borehole identification tables, callaway power plant ... · tritium in water

34
( .1 i BOREHOLE IDENTIFICATION TABLES CýLLAWAY POWER PLANT TERRACON PROJECT NO. 09067011T ;l r :Bdrnfg: CA7SOLLSt,, 19 35, 27~LT (VicinityofDbck Haul Road) SamlenteJa (feetii bgs)e L~:Tnnutjpi/)u 1, UT NID'Lthid ;itpi ftb, Titu (u L D ~tiue DDogtu ~UTM~Esig UMot~g 0-5' <166 I 2/7/2007 5-10' <166 1 2/7/2007 10-15' <166 1 2/7/2007 15-20' <166 1 2/7/2007. 38.7054 -91.7406 1857119.57 1046600.61 20-25' <166 2/7/2007 25-30' 657 ± 113 - 2/7/2007 Tritium in Water <145 - 2/9/2007 PBrI %a:; 20 6i,.60aB1St 6 0 a1k.a MWý0116), •Sample lnt•'r,-al (friti)m •,,"nt p(ZiL •S~m~plingi•,• D •oD ,jtituiil• •DD lui.gitb•d, LIT •E aýtJsnq ý,iglhing 3-5' <145 1 10/312007 8-10' <145 10/3/2007 13-15' <145 1 10/3/2007 18-20' <145 10/3/2007 23-25' <145 10/2007 38.7093 -91.7577 1852231.94 1047973.94 23-25' <145" I 10/3/?20 28-30' <145 i 10/3/2007 33-35' <145 1 10/3/2007 38-40' <145 10/3/2007 sapý "er"j'o- Lq- lingimlDate'L ~.DIL titude DL~vjL T IflEi iVatn ~U],itMNrthiný 3-5' <147 i 9/28/2007 8-10' <147 1 9/28/2007 13-15' <147 1 9/28/2007 18-20' <147 i 9/28/2007 23-25' <147 - 9/28/2007 38.7058 -91.74222 1856668.3 1046737.59 23-25' <147 1 9/28/2007 28-30' <147 - 9/28/2007 33-35' <147 - 9/28/2007 Tritium in Water <156 10/3/2007 _ NOTES: 1) Bold value represents value detected above reportng limits. 2) DD = Decimal Degrees. - 3) RT = Right of pipeline. 4) LT = Left of pipeline. 5) Analysis conducted by Environmental Inc. Midwest Laboratory. 6) Stations represent field measured approximations. Not measured by professional surveyors.

Upload: others

Post on 07-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

( . 1

iBOREHOLE IDENTIFICATION TABLES

CýLLAWAY POWER PLANT

TERRACON PROJECT NO. 09067011T;lr

:Bdrnfg: CA7SOLLSt,, 19 35, 27~LT (VicinityofDbck Haul Road)SamlenteJa (feetii bgs)e L~:Tnnutjpi/)u 1, UT NID'Lthid

;itpi ftb, Titu (u L D ~tiue DDogtu ~UTM~Esig UMot~g

0-5' <166 I 2/7/20075-10' <166 1 2/7/200710-15' <166 1 2/7/200715-20' <166 1 2/7/2007. 38.7054 -91.7406 1857119.57 1046600.6120-25' <166 2/7/200725-30' 657 ± 113 - 2/7/2007Tritium in Water <145 - 2/9/2007

PBrI %a:; 20 6i,.60aB1St 6 0 a1k.a MWý0116),

•Sample lnt•'r,-al (friti)m •,,"nt p(ZiL •S~m~plingi•,• D •oD ,jtituiil• •DD lui.gitb•d, LIT •E aýtJsnq Tý ý,iglhing

3-5' <145 1 10/312007

8-10' <145 10/3/200713-15' <145 1 10/3/200718-20' <145 10/3/200723-25' <145 10/2007 38.7093 -91.7577 1852231.94 1047973.9423-25' <145" I 10/3/?20

28-30' <145 i 10/3/200733-35' <145 1 10/3/200738-40' <145 10/3/2007

sapý "er"j'o- Lq- lingimlDate'L ~.DIL titude DL~vjL T IflEi iVatn ~U],itMNrthiný

3-5' <147 i 9/28/20078-10' <147 1 9/28/200713-15' <147 1 9/28/200718-20' <147 i 9/28/200723-25' <147 - 9/28/2007 38.7058 -91.74222 1856668.3 1046737.5923-25' <147 1 9/28/2007

28-30' <147 - 9/28/200733-35' <147 - 9/28/2007Tritium in Water <156 10/3/2007 _

NOTES:1) Bold value represents value detected above reportng limits.2) DD = Decimal Degrees. -

3) RT = Right of pipeline.4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. Midwest Laboratory.6) Stations represent field measured approximations. Not measured by professional surveyors.

Page 2: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLES

CALLAWAY POWER PLANTTERRACON PROJECT NO. 09067011T

B66cCASO-Sa.69+45' 4,,RT cmi riof MH-2). - . •.

ST,-6'Tum p-i L, g Date DD Latitude 1DD Lon/2itu/de 0TM Eas;hng

4-6' <171 12/28/20069-11' <171 12/28/200614-216 <171 1228/206 38,7078 -91.7579 1852187.95 1047414.42192'<171 i 12/?28/2006

24-26' <171 I 12/28/2006Tritium in Water <143 - 12/2812006

~~ . B~~driii q. 0jSOI0-3ta: 72 , 05, 4C' LTz li fMH2 - 4-

3-5' <147 1 10/11/20078-10' <147 10/1/200713-15' <147 10/1/200718-20' <147 10/1/200723-25' <147 1 10/1/2007 38.70773 -91.75868 1851956.06 1047399.928-30' <147 i 10/1/200733-35' <147 i 1011/200738-40' <147 1 10/1/2007Tritium in Water <156 10/3/2007

lIntere, fe bgs) ~ T bqq'(ý i~ Lm, gUtLE) LD.Ifitud! DID Lýigiudie UTME-ri4 U%

4-6' <167 12/15/20069-11' <167 12/15/200614-16' <167 12/15/200619-21' 429±1105 t 12/15/2006 38.7078 -91.7589 1851897.3 1047410.6724-26' 451 ± 106 ! 12/15/200629-31' 431 ± 105 12/15/200634-36' 274 t 99 12/15/2006Tritium in Water 583 ± 105 - 12/18/2006

NOTES:1) Bold value represents value detected above reportir

2) D0 = Decimal Degrees.3) RT = Right of pipeline.

4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. Midwest I

6) Stations represent field measured approximations.

g limits.

aboratory.Not measured by professional surveyors.

Page 3: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLES

CALLAWAY POWER PLANT

TERRACON PROJECT NO. 09067011T

Fl'7h LTX(idinit, fMtH-2) .

sarl!i~evl(etbiý Tilr FV) Sr pliqg~fte DD Lat~tUde ~DD Longiitude UTM Ea'stnq g l UTM Northing

10-5' I 11 , J1/07 3870178 -91 7589ý 18518ý79ý77 10474L22.4_

!,, iB CA-SO)LSta,72. 1 80,235 LT Vcr nty, ofMH-2).. ,

,sample [)ea (fe bg. T ,tiun;4 l Samp ___ Dat 1__' Litatijfe DDPALonvjlUd UTM Ea-Arg IJ,,, UMNorthirng

0-5' <162 I 2/7/20075-10' <165 2/7/200710-15' <165 2./7/2007.10-2 <165 217/2007 38.7078 -91,7589 1851879.10 1047417.6615-20' <162 ! 2/7/2007

20-25' <181 '27/2007Trtium in Water None Not sampled

Sait-o1[tr~l(feet~ TntIUM S(pe/Lji, D,.It pD Lýýg'd~ DD Lcn~iý)ide~ U T %1Easg ~UT!1 t'Jorthiiig_

3-5' <147 8 9/28/20078-10' <147 9/28/200713-15' <147 9/28/200718-20' <147 9/28/2007 38.7081 -91.7592 1851806.59 1047533.4523-25' <147 1 9/281200728-30' <147 1 9/28/2007Tritium in Water <156 10/9/2007 1

ru- iW <162 8 2/7/20075-10' <181 I 2/7/2007_10-15' <162 1 2/7/2007"10-15, <162 1 217/2007 38.7077 -91.7590 1851871.69 1047378.1415-20' <162 1 2/7/200720-25' 238-± 91 2/712007ITritium in Water 313 ± 87 2/9/2007

NOTES:1) Bold value represents value detected above reporting limits.2) D0 = Decimal Degrees.3) RT = Right of pipeline.4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. Midwest Laboratory.6) Stations represent field measured approximations . Not measured by professional surveyors.

