Preamble to Bill of Quantities

10

1

2

3

4

5

6

7

8

9

Page 2: BoQ Part 1 Version 1
Page 3: BoQ Part 1 Version 1

Preamble to Bill of Quantities

The following terms and abbreviations have been used in the Bill of Quantities:

This preamble shall apply to the Bill of Quantities in the Contract unless shown otherwise.

The number, quantities and measurements set out in the Bill of Quantities are approximate and their accuracy or inaccuracy shall in no way affect the validity of the Contract based thereon. The total amount of each item set out in the Bill of Quantities are required solely for the purpose of assessment and shall not be deemed to be the actual sums which shall be paid to the Contractor for the execution of the works. The sum to be paid to the Contractor shall (subject to the provisions of the Contract) be determined by measuring the work actually done in accordance with the Contract and valuing it at the rates and prices inserted by the Contractor in the Bill of Quantities.

The rates and prices entered in the Bill of Quantities shall except insofar as is otherwise provided under the Contract be deemed to cover all obligations as set out in the Contract. Items in the Bill of Quantities against which no price is entered shall be deemed to be included in the prices or rates of other items in the Bills. All rates and prices given in the Bill of Quantities are exclusive of IGV.

Provisional Sums and Dayworks shall be expended in whole or in part only at the direction and discretion of the Engineer. Items marked Optional shall be carried to the Summary.

Works subjected to measurement shall be measured as stated in the Specifications. Where no rule for measurement is stated, works as executed shall be measured in accordance with the Civil Engineering Standard Method of Measurement issued by the Institution of Civil Engineers, UK, The net measurement or weight of the finished work in place will always be taken except where otherwise stated.

The brief descriptions of the items given in the Bill of Quantities are purely for the purpose of identification and shall in no way modify or supersede the detailed descrip¬tions given in the Conditions of Contract, Specifications or Drawings.

If any material is directed by the Engineer to be measured in vehicles by the cubic metre it shall be hauled in approved vehicles and measured therein at the point of delivery. Vehicles shall be of size or type acceptable to the Engineer, provided that the body is of such shape that the volume of the contents may be readily and accurately deter¬mined. Unless all approved vehicles are of uniform capacity, each approved vehicle must bear a plainly legible identification mark indicating the specified approved capacity.

The rates entered by the Contractor for earthworks and pavement construction related to roadwork shall also apply when carrying out such work to accesses, junctions and the like where these are indicated on the drawings or instructed by the Engineer.

"Authorised", "Directed" or "Approved" shall mean the authority, direction or approval by the Engineer, unless otherwise stated. Certain priced items marked as additional work to normal shall only be accepted for payment when ordered or approved by the Engineer.

Unit of description Abbreviations Bill of Quantities BoQ millimetre mmmetre m square metre m2 cubic metre m3 hectare (10 000 m2) ha kilogramme kg tonne (1000 kg) t lump sum LS number no hour hr man-hour mhr litre l diameter D

Page 4: BoQ Part 1 Version 1

Term

Rate The unit price for executing the BoQ item complete in full accordance with the requirements of the Contract.

Provisional Sums A sum provided in the BoQ for works or costs which cannot be entirely foreseen, defined or detailed.

Page 5: BoQ Part 1 Version 1

Preamble to Bill of Quantities

10

1

2

3

4

5

6

7

8

9

Page 6: BoQ Part 1 Version 1
Page 7: BoQ Part 1 Version 1

Preamble to Bill of Quantities

Este preámbulo se aplicará a la lista de cantidades en el contrato a menos que se demuestre lo contrario.

Los siguientes términos y abreviaturas se han utilizado en la Lista de Cantidades:

Los números, cantidades y medidas establecidas en la lista de cantidades son aproximadas y su exactitud o inexactitud no será en modo afectará a la validez del contrato base de estos colorantes. La cantidad total de cada artículo que figura en la lista de cantidades se requiere con el único propósito de la evaluación y no se considerará que las cantidades reales que se pagarán al Contratista para la ejecución de las obras. La suma que se pagará a la Contratista (sujeto a las disposiciones del Contrato) se determina midiendo el trabajo efectivamente realizado de conformidad con el Contrato y valorándola en las tarifas y los precios incluidos por el contratista en la Lista de Cantidades.

Se considerará que las tasas y precios consignados en la Lista de Cantidades se salvo en lo que se disponga otra cosa en el Contrato para cubrir todas las obligaciones establecidas en el Contrato. Los elementos de la lista de cantidades contra la que se ha introducido ningún precio se considerarán incluidos en los precios o tarifas de otros elementos en los proyectos de ley. Todas las tarifas y precios que figuran en la lista de cantidades no incluyen el IGV.

Montos provisionales y Dayworks se utilizarán, en su totalidad o en parte sólo en la dirección y la discreción del Ingeniero. Los elementos marcados opcional se llevará al Resumen.

Obras sometidas a medición se medirán según lo indicado en las especificaciones. Cuando se declaró ninguna regla para la medida, funciona como ejecutado se medirá de acuerdo con la Ingeniería Civil método estándar de medida emitida por la Institución de Ingenieros Civiles, Reino Unido, la medición neta o el peso de la obra terminada en su lugar se dictarán siempre de excepción donde se indique lo contrario.

Las breves descripciones de los elementos que figuran en la lista de cantidades son únicamente con fines de identificación y no será en modo modificar o sustituir las descripciones detalladas que figuren en las Condiciones del contrato, las especificaciones o dibujos.

Si cualquier material es dirigido por el Ingeniero de medirse en los vehículos por el metro cúbico será transportada en vehículos habilitados y medido en el mismo en el punto de entrega. Los vehículos deberán ser de tamaño o tipo aceptable para el Ingeniero, a condición de que el cuerpo es de tal forma que el volumen de los contenidos puede ser determinada fácilmente y con precisión. A menos que todos los vehículos aprobados son de capacidad uniforme, cada vehículo homologado, deberá llevar una marca de identificación claramente legibles indicando la capacidad aprobada especificado.

Las tasas introducidas por el Contratista para movimiento de tierras y construcción de pavimentos relacionados con la obra vial se aplicará también cuando se lleva a cabo una labor de accesos, cruces y similares cuando éstas se indican en los planos o indique el Ingeniero.

"Autorizado", "Director" o "Aprobado": la autoridad, dirección o aprobación del Ingeniero, a menos que se indique lo contrario. Ciertos artículos con precios marcados trabajo como adicional a la normalidad sólo se aceptan pagos en cuando es ordenado o aprobado por el Ingeniero.

Unit of description Abbreviations Bill of Quantities BoQ millimetre mmmetre m square metre m2 cubic metre m3 hectare (10 000 m2) ha kilogramme kg tonne (1000 kg) t lump sum, suma global LS number no hour hr man-hour mhr litre l diameter D

Page 8: BoQ Part 1 Version 1

Term

Tarifa El precio unitario para la ejecución de la partida BoQ completa de plena conformidad con los requisitos del Contrato.

Montos Provisionales Una cantidad prevista en el BoQ para obras o gastos que no pueden ser totalmente previsibles, definidos o detallada.

Page 9: BoQ Part 1 Version 1

DESCRIPTION

Bill No. 1 - Preliminaries and General

Bill No. 2 - RoadworksBill 2.1 Permanent Roads and Paved AreasBill 2.2 Drainage and Erosion Protection.

Bill No. 3 - The Huaura DiversionBill 3.1 Huaura Dam and IntakeBill 3.2 Huaura Diversion Tunnel

Bill No. 4 - Checras HeadworksBill 4.1 Dam, Intake and Sand Excluder

Bill No. 5 - HeadraceBill 5.1 Adit 1Bill 5.2 SurgetunnelBill 5.3 Headrace tunnel H01 to H18Bill 5.4 Headrace tunnel H18 to H31

Bill No. 6 - Pressure shaft - NOT USED

Bill No. 7 - Steel lined penstock, H31 to powerhouse cavern

Bill No. 8 - Powerhouse and Access TunnelBill 8.1 Access TunnelBill 8.2 Construction adit to tailrace tunnelBill 8.3 Construction adit to Headrace tunnelBill 8.4 Powerhouse CavernBill 8.5 Transformer Cavern and Busbar Connections

Bill No. 9 - Tailrace Tunnel

Bill No. 10 - Picunche Dam and Compensation Reservoir

Bill No. 11 - Other Works

ACCEPTED CONTRACT AMOUNT

Bill No. 12 - DayworksBill No. 13 (Intentionally not used)

CHEVES HPPCIVIL CONTRACTVOLUMEN 5 - SCHEDULE 1 - BILL OF QUANTITIES04-Nov-10

Page 10: BoQ Part 1 Version 1

Bill No. 14 - Alternative Unit Price

Page 11: BoQ Part 1 Version 1

TOTALPRICE (USD)

39,271,663.78

4,973,522.15788,551.25

3,333,609.639,624,234.24

18,301,121.12

3,565,813.302,800,687.4418,812,561.8117,333,736.54

1,546,953.67

5,722,270.58591,174.481,733,471.506,889,577.461,370,389.29

11,147,799.11

5,943,047.73

1,197,632.08

154,947,817.16

3,503,455.00

Page 12: BoQ Part 1 Version 1
Page 13: BoQ Part 1 Version 1

DESCRIPTION

Bill No. 1 - Preliminares y general

Bill No. 2 - Obras de carreteraBill 2.1 Las carreteras permanentes y áreas pavimentadasBill 2.2 El drenaje y protección contra la erosión.

Bill No. 3 - La desviación HuauraBill 3.1 Huaura presa y tomaBill 3.2 Huaura túnel de desviación

Bill No. 4 - Checras obras cabeceraBill 4.1 Presa, toma and desarenador

Bill No. 5 - AducciónBill 5.1 Adit N°1 - Túnel secundario 1Bill 5.2 Túnel de sobretensionesBill 5.3 Túnel de aducción H01 to H18Bill 5.4 Túnel de aducción H18 to H31

Bill No. 6 - Eje de presión - NOT USED

Bill No. 7 - Tuberia forzada, H31 a caverna de casa de maquinas

Bill No. 8 - Casa de maquina y acceso a túnelBill 8.1 Acceso a túnelBill 8.2 Construcción de Adit N°1 (tunel secundario N°1) a túnel de descargaBill 8.3 Construcción de Adit N°1 ( tunel secundario N°1) a túnel de aducciónBill 8.4 Caverna de casa de maquinaBill 8.5 Caverna de transformadores y barra de conecciones

Bill No. 9 - Túnel de descarga

Bill No. 10 - Presa Picunche y Reservorio de compensación

Bill No. 11 - Trabajos varios

ACCEPTED CONTRACT AMOUNT

Bill No. 12 - DayworksBill No. 13 (Intentionally not used)

CHEVES HPPCIVIL CONTRACTVOLUMEN 5 - SCHEDULE 1 - BILL OF QUANTITIES04-Nov-10

Page 14: BoQ Part 1 Version 1

Bill No. 14 - Alternative Unit Price

Page 15: BoQ Part 1 Version 1

TOTALPRICE (USD)

39,271,663.78

4,973,522.15788,551.25

3,333,609.639,624,234.24

18,301,121.12

3,565,813.302,800,687.4418,812,561.8117,333,736.54

1,546,953.67

5,722,270.58591,174.481,733,471.506,889,577.461,370,389.29

11,147,799.11

5,943,047.73

1,197,632.08

154,947,817.16

3,503,455.00

Page 16: BoQ Part 1 Version 1
Page 17: BoQ Part 1 Version 1

Item Description Unit

A. PRECONSTRUCTION PHASE and EARLY WORKS COSTA.1 Preconstruction Phase LSA.2 Early Works LS

1.1 OBLIGATIONS UNDER CONTRACT CONDITIONS (CC).1.1.01 Performance Security. Included in Mark-Up1.1.02 Insurances to be provided by Contractor Included in Mark-Up1.1.03 Compliance with Clause 4.8 Safety Procedures Included in Mark-Up1.1.04 Compliance with Clause 4.18 Protection of the Environment and Social Mitigation Included in Mark-Up1.1.05 Compliance with Clause 4.24 Archaeology Included in Mark-Up1.1.06 Compliance with all tasks and responsibilites as Principal Contractor Included in Mark-Up1.1.07 Compliance with Statutes and Regulations in accordance with the Contrac Included in Mark-Up1.1.08 LEG-3 Insurances to be provided by Contractor Prov. Sum

1.2

1.2.01 Provision of Contractor's camps, offices, workshops, stores etca) Mirahuay (Staff Camps, Office, Workshop) LSb) Pampa Libre Labour Camps LSc) Site Offices LS

1.2.02

a) Mirahuay (Staff Camps, Office, Workshop) LSb) Pampa Libre Labour Camps LSc) Site Offices LS

1.2.03 LS

1.2.04 LS

1.2.05 LS

1.2.06 All temporary roadworks except Item 2.1.13 Included in Mark-Up1.2.07 Not used1.2.08 Temporary diversions, cofferdams, care of river and dewatering

1.2.08.01 Huaura Site LS1.2.08.02 Checras Site LS1.2.08.03 Picunche Site LS1.2.08.04 Tailrace outlet LS1.2.08.05 Access Tunel Site LS1.2.09 Not used1.2.10 LS

1.2.11 Supply of electric power to Other Contractors. kWh

1.2.13 Not used1.2.14 LS

1.2.15 Contractor's supervision and administration on and off Site LS1.2.16 Removal of all temporary works, cleaning and reinstatement of the Site. LS1.2.17 Site Laboratory and Site Testing1.2.17.01 Provide laboratory building and equipment for specified tests LS

1.2.17.02 Additional site testing equipment ordered by the Engineer Prov. Sum1.2.17.03 Contractor's overhead and profit on Item .17.02 %1.2.17.04 Running of Site laboratory LS1.2.17.05 Off-site laboratory testing. Prov. Sum1.2.17.06 Contractor's overhead and profit on Item .17.05 %1.2.18 Deduction LS

1.3 ASSISTANCE AND SUPPLIES TO EMPLOYER AND ENGINEER.1.3.01 Establish working and storage area for Other Contractors

1.3.02 Provide offices for Other Contractors

1.3.03 Provide offices for Employer's Personnel LS1.3.04 Provide field offices for the Engineer No1.3.05 Provide temporary houses for Employer's Personnel No1.3.06 Provide temporary hotels for Employer's Personnel LS1.3.07 Provide permanent houses type A for Employer No1.3.08 Provide permanent houses type B for Employer No1.3.09 Maintenance and cleaning of the offices month1.3.10 Not used1.3.11 Supply of additional furniture, equipment and various site supplies Prov. Sum1.3.12 Contractor's overhead and profit on Item 1.3.11 %

Bill No. 1 - Preliminaries and General

CONTRACTOR'S MOBILISATION, TEMPORARY FACILITIES AND GENERAL ADMINISTRATION.

Provision of all temporary facilities for water supply, sewerage, communication, solid waste collection and other necessary services

Provision of all temporary facilities for power generation, transmission and outlet with meters etc

Mobilisation of Contractor's equipment including also crushing, screening and batching& mixing facilities

Provision of first aid station with ambulance car and all required furniture and medical equipment.

Contractor's general survey, control of survey network, traversing, establishing of control points and bench marks

1.2.12 Operation and maintenance of camps, offices, workshops, stores etc.Operation and maintenance of temporary facilities for water supply, sewerage, electricity, communication, solid waste collection and other temporary and permanent works.

LS

Operation and maintenance of first aid station with ambulance car, personnel and medicines

m2

m2

Page 18: BoQ Part 1 Version 1

Sum Bill No. 1 - Preliminaries and General

Page 19: BoQ Part 1 Version 1

Quantity Unit Price Total Price ItemUSD USD

A.1 435,120.00 435,120.00 A.11 948,948.00 948,948.00 A.2

1.11.1.011.1.021.1.031.1.041.1.051.1.061.1.07

1 700,000.00 700,000.00 1.1.08

1.2

1.2.011 2,686,344.00 2,686,344.001 2,336,891.00 2,336,891.001 518,190.00 518,190.00

1.2.02

1 287,996.00 287,996.001 128,398.00 128,398.001 137,999.00 137,999.001 179,998.00 179,998.00 1.2.03

1 1,176,574.00 1,176,574.00 1.2.04

1 259,446.00 259,446.00 1.2.05

1.2.061.2.071.2.08

1 198,737.86 198,737.86 1.2.08.011 664,919.00 664,919.00 1.2.08.021 512,545.00 512,545.00 1.2.08.031 145,481.65 145,481.65 1.2.08.041 166,555.00 166,555.00 1.2.08.05

1.2.091 59,623.23 59,623.23 1.2.10

1,000,000.00 0.29 290,000.00 1.2.11

1.2.131 1,066,894.77 1,066,894.77 1.2.14

1 15,585,702.84 15,585,702.84 1.2.151 321,472.00 321,472.00 1.2.16

1.2.171 16,521.00 16,521.00 1.2.17.01

1 1,000.00 1,000.00 1.2.17.0220 1,000.00 200 1.2.17.031 748,131.00 748,131.00 1.2.17.041 1,000.00 1,000.00 1.2.17.05

20 1,000.00 200 1.2.17.061 -1,500,000.00 -1,500,000.00 1.2.18

1.322,300.00 5.53 123,319.00 1.3.01

120 462 55,440.00 1.3.02

1 224,070.00 224,070.00 1.3.034 6,601.00 26,404.00 1.3.046 24,000.00 144,000.00 1.3.051 367,732.00 367,732.00 1.3.063 42,000.00 126,000.00 1.3.075 33,600.00 168,000.00 1.3.08

34 1,804.56 61,355.04 1.3.091.3.10

1 10,000.00 10,000.00 1.3.1130 10,000.00 3,000.00 1.3.12

Bill No. 1 - Preliminaries and General

1.00 9,887,456.39 9,887,456.39 1.2.12

Page 20: BoQ Part 1 Version 1

39,271,663.78 Sum

Page 21: BoQ Part 1 Version 1

Description

Obras preliminares y costos iniciales- PRECONSTRUCTION PHASE and EARLY WORKS COSTObras provicionales - Preconstruction PhaseObras preliminares - Early Works

OBLIGACIONES EN CONDICIONES CONTRACTUALES - OBLIGATIONS UNDER CONTRACT CONDITIONS (CC).Garantía de fiel Cumplimiento - Performance Security.Seguros que deberá prestar Contratista - Insurances to be provided by ContractorCumplimiento de la Cláusula 4.8 Procedimientos de Seguridad Cumplimiento de la Cláusula 4.18 de Protección del Medio Ambiente y la Mitigación Social Cumplimiento de la Cláusula 4.24 Arqueología - Compliance with Clause 4.24 ArchaeologyCumplimiento de las tareas y responsabilidades como Contratista PrincipaEl cumplimiento de los Estatutos y Reglamentos de conformidad con el ContratistaLEG-3 Seguros a ser proporcionados por el Contratista

MOVILIZACIÓN DEL CONTRATISTA, INSTALACIONES TEMPORALES Y ADMINISTRACIÓN GENERAL.

Provisión de del Contratista campamentos, oficinas, talleres, almacenes, etc.a) Mirahuay (Personal campamentos, oficina, taller)b) Pampa Libre trabajos de campo.c) Oficinas del sitioProvisión de todas las instalaciones temporales para el suministro de agua, alcantarillado, comunicaciones, recolección de desechos sólidos y otros servicios necesarios

a) Mirahuay (Personal campamentos, oficina, taller)b) Pampa Libre trabajos de campo.c) Oficinas del sitioProvisión de todas las instalaciones temporales para la generación de energía, la transmisión y la salida con los medidores, etc.

La provisión de puesto de primeros auxilios con ambulancia y todo el mobiliario necesario y equipos médicos.

Todas las obras viales temporales excepto Artículo 2.1.13Not usedDesvios temporales, ataguias, cuidados en el rio en bombeo y drenaje

Huaura SitioChecras SitioPicunche SitioSalida de descargaAcceso Túnel SitioNot usedEstudio general del Contratista, el control de redes de vigilancia, de desplazamiento, el establecimiento de puntos de control y puntos de referencia

Suministro de energía eléctrica a otros contratistas.

Not usedOperación y mantenimiento de la estación de primeros auxilios con el coche ambulancia, personal y medicamentos

Supervisión del contratista y administración dentro y fuera del sitio.La eliminación de todas las obras temporales, limpieza y restablecimiento del sitio.Laboratorio del sitio y de PruebaProporcionar edificio de laboratorios y equipo para pruebas especificadas

Equipos adicionales de estudio de sitio ordenado por el IngenieroLos gastos generales del contratista y el beneficio sobre el punto .17.02Ejecución de laboratorio del SitioFuera de las instalaciones de pruebas de laboratorio.Los gastos generales del contratista y el beneficio sobre el punto .17.05Deducción

ASISTENCIA Y SUMINISTROS AL EMPLEADOR E INGENIEROS.Establecer área de trabajo y de almacenamiento para otros contratistas

Proporcionar oficinas para otros Contratistas

Proporcionar oficinas para el personal del ContratanteProporcionar a las oficinas de campo para el IngenieroProporcionar viviendas temporales para el Personal del ContratanteProporcionar hoteles temporales para el Personal del ContratanteProporcionar casas tipo A permanentes para el empleadorProporcionar casas tipo B permanentes para el empleadorMantenimiento y limpieza de las oficinasNot usedSuministro de mobiliario adicional, equipos y diversos suministros en sitioLos gastos generales del contratista y el beneficio sobre el punto 1.3.11

Bill No. 1 - Preliminaries and General

Movilización de los equipos del Contratista incluyendo también trituración, cribado, dosificaciónY preparación de mezcla

Operación y mantenimiento de campamentos, oficinas, talleres, almacenes, etc.Operación y mantenimiento de instalaciones temporales para el suministro de agua, alcantarillado, electricidad, comunicación, recogida de residuos sólidos y otras obras temporales y permanentes.

