boq sample 2

Upload: sheikh-nouman-mohsin-ramzi

Post on 21-Feb-2018

301 views

Category:

Documents


1 download

TRANSCRIPT

  • 7/24/2019 BOQ Sample 2

    1/18

    CONTENTS

    1

    2 Excavationandearthwork

    3 Concretework

    4 Masonrywork

    5 Thermalandmoistureprotection

    6 Structuralsteel

    7 Roofingwork

    8 Metalwork,doorsandwindows

    9 Floorwallandfinishing

    10 Paintinganddecoration

    11 Electricitywork

    Bill No. 03 : Toilet Blocks

    12 Excavationforsewagesanddrainage

    13 Concretework

    14 Masonrywork

    15 Thermalandmoistureprotection

    16 Structuralsteel

    17 Roofingwork

    18 Metalwork

    19 Floorwallandfinishing

    20 Painting

    21 Plumbingandventilation

    Bill No. 02 : Room Works

    BILL OF QUANTITIES

    PROPOSED RENOVATION OF MIN. LABOR AND PUBLIC SERVICES OFFICES

    Bor, Joglei State

    Bill No. 01

    Preliminaries

  • 7/24/2019 BOQ Sample 2

    2/18

    Amount Amount

    USD ( Per SQ.M ) %

    Bill No. 01

    1 Preliminaries -

    Bill No. 02 : Room Works

    2 Excavation

    and

    earth

    work

    -

    3 Concretework -

    4 Masonry

    work -

    5 Thermal

    and

    moisture

    protection -

    6 Structural

    steel -

    7 Roofingwork -

    8 Metal

    work

    ,doors

    and

    windows -

    9

    Floor

    wall

    and

    finishing

    -

    10 Paintinganddecoration -

    11 Electricity

    work -

    -

    Bill No. 03 : Toilet Blocks

    12 Excavationforsewagesanddrainage -

    13 Concrete

    work -

    14 Masonry

    work -

    15 Thermalandmoistureprotection -

    16 Structural

    steel -

    17 Roofing

    work -

    18 Metal

    work -

    19 Floorwallandfinishing -

    20 Painting

    -

    21 Plumbing

    and

    ventilation -

    -

    -

    -

    Total Gross Floor Area (m) 406

    Price per SQ. m -

    Summary of Bill Carried to Grand Summary

    BILL OF QUANTITIESPROPOSED RENOVATION OF MIN. LABOR AND PUBLIC SERVICES OFFICES

    Bor, Joglei State

    SUMMARY

    Item Description

  • 7/24/2019 BOQ Sample 2

    3/18

    Item Description Qty Unit Rate$ AmountUSD

    A. BillNo:01 PRELIMINARIES

    Notes

    Thecontractorshallprovideandmaintaintemporaryshedsforthestorage

    ofmaterials,tools,andtheuseofallpersonsemployedontheSite. Those

    usedforthestorageofcementandotherperishablematerialsandthelikeare

    to be weather roofed at all times

    1 item

    ThecontractorshallProvide,maintainandkeepinacleancondition

    adequatetemporarysanitaryaccommodationandfacilities,ANDAFirstAid

    Boxinaccordancewithlocalregulationsforallpersonsemployedonthe

    Works.

    TheContractorshallProvide,maintainandkeepinacleancondition

    adequatetemporarysanitaryaccommodationand

    facilitiesinaccordancewithlocalregulationsforall

    ersons em lo ed on the Works.

    1 Item

    ThecontractorshallProvideforsupplyingtemporaryelectricityforthe

    Worksandfacilitiesofthecontractorincludingconnection,distribution

    systemforthework,internalarrangementsandallpaymenttotheauthorities

    forconnections.It

    is

    the

    responsibility

    of

    the

    Contractor

    to

    ensure

    steady

    and

    uninterruptedpowersupplytoWorks. TheContractorshallnotbeentitledto

    claimandtheEmployershallnotpaycostincurredbytheContractorfor

    powersupplyorforusingelectricpowergeneratorsorforusingother

    alternativepowersupplymethodsincasetherehappenstobeneedforsuch

    powersupplyforwhateverreason.

    1 Item

    ThecontractorshallProvide forprovisionofwater fortheworksincluding

    drinkingwater,andpayingallchargesandotherexpensesinconnectionwith

    thesupplyfromwatermainsoranyotheralternativemethodofwatersupply,

    storageanddistribution. Itisthesoleresponsibilityofthecontractorto

    ensuresteady,uninterruptedadequatesupplyofwaterrequiredformain

    contractandnominatedsubcontractwork.