Page 4: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLESi

CALLAWAY POWER PLANTTTERRACON PROJECT NO. 09067011T

Sape lu i ~,) 8Tiwi(pUt/t Snimplinq Dite ~DD L~tlitude DD L-ngitud'e UT1Etq IT11fnlm

0-5' <167 2/7/20075-10' <167 *2/7/200710-153 <167 E/0 38.7077 -91.7592 1851808.32 1047387.84

15-20' <167 I 2/7/2007;20-25' <167 * 2/7/2007Tritium in Water None Not sampled

I>SanpeIitKm F.C u L Sa "%W ' .DE) Ltitudel ,UTMl Eaistiný U- r,1Nrhn

0-5' 497:1:108 1 2 2/720075-10' <167 2/7/2007

10-5' <167 t 2/7/2007 gtd.g

10-15' <167 2/7/2007 38.7080 -91.7592 1851815.54 1047514.215-20' <168 2/7/2007M2025' 229 ± 97 2/7/200;

ITritium in Water 162 ± 80 9 /92007

0-5' <167 -2/7/20075-10' <167 [ 2/7/200710-15' <167 [ 2/7/2007 38.7077 -91.7593 1851782.9 1047385.41

115-20' <167 2/7/2007

Tritium in Water None Not sampled -

sap. <171t Samplingls nt~j'np~i ~ate; DD Latitujde- DD Lun UT Ea,#-

3-5' <171 I 12/28/20068-10' <171 i 12/28/200613-15' <171 12/28/2006 38.7082 -91.7592 1851800.63 1047559.4419-20' <171 12/28/200623-25' <171 12/28/2006

Tritium in Water <143 1 1/3/2007

NOTES:1) Bold value represents value detected above reporting limits.2) DD = Decimal Degrees.3) RT = Right of pipeline.4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. Midwest Laboratory.6) Stations represent field measured approximations. Not measured by professional surveyors.

Page 5: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLESCALLAWAY POWER PLANT

TERRACON PROJECT NO. 09067011T

CAihi(-!-SOL-Sta: 74;+ 03,.117 TT (VibinitVofMH-3) <W<.-~

Sample interval (feet•bgs) Tritium (p!i U Sam$IinqDaie DE)Latitude> DD Longitude UTIM Easbng ' UTM Northing2

4-6' <167 1 12/27/2006

9-11' <165 12/27/200614-16' <165 1 12/27/200614-21' <171 12/27/2006 38.7076 -91.7594 1851748.79 1047346.51119-21' <171 i 12/27/2006

24-26' <171 12/27/2006

Tritium in Water None I Not sampled

-~ on 4: ~--)US ta25S 132z,26' RT (Vidriiy of

ietlalftbs I'J' TI; (pc L/ 'H pi-?V t UL ti" D cmii UTh4l Eastn M N_ ,fhl1 . p ing ~ ILIT

0-5' <181 . 2/8/20075-10' <167 2/8/2007

10' <181 2/8/2007 38.7081 -91.7600 1851591.17 1047513.6110-15' <_181 _ 2/8/2007Tritium in Water None Not sampled

____,,_,--___;____go'i__g CA Sta,-7.5 + 93, 37'LT iciniy of MH-3A) 2 ____________

is ý ý) nYTtiunmpCi L), ý irapl Dte iDDl•atitudl DD ongII.de UTEa~timj ?UThl NNi'rrgNSml InerD (feI -H '- ~ .. ~. - ,-

0-5' <167 i 2/8/2007

5-10' <181 2/8/2007

10-15' <168 b2/8/2007

15-20' <169 2/8/2007 38.7079 -91.7600 1851571.86 1047452.55

20-25 <181 2/8/2007

Tritium in Water <145 2/9/2007

NOTES:

1) Bold value represents value detected above reporting limits.

2) DD = Decimal Degrees.

3) RT = Right of pipeline.

4) LT = Left of pipeline.

5) Analysis conducted by Environmental Inc. Midwest Laboratory.

6) Stations represent field measured approximations. Not measured by professional surveyors.

Page 6: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLESICALLAWAY POWER PLANT

TERRACbN PROJECT NO. 09067011T

stwq~, ntr,ýil(f-tl~gs TdtSa ipinL)Dat, DIDLatitude. 'DD Lojngfitude UyEM Ea~ti,~ ~UTM1 N~ortiNg

0-5' <167 218/20075-10' <167 i 2/8/200710-15 <167 2/8/2007 38.7084 -91.7626 1850844.05 1047642.0215-20' <167 i 2/8/200720-25; <167 - 2/8/2007Tritium in Water <145 - 2/9/2007 1 1 1 1

nerva, eesj TritJum1 (p~t'L)y ~ Samplipng Daite ~DD Ljatitudý DD____qjjastirM L T Nýo hinq

0-5' <167 I 2/8/20075-10' <167 1 2/8/200710-15' <167 2/8/2007 38.7089 -91.7666 1849684.02 1047811.2815-20' <167 2/8/200720-25' <169 2/8/2007Tritium in Water <145 - 2/9/2007

~Boring ~CA-- L%-Sta.:'14 K. 100' LT (Vicinity, of MýH-5)~

Inter-il tut ý,jsISanýýiplwii ) ),t D L ititud, DED Lorgitml i-T~ L-,,- UTNotý,hinq

0-5' <169 1 22/8/20075-10' <169 1 2/8/200710-15' <169 1 2/8/2007 38.7088 -91.7699 1848744.63 1047774.3715-20' <169 1 2/8/2007Tritum in Water <145 1 2/9/2007

NOTES:

1) Bold value represents value detected above reporting limits.

2) DD = Decimal Degrees.

3) RT = Right of pipeline.

4) LT = Left of pipeline.

5) Analysis conducted by Environmental Inc. Midwest Laboratory.

6) Stations represent field measured approximations. Not measured by professional surveyors.

