Braddock Rd/Pleasant Valley Rd Intersection Improvement Project UPC 103318 Request for Proposal Overview Pre-bid Conference Pre-bid Conference March 6, 2014 Amir Salahshoor, P.E., District Project Manager Bryan Stevenson, P.E., APD Project Manager

Upload: vuongthuy

Post on 12-Mar-2019

230 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Braddock Rd/Pleasant Valley Rd Intersection Improvement Projectp j

UPC 103318Request for Proposal Overview

Pre-bid ConferencePre-bid Conference March 6, 2014

Amir Salahshoor, P.E., District Project ManagerBryan Stevenson, P.E., APD Project Manager

Page 2: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Project Locationj

2

Page 3: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Introduction & Background

3

Page 4: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Project GoalsProject Goals

• Improve traffic safety and operations through design p y p g gyear 2020

• Minimize impacts to surrounding properties• Wetlands• 4f park lands

Agricultural Forestal District (Cox Farm)• Agricultural – Forestal District (Cox Farm)• Utilities• Right-of-wayRight of way

4

Page 5: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Project Description

• Construct a 100-foot ICD Roundabout Adj t li t t i i i i ht f• Adjust alignment to minimize right-of-way, environmental, utility, and maintenance of traffic impacts p

• Meets capacity needs through design year• Better safety performance than traffic signal• Reduced “footprint”• Reduce impacts to Conservation Easement in SE

QuadrantQuadrant

5

Page 6: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2.1.3 Design Exceptions and Waivers

• VDOT has not identified Design Exceptions (DE) or D i W i (DW) ( C l Pl )Design Waivers (DW) (per Conceptual Plans).

• Design Builder to eliminate or apply for the appropriate DE or DW.

• Preparation of such DE or DW and any information needed to support these documents is theneeded to support these documents is the responsibility of the Design Builder.

6

Page 7: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2.2 Roadway Design y g

• The Roadway information and major Design Criteria i d i h d i C i i T blare summarized in the design Criteria Table

(Attachment 2.2)

• Both Braddock Road and Pleasant Valley Road are classified as Urban Minor Arterials.classified as Urban Minor Arterials.

• Use GS-6 Design Standards• Use GS-6 Design Standards

• Construct a 100 foot ICD Roundabout7

• Construct a 100-foot ICD Roundabout

Page 8: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2.3 Environmental2.3 Environmental

2.3.1 Environmental Document - FHWA has approved the CE on January 31, 2014

2.3.2 Cultural Resources: No Effect2.3.2 Cultural Resources: No Effect

2.3.3 Section 4(f) Resources• The proposed Project includes use of land• The proposed Project includes use of land

from three Section 4(f) resources:Section 4(f) Resource Parcel No.( )Mountain Road District Park 003 Rock Hill District Park 004

8

Elklick Preserve 005

Page 9: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2.3 Environmental

Mountain Road District park

Agricultural & ForestalDistrict

Rock Hill District park

9Elklick Preserve

Page 10: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2.3 Environmental

• de minimis Impact Finding dated January 31, 2014 to the use of land protected by Section 4(f) legislation.p y ( ) g

• Minimization and mitigation measures negotiated with the Fairfax County Park Authority:• Providing Commercial Entrances for the planned

development of Mountain Road District (Parcel 003).

• Graded right-turn lane off EB Braddock Road.

• Design Builder shall perform the necessary drainage analysis to demonstrate the existing wetland in Rockanalysis to demonstrate the existing wetland in Rock Hill District Park (Parcel 004) are not adversely affected. Please refer to Part 2 of the RFP Document for more information

10

for more information.

Page 11: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2.3 Environmental

2.3.4 Agricultural and Forestal District (AFD)

• Cox Farm (Parcel 002) – RFP Plan is anticipated to require less than an acre of AFD property for conversion to transportation use.