    1 Item

    A.1 Allowforprovidingandmaintenanceofnameboard(advertisingboard) to

    thespecificationsandasdirectedbytheEngineer. 1 Item

    A.2

    Allowfor mobilizationIncluding:AlltheContractor'splant,machinery,other

    equipments,workforceetc tothesite,settingout,establishingbench

    marks,andallpreliminaryworksincludingthoseNotedabove

    1 Item

    A.3 Allowfor providingThree(3)MetallicFlagPolesandMasonryFlagarea

    PlatformtothespecificationsandasdirectedbytheEngineer. 1 Item

    ToSummary

    A SubTotalBill01:Preliminaries

    BILLOFQUANTITIES

    PROPOSEDRENOVATIONOFMIN.LABORANDPUBLICSERVICESOFFICESBor,JogleiState

  • 7/24/2019 BOQ Sample 2

    4/18

    B BillNo02Roomwork

    B.1 EXCAVATIONSANDEARTHWORKS

    Unlessotherwisestated,Rateshallincludefor

    a)backfillingwithselectedexcavatedmaterial&consolidating;compaction

    beforebackfillingaround thefoundationplinthwall

    b)disposal

    of

    surplus

    soil

    as

    directed

    &

    keeping

    all

    excavations

    free

    from

    waterunlessotherwisemeasuredseparately.

    c)anyadditionalexcavationforworkingspace.

    d)excavatinginanymaterial,includingrunningsandandrock,commencing

    excavationatanydepth,excavatingbelowthenormalwatertable,excavating

    aroundexistingservicesandmains,supportingtheverticalsidesof

    excavations and fillin soft s ots.

    Excavation&EarthworkSupports

    B.1 Clearingandpreparationofthesiteincludingremovaloftopsoiluptoa

    depthof150mmanddisposedoffasdirected.2800 m

    B.2

    Excavationforstripfoundationstrench;0.60mwideby1.2mdeep fromthe

    strippedlevelinanymaterialexceptrock:includeremovalofsurplusas

    directed,andbackfillingaroundthestripfoundationwithslectedexcavated

    material: ram and com act well .

    217 m

    B.2a

    ExcavationforColumnFootings;1.0mwideby1.0mby1.8mdeep fromthe

    strippedlevelinanymaterialexceptrock:includeremovalofsurplusas

    directed,andbackfillingaroundthestripfoundationwithslectedexcavated

    material: ram and com act well .

    79 m

    B.2b

    ExcavationforSplashApron0.45mwideby0.9mdeep fromthestrippedlevel

    inanymaterialexceptrock:includeremovalofsurplusasdirected,and

    backfillingaroundthestripfoundation,andfillingwithslectedexcavated

    material;leveled,rammedandcompactedwell.

    56 m

    Filling

    B.3 Fillingunderfloorswith300mmThick HardcoreLayerofsize80mmto

    150mm.S readin waterin andwellrammin in50 m

    B.4

    Fillingunderfloorswith300mmthickMurramLayer.Spreading,wateringand

    wellrammingin.Murramshallbeplacedinlayersof notmorethan150mm

    andwellcompactedbeforeaddingthenextlayer.

    190 m

    B.4a DittoforSplashApronFillingunderfloorswith150mmthickMurram.

    Spreading,wateringandwellrammingin37 m

    B.5 50mmthickSandblinding 6.00 m

    B.6

    Anti termitetreatmenttofillingsandtopsoffoundations:as"Aldrex"or

    equalandapprovedinsecticidetreatment:appliedinaccordancewiththe

    manufacturer'sprintedinstructions:includefor10yearswarranty period.

    635 m

    B ExcavationandEarthWorks ToSummary

  • 7/24/2019 BOQ Sample 2

    5/18

    C CONCRETEWORKS

    a RateshallincludeforallthenecessaryFormworkandaccessories,including

    wrinches nails etc.Note

    b

    RateshallincludeforFormworkdepositing&shutteringincluding

    wrinches,nails,handling,hoistingintoposition,vibrating,curingetc.and

    makin oodafterremovalofformworketc.

    Note

    b Reinforcementsarepaidseparatelyunlessotherwisespecifiedintheitem Note

    c

    Rateshallincludeforsupplyingandlayingofgauge1000polytheneonground

    whereconcreteisindirectcontactwithground,beforepouringconcrete

    unless otherwisemeasuredseparately.

    Note

    d Rateshallincludeforcuringthreetimesadayfor7days. Note

    InSituConcrete:

    Insituconcreteclass20/20mmaggregates asdescribed.

    C.1 SupplyingandplacingofC.20screedconcreteasspecifiedto200mmthick

    concretestripfoundationfootings24.00 m

    Ditto:100mmthickblindingunderstripfoundation 12.00 m

    C.1a Ditto:100mmthickSplashApron 6.00 m

    Ditto:100mmthickblindingundercolumnsfooting 4.40 m

    Insituconcrete

    class

    25/20mm

    aggregates

    as

    described:

    C.2

    SupplyingandplacingofC.25concreteasspecifiedto250mmthickconcrete

    Columnfootings11.00 m

    C.2a

    Ditto:to100mmthickfloorSlab 64.00 m

    C.2b

    Ditto:toColumns 5.00 m

    C.2c

    Ditto:toshortcolumns 4.00 m

    C.2d Ditto:to(250mmx200mm)GroundBeams 15.00 m

    Ditto:toseptictanks200mmthickness 8.00 m

    Dittoto:(250mmx200mm) RoofTieBeamsBeams 15 m

    Reinforcement

    Ratetoincludeforsupplying,cleaning,cutting,bending,fabricating,placing

    andthe

    provision

    of

    all

    necessary

    temporary

    fixings

    and

    supports

    etc.