Page 7: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLES

CALLAWAY POWER PLANT

TERRACON PROJECT NO. 09067011T

____________________ >BoririoýG:CAS0L`-Sta. 104 +64,60'I L(Vicinity, of MH-5) ______________

.Sam~le Interval (feet bgs) Tritium (Ci/Li)A SamnplingDate DID Latitude ODDLongitude UTM Easting UTM Northing

3.2-5.2' <193 1 6/21/20078-10' <190 6/21/200713-15' <192 I 6/21/200718-20' <192 1 6/21/2007 38.7089 -91.7699 1849610.71 1047809.2223-25' <192 . 6/21/200728-30' <190 1 6/21/2007Tritium in Water None Not sampled

~~ 7::-~~~~;tbiH; A- !- n«b~i A~3t 104 +'94,60'LT (intyf.H:5)~~%v,,I • ' :f@•-l Tnin •: p'• i !_L: ýan ln • I•,' ' 4 at . .. I. M Ei,t; ' * • •,iri UT, 1 No lw, •

4-6' <167 1 12/4/200619-11' .< 167 1 2/4/200698114 567 93 12/4/2006 -91.7701 1848703.25 1047949.5614-16' 556 ±- 110 1 2124/2006

Tritium in Water 468 ± 104 1 12/5/2006I

-Sruki1rt~wl(Ietý,sý Tnitw urn pCtjý 1 an'n aD attitude EDD [,-L1Lgitde. UTýlEaistin -j UWT M ortIihw,ý

4-6' <167 i 12/4/20069-11' <167 ! 12/4/2006 3879 9-1 <167 12/4/2006 38.7093 -91.7701 1848703.25 1047949.5614-16' <167 1 1/4/2006

Tritium in Water <177 1 12/5/2006

[3ý7Bring:, C3AýSOL-Stb, 1 O,+0540,400' LT (Vdlhif ,-bfMH/5 ýf'

eltr I . TrtteCVI b; Silij Date DE)_______, E)D gin)ue~ Ui; aýtiprI ___________

3-5' <144 1 12/4/20075-10' <144 12/4/200710-15' <144 12/4/200715-20' <144 I 12/4/2007 38.7082 -91.7705 1848582.70 1047535.1420-25' <144 1 12/4/200725-28' <144 I 12/4/2007Tritium in Water <188 12/4/2007

NOTES:

1) Bold value represents value detected above reporing limits.

2) DD = Decimal Degrees.

3) RT = Right of pipeline. .

4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. MidwesIt Laboratory.

6) Stations represent field measured approximations! Not measured by professional surveyors.

Page 8: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

IBOREHOLE IDENTIFICATION TABLES

CALLAWAY POWER PLANT

TERRACON PROJECT NO. 09067011T

_________ _.__,: •,, • Borilng,<•CA;SOL~sta,,>105 +24:. 200' LT(VciW ofAMlH5)§:A ;..;,,: :

3-5 <147 i 10/1/20078-10, <147 I 10/1/200713-15' 1046±117975±,117 1011/2007 - 38.7087 -91.7709 1848481.40 1047712.8018-20' 616 ± 103; 525 ± 101 10/1/200723-25 <147 10/1/2007Tritium in Water 473 ± 101 - 10/9/2007 1

am , ':e 2 T.tiumýp~i L)&... Daiteq D Dta• t..Iude 0. . Ea-itinbn.

6-5n <144 _e 11/9/20078-10' <144 I 11/9/200713-15 <144 11/9207 38.7085 -91.7706 1848570.27 1047662.5218-20 644 ± 103 ; 535 : 99 11/9/200723-25' 215 87 I 11/9/2007Tritium in Water <160 i 11/9/2007

&jrnii~,v1Tnbuimm(pCi/LL) ,S mpflnq Date DD Lititujde nDLr~td Uý ~ atn djMNrhr~

0-5' <169 I 2/8/20075-10' 402 100 _ 2/8/200710-15" 2956 ±- 175 ;2890 +171 2/81200710-15-0" 205 ± 17; 21706t142 2/8/2007 38.7089 -91.7703 1848640.48 1047788.4915-20" 1305±1:141 ; 1706±+1142 2/8/2007

Tritum in Water' 2700 - 2/9/2007Tritum in Water 2707 2/9/2007

;.'k:..><'V9 ,. Boiing'ASil Sta •106$50, 200'LT f .j 4 ,:'

3-5' <156 t 10/12/20078-10' <156 1 10/12/200713-15' <156 10/12/200718-20' <156 t 10/12/2007 38.7087 -91.7709 1848477.70 1047710.7123-25' 339 ± 96 10/12/200728-30' <156 10/12/2007Tritium in Water <156 I 10/12/2007

NOTES:1) Bold value represents value detected above reporting limits.2) DD = Decimal Degrees.3) RT = Right of pipeline.4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. Midwest Laboratory.6) Stations represent field measured approximations. Not measured by professional surveyors.

Page 9: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLES

CALLAWAY POWER PLANT

TERRACON PROJECT NO. 09067011T

,• •:••',<•..•;•; •=•i• .,• :,;•:• :•.'• • '', ", 36f*g CGA-SOL-Sta. 107 + 00'-"90•'-LT: (Vi niy .... .. .MH-6)•>... •;' '•"' "÷; ;..

Sample Inter-al jeat bg) ~ u C ) Smpling . Dte ,D ,D Lititiifl ~DO Lorgitude U MEsil U~l,ýlin4-6' <167 I 12/13/2006

9-11' 171 ±- 95 1 12/13/200614-1 [ 1671 95 1 2/3/2006 - 38.7090 -91.7709 1848476.99 1047820.8214-16' f <167 i 12/13/2006 _ _ 1 _

Trdtium in Water <184 I 12/13/2006

Tritium in Wat~iterNnNosapedt__s______ _________________

Sample Initdral (fe~et bs Thitium 1LUL ' Sampingpi~ Date L~atitude, rDD Lonqitude UTM! Easting t~~ ~ti

3-5' <193 1 6/21/20075-10' <190 I 62/200713-15' 967 < 136 1 6/21/200718-20' 691 t 126 < 1 6/21/2007 38.7090 -91.7709 1848469.00 1047836.5323-25' <191 i 6/21/200728-30' <191 6/21/2007-Tritium in Water None i Not sampled

ntrl(etbs Tritium (p-CVL) iSampti? Date DD.Latitude' DDI fongitude, UTM Eating ~UT%1rNorthi~g~

0-5' <169 1 2/8/2007

9-11' <177 t 12/6/2006

9-210' <16 9 12/6/2006 38.7092 -91.7709 1848473.49 1047891.0310-15' <169 11 2/8/2007,Tritium in Water <145 i 2/9/2007.

4-6' < 177 1 1 2/6/20069-11' <177 :1 1 2/6/200614-16' 3116 4. 1851 12/6/200619-21' 16624±.1491 12/6/2006 38.7089 -91.7711 1848414.59 1047809.04

19-21' 1531 ±. 146 1 12/6/2006

24-26' 2343 ± 1671 12/6/2006Tritium in Water None I Not sampled

NOTES:1) Bold value represents value detected above reporting limits.2) DD = Decimal Degrees.3) RT = Right of pipeline.4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. Midwest Laboratory.6) Stations represent field measured approximations. Not measured by professional surveyors.

Page 10: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLESi

CALLAWAY POWER PLANT

TERRACON PROJECT NO. 09067011T

B~6rinn i.(-CA-SOL-,ta' 1U0 +.03, lQU RT -Vicinit, rr.MH,6)

s~ipl ne~i fet 1 ,"'s ~Tritium(pCti L) D~[, DD InL D itiu D Lm;ud~e UTM E. [wý Ur~ OJI,

0-5' <181 12/11/20065-10' <181 L 12/112006 38.7095 -91.7711 1848408.03 104802212410-15, <181 [ 12/11/2006Tritium in Water <184 12/13/2006

. ;2htim~piL Sampling Pate. ,DD Latitu.M; ~DO.Luniwjfde UTM Eastiri V UT.M~r~gSaniýýI,~~,•mp N- ngum puaL rr4ehi

0-5' <157 1 2/81/2007

5-10' __157_ 2/8/2007 38.7093 -91.7716 1848354.59 1047956.6610-15' <157 _ 2/8/2007

LTritium in Water <145 2/9/2007

.. 1arnpe#InwaI(feet [bgs)~ T ntium (pCi!L') Samptinm Dat DD L~aftiude ~Dr) Lonqilde~ UTM Eas~tiri HUTrMlN(,thmn

4-6' <181 1 12/11/20069-11' <181 1 12/11/200614-16' <181 1 12/11/2006

11-1 11 1 12,,06 38.7095 -91.7716 1848268.93 1048003.6819-21 <181 12/11/2006

24-26- <181 12/1112006Tritium in Water <184 1 12/13/2006

g:jXSL-ta 10 856ýj.I Bjin -d~ 6B _

S~iihilednterval I ý is Trqur. pc __ F~~~ii D- - DIDL~atitude 00:(rije UT% E-Zir r hr,

4-6' <177 12/6/20069-11' <177 1 12/6/200614-16' 3116 ± 1851 12/6/200619-21' 1662:±11491 12/6/2006 38.7091 -91,7718 1848201.11 1047881.3619-21' 1531:1461 12/6/200624-26' 2343 : 167 I 12/6/2006Tritium in.Water 2518 ± 171 ! 12/13/2006 1 1 1

NOTES:

1) Bold value represents value detected above reporting limits.