• The Design-Builder should refer to the Technical Advisory for AFD Notice/Report to County Government in the RFP I f ti P k R i d if i t i t thInformation Package. Required if impact is greater than an acre

• The Design Builder is solely responsible for any costs or• The Design-Builder is solely responsible for any costs or schedule delays related to the AFD impacts exceeding one acre.

11

Page 12: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2.3 Environmental2.3.5 Water Quality Permits - The Design Builder will

obtain all necessary environmental clearances, permits.permits.– Wetland - VDOT has completed a wetlands

delineation of the Project area and has obtained a preliminary jurisdictional determination froma preliminary jurisdictional determination from the US Army Corp of Engineers dated October 7, 2013; the Design-Builder shall utilize this information to obtain required permits.

2.3.7 Hazardous Material – No potential for2.3.7 Hazardous Material No potential for hazardous materials within the project area.

2 3 9 Noise Mitigation Type III project and a Noise12

2.3.9 Noise Mitigation – Type III project and a Noise Study is not required.

Page 13: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2 5 Geotechnical2.5 Geotechnical

• Geotechnical Engineering Data Report (GDR)g g p ( )

• The Design-Builder shall:

• Validate Minimum Pavement Designs

• Design Temporary Pavement

• Perform Design-Level Geotechnical Investigation. AMRL Certification is required for labs performing soil tests

Ph t hi ll d t th i ti diti f ll• Photographically document the existing condition of all pavement within and adjacent to the project limits

• NOVA Materials Section support13

• NOVA Materials Section support

Page 14: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2.6 Hydraulics2.6 Hydraulics

• Design-Builder shall provide final Drainage Design

– Culverts, entrance pipes, open channels, storm sewers, adequate outfall analysis, etc.

– Erosion & Sediment Control – Section 2.6.2

Storm Water Management - Section 2 6 3– Storm Water Management - Section 2.6.3

– VSMP Permit may be required

14

Page 15: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2.6.1 Drainage

• Drainage Inventory – For Price Proposal, assume all existing pipes to be

plugged/abandoned and new pipes installed– Design Builder may investigate serviceability and

functionality by visual/video inspection– VDOT must approve restore vs. replace of damaged

pipesp p

• Backfill all abandoned pipes with flowable fill

15

Page 16: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

MOT/ Traffic Control

• 2.9.2 – Lane and Road Closure Restriction

• Design Builder shall follow the NOVA District Administrator Memo regarding Lane Closures dated March 2012.

• Detour Plans will be required for any proposed total road closure exceeding 20 minutes, and are g ,subject to VDOT review and approval as part of the Design Builder TMP.

16

Page 17: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

MOT/ Traffic Control

• 2.9.3 – Use Virginia State police

• Design Builder shall be responsible for coordination through VDOT for VSP services during Temporary Traffic operations involving g p y p glane closures, and any other operations as covered in Appendix C of the Virginia Work Area Protection ManualProtection Manual.

• VDOT shall be responsible for all costs incurred by VSP specific to the projectby VSP specific to the project.

17

Page 18: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2.11 Right of Way

• Fairfax County Park Authority is the owner of Parcel 003, 004 and 005.003, 004 and 005.

• VDOT shall be responsible for the acquisition costs for land and easements for all Parcels. VDOT shall be responsible for the acquisition services for land and easements to be acquired from Parcel 003, 004 and 005 Parcel.005 Parcel.

• All Parcels are partial takes as shown on RFP Conceptual Plans.

• Utility easements have not yet been identified or shown on the RFP Conceptual Plans.

18

Page 19: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2.11 Right of Way

19

Page 20: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2.11 Right of Way• The Design Builder shall not propose further

impacts to the remainder of Parcel 005.

• Parcel 005, in its entirety, is subject to a conservation easement held by the Fairfax County Board of SupervisorsBoard of Supervisors.

• To the extent this conservation easement is impacted by this Project, it may need to be replaced outside of the Project construction limits by agreement between Fairfax County Park Authorityagreement between Fairfax County Park Authority and the Board of Supervisors.