    includingbindingwires,bends,hooks,tyingwires,chairs,distanceblocks,

    steel se arators s acers

    C.3

    Torsteel reinforcement(toBS4449andcharacteristicstrengthfy=

    460N/mm2)andMildsteelreinforcement(toBS4449andcharacteristic

    stren thf =250N/mm2

    1000 kgs

    C.4 R6mildsteelreinforcementbarsbStirrups

    C.5 Highyieldreinforcementbars(Y12) 4000 kgs

    Supplying& laying A142BRCnet for groundfloorslab:includelapsand

    waste635 m

    C.6

    C.7

    C.8

    C ConcreteWorks ToSummary

  • 7/24/2019 BOQ Sample 2

    6/18

    D MASONRYWORKS

    a

    Rateshallincludeforallthescaffolds,lifting,handling,weightingallroughand

    faircutting,plumbingangles,normalstraightcutting,formingrebatedreveals

    andrakingoutjointsforplastering,andcuringthreetimesadayfor7days.

    b TheContractorisrequiredtousesolidprecastBlockwork. Note

    MasonryWork

    UptoDPClevel

    D.1 Solidconcreteblockwallsincementsand(1:4)mortarinsteps

    D.2 225mmthickSolidBlockPlinthwallsincementsand(1:4)mortarin

    foundations483.00 m

    Blockwork

    D.3 200mmthickwallsinstandardprecastsolidcementblocks in1:4cement

    sandmortarforthewalls. 906 m

    D.3a Ditto.forSplashApron 110 m

    `

    D MasonryWork ToSummary

    E THERMALANDMOISTUREPROTECTION

    DampProofCourse

    E.1 Horizontaldampproofcourse:bituminous:laidhorizontallyonscreeded200

    mmthick(1:3)screededbedstoreceiveblock walls. 50 m

    Dampproof membrane

    E.2

    Horizontaldampproofmembrane:1000gaugepolythenemembrane:laidon

    compacted fillings(measuredseparately)ingroundfloor slab.(Therate

    shallincludeforla s&wasta e .

    635 m

    E ThermalandMoistureProtection ToSummary

  • 7/24/2019 BOQ Sample 2

    7/18

    F ST RUCT UR ALSTEELWORKS

    Definitions

    Weldingisdeemedtobeinaccordancewiththespecificationandforthe

    materialtowhichitistobeused.Gussetplates,shoeplates,ends,caps,

    cleats,brackets,stiffeners,bolts,etc.,havebeenincludedtotherateofthe

    associated steel worksNote:

    a] Forthedescriptionofmaterialsand workmanshipreferto"Specification

    of works", "preambles"and"Drawings". Note

    b] Rateshallincludefor Note

    b.1] Allshopfabricationwork,marking,delivery,unloading,hoisting,erecting

    andfixingasper detaildrawings. Note

    b.2] Allweldsare6mmthickfilletweld&allowanceforrollingmargin. Note

    b.3] Theweightofweldmetalinweldedconstructions. Note

    b.4] Membersofanylength. Note

    b.5] Cuttingtosizeandshapeandjointsintherunninglength. Note

    b.6] Grindingtoasmoothfinish,unlessotherwiserequired. Note

    b.7] Machinedrilledboltholes,bolts,nutsandwashers,cleats,shoeand

    gussetplatesandallotherconnections. Note

    b.8] Afterfabricationwirebrushedtocleantheallsteelsurfacesandspray

    paintedwithtwocoatsofquickdryingmetalprimerzincphosphate&two

    coatsofmattanticorrosivewithnecessaryaccessories.

    Note

    Fabricatinganderectingframedstructures Note

    F.1a

    RooftrusstypeT1;spanning15600mmwidex4500mmhigh,consistingof

    80x60x6mm(doublebottommember)structuralrectangulartubemembers

    weldedtogussetplateallasperdetaildrawing;Rateshallincludeforpainting

    as s ecified.

    86 No

    F.1b

    RooftrusstypeT2;spanning3000mmwidex2200mmhigh,consistingof

    80x60x6mm(doublebottommember)structuralrectangulartubemembers

    weldedtogussetplateallasperdetaildrawing;Rateshallincludeforpainting

    as s ecified.

    20 No

    RooftrusstypeT3forthePorcharea;spanning7800mmwidex2500mm

    high,consistingof 80x60x4mmstructuralrectangulartubememberswelded

    togussetplateallasperdetaildrawing;Rateshallincludeforpaintingas

    s ecified.

    324 No

    F

    Purlins

    Supplying&fixingofZedpurlins,100x50x2mm:weldedtorooftrusses(

    measuredseparately)at850mmcentres:completewithalltherequiredpaint

    worksandallnecessar su orts

    620 m

    G

    StructuralSteelWorks ToSummary

  • 7/24/2019 BOQ Sample 2

    8/18

    a.01

    ROOFINGWORKS

    a.02 Rateshallinclude;

    All,rivets,nails,clips,stripsanddeliveringandfixinginposition. Note

    G.1 Note

    Roof plumbingshallbemeasured&groupedseparately;