2) DD = Decimal Degrees.

3) RT = Right of pipeline.

4) LT = Left of pipeline.

5) Analysis conducted by Environmental Inc. Midwest Llaboratory.6) Stations represent field measured approximations. Iot measured by professional surveyors.

Page 11: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLES

CALLAWAY POWER PLANTITERRACON PROJECT NO. 09067011 IV

0-5' <169 218/20075-10' < 169 I 2/81200710-15' <169 2/8/2007 38.7090 -91.7719 1848186.49 1047834.28

15-20' <169 2/8/2007Tritum in Water <145 1 2/9/2007

neia(feetbg) S~TrtIJIfiff(pCIL,~ 6 am4 U~, r,,rti

4-6' 228 ± 103 i 1216/20069-11' <177 1 12/6/200614-16' <177 1 1216/2006 38.7092 -91.7721 1848118.97 1047889.8919-21' <177 12/6/200624-26' •<177 12/6/2006Tritium in Water <176 12/8/2006

~ N;B~rih LiCA ISOLa,,-30 RT Vidinhif -f~I8 ~ ~ A<~

0-5' <157 2/9/20075-10' <157 219/2007_ 38.7141 -91.7742 1847520.49 1049684.5210-15' <157 1 2/9/2007Tritium in Water <145 2/10/2007

Bdri~:'CAS0L1S6 13 ý 8, 12"T ofcifit,-tM-

S a ný,Vle hiiEral Tritium ýýjCL [1) Sa[Tpýliniý DýIp E)D Latitude DE Lfjriýjtude UT41 F-citiial UTrýl tJuilhinj

4-6' <190 6/21/2007'-1 193 i 6/21/2007 I93<193 6/21/2007 38.7155 -91.7740 1847565.64 1050196.7314-16' <193 6/21/2007

Tritium in Water None i Not sampled

NOTES:1) Bold value represents value detected above reporting limits.2) DD = Decimal Degrees.3) RT = Right of pipeline.4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. Midwest Laboratory.6) Stations represent field measured approximations. Not measured by professional surveyors.

Page 12: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLES

CALLAWAY POWER PLANTiTERRACON PROJECT NO. 09067011IT

Sanle~terval jet , 1n rtium ei/L)' Samli' D4 ~DD Latitude, -DLniid ~. isrq Ut1Nrhn

3-5' <190 I 6/21/20078-10 <190 6/21/0 38.7155 -91.7742 1847508.58 1050196.2813-15' <190 6/121/2007Tritium in Water None Not sampled

•SairiH/•,ta•(frt•g) 1'3 D 1,at 2o"L atitude DVi o'lude UMEat H-8) UT

~Simple~l ntervl detý" nýj ,~,L E aiuý DDL i d UMEitrj Iir1Northing

4-6' 403 ± 102 I 12/22/20064-6' 249 ± 97 1 12/22/20069-11' 213 ± 96 I 12/22/20069-11, <165 12/22/2006 38.7156 -91.7741 1847544.22 1050238.7514-16' <1652 12/22/200614-16' 216 ± 96 1 12/22/2006Tritium in Water <142 12/22/2006

SJIIýý' 11ýý-11ýJ~t h,'l Tntium (p'i/L'L Sýamplirig DatH LDiT) Lidetlý ~DD Loinglitde', UTM E-i,ýhg j-r'

0-5' 267± 97 1 2/9120075-10' 2/200 38.7157 -91.7745 1847503.56 1050282.8510-15' 305 ± 99 I 2/9/2007Tritium in Water <145 - 2/10/2007

4-6' <161 11/27/20069-11' <161 1 11/27/2006

[14-16' <161 1 11/27/2006 38.7158 -91.7744 1847443.12 1050298.04

19

-2 1' <161 11/27/2006

Tritium in Water <177 - 12/5/2006

NOTES: I1) Bold value represents value detected above reportin limits.

2) DD = Decimal Degrees. i3) RT = Right of pipeline.

4) LT = Left of pipeline.

5) Analysis conducted by Environmental Inc. Midwest Laboratory.6) Stations represent field measured approximations. Not measured by professional surveyors.

Page 13: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

iBOREH OLE IDENTIFICATION TABLES

CALLAWAY POWER PLANT

TERRACON PROJECT NO. 09067011T

GAY>SO',~ 13ý hto MH 8)•~~

ISaýmp~e (nterail (feet Ls). 'Tnt (pQi/E) -Smlný D~t DDL&ue D ogu. UTi. Eatn UTM 5~ thig4-6' < 172 D 11/28/2006

9-11' 273 1 11/28/200614-16' <172 11/28/2006 38.7158 -91.7740 1847551.63 1050288.5719-21- <172 11/28/2006Tritium in Water <177 12/5/2006

-1, 6, nPT LnateSA~jl (,etLjs Titim4I/L, Sam.in L)jt BE Lttu DD Loijiiiý TM Eistrij~CT'oti~,

4-6' <161 1 11/28/20069-11' <161 11/28/200614-16' <161 11/28/2006 38,7158 -91.7737 1847645.29 1050302.719-16' <161 11/28/2006Tritium in Water <177 12/5/2006

_______._______ C?•Bbirg•A SeE-'St139C+SL n f 8 7;;' -

,SampIe lnt e L alfteet, b, S,•amp~lg ate , atit e, DDOLongtue, .... ET g MNoing ....

0-5' 3341100 I 2/9/20075-10' <164 I 2/9/2007 I1015 <164 1 2/9/2007 1 38.7159 -91.7741 1847518.77 1050351.8110-15' <164 1 2/9/2007

Tritium in Water <145 I 2/10/2007

*KBýri$. CA ;O-t.'4 20, 90!RT (Viclnity of MH-9)2: ______

4-6' <161 11/28/20069-11' <161 11/28/200614-16' <161 11/28/2006 38.7161 -91.7735 1847688.83 1050401.0719-21' <161 11/28/2006Tritium in Water 343± 100 I 12/5/2006Tritium in Water I <170 I 12/22/2006 1 _

NOTES:1) Bold value represents value detected above reporting limits.2) DO = Decimal Degrees. I

3) RT = Right of pipeline.4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. Midwest Laboratory.6) Stations represent field measured approximations! Not measured by professional surveyors.