Page 22: BoQ Part 1 Version 1

Bill No. 1 - Preliminares y general

Page 23: BoQ Part 1 Version 1

Unit Quantity Unit Price Total PriceUSD USD

Glb (LS) 1 435,120.00 435,120.00Glb (LS) 1 948,948.00 948,948.00

Included in Mark-UpIncluded in Mark-UpIncluded in Mark-UpIncluded in Mark-UpIncluded in Mark-UpIncluded in Mark-UpIncluded in Mark-UpProv. Sum 1 700,000.00 700,000.00

Glb (LS) 1 2,686,344.00 2,686,344.00Glb (LS) 1 2,336,891.00 2,336,891.00Glb (LS) 1 518,190.00 518,190.00

Provisión de todas las instalaciones temporales para el suministro de agua, alcantarillado, comunicaciones, recolección de desechos sólidos y otros servicios necesarios

Glb (LS) 1 287,996.00 287,996.00Glb (LS) 1 128,398.00 128,398.00Glb (LS) 1 137,999.00 137,999.00Glb (LS) 1 179,998.00 179,998.00

Glb (LS) 1 1,176,574.00 1,176,574.00

Glb (LS) 1 259,446.00 259,446.00

Included in Mark-Up

Glb (LS) 1 198,737.86 198,737.86Glb (LS) 1 664,919.00 664,919.00Glb (LS) 1 512,545.00 512,545.00Glb (LS) 1 145,481.65 145,481.65Glb (LS) 1 166,555.00 166,555.00

Glb (LS) 1 59,623.23 59,623.23

kWh 1,000,000.00 0.29 290,000.00Glb (LS)

Glb (LS) 1 1,066,894.77 1,066,894.77

Glb (LS) 1 15,585,702.84 15,585,702.84Glb (LS) 1 321,472.00 321,472.00Glb (LS)Glb (LS) 1 16,521.00 16,521.00

Prov. Sum 1 1,000.00 1,000.00% 20 1,000.00 200

Glb (LS) 1 748,131.00 748,131.00Prov. Sum 1 1,000.00 1,000.00

% 20 1,000.00 200Glb (LS) 1 -1,500,000.00 -1,500,000.00

22,300.00 5.53 123,319.00

120 462 55,440.00

Glb (LS) 1 224,070.00 224,070.00No 4 6,601.00 26,404.00No 6 24,000.00 144,000.00

Glb (LS) 1 367,732.00 367,732.00No 3 42,000.00 126,000.00No 5 33,600.00 168,000.00

month 34 1,804.56 61,355.04

Prov. Sum 1 10,000.00 10,000.00% 30 10,000.00 3,000.00

1.00 9,887,456.39 9,887,456.39

m2

m2

Page 24: BoQ Part 1 Version 1

39,271,663.78

Page 25: BoQ Part 1 Version 1

Item Description Item

2.1.01 STRENGTHENING OF EXISTING PUBLIC ROADS 2.1.01

2.1.02 ACCESS ROAD TO HUAURA DAM AND INTAKE. Design and built. 2.1.022.1.02.01 Topsoil excavation. 2.1.02.012.1.02.02 Soil excavation. 2.1.02.022.1.02.03 2.1.02.032.1.02.04 Embankment fill. 2.1.02.042.1.02.05 Reinforced concrete pipe. Di = 500 mm 2.1.02.052.1.02.06 Subgrade preparation. 2.1.02.062.1.02.07 Subbase. Thickness minimum 300 mm 2.1.02.072.1.02.08 Base course. Thickness minimum 150 mm 2.1.02.082.1.02.09 Double bitumenous surface treatment 2.1.02.092.1.02.10 Spoiling of surplus 2.1.02.10

2.1.03 ACCESS ROAD TO CHECRAS DAM, INTAKE AND SAND EXCLUDER. Design and built. 2.1.032.1.03.01 Reinforced concrete pipe. Di = 500 mm 2.1.03.012.1.03.02 Fully cement grouted rock bolts. D= 25 mm. Depth in rock 3.0 m. 2.1.03.022.1.03.03 Subgrade preparation. 2.1.03.032.1.03.04 Subbase. Thickness minimum 300 mm 2.1.03.042.1.03.05 Concrete pavement as specified for access roads, thickness 200 mm 2.1.03.052.1.03.06 Guard rail. 2.1.03.062.1.03.07 Shotcrete, plain 2.1.03.072.1.03.08 Welded wire fabric fixed to rock bolts 2.1.03.08

2.1.04 ACCESS ROAD TO CONSTRUCTION ADIT NO 1. Design and built. 2.1.042.1.04.01 Topsoil excavation. 2.1.04.012.1.04.02 Soil excavation. 2.1.04.022.1.04.03 2.1.04.032.1.04.04 Embankment fill. 2.1.04.04

2.1.04.05 Reinforced concrete pipe. Di = 500 mm 2.1.04.052.1.04.06 Subgrade preparation. 2.1.04.062.1.04.07 Subbase. Thickness minimum 300 mm 2.1.04.072.1.04.08 Base course. Thickness minimum 150 mm 2.1.04.082.1.04.09 Gravel Wearing Course 2.1.04.092.1.04.10 Guard rail. 2.1.04.102.1.04.11 2.1.04.11

2.1.04.12 2.1.04.12

2.1.04.13 2.1.04.13

2.1.04.14 Chainlinked mesh fixed to rock bolts. 2.1.04.142.1.04.15 Steel straps fixed to rock bolts. 2.1.04.152.1.04.16 Shotcrete.Fibre-reinforced. 2.1.04.16

2.1.05 ACCESS ROAD TO CONSTRUCTION ADIT NO 2 AND SURGE TUNNEL 2.1.05Not used

2.1.06 2.1.06

2.1.06.01 Topsoil excavation. 2.1.06.012.1.06.02 Soil excavation. 2.1.06.022.1.06.03 Embankment fill. 2.1.06.032.1.06.04 Reinforced concrete pipe. Di = 500 mm 2.1.06.042.1.06.05 Subgrade preparation. 2.1.06.052.1.06.06 Subbase. Thickness minimum 300 mm 2.1.06.062.1.06.07 Gravel Wearing Course 2.1.06.072.1.06.08 Concrete pavement as specified for access roads, thickness 200 mm 2.1.06.082.1.06.09 Guard rail. 2.1.06.092.1.06.10 Gravel Wearing Course 2.1.06.10

2.1.07 ACCESS ROAD TO PICUNCHE DAM. Design and built. 2.1.072.1.07.01 Topsoil excavation. 2.1.07.012.1.07.02 Soil excavation. 2.1.07.022.1.07.03 Rock excavation. 2.1.07.032.1.07.04 Embankment fill. 2.1.07.042.1.07.05 Reinforced concrete pipe. Di = 500 mm 2.1.07.052.1.07.06 Subgrade preparation. 2.1.07.062.1.07.07 Subbase. Thickness minimum 300 mm 2.1.07.072.1.07.08 Double bitumenous surface treatment 2.1.07.08

Bill No. 2 - RoadworksBill 2.1 Permanent Roads and Paved Areas

Bill No. 2 - RoadworksBill 2.1 Permanent Roads and Paved Areas

The Contractor shall, based on his detailed investigations of the road conditions, establish his needs of strengthening and improving of existing public roads and bridges outside the Site for the purpose of

execution the Works. A Lump Sum covering the corresponding work and design shall be given together with a detailed description of the scope and costs.

Bulk rock excavation (width > 2 m).

Bulk rock excavation (width > 2 m).

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 2.9 m

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 3.9 m

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 5.9 m

ACCESS TUNNEL PORTAL, ACCESS ROAD AND REALIGNMENT OF PUBLIC ROAD.Design and built.

Page 26: BoQ Part 1 Version 1

2.1.07.09 Guard rail. 2.1.07.092.1.07.10 Spoiling of surplus 2.1.07.10

Page 27: BoQ Part 1 Version 1

Description Unit Quantity

FORTALECIMIENTO DE LOS CAMINOS PÚBLICOS EXISTENTES

CAMINO DE ACCESO A LA PRESA HUAURA Y TOMA. Diseño y construcción.Excavación tierra vegetal. m3 400Excavación del suelo. m3 2,000.00

m3 50Relleno de terraplén. m3 300Tubería de concreto reforzado. Di = 500 mm m 20Preparación de la subrasante. m2 1,000.00Sub-base. Espesor mínimo de 300 mm m3 300Base. Espesor mínimo de 150 mm m3 140Tratamiento de superficie bicapa asfaltica - Double bitumenous surface treatment m2 900Reciclaje de excedentes - Spoiling of surplus m3 2,450.00

CAMINO DE ACCESO A LA PRESA Checras, TOMA Y DESARENADOR. Diseño y construicción.Tubería de concreto reforzado. Di = 500 mm m 50Pernos totalmente cementados en roca, barra corrugada. D= 25 mm. Profundidad de anclaje en roca 3.0 m. no 100Preparación de la subrasante. m2 1,000.00Sub-base. Espesor mínimo de 300 mm m3 300Pavimento de hormigón que se especifican para las vías de acceso, espesor 200 mm m2 900Guardavía - Guard rail. m 200Hormigón proyectado, en llanura m3 50Cercado con malla empotrada a pernos de anclaje m2 100

CAMINO DE ACCESO A LA CONSTRUCCIÓN ADIT NO 1 (tunel secundario). Diseño y construcción.Excavación tierra vegetal. m3 500Excavación del suelo. m3 8,000.00

m3 2,500.00Relleno de terraplén. m3 500

Tubería de concreto reforzado. Di = 500 mm m 80Preparación de la subrasante. m2 6,000.00Sub-base. Espesor mínimo de 300 mm m3 1,500.00Base. Espesor mínimo de 150 mm m3 750Grava en capa de rodadura - Gravel Wearing Course m3 2,500.00Guardavía - Guard rail. m 600Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 2.9 m. no 125

Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 3.9 m. no 40

Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 5.9 m. no 10

Cercado con malla empotrada a pernos de anclaje m2 250Soporte con barras planas de acero empotrada a pernos de ancalje - Steel fixed to rock bolts. m 100Hormigón proyectado con fibra reforzada - Shotcrete.Fibre-reinforced. m3 20

ACCESS ROAD TO CONSTRUCTION ADIT NO 2 AND SURGE TUNNELNot used

Excavación tierra vegetal. m3 50Excavación del suelo. m3 3,500.00Relleno de terraplén. m3 12,000.00Tubería de concreto reforzado. Di = 500 mm m 150Preparación de la subrasante. m2 3,500.00Sub-base. Espesor mínimo de 300 mm m3 1,250.00Grava en capa de rodadura - Gravel Wearing Course m3 300Pavimento de hormigón que se especifican para las vías de acceso, espesor 200 mm m2 600Guardavía - Guard rail. m 500Grava en capa de rodadura - Gravel Wearing Course m3 300

ACCESS ROAD TO PICUNCHE DAM. Design and built.Excavación tierra vegetal. m3 600Excavación del suelo. m3 1,500.00Excavación en roca - Rock excavation. m3 500Relleno de terraplén. m3 7,500.00Tubería de concreto reforzado. Di = 500 mm m 50Preparación de la subrasante. m2 1,500.00Sub-base. Espesor mínimo de 300 mm m3 450Tratamiento de superficie bicapa asfaltica - Double bitumenous surface treatment m2 1,300.00

Bill No. 2 - RoadworksBill 2.1 Permanent Roads and Paved Areas

El Contratista, en base a sus investigaciones detalladas de las condiciones de la carretera, establecer sus necesidades de fortalecimiento y mejora de las vías públicas y puentes existentes fuera del sitio para los fines de la ejecución de las Obras. Una suma global que cubre el trabajo correspondiente y el diseño será entregada junto con una descripción detallada del alcance y los costos.

LS 1.00

Excavación masiva en roca (ancho > 2 m).

Excavación masiva en roca (ancho > 2 m).

ACCESO A PORTAL DE TUNEL, ACCESO A CARRETERA Y REALINEAMIENTO DE CARRETERA PUBLICA. Diseño and construcción.

Page 28: BoQ Part 1 Version 1

Guardavía - Guard rail. m 50Reciclaje de excedentes - Spoiling of surplus m3 2,100.00

Page 29: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

5.25 2,100.005.13 10,260.00

32.72 1,636.0024.5 7,350.00

334 6,680.000.88 880

29.25 8,775.0029.25 4,095.004.37 3,933.003.73 9,138.50

334 16,700.0088.91 8,891.000.88 880

29.25 8,775.0058.38 52,542.0089.45 17,890.00

348.48 17,424.0011.65 1,165.00

5.25 2,625.005.13 41,040.00

32.72 81,800.0024.5 12,250.00

334 26,720.000.88 5,280.00

29.25 43,875.0029.25 21,937.5020.53 51,325.0089.45 53,670.0047.74 5,967.50

54.26 2,170.40

106.5 1,065.00

14.48 3,620.0042.01 4,201.00

348.48 6,969.60

5.25 262.55.13 17,955.0024.5 294,000.00

334 50,100.000.88 3,080.00

29.25 36,562.5020.53 6,159.0058.38 35,028.0089.45 44,725.0020.53 6,159.00

5.25 3,150.005.13 7,695.00

32.72 16,360.0024.5 183,750.00

334.02 16,701.000.88 1,320.00

29.25 13,162.504.37 5,681.00

615,091.00 615,091.00

Page 30: BoQ Part 1 Version 1

89.44 4,472.003.73 7,833.00

Page 31: BoQ Part 1 Version 1

Item Description Unit

2.1.08 ADJUSTMENT OF PUBLIC ROAD ALIGNMENT AT HUAURA DAM.2.1.08.01 Topsoil excavation. m32.1.08.02 Soil excavation. m32.1.08.03 m3

2.1.08.04 Reinforced concrete pipe. Di = 500 mm m2.1.08.06 Subgrade preparation. m22.1.08.07 Subbase. Thickness minimum 300 mm m32.1.08.08 Base course. Thickness minimum 150 mm m32.1.08.09 Gravel Wearing Course m32.1.08.10 Guard rail. m2.1.08.11 Spoiling of surplus m32.1.08.12 no

2.1.08.13 no

2.1.08.14 no

2.1.08.15 Chainlinked mesh fixed to rock bolts. m22.1.08.16 Steel straps fixed to rock bolts. m2.1.08.17 Shotcrete.Fibre-reinforced. m3

2.1.09 NEW ALIGNMENT OF PUBLIC ROAD AT CHECRAS HEADWORKS2.1.09.01 Topsoil excavation. m32.1.09.02 Soil excavation. m32.1.09.03 m32.1.09.04 Embankment fill. m32.1.09.05 Reinforced concrete pipe. Di = 500 mm m2.1.09.06 Subgrade preparation. m22.1.09.07 Subbase. Thickness minimum 300 mm m32.1.09.08 Base course. Thickness minimum 150 mm m32.1.09.09 Gravel Wearing Course m32.1.09.10 Guard rail. m2.1.09.11 Spoiling of surplus m32.1.09.12 no

2.1.09.13 no

2.1.09.14 no

2.1.09.15 Chainlinked mesh fixed to rock bolts. m22.1.09.16 Steel straps fixed to rock bolts. m2.1.09.17 Shotcrete.Fibre-reinforced. m3

2.1.10 ADJUSTMENT OF PUBLIC ROAD AT TAILRACE TUNNEL OUTLET. Design and built.2.1.10.01 Subgrade preparation. m22.1.10.02 Subbase. Thickness minimum 300 mm m32.1.10.03 Base course. Thickness minimum 150 mm m32.1.10.04 Gravel Wearing Course m32.1.10.05 Guard rail. m2.1.10.06 Temporary realignment of public road LS

2.1.11 MAINTENANCE OF ROADS. Design and built.

2.1.12 PAVED AREAS AT ACCESS TUNNEL PORTAL AND SWITCHYARD. Design and built.2.1.12.01 Subgrade preparation. m22.1.12.02 Subbase. Thickness minimum 300 mm m32.1.12.03 Concrete pavement as specified for access roads, thickness 200 mm m2

Sum Bill 2.1 Permanent Roads and Paved Areas

Bill No. 2 - RoadworksBill 2.1 Permanent Roads and Paved Areas

Bulk rock excavation (width > 2 m).

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 2.9 m

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 3.9 m

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 5.9 m

Bulk rock excavation (width > 2 m).

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 2.9 m

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 3.9 m

Fully cement-grouted rock bolts, deformed bar. D=20 mm. Depth in rock 5.9 m

2.1.11.01 Maintenance of roads within the Site.Maintenance of public roads close to the Site which are used regularly by theContractor and Other Contractors

months

Page 32: BoQ Part 1 Version 1

Item Description Unit

2.1.08 AJUSTE DE LA ALINEACIÓN VIAL PÚBLICO EN PRESA HUAURA.2.1.08.01 Excavación tierra vegetal. m32.1.08.02 Excavación del suelo. m32.1.08.03 m3

2.1.08.04 Tubería de concreto reforzado. Di = 500 mm m2.1.08.06 Preparación de la subrasante. m22.1.08.07 Sub-base. Espesor mínimo de 300 mm m32.1.08.08 Base. Espesor mínimo de 150 mm m32.1.08.09 Grava en capa de rodadura - Gravel Wearing Course m32.1.08.10 Guardavía - Guard rail. m2.1.08.11 Reciclaje de excedentes - Spoiling of surplus m32.1.08.12 Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 2.9 m. no

2.1.08.13 Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 3.9 m. no

2.1.08.14 Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 5.9 m. no

2.1.08.15 Cercado con malla empotrada a pernos de anclaje m22.1.08.16 Soporte con barras planas de acero empotrada a pernos de ancalje - Steel fixed to rock bolts. m2.1.08.17 Hormigón proyectado con fibra reforzada - Shotcrete.Fibre-reinforced. m3

2.1.09 NUEVA ALINEACIÓN DEL CAMINO PÚBLICO EN CHECRAS - OBRAS CABECERA2.1.09.01 Excavación tierra vegetal. m32.1.09.02 Excavación del suelo. m32.1.09.03 m32.1.09.04 Relleno de terraplén. m32.1.09.05 Tubería de concreto reforzado. Di = 500 mm m2.1.09.06 Preparación de la subrasante. m22.1.09.07 Sub-base. Espesor mínimo de 300 mm m32.1.09.08 Base. Espesor mínimo de 150 mm m32.1.09.09 Grava en capa de rodadura - Gravel Wearing Course m32.1.09.10 Guardavía - Guard rail. m2.1.09.11 Reciclaje de excedentes - Spoiling of surplus m32.1.09.12 Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 2.9 m. no

2.1.09.13 Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 3.9 m. no

2.1.09.14 Pernos totalmente cementados en roca. D= 20 mm, barra corrugada. Profundidad de anclaje en roca 5.9 m. no

2.1.09.15 Cercado con malla empotrada a pernos de anclaje m22.1.09.16 Soporte con barras planas de acero empotrada a pernos de ancalje - Steel fixed to rock bolts. m2.1.09.17 Hormigón proyectado con fibra reforzada - Shotcrete.Fibre-reinforced. m3

2.1.10 AJUSTE DE CAMINO PÚBLICO EN SALIDA TÚNEL DE DESCARGA. Diseño y construccción.2.1.10.01 Preparación de la subrasante. m22.1.10.02 Sub-base. Espesor mínimo de 300 mm m32.1.10.03 Base. Espesor mínimo de 150 mm m32.1.10.04 Grava en capa de rodadura - Gravel Wearing Course m32.1.10.05 Guardavía - Guard rail. m2.1.10.06 Reajuste temporal de la vía pública LS

2.1.11 MANTENIMIENTO DE CARRETERAS. Diseño y construccción.

2.1.12 ZONAS PAVIMENTADAS EN ACCESO TÚNEL PORTAL SUBESTACIONES TRANSFORMADORAS. Diseñar y construir.2.1.12.01 Preparación de la subrasante. m22.1.12.02 Sub-base. Espesor mínimo de 300 mm m32.1.12.03 Pavimento de hormigón que se especifican para las vías de acceso, espesor 200 mm m2

Sum Bill 2.1 Las carreteras permanentes y áreas pavimentadas.

Bill No. 2 - RoadworksBill 2.1 Permanent Roads and Paved Areas

Excavación masiva en roca (ancho > 2 m).

Excavación masiva en roca (ancho > 2 m).

2.1.11.01 Mantenimiento de caminos dentro del Sitio. Mantenimiento de la vía pública cerca del sitio que se utilizan regularmente por el Contratista y otros contratistas

months

Page 33: BoQ Part 1 Version 1

Quantity Unit Price Total PriceUSD USD

160 5.25 8404,000.00 5.13 20,520.004,000.00 32.72 130,880.00

50 334 16,700.00400 0.88 352118 29.25 3,451.50

53 29.25 1,550.25344 20.53 7,062.32

40 89.45 3,578.008,160.00 3.73 30,436.80300 47.74 14,322.00

30 54.26 1,627.80

20 106.5 2,130.00

1,000.00 14.48 14,480.00100 42.01 4,201.00

50 348.48 17,424.00

2,600.00 5.25 13,650.0011,000.00 5.13 56,430.005,000.00 32.72 163,600.001,000.00 24.5 24,500.00120 334 40,080.006,500.00 0.88 5,720.002,000.00 29.25 58,500.00900 29.25 26,325.005,600.00 20.53 114,968.00

40 89.45 3,578.0012,600.00 3.73 46,998.00500 47.74 23,870.00

70 54.26 3,798.20

30 106.5 3,195.00

300 14.48 4,344.0050 42.01 2,100.50

200 348.48 69,696.00

500 0.88 440147 29.25 4,299.75

67 29.25 1,959.75430 20.53 8,827.90

20 89.45 1,789.001 33,188.00 33,188.00

750 0.88 660250 29.25 7,312.50650 58.38 37,947.00

4,973,522.15

34.00 59,803.32 2,033,312.88

Page 34: BoQ Part 1 Version 1

Item Description Unit

Bill 2.2 includes also permanent drainage and erosion protection at spoil areas

2.2.01.0 DRAINAGE AND EROSION PROTECTION2.2.01.01 Mitre drains m2.2.01.02 Catchwater drains m2.2.01.03 Other canals and ditches m32.2.01.04 Extra over 2.2.01.01 to 2.2.01.03 for rock excavation m32.2.01.05 Slope protection with crushed rock, 5-200 mm m32.2.01.06 Rip-rap

a) 200 - 300 mm m3b) 300 - 500 mm m3c) Selected blocks >500 mm m3d) Grouted rip-rap m3

2.2.01.07 Concrete lining m32.2.01.08 Scour checks no2.2.01.09 Filter fabric

a) 250 g/m2 m2b) 300 g/m2 m2

2.2.01.10 Gabion mattresses m22.2.01.11 Gabion boxes m32.2.01.12 Grassing m2

2.2.02.0 PIPE CULVERTS AND DRAIN PIPES2.2.02.01 Excavation for head walls, wing walls and drop inlets m32.2.02.02 Backfill at head walls, wing walls and drop inlets m32.2.02.03 Reinforced concrete pipe culverts - Diameter 600 mm m2.2.02.04 Reinforced concrete pipe culverts - Diameter 800 mm m2.2.02.05 Reinforced concrete pipe culverts - Diameter 1200 mm m2.2.02.06 PVC pipes in trench - Diameter 100 mm m2.2.02.07 PVC pipes in trench - Diameter 150 mm m2.2.02.08 PVC pipes in trench - Diameter 200 mm m2.2.02.09 Formwork Class B m22.2.02.10 Formwork Class C m22.2.02.11 Concrete Class B m32.2.02.12 Concrete class C m32.2.02.13 Reinforcement, deformed bars, 420 N/mm2 t2.2.02.14 Reinforcement mesh t

Sum Bill 2.2 Drainage and Erosion Protection.

Bill No. 2 - RoadworksBill 2.2 Drainage and Erosion Protection.

Page 35: BoQ Part 1 Version 1

Item Description Unit

Bill 2.2 Incluye también el drenaje permanente y protección contra la erosión en zonas de relleno

2.2.01.0 DRENAJE Y PROTECCIÓN DE EROSIÓN2.2.01.01 Canal de drenaje - Mitre drains m2.2.01.02 canales de coronación - Catchwater drains m2.2.01.03 Otros canales y acequias - Other canals and ditches m32.2.01.04 Extra sobre 2.2.01.01 a 2.2.01.03 para la excavación de roca m32.2.01.05 Protección de taludes con piedra triturada - Slope protection with crushed rock, 5-200 mm m32.2.01.06 Escollerado - Enrrocado - Rip-rap

a) 200 - 300 mm m3b) 300 - 500 mm m3c) Bloques seleccionados >500 mm m3d) Enrrocado embebido en mortero - Grouted rip-rap m3

2.2.01.07 Revestimiento de Hormigón - Concrete lining m32.2.01.08 Disipador de energía en rápidas - Scour checks no2.2.01.09 Geotextil - Filter fabric

a) 250 g/m2 m2b) 300 g/m2 m2

2.2.01.10 Gavión tipo colchon reno - Gabion mattresses m22.2.01.11 Gavión tipo caja - Gabion boxes m32.2.01.12 Encespedado - Grassing m2

2.2.02.0 Tubos de crenaje y tuberías de desague - PIPE CULVERTS AND DRAIN PIPES2.2.02.01 Excavación para muros de cabeza, muros de ala y ensenadas de caída m32.2.02.02 Relleno en muros de cabeza, muros de ala y ensenadas de caída m32.2.02.03 Alcantarillas de tubo de hormigón armado - Diámetro 600 mm m2.2.02.04 Alcantarillas de tubo de hormigón armado - Diámetro 800 mm m2.2.02.05 Alcantarillas de tubo de hormigón armado - Diámetro 1200 mm m2.2.02.06 Tubos de PVC en zanja - Diámetro 100 mm m2.2.02.07 Tubos de PVC en zanja - Diámetro 150 mm m2.2.02.08 Tubos de PVC en zanja - Diámetro 200 mm m2.2.02.09 Encofrado Clase B m22.2.02.10 Encofrado Clase C m22.2.02.11 Hormigón Clase B m32.2.02.12 Hormigón Clase B m32.2.02.13 Acero de refuerzo, barras corrugadas, 420 N/mm2 - Reinforcement, deformed bars, 420 N/mm2 t2.2.02.14 Mallas de acero - Reinforcement mesh t

Sum Bill 2.2 Drainage and Erosion Protection.

Bill No. 2 - RoadworksBill 2.2 Drainage and Erosion Protection.