    RoofCovering Note

    G.2

    Supplying & fixing ofgauge28prepaintedIT4(SuperEcooritsequivalent)

    profiled roofing sheetsofapprovedcolour:fixed withJboltsto100x50x

    2mmzedpurlins(measuredseparately) andrubbercapingtotopsofbolts

    648 m

    Ridges

    G.3

    Supplying&fixingGauge28prepaintedridgecap;650mmgirth(average)in

    positioncompletewithallnecessaryroofingscrewsorhooksasrequired. 120 m

    G.4

    FasciaBoard

    G.5

    30x200mm,high1.2mmthickSteelRoofFasciaBoardfixedtoedgesofrafters

    includingnecessary

    fittings

    screws

    etc.:

    including

    painting

    as

    specified

    138 m

    Supplying&fixingofPVCsquareeaveguttersofcrosssection200mmx

    200mmorass ecified includin allnecessar accessories138 m

    a.02

    Supplying&fixingof110diaPVC rainwaterdownpipeswithmetalstrapsto

    concreteblockworkasperdetailonDrawingat1000mmcentresvertically 50 m

    a.03

    CielingConstruction

    G.5 ratesshallincludeandgavanizessteelnetworkasspecificationanddrawing

    provide&fixingaluminumfalseceiling 638 m

    G

    H

    a RoofingWorks ToSummary

    b

    METALWORKS DOORSANDWINDOWS

    b.01

    Theworkshallincludesupply,fabricateandinstallationofdoors,windows,

    madeoutof steel tobefinishedaspertherespectivespecification&

    drawin s.b.02

    Doors &Windowsframesectionstobeof, Note

    b.03

    Outerframe&Innerframe 75mmx75mmminimum FinishSize,unless

    otherwisestated.

    b.04

    Thecontractorshallsubmitshopdrawingsfortheapprovalofthe Engineer,

    priortofabrication. Note

    b.05

    Thecontractorshallrefertoallrelevantspecificationsanddrawingspriorto

    pricinganditshallbehisresponsibilitytocompletethesaidworkstothe

    entiresatisfactionoftheEn ineeratnoadditionalcost

    Note

    c

    AllsamplesshallbeprovidedforEngineer'sapprovalpriortopurchaseof

    material.Note

    c.01

    Whereswingdoorshasbeenspecifiedpricesshallincludeforprovisionsof

    floorhinges.Note

    c.02

  • 7/24/2019 BOQ Sample 2

    9/18

    Ratesshallinclude; Note

    c.03

    Hoistingandfixinginposition,drillingandmakinggood.

    c.04

    Alltheshopdrawings,asmayberequired,shopfabricationwork,marking,

    deliver unloadin hoistin erectin andfixin in laceNote

    c.05

    Afterfabricationwirebrushedtocleanthesteelsurfacesandspraypainted

    withtwocoatsofquickdryingmetalprimerzincphosphate&threecoatsof

    mattanticorrosivewithnecessar accessories.

    Note

    d

    Rateto

    include

    for

    providing

    sundry

    items

    related

    to

    the

    door

    &

    windows

    like

    stoppersetc..Note

    d.01

    Rateshallincludefor5mmthickonewaytintedglassasappropriatetosuit

    therespectivedoorsandwindowsasshowninthedrawings.Note

    d.02

    Sizes Note

    e

    ThesizesgiveninthedrawingsanddescriptionofBillofQuantitiesare

    finished sizesandsubjecttosame permittedinthespecifications.

    e.01

    Thecontractorshallcheckthe measurementofopeningsphysicallyatthesite

    beforefabricatin thedoors&windows.Note

    e.02

    Ironmongery Note

    f

    Allthelocksshallbeunion/Yaleorapprovedequivalentsuppliedby

    authorizeddealer

    appointed

    by

    the

    manufacturer

    &

    approved

    by

    the

    En ineer.f.01

    AllironmongeryshallbeheavyqualitybrassofapprovedEuropean

    manufacturesubject toapprovaloftheArchitect,ironmongerysamples

    shouldbesubmittedfora roval.

    Note

    Painting/FinalFinish Note

    H.1

    Unlessotherwisestatedallsurfacesofmetaldoors andwindowsand

    casementsanddoorsashesshallbefinishedwiththreecoatsofoilpaint,with

    thecolourtobeapprovedonsitebytheEngineerpriortoapplication.

    H.2

    Metaldoors Note

    H.3

    Metaldoorset,typeD1,twoshuttersofsize1800x2200mmhighoverall,

    comprisingof

    100mm

    steel

    channel

    frame

    fully

    welded

    and

    mitred

    at

    corners:

    includefor5mmthickonewaytintedglassandallnecessarydoorlocks,iron

    mongery,finalfinish,&fixingtoconcreteorblockwork

    2 Nos.

    H.4

    Metaldoorset,typeD2,ofsize120x2200mmhighoverall,comprisingof

    100mmsteelchannelframefullyweldedandmitredatcorners:includefor

    5mmthickonewaytintedglassandallnecessarydoorlocks,ironmongery,

    finalfinish,&fixingtoconcreteorblockwork

    8 Nos.

    H.5

    Metaldoorset,typeD3,ofsize900x2100mmhighoverall,comprisingof

    100mmsteelchannelframefullyweldedandmitredatcorners: includeforall

    necessarydoorlocks,ironmongery,finalfinish,&fixingtoconcreteor

    blockwork

    20 Nos.

    MetalWindows

    H

    Standardsteelcasementwindowset,typeW1,ofsize1200mmx100mmhigh

    overallcompletewithstays,comprisingof 100mmsteelchannelframefully

    weldedand

    mitred

    at

    corners:

    include

    for

    5mm

    thick

    one

    way

    tinted

    glass

    and

    allnecessaryfastenersandironmongery,finalfinish,&fixingtoconcreteor

    blockwork.Thewindowsaretobeprovidedwithbarglarproofingasper

    drawingsandopeninginwards.