Page 14: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOILE IDENTIFICATION TABLES

CALLAWAY POWER PLANTITERRACON PROJECT NO. 09067011IT

I jarnpletlnt a.(feet bgL - Tnitium~p~i/ýL) S Ln ate DD Latiude, DD Lu Long•tuode UTY Eiasing.i UTY NMgNoin1gC

3-5' <147 I 10/2/20078-.10' <147 1 21/2007 38.7161 -91.7738 1847600.10 1050420.7513-15' <147 10/2/2007Tritium in Water <156 10/9/2007

•; • ',•B~~~~~~d•~'•.QA -4 St1•0•,'-ý5L, 102ý5"RT ýci,• (: "•fMHz9 • ;: .,),••%••;-i

3-5' <193 i 6/20/20078-10' <193 6/20/200713-15' <193 6/20/2007 38.7162 -91.7735 1847706.80 1050452.80

18-20' <193 6120/2007Tritium in Water None I Not sampled

',rkntr,. fetfs I1tium,(PICL L) S; pln EteD Lrlt,'ý D .. nmitude UTM Easttfng UTM Nth

3-5' <190 1 6120120078-10' <193 i 6/20/200713-15' <193 1 6/20/2007 38.7163 -91.7744 1847445.51 1050485.0818-20' <193 1 6/2012007Tritium in Water None Not sampled

Sj~ý bgsý,d(et.mj) 'Tilu ([( 1S~imrqDrig~e. DD Latitude~ DD Lom-itude UTM j,Esting/½ I UTM toithiri2

4-6' 1537±138 11/21/2006

14-16' <170 1 11/21/200614-16' <170 1 1121/ 38.7164 -91.7740 1847558.40 1050524.2919-21' <178 11/21/200624-26' <170 I 11/21/2006Tritium in Water 211 ± 96 F 11/27/2006

NOTES:1) Bold value represents value detected above reportin2) DD = Decimal Degrees.3) RT = Right of pipeline.4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. Midwest L6) Stations represent field measured approximations.

I limits.

laboratory.Iot measured by professional surveyors.

Page 15: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLES

CALLAWAY POWER PLANT

TERRACON PROJECT NO. 09067011T

[ ___________________Bornt] CA SOL-Sta: 141 +- 24.5, 100'LT (Vicinit; ,r MH-9A) ______ ______

Sam~ple• Inte l(fet'bgs) Tf im(~ L) -SwahplIg.Dati .DD'L'atitud.e~ [DD Longitude UTM Easting UM othn

4-4 <170 1 12/22/20069-11'1 <170 12/22/2006 38.7164 -91.7742 1847514.97 1050528.9914-16' <170 1 12/22/2006Tritium in Water None I Not sampled

§.ýCI..LS6 4 0f,~B~t 3117 (iainiiti fMH'9B _______

SmiloFwl(etTntimn (pCi/L)' iSampling Date. ODDLaktul E oitude UT%1L Latnj U%"Nrln,

4-6' 253 ± 95 1 11/21/20069-11 , <170 j 11/21/2006

19-216' <170 1 11/21/2006 38.7166 -91.7735 1847713.25 1050584.1624-26' <170 11/21/2006

Triiu inWtr 191 ± 95 1 - 1/27/200N6 ____________________1T~um in Wat7eStb16 170 + 12 17/2006 T r ht i-MF4

,SjP1P1 [ava tfe .~t TrtiumnqCt L) .- tSaiýmp DciDte ~DD iattudle -'DU Longtude Ui7M1 EAsing. IUTM1ýNorlhirg'.4-6' <161 i 11/27/20069-11' <161 I 11/27/2006 I1-16' <172 1 11/27/2006 38.7168 -91.7741 1847515.30 1050680.7914-16' <172 1 11l/27/2006

Tritium in Water None I Not sampled

Sampe (eetLgs Trtiun (p~iL) ~iw nqDat DDLatittidj ~DDL~onitude UTflM Ea'sting UTM'lNnrlhmino

3-5' <157 i 11/9/2007.8-10' <157 i 11/9/200713-15' <157 11/9/2007 38.7165 -91.7739 1847587.59 1050559.0518-20' <157 I 11/9/200723-25' <157 I 11/9/2007Tritium in Water <172 I 11/9/2007

NOTES:1) Bold value represents value detected above repo.ling limits.

2) DD = Decimal Degrees.

3) RT = Right of pipeline.

4) LT = Left of pipeline.

5) Analysis conducted by Environmental Inc. Midwest Laboratory.

6) Stations represent field measured approximations! Not measured by professional surveyors.

Page 16: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLES

CALLAWAY POWER PLANT

TERRACON PROJECT NO. 09067011T

136-di: ( ,AZSOLStbi. 1~42 + 2Z,'5,23'RT(Vicinit> oyH-B

_____________(feet[___, )ftm p~,- Safiplinfj Date DID Latli'ude (DO L)oLr )t ud e( .UTM Easting. UTMN&VI~•Sa mpleihterval (fe~et~bgs)i }UM;~itni

3-5' <157 F 11/9/20078-10' <157 11/9/200713-15' <157 F 11/9/200718-20' <14 11/9/2007 38,7166 -91.7736 1847672.90 1050596.14

20-25' <157 F 11/9/2007Tritium in Water <172 I 11/9/2007

S-ýrmpleItea A •(~lef~tsi~j Tnitir L) Samplng t Da .)te t DD Latu.eee DLo tiDD le t-'t EIEsti, 4 I•sij'ti

3-5' <144 I 11/9/20078-10' <157 F 11/9/200713-15' <144 i 11/912007 38.7167 -91.7736 1847672.61 1050632.5618-20' <157 F 11/9/200723-25' <157 11/9/2007Tritium in Water <172 1 11/9/2007

Sarmip1e Intei?/ajl~feet bgs)~ Tn~tlum~ptL ampliip Dt DD.ILatitudc .DP LonjjtUdý 4Esig~tlM~~ig

3-5' <157 1 11/9/20078-10' <157 I 11/9/200713-15' <157 1 11/9/2007 38.7165 -91.7740 1847701.72 1050559.9518-20' <157 T11/9/200723-25' <157 11/9/2007Tritium in Water <172 11/9/2007

E1oIrig ýCiAOL-Sta2143 + 17'40'RT ViciniWtofMHý9B)rsainple&JIFal (Ibbl LýýS) Trtium ý)C.uLý Sý3n)phnq Dale DD Lalitude DD LuiioituJe I JT M Ertinq UTý,! rllý-tlhw,

3-5' <147 1 10/2/200718-10' <147 F 102ý2007 38.7168 -91.7736 1847663.56 1050694.4113-15' <147 I 10/2/2007

,Tritium in Water <156 1 10/9/207

NOTES:1) Bold value represents value detected above reporting limits.2) DD = Decimal Degrees.3) RT = Right of pipeline.4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. Midwest Llaboratory.6) Stations represent field measured approximations. Not measured by professional surveyors.

•H

Page 17: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

caul

I-mA z2Fo zw

j I-z0.4 -LU

0I- I-uwI- a0.

C-4

C-)

N

CC

10

WC

ro2'E

'C

a<S40

C14

0l)

CD

0

'Cc-.

Ct

10)-

04

0,0)

'0~C

~J

0

'~0

.~

CO

4

0.

E'24I~

~

0~a'-0'

-q

00C)

C4-

C.-

CD

C.-

CO

V

C-

Co

V

00. 02

CC

I

E2

> 0

cou)LO

Cl)

wz

Page 18: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

iBOREHOLE IDENTIFICATION TABLES

CALLAWAY POWER PLANTTERRACaN PROJECT NO. 09067011T

Brh-,G ELS, 3 +. 4E Y2E'.R7tici fii 1jfMH2-12)1 ______ _____

Samletqu T ri n (p1, /L) E arpjing Dd 77 D Lattude [)D L-oriue UtIv1En TVrti EI-,j

L4-6' _<165 12/21/20068-10 _ <165 [12/21/2006

!Tritium in Water I None I Not sampled 38.7390 -91.7793 1845993.63 1058913.78

_________________ JeBo C ~L, ~Sta 230'+ 5, Z2 5'R7~Vii L M 2) 1_____________

S~iinle Iner-1 f,,,, Lq'A, Tn i /m(, L) S mrpliing D~te DD Liiude ) L oiDE lgiltie) .UTYEMEastirg ~UT%1 ýNorttihw

3-5' <170 - 11120/2006

3-10, <170 i 11/2120022410<170 ±95 11/20/2006 38.7396 -91.7793 1845993.61 1058963.84

13-15T 247i±95 W N I 1 1s20/20Tritium in Water None [ Not sampled ____________ ______

NOTES:1) Bold value represents value detected above reporting limits.