Page 36: BoQ Part 1 Version 1

Quantity Unit Price Total PriceUSD USD

200 65.22 13,044.002,000.00 65.22 130,440.001,000.00 25.62 25,620.00300 23.76 7,128.00500 53.39 26,695.00

300 27.3 8,190.00300 27.3 8,190.00500 27.3 13,650.00300 27.3 8,190.00400 445.36 178,144.00

20 12.2 244

1,000.00 2.79 2,790.001,000.00 2.79 2,790.00500 37.27 18,635.00700 36.62 25,634.001,000.00 11.17 11,170.00

200 7.92 1,584.00150 31.97 4,795.50100 416.94 41,694.00

60 556.23 33,373.8040 1,248.10 49,924.00

400 9.77 3,908.00200 16.77 3,354.00150 20.04 3,006.00100 44.71 4,471.00500 44.71 22,355.00150 192.22 28,833.00300 192.22 57,666.00

15 2,448.53 36,727.955 3,261.00 16,305.00

788,551.25

Page 37: BoQ Part 1 Version 1

Item Description Unit

Bill 3.1 includes upstream tunnel portal

3.1.01.0 EARTHWORKS3.1.01.01 Remove usable timber no3.1.01.02 Clearing and grubbing ha3.1.01.03 Topsoil excavation m33.1.01.04 Soil excavation

a) Bulk excavation, to spoil deposit m3b) Excavation to stock pile (gravel, boulders) m3c) Excavations for footings m3

3.1.01.05 Preparation of rock foundation for concreting m23.1.01.06 Fill and backfill

a) Embankment filli) Gravel m3ii) Rock m3b) Structural backfill m3c) High quality rockfill m3d) Backfill of trenches m3e) Low permeability fill m3f) Filter material, 0 - 60 mm m3g) Drainage material , 50 - 100 mm m3

3.1.01.07 Placing of topsoil m23.1.01.08 Turfing (optional) m2

3.1.02.0 ROCK EXCAVATION3.1.02.01 a) Bulk excavation m3

b) Trench/ditch excavation m33.1.02.02 Contour boreholes m3.1.02.03 m3

3.1.03.0 GROUND TESTING AND GROUTING, ROCK SUPPORTRock support at tunnel portal, incuded in bill 3.2

3.1.03.01 Percussion drilling, diameter minimum 51 mm, depth 0 - 20 m (in rock and concrete) m

3.1.03.02 Rotary drilling with casing, diameter minimum 76 mm, depth 0 - 20 m m3.1.03.03 Extra over 3.1.03.01 and 3.1.03.02 for sloping holes m

3.1.03.05 Cement pressure grouting, per packer setting, depth 0-20 m no3.1.03.06 Cement grouting: Cement consumption per packer setting, Type A

a) 0 - 100 kg kgb) 0 - 200 kg kgc) 0 - 300 kg kgd) 0 - 500 kg kge) More than 500 kg kg

3.1.03.07 kg

3.1.03.08 Fully cement-grouted rock bolts. D=32mma) Length 2.0 m nob) Length 3.0 m noc) Length 4.0 m nod) Length 6.0 m noe) Length 8.0 m no

3.1.04.0 DRAINAGE AND EROSION PROTECTION3.1.04.01 m3

3.1.04.02 Rip-rapa) Stone size 200 - 300 mm m3b) Stone size 300 - 500 mm m3c) Selected blocks > 500 mm m3d) Grouted Rip rap m3

3.1.04.03 Filter fabrica) Minimum 180 g/m2 m2b) Minimum 250 g/m2 m2c) Minimum 300 g/m2 m2

3.1.04.04 m

3.1.04.05 Excavation of permanent ditches and catchwater drains m33.1.04.06

a) 150 mm mb) 200 mm m

3.1.04.07 Prefabricated plastic mesh for slope protection. m2

Bill No. 3 - The Huaura DiversionBill 3.1 Huaura Dam and Intake

Above ground. Rock excavation. Abnormal overbreak.

3.1.03.04 Water pressure testing, per packer setting, single packer, depth 0 - 20 m no

Chemical grouting. Type of grout: Epoxy

Erosion protection with crushed rock 50 - 200 mmMin. thickness 300 mm

Drilling of weep holes, vertical or sloping holes. Diameter 51 mm

Reinforced concrete drain pipes including bends and tees.Internal diameter:

Page 38: BoQ Part 1 Version 1
Page 39: BoQ Part 1 Version 1

Item Description Unit

Bill 3.1 Incluido portal tunel aguas arriba - includes upstream tunnel portal

3.1.01.0 MOVIMIENTOS DE TIERRA - EARTHWORKS3.1.01.01 Retiro de madera utilizable - Remove usable timber no3.1.01.02 Limpieza e inicio de actividaddes - Clearing and grubbing ha3.1.01.03 Excavación tierra vegetal - Topsoil excavation m33.1.01.04 Excavación de suelo - Soil excavation

a) Excavación masiva, traslado a botadero - Bulk excavation, to spoil deposit m3b) Excavacíon y selección en cantera (gravas y canto rodado) - Excavation to stock pile (gravel, boulders) m3c) Excavación para cimientos - Excavations for footings m3

3.1.01.05 Preparacíon de concretado en cimentacio de roca - Preparation of rock foundation for concreting m23.1.01.06 Corte y relleno - Fill and backfill

a) Relleno del terraplén - Embankment filli) Grava - Gravel m3ii) Roca - Rock m3b) Relleno estructural - Structural backfill m3c) Enrocado de alta calidad - High quality rockfill m3d) El relleno de las zanjas - Backfill of trenches m3e) Relleno de baja permeabilidad - Low permeability fill m3f) Material de filtro - Filter material, 0 - 60 mm m3g) Material de drenaje - Drainage material , 50 - 100 mm m3

3.1.01.07 Colocación de tierra vegetal - Placing of topsoil m23.1.01.08 Encespado - Turfing (optional) m2

3.1.02.0 EXCAVACIÓN EN ROCK - ROCK EXCAVATION3.1.02.01 a) Excavacíon masiva - Bulk excavation m3

b) Excavacíon de zanjas - Trench/ditch excavation m33.1.02.02 Perforaciones (sondeos) y gráficas de curvas - Contour boreholes m3.1.02.03 Excavación masiva en suelo rocoso. Sobreexcavación normal. - Above ground. Rock excavation. Abnormal overbreak. m3

3.1.03.0 PRUEBAS DE SUELO, CEMENTACIÓN Y SOPORTE EN ROCA - GROUND TESTING AND GROUTING, ROCK SUPPORTSoporte en roca del Portal túnel, incluye reglamento 3.2 - Rock support at tunnel portal, incuded in bill 3.2

3.1.03.01 Perforación por percusión, diámetro mínimo de 51 mm, profundidad 0-20 m (en roca y hormigón) m

3.1.03.02 Perforación rotatoria con relleno, diámetro mínimo de 76 mm, profundidad de 0-20 m m3.1.03.03 Adicional sobre 3.1.03.01 y 3.1.03.02 para agujeros inclinados m

Pruebas de presión de agua, por ajuste envasador, packer simple, profundidad 0-20 m

3.1.03.05 Cementado con lechada a presión, por ajuste envasador, profundidad 0-20 m no3.1.03.06 Cementado con lechada: El consumo de cemento segun ajuste envasador, Tipo A

a) 0 - 100 kg kgb) 0 - 200 kg kgc) 0 - 300 kg kgd) 0 - 500 kg kge) Mas de 500 kg kg

3.1.03.07 Cementación Química. Tipo lechada: Epoxico. kg

3.1.03.08 Pernos totalmente cementados en roca. D= 32 mma) Longitud 2.0 m nob) Longitud 3.0 m noc) Longitud 4.0 m nod) Longitud 6.0 m noe) Longitud 8.0 m no

3.1.04.0 DRENAJE Y PROTECCIÓN A LA EROSIÓN - DRAINAGE AND EROSION PROTECTION3.1.04.01 m3

3.1.04.02 Enrrocado - Rip-rapa) Tamaño de piedra 200 - 300 mm m3b) Tamaño de piedra 300 - 500 mm m3c) Bloques seleccionados >500 mm m3d) Enrrocado embebido en mortero - Grouted rip-rap m3

3.1.04.03 Geotextil - Filter fabrica) Mínimo 180 g/m2 m2b) Mínimo 250 g/m2 m2c) Mínimo 300 g/m2 m2

3.1.04.04 La perforación de agujeros de drenaje, vertical o inclinada agujeros. Diámetro 51 mm m

3.1.04.05 Excavación de acequias permanetes y canales de coronación. m33.1.04.06

a) 150 mm mb) 200 mm m

3.1.04.07 Malla de plástico prefabricado para protección de taludes. m2

Bill No. 3 - Desviación Huaura - The Huaura DiversionBill 3.1 Presa y bocatoma Huaura - Huaura Dam and Intake

3.1.03.04 no

Protección contra la erosión con piedra triturada 50 - 200 mmMin. espesor 300 mm

Tuberias de drenaje de hormigon armado incluye curvas y tees.Diametro interior:

Page 40: BoQ Part 1 Version 1
Page 41: BoQ Part 1 Version 1

Quantity Unit Price Total PriceUSD USD

10 105.23 1,052.303 9,990.00 29,970.00

100 3.34 334

12,000.00 5.62 67,440.00500 6.35 3,175.00500 6.52 3,260.00800 3.59 2,872.00

750 22.43 16,822.50750 17.21 12,907.503,500.00 15.92 55,720.00400 23.68 9,472.00400 14.89 5,956.00400 16.76 6,704.00500 25.96 12,980.00250 26.49 6,622.50500 0.32 160250 0.32 80

6,000.00 18.92 113,520.00200 20.37 4,074.00400 17.98 7,192.00200 14.2 2,840.00

300 15.58 4,674.00

100 63.4 6,340.0050 80.04 4,002.00

60 129.12 7,747.20

9,000.00 0.88 7,920.006,000.00 1.05 6,300.004,000.00 1.27 5,080.003,000.00 1.63 4,890.003,000.00 2.61 7,830.00100 23.71 2,371.00

80 56.9 4,552.0040 68.24 2,729.6030 79.57 2,387.1020 102.26 2,045.2010 129.48 1,294.80

1,000.00 18.08 18,080.00

600 20.01 12,006.00600 20.04 12,024.00750 20.43 15,322.50100 129.62 12,962.00

1,000.00 6.41 6,410.00200 6.66 1,332.00200 7.01 1,402.00

50 15.58 779

100 3.41 341

100 24.32 2,432.0050 33.28 1,664.00

200 14.49 2,898.00

20.00 119.42 2,388.40

Page 42: BoQ Part 1 Version 1
Page 43: BoQ Part 1 Version 1

Item Description Item

3.1.05.0 CONCRETE WORKS 3.1.05.03.1.05.01 3.1.05.01

a) Depth in rock 2.0 mb) Depth in rock 3.0 mc) Depth in rock 4.0 m

d) Depth in rock 2.0 me) Depth in rock 3.0 mf) Depth in rock 4.0 mg) Depth in rock 6.0 m

3.1.05.02 Formwork Class A. Plain. 3.1.05.02a) Dam, gravity section and right abutmentb) Dam, gated section and bridgec) Intake block and left abutmentd) Gravel trap and diversion tunnel inlet.e) Gate house

3.1.05.03 Formwork Class A. Curved 3.1.05.03a) Dam, gravity section and right abutmentb) Dam, gated section and bridgec) Intake block and left abutmentd) Gravel trap and diversion tunnel inlet.

3.1.05.04 Formwork Class B Plain. 3.1.05.04a) Dam, gravity section and right abutmentb) Dam, gated section and bridgec) Intake block and left abutmentd) Gate house

3.1.05.05 Formwork Class C. 3.1.05.05a) Dam, gravity section and right abutmentb) Dam, gated section and bridgec) Intake block and left abutmentd) Gravel trap and diversion tunnel inlet.e) Floor and foundation in gate housef) Construction and expansion joints incl. shear keys

3.1.05.06 Grooves 3.1.05.06a) Triangular, drip throats, 25 mmb) Rectangular, for sealing of roofing

3.1.05.07 Rectangular voids 3.1.05.07a) Cross-section not exceeding 0.1 m2b) Cross-section 0.1 - 0.5 m2c) Formwork for concreting of voids.Class according to adjacent surface

3.1.05.08 Shear keys in construction joints 3.1.05.083.1.05.09 PVC waterstops 3.1.05.09

a) 150 mm wideb) 225 mm widec) 300 mm wide

3.1.05.10 Grouting of joints and interphases 3.1.05.10a) Supply and installation of tubesb) Cement groutingc) Chemical groutingType proposed by tenderer:

3.1.05.11 Bituminous coating on concrete surface 3.1.05.113.1.05.12 Joint sealing compound. 3.1.05.123.1.05.13 Concrete covers of duct, w = 300 mm at at abutment and bridge including steel frames. 3.1.05.13

3.1.05.14 Preparation of contraction joints. 3.1.05.143.1.05.15 Reinforcement. All dimensions 3.1.05.15

a) Deformed bars, 420 N/mm2b) Plain barsc) Welded mesh reinforcement

3.1.05.16 3.1.05.16

a) D = 20 mmb) D = 25 mmc) D = 32 mm

3.1.05.17 a) Stainless steel bars. D = 32 mm 3.1.05.17b) Stainless steel bars. D = 25 mm

3.1.05.18 Embedded PVC-pipes including bends and fixtures 3.1.05.18a) D = 50 mmb) D = 75 mmc) D = 100 mm

Bill No. 3 - The Huaura DiversionBill 3.1 Huaura Dam and Intake

Bill No. 3 - Desviación Huaura - The Huaura DiversionBill 3.1 Presa y bocatoma Huaura - Huaura Dam and Intake

Grouted rock bolts. D = 25 mmLength in concrete 1.5 m

Grouted rock bolts. D = 32 mmLength in concrete 1.5 m

Deformed steel bars of weldable quality for fixing hydraulic steelwork such as steel lining, gate guides, etc. Length approx .2.0 m Partly embedded

Page 44: BoQ Part 1 Version 1

d) D = 150 mme) D = 200 mm

3.1.05.19 Embedded cast-iron floor gullies with hot dip galvanized steel cover 3.1.05.193.1.05.20 3.1.05.20Steel angle section 100 x 100 with anchoring c/c 300 mm, embedded in first stage concrete

Page 45: BoQ Part 1 Version 1

Description Unit Quantity

OBRAS DE CONCRETO - CONCRETE WORKS

a) Anclaje en roca 2.0 m - Depth in rock 2.0 m no 50b) Anclaje en roca 3.0 m - Depth in rock 3.0 m no 100c) Anclaje en roca 4.0 m -Depth in rock 4.0 m no 15

d) Anclaje en roca 2.0 m - Depth in rock 2.0 m no 20e) Anclaje en roca 3.0 m - Depth in rock 3.0 m no 20f) Anclaje en roca 4.0 m - Depth in rock 4.0 m no 10g) Anclaje en roca 6.0 m - Depth in rock 6.0 m no 10Encofrado Clase A. Plano - Formwork Class A. Plain.a)Presa sección gravedad y estribo derecho - a) Dam, gravity section and right abutment m2 1,000.00b)Presa, sección compuerta y puente - Dam, gated section and bridge m2 700c) Brida de entrada y estribo izquierdo - Intake block and left abutment m2 1,000.00d) Trampa de grava y entrada del túnel de desvío. - Gravel trap and diversion tunnel inlet. m2 1,000.00e) Casa de compuertas - Gate house m2 250Encofrado Clase A. Curvo - Formwork Class A. Curveda) Presa sección gravedad y estribo derecho - a) Dam, gravity section and right abutment m2 200b)Presa, sección compuerta y puente - Dam, gated section and bridge m2 150c) Brida de entrada y estribo izquierdo - Intake block and left abutment m2 50d) Trampa de grava y entrada del túnel de desvío. - Gravel trap and diversion tunnel inlet. m2 50Encofrado Clase B. Plano - Formwork Class B. Plain.a) Presa sección gravedad y estribo derecho - a) Dam, gravity section and right abutment m2 300b)Presa, sección compuerta y puente - Dam, gated section and bridge m2 500c) Brida de entrada y estribo izquierdo - Intake block and left abutment m2 400e) Casa de compuertas - Gate house m2 50Encofrado Clase C.a) Presa sección gravedad y estribo derecho - a) Dam, gravity section and right abutment m2 600b)Presa, sección compuerta y puente - Dam, gated section and bridge m2 200c) Brida de entrada y estribo izquierdo - Intake block and left abutment m2 900d) Trampa de grava y entrada del túnel de desvío. - Gravel trap and diversion tunnel inlet. m2 600e) Piso y fundación de casa de la puerta - Floor and foundation in gate house m2 50f) Construcción y juntas de dilatación incl. Llaves de corte - Construction and expansion joints incl. shear keys m2 400Acanaladura - Groovesa) Triangulares, gargantas de goteo, 25 mm - Triangular, drip throats, 25 mm m 50b) Rectangular, para el sellado de techos - Rectangular, for sealing of roofing m 15Huecos rectangulares - Rectangular voidsa) Sección transversal no exceda de 0,1 m2 - Cross-section not exceeding 0.1 m2 no 5b) Sección transversal desde 0,1 hasta 0,5 m2 - Cross-section 0.1 - 0.5 m2 no 5c) Encofrado para el hormigonado de huecos. Clase de acuerdo con la superficie adyacente - Formwork for concretin m2 20Llaves de corte en juntas de construcción - Shear keys in construction joints m 40PVC waterstopsa) 150 mm ancho m 10b) 225 mm ancho m 100c) 300 mm ancho m 110Grouting(lechada) de las juntas e interfases - Grouting of joints and interphasesa) Suministro e instalacion de tuberias - Supply and installation of tubes m 200b) Lechada de cemento - Cement grouting kg 150c) lechada quimica - Chemical grouting l 50Escriba propuesta del licitador - Type proposed by tenderer:Revestimiento asflato sobre superficie de hormigón - Bituminous coating on concrete surface m2 150Compuesto de sellado de juntas. - Joint sealing compound. kg 50

m 15

Preparación de las juntas de contracción. - Preparation of contraction joints. m2 150Refuerzo. todas las dimensiones - Reinforcement. All dimensionsa) barras corrugadas, 420 N/mm2 t 600b) barras lisas t 2c) reforzamiento con malla electrosoldada - Welded mesh reinforcement t 4

a) D = 20 mm no 40b) D = 25 mm no 80c) D = 32 mm no 20a) Barras de acero inoxidable - Stainless steel bars. D = 32 mm no 5b) Barras de acero inoxidable - Stainless steel bars. D = 25 mm no 5PVC-tubos empotrados, incluida curvas y accesorios - Embedded PVC-pipes including bends and fixturesa) D = 50 mm m 20b) D = 75 mm m 30c) D = 100 mm m 50

Bill No. 3 - Desviación Huaura - The Huaura DiversionBill 3.1 Presa y bocatoma Huaura - Huaura Dam and Intake

Pernos de anclaje con lechada. D = 25 mm - Grouted rock bolts. D = 25 mmLongitud de anclaje en concreto 1.5 - Length in concrete 1.5 m

Pernos de anclaje con lechada. D = 32 mm - Grouted rock bolts. D = 32 mmLongitud de anclaje en concreto 1.5 - Length in concrete 1.5 m

Recubrimiento de hormigón de conducto, w = 300 mm en al pilar y el puente incluyendo marcos de acero.Concrete covers of duct, w = 300 mm at at abutment and bridge including steel frames.

Barras de acero corrugadas aptas para soldadura, para fijación de estructuras hidráulicas de acero tales como revestimiento de concreto, guias de compuertas, etc . longitu de 2.0 metros de embebido - Deformed steel bars of weldable quality for fixing hydraulic steelwork such as steel lining, gate guides, etc. Length approx .2.0 m Partly embedded

Page 46: BoQ Part 1 Version 1

d) D = 150 mm m 20e) D = 200 mm m 20hierro fundido embebido con covertura de acero galvanizado en caliente no 2

kg 120Sección del ángulo de acero de 100 x 100 con anclaje c / c de 300 mm, embebido en concreto en la primera etapa. - Steel angle section 100 x 100 with anchoring c/c 300 mm, embedded in first stage concrete

Page 47: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

66.07 3,303.5077.22 7,722.0088.36 1,325.40

68.24 1,364.8079.57 1,591.40

102.26 1,022.60129.48 1,294.80

53.95 53,950.0053.95 37,765.0053.95 53,950.0053.95 53,950.0053.95 13,487.50

73.51 14,702.0073.51 11,026.5073.51 3,675.5073.51 3,675.50

53.99 16,197.0053.99 26,995.0053.99 21,596.0053.99 2,699.50

51.55 30,930.0051.55 10,310.0051.55 46,395.0051.55 30,930.0051.55 2,577.5051.55 20,620.00

33.5 1,675.0034.25 513.75

26.7 133.526.7 133.5

53.95 1,079.0022.63 905.2

15.27 152.724.93 2,493.0030.31 3,334.10

3.67 7341.01 151.52.5 125

6.2 93018.25 912.572.58 1,088.70

6.07 910.5

1,459.67 875,802.001,459.67 2,919.342,812.50 11,250.00

8.05 32211.14 891.217.63 352.627.28 136.417.95 89.75

5.45 1097.15 214.58.92 446

Page 48: BoQ Part 1 Version 1

16.9 33825.92 518.4

123.23 246.467.41 889.2

Page 49: BoQ Part 1 Version 1

Item Description Item

3.1.05.21 Step iron partly embedded in concrete 3.1.05.213.1.05.22 Guides and sills for stop logs embeded in concrete 3.1.05.223.1.05.23 Concrete Class A 3.1.05.23

a) Dam, gravity section and right abutmentb) Intake block and left abutment

3.1.05.24 Concrete Class B 3.1.05.24a) Gate housesb) Culverts, ducts

3.1.05.25 Concrete Class C 3.1.05.25a) Dam, gravity section and right abutmentb) Dam, gated section and bridgec) Intake block and left abutmentd) Gravel trap and diversion tunnel inlet.e) Gate housef) Erosion protection slabsg) Culverts, ductsh) Retaining walls

3.1.05.26 Concrete Class E 3.1.05.26Gate openings, floor and lower parts of piers and walls and erosion protection slab.

3.1.05.27 Concrete Class F 3.1.05.273.1.05.28 Finishing of unformed surfaces 3.1.05.28

a) Class UAb) Class UB, curved surfacesc) Class UB, plane surfacesd) Class UC, plane surfaces

3.1.05.29 Blockout for and grouting of fence posts in concrete slabs 3.1.05.29

3.1.05.30 Grouting around hydraulic steelworks with expanding mortar. Incl. plant positioning 3.1.05.30

3.1.05.31 Not used 3.1.05.313.1.05.32 3.1.05.32

3.1.05.33 Grouting of construction joints with cement based grout. Incl. plant positioning 3.1.05.33

3.1.05.34 Sandblasting of concrete surfaces 3.1.05.34

3.1.06.0 INTERFACE WITH H, EMBEDMENT OF HYDRAULIC STEELWORKS 3.1.06.0

3.1.06.01 Flood Flushing Gates 3.1.06.013.1.06.02 Stop Log Guides, Flushing Gates 3.1.06.023.1.06.03 Coarse Trash Rack 3.1.06.033.1.06.04 Intake Gates 3.1.06.043.1.06.05 Fine Trash Rack 3.1.06.053.1.06.06 Gravel Flushing Gate / Minimum Flow Gate 3.1.06.063.1.06.07 Trash Rack Cleaner 3.1.06.073.1.06.08 Not used 3.1.06.08

3.1.07.0 BUILDER'S WORKS 3.1.07.03.1.07.01 Blockwork Walling 3.1.07.01

a) 150 mmb) 100 mm

3.1.07.02 Roofing membrane 3.1.07.023.1.07.03 Doors 3.1.07.03

b) Insulated double steel doors. Fire rating A60. External dimensions 1600x2100mm

3.1.07.04 Not used 3.1.07.043.1.07.05 Windows 3.1.07.05

a) Aluminium window with fixed panes Size 1000 x 1200 mm

c) Glazing 5 mm float glass and glazing in panes of any size.3.1.07.06 Plastering on walls 3.1.07.06

3.1.07.07 Painting and decorating. Painting of: 3.1.07.07a) Internal metalwork or steelworkb) Galvanized metalwork

Bill No. 3 - The Huaura DiversionBill 3.1 Huaura Dam and Intake

Bill No. 3 - Desviación Huaura - The Huaura DiversionBill 3.1 Presa y botoma Huaura - Huaura Dam and Intake

Grouting of construction joints with chemical-based grout as approved by the Engineer. Incl. plant positioning.