• If replacement is required the Design Builder will20

• If replacement is required, the Design Builder will not be responsible for facilitating the conservation easement’s reestablishment.

Page 21: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2.12 Utilities• Design-Builder responsible for relocation of all

utilities required for construction of project

• Numerous existing Multi-phased utility poles

• No additional time or money will be granted forNo additional time or money will be granted for delays due to utility relocation conflicts

• Known existing Utilities Owners (Plan Sheet 3):g ( )– Electric– Fiber Optic

T l h– Telephone– CATV– Other unidentified utilities?

21• Provide power supply to Lighting

Page 22: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2 12 Utilities2.12 Utilities

22

Page 23: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Contract DocumentsContract Documents

Five Parts:• Part 1 – Instructions for Offerors • Part 2 – Technical Requirements

• RFP Information Package• RFP Information Package • Part 3 – Lump Sum Agreement

• Exhibit 1 to Part 3• Part 4 – General Terms & Conditions • Part 5 – Division I Amendments

Note:Parts 3, 4 and 5 Template Documents, revised July 2013

23

• Not provided on CD with RFP Information Package• Download at www.virginiadot.org/business/design-build.asp

Page 24: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Updates to Project DocumentsUpdates to Project Documents

Since this project is Single Phase please monitor theSince this project is Single Phase, please monitor the APD RFP website for any addendums or additional information: http://www.virginiadot.org/business/request-for-p g g qproposals.asp

24

Page 25: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Part 1 – Instructions to OfferorsPart 1 – Instructions to Offerors

Introduction (Section 1.0)( )• Project Priorities –

• Cost - Best price for scope of work identified in RFP

• Estimated Contract Value - $2,500,000

Procurement Overview (Section 1.1)• Single-Phase Low-Bid

• Responsive Bidder with lowest Proposal Price within VDOT’s budget will be awarded the contract

• Bidders must meet minimal qualifications

25

Page 26: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Procurement Schedule & Project Milestones (Part 1, Section 2.4)

Pre-proposal Meeting 03/06/14Pre proposal Meeting 03/06/14RFP Questions Due to VDOT 03/20/14VDOT Response to Questions 04/01/14LOS/Price Proposal Due Date 04/24/14LOS/Price Proposal Due Date 04/24/14Open LOS/Price Proposals 04/28/14Notice of Intent to Award 05/05/14CTB A l/ N ti t A d 06/18/14CTB Approval/ Notice to Award 06/18/14Contract Execution 07/07/14Notice to Proceed 07/10/14Final Completion 05/04/16

26

Page 27: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Contents of Proposals (Part 1, Section 4.0)

• Letter of Submittal (Section 4.1)

• Attachments to the Letter of Submittal (Section 4.2)( )

• Price Proposal (Section 4.3)

• Post Notice of Intent to Award Submittals (Section 4.4)

27

Page 28: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Letter of Submittal (Part 1, Section 4.1)

• C-78-RFP -Acknowledgment of RFP

• Declare the Offerors intent to enter into a contract with VDOT and that the offer will remain in effect for 120 days

• Identify the Point of Contact for the Offerory

• Identify the Principal Officer for the Offeror

• Identify the Lead Contractor and Lead Designer

• Commit to achieving a 20% DBE Goal

28• Provide Final Completion date

Page 29: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Attachments to the Letter of Submittal (Part 1, Section 4.2)

• Affiliated and Subsidiary CompaniesAffiliated and Subsidiary Companies

• Debarment Forms

• VDOT Prequalification Certificate

• Letter of Suretyy

• SCC and DPOR Registration Information for Businesses

• Work History Forms for Lead Contractor and Lead Designer

29

Page 30: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Attachments to the Letter of Submittal (Part 1, Section 4.2)

• Conceptual Roadway Plans• Lane widths and truck apron widths• Shoulder widths

R d b t di i• Roundabout dimensions• Sidewalk and path widths• Median widths• Location of entrances to adjacent properties• Limits of demolition of pavement and mill and overlay area

Minimum pavement sections• Minimum pavement sections• Cross slopes

30

Offerors Conceptual Plan must meet RFP requirements to be responsive

Page 31: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Price Proposal (Part 1, Section 4.3)

• Proposal Price specified as a Lump Sum Amount

• Asphalt, Fuel and Steel Adjustments

P l G t (F C 24)• Proposal Guaranty (Form C-24)

• Sworn Statement Forms

• Applicable Design Builder Forms

• Make sure Design Builder forms are complete and accurate!!Make sure Design Builder forms are complete and accurate!!