2) DD = Decimal Degrees.3) RT = Right of pipeline.

4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. Midwest Laboratory.

6) Stations represent field measured approximations. Not measured by professional surveyors.

Page 19: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLES

CALLAWAY POWER PLANT

TERRACON PROJECT NO. 09067011T

3F, 7V RT Vin*iif,, ýUMH-12ý

-i' a fl rtu jiL apm ýt DD Laltitude FD Longitudeý UTM LEastlng- cT1Noing

3-5' <170 m 11/20120,06 38.7403 -91 7791 1846046.77 1059203.93Tdtium in Water None Not osampled _ _"_"

~ ~P ~%BMhgý CA%ýS SL-St6Y266'q95,'.10'FRT 71irinity or MH' 13)

*Sampip Int~rJýe t lftbqs), ~j.Tftim 6V(pý/Lt) SarniplingDate .DE, Latitude ~DD Longitude UTM Eastinq2 I.UMNrhr~9

0-5' <163 1 2/9/20075-10' <157 1 2/9/2007 "10-15' <157 1 2/9/2007 38.7486 -91.7772 1846555.95 1062253.4615-18.2' <157 2/9/2007Titium in Water None Not sampled

on6rhg C l -tb 7 0 39' RT (icinityrof MH 13)

0-5' <164 I 2/9/200751'16 1 2//07 38.7495 -91.7770 1846401.79 1062585.2710-15' <164 1 2/9/2007

Tdtium in Water <145 2/10/2007

BonirfqýV C L-3>th 27-0 + 60, 42'LT~ cm~int ~of MH- 13)

•Sample lnterwal (feetbg) • Tnt urifimn (,ram 'igDtme DE) Latide DD Lo ...... UTM.No•rthm-.

0-5' <164 1 2/9/2007

5-10' <164 I 2/9/200710-15' <171 1 2/9/2007 38.7494 -91.7780 1846330.71 1062546.5215-20' <171 1 2/9/2007Tdtium in Water <145 r 2/10/2007

NOTES:1) Bold value represents value detected above reporting limits.2) DD = Decimal Degrees.3) RT = Right of pipeline.4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. Midwest Laborato6) Stations represent field measured approximationsI. Not mea

ry.sured by professional surveyors.

Page 20: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOILE IDENTIFICATION TABLES