    39 Nos.

    SteelwindowGrilleset,typeG1,ofsize3360mmx1200mmhighoverall

    completewithstays,comprisingof 50x50mmx3mmmmSquareHollow

    Sectionsframefullyweldedandmitredatcorners:includefor4mmwelded

    Mesh,infilledwithanintegralinsectscreen,finalfinish,&fixingtoconcreteo

    blockworkasperdrawings.Provideforsun/rainshade/canopiesabovethe

    30 Nos.

    I

    Metal Work Doors & Windows ToSummary

  • 7/24/2019 BOQ Sample 2

    10/18

    a

    b FLOOR,WALLANDCEILINGFINISHES

    Therateshallincludeforalltemporaryrules,screeds,groundsetc.forraking

    outjointsofnewbrickworkorhackingnewconcreteforkey,internal&

    curvedangles,jointsbetweendifferentsurfacesarisesquirks,intersections

    between curved or irre ular sections.I.1

    AllsamplesshallbeprovidedforapprovalbytheEngineerpriortopurchaseof

    materials. NoteI.2

    WallFinishes Note

    25mmthickcement&sand(1:5)plasterfinishedsemiroughwithwoodfloat

    onexternalfaces,onblockwallsorconcretesurfaces.ProvideforPointing

    Groovesinthefinishas erthedrawin s

    906 m

    20mmthickcementlimesand(1:1:5)plasterfinishedsmoothwithlimeputty

    orapprovedequivalentoninternalfaces,onblockwallsorconcretesurfaces. 906 m

    I.3

    Floorfinishes

    I.4

    I.5

    450mmx450mmPorcelainfloortilesinclusiveofskirting,100mmhigh.Rate

    shall

    include

    the

    necessary

    screed,spacers

    etc.(Samples

    of

    Tiles

    to

    be

    approvedbytheengineer)

    635 m

    I.5a

    DittoforthePorches 25 m

    20mm.thickcementandsand1:3screedfinishedsmoothtoSplash

    Apron:Sloped55 m

    I.6

    Ditto:Treadsandrisers 3 m

    I PlinthPlaster

    25mm.thickcementandsand1:3plinthplasterfinishedsmooth.

    J 15 m

    a Floor,Wall&CeilingFinishes ToSummary

    bPAINTINGWORKS

    Rateshallincludeforpreparationofsurfacecleaningdown,smoothing,

    knotting,stoppingetc.protectionoffloorsandfittings,furniture,etcand

    cleanin doorsandwindowsetc.u oncom letion.J.1

    Paintshallbefromapprovedcolourwithapprovedmanufacturer. Note

    J.2

    Walls Note

    J.3

    Prepareandapplyonecoatofprimerandthreecoatsofweathershieldpaint

    ofapprovedcolourandqualitytoexternalfacesofwalls906 m

    J.4

    PrepareandapplyonecoatofprimerandthreecoatsofVinylemulsionpaint

    ofapprovedcolourandqualitytointernalfacesofwalls 906 m

    J Ditto:Plinths 20 m

    K

    a PaintingWorks ToSummary

  • 7/24/2019 BOQ Sample 2

    11/18

    b

    ELECTRICAL INSTALLATIONS

    K.1

    Unlessotherwisestated,RatesinBillofQuantitiesshallincludeallnecessary

    Hacking,provisionofholes,allmaterialsincluding;Cables,conduits,PVCsunk

    box,bulbs,switchesetc.)andlabourrequiredtocompletetheelectrical

    installation to ood workin order.

    Note

    Testingandcommissioningoftheelectricalinstallationistobecarriedoutby

    thecontractorandCostofsuchtestingandreportstobeincludedintherates

    unlessotherwise

    mentioned

    se aratel .

    Note

    MCCB,MCBshallbemanufacturedbyHarvels,Merlin Gerin,F&G,Moleror

    equivalent &approvedbytheEngineer.

    SupplyandinstallationofChangeoverswitchgear,controlpanelcubiclemade

    outof(2mmthickness)sheetsteelenclosure,withallassociatedCircuit

    BreakersfortheLights,SocketsandCielingFanstotheapprovalofthe

    en ineer include for all associated wirin .Item

    K.2

    Note

    K.3

    providesockets,wires,switches,PVCsunkboxandinstallation 1 item

    providelamps 31 No

    K.4

    SupplyandinstallationofapprovedtypeceilingFans,completewiththe

    neccessar switchesandconcealedwirin .20 No

    L

    Airconditions

    a theratesinlcudedprovidingandinstallationfortheairconditions 7 No

    b

    ElectricalWorks ToSummary

    c

    PROVISIONAL SUMS

    L.1

    Thework

    to

    be

    done

    and

    or

    materials

    to

    be

    provided

    which

    is

    covered

    by

    the

    followingProvisionalSumsformpartoftheWorksandshallbecompleted

    withintheTimeforCompletionfortheapplicableSectionorPortionofthe

    Works.L

    PaymentsagainsttheProvisionalSumsshallbesubjecttoawritten

    instructionbytheEngineerforanyadditionalworksdeviatingfromthetender

    documents

    Note

    Wherenoinstructionshavebeenissuedinrespectofadditionalworksagainst

    theprovisionalsum,thevalueoftheprovisionalsumshallbedeductedfrom

    thecontractor'scontractsum.