Reference H-tender documents, Part D, Section 2This item shall include all works related to forming of recesses, blockouts and the like to divide between first and second step concreting, provision and removal of shuttering for items to be embedded, extra over for embedment and second stageconcreting and the like, for hydraulic steelworks as listed below. The concrete volumes and concrete reinforcement are catered for under Concrete Works.

a) Insulated single steel doors. Fire rating A60. External dimensions 1000x2100mm

b) Louvred aluminium ventilation grilles with aluminium frame and insect screen size500 x 400 mm

Page 50: BoQ Part 1 Version 1

c) External surfaces of steelworkd) External concrete surfaces

Page 51: BoQ Part 1 Version 1

Description Unit Quantity

Step iron (escalera tipo gato) parte embebida en hormigon no 25Guias y topes de compuertas emebebidas en hormigon - Guides and sills for stop logs embeded in concrete kg 300Concreto clase A - Concrete Class Aa)Presa sección gravedad y estribo derecho - Dam, gravity section and right abutment m3 2,500.00b) Brida de entrada y estribo izquierdo - Intake block and left abutment m3 400Hormigon clase B - Concrete Class Ba) Casa de compuerta - Gate houses m3 45b)Alcantarillas y ductos - Culverts, ducts m3 50Hormigon clase C - Concrete Class Ca)Presa sección gravedad y estribo derecho - Dam, gravity section and right abutment m3 1,100.00b)Presa, sección compuerta y puente - Dam, gated section and bridge m3 1,060.00c) Brida de entrada y estribo izquierdo - Intake block and left abutment m3 1,500.00d) Trampa de grava y entrada del túnel de desvío. - Gravel trap and diversion tunnel inlet. m3 650e) Casa de compuerta - Gate houses m3 15f) Losas de protección contra la erosión - Erosion protection slabs m3 1,460.00g)Alcantarillas y ductos - Culverts, ducts m3 40h) Muros de contención - Retaining walls m3 200Hormigon clase E - Concrete Class E

m3 200

hormigón clase F m3 150Acabado de superficies - Finishing of unformed surfacesa) Clase UA m2 1,000.00b) Clase UB, superficie curva m2 300c) Clase UB, Superficie plana m2 800d) Clase UC, Superficie plana m2 200Colocación de Blockout con grouting sobre losas de hormigón - Blockout for and grouting of fence posts in concrete slabs no 60

l 40

Not usedl 20

l 50

Arenado de superficies de hormigón - Sandblasting of concrete surfaces m2 20

Compuerta de ductos de purga - Flood Flushing Gates LS 1topes de guias, compuertas de purga - Stop Log Guides, Flushing Gates LS 1Rejilla para desperdicios grandes - Coarse Trash Rack LS 1Compuerta de bocatoma - Intake Gates LS 1rejilla para despedicios menores - Fine Trash Rack LS 1compuerta de purga de gravas/compuerta de flujo mínimo - Gravel Flushing Gate / Minimum Flow Gate LS 1Limpiador de rejas - Trash Rack Cleaner LS 1Not used

ACABADOS DE CONSTRUCCIÓN - BUILDER'S WORKSAdoquines - Blockwork Wallinga) 150 mm m2 25b) 100 mm m2 15membrana para techo - Roofing membrane m2 40Puertas - Doors

no 1

no 1

Not usedVentanas - Windowsa) Ventanas con marcos de aluminio, tamaños de paneles de 1000 x 1200 mm no 4

no 2

c) Colocacíon de vidrio en ventanas de cualquier tamaño, espesor de 5mm m2 3Empastado de muros m2 70

Pintura y decoración.a) carpinteria metálica estructuras de acero - Internal metalwork or steelwork m2 10b) carpinteria metálica galvanizada - Galvanized metalwork m2 5

Bill No. 3 - Desviación Huaura - The Huaura DiversionBill 3.1 Presa y botoma Huaura - Huaura Dam and Intake

Recubrimiento de partes bajas de las compuerta como muros, muelles y losa - Gate openings, floor and lower parts of piers and walls and erosion protection slab.

Revestimiento de estructuras hidráulicas con mortero expansivo . Incluida instalación - Grouting around hydraulic steelworks with expanding mortar. Incl. plant positioning

Relleno de juntas de construcción con chemical-based grout aprobado por el ingenieros. Incluye instalación - Grouting of construction joints with chemical-based grout as approved by the Engineer. Incl. plant positioning.

Relleno de juntas de construcción con cement based grout. . Incluye instalación - Grouting of construction joints with cement based grout. Incl. plant positioning

INTERFACE CON H, ANCLAJE DE ESTRUCTURAS HIDRÁULICAS- INTERFACE WITH H, EMBEDMENT OF HYDRAULIC STEELWORKS

Reference H-tender documents, Part D, Section 2Esta partida se incluirán todos los trabajos relacionados con la formación de espacios, bloqueadores y similares para dividir entre la primera y segunda etapa de hormigonado, provisión y remoción de los encofrados para elementos a ser incorporados, sobre empotramiento y segunda etapa hormigonado y similares, para estructuras de acero hidráulicas que se enumeran a continuación. Los volúmenes de concreto y refuerzo de concreto son atendidos bajo estructuras de concreto.

a) Puertas indivduales de acero aisladas. Resistencia a fuego A60. dimensión externa 1000x2100mm - Insulated single steel doors. Fire rating A60. External dimensions 1000x2100mm

b) Puertas dobles de acero aisladas. Resistencia a fuego A60. dimensión externa 1600x2100mm - Insulated double steel doors. Fire rating A60. External dimensions 1600x2100mm

b) persianas de rejillas con marco de aluminio, incluye malla contra insectos tamaño de pantalla500 x 400 mm

Page 52: BoQ Part 1 Version 1

c) Las superficies externas de estructuras de acero - External surfaces of steelwork m2 10d) Concreto en superficies exteriores m2 90

Page 53: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

15.71 392.757.41 2,223.00

128.39 320,975.00128.39 51,356.00

130.16 5,857.20130.16 6,508.00

135.63 149,193.00135.63 143,767.80135.63 203,445.00135.63 88,159.50135.63 2,034.45135.63 198,019.80135.63 5,425.20135.63 27,126.00

173.13 34,626.00

119.09 17,863.50

4.2 4,200.004.65 1,395.004.65 3,720.004.85 97048.2 2,892.00

30.95 1,238.00

30.95 619

30.95 1,547.50

10.64 212.8

4,786.21 4,786.2118,408.50 18,408.501,110.51 1,110.514,418.04 4,418.041,472.68 1,472.682,209.02 2,209.02736.34 736.34

73.3 1,832.5073.3 1,099.50

146.58 5,863.20

3,049.00 3,049.00

3,415.00 3,415.00

427.5 1,710.00464 928

1,044.67 3,134.0142.76 2,993.20

24.43 244.324.43 122.15

Page 54: BoQ Part 1 Version 1

24.43 244.324.43 2,198.70

Page 55: BoQ Part 1 Version 1

Item Description Item

3.1.08.0 INVESTIGATION AND INSTRUMENTATION 3.1.08.03.1.08.01 Electric piezometer. Measuring device 3.1.08.013.1.08.02 Electric piezometer, piping 3.1.08.023.1.08.03 Surface settlement monuments 3.1.08.03

a)Foundation on rockb) Foundation on soil

3.1.08.04 Surface settlement fixed point 3.1.08.04a)Foundation on rockb) Foundation on soil

3.1.09.0 MISCELLANEOUS WORKS 3.1.09.03.1.09.01 Light duty hatch cover 3.1.09.013.1.09.02 Light duty duct cover 3.1.09.023.1.09.03 Heavy duty duct cover 3.1.09.033.1.09.04 External railings, fixed or removable 3.1.09.04

a)Type Ab)Type B

3.1.09.05 Steel ladders 3.1.09.053.1.09.06 Fencing, excavation and casting of individual foundation included 3.1.09.06

3.1.09.07 Fence gates, excavation for and concreting of individual foundations included 3.1.09.07

a) Double wing gateb) Single wing gate

3.1.09.08 Preparation of subgrade level 3.1.09.083.1.09.09 3.1.09.09

3.1.09.10 3.1.09.10

3.1.09.11 Double bitumenous surface treatment 3.1.09.113.1.09.12 Earthing electrodes 3.1.09.12

a) 1 x 95 Cu wiresb) Earthing rods, 6 m longc) Cadwelding of joints connections and intersections

3.1.09.13 Not used 3.1.09.133.1.09.14 Not used 3.1.09.143.1.09.15 3.1.09.15

3.1.10.0 VENTILATION AND AIR CONDITIONING 3.1.10.03.1.10.01 Ventilation and airconditioning in the intake gate house. Design, supply and installation. 3.1.10.01

3.1.11.0 WATER SUPPLY, PLUMBING AND SANITARY INSTALLATION AND SEWERAGE 3.1.11.0

3.1.11.01 3.1.11.01

3.1.12.0 FIRE FIGHTING INSTALLATIONS 3.1.12.03.1.12.01 Fire fighting installations and rescue equipment. 3.1.12.01

Sum Bill 3.1 Huaura Dam and Intake Sum

Bill No. 3 - The Huaura DiversionBill 3.1 Huaura Dam and Intake

Bill No. 3 - Desviación Huaura - The Huaura DiversionBill 3.1 Presa y bocatoma Huaura - Huaura Dam and Intake

e) Internal plastered or concrete surfacesWalls

f) Internal plastered or concrete surfaces, Ceilings

g) Concrete floors with moderate loads. Epoxy, Type proposed by tenderer:

h) Concrete floors with heavy loads, including battery rooms. Self levelling epoxy. Type proposed by tenderer:

Subbase of crushed rock (0-75 mm) Thickness min. 200 mm

Wearing course of crushed rock (0-30 mm) Thickness min. 150 mm

Expanded polystyrene at bridge abutmentsThickness 50 mm

Water supply, plumbing and sanitary installation and sewerage in the intake gate house. Design, supply and installation.

Page 56: BoQ Part 1 Version 1

Description Unit Quantity

m2 120

f) Tarrajeo de cielo raso - Internal plastered or concrete surfaces, Ceilings m2 35

m2 25

ANALISIS E INSTRUMENTACIÓN - INVESTIGATION AND INSTRUMENTATIONPiezómetro eléctrico. dispositivo de medición - Electric piezometer. Measuring device no 3Piezómetro eléctrico, tuberías - Electric piezometer, piping m 60Miras monumentadas en superficies - Surface settlement monumentsa)Fundación en roca - Foundation on rock no 2b) Fundación en suelo - Foundation on soil no 3Puntos de control de asentamiento - Surface settlement fixed pointa) Fundación en roca - Foundation on rock no 2b) Fundación en tierra - Foundation on soil no 4

TRABAJOS VARIOS - MISCELLANEOUS WORKSTapa de escotilla, liviana - Light duty hatch cover kg 100Tapa de ductos, liviana - Light duty duct cover kg 300tapa de ductos de alta resistencia - Heavy duty duct cover kg 2,000.00Barandas exteriores, fijas o desmontables - External railings, fixed or removablea)Tipo A kg 500b)Tipo B kg 1,000.00Escaleras de acero - Steel ladders kg 150

m 20

a) Puertas de dos cuerpos - Double wing gate no 1b) Puertas de un cuerpo - Single wing gate no 1Preparación a nivel de subrrasante - Preparation of subgrade level m2 300Subbase de piedra tirurada (0-75 mm) Espesor min. 200 mm m3 70

base de roca triturada (0-30 mm) Espesor min. 150 mm m3 60

Tratamiento de asfalto bica en superficie de rodadura - Double bitumenous surface treatment m2 70Puesta a tierra - Earthing electrodesa) 1 x 95 cable de cobre m 300b) Varillas de puesta a tierra, 6 m de largo - Earthing rods, 6 m long no 5c) Juntas con soldadura en conecciones e intersecciones - Cadwelding of joints connections and intersections no 50Not usedNot used

m2 3

VENTILACIÓN Y AIRE A CONDICIONADO - VENTILATION AND AIR CONDITIONINGLS 1

LS 1

INSTALACION DE SISTEMA CONTRA INCENDIOS - FIRE FIGHTING INSTALLATIONSLS 1

Bill 3.1 Huaura Dam and Intake

Bill No. 3 - Desviación Huaura - The Huaura DiversionBill 3.1 Presa y bocatoma Huaura - Huaura Dam and Intake

e) tarrajeo interno de muros - Internal plastered or concrete surfacesWalls

g) Losa de concreto con cargas moderadas. Tipo de epoxy, propuesto por licitador: - Concrete floors with moderate loads. Epoxy, Type proposed by tenderer:

h) Losa de concreto con cargas pesadas, incluyendo salas de baterías. Auto epoxi nivelación. Escriba propuesto por licitador: - Concrete floors with heavy loads, including battery rooms. Self levelling epoxy. Type proposed by tenderer:

m2 10.00

Cerca, y la excavación, hormigonado de fundaciones individuales incluidos - Fencing, excavation and casting of individual foundation included

Puertas de la cerca, y la excavación, hormigonado de fundaciones individuales incluidos - Fence gates, excavation for and concreting of individual foundations included

Neopreno en estribos de puente espesor de 50 mm- Expanded polystyrene at bridge abutmentsThickness 50 mm

Ventilación y aire acondicionado en casa de compuerta en bocatoma. Diseño y construcción - Ventilation and airconditioning in the intake gate house. Design, supply and installation.

SUMINISTRO DE AGUA, FONTANERIA E INSTALACION SANITARIA Y ALCANTARILLADO - WATER SUPPLY, PLUMBING AND SANITARY INSTALLATION AND SEWERAGE

El suministro de agua, fontanería e instalación sanitaria y alcantarillado en la casa de la compuerta de admisión.Diseño, suministro e instalación.

Instalaciones de sistema contra incendios y equipos de rescate. - Fire fighting installations and rescue equipment.

Page 57: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

24.43 2,931.60

24.43 855.05

24.43 610.75

975.67 2,927.019.75 585

911.3 1,822.60842.95 2,528.85

915.86 1,831.72847.51 3,390.04

7.01 7017.01 2,103.006.34 12,680.00

7.01 3,505.007.01 7,010.007.01 1,051.5085.5 1,710.00

4,275.00 4,275.001,832.00 1,832.00

0.88 26429.25 2,047.50

29.25 1,755.00

4.37 305.9

21.34 6,402.00101.2 506230.3 11,515.00

8.5 25.5

2,112.01 2,112.01

14,017.73 14,017.73

2,112.01 2,112.01

3,333,609.63

24.43 244.30

Page 58: BoQ Part 1 Version 1

Item Description Item

Portals shall be regarded and measured as support work behind the face

3.2.01.0 EARTHWORKS 3.2.01.0Above ground works at upstream portal, included in bill 3.1

3.2.01.01 Topsoil excavation. 3.2.01.013.2.01.02 Soil excavation. 3.2.01.02

3.2.02.0 ROCK EXCAVATION. 3.2.02.03.2.02.01 Above ground. Bulk rock excavation (width > 2 m). 3.2.02.01

3.2.02.03 3.2.02.03

3.2.02.05 3.2.02.05

3.2.02.06 3.2.02.06

3.2.02.07 3.2.02.07

a) Addition for 1/2 blasting roundsb) Addition for 1/4 blasting rounds

3.2.02.09 3.2.02.09

3.2.02.14 Water measuring station 3.2.02.14

3.2.03.00 EXPLORATORY DRILLING AND GROUTING. 3.2.03.00

3.2.03.05 Flushing between holes. At the face. 3.2.03.053.2.03.06 Flushing between holes. Behind the face. 3.2.03.063.2.03.07 Grouting. per packer setting. Depth 0-5 m. At the face 3.2.03.073.2.03.08 Grouting. per packer setting. Depth 0-5 m. Behind the face 3.2.03.083.2.03.09 Cement grouting. Type A. Cement consumption 3.2.03.093.2.03.10 Cement grouting. Type B. Cement consumption 3.2.03.103.2.03.11 Cement grouting. Type C. Cement consumption 3.2.03.113.2.03.12 Chemical grouting. Type D. Dry weight grout consumption 3.2.03.123.2.03.13 Consolidation grouting. 3.2.03.133.2.03.14 Flexible tubes for contact grouting. 3.2.03.143.2.03.15 Contact grouting. Type D. 3.2.03.153.2.03.16 Contact grouting. Type E. 3.2.03.163.2.03.17 Grouting time. At the face 3.2.03.173.2.03.18 Grouting time. Behind the face 3.2.03.18

Bill No. 3 -The Huaura DiversionBill 3.2 Huaura Diversion Tunnel

Bill No. 3 -EL TUNEL DE DESVIO HUAURA - The Huaura DiversionBill 3.2 HUAURA TUNEL DE DESVIO - Huaura Diversion Tunnel

3.2.02.02 Above ground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required). 3.2.02.02

Above ground. Rock excavation. Abnormal overbreak.

3.2.02.04 Underground. Excavation of Diversion Tunnel. Minimum cross section, 15.9 m2 (3.80 m x 4.60 m). 3.2.02.04

Underground. Excavation of tunnel. Addition for increased cross-section.

Underground. Excavation of tunnel. Abnormal overbreak.

Underground. Excavation of tunnel. Addition for short blasting rounds.

3.2.02.08 Underground. Excavation of tunnel.Addition for subdivision of cross-section into heading and benches.

3.2.02.08

Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

3.2.02.10 Underground. Water discharge.Pump out rate 1 - 2 m3/min. Includes also discharges for waterways and other cavities excavated from this tunnel

3.2.02.10

3.2.02.11 Underground. Water discharge.Pump out rate 2 - 3 m3/min. Includes also discharges for waterways and other cavities excavated from this tunnel

3.2.02.11

3.2.02.12 Underground. Water discharge.Pump out rate 3 - 4 m3/min. Includes also discharges for waterways and other cavities excavated from this tunnel

3.2.02.12

3.2.02.13 Underground. Water discharge.Pump out rate more than 4 m3/min. Includes also discharges for waterways and other cavities excavated from this tunnel

3.2.02.13

3.2.03.01 Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face 3.2.03.01

3.2.03.02 Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face 3.2.03.02

3.2.03.03 Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face 3.2.03.03

3.2.03.04 Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face 3.2.03.04

Page 59: BoQ Part 1 Version 1

Description Unit Quantity

MOVIMIENTO DE TIERRAS - EARTHWORKS

Excavación tierra vegetal - Topsoil excavation m3 10Excavación de suelo - Soil excavation m3 500

EXCAVACIÓN EN ROCA - ROCK EXCAVATION.Excavación masiva en suelo rocoso ( ancho > 2m) - Above ground. Bulk rock excavation (width > 2 m). m3 900Perforación de taladros y disparos en suelo rocoso (0.7 m profundida requerida).

m3 100

Subterráneo. La excavación del túnel de desvío. Sección mínima, 15,9 m2 (3,80 mx 4,60 m).

Subterráneo. La excavación del túnel de desvío. Adición de una mayor sección transversal. m3 300

Underground. Excavation of tunnel. Sobreexcavación normal. m3 500

Subterráneo. Excavación del túnel. Adicion de mallas de voladuras.

a) Adicion de 1/2 malla de voladura - Addition for 1/2 blasting rounds m 114b) Adicion de 1/4 malla de voladura -Addition for 1/4 blasting rounds m 76

Perforación de taladros y disparos en suelo rocoso (0.7 m profundida requerida). m 300

Vertederos. no 2

Perforación exploratoria e inyección.Perforación a percusión, diametro mínimo 50 mm. Profundidad 0 - 30 m. Directa a roca (At the face)

Flushing between holes. At the face. no 150Flushing between holes. Behind the face. no 10Inyección de lechada. Según resistencia de packer. profundidad 0-5 m. At the face no 500Inyección de lechada. Según resistencia de packer. profundidad 0-5 m.Behind the face no 80Cement grouting. Type A. Cement consumption kg 350,000.00Cement grouting. Type B. Cement consumption kg 140,000.00Cement grouting. Type C. Cement consumption kg 50,000.00Chemical grouting. Type D. Dry weight grout consumption kg 100Consolidation grouting. kg 1,000.00Flexible tubes for contact grouting. m 120Contact grouting. Type D. kg 400Contact grouting. Type E. kg 400Grouting time. At the face hr 600Grouting time. Behind the face hr 60

Bill No. 3 -EL TUNEL DE DESVIO HUAURA - The Huaura DiversionBill 3.2 HUAURA TUNEL DE DESVIO - Huaura Diversion Tunnel

Trabajos de apoyo se valoran como parte del Portal de tunel - Portals shall be regarded and measured as support work behind the face

Trabajos de excavación masiva aguas arriva del portal incluye factura 3.1 - Above ground works at upstream portal, included in bill 3.1

m 800.00

Excavación masiva en suelo rocoso. Sobreexcavación normal. - Excavación en suelo rocoso. Abnormal overbreak.

m 2,530.00

Subterráneo. Excavación del túnel.Adición de corte trasnversal en rumbos y relleno . Addition for subdivision of cross-section into heading and benches.

m 50.00

Subterráneo. Manejo de aguas - Underground. Water discharge.Caudales entre 1 - 2 m3/min. Incluye también drenaje y otras cavidades excavadas en este túnel

month 4.00

Underground. Water discharge.Caudales entre 2 - 3 m3/min. Incluye también drenaje y otras cavidades excavadas en este túnel.

month 2.00

Underground. Water discharge.Caudales entre 3 - 4 m3/min. Incluye también drenaje y otras cavidades excavadas en este túnel.

month 0.50

Underground. Water discharge.Caudales entre 4 m3/min. Incluye también drenaje y otras cavidades excavadas en este túnel.

month 0.50

m 20,000.00

Perforación a percusión, diametro mínimo 50 mm. Depth 0 - 30 m. Uso de tapon de hormigon (Behind the face)

m 2,000.00

Pruebas de presión de agua. Según resistencia de packer. Pruebas con un packer. profundidad 0-5 m. directa a roca

no 150.00

Pruebas de presión de agua. Según resistencia de packer. Pruebas con un packer. profundidad 0-5 m. Uso de tapon de hormigon.

no 20.00

Page 60: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

3.34 33.45.68 2,840.00

29.66 26,694.00

14.2 1,420.00

31.71 9,513.00

15.76 7,880.00

587.18 66,938.522,046.38 155,524.88

15.23 4,569.00

2,385.50 4,771.00

30.3 4,545.0026.25 262.5

143.86 71,930.00140.23 11,218.40

1.01 353,500.002.59 362,600.007.19 359,500.00

23.71 2,371.001.9 1,900.00

31.11 3,733.2022.57 9,028.0026.23 10,492.00

605 363,000.00520 31,200.00

21.76 17,408.00

1,424.29 3,603,453.70

855.66 42,783.00

9,942.33 39,769.32

12,052.57 24,105.14

14,162.81 7,081.41

16,273.05 8,136.53

15.58 311,600.00

13.55 27,100.00

73.32 10,998.00

60.68 1,213.60

Page 61: BoQ Part 1 Version 1

Item Description Item

3.2.04.0 ROCK SUPPORT tunnel and portals. 3.2.04.0

3.2.04.03 3.2.04.03

3.2.04.04 3.2.04.04

3.2.04.05 3.2.04.05

3.2.04.06 High pressure water flushing. Behind the face 3.2.04.06

3.2.04.21 3.2.04.21

3.2.04.22 3.2.04.22

3.2.04.23 3.2.04.23

3.2.04.24 3.2.04.24

3.2.04.25 3.2.04.25

3.2.04.26 3.2.04.26

3.2.04.27 3.2.04.27

3.2.04.28 3.2.04.28

3.2.04.29 3.2.04.29

Bill No. 3 -The Huaura DiversionBill 3.2 Huaura Diversion Tunnel

Bill No. 3 -The Huaura DiversionBill 3.2 Huaura Diversion Tunnel

3.2.04.01 Temporary installation for rock fall protection at downstream portal. Contractors design 3.2.04.01

3.2.04.02 Temporary installation for rock fall protection at Huaura portal. Contractors design 3.2.04.02

Extra scaling. At the face.

Extra scaling. Behind the face.

Invert cleaning and scaling. Behind the face.