CALLAWAY POWER PLANTITERRACON PROJECT NO. 09067011ITI

a2p e~ey .- api & i~e~DD Longjitude ~U~r1Easiitw UTJT r Norh 1,3-5' < 145 I 10/2/20078-0' <145 I 10/2/200713-10, <145 1 10/2/200713-15' <145 1 10/2/2007 38.7570 -91.7785 1846150.12 1065323.7518-20' <145 i 10/2/200723-25' <145 1 10/2/2007Tritum in water None I Not sampled 'I _ I II _ I

~~~e L) [S),-i~ifglate DE DLditftu e~ DD Lniiittfde UTrMlEistirg~ U~T, Iotng

4-6' <167 1 1/10/20079-11' <171 1 1/10/200714-16' 1616 t 145 1 1/10/200719-21' <171 1/10/2007 38.7572 -91.7786 1846117.98 1065362.6924-26' <171 1 1110/200729-31' <171 1 1/10/200734-36' <171 1 1/10/2007Tritum in water None Not sampled

___________________-S -t , F9 80'.LT (VIcnt ofMnil 6-6) _____ ______

3-5 <147 e 10/2/2007 DDI.

3-5' <147 1 10/2/20078-10' <147 1 10/2/2007

13-15' <147 I 10/2/2007 38.7570 -91.7789 1846044.70 1065311.99

18-0 n e<147 I 1o/2/200723-25' <147 I 10/2/2007Iritumn in water Noe j Not sa.mpl'ed ____________________

-~~'~'~~~< K~>' V ý-ŽB b flhdfA.9OL-,St~i.2294+'89; 45'RT,(Vicinity oflManh6le. 8"-),. .;K$ &,,.~&

~~ ~ ~ - -~~~ ~~Sa~qpLi~g te tDD Latitude -DEL 'opgtuide ~ E'tn Tioti

3-5' <145 10/4/20078-10' <145 I 10/4/200713-15' <145 2 104/2007 38.7573 -91 .7786 1846109.51 1065410.84

18-20'<145 - 04/200723-25' <145 - 10/4/2007Tritum in water None I Not sampled I I

NOTES:1) Bold value represents value detected above reportir

2) DD = Decimal Degrees.

3) RT = Right of pipeline.

4) LT = Left of pipeline.

5) Analysis conducted by Environmental Inc. Midwest I

6) Stations represent field measured approximations. I

g limits.

aboratory.lot measured by professional surveyors.

Page 21: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLES

CALLAWAY POWER PLANT

TERRACON PROJECT NO. 09067011T

2.CBoring CA-SOL-Sta. 2303 +- 98, 20',LT (icinit ~of Manhole 86'5)

Samle nteali~fet ~gs Ttiu (pi L Ewp~i~qD~ie D LtitdeDDLongitude; UTV Etirig ~UTM Northing

4-6' <167 1111/20079-11' <167 1/11/200714-16' <167 j 1/11/2007

19-21' <167 1/11/2007 38.7880 -91.7777 1846375.90 1065662.8824-26' <167 1/11/200729-31' <167 1/11/2007Tritium in Water None Not sampled

-Borin g: CA-SOL-Sta,23i 0 + 47.7, 33 LT•. cinitly (of Marntlole 86-4A)

SamiplIner- !tL bg s :~Tnt"ii /L' S£wpling Date DDLttd - LoUIINrhn

0-5' <158 j 219/20075-10' <158 2/9/2007

10-15' <158 2/9/2007 38.7596 -91.7774 1846479.21 1066248.3

Tntium in Water None - Not sampled

R• i . :•-, I CA.SOsta?23116-C1 :7:37'RT) c+nityf M7,nht e;86 3:-.

'anrieInteiral (fe g) Tuu p, L Sampingpa~ ,te _DDLatitude EID 0Longitude IJTM Eatn 'UTM Northing

0-5' <158 I 2/9/2007

5-10' <158 i 2/9/200710-15' <158 1 2/9/20071520' <158 2/9/2007_ 38.7612 -91.7774 1846452.23 1066823.75115-20' < 158 [ 2/9/2007,

20-25' <158 2/9/2007Tritium in Water None Not sampled __ __

NOTES:1) Bold value represents value detected above reportng limits.2) DD = Decimal Degrees.3) RT = Right of pipeline.4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. Midwest Laboratory.6) Stations represent field measured approximations!. Not measured by professional surveyors.

Page 22: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

BOREHOLE IDENTIFICATION TABLES

CALLAWAY POWER PLANT

TERRACON PROJECT NO. 09067011T

h. -Bodno CA.-SOL-Sta. 2316 + 66.7, 22'RT VicinityofMýanhboe386-3)

Sample IntervaLd fet tbgs) 'Trhfum' p&iL -iapling Date IDD L,,t(ijde DD Long itujde UTMV Eatng Ur. orhn

0-5' <155 i 2/9/20075-10' <158 2/9/200710-15' <158 2/912007 38.7613 -91.7775 1846425.86 1066883.2415-20' <158 i2/9/200720-25' <158 - 2/9/2007Tritium in Water None I Not sampled

-: Bnn C-S7OL-Sta. 23520 , 'n, 20'RT~ ,c-nity of Manhole 86-2) ,4

Sapýl~ntevtiva(feet bg's) Tri4'Vtium (pCi/L) Sanmpflii DAe DI Laiud DLo.nild TM Etig UTM No ,rthing

0-5' <156 I 2/9/20075-10' <165 i 2/9/200710-15' <165 - 2/9/2007 38.7624 -91.7777 1846378.19 1067280.4915-20' <165 2/9/200720-25' <158 2/9/2007Tritium in Water None I :Not sampled _1

SampleIriý a Trlbgs) pi,) S"1,1i aD ~iiUý DLnjtd UTM Eastin 1-T%1 No(tkmg

3-5' <156 I 10/4/20078-10' <156 1 10/4/200713-15' <156 I 10/4/200718-20' <156 10/4/2007 38.7634 -91.7791 1845957.75 1067660.4823-25' <156 f 10/4/200728-29' <156 10/4/2007Tritium in Water <156 10/12/2007

NOTES:1) Bold value represents value detected above reporting limits.2) DD = Decimal Degrees.3) RT = Right of pipeline.4) LT = Left of pipeline.5) Analysis conducted by Environmental Inc. Midwest Laboratory.6) Stations represent field measured approximations. Not measured by professional surveyors.

Page 23: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

Manhole Tritium Investigation - Phase I TerraconCallaway PlantProject No. 00906701 ITSeptember 8, 2006

Table 2: Manhole 2 - Borehole Sampling ResultsMH 2

0-1': 219,003 6/30/20061-2': 249,630 6/30/2006unspecified 118,988 6/14/2006

Tritium in Water no sample dry

3-5': 673 6/30/20068-10': 791 6/30/200613-15': 966 6/30/200618-20': 1374 6/30/200623-25': 1381 6/30/2006Composite 500 6/30/2006

Tritium in Water 590 6/30/2006Tritium in Water <128' 7/5/2006

IVMHW2ZB12 2 .~:~~73 03ý L3~4. j*

'Sam Ielbjtbriv'I :fe~itbgs) Tritium,_i~Y+ Da~teX3-5': 174 7/11/20068-10': 175 7/11/200613-15': 879 7/11/2006

Tritium in Water 337 7/11/2006

5.5-7.5': 6,378 7/11/200614-16': 2,361 7/11/2006

Tritium in Water 340 7/11/2006

Sam Ipe.,1nt'ervl j~bt-ýbgs Triidfiunj (CL) Dat3-5': 1 <165 7/11/20068-10': <165 7/11/200613-15': <165 7/11/2006

Tritium in Water 435 " 7/11/2006location MH-2 B-1B

2

Page 24: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

Manhole Tritium Investigation - Phase I TerraconCallaway PlantProject No. 009067011TSeptember 8, 2006

Table 2: Manhole 3B - Borehole Sampling Results

0-11': 43,304 7/10/20061-2': 117,359 7/10/2006unspecified 19,257 6/14/2006

Tritium in Water no sample dry

3-5': 187 7/10/20068-10': <159 7/10/200613-15': <159 7/10/200619-20': <159 7/10/2006

Tritium in Water 138 7/10/2006

SahiTtti leI~iL:Date~4-6': <167 7/12/20069-11': <167 7/12/200617-19': <167 7/12/2006

Tritium in Water <139 7/12/2006

- i-~---~-- ~

3-5': <167 7/12/20068-10': <167 7/12/200613-15': <167 7/12/2006

Tritium in Water <139 7/12/2006

k~+~l~113. BA ~~7t55R50~?

3-5': <167 7/12/20068-10': <167 7/12/200613-15': <167 7/12/2006

Tritium in Water <139 7/12/2006

3

Page 25: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

Manhole Tritium Investigation - Phase I TerraconCallaway PlantProject No. 009067011TSeptember 8, 2006

Table 2: Manhole 5 - Borehole Sampling ResultsYM H7"':- YGW5+50:~

jpr1fl@e lrJtfvalte~tb KT~htiurn_ _QiL fDote -

0-1': 141,170 6/30/20061-2': 96,036 6/30/2006unspecified 214,455 6/14/2006

Tritium in Water. no sample dry

S'M H'~-,5,01311 , 1055ý1~

3-5': 174 7/5/20068-10': 3871 7/5/200613-15': <165 7/5/200618-20': <166 7/5/2006

Tritium in Water <128z 7/5/2006

113 1 G5 7ýTL49jj>ý

4-6': <165 7/5/20069-11': <165 7/5/200614-16': <165 7/5/200619.5-21.5': <165 7/5/2006

Tritium in Water <129 7/5/2006

SMH7-5 .13;73~ ' ~105+29 R50-~S-ýapl Je lpervAi~ f bg_7§,5 Tiriit~u? CpiL) Datfe4-6': <166 7/6/20069-11': No Recovery14-16': <166 7/6/200618-20': <166 7/6/2006

Tritium in Water <128 7/6/2006

~, ~' 1354-~ 1 Ž T1061ý2 1 1L21 -V$~Irn~el~itTral fee b(p -Li/L)ii Date L

4.5-6.5': <166 7/6/20069-11': <166 7/6/200614-16': <166 7/6/200619.5 20.5 <166 7/6/2006

Tritium in Water <128 7/6/2006'MH-5 B-1 ,B-1A Comp2 MH-5 B-1A

4

Page 26: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

Manhole Tritium Investigation - Phase I TerraconCallaway PlantProject No. 009067011TSeptember 8, 2006

Table 2: Manhole 6 - Borehole Sampling Results

F2~~¾, ~4,L ŽZ<c!~ ~!IILt'~ C., C tXt¾~,~tr - . . ¾,