    Note

    B

    Allowprovisionalsumtocoverpossibleadditionalcostsduetoanydeviation

    fromthetenderissuedocuments.Paymentsagainstthisitemshallbesubject

    toanEngineer'sinstructionforadditionalworks.Anysumsagaisnt thisitem,

    forwhichnoinstructionhasbeenissuedshallbedeductedfromthefinal

    certificateofpaymentduetothecontractor.

    Note

    PS

    Provisional Sums 1

    ToSummary

    SubTotalBill02: Room Works

  • 7/24/2019 BOQ Sample 2

    12/18

    BillNo.03ToiletBlock

    EXCAVATIONSANDEARTHWORKS

    Unlessotherwisestated,Rateshallincludefor

    a)backfillingwithselectedexcavatedmaterial&consolidating. Surface

    treatment;compactionbeforefilling/foundation

    b)disposal

    of

    surplus

    soil

    as

    directed

    &

    keeping

    all

    excavations

    free

    from

    waterunlessotherwisemeasuredseparately.

    c)anyadditionalexcavationforworkingspace.

    d) Treeswillrequireprotection

    B.1

    e)keepingtheexcavationsfreeofwater(includingrainwater),plankingand

    strutting,etc

    f)excavatinginanymaterial,includingrunningsandandsoftrock,

    commencingexcavationatanydepth,excavatingbelowthenormalwater

    table,excavatingaroundexistingservicesandmains,supportingthevertical

    sides of excavations and fillin soft s otsB.2

    Excavation&Earthworks

    B

    Clearingandpreparationofthesiteincludingcuttingdown smalltreesand

    shrubsandremovaloftopsoiluptoadepthof150mmandextendupto2m

    beyondtheouterwallsofthebuilding&disposedoffasdirected.

    32 m 0

    Bulkexcavations

    C

    Excavationforseptictank(4.0mx2.5mx4.0m)deepfromthestrippedlevelin

    anymaterialexcepthardrock:includeremovalofexcavatedmaterialand

    de ositawa asdirected.ProvideforWorkin S ace

    106 m

    C

    ExcavationandEarthWorks ToSummary

    a

    b ConcreteWork

    CONCRETEWORKS

    C.1 Rateshallincludeforformworkdepositing,handling,hoistingintoposition,

    vibrating,curingetc.andmakinggoodafterremovalofformworketc.

    C.2

    Reinforcementsarepaidseparatelyunlessotherwisespecifiedintheitem Note

    C.3

    Note

    C.4 Insituconcreteclass20/20mmaggregates asdescribed.

    C.5 SupplyingandplacingofClass20,concreteasspecifiedon100mmthickbeds 2 m

    Ditto:suspendedslabs:4.0mx2,5mwith200mmthick 4 m

    Ditto100mmThick,(Ratio:1:3:6)PlainConcretetotheentrance 2.00 m

    Supportcolumns150mmx150mmThick,(Ratio:1:3:6)Concrete 1.00 m

    SupportmidlevelBeam200mmx200mmThick,(Ratio:1:3:6)Concrete 1.00 m

    C.6

  • 7/24/2019 BOQ Sample 2

    13/18

    Reinforcement:

    C.6

    Ratetoincludeforsupplying,cleaning,cutting,bending,fabricating,placing

    andtheprovisionofallnecessarytemporaryfixingsandsupportsetc.

    includingbindingwires,bends,hooks,tyingwires,chairs,distanceblocks,

    steelseparators/spacers(designedlapsandm.s.chairsifanyincludedin

    C.7

    Torsteel reinforcement(toBS4449andcharacteristicstrengthfy=

    460N/mm2)andMildsteelreinforcement(toBS4449andcharacteristic

    strengthfy=250N/mm2)

    Note

    C Y12 highyieldreinforcementbars(standardlength12m) 500 kgs

    R6mildsteelreinforcementbars(6mstandardlength).Stirrupstobeevery

    200mmc/c.250 kgs

    D

    Lintelsoveropenings(size200x200mm)incrosssection:including 4No.T10

    barsandR6linksat100mmcentres,completewithallformwork 24 m

    a

    ConcreteWorks ToSummary

    D.1

    MASONRYWORK

    D.2

    Rateshallincludeforlifting,handling,weightingallroughandfaircutting,

    plumbingangles,

    normal

    straight

    cutting,

    forming

    rebated

    reveals

    and

    raking

    outjointsforplastering.

    UptoDPClevelSubstructure Note

    D.3

    225mmthickSolidBlock wallsincementsand(1:4)mortarforthe

    substructurewall,6.3mhigh

    50 m

    D DittoforCurtainWall,0.6mDeep

    10 m

    Concreteblockwork

    E

    200mmthickSolidBlock wallsin1:4cementsandmortarforthewalls. 106 m

    E.1 MasonryWork ToSummary

    E THERMALANDMOISTUREPROTECTION

    Dampproofcourse

    F

    Horizontaldampproofcourse:bituminous:laidhorizontallyonscreeded20

    mmthick(1:3)screededbedstoreceiveblock walls.18 m

    ThermalandMoistureProtection ToSummary

    STRUCTURAL METALWORK

    Definitions

    Weldingis

    deemed

    to

    be

    in

    accordance

    with

    the

    specification

    and

    for

    the

    materialtowhichitistobeused.Gussetplates,shoeplates,ends,caps,

    cleats,brackets,stiffeners,bolts,etc.,havebeenincludedtotherateofthe

    associated steel work in which the occur.