3.2.04.07 Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

3.2.04.07

3.2.04.08 Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

3.2.04.08

3.2.04.09 Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

3.2.04.09

3.2.04.10 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

3.2.04.10

3.2.04.11 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

3.2.04.11

3.2.04.12 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

3.2.04.12

3.2.04.13 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

3.2.04.13

3.2.04.14 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

3.2.04.14

3.2.04.15 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

3.2.04.15

3.2.04.16 Fully cement-grouted rock bolts, deformed bar. At the face.D=25 mm. Depth in rock 5.9 m

3.2.04.16

3.2.04.17 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

3.2.04.17

3.2.04.18 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

3.2.04.18

3.2.04.19 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

3.2.04.19

3.2.04.20 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 5.9 m

3.2.04.20

Chainlinked mesh fixed to rock bolts. At the face.

Chainlinked mesh fixed to rock bolts. Behind the face.

Welded wire fabric fixed to rock bolts. At the face.

Welded wire fabric fixed to rock bolts. Behind the face.

Steel straps fixed to rock bolts. At the face.

Steel straps fixed to rock bolts. Behind the face.

Shotcrete. Plain. At the face.

Shotcrete. Plain. Behind the face.

Shotcrete. Fibre-reinforced. At the face.

Page 62: BoQ Part 1 Version 1

3.2.04.30 3.2.04.30Shotcrete. Fibre-reinforced. Behind the face.

Page 63: BoQ Part 1 Version 1

Description Unit Quantity

ROCK SUPPORT tunnel and portals.

hr 200

hr 300

m2 500

High pressure water flushing. Behind the face m2 500

m2 50

m2 200

m2 400

m2 100

m 100

m 200

m3 300

m3 100

m3 3,800.00

Bill No. 3 -The Huaura DiversionBill 3.2 Huaura Diversion Tunnel

Temporary installation for rock fall protection at downstream portal. Contractors design Prov. Sum 1.00

Temporary installation for rock fall protection at Huaura portal. Contractors design Prov. Sum 1.00

Extra scaling. At the face.

Extra scaling. Behind the face.

Invert cleaning and scaling. Behind the face.

Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

no 1,000.00

Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

no 2,000.00

Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

no 1,300.00

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

no 100.00

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

no 130.00

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

no 100.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

no 100.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

no 1,000.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

no 1,000.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=25 mm. Depth in rock 5.9 m

no 2,000.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

no 100.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

no 1,800.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

no 1,400.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 5.9 m

no 50.00

Chainlinked mesh fixed to rock bolts. At the face.

Chainlinked mesh fixed to rock bolts. Behind the face.

Welded wire fabric fixed to rock bolts. At the face.

Welded wire fabric fixed to rock bolts. Behind the face.

Steel straps fixed to rock bolts. At the face.

Steel straps fixed to rock bolts. Behind the face.

Shotcrete. Plain. At the face.

Shotcrete. Plain. Behind the face.

Shotcrete. Fibre-reinforced. At the face.

Page 64: BoQ Part 1 Version 1

m3 1,200.00Shotcrete. Fibre-reinforced. Behind the face.

Page 65: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

87.62 17,524.00

69.96 20,988.00

24.34 12,170.00

9.06 4,530.00

14.48 724

13.1 2,620.00

10.45 4,180.00

9.51 951

42.01 4,201.00

37.89 7,578.00

300.41 90,123.00

260.72 26,072.00

363.79 1,382,402.00

25,000.00 25,000.00

25,000.00 25,000.00

53.27 53,270.00

54.35 108,700.00

65.04 84,552.00

47.72 4,772.00

52.95 6,883.50

61.32 6,132.00

49.06 4,906.00

50.65 50,650.00

61.20 61,200.00

93.00 186,000.00

43.62 4,362.00

47.74 85,932.00

54.26 75,964.00

106.50 5,325.00

Page 66: BoQ Part 1 Version 1

315.64 378,768.00

Page 67: BoQ Part 1 Version 1

Item Description Item

3.2.04.31 Supply of rebars for ribs of reinforced shotcrete . 3.2.04.313.2.04.32 3.2.04.32

3.2.04.33 3.2.04.33

3.2.04.34 Prefabrication and supply of lattice girders. 3.2.04.343.2.04.35 3.2.04.35

3.2.04.36 3.2.04.36

3.2.04.37 3.2.04.37

3.2.04.38 3.2.04.38

3.2.04.39 Formwork for concrete lining, Class C 3.2.04.393.2.04.40 3.2.04.40

3.2.04.41 3.2.04.41

3.2.04.42 Reinforcement of roof and/or walls 3.2.04.423.2.04.43 Reinforcement of invert. At or behind the face 3.2.04.43

3.2.05.0 INVESTIGATION AND INSTRUMENTATION. 3.2.05.03.2.05.01 Investigation and testing underground. Down time. 3.2.05.013.2.05.02 Core drilling. Set-up at each drilling location. 3.2.05.023.2.05.03 3.2.05.03

3.2.05.04 3.2.05.04

3.2.05.05 Core drilling. Hole stabilisation. Cement grouting. 3.2.05.05

3.2.05.08 Lugeon tests 3.2.05.083.2.05.09 Convergence station. Max. 3 pins. 3.2.05.093.2.05.10 Multipoint borehole extensometer. 3.2.05.10

3.2.06.0 CONCRETE WORKS. 3.2.06.03.2.06.01 Formwork Class B. Plain. 3.2.06.013.2.06.02 Formwork Class B. Curved. 3.2.06.023.2.06.03 Finishing of concrete surfaces, Class UA 3.2.06.033.2.06.04 Concrete Class C. 3.2.06.043.2.06.05 Reinforcement. Deformed bars. 3.2.06.05

Sum Bill 3.2 Huaura Diversion Tunnel Sum

Bill No. 3 -The Huaura DiversionBill 3.2 Huaura Diversion Tunnel

Bill No. 3 -The Huaura DiversionBill 3.2 Huaura Diversion Tunnel

Installation of ribs of reinforced shotcrete. At the face.

Installation of ribs of reinforced shotcrete. Behind the face.

Installation of lattice girders for ribs of shotcrete. At the face.

Installation of lattice girders for ribs of shotcrete. Behind the face.

Concrete lining. Behind the face.

Additional concrete. Behind the face.

Invert concrete. At the face.

Invert concrete. Behind the face.

Core drilling, diameter minimum 76 mm. Depth 0-30 m

Core drilling, diameter minimum 76 mm. Depth 30-100 m

3.2.05.06 Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m 3.2.05.06

3.2.05.07 Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m 3.2.05.07

3.2.06.06 Concrete pavement. Concrete Class B. Thickness minimum 150 mm. Reiforcement mesh min 6.5 kg/m2 3.2.06.06

Page 68: BoQ Part 1 Version 1

Description Unit Quantity

Supply of rebars for ribs of reinforced shotcrete . kg 27,000.00m 1,100.00

m 700

Prefabrication and supply of lattice girders. kg 7,500.00m 200

m 100

m3 320

m3 30

Formwork for concrete lining, Class C m2 500m3 200

m3 200

Reinforcement of roof and/or walls kg 20,000.00Reinforcement of invert. At or behind the face kg 25,000.00

INVESTIGATION AND INSTRUMENTATION. Investigacion e instrumentacionInvestigation and testing underground. Down time. hr 60Core drilling. Set-up at each drilling location. no 2

m 90

m 80

Core drilling. Hole stabilisation. Cement grouting. kg 500

Lugeon tests no 8Convergence station. Max. 3 pins. no 2Multipoint borehole extensometer. no 2

CONCRETE WORKS. OBRAS DE CONCRETOFormwork Class B. Plain. m2 400Formwork Class B. Curved. m2 300Finishing of concrete surfaces, Class UA m2 60Concrete Class C. m3 80Reinforcement. Deformed bars. t 6

Bill 3.2 Huaura Diversion Tunnel : TUNEL DE DESVIO O TUNEL DE DESVIACION

Bill No. 3 -The Huaura DiversionBill 3.2 Huaura Diversion Tunnel

Installation of ribs of reinforced shotcrete. At the face.

Installation of ribs of reinforced shotcrete. Behind the face.

Installation of lattice girders for ribs of shotcrete. At the face.

Installation of lattice girders for ribs of shotcrete. Behind the face.

Concrete lining. Behind the face.

Additional concrete. Behind the face.

Invert concrete. At the face.

Invert concrete. Behind the face.

Core drilling, diameter minimum 76 mm. Depth 0-30 m

Core drilling, diameter minimum 76 mm. Depth 30-100 m

Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m no 4.00

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m no 4.00

Concrete pavement. Concrete Class B. Thickness minimum 150 mm. Reiforcement mesh min 6.5 kg/m2 m 2,500.00

Page 69: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

1.8 48,600.0018.87 20,757.00

13.7 9,590.00

3.2 24,000.0071.17 14,234.00

59.43 5,943.00

190.04 60,812.80

190.04 5,701.20

136.53 68,265.00100.41 20,082.00

99.56 19,912.00

2.31 46,200.002.4 60,000.00

605 36,300.001,108.00 2,216.00125.06 11,255.40

171.84 13,747.20

1.01 505

1,440.00 11,520.003,269.62 6,539.247,612.00 15,224.00

67.26 26,904.0096.29 28,887.00

4.2 252142.91 11,432.801,459.67 8,758.02

9,624,234.24

115.56 462.24

135.56 542.24

138.00 345,000.00

Page 70: BoQ Part 1 Version 1

Item Description Item

Bill 4.1 includes portal of Headrace Tunnel

4.1.01.0 EARTHWORKS 4.1.01.04.1.01.01 Remove usable timber 4.1.01.014.1.01.02 Clearing and grubbing 4.1.01.024.1.01.03 Topsoil excavation 4.1.01.034.1.01.04 Soil excavation 4.1.01.04

a) Excavation to spoil depositb) Excavation to stockpile (gravel & sandy gravel)c) Excavation for footings/structures

4.1.01.05 Preparation of rock foundation for concreting 4.1.01.054.1.01.06 Fill and backfill 4.1.01.06

a) Embankment filli) Gravelii) Rockb) Structural backfillc) High quality rockfilld) Backfill of trenchese) Low permeability fillf) Filter material, 0 - 60 mmg) Drainage material, 50 - 100 mm

4.1.01.07 Placing of topsoil 4.1.01.074.1.01.08 Turfing (optional) 4.1.01.084.1.01.09 Not Used. 4.1.01.094.1.01.10 Additional borings 4.1.01.10

4.1.02.0 SHEET PILING AND JET GROUTING 4.1.02.0

4.1.02.02 Steel pipes , Ø 100 mm, welded on pile 4.1.02.024.1.02.03 4.1.02.03

4.1.02.04 4.1.02.04

4.1.02.05 Self drilling soil anchor (type Ischebeck Titan 52/ 20 or similar), fully grouted 4.1.02.05

a) Number of Anchorsb) Total length of Anchors

4.1.02.06 4.1.02.06

4.1.03.0 ROCK EXCAVATION 4.1.03.04.1.03.01 4.1.03.01

a) Bulk excavationb) Trench/ditch excavation

4.1.03.02 Contour boreholes 4.1.03.024.1.03.03 4.1.03.03

4.1.04.0 GROUND TESTING AND GROUTING, ROCK SUPPORT 4.1.04.0Rock support at tunnel portal Headrace Tunnel, included in bill 5.3

4.1.04.01 Percussion drilling, diameter minimum 50 mm, depths up to 30 m in rock/concrete 4.1.04.01

4.1.04.02 Rotary drilling, diameter minimum 76 mm, in rock/concrete, depths to 15 m 4.1.04.02

4.1.04.04 Extra over 4.1.04.01 to 4.1.04.03 for sloping holes 4.1.04.044.1.04.05 Water pressure testing, per packer 4.1.04.054.1.04.06 Cement pressure grouting, per packer setting 4.1.04.064.1.04.07 Cement grouting: Cement consumption per packer setting, Type B 4.1.04.07

a) 0 - 100 kgb) 0 - 200 kgc) 0 - 300 kgd) 0 - 500 kge) More than 500 kgf) Alkali silicate

4.1.04.08 4.1.04.08

4.1.04.09 Grouted rock bolts. D = 32 mm 4.1.04.09a) Length 2.0 mb) Length 3.0 mc) Length 4.0 md) Length 6.0 m

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

4.1.02.01 Sheet piles. Minimum resistive moment: 1800 cm3/m. Type of sheet pile proposed by tenderer:Type Larseen,weight 100 kg/m2.Adjustment rate for other type 3.70 USD/kg4.1.02.01

Rock bolts, Ø 40 mm and minimum length 3 m, included drilling (Ø 50 mm) and placement

Steel support beam, tentative type: 2 no UNP 300, weight 100 kg/m Adjustment rate for other type: 3.50 USD/kg

Load testing, prestressing, fixing of steel beam and other works not covered by previous bills

Excavation of the right abutment and foundation for the intake structure, left abutment, desander and intake

Above ground. Rock excavation. Abnormal overbreak.

4.1.04.03 Rotary drilling with casing, diameter 76 mm, in soil or combined soil / rock, drilled from surface or from bottom of steel pipes welded to the sheet pile wall4.1.04.03

Chemical groutingType of grout: Epoxy

Page 71: BoQ Part 1 Version 1

e) Length 8.0 mf) Length 10.0 m

Page 72: BoQ Part 1 Version 1

Description Unit Quantity

Bill 4.1 includes portal of Headrace Tunnel

EARTHWORKS: MOVIENTOS DE TIERRARemove usable timber no 20Clearing and grubbing ha 5Topsoil excavation m3 250Soil excavationa) Excavation to spoil deposit m3 200,000.00b) Excavation to stockpile (gravel & sandy gravel) m3 8,000.00c) Excavation for footings/structures m3 4,000.00Preparation of rock foundation for concreting m2 1,000.00Fill and backfilla) Embankment filli) Gravel m3 5,000.00ii) Rock m3 18,000.00b) Structural backfill m3 4,500.00c) High quality rockfill m3 18,000.00d) Backfill of trenches m3 700e) Low permeability fill m3 500f) Filter material, 0 - 60 mm m3 500g) Drainage material, 50 - 100 mm m3 700Placing of topsoil m2 700Turfing (optional) m2 350Not Used.Additional borings no 4

SHEET PILING AND JET GROUTING

Steel pipes , Ø 100 mm, welded on pile m 550no 20

m 80

Self drilling soil anchor (type Ischebeck Titan 52/ 20 or similar), fully grouted

a) Number of Anchors no 20b) Total length of Anchors m 200

LS 1

ROCK EXCAVATION: EXCAVACION DE ROCAS

a) Bulk excavation m3 15,000.00b) Trench/ditch excavation m3 400Contour boreholes m 900

m3 800

GROUND TESTING AND GROUTING, ROCK SUPPORT: PRUEBAS DE SUELO, CEMENTACIÓN Y SOPORTE EN ROCARock support at tunnel portal Headrace Tunnel, included in bill 5.3Percussion drilling, diameter minimum 50 mm, depths up to 30 m in rock/concrete m 600

Rotary drilling, diameter minimum 76 mm, in rock/concrete, depths to 15 m m 350

Extra over 4.1.04.01 to 4.1.04.03 for sloping holes m 100Water pressure testing, per packer no 30Cement pressure grouting, per packer setting no 130Cement grouting: Cement consumption per packer setting, Type Ba) 0 - 100 kg kg 9,000.00b) 0 - 200 kg kg 6,000.00c) 0 - 300 kg kg 4,000.00d) 0 - 500 kg kg 4,000.00e) More than 500 kg kg 3,000.00f) Alkali silicate l 500

l 200

Grouted rock bolts. D = 32 mma) Length 2.0 m no 130b) Length 3.0 m no 80c) Length 4.0 m no 60d) Length 6.0 m no 40

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

Sheet piles. Minimum resistive moment: 1800 cm3/m. Type of sheet pile proposed by tenderer:Type Larseen,weight 100 kg/m2.Adjustment rate for other type 3.70 USD/kgm2 1,120.00

Rock bolts, Ø 40 mm and minimum length 3 m, included drilling (Ø 50 mm) and placement

Steel support beam, tentative type: 2 no UNP 300, weight 100 kg/m Adjustment rate for other type: 3.50 USD/kg

Load testing, prestressing, fixing of steel beam and other works not covered by previous bills

Excavation of the right abutment and foundation for the intake structure, left abutment, desander and intake

Above ground. Rock excavation. Abnormal overbreak.

Rotary drilling with casing, diameter 76 mm, in soil or combined soil / rock, drilled from surface or from bottom of steel pipes welded to the sheet pile wallm 800.00

Chemical groutingType of grout: Epoxy

Page 73: BoQ Part 1 Version 1

e) Length 8.0 m no 20f) Length 10.0 m no 20

Page 74: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

105.23 2,104.609,990.00 49,950.00

3.34 835

3.38 676,000.003.38 27,040.003.38 13,520.003.59 3,590.00

22.43 112,150.0017.21 309,780.0015.92 71,640.0023.68 426,240.0014.89 10,423.0016.76 8,380.0025.96 12,980.0026.49 18,543.000.32 2240.32 112

8,653.00 34,612.00

54.35 29,892.50161.85 3,237.00

716.48 57,318.40

131.27 2,625.403.1 620

12,214.00 12,214.00

18.92 283,800.0020.37 8,148.0017.98 16,182.0014.2 11,360.00

15.58 9,348.00

63.4 22,190.00

63.4 6,340.00119.42 3,582.60129.12 16,785.60

0.88 7,920.001.05 6,300.001.27 5,080.001.63 6,520.002.61 7,830.002.5 1,250.00

23.71 4,742.00

56.9 7,397.0068.24 5,459.2079.57 4,774.20

102.26 4,090.40

689.07 771,758.40

63.40 50,720.00

Page 75: BoQ Part 1 Version 1

129.48 2,589.60161.85 3,237.00

Page 76: BoQ Part 1 Version 1

Item Description Item

4.1.05.0 DRAINAGE AND EROSION PROTECTION 4.1.05.04.1.05.01 4.1.05.01

4.1.05.02 Rip-rap 4.1.05.02a) Stone size 150 - 300 mmb) Stone size 300 - 600 mmc) Selected blocks > 600 mmd) Grouted Rip rap

4.1.05.03 Filter fabric 4.1.05.03a) Minimum 180 g/m2b) Minimum 250 g/m2c) Minimum 300 g/m2

4.1.05.04 4.1.05.04

4.1.05.05 Excavation of permanent ditches and catchwater drains 4.1.05.054.1.05.06 Reinforced concrete drain pipes including bends and tees. Internal diameter: 4.1.05.06

a) 150 mmb) 200 mm

4.1.05.07 Prefabricated plastic mesh for slope protection. 4.1.05.07

4.1.06.0 CONCRETE WORKS 4.1.06.04.1.06.01 4.1.06.01

a) Depth in rock 2.0 mb) Depth in rock 3.0 mc) Depth in rock 4.0 m

4.1.06.02 4.1.06.02

a) Depth in rock 2.0 mb) Depth in rock 3.0 mc) Depth in rock 4.0 md) Depth in rock 6.0 m

4.1.06.03 Formwork Class A. Plain. 4.1.06.03a) Diversion tunnel outlet structure,b) Dam, gravity section and right abutmentc) Dam, gate sectiond) Intake block and left abutmente) Sand Excludersf) Forebay and headrace intakeg) Gate housesh) Bridge piers and deck

4.1.06.04 Formwork Class A. Curved 4.1.06.04a) Diversion tunnel outlet structure, overflow sectionb) Dam, gravity section, spillway, bridge pilarsc) Dam, gate section, piers, flapgated) Intake block,e) Forebay and headrace intake

4.1.06.05 Formwork Class B. Plain. 4.1.06.05a) Diversion tunnel outlet structure,b) Dam, gravity section and right abutmentc) Dam, gate sectiond) Intake block and left abutmente) Sand Excludersf) Forebay and headrace intakeg) Gate housesh) Bridge piers and deck

4.1.06.06 Formwork Class C. 4.1.06.06a) Diversion tunnel outlet structure,b) Diversion canal between diversion tunnel and gravity damc) Dam, gravity section and right abutmentd) Dam, gate sectione) Intake block and left abutmentf) Sand Excludersg) Forebay and headrace intakeh) Construction and expansion joints incl. shear keysi) Culverts, ducts

4.1.06.07 Grooves 4.1.06.07a) Triangular, drip throats, 25 mmb) Rectangular, for sealing of roofing

4.1.06.08 Rectangular voids 4.1.06.08a) Cross-section not exceeding 0.1 m2b) Cross-section 0.1 - 0.5 m2c) Formwork for concreting of voids. Class according to adjacent surface

4.1.06.09 Shear keys in construction joints 4.1.06.094.1.06.10 PVC waterstops 4.1.06.10

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

Erosion protection with crushed rock 50 - 200 mmMin. thickness 300 mm

Drilling of weep holes, vertical or sloping holes. Diameter min. 51 mm

Grouted rock bolts. D = 25 mmLength in concrete 1.5 m

Grouted rock bolts. D = 32 mmLength in concrete 1.5 m

Page 77: BoQ Part 1 Version 1

a) 150 mm wideb) 225 mm widec) 300 mm wided) 500 mm wide

4.1.06.11 Grouting of joints and interphases 4.1.06.11a) Supply and installation of tubes

Page 78: BoQ Part 1 Version 1

Description Unit Quantity

DRAINAGE AND EROSION PROTECTION DRENAJE Y PROTECCIÓN A LA EROSIÓNm3 1,700.00

Rip-rapa) Stone size 150 - 300 mm m3 1,800.00b) Stone size 300 - 600 mm m3 2,100.00c) Selected blocks > 600 mm m3 2,100.00d) Grouted Rip rap m3 200Filter fabrica) Minimum 180 g/m2 m2 3,400.00b) Minimum 250 g/m2 m2 700c) Minimum 300 g/m2 m2 500

m 300

Excavation of permanent ditches and catchwater drains m3 200Reinforced concrete drain pipes including bends and tees. Internal diameter:a) 150 mm m 300b) 200 mm m 100Prefabricated plastic mesh for slope protection. m2 400

CONCRETE WORKS OBRAS DE CONCRETO

a) Depth in rock 2.0 m no 150b) Depth in rock 3.0 m no 150c) Depth in rock 4.0 m no 30

a) Depth in rock 2.0 m no 100b) Depth in rock 3.0 m no 150c) Depth in rock 4.0 m no 20d) Depth in rock 6.0 m no 20Formwork Class A. Plain.a) Diversion tunnel outlet structure, m2 800b) Dam, gravity section and right abutment m2 2,300.00c) Dam, gate section m2 3,000.00d) Intake block and left abutment m2 1,000.00e) Sand Excluders m2 2,000.00f) Forebay and headrace intake m2 600g) Gate houses m2 250h) Bridge piers and deck m2 400Formwork Class A. Curveda) Diversion tunnel outlet structure, overflow section m2 100b) Dam, gravity section, spillway, bridge pilars m2 680c) Dam, gate section, piers, flapgate m2 300d) Intake block, m2 50e) Forebay and headrace intake m2 10Formwork Class B. Plain.a) Diversion tunnel outlet structure, m2 900b) Dam, gravity section and right abutment m2 2,700.00c) Dam, gate section m2 700d) Intake block and left abutment m2 900e) Sand Excluders m2 7,500.00f) Forebay and headrace intake m2 1,300.00g) Gate houses m2 280h) Bridge piers and deck m2 470Formwork Class C.a) Diversion tunnel outlet structure, m2 110b) Diversion canal between diversion tunnel and gravity dam m2 440c) Dam, gravity section and right abutment m2 4,000.00d) Dam, gate section m2 2,900.00e) Intake block and left abutment m2 1,360.00f) Sand Excluders m2 4,460.00g) Forebay and headrace intake m2 1,500.00h) Construction and expansion joints incl. shear keys m2 730i) Culverts, ducts m2 530Groovesa) Triangular, drip throats, 25 mm m 500b) Rectangular, for sealing of roofing m 50Rectangular voidsa) Cross-section not exceeding 0.1 m2 no 15b) Cross-section 0.1 - 0.5 m2 no 30c) Formwork for concreting of voids. Class according to adjacent surface m2 20Shear keys in construction joints m 200PVC waterstops