unspecified -300'unspecified <160 7/13/2006

Tritium in Water <138 7/13/2006Tritium in Water <160 7/28/2006

3-5': 188 7/13/20068-10': 236 7/13/200613-15': 272 7/13/2006

Tritium in Water <138 7/13/2006.

3-5': <163 7/13/20068-10': 215 7/13/200613-15': 230 7/13/2006

Tritium in Water 188 7/13/2006

! : " ý MH-6 B-3 1'08+036R4:01-

3-5': <163 7/13/20068-10': 221 7/13/2006

13-15': <163 7/13/2006

Tritium in Water <138 7/13/2006

¼MH-6,"B-4 , 107+62 L16/ -

S,5pipiý I nijal&eIý(pt gi)fsK. T~jjtju6rý pi/L '.Date~3-5': 1,204 7/13/20068-10': 2,303 7/13/200613-15': <163 7/13/2006

Tritium in Water 281 7/13/2006

'Reported by AmerenUE

5

Page 27: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

Manhole Tritium Investigation - Phase I TerraconCallaway PlantProject No. 009067011TSeptember 8, 2006

Table 2: Manhole 6B - Borehole Sampling ResultsMH-61 1,99

0-1': 64,704 7/6/20061-2': 53,981 7/6/2006unspecified 144,060 6/14/2006

Tritium in Water no sample dry

3.5-5.5': 2491 7/6/2006

8.5-10.5': 7311 7/6/200613.5-15.5': 33841 7/6/200618.5-20.5': <165 7/6/2006

Tritium in Water 1554 7/6/2006

S~~~i ~ '( e ltrafet b~- s fflf -( ~Ii~ /1 L,) Dat3-5': <166 7/6/20068-10': <166 7/6/200613-15': <166 7/6/200620-21': <166 7/6/2006

Tritium in Water 158 7/6/2006

4.5-6.5': <159 7/10/200613-15': 8,743 7/10/2006

Tritium in Water 1306 7/10/2006

M MH3-6B 4 ~ 1 09t60 Li _____

3-5': 194 7/10/20068-10': 25,863 7/10/200613-15': 5,284 7/10/200618-20': 793 7/10/2006

Tritium in Water 910 7/10/2006

'Composite of B-1 and B-1 B

6

Page 28: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

Manhole Tritium Investigation - Phase I TerraconCallaway PlantProject No. 00906701 1TSeptember 8, 2006

Table 2: Manhole 8 - Borehole Sampling Results

0-1 230,868 6/28/20061-2 147,428 6/28/2006unspecified 57,178 6/14/2006

Tritium in Water no sample dry

3-5': 761 6/28/20068-10': 1,889 6/28/200613-15': <171 6/28/200618-20': <171 6/28/200623-25": <162 6/28/2006

Tritium in Water <124 6/28/2006

3-5': <162 6/28/20068-10': 924 6/28/200613-15': 714 6/28/200618-20': <162 6/28/200623-25": <171 6/28/2006

Tritium in Water <124 6/28/2006

MH48 B 3 1 1

3-5': <162 6/28/20068-10': 290 6/28/200613-15': <162 6/28/200618-20': <162 6/28/200623-25": <163 6/28/2006

Tritium in Water <124 6/28/2006

9-11': 3,651 6/29/200613.5-15.5: <176 6/29/2006

Tritium in Water 159 6/29/2006

7

Page 29: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

Manhole Tritium Investigation - Phase I TerraconCallaway PlantProject No. 00906701 1TSeptember 8, 2006

Table 2: Manhole 9B - Borehole Sampling ResultsMH-9B1 K1i42~+47.5

SaMple Interval (fepet2 Tt• iL ) Date,0-1': 154,956 6/27/20061-2': 53,735 6/27/2006

Tritium in Water <138 5/4/2006Tritium in Water <124 6/28/2006

' MH-9B3 B-1 4+50~<SqrnpIe Interval (feet bgs) Tritiumr(pCi/L), >Date<3.5-5.5': 480 6/27/20068.5-10.5': <166 6/27/200613.5-15.5': <166 6/27/2006

Tritium in Water <124 6/28/2006

MH-9B3 B-2> 1 4-2+90,R50 _____

Sample Interval (feet g,) Tritium (pGiL) &2 Date3-5': 197 6/27/20068-10': <171 6/27/200613-15': <171 6/27/200618-20': <171 6/27/200623-25': <171 6/27/2006

Tritium in Water <124 6/28/2006

MH-91 B-3141+85 L70Sample, 1ntervaI'(feet bgs) -,Tritium~ (pCiL Date3-5': 5,223 6/27/20068-10': <171 6/27/200613-15': 302 6/27/200618-20': 588 6/27/200623-23': 569 6/27/2006

Tritium in Water <124 6/28/2006

MH-9B3B-4 >141+301L15 -~

Sample' Interval- (feet1bgs~) Tritium_________ Date3.5-5.5': 204 6/27/20068-9': 665 6/27/2006

Tritium in Water 155 6/28/2006

8

Page 30: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

Manhole Tritium Investigation - Phase I TerraconCallaway PlantProject No. 009067011 TSeptember 8, 2006

Table 2: Manhole 11A - Borehole Sampling ResultsMH-1 1A ~ 232_______ _80__

Sample Interval (feet bg~s)~ Tritiiuirn5Ci/L)- ~Date.0-1': 816 6/29/20061-2': 669 6/29/2006unspecified 885 6/15/2006

Tritium in Water no sample dry

S§am~ple Inera (fe g Tritium (pCi/L):'~ Date3-5': <176 6/29/20068-10': <176 6/29/200613-15': <176 6/29/2006

Tritium in Water no sample dry

MIH-1 1 A B-2< 232+25 L25~Sample lntqrval (feet bg) (Tritium (p~i/L)j Date3-5': 722 6/29/20068-10': <176 6/29/200613-14': <165 6/29/200617-18': <165 6/29/2006

Tritium in Water <173 7/11/2006

<MH-1I AJB-3 : 'K231+95'R40~

3-5': <176 6/29/20068-10': 992 6/29/200613-15': <165 6/29/200618-19.5: <165 6/29/2006

Tritium. in Water <173 7/11/2006

9

Page 31: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

DIC 2601.2

DECOMMISSIONING RECORDKEEPING LOG

Event ReportNumber(YY-XXX) Prepared by Date Location Event Description

mDrain Tritium discharged to the Storm92-001(1) R. Winslow 11/14/07 Stormd Drain Pond from 1984 - 1992 viaT-1, T02, & T-3 sumps.

Contaminated sumps containing92"002(1) Storm Drain measurable gamma-emitting(combined R. Winslow 11/14/07 Pond isotopes were routed to Turbinewith 92-001) Bldg sumps and discharged to the

Strom Drain Pond.Sewage Sewage Treatment Plant

92-003(1) R. Winslow 11/14/07 Treatment contaminated via a cross-Plant connection from FFTF.Cooling Sludge removed from Cooling

92-004(1) R. Winslow 12/6/07 Tower sludge Towers contains low levels ofdisposal site radioactivity.

Contaminated sediment fromSpray Pond cleanout of the SW Spray Ponds

93-001(1) R. Winslow 12/6/07 sediment in 1989 and 1991 was placed indisposal sites disposal trenches south of the

Protected Area.

Storm Drain PER 298-0783: Isotopic analysis98-001 R. Winslow 12/12/07 Pond of discharge to storm drainindicates some Co-60 present

PER 200-1826: Co-60 found inliquid nitrate waste. These

00-001(2) wastes typically are drained to the,(combined N N/A -.Storm.Drain Storm-Drain Pond_-Determined to-with 98-001) Pond be cross-contamination of sample

container, and not a radioactivedischarge to the SDP.

01_001(2) Storm Drain PER 201-1381: Potentially(combined R. Winslow 12/12/07 Pond contaminated water poured downwith 98-001) drain to Storm Drain Pond

01-002(2) Storm Drain PER 201-1233: Water drained to(combined R. Winslow 12/12/07 Pond Storm Drain Pond usingwith 98-001) potentially contaminated hoses

03-001 Storm Drain PER 203-0856: Tritium levels in(combined R. Winslow 12/12/07 Pond January composite sample ofwith 98-001) storm drain outfall water elevated.

PER 203-2356: Radioactive waterfound in demineralized water

03-002(2) system including DWST.(combined R. Winslow 12/12/07 Storm Drain Leakage from pumps and DWSTwith 98-001) Pond overflow goes to the Storm Drain

Pond. (Note there were multiplePERs - documenting multiplecontamination events.)

Page 1 of 2

Page 32: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

DIC 2601.2

DECOMMISSIONING RECORDKEEPING LOG

03-003(2) PER 203-3885: Tritium detected in(combined R. Winslow 12/12/07 Storm Drain the WOA air wash water. Thiswith 98-001.) Pond drains to the Storm Drain Pond.

05-001 Storm Drain CR 2-05-08789: Increased Co-60(combined R. Winslow 12/12/07 Pond was observed at the Storm Pondwith 98-001) discharge during October.

Soil samples indicate Co-60 and

0/40 Cs-137 along pipe with higherlevels indicated in valve box 12.06-1 MLodne Contamination in CBD valveboxes re-mediated (reference AR-

OER 53852).

(')Reference G02-06-100, COLUMBIA GENERATING STATION, DOCKET NO. 50-397,GROUNDWATER PROTECTION - DATA COLLECTION QUESTIONNAIRE(2)Reference PTL 244301, REVIEW SITE OPERATING HISTORY FOR EVIDENCE OF PASTSPILLS AND LEAKS TO THE ENVIRONMENT

Page 2 of 2

Page 33: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

~k

Page 34: Borehole Identification Tables, Callaway Power Plant ... · Tritium in Water

.1