    Note: Note

    a] Forthedescriptionofmaterialsand workmanshiprefer"Specificationof

    works", "preambles"and"Drawings".

    b] Rateshallincludefor Note

    b.1] Allshopfabricationwork,marking,delivery,unloading,hoisting,erecting

    andfixingasper detaildrawings.Note

  • 7/24/2019 BOQ Sample 2

    14/18

    b.2] Allweldsare6mmthickfilletweld&allowanceforrollingmargin. Note

    b.3] Theweightofweldmetalinweldedconstructions. Note

    b.4] Membersofanylength. Note

    b.5] Cuttingtosizeandshapeandjointsintherunninglength. Note

    b.6] Grindingtoasmoothfinish,unlessotherwiserequired. Note

    b.7] Machinedrilledbolt,holes,bolts,nutsandwashers,cleats,shoeand

    gussetplatesandallotherconnections.Note

    F.1

    b.8] Afterfabricationwirebrushedtocleantheallsteelsurfacesandspray

    paintedwithtwocoatsofquickdryingmetalprimerzincphosphate&two

    coatsofmattanticorrosivewithnecessaryaccessories.

    Note

    F.2 Fabricatinganderectingframedstructures Note

    Roof structures

    F

    Rooftruss,T.4,spanning1700mmwide;tapperedallasperDrawing.

  • 7/24/2019 BOQ Sample 2

    15/18

    Purlins 6 No

    G

    Supplying&fixingofZedpurlins,100x50x2mm:weldedtorooftrusses(

    measuredseparately)at900mmcentres:completewithalltherequiredpaint

    worksandallnecessar su orts

    30 m

    a.01 StructuralMetalWorks ToSummary

    a.02

    ROOFCOVERINGSANDROOFDRAINAGE

    a.03

    Rateshallinclude;

    a.04

    All,rivets,nails,clips,stripsanddeliveringandfixinginposition. Note

    AlltimbershallapplyPrimingbacks&applyingtwocoatsofanapproved

    woodpreservativebeforefixing.Note

    G.1

    Alltimbershallhavefinalfinish;Twocoatofwoodpreservative,twocoatsof

    primer,twocoatsofwoodsheenspraypaint.Note

    Roof drainageshallbemeasured&groupedseparately Note

    G.2

    RoofCovering Note

    G

    Supplying & fixing ofgauge28prepaintedIT4profiledroofing sheetsof

    approvedcolour:fixed withJboltsto100x50x2mmzedpurlins(measured

    se aratel

    andrubber

    ca in

    to

    to s

    of

    bolts

    24 m

    FasciaBoard

    H

    30x200mm,high1.2mmthickSteelRoofFasciaBoardfixedtoedgesofrafters

    includingnecessaryfittingsscrewsetc.:includingpaintingasspecified

    a 16 m

    b RoofCoverings&Roof Drainage ToSummary

    b.01

    METALWORK DOORSANDWINDOWS

    b.02

    Theworkshallincludesupply,fabricateandinstallationofdoors,windows,

    madeoutof steel tobefinishedaspertherespectivespecification&

    drawin s.

    b.03Doors &Windowsframesectionstobeof, Note

    b.04

    Outerframe&Innerframe 75mmx75mmminimum FinishSize,unless

    otherwisestated.

    c

    Thecontractorshallsubmitshopdrawingsfortheapprovalofthe Engineer,

    priortofabrication.Note

    c.01

    Thecontractorshallrefertoallrelevantspecificationsanddrawingspriorto

    pricinganditshallbehisresponsibilitytocompletethesaidworkstothe

    entiresatisfactionoftheEn ineeratnoadditionalcost

    Note

    c.02

    AllsamplesshallbeprovidedforEngineer'sapprovalpriortopurchaseof

    material.Note

    c.03

    Ratesshallinclude; Note

    c.04

    Hoistingand

    fixing

    in

    position,

    drilling

    and

    making

    good.

    c.05

    Allshopfabricationwork,marking,delivery,unloading,hoisting,erectingand

    fixinginplace.Note

    d

    Afterfabricationwirebrushedtocleanthesteelsurfacesandspraypainted

    withtwocoatsofquickdryingmetalprimerzincphosphate&twocoatsof

    mattanticorrosivewithnecessar accessories.

    Note

    d.01

    Ratetoincludeforprovidingsundryitemsrelatedtothedoor&windowslike

    stoppersetc..Note

    d.02

    Rateshallincludefor4mmthicksteelplateasappropriatetosuitthe

    respectivedoorsandwindowsasshowninthedrawings.Note

  • 7/24/2019 BOQ Sample 2

    16/18

    e

    Sizes Note

    e.01

    ThesizesgiveninthedrawingsanddescriptionofBillofQuantitiesare

    finished sizesandsubjecttosame permittedinthespecifications.

    e.02

    Thecontractorshallcheckthe measurementofopeningsphysicallyatthesite

    beforefabricatingthedoors&windows.Note

    f

    Ironmongery Note

    f.01

    Allthelocksshallbeunion/Yaleorapprovedequivalentsuppliedby

    authorizeddealerappointedbythemanufacturer& approvedbythe

    En ineer.

