bratislava - europa · bratislava . financing of innovative projects from the point of view of a...

15
SET-Plan conference 2016 Bratislava Financing of innovative projects from the point of view of a financial intermediary DG JRC side event: NER 300 - A funding programme for innovative low-carbon demonstration projects 30/11/2016

Upload: others

Post on 12-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

SET-Plan conference 2016

Bratislava

Financing of innovative projects from the point of view of a financial intermediary

DG JRC side event: NER 300 - A funding programme for innovative low-carbon demonstration projects

30/11/2016

Page 2: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

European Union’s long-term lending bank set up in 1958 by the Treaty of Rome

A not-for-profit, policy driven institution Shareholders: 28 EU Member States Largest supranational lender:

signatures in 2015 amounted to EUR 78bn (90% in EU) Supporting sound investments which foster EU policy goals

The European Investment Bank – The EU Bank Profile, Public policy goals and objectives

Growth and employment potential Knowledge economy Strategic transport (TEN-T) Competitive and secure energy Small and Medium Enterprises (SMEs) Urban renewal and regeneration (incl. health care)

Environmental sustainability Environmental protection Renewable Energy, Energy Efficiency Sustainable transport (urban, inter-urban)

Cohesion (primary, transversal) Climate action (primary, transversal)

2

Page 3: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

EIB and the Energy Sector Energy Sector Lending Review - Key Conclusions

Fully aligned with EU energy and climate policy

http://www.eib.org/infocentre/publications/all/eib-energy-lending-criteria.htm

3

Focus on low carbon technologies

Background broad range of technologies needed to meet long term climate goals technology and cost challenges investments in RDI needed to reduce costs important role of EU and MS in creating supportive policy environments

Specific EIB actions Increase commitments to energy projects under knowledge economy Develop risk sharing mechanisms with the EC on RDI projects Foster implementation of SET-Plan technologies in cooperation with the EC

Page 4: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

Economic value of renewable energy

CAP

/ O

&M

Fu

el

Mat

ure

RE C

ost (

EUR

/MW

h) R

&D

sup

port

Solar PV Off-shore wind Ocean

On-shore wind Hydro Biomass

CCGT Benchmark

Energy: Oil @ high USD/bbl

Current price of CO2

Long-run marginal cost

Higher CO2 + Security of supply EIB Benchmark for the EU

4

Page 5: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

Financial instruments managed by the EIB Own-resources lending activity

– Wide eligibility – Limited risk taking capacity

European Fund for Strategic Investments – Wide eligibility – Increased risk taking capacity (with important residual risk for EIB)

Connecting Europe Facility Debt Instrument – Eligibility limited to Projects of Common Interest, possibility to support new technologies

and cleaner transport. – Risk taking capacity +/- similar to EFSI’s

InnovFin – including EDP (Energy Demonstration Projects) – Limited eligibility for first-of-a-kind demonstration projects in the renewable energy, fuel

cells and sustainable hydrogen sectors – Higher risk taking capacity than EFSI and CEF, thanks to very high coverage by EU budget

5

Page 6: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

Typology of possible financial support vs risks/bankability

Degree of bankability of the targeted projects

Revenues cannot support initial

investment costs/debt

Bankability – limited

risks

Bankability – higher

risks

Too risky to attract financing at acceptable terms without high risk coverage

Grants

Investment grants,

operating grants

Repayable grants,

subsidised interest rates

EIB/EC Financial

instruments with high

risk coverage by EU

(InnovFin – EDP)

EIB own risk

lending

EFSI loans

or equity

Platforms combining EFSI or CEF with strong

FLP, managed by EIB/EC

EFSI Investment Platforms attracting

investors with an EFSI layer and a small

FLP, managed by a fund manager

Possible synergies with NER300 funds

6

Page 7: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

InnovFin Product Overview

7

Page 8: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

EIF

How does InnovFin Energy Demo Projects work?

Broad range of instruments (loans, guarantees)

EIB can only finance 50% of project costs

Comprehensive due diligence (legal, financial, technical, etc.)

EIB standard documentation under English or Luxembourgish law

Projects Direct Lending Up to EUR 75m

8

Page 9: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

Which projects can be supported?

Pre-commercial stage

Loan amount: min EUR 7.5m, max EUR 75m

Loan maturity: max 15 years

Currency: EUR and local currency

Eligible Projects

Renewable energy Fuel Cells, Hydrogen

9

Page 10: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

Eligibility criteria

http://www.eib.org/attachments/documents/innovfin_energy_demo_projects_flysheet_en.pdf

Renewable energy

Fuel Cells, Hydrogen

Innovativeness

Replicability

Readiness for demonstration at scale

Timeline (operation <= 4 years after accepted)

Prospects of bankability

Commitment

10

Page 11: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

Risk and pricing

EIB 100% risk

Implementation and

Performance Risk

Design, Construction and Early Operational

Phase

Operating Risks and Market Risks

Operating Phase

Leve

l of r

isk

Time

EU 95% FLP risk EIB 5% RRT risk

Guarantee release

FLP – First loss piece RRT – Residual risk tranche

11

Page 12: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

Technical and Financial Guarantee Release Tests

pre-agreed debt service cover ratios reached

competent advisor confirms

Evidence of project completion

Achievement of minimum technical

performance

Project is fully operational

1 2 3

12

Page 13: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

“Wave Roller” technology Near shore device installed on seabed Developed by a pioneering start-up company

located in Finland Operation site in Portugal with 100kW

prototype in operation Full scale will be 350-700kW

EIB loan (10 MEUR) to pre-revenue company

part finance of remaining development and first commercialization of the technology

Equity type transaction given project risks Disbursement in tranches linked to

company’s performance Repayment based on a revenue share

mechanism

Potential market capacity of ~200GW based on detailed coastline analysis

13

Page 14: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

Windfloat demo project

Floating offshore windfarm in Portugal (3 x 8 MW) Semi-submersible floating structure 20 km from shore Water depth 85-100 m Pilot installation, 2 MW (2011) EIB loan 25 MEUR (investment cost 104 MEUR) Benefits from an NER 300-grant (first round 2012) Success of this technology would open up a new vast

market

14

Estimate: 80% of offshore wind resource in the EU is in deep water

Page 15: Bratislava - Europa · Bratislava . Financing of innovative projects from the point of view of a financial intermediary. DG JRC side event: NER 300 - A funding programme for innovative

Thank you for your attention ! Roland Schulze Managerial Adviser - Low Carbon Energy Technology EIB - European Investment Bank Energy Department [email protected]

15