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

Erosion protection with crushed rock 50 - 200 mmMin. thickness 300 mm

Drilling of weep holes, vertical or sloping holes. Diameter min. 51 mm

Grouted rock bolts. D = 25 mmLength in concrete 1.5 m

Grouted rock bolts. D = 32 mmLength in concrete 1.5 m

Page 79: BoQ Part 1 Version 1

a) 150 mm wide m 200b) 225 mm wide m 2,100.00c) 300 mm wide m 100d) 500 mm wide m 100Grouting of joints and interphasesa) Supply and installation of tubes m 500

Page 80: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

18.08 30,736.00

20.01 36,018.0020.04 42,084.0020.43 42,903.00

129.62 25,924.00

6.41 21,794.006.66 4,662.007.01 3,505.00

15.58 4,674.00

3.41 682

24.32 7,296.0033.28 3,328.0014.49 5,796.00

66.07 9,910.5077.22 11,583.0088.36 2,650.80

68.24 6,824.0079.57 11,935.50

102.26 2,045.20129.48 2,589.60

53.95 43,160.0053.95 124,085.0053.95 161,850.0053.95 53,950.0053.95 107,900.0053.95 32,370.0053.95 13,487.5053.95 21,580.00

73.51 7,351.0073.51 49,986.8073.51 22,053.0073.51 3,675.5073.51 735.1

53.99 48,591.0053.99 145,773.0053.99 37,793.0053.99 48,591.0053.99 404,925.0053.99 70,187.0053.99 15,117.2053.99 25,375.30

51.55 5,670.5051.55 22,682.0051.55 206,200.0051.55 149,495.0051.55 70,108.0051.55 229,913.0051.55 77,325.0051.55 37,631.5051.55 27,321.50

33.5 16,750.0034.25 1,712.50

26.7 400.526.7 801

53.95 1,079.0022.63 4,526.00

Page 81: BoQ Part 1 Version 1

15.27 3,054.0024.93 52,353.0030.31 3,031.0047.44 4,744.00

3.67 1,835.00

Page 82: BoQ Part 1 Version 1

Item Description Item

b) Cement groutingc) Chemical groutingType proposed by tenderer:

4.1.06.12 Bituminous coating on concrete surface 4.1.06.124.1.06.13 Joint sealing compound. 4.1.06.134.1.06.14 Steel details in bridge expansion joints (dam piers). Hot dip galvanized. 4.1.06.144.1.06.15 Preparation of contraction joints. 4.1.06.154.1.06.16 Reinforcement. All dimensions 4.1.06.16

a) Deformed bars, 420 N/mm2b) Plain barsc) Welded mesh reinforcement

4.1.06.17 4.1.06.17

a) D = 20 mmb) D = 25 mmc) D = 32 mm

4.1.06.18 a) Stainless steel bars. D = 32 mm 4.1.06.18b) Stainless steel bars. D = 25 mm

4.1.06.19 Embedded PVC-pipes including bends and fixtures 4.1.06.19a) D = 50 mmb) D = 75 mmc) D = 100 mmd) D = 150 mme) D = 200 mm

4.1.06.20 Embedded cast-iron floor gullies with hot dip galvanized steel cover 4.1.06.204.1.06.21 4.1.06.21

4.1.06.22 Step iron partly embedded in concrete 4.1.06.224.1.06.23 Guides and sills for stop logs embeded in concrete 4.1.06.234.1.06.24 Neoprene bridge bearings max. vertical load 1,500 kN 4.1.06.24

Type and details to be proposed by Contractor:Concrete Class A

4.1.06.25 a) Dam, gravity section and right abutment 4.1.06.25b) Dam, gate sectionc) Intake block and left abutment

4.1.06.26 Concrete Class B 4.1.06.26a) Gate housesb) Culverts, ducts

4.1.06.27 Concrete Class C 4.1.06.27a) Diversion tunnel outlet structure,b) Diversion canal between diversion structure and main damc) Dam, gravity section and right abutmentd) Dam, gate sectione) Intake block and left abutmentf) Sand Excludersg) Forebay and headrace intakeh) Gate housesi) Bridge piersj) Erosion protection slabsk) Culverts, ductsl) Retaining walls

4.1.06.28 Concrete Class D 4.1.06.28a) Bridge deck

4.1.06.29 Concrete Class E 4.1.06.29Gate openings, floor and lower parts of piers and walls and erosion protection slab.

4.1.06.30 Concrete Class F 4.1.06.304.1.06.31 Finishing of unformed surfaces 4.1.06.31

a) Class UAb) Class UB, curved surfacesc) Class UB, plane surfacesd) Class UC

4.1.06.32 Blockout for and grouting of fence posts in concrete slabs 4.1.06.324.1.06.33 Grouting around hydraulic steelworks with expanding mortar. Incl. plant positioning 4.1.06.33

4.1.06.34 4.1.06.34

4.1.06.35 Grouting of construction joints with cement based grout. Incl. plant positioning 4.1.06.35

4.1.06.36 Sandblasting of concrete surfaces 4.1.06.36

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

Deformed steel bars of weldable quality for fixing hydraulic steelwork such as steel lining, gate guides, etc. Length approx .2.0 m Partly embedded

Steel angle section 100 x 100 with anchoring c/c 300 mm, embedded in first stage concrete

Grouting of construction joints with chemical-based grout as approved by the Engineer. Incl. plant positioning.

Page 83: BoQ Part 1 Version 1

Description Unit Quantity

b) Cement grouting kg 500c) Chemical grouting l 200Type proposed by tenderer:Bituminous coating on concrete surface m2 300Joint sealing compound. kg 400Steel details in bridge expansion joints (dam piers). Hot dip galvanized. kg 550Preparation of contraction joints. m2 1,200.00Reinforcement. All dimensionsa) Deformed bars, 420 N/mm2 t 2,900.00b) Plain bars t 2c) Welded mesh reinforcement t 5

a) D = 20 mm no 50b) D = 25 mm no 300c) D = 32 mm no 200a) Stainless steel bars. D = 32 mm no 30b) Stainless steel bars. D = 25 mm no 40Embedded PVC-pipes including bends and fixturesa) D = 50 mm m 50b) D = 75 mm m 50c) D = 100 mm m 100d) D = 150 mm m 50e) D = 200 mm m 50Embedded cast-iron floor gullies with hot dip galvanized steel cover no 4

kg 300

Step iron partly embedded in concrete no 50Guides and sills for stop logs embeded in concrete kg 500Neoprene bridge bearings max. vertical load 1,500 kN no 16

Type and details to be proposed by Contractor:Concrete Class Aa) Dam, gravity section and right abutment m3 15,000.00b) Dam, gate section m3 2,000.00c) Intake block and left abutment m3 1,000.00Concrete Class Ba) Gate houses m3 90b) Culverts, ducts m3 350Concrete Class Ca) Diversion tunnel outlet structure, m3 315b) Diversion canal between diversion structure and main dam m3 1,050.00c) Dam, gravity section and right abutment m3 11,700.00d) Dam, gate section m3 5,900.00e) Intake block and left abutment m3 4,800.00f) Sand Excluders m3 9,120.00g) Forebay and headrace intake m3 2,370.00h) Gate houses m3 30i) Bridge piers m3 250j) Erosion protection slabs m3 4,100.00k) Culverts, ducts m3 240l) Retaining walls m3 1,000.00Concrete Class Da) Bridge deck m3 110Concrete Class EGate openings, floor and lower parts of piers and walls and erosion protection slab. m3 780

Concrete Class F m3 400Finishing of unformed surfacesa) Class UA m2 5,000.00b) Class UB, curved surfaces m2 600c) Class UB, plane surfaces m2 4,000.00d) Class UC m2 500Blockout for and grouting of fence posts in concrete slabs no 140Grouting around hydraulic steelworks with expanding mortar. Incl. plant positioning l 100

l 50

Grouting of construction joints with cement based grout. Incl. plant positioning l 200

Sandblasting of concrete surfaces m2 100

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

Deformed steel bars of weldable quality for fixing hydraulic steelwork such as steel lining, gate guides, etc. Length approx .2.0 m Partly embedded

Steel angle section 100 x 100 with anchoring c/c 300 mm, embedded in first stage concrete

Grouting of construction joints with chemical-based grout as approved by the Engineer. Incl. plant positioning.

Page 84: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

1.01 5052.5 500

6.2 1,860.0018.25 7,300.0010.52 5,786.006.07 7,284.00

1,459.67 4,233,043.001,459.67 2,919.342,812.50 14,062.50

8.05 402.511.14 3,342.0017.63 3,526.0027.28 818.417.95 718

5.45 272.57.15 357.58.92 89216.9 845

25.92 1,296.00123.23 492.92

7.41 2,223.00

15.71 785.57.41 3,705.00

856.23 13,699.68

117.83 1,767,450.00117.83 235,660.00117.83 117,830.00

124.99 11,249.10124.99 43,746.50

127.78 40,250.70127.78 134,169.00127.78 1,495,026.00127.78 753,902.00127.78 613,344.00127.78 1,165,353.60127.78 302,838.60127.78 3,833.40127.78 31,945.00127.78 523,898.00127.78 30,667.20127.78 127,780.00

160.77 17,684.70

163.15 127,257.00

133.53 53,412.00

4.2 21,000.004.65 2,790.004.65 18,600.004.85 2,425.0048.2 6,748.00

30.95 3,095.00

30.95 1,547.50

30.95 6,190.00

10.64 1,064.00

Page 85: BoQ Part 1 Version 1

Item Description Item

4.1.07.0 INTERFACE WITH H, EMBEDMENT OF HYDRAULIC STEELWORKS 4.1.07.0

4.1.07.01 Diversion Tunnel Outlet Gate 4.1.07.014.1.07.02 Coarse Trash Rack, Inlet of Diversion Duct 4.1.07.024.1.07.03 Flood Flushing Gates 4.1.07.034.1.07.04 Stop Logs, Flood Flushing Gates 4.1.07.044.1.07.05 Trash Flushing Gate 4.1.07.054.1.07.06 Intake Trash Rack 4.1.07.064.1.07.07 Trash Rack Cleaner 4.1.07.074.1.07.08 Intake Gates 4.1.07.084.1.07.09 Under-sluicing Gates / Minimum Flow Gates and Steel Linings 4.1.07.094.1.07.10 Diversion Conduite Gates 4.1.07.104.1.07.11 Flow Tranquilizers 4.1.07.114.1.07.12 Sand Excluder Flushing Gates 4.1.07.124.1.07.13 Sand Excluder Outlet Gates 4.1.07.134.1.07.14 Coarse Trash Rack, Headrace Tunnel Inlet 4.1.07.144.1.07.15 Stop Log Guides Tunnel Entrance 4.1.07.15

4.1.08.0 BUILDER'S WORKS 4.1.08.04.1.08.01 Blockwork Walling 4.1.08.01

a) 150 mmb) 100 mm

4.1.08.02 Roofing membrane 4.1.08.024.1.08.03 Doors 4.1.08.03

b) Insulated double steel doors. Fire rating A60. External dimensions 1600x2100mm

c) Insulated double steel doors. Fire rating A60. External dimensions 2200x2200mm

d) Single interior timber doors. External opening 900 x 2100 mm4.1.08.04 Windows 4.1.08.04

a) Aluminium window with fixed panes Size 1000 x 1200 mm

c) Glazing 5 mm float glass and glazing in panes of any size.4.1.08.05 Floor, Wall and Ceiling Finishes 4.1.08.05

a) Ceramic floor tilesb) Ceramic wall tilesc) Vinyl floord) Plastering on walls

4.1.08.06 Painting and decorating. Painting of: 4.1.08.06a) Internal metalwork or steelworkb) Galvanized metalworkc) External surfaces of steelworkd) External concrete surfaces

g) Concrete floors with moderate loads. Epoxy,Type Sherwin Williams poly-cote 4685

4.1.09.0 INVESTIGATION AND INSTRUMENTATION 4.1.09.04.1.09.01 Electric piezometer. Measuring device 4.1.09.014.1.09.02 Electric piezometer, piping 4.1.09.024.1.09.03 Surface settlement monuments 4.1.09.03

a)Foundation on rockb) Foundation on soil

4.1.09.04 Surface settlement fixed point 4.1.09.04a)Foundation on rockb) Foundation on soil

4.1.10.0 MISCELLANEOUS WORKS 4.1.10.04.1.10.01 Light duty hatch cover 4.1.10.01

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

Reference H-tender documents, Part D, Section 2This item shall include all works related to forming of recesses, blockouts and the like to divide between first and second step concreting, provision and removal of shuttering for items to be embedded, extra over for embedment and second stageconcreting and the like, for hydraulic steelworks as listed below. The concrete volumes and concrete reinforcement are catered for under Concrete Works.

a) Insulated single steel doors. Fire rating A60. External dimensions 1000x2100mm

b) Louvred aluminium ventilation grilles with aluminium frame and insect screen size500 x 400 mm

e) Internal plastered or concrete surfacesWalls

f) Internal plastered or concrete surfaces, Ceilings

h) Concrete floors with heavy loads, including battery rooms. Self levelling epoxy,TypeSherwin Williams poly-cote 4685

Page 86: BoQ Part 1 Version 1

4.1.10.02 Heavy duty hatch cover incl. fittings with concrete, Class C and surface finishing 4.1.10.02

4.1.10.03 Heavy duty cast iron grating for drainage gutters 4.1.10.034.1.10.04 Light duty duct cover 4.1.10.044.1.10.05 Heavy duty duct cover 4.1.10.05

Page 87: BoQ Part 1 Version 1

Description Unit Quantity

INTERFACE WITH H, EMBEDMENT OF HYDRAULIC STEELWORKS SISTEMA DE COMUNICACIÓN CON H, INTEGRACION DE ESTRUCCTURAS HIDRAULICAS DE ACERO.

Diversion Tunnel Outlet Gate LS 1Coarse Trash Rack, Inlet of Diversion Duct LS 1Flood Flushing Gates LS 1Stop Logs, Flood Flushing Gates LS 1Trash Flushing Gate LS 1Intake Trash Rack LS 1Trash Rack Cleaner LS 1Intake Gates LS 1Under-sluicing Gates / Minimum Flow Gates and Steel Linings LS 1Diversion Conduite Gates LS 1Flow Tranquilizers LS 1Sand Excluder Flushing Gates LS 1Sand Excluder Outlet Gates LS 1Coarse Trash Rack, Headrace Tunnel Inlet LS 1Stop Log Guides Tunnel Entrance LS 1

BUILDER'S WORKS: ACABADOS DE CONSTRUCCIONBlockwork Wallinga) 150 mm m2 90b) 100 mm m2 30Roofing membrane m2 155Doors

no 3

b) Insulated double steel doors. Fire rating A60. External dimensions 1600x2100mm no 1

c) Insulated double steel doors. Fire rating A60. External dimensions 2200x2200mm no 1

d) Single interior timber doors. External opening 900 x 2100 mm no 3Windowsa) Aluminium window with fixed panes Size 1000 x 1200 mm no 6

no 5

c) Glazing 5 mm float glass and glazing in panes of any size. m2 5Floor, Wall and Ceiling Finishesa) Ceramic floor tiles m2 30b) Ceramic wall tiles m2 30c) Vinyl floor m2 15d) Plastering on walls m2 200Painting and decorating. Painting of:a) Internal metalwork or steelwork m2 40b) Galvanized metalwork m2 10c) External surfaces of steelwork m2 40d) External concrete surfaces m2 200

m2 340

m2 150

g) Concrete floors with moderate loads. Epoxy,Type Sherwin Williams poly-cote 4685 m2 100

m2 40

INVESTIGATION AND INSTRUMENTATION: INVESTIGACION E INSTRUMENTACION Electric piezometer. Measuring device no 10Electric piezometer, piping m 250Surface settlement monumentsa)Foundation on rock no 4b) Foundation on soil no 6Surface settlement fixed pointa)Foundation on rock no 3b) Foundation on soil no 4

MISCELLANEOUS WORKS: OBRAS DIVERSASLight duty hatch cover kg 100

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

Reference H-tender documents, Part D, Section 2This item shall include all works related to forming of recesses, blockouts and the like to divide between first and second step concreting, provision and removal of shuttering for items to be embedded, extra over for embedment and second stageconcreting and the like, for hydraulic steelworks as listed below. The concrete volumes and concrete reinforcement are catered for under Concrete Works.

a) Insulated single steel doors. Fire rating A60. External dimensions 1000x2100mm

b) Louvred aluminium ventilation grilles with aluminium frame and insect screen size500 x 400 mm

e) Internal plastered or concrete surfacesWalls

f) Internal plastered or concrete surfaces, Ceilings

h) Concrete floors with heavy loads, including battery rooms. Self levelling epoxy,TypeSherwin Williams poly-cote 4685

Page 88: BoQ Part 1 Version 1

Heavy duty hatch cover incl. fittings with concrete, Class C and surface finishing kg 500

Heavy duty cast iron grating for drainage gutters kg 150Light duty duct cover kg 400Heavy duty duct cover kg 15,000.00

Page 89: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

INTERFACE WITH H, EMBEDMENT OF HYDRAULIC STEELWORKS SISTEMA DE COMUNICACIÓN CON H, INTEGRACION DE ESTRUCCTURAS HIDRAULICAS DE ACERO.

3,681.70 3,681.702,577.19 2,577.1913,990.46 13,990.4612,149.61 12,149.611,104.51 1,104.516,258.89 6,258.89736.34 736.3412,149.61 12,149.611,840.85 1,840.856,258.89 6,258.8913,622.29 13,622.298,099.74 8,099.745,890.72 5,890.721,472.68 1,472.6820,617.52 20,617.52

73.3 6,597.0073.3 2,199.00

146.58 22,719.90

3,049.00 9,147.00

3,415.00 3,415.00

5,542.00 5,542.00

1,044.67 3,134.01

427.5 2,565.00464 2,320.00

1,044.67 5,223.35

28.43 852.928.43 852.970.98 1,064.7042.76 8,552.00

24.43 977.224.43 244.324.43 977.224.43 4,886.0024.43 8,306.20

24.43 3,664.50

24.43 2,443.00

24.43 977.2

975.67 9,756.709.75 2,437.50

911.3 3,645.20842.95 5,057.70

915.86 2,747.58847.51 3,390.04

7.01 701

Page 90: BoQ Part 1 Version 1

6.34 3,170.00

6.34 9517.01 2,804.006.34 95,100.00

Page 91: BoQ Part 1 Version 1

Item Description Item

4.1.10.06 External railings, fixed or removable, 4.1.10.06a) Type Ab) Type Bc) Type C

4.1.10.07 Steel ladders 4.1.10.074.1.10.08 Fencing, excavation and casting of individual foundation included 4.1.10.084.1.10.09 Fence gates, excavation for and concreting of individual foundations included 4.1.10.09

a) Double wing gateb) Single wing gate

4.1.10.10 Preparation of subgrade level 4.1.10.104.1.10.11 4.1.10.11

4.1.10.12 4.1.10.12

4.1.10.13 Double bitumenous surface treatment 4.1.10.134.1.10.14 Earthing electrodes 4.1.10.14

a) 1 x 95 Cu wiresb) Earthing rods, 6 m longc) Cadwelding of joints, connections and intersections

4.1.10.15 4.1.10.15

4.1.11.0 VENTILATION AND AIR CONDITIONING 4.1.11.04.1.11.1 4.1.11.1

4.1.12.0 WATER SUPPLY, PLUMBING AND SANITARY INSTALLATION AND SEWERAGE 4.1.12.04.1.12.1 4.1.12.1

4.1.13.0 FIRE FIGHTING INSTALLATIONS 4.1.13.04.1.13.01 Fire fighting installations and rescue equipment. 4.1.13.01

Sum Bill 4.1. Dam, Intake and Sand Excluder Sum

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

Subbase of crushed rock (0-75 mm) Thickness min. 200 mm

Wearing course of crushed rock (0-30 mm) Thickness min. 150 mm

Expanded polystyrene at bridge abutmentsThickness 50 mm

Ventilation and airconditioning in the intake gate houses. Design, supply and installation.

Water supply, plumbing and sanitary installation and sewerage in the intake gate house. Design, supply and installation.

Page 92: BoQ Part 1 Version 1

Description Unit Quantity

External railings, fixed or removable,a) Type A kg 10,000.00b) Type B kg 5,000.00c) Type C kg 1,000.00Steel ladders kg 400Fencing, excavation and casting of individual foundation included m 150Fence gates, excavation for and concreting of individual foundations includeda) Double wing gate no 1b) Single wing gate no 1Preparation of subgrade level m2 1,450.00

m3 290

m3 220

Double bitumenous surface treatment m2 1,450.00Earthing electrodesa) 1 x 95 Cu wires m 600b) Earthing rods, 6 m long no 10c) Cadwelding of joints, connections and intersections no 80

m2 5

VENTILATION AND AIR CONDITIONING: VENTILACION Y AIRE ACONDICIONADOLS 1

WATER SUPPLY, PLUMBING AND SANITARY INSTALLATION AND SEWERAGE: SUMINISTRO DE AGUA, FONTANERIA E INSTALACION SANITARIA Y ALCANTARILLADOLS 1

FIRE FIGHTING INSTALLATIONS: INSTALACIONES CONTRA INCENDIOSFire fighting installations and rescue equipment. LS 1

Bill 4.1. Dam, Intake and Sand Excluder :

Bill No. 4 - Checras HeadworksBill 4.1. Dam, Intake and Sand Excluder

Subbase of crushed rock (0-75 mm) Thickness min. 200 mm

Wearing course of crushed rock (0-30 mm) Thickness min. 150 mm

Expanded polystyrene at bridge abutmentsThickness 50 mm

Ventilation and airconditioning in the intake gate houses. Design, supply and installation.

Water supply, plumbing and sanitary installation and sewerage in the intake gate house. Design, supply and installation.

Page 93: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

7.01 70,100.007.01 35,050.007.01 7,010.007.01 2,804.0085.5 12,825.00

4,275.00 4,275.001,832.00 1,832.00

0.88 1,276.0029.25 8,482.50

29.25 6,435.00

4.37 6,336.50

21.34 12,804.00101.2 1,012.00230.3 18,424.00

8.5 42.5

5,841.00 5,841.00

WATER SUPPLY, PLUMBING AND SANITARY INSTALLATION AND SEWERAGE: SUMINISTRO DE AGUA, FONTANERIA E INSTALACION SANITARIA Y ALCANTARILLADO12,922.00 12,922.00

5,841.00 5,841.00

18,301,121.12

Page 94: BoQ Part 1 Version 1

Item Description Item

Rock support at portal shall be regarded and measured as support work behind the face

5.1.01.0 EARTH WORKS AND ROAD WORKS. 5.1.01.05.1.01.01 5.1.01.01

5.1.02.0 EARTH WORKS. 5.1.02.05.1.02.01 Topsoil excavation. 5.1.02.015.1.02.02 Soil excavation 5.1.02.02

a) Excavation to spoil depositb) Excavation to stockpile (gravel & sandy gravel)c) Excavation for footings/structures

5.1.02.03 Fill and backfill 5.1.02.03a) Embankment fillb) Structural backfillc) High quality rockfilld) Backfill of trenches

5.1.02.04 Preparation of rock foundation for concreting 5.1.02.04

5.1.03.00 ROCK EXCAVATION. 5.1.03.005.1.03.01 5.1.03.01

5.1.03.03 5.1.03.03

5.1.03.04 Underground. Excavation of tunnel. Minimum cross section 30,1 m2, (6m x 5.50m) 5.1.03.04

5.1.03.05 5.1.03.05

5.1.03.06 5.1.03.06

5.1.03.07 5.1.03.07

a) Addition for 1/2 blasting roundsb) Addition for 1/4 blasting rounds

5.1.03.08 5.1.03.08

5.1.03.09 Water measuring station 5.1.03.09

5.1.04.0 EXPLORATORY DRILLING AND GROUTING. 5.1.04.05.1.04.01 5.1.04.01

5.1.04.02 5.1.04.02

5.1.04.03 5.1.04.03

5.1.04.04 5.1.04.04

5.1.04.05 5.1.04.05

5.1.04.06 5.1.04.06

5.1.04.07 5.1.04.07

5.1.04.08 5.1.04.08

5.1.04.09 Cement grouting. Type A. Cement consumption 5.1.04.095.1.04.10 Cement grouting. Type B. Cement consumption 5.1.04.105.1.04.11 Cement grouting. Type C. Cement consumption 5.1.04.115.1.04.12 Consolidation grouting. 5.1.04.125.1.04.13 Flexible tubes for contact grouting. 5.1.04.135.1.04.14 Contact grouting. Type D. 5.1.04.145.1.04.15 Contact grouting. Type E. 5.1.04.155.1.04.16 Grouting time. At the face 5.1.04.165.1.04.17 Grouting time. Behind the face 5.1.04.17

5.1.05.00 ROCK SUPPORT tunnel and portal. 5.1.05.00

5.1.05.01 5.1.05.01

5.1.05.02 5.1.05.02

Bill No. 5 - HeadraceBill 5.1 Adit 1

Bill No. 5 - HeadraceBill 5.1 Adit 1

Gravel wearing course in tunnel and platform outside the tunnel. Thickness minimum100 mm

Above ground. Bulk rock excavation (width > 2 m).5.1.03.02 Above ground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required). 5.1.03.02

Above ground. Rock excavation. Abnormal overbreak.

