePartnerHolland + Knight
8
Building Information Modeling
6 March 2008
Division 3 – Construction Implementation
2D Info (Plans & Specs)3D Info
Component IntelligenceParametric Logic
BIM Team
2D Info3D
IntelligenceParametrics
Owner or Consultant
BIM-Based Team
Member
BIM-Based Team
Member
Defined by Team / Enabled by Software
Contractually Limited
9
Building Information Modeling
6 March 2008
DIVISION 1 – 3D Design Coordination
DIVISION 2 – Design Optimization
DIVISION 3 – Construction Implementation
DIVISION 4 – Long-Term Building Operation –the future of BIM
10
Building Information Modeling
6 March 2008
• Links to Computer-Aided Facility Management (CAFM) • Links to Building Automation Systems (BAS)
• Life Cycle Studies • Ease of Future Renovation
Project Time Line
`
Design & Construction Life of the Building
Division 4 – Long-Term Building Operation
13
Building Information Modeling
6 March 2008
DIVISION 1 – 3D Design Coordination
DIVISION 2 – Design Optimization
DIVISION 3 – Construction Implementation
Douglas Palladino AIAPrincipalRTKL Associates Inc.
Ray Doyle PE LEEDEngineering Design Principal KlingStubbins
Alex ZolotovTechnical Lead, BIMClark Construction
Dirk HairePartnerHolland + Knight
ENABLING INTEGRATED PRACTICE
11
Building Information Modeling
6 March 2008
ARCHITECT CONTRACTOR
OWNER
TRADITIONAL TEAM
RELATIONSHIPS
Implications – Contractual Relationships
SubsConsultants SubsConsultants
12
Building Information Modeling
6 March 2008
ARCHITECT CONTRACTOR
INTEGRATED PRACTICE
Implications – Contractual Relationships
SubsConsultants SubsConsultants
OWNER