    AllironmongeryshallbeheavyqualitybrassofapprovedEuropean

    manufacturesubject toapprovaloftheArchitect,ironmongerysamples

    shouldbesubmittedfora roval.

    Note

    H.1

    Painting/FinalFinish Note

    H.2

    Unlessotherwisestatedallsurfaceoftimberdoors andwindowsand

    casementsandplywooddoorsashesshallbefinishedwithtwocoatofwood

    preservative,twocoatsofprimer,twocoatsofwoodsheenspraypaint.

    H Doors Note

    Metaldoor

    set,

    type

    D4,

    of

    size

    800x2100mm

    high

    overall,

    comprising

    of

    100mmsteelchannelframefullyweldedandmitredatcorners:includeforall

    necessarydoorlocks,ironmongery,finalfinish,&fixingtoconcreteor

    blockwork

    10 Nos.

    I

    Flyscreenstoallventilationopenings 1 Item

    a

    b Metal Work Doors & Windows ToSummary

    c

    FINISHES

    0

    Thecontractorisadvisedtorefertothespecificationpriortopricingforthis

    sectionofwork

    I.1

    Therateshallincludeforalltemporaryrules,screeds,groundsetc.forraking

    outjoints

    of

    new

    brick

    work

    or

    hacking

    new

    concrete

    for

    key,

    internal

    &

    curvedangles,jointsbetweendifferentsurfacesarisesquirks,intersections

    betweencurvedorirregularsurfaces,etc.andallmakinggoodaroundpipes,

    sanitar fittin s & the like

    Note

    I.2

    AllsamplesshallbeprovidedforapprovalbytheEngineerpriortopurchaseof

    materials.Note

    Wall Finishes Note

    I.3 15mmthickcementandsand(Ratio1:5)renderonconcreteorblockwork:

    woodfloatedhardandsmooth:toSubstructurewalls100 m

    15mmthickcementandsand(Ratio1:5)renderonconcreteorblockwork:

    woodfloatedhardandsmooth:tobothexternalandinternal walls

    140 m

    I.4

    Floorfinishes

    I 50mmThick cementandsand(1:3)screed:steeltrowelled hardandsmooth

    tointernalfloors18 m

    PlinthPlaster

    J

    20mmThickcementandsand(1:3)render:woodfloatedhardandsmoothto

    plinths:externally6 m

    a

    b Finishes ToSummary

  • 7/24/2019 BOQ Sample 2

    17/18

    PAINTING

    J.1

    Rateshallincludeforpreparationofsurfacecleaningdown,smoothing,

    knotting,steppingetc.protectionoffloorsandfitting,removing&replacing

    doorandwindow,furniture,andcleaningwindowsetc.uponcompletion.

    J.2

    Paintshallbefromapprovedcolorwithapprovedmanufacturer. Note

    J.3

    WallPainting Note

    J Prepare

    and

    apply

    one

    coat

    of

    primer

    and

    three

    coats

    of

    weather

    shield

    paint

    ofapprovedcolourandqualitytoexternalfacesofwalls18 m

    Ditto:renderedplinthsurfaces 10 m

    K

    PrepareandapplyonecoatofprimerandthreecoatsofVinylemulsionpaint

    ofapprovedcolourandqualitytointernalfacesofwalls 20 m

    a Painting ToSummary

    b

    VENTILATIONANDOTHERACCESSORIES

    c AllProvisional

    e PlumbingWorks

    Unplasticizedpolyvinyl

    chloride

    (uPVC)

    pipes

    shall

    be

    used

    in

    the

    plumbing

    installationandtheymustconformineveryrespecttotherequirementsofBS

    4514.

    Note

    e.01

    Allfittingsandpipespecialsusedintheplumbinginstallationshallbesuitable

    andcompatiblewithallrespectstothepipelinetowhichfittingsandspecials

    arefixed.

    Note

    e.02

    e.03 Allsanitaryfittings&fixturesshallbeAmericanStandardsorapproved

    equivalent.Note

    e.04 Ratesforsanitaryfittingsshallincludefor:

    e.05

    Fittingssuchastaps,wastewateroutlet,internaloverflowsetc.and

    supportingbrackets,incidentalmaterialsforfixing,unlessotherwise

    measuredse aratel .

    Note

    e.06

    Assembling,jointingtogetherfixingcomponentsparts,andjointingtopipes

    includingnecessary

    coupling

    and

    for

    leaving

    perfectly

    clean

    and

    in

    perfect

    workin orderoncom letion.

    Note

    Jointingandconnectingofpipestosanitaryfittings.

    e.07

    Testingandcommissioningoftheinstallation. Note

    Makinggoodoftheworkdisturbed. Note

    SubmittingsamplesfortheapprovaloftheEngineer. Note

    K.1

    Protectingtheworks. Note

    K.2

  • 7/24/2019 BOQ Sample 2

    18/18

    VentPipes Note

    PVCpipewithallnecessaryfittingsandfixings

    K

    100mmdiameter Ventpipe 150 m

    100mmDiameterVentCowl

    40 No

    ratwsincludewatertanktower,tankandinstallation 1 item

    Ventilation ToSummary

    SubTotalBill03: ToiletBlock

    Bill01:Preliminaries

    Bill02: RoomWorks

    Bill03: ToiletBlock

    SubTotal

    GrandTotal