Underground. Excavation of tunnel. Addition for increased cross-section.

Underground. Excavation of tunnel. Abnormal overbreak.

Underground. Excavation of tunnel. Addition for short blasting rounds.

Underground. Excavation of tunnel.Addition for subdivision of cross-section into heading and benches.

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face

Flushing between holes. At the face.

Flushing between holes. Behind the face.

Grouting. per packer setting. Depth 0-5 m. At the face

Grouting. per packer setting. Depth 0-5 m. Behind the face

Temporary installation for rock fall protection at portal. Contractors design

Extra scaling. At the face.

Page 95: BoQ Part 1 Version 1

5.1.05.03 5.1.05.03

5.1.05.04 5.1.05.04

5.1.05.05 High pressure water flushing. Behind the face 5.1.05.05

Extra scaling. Behind the face.

Invert cleaning and scaling. Behind the face.

Page 96: BoQ Part 1 Version 1

Description Unit Quantity

Rock support at portal shall be regarded and measured as support work behind the face

EARTH WORKS AND ROAD WORKS. OBRAS DE TIERRA Y OBRAS VIALESm3 450

EARTH WORKS: OBRAS DE TIERRATopsoil excavation. m3 50Soil excavationa) Excavation to spoil deposit m3 200b) Excavation to stockpile (gravel & sandy gravel) m3 150c) Excavation for footings/structures m3 40Fill and backfilla) Embankment fill m3 800b) Structural backfill m3 150c) High quality rockfill m3 50d) Backfill of trenches m3 200Preparation of rock foundation for concreting m2 50

ROCK EXCAVATION. EXCAVACION DE ROCAm3 1,000.00

m3 100

Underground. Excavation of tunnel. Minimum cross section 30,1 m2, (6m x 5.50m) m 893

m3 100

m3 200

a) Addition for 1/2 blasting rounds m 60b) Addition for 1/4 blasting rounds m 25

m 20

Water measuring station no 1

EXPLORATORY DRILLING AND GROUTING. PERFORACION DE EXPLORACION E INYECCION DELECHADA m 1,250.00

m 1,000.00

no 10

no 40

no 10

no 20

no 20

no 60

Cement grouting. Type A. Cement consumption kg 22,000.00Cement grouting. Type B. Cement consumption kg 18,000.00Cement grouting. Type C. Cement consumption kg 5,000.00Consolidation grouting. kg 2,000.00Flexible tubes for contact grouting. m 250Contact grouting. Type D. kg 1,000.00Contact grouting. Type E. kg 1,500.00Grouting time. At the face hr 45Grouting time. Behind the face hr 50

ROCK SUPPORT tunnel and portal.SOPORTE DE ROCA TUNEL Y PORTAL

Prov. Sum 1

hr 80

Bill No. 5 - HeadraceBill 5.1 Adit 1

Gravel wearing course in tunnel and platform outside the tunnel. Thickness minimum100 mm

Above ground. Bulk rock excavation (width > 2 m).Above ground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required). m 400.00

Above ground. Rock excavation. Abnormal overbreak.

Underground. Excavation of tunnel. Addition for increased cross-section.

Underground. Excavation of tunnel. Abnormal overbreak.

Underground. Excavation of tunnel. Addition for short blasting rounds.

Underground. Excavation of tunnel.Addition for subdivision of cross-section into heading and benches.

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face

Flushing between holes. At the face.

Flushing between holes. Behind the face.

Grouting. per packer setting. Depth 0-5 m. At the face

Grouting. per packer setting. Depth 0-5 m. Behind the face

Temporary installation for rock fall protection at portal. Contractors design

Extra scaling. At the face.

Page 97: BoQ Part 1 Version 1

hr 80

m2 500

High pressure water flushing. Behind the face m2 500

Extra scaling. Behind the face.

Invert cleaning and scaling. Behind the face.

Page 98: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

29.25 13,162.50

3.34 167

3.7 7403.7 5553.7 148

16.76 13,408.0015.92 2,388.0023.68 1,184.0014.89 2,978.003.59 179.5

29.66 29,660.00

14.2 1,420.00

2,020.93 1,804,690.49

31.71 3,171.00

15.76 3,152.00

615.83 36,949.802,204.10 55,102.50855.66 17,113.20

2,385.50 2,385.50

15.58 19,475.00

13.55 13,550.00

73.32 733.2

60.68 2,427.20

30.3 303

26.25 525

143.86 2,877.20

140.23 8,413.80

1.01 22,220.002.59 46,620.007.19 35,950.001.9 3,800.00

31.11 7,777.5022.57 22,570.0026.23 39,345.00

605 27,225.00520 26,000.00

25,000.00 25,000.00

87.62 7,009.60

21.76 8,704.00

Page 99: BoQ Part 1 Version 1

69.96 5,596.80

24.34 12,170.00

9.06 4,530.00

Page 100: BoQ Part 1 Version 1

Item Description Item

5.1.05.20 5.1.05.20

5.1.05.21 5.1.05.21

5.1.05.22 5.1.05.22

5.1.05.23 5.1.05.23

5.1.05.24 5.1.05.24

5.1.05.25 5.1.05.25

5.1.05.26 5.1.05.26

5.1.05.27 5.1.05.27

5.1.05.28 5.1.05.28

5.1.05.29 5.1.05.29

5.1.05.30 Supply of rebars for ribs of reinforced shotcrete . 5.1.05.305.1.05.31 5.1.05.31

5.1.05.32 5.1.05.32

5.1.05.33 Prefabrication and supply of lattice girders. 5.1.05.335.1.05.34 5.1.05.34

5.1.05.35 5.1.05.35

5.1.05.36 5.1.05.36

Bill No. 5 - HeadraceBill 5.1 Adit 1

Bill No. 5 - HeadraceBill 5.1 Adit 1

5.1.05.06 Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

5.1.05.06

5.1.05.07 Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

5.1.05.07

5.1.05.08 Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

5.1.05.08

5.1.05.09 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

5.1.05.09

5.1.05.10 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

5.1.05.10

5.1.05.11 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

5.1.05.11

5.1.05.12 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

5.1.05.12

5.1.05.13 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

5.1.05.13

5.1.05.14 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

5.1.05.14

5.1.05.15 Fully cement-grouted rock bolts, deformed bar. At the face.D=25 mm. Depth in rock 5.9 m

5.1.05.15

5.1.05.16 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

5.1.05.16

5.1.05.17 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

5.1.05.17

5.1.05.18 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

5.1.05.18

5.1.05.19 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 5.9 m

5.1.05.19

Chainlinked mesh fixed to rock bolts. At the face.

Chainlinked mesh fixed to rock bolts. Behind the face.

Welded wire fabric fixed to rock bolts. At the face.

Welded wire fabric fixed to rock bolts. Behind the face.

Steel straps fixed to rock bolts. At the face.

Steel straps fixed to rock bolts. Behind the face.

Shotcrete. Plain. At the face.

Shotcrete. Plain. Behind the face.

Shotcrete. Fibre-reinforced. At the face.

Shotcrete. Fibre-reinforced. Behind the face.

Installation of ribs of reinforced shotcrete. At the face.

Installation of ribs of reinforced shotcrete. Behind the face.

Installation of lattice girders for ribs of shotcrete. At the face.

Installation of lattice girders for ribs of shotcrete. Behind the face.

Concrete lining. Behind the face.

Page 101: BoQ Part 1 Version 1

5.1.05.37 5.1.05.37

5.1.05.38 Formwork for concrete lining, Class C 5.1.05.385.1.05.39 5.1.05.39

Additional concrete. Behind the face.

Invert concrete. At the face.

Page 102: BoQ Part 1 Version 1

Description Unit Quantity

m2 100

m2 200

m2 80

m2 80

m 50

m 100

m3 80

m3 60

m3 850

m3 500

Supply of rebars for ribs of reinforced shotcrete . kg 3,400.00m 140

m 90

Prefabrication and supply of lattice girders. kg 2,300.00m 90

m 60

m3 35

Bill No. 5 - HeadraceBill 5.1 Adit 1

Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

no 80.00

Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

no 550.00

Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

no 550.00

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

no 30.00

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

no 30.00

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

no 30.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

no 30.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

no 300.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

no 300.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=25 mm. Depth in rock 5.9 m

no 500.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

no 80.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

no 600.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

no 500.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 5.9 m

no 100.00

Chainlinked mesh fixed to rock bolts. At the face.

Chainlinked mesh fixed to rock bolts. Behind the face.

Welded wire fabric fixed to rock bolts. At the face.

Welded wire fabric fixed to rock bolts. Behind the face.

Steel straps fixed to rock bolts. At the face.

Steel straps fixed to rock bolts. Behind the face.

Shotcrete. Plain. At the face.

Shotcrete. Plain. Behind the face.

Shotcrete. Fibre-reinforced. At the face.

Shotcrete. Fibre-reinforced. Behind the face.

Installation of ribs of reinforced shotcrete. At the face.

Installation of ribs of reinforced shotcrete. Behind the face.

Installation of lattice girders for ribs of shotcrete. At the face.

Installation of lattice girders for ribs of shotcrete. Behind the face.

Concrete lining. Behind the face.

Page 103: BoQ Part 1 Version 1

m3 10

Formwork for concrete lining, Class C m2 175m3 80

Additional concrete. Behind the face.

Invert concrete. At the face.

Page 104: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

14.48 1,448.00

13.1 2,620.00

10.45 836

9.51 760.8

42.01 2,100.50

37.89 3,789.00

300.41 24,032.80

260.72 15,643.20

363.79 309,221.50

315.64 157,820.00

1.8 6,120.0018.87 2,641.80

13.7 1,233.00

3.2 7,360.0071.17 6,405.30

59.43 3,565.80

190.04 6,651.40

53.27 4,261.60

54.35 29,892.50

65.04 35,772.00

47.72 1,431.60

52.95 1,588.50

61.32 1,839.60

49.06 1,471.80

50.65 15,195.00

61.20 18,360.00

93.00 46,500.00

43.62 3,489.60

47.74 28,644.00

54.26 27,130.00

106.50 10,650.00

Page 105: BoQ Part 1 Version 1

190.04 1,900.40

136.53 23,892.75100.41 8,032.80

Page 106: BoQ Part 1 Version 1

Item Description Item

5.1.05.40 5.1.05.40

5.1.05.41 Reinforcement of roof and/or walls 5.1.05.415.1.05.42 Reinforcement of invert. At or behind the face 5.1.05.42

5.1.06.00 INVESTIGATION AND INSTRUMENTATION. 5.1.06.005.1.06.01 Investigation and testing underground. Down time. 5.1.06.015.1.06.02 Core drilling. Set-up at each drilling location. 5.1.06.025.1.06.03 5.1.06.03

5.1.06.04 5.1.06.04

5.1.06.05 Core drilling. Hole stabilisation. Cement grouting. 5.1.06.05

5.1.06.08 Lugeon tests 5.1.06.085.1.06.09 5.1.06.09

5.1.06.10 Number of hydrofracture or hydraulic jacking tests 5.1.06.105.1.06.11 Convergence station. Max. 3 pins. 5.1.06.115.1.06.12 Multipoint borehole extensometer. 5.1.06.12

5.1.07.00 CONCRETE WORKS. 5.1.07.005.1.07.01 Not used 5.1.07.015.1.07.02 Formwork Class A, Plain 5.1.07.025.1.07.03 Formwork Class B. Plain. 5.1.07.035.1.07.04 Formwork Class B. Curved. 5.1.07.045.1.07.05 Finishing of unformed surfaces, Class UA. 5.1.07.055.1.07.06 Finishing of unformed surfaces, Class UB. 5.1.07.065.1.07.07 Concrete Class C. 5.1.07.075.1.07.08 Reinforcement. Deformed bars. 5.1.07.085.1.07.09 Reinforcement. Welded mesh 5.1.07.09

5.1.08.00 PIPE CULVERTS AND DRAIN PIPES 5.1.08.005.1.08.01 5.1.08.01

5.1.08.02 Rock excavation trench, over item 5.1.08.01 5.1.08.025.1.08.03 Backfill of headwalls, wingwalls etc 5.1.08.035.1.08.04 5.1.08.04

5.1.09.00 METAL WORKS. 5.1.09.005.1.09.01 Bar-gate with steel frame and lock at tunnel entrance 4m x 4 m. 5.1.09.015.1.09.02 Steeldoor, 1m x 2m at entrance of tunnel 5.1.09.02

5.1.10.00 PARTICULAR WORKS FOR INSTALLATION OF ADIT GATE 5.1.10.005.1.10.01 Preparation of rock surface for concreting. 5.1.10.015.1.10.02 Grouted rock bolts of weldable quality for fixing of gate, D = 25 mm. 5.1.10.02

a) Length 3 m, depth in rock 2.0 mb) Length 2 m, depth in rock 1.0 m

5.1.10.03 PVC Waterstop in construction joints. Width 200 mm 5.1.10.03

5.1.10.05 Groove, rectangular. W x H = 100 x 100 mm 5.1.10.055.1.10.06 Shear keys in construction joints 5.1.10.06

Bill 5.1 Adit 1

Bill No. 5 - HeadraceBill 5.1 Adit 1

Bill No. 5 - HeadraceBill 5.1 Adit 1

Invert concrete. Behind the face.

Core drilling, diameter minimum 76 mm. Depth 0-30 m

Core drilling, diameter minimum 76 mm. Depth 30-100 m

5.1.06.06 Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m 5.1.06.06

5.1.06.07 Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m 5.1.06.07

Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests

PVC pipe D = 300 mm, diversion of headrace tunnel. Incl. excavation and backfill of trench

Drainpipes PVC D=100 mm including access pipes each 60 m, joints, excavation and backfill

5.1.10.04 PVC pipes for grouting of voids between concrete and rock before contact grouting and for contact grouting. Placed through formwork. Dimension in accordance with contractors grouting equipment5.1.10.04

5.1.10.07 Interface with Contract H, embedment of adit gate in tunnel. Reference H-tender documents, Part D, Section 2. This item shall include works related to preparation for, and embedment in concrete and the like, for the adit gate that may not be included in other items, coordinating with the H-Contractor in his transport and work, etc. Scaling, formwork, reinforcement, concreting and grouting is cater for elsewhere.

5.1.10.07

Page 107: BoQ Part 1 Version 1

Description Unit Quantity

m3 30

Reinforcement of roof and/or walls kg 2,000.00Reinforcement of invert. At or behind the face kg 5,500.00

INVESTIGATION AND INSTRUMENTATION.: INVESTIGACION E INSTRUMENTACION Investigation and testing underground. Down time. hr 200Core drilling. Set-up at each drilling location. no 2

m 180

m 100

Core drilling. Hole stabilisation. Cement grouting. kg 800

Lugeon tests no 12no 2

Number of hydrofracture or hydraulic jacking tests no 6Convergence station. Max. 3 pins. no 2Multipoint borehole extensometer. no 2

CONCRETE WORKS. OBRAS DE CONCRETONot usedFormwork Class A, Plain m2 50Formwork Class B. Plain. m2 200Formwork Class B. Curved. m2 50Finishing of unformed surfaces, Class UA. m2 15Finishing of unformed surfaces, Class UB. m2 35Concrete Class C. m3 350Reinforcement. Deformed bars. t 9Reinforcement. Welded mesh t 0.5

PIPE CULVERTS AND DRAIN PIPESm 830

Rock excavation trench, over item 5.1.08.01 m3 120Backfill of headwalls, wingwalls etc m3 50

m 1,600.00

METAL WORKS. ESTRUCTURAS METALICAS Bar-gate with steel frame and lock at tunnel entrance 4m x 4 m. kg 400Steeldoor, 1m x 2m at entrance of tunnel no 1

PARTICULAR WORKS FOR INSTALLATION OF ADIT GATE:OBRAS PARTICULARES PARA LA INSTALACIÓN DE PUERTA DE TUNEL O LA PUERTA DE ENTRADA.Preparation of rock surface for concreting. m2 200Grouted rock bolts of weldable quality for fixing of gate, D = 25 mm.a) Length 3 m, depth in rock 2.0 m no 25b) Length 2 m, depth in rock 1.0 m no 30PVC Waterstop in construction joints. Width 200 mm m 20

Groove, rectangular. W x H = 100 x 100 mm m 10Shear keys in construction joints m 20

Bill 5.1 Adit 1

Bill No. 5 - HeadraceBill 5.1 Adit 1

Invert concrete. Behind the face.

Core drilling, diameter minimum 76 mm. Depth 0-30 m

Core drilling, diameter minimum 76 mm. Depth 30-100 m

Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m no 6.00

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m no 6.00

Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests

PVC pipe D = 300 mm, diversion of headrace tunnel. Incl. excavation and backfill of trench

Drainpipes PVC D=100 mm including access pipes each 60 m, joints, excavation and backfill

PVC pipes for grouting of voids between concrete and rock before contact grouting and for contact grouting. Placed through formwork. Dimension in accordance with contractors grouting equipmentno 25.00

Interface with Contract H, embedment of adit gate in tunnel. Reference H-tender documents, Part D, Section 2. This item shall include works related to preparation for, and embedment in concrete and the like, for the adit gate that may not be included in other items, coordinating with the H-Contractor in his transport and work, etc. Scaling, formwork, reinforcement, concreting and grouting is cater for elsewhere.

LS 1.00

Page 108: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

99.56 2,986.80

2.31 4,620.002.4 13,200.00

605 121,000.001,108.00 2,216.00125.06 22,510.80

171.84 17,184.00

1.9 1,520.00

1,440.00 17,280.001,140.23 2,280.46

961.56 5,769.363,269.62 6,539.247,612.00 15,224.00

67.26 3,363.0067.26 13,452.0096.29 4,814.50

4.2 634.65 162.75

142.91 50,018.501,459.67 13,137.032,812.50 1,406.25

43.34 35,972.20

20.37 2,444.4028.89 1,444.508.92 14,272.00

7.01 2,804.001,832.00 1,832.00

PARTICULAR WORKS FOR INSTALLATION OF ADIT GATE:OBRAS PARTICULARES PARA LA INSTALACIÓN DE PUERTA DE TUNEL O LA PUERTA DE ENTRADA.3.59 718

88.36 2,209.0066.07 1,982.1024.93 498.6

36.12 361.222.63 452.6

3,565,813.30

115.56 693.36

135.56 813.36

150.21 3,755.25

33,135.00 33,135.00

Page 109: BoQ Part 1 Version 1

Item Description Item

Portal shall be regarded and measured as support work behind the face

5.2.01.00 ROCK EXCAVATION. 5.2.01.005.2.01.01 5.2.01.015.2.01.02 5.2.01.02

5.2.01.03 5.2.01.03

5.2.01.05 5.2.01.05

5.2.01.06 5.2.01.06

5.2.01.07 5.2.01.07

5.2.01.08 a) Addition for 1/2 blasting rounds 5.2.01.08b) Addition for 1/4 blasting rounds

5.2.01.09 5.2.01.09

5.2.01.10 Water measuring station 5.2.01.10

5.2.02.00 EXPLORATORY DRILLING AND GROUTING. 5.2.02.005.2.02.01 5.2.02.01

5.2.02.04 5.2.02.04

5.2.02.05 Flushing between holes. At the face. 5.2.02.05

5.2.02.06 Flushing between holes. Behind the face. 5.2.02.06

5.2.02.07 Grouting. per packer setting. Depth 0-5 m. At the face 5.2.02.075.2.02.08 Grouting. per packer setting. Depth 0-5 m. Behind the face 5.2.02.085.2.02.09 Cement grouting. Type A. Cement consumption 5.2.02.09

5.2.02.10 Cement grouting. Type B. Cement consumption 5.2.02.105.2.02.11 Cement grouting. Type C. Cement consumption 5.2.02.11

5.2.02.12 Chemical grouting. Type D. Dry weight grout consumption 5.2.02.12

5.2.02.13 Grouting time. At the face 5.2.02.135.2.02.14 Grouting time. Behind the face 5.2.02.14

5.2.03.00 ROCK SUPPORT tunnel and portal. 5.2.03.00

5.2.03.01 5.2.03.01

5.2.03.02 5.2.03.02

5.2.03.03 5.2.03.03

5.2.03.04 High pressure water flushing. Behind the face 5.2.03.04

Bill No. 5 - HeadraceBill 5.2 Surgetunnel

Bill No. 5 - HeadraceBill 5.2 Surgetunnel

Above ground. Bulk rock excavation (width > 2 m).Above ground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

Above ground. Rock excavation. Abnormal overbreak.

5.2.01.04 Underground. Excavation of tunnel. Minimum cross section 30,1 m2, (6m x 5.50m) 5.2.01.04

Underground. Excavation of tunnel. Addition for increased cross-section.

Underground. Excavation of tunnel. Abnormal overbreak.

Underground. Excavation of tunnel. Addition for short blasting rounds.

Underground. Excavation of tunnel.Addition for subdivision of cross-section into heading and benches.

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face

5.2.02.02 Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face 5.2.02.02

5.2.02.03 Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face 5.2.02.03

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face

Extra scaling. At the face.

Extra scaling. Behind the face.

Invert cleaning and scaling. Behind the face.

5.2.03.05 Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

5.2.03.05

5.2.03.06 Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

5.2.03.06

5.2.03.07 Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

5.2.03.07

5.2.03.08 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

5.2.03.08

5.2.03.09 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

5.2.03.09

5.2.03.10 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

5.2.03.10

5.2.03.11 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

5.2.03.11

5.2.03.12 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

5.2.03.12

Page 110: BoQ Part 1 Version 1

Description Unit Quantity

Portal shall be regarded and measured as support work behind the face

ROCK EXCAVATION. EXCAVACION DE ROCAm3 1,500.00m 500

m3 100

m3 70

m3 210

a) Addition for 1/2 blasting rounds m 50b) Addition for 1/4 blasting rounds m 20

m 15

Water measuring station no 1

EXPLORATORY DRILLING AND GROUTING.PERFORACIÓN EXPLORATORIA Y INYECCION m 1,000.00

no 1

Flushing between holes. At the face. no 10

Flushing between holes. Behind the face. 1

Grouting. per packer setting. Depth 0-5 m. At the face no 15Grouting. per packer setting. Depth 0-5 m. Behind the face no 2Cement grouting. Type A. Cement consumption kg 12,000.00

Cement grouting. Type B. Cement consumption kg 8,000.00Cement grouting. Type C. Cement consumption kg 3,000.00

Chemical grouting. Type D. Dry weight grout consumption kg 200

Grouting time. At the face hr 30Grouting time. Behind the face hr 8

ROCK SUPPORT tunnel and portal. SOPORTE DE ROCA TUNEL Y PORTAL

hr 60

hr 60

m2 50

High pressure water flushing. Behind the face m2 100

Bill No. 5 - HeadraceBill 5.2 Surgetunnel

Above ground. Bulk rock excavation (width > 2 m).Above ground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

Above ground. Rock excavation. Abnormal overbreak.

Underground. Excavation of tunnel. Minimum cross section 30,1 m2, (6m x 5.50m) m 702.00

Underground. Excavation of tunnel. Addition for increased cross-section.

Underground. Excavation of tunnel. Abnormal overbreak.

Underground. Excavation of tunnel. Addition for short blasting rounds.

Underground. Excavation of tunnel.Addition for subdivision of cross-section into heading and benches.

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face m 100.00

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face no 10.00

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face

Extra scaling. At the face.