• Providing inaccurate Design Builder information or incomplete forms may render a Proposal non-responsive.

31• Note that DBE forms have been moved to Post Award

Page 32: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Post Notice of Intent to Award S bmittals (Part 1 Section 4 4)Submittals (Part 1, Section 4.4)

• Organizational Chart and Narrative• Identify Offerors Key Personnel

– Design-Build Project Manager– Quality Assurance Manager (PE)

Design Manager (PE)– Design Manager (PE)– Construction Manager (RLD and ESCCC)

• SCC and DPOR Registration Information for Individuals• SCC and DPOR Registration Information for Individuals• Design Builder Subcontracting Narrative• Proposal Schedule and Narrative

S h d l f It• Schedule of Items• Monthly Payment Schedule• Escrow Proposal Documents

32

Page 33: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Parts 3, 4 and 5 – Standard Template Documents and p

Exhibit 1 to Part 3

• Liquidated Damages (Part 3, Article 5.6)• Final Completion - $1,350/ day

• Scope Validation (Part 4, Article 2.2) • Begins on Date of Commencement and lasts for 90 days• Begins on Date of Commencement and lasts for 90 days• Verify and Validate RFP Documents provided by VDOT • Identify Errors, Inconsistencies or Defects in the RFP• Notify VDOT in Writing and with Supporting Documentation

within Time Period

33

Page 34: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Parts 3, 4 and 5 – Standard Template Documents and

Exhibit 1 to Part 3

• Builder’s Risk Insurance (Part 5, Section 103.06)

34

Page 35: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

VDOT Point of ContactVDOT Point of Contact

Bryan Stevenson, P.E.

Alternate Project Delivery OfficeVirginia Department of Transportation1401 East Broad Street1401 East Broad StreetRichmond, Virginia 23219

Phone: (804) 786-6929Fax: (804) 786-7221E-mail: [email protected]

35

Page 36: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Braddock Rd/Pleasant Valley Rd Intersection Improvement ProjectBraddock Rd/Pleasant Valley Rd Intersection Improvement ProjectUPC 103318

Utility Coordination Meeting

March 6, 2014

Amir Salahshoor, P.E., Design-Build Project ManagerBryan Stevenson P E APD Project ManagerBryan Stevenson, P.E., APD Project Manager

Page 37: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2.12 Utilities• Design-Builder responsible for relocation of all

utilities required for construction of project

• Numerous existing Multi-phased utility poles

• No additional time or money will be granted forNo additional time or money will be granted for delays due to utility relocation conflicts

• Known existing Utilities Owners (Plan Sheet 3):g ( )– Electric– Fiber Optic

T l h– Telephone– CATV– Other unidentified utilities?

37• Provide power supply to Lighting

Page 38: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

2 12 Utilities2.12 Utilities

38

Page 39: Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement ... · Braddock Rd/Pleasant Valley Rd Intersection Imppjrovement Project UPC 103318 Request for Proposal Overview Pre-bid

Known Utilities - BriefingKnown Utilities - Briefing• NOVEC

Mark Bell – 703.754.6732 or 757.879.2218

• VerizonSteve Puryear – 703.886.6490

• Cox CableDan Hollenback - 703.480.7869

Fib Li ht LLC (FBL)• Fiber Light LLC (FBL)Perry Jackson - 571.323.7670 or 240.994.0305Wayne Haithcox - 703.787.7970 or 540.522.3776

NOTE: No gas or water on this project

39