Extra scaling. Behind the face.

Invert cleaning and scaling. Behind the face.

Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

no 70.00

Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

no 450.00

Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

no 500.00

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

no 25.00

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

no 30.00

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

no 25.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

no 25.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

no 250.00

Page 111: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

29.66 44,490.0021.76 10,880.00

14.2 1,420.00

31.71 2,219.70

15.76 3,309.60

706.07 35,303.502,576.71 51,534.20855.66 12,834.90

2,385.50 2,385.50

15.58 15,580.00

60.68 60.68

30.3 303

26.25 26.25

143.86 2,157.90140.23 280.46

1.01 12,120.00

2.59 20,720.007.19 21,570.00

23.71 4,742.00

605 18,150.00520 4,160.00

87.62 5,257.20

69.96 4,197.60

24.34 1,217.00

9.06 906

2,223.27 1,560,735.54

13.55 1,355.00

73.32 733.20

53.27 3,728.90

54.35 24,457.50

65.04 32,520.00

47.72 1,193.00

52.95 1,588.50

61.32 1,533.00

49.06 1,226.50

50.65 12,662.50

Page 112: BoQ Part 1 Version 1

Item Description Item

5.2.03.19 5.2.03.19

5.2.03.20 5.2.03.20

5.2.03.21 5.2.03.21

5.2.03.25 5.2.03.25

5.2.03.31 5.2.03.31

5.2.03.32 Prefabrication and supply of lattice girders. 5.2.03.32

5.2.03.33 5.2.03.33

5.2.03.34 5.2.03.34

5.2.03.35 5.2.03.35

5.2.03.36 5.2.03.36

5.2.03.37 Formwork for concrete lining, Class C 5.2.03.37

5.2.03.38 5.2.03.38

5.2.03.40 Reinforcement of roof and/or walls 5.2.03.40

5.2.03.41 Reinforcement of invert. At or behind the face 5.2.03.41

5.2.04.00 INVESTIGATION AND INSTRUMENTATION. 5.2.04.005.2.04.01 Investigation and testing underground. Down time. 5.2.04.01

5.2.04.02 Core drilling. Set-up at each drilling location. 5.2.04.02

5.2.04.04 5.2.04.04

Bill No. 5 - HeadraceBill 5.2 Surgetunnel

Bill No. 5 - HeadraceBill 5.2 Surgetunnel

5.2.03.13 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

5.2.03.13

5.2.03.14 Fully cement-grouted rock bolts, deformed bar. At the face.D=25 mm. Depth in rock 5.9 m

5.2.03.14

5.2.03.15 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

5.2.03.15

5.2.03.16 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

5.2.03.16

5.2.03.17 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

5.2.03.17

5.2.03.18 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 5.9 m

5.2.03.18

Chainlinked mesh fixed to rock bolts. At the face.

Chainlinked mesh fixed to rock bolts. Behind the face.

Welded wire fabric fixed to rock bolts. At the face.

5.2.03.22 Welded wire fabric fixed to rock bolts. Behind the face. 5.2.03.22

5.2.03.23 Steel straps fixed to rock bolts. At the face. 5.2.03.23

5.2.03.24 Steel straps fixed to rock bolts. Behind the face. 5.2.03.24

Shotcrete. Plain. At the face.

5.2.03.26 Shotcrete. Plain. Behind the face. 5.2.03.26

5.2.03.27 Shotcrete. Fibre-reinforced. At the face. 5.2.03.27

5.2.03.28 Shotcrete. Fibre-reinforced. Behind the face. 5.2.03.28

5.2.03.29 Supply of rebars for ribs of reinforced shotcrete. 5.2.03.29

5.2.03.30 Installation of ribs of reinforced shotcrete. At the face. 5.2.03.30

Installation of ribs of reinforced shotcrete. Behind the face.

Installation of lattice girders for ribs of shotcrete. At the face.

Installation of lattice girders for ribs of shotcrete. Behind the face.

Concrete lining. Behind the face.

Additional concrete.Behind the face.

Invert concrete. At the face.

5.2.03.39 Invert concrete. Behind the face. 5.2.03.39

5.2.04.03 Core drilling, diameter minimum 76 mm. Depth 0-30 m 5.2.04.03

Core drilling, diameter minimum 76 mm. Depth 30-100 m

Page 113: BoQ Part 1 Version 1

5.2.04.05 Core drilling. Hole stabilisation. Cement grouting. 5.2.04.055.2.04.06 Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m 5.2.04.06

Page 114: BoQ Part 1 Version 1

Description Unit Quantity

m2 50

m2 200

m2 50

m3 60

m 80

Prefabrication and supply of lattice girders. kg 1,800.00

m 70

m 50

m3 30

m3 5

Formwork for concrete lining, Class C m2 150

m3 60

Reinforcement of roof and/or walls kg 1,600.00

Reinforcement of invert. At or behind the face kg 4,000.00

INVESTIGATION AND INSTRUMENTATION. INVESTIGACION E INSTRUMENTACION Investigation and testing underground. Down time. hr 60

Core drilling. Set-up at each drilling location. no 2

m 100

Bill No. 5 - HeadraceBill 5.2 Surgetunnel

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

no 250.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=25 mm. Depth in rock 5.9 m

no 300.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

no 25.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

no 500.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

no 500.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 5.9 m

no 10.00

Chainlinked mesh fixed to rock bolts. At the face.

Chainlinked mesh fixed to rock bolts. Behind the face.

Welded wire fabric fixed to rock bolts. At the face.

Welded wire fabric fixed to rock bolts. Behind the face. m2 50.00

Steel straps fixed to rock bolts. At the face. m 50.00

Steel straps fixed to rock bolts. Behind the face. m 100.00

Shotcrete. Plain. At the face.

Shotcrete. Plain. Behind the face. m3 50.00

Shotcrete. Fibre-reinforced. At the face. m3 700.00

Shotcrete. Fibre-reinforced. Behind the face. m3 350.00

Supply of rebars for ribs of reinforced shotcrete. kg 2,800.00

Installation of ribs of reinforced shotcrete. At the face. m 110.00

Installation of ribs of reinforced shotcrete. Behind the face.

Installation of lattice girders for ribs of shotcrete. At the face.

Installation of lattice girders for ribs of shotcrete. Behind the face.

Concrete lining. Behind the face.

Additional concrete.Behind the face.

Invert concrete. At the face.

Invert concrete. Behind the face. m3 30.00

Core drilling, diameter minimum 76 mm. Depth 0-30 m m 90.00

Core drilling, diameter minimum 76 mm. Depth 30-100 m

Page 115: BoQ Part 1 Version 1

Core drilling. Hole stabilisation. Cement grouting. kg 500Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m no 20.00

Page 116: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

14.48 724

13.1 2,620.00

10.45 522.5

300.41 18,024.60

13.7 1,096.00

3.2 5,760.00

71.17 4,981.90

59.43 2,971.50

190.04 5,701.20

190.04 950.2

136.53 20,479.50

100.41 6,024.60

2.31 3,696.00

2.4 9,600.00

605 36,300.00

1,108.00 2,216.00

171.84 17,184.00

61.20 15,300.00

93.00 27,900.00

43.62 1,090.50

47.74 23,870.00

54.26 27,130.00

106.50 1,065.00

9.51 475.50

42.01 2,100.50

37.89 3,789.00

260.72 13,036.00

363.79 254,653.00

315.64 110,474.00

1.80 5,040.00

18.87 2,075.70

99.56 2,986.80

125.06 11,255.40

Page 117: BoQ Part 1 Version 1

1.9 950115.56 2,311.20

Page 118: BoQ Part 1 Version 1

Item Description Item

5.2.04.08 Lugeon tests 5.2.04.085.2.04.09 Convergence station. Max. 3 pins. 5.2.04.095.2.04.10 Multipoint borehole extensometer. 5.2.04.10

5.2.05.00 CONCRETE WORKS. 5.2.05.005.2.05.01 Formwork Class B. Plain.. 5.2.05.015.2.05.02 Formwork Class B. Curved. 5.2.05.025.2.05.03 Finishing of unformed surfaces, Class UC. 5.2.05.035.2.05.04 Concrete Class C. 5.2.05.045.2.05.05 Reinforcement. Deformed bars. 5.2.05.055.2.05.06 Reinforcement. Welded mesh 5.2.05.065.2.05.07 Not used 5.2.05.075.2.05.08 5.2.05.08

5.2.05.09 5.2.05.09

5.2.06.00 METAL WORKS. 5.2.06.005.2.06.01 Steel ventilation grating 5.2.06.015.2.06.02 Steel door with lock, 1m x 2m at entrance of tunne 5.2.06.02

Sum Bill 5.2 Surgetunnel Sum

Bill No. 5 - HeadraceBill 5.2 Surgetunnel

Bill No. 5 - HeadraceBill 5.2 Surgetunnel

5.2.04.07 Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m 5.2.04.07

Grouted rock bolts for concrete walls D = 25 mm, depth in rock 1.5 m depth in concrete1 m

Concrete pavement.Concrete Class B. Thickness minimum 150 mm. Reinforcement mesh min 6.5 kg/m2

Page 119: BoQ Part 1 Version 1

Description Unit Quantity

Lugeon tests no 30Convergence station. Max. 3 pins. no 2Multipoint borehole extensometer. no 2

CONCRETE WORKS. OBRAS DE CONCRETOFormwork Class B. Plain.. m2 250Formwork Class B. Curved. m2 80Finishing of unformed surfaces, Class UC. m2 50Concrete Class C. m3 90Reinforcement. Deformed bars. t 5Reinforcement. Welded mesh t 1Not used

no 60

m 697

METAL WORKS. ESTRUCTURAS METALICAS Steel ventilation grating kg 150Steel door with lock, 1m x 2m at entrance of tunne no 1

Bill 5.2 Surgetunnel

Bill No. 5 - HeadraceBill 5.2 Surgetunnel

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m no 10.00

Grouted rock bolts for concrete walls D = 25 mm, depth in rock 1.5 m depth in concrete1 m

Concrete pavement.Concrete Class B. Thickness minimum 150 mm. Reinforcement mesh min 6.5 kg/m2

Page 120: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

1,440.00 43,200.003,269.62 6,539.247,612.00 15,224.00

67.26 16,815.0096.29 7,703.204.85 242.5

142.91 12,861.901,459.67 7,298.352,812.50 2,812.50

66.07 3,964.20

169.26 117,974.22

6.34 9511,832.00 1,832.00

2,800,687.44

135.56 1,355.60

Page 121: BoQ Part 1 Version 1

Item Description Item

Rock support at portal shall be regarded and measured as support work behind the face

5.3.01.0 ROCK EXCAVATION. 5.3.01.0

5.3.01.02 5.3.01.02

5.3.01.03 5.3.01.03

5.3.01.04 5.3.01.04

a) Addition for 1/2 blasting roundsb) Addition for 1/4 blasting rounds

5.3.01.05 5.3.01.05

5.3.01.06 5.3.01.06

5.3.01.11 Water measuring station 5.3.01.11

5.3.02.00 EXPLORATORY DRILLING AND GROUTING. 5.3.02.00

5.3.02.05 Flushing between holes. At the face. 5.3.02.055.3.02.06 Flushing between holes. Behind the face. 5.3.02.065.3.02.07 Grouting. per packer setting. Depth 0-5 m. At the face 5.3.02.075.3.02.08 Grouting. per packer setting. Depth 0-5 m. Behind the face 5.3.02.085.3.02.09 Cement grouting. Type A. Cement consumption 5.3.02.095.3.02.10 Cement grouting. Type B. Cement consumption 5.3.02.105.3.02.11 Cement grouting. Type C. Cement consumption 5.3.02.115.3.02.12 Consolidation grouting. 5.3.02.125.3.02.13 Flexible tubes for contact grouting. 5.3.02.135.3.02.14 Contact grouting. Type D. 5.3.02.145.3.02.15 Contact grouting. Type E. 5.3.02.155.3.02.16 Grouting time. At the face 5.3.02.165.3.02.17 Grouting time. Behind the face 5.3.02.17

5.3.03.00 ROCK SUPPORT 5.3.03.00

5.3.03.02 5.3.03.02

5.3.03.03 5.3.03.03

5.3.03.04 5.3.03.04

Bill No. 5 - HeadraceBill 5.3 Headrace tunnel H01 to H18

Bill No. 5 - HeadraceBill 5.3 Headrace tunnel H01 to H18

Above ground works included in Bill 4, except for rock support and temporary rock fall protection as included below

5.3.01.01 Underground. Excavation of tunnel, minimum net cross section 22.6 m2, (4.50m x5.50m)

5.3.01.01

Underground. Excavation of tunnel. Addition for increased cross-section.

Underground. Excavation of tunnel. Abnormal overbreak.

Underground. Excavation of tunnel with cross section 22.6 m2. Addition for short blasting rounds.

Underground. Excavation of tunnel.Addition for subdivision of cross-section into heading and benches.

Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

5.3.01.07 Underground. Water discharge.Pump out rate 1 - 2 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

5.3.01.07

5.3.01.08 Underground. Water discharge.Pump out rate 2 - 3 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

5.3.01.08

5.3.01.09 Underground. Water discharge.Pump out rate 3 - 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel.Measured on each front

5.3.01.09

5.3.01.10 Underground. Water discharge.Pump out rate more than 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

5.3.01.10

5.3.02.01 Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face 5.3.02.01

5.3.02.02 Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face 5.3.02.02

5.3.02.03 Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face 5.3.02.03

5.3.02.04 Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face 5.3.02.04

5.3.03.01 Temporary installation for rock fall protection at Checras portal. See also Bill 4Contractors design

5.3.03.01

Extra scaling. At the face.

Extra scaling. Behind the face.

Invert cleaning and scaling. Behind the face.

Page 122: BoQ Part 1 Version 1

5.3.03.05 High pressure water flushing. Behind the face 5.3.03.055.3.03.06 Resin end-anchored rock bolts, deformed bar. At the face.

D=20 mm. Depth in rock 2.4 m5.3.03.06

Page 123: BoQ Part 1 Version 1

Description Unit Quantity

Rock support at portal shall be regarded and measured as support work behind the face

ROCK EXCAVATION. EXCAVACIÓN DE ROCA

m3 1,000.00

m3 1,200.00

a) Addition for 1/2 blasting rounds m 400b) Addition for 1/4 blasting rounds m 200

m 120

m 1,000.00

Water measuring station no 3

EXPLORATORY DRILLING AND GROUTING.PERFORACIÓN EXPLORATORIA E INYECCION

Flushing between holes. At the face. no 120Flushing between holes. Behind the face. 10Grouting. per packer setting. Depth 0-5 m. At the face no 350Grouting. per packer setting. Depth 0-5 m. Behind the face no 80Cement grouting. Type A. Cement consumption kg 155,000.00Cement grouting. Type B. Cement consumption kg 100,000.00Cement grouting. Type C. Cement consumption kg 40,000.00Consolidation grouting. kg 1,000.00Flexible tubes for contact grouting. m 120Contact grouting. Type D. kg 400Contact grouting. Type E. kg 400Grouting time. At the face hr 450Grouting time. Behind the face hr 60

ROCK SUPPORT SOPORTE DE ROCA

hr 300

hr 600

m2 500

Bill No. 5 - HeadraceBill 5.3 Headrace tunnel H01 to H18

Above ground works included in Bill 4, except for rock support and temporary rock fall protection as included below

Underground. Excavation of tunnel, minimum net cross section 22.6 m2, (4.50m x5.50m)

m 5,668.00

Underground. Excavation of tunnel. Addition for increased cross-section.

Underground. Excavation of tunnel. Abnormal overbreak.

Underground. Excavation of tunnel with cross section 22.6 m2. Addition for short blasting rounds.

Underground. Excavation of tunnel.Addition for subdivision of cross-section into heading and benches.

Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required).

Underground. Water discharge.Pump out rate 1 - 2 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

month 8.00

Underground. Water discharge.Pump out rate 2 - 3 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

month 4.00

Underground. Water discharge.Pump out rate 3 - 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel.Measured on each front

month 2.00

Underground. Water discharge.Pump out rate more than 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

month 1.00

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face m 12,000.00

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face m 2,000.00

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face no 120.00

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face no 50.00

Temporary installation for rock fall protection at Checras portal. See also Bill 4Contractors design

Prov. Sum 1.00

Extra scaling. At the face.

Extra scaling. Behind the face.

Invert cleaning and scaling. Behind the face.

Page 124: BoQ Part 1 Version 1

High pressure water flushing. Behind the face m2 500Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

no 1,200.00

Page 125: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

31.71 31,710.00

15.76 18,912.00

710.88 284,352.002,461.12 492,224.00855.66 102,679.20

15.23 15,230.00

2,385.50 7,156.50

30.3 3,636.0026.25 262.5

143.86 50,351.00140.23 11,218.40

1.01 156,550.002.59 259,000.007.19 287,600.001.9 1,900.00

31.11 3,733.2022.57 9,028.0026.23 10,492.00

605 272,250.00520 31,200.00

87.62 26,286.00

69.96 41,976.00

24.34 12,170.00

1,694.09 9,602,102.12

9,942.33 79,538.64

12,052.57 48,210.28

14,162.81 28,325.62

16,273.05 16,273.05

15.58 186,960.00

13.55 27,100.00

73.32 8,798.40

60.68 3,034.00

25,000.00 25,000.00

Page 126: BoQ Part 1 Version 1

9.06 4,530.0053.27 63,924.00

Page 127: BoQ Part 1 Version 1

Item Description Item

5.3.03.20 5.3.03.20

5.3.03.21 5.3.03.21

5.3.03.22 5.3.03.22

5.3.03.23 5.3.03.23

5.3.03.24 5.3.03.24

5.3.03.25 5.3.03.25

5.3.03.26 5.3.03.26

5.3.03.27 5.3.03.27

5.3.03.28 5.3.03.28

5.3.03.29 5.3.03.29

5.3.03.30 Supply of rebars for ribs of reinforced shotcrete. 5.3.03.305.3.03.31 5.3.03.31

5.3.03.32 5.3.03.32

5.3.03.33 Prefabrication and supply of lattice girders. 5.3.03.335.3.03.34 5.3.03.34

5.3.03.35 5.3.03.35

5.3.03.36 5.3.03.36

5.3.03.37 5.3.03.37

5.3.03.38 Formwork for concrete lining, Class C 5.3.03.38

Bill No. 5 - HeadraceBill 5.3 Headrace tunnel H01 to H18

Bill No. 5 - HeadraceBill 5.3 Headrace tunnel H01 to H18

5.3.03.07 Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

5.3.03.07

5.3.03.08 Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

5.3.03.08

5.3.03.09 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

5.3.03.09

5.3.03.10 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

5.3.03.10

5.3.03.11 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

5.3.03.11

5.3.03.12 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

5.3.03.12

5.3.03.13 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

5.3.03.13

5.3.03.14 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

5.3.03.14

5.3.03.15 Fully cement-grouted rock bolts, deformed bar. At the face.D=25 mm. Depth in rock 5.9 m

5.3.03.15

5.3.03.16 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

5.3.03.16

5.3.03.17 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

5.3.03.17

5.3.03.18 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

5.3.03.18

5.3.03.19 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 5.9 m

5.3.03.19

Chainlinked mesh fixed to rock bolts. At the face.

Chainlinked mesh fixed to rock bolts. Behind the face.

Welded wire fabric fixed to rock bolts. At the face.

Welded wire fabric fixed to rock bolts. Behind the face.

Steel straps fixed to rock bolts. At the face.

Steel straps fixed to rock bolts. Behind the face.

Shotcrete. Plain. At the face.

Shotcrete. Plain. Behind the face.

Shotcrete. Fibre-reinforced. At the face.

Shotcrete. Fibre-reinforced. Behind the face.

Installation of ribs of reinforced shotcrete. At the face.

Installation of ribs of reinforced shotcrete. Behind the face.

Installation of lattice girders for ribs of shotcrete. At the face.

Installation of lattice girders for ribs of shotcrete. Behind the face.

Concrete lining. Behind the face.

Additional concrete. Behind the face.

Page 128: BoQ Part 1 Version 1

5.3.03.39 5.3.03.39

5.3.03.40 5.3.03.40

5.3.03.41 Reinforcement of roof and/or walls 5.3.03.41

Invert concrete. At the face.

Invert concrete. Behind the face.

Page 129: BoQ Part 1 Version 1

Description Unit Quantity

m2 150

m2 500

m2 600

m2 500

m 400

m 400

m3 500

m3 500

m3 5,700.00

m3 3,000.00

Supply of rebars for ribs of reinforced shotcrete. kg 27,000.00m 1,100.00

m 700

Prefabrication and supply of lattice girders. kg 18,000.00m 700

m 500

m3 310

m3 30

Formwork for concrete lining, Class C m2 1,400.00

Bill No. 5 - HeadraceBill 5.3 Headrace tunnel H01 to H18

Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

no 4,500.00

Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

no 4,000.00

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

no 200.00

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

no 200.00

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

no 200.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

no 200.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

no 500.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

no 1,000.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=25 mm. Depth in rock 5.9 m

no 3,300.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

no 200.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

no 4,500.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

no 3,600.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 5.9 m

no 400.00

Chainlinked mesh fixed to rock bolts. At the face.

Chainlinked mesh fixed to rock bolts. Behind the face.

Welded wire fabric fixed to rock bolts. At the face.

Welded wire fabric fixed to rock bolts. Behind the face.

Steel straps fixed to rock bolts. At the face.

Steel straps fixed to rock bolts. Behind the face.

Shotcrete. Plain. At the face.

Shotcrete. Plain. Behind the face.

Shotcrete. Fibre-reinforced. At the face.

Shotcrete. Fibre-reinforced. Behind the face.

Installation of ribs of reinforced shotcrete. At the face.

Installation of ribs of reinforced shotcrete. Behind the face.

Installation of lattice girders for ribs of shotcrete. At the face.

Installation of lattice girders for ribs of shotcrete. Behind the face.

Concrete lining. Behind the face.

Additional concrete. Behind the face.

Page 130: BoQ Part 1 Version 1

m3 600

m3 200

Reinforcement of roof and/or walls kg 16,500.00

Invert concrete. At the face.

Invert concrete. Behind the face.

Page 131: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

14.48 2,172.00

13.1 6,550.00

10.45 6,270.00

9.51 4,755.00

42.01 16,804.00

37.89 15,156.00

300.41 150,205.00

260.72 130,360.00

363.79 2,073,603.00

315.64 946,920.00

1.8 48,600.0018.87 20,757.00

13.7 9,590.00

3.2 57,600.0071.17 49,819.00

59.43 29,715.00

190.04 58,912.40

190.04 5,701.20

136.53 191,142.00

54.35 244,575.00

65.04 260,160.00

47.72 9,544.00

52.95 10,590.00

61.32 12,264.00

49.06 9,812.00

50.65 25,325.00

61.20 61,200.00

93.00 306,900.00

43.62 8,724.00

47.74 214,830.00

54.26 195,336.00

106.50 42,600.00

Page 132: BoQ Part 1 Version 1

100.41 60,246.00

99.56 19,912.00

2.31 38,115.00

Page 133: BoQ Part 1 Version 1

Item Description Item

5.3.03.42 Reinforcement of invert. At or behind the face 5.3.03.42

5.3.04.00 INVESTIGATION AND INSTRUMENTATION. 5.3.04.005.3.04.01 Investigation and testing underground. Down time. 5.3.04.015.3.04.02 Core drilling. Set-up at each drilling location. 5.3.04.025.3.04.03 5.3.04.03

5.3.04.04 5.3.04.04

5.3.04.05 Core drilling. Hole stabilisation. Cement grouting. 5.3.04.05

5.3.04.08 Lugeon tests 5.3.04.08

5.3.04.10 Number of hydrofracture or hydraulic jacking tests 5.3.04.105.3.04.11 Convergence station. Max. 3 pins. 5.3.04.115.3.04.12 Multipoint borehole extensometer. 5.3.04.12

5.3.05.0 CONCRETE WORKS. 5.3.05.0

Sum Bill 5.3 Headrace tunnel H01 to H18 Sum

Bill No. 5 - HeadraceBill 5.3 Headrace tunnel H01 to H18

Bill No. 5 - HeadraceBill 5.3 Headrace tunnel H01 to H18

Core drilling, diameter minimum 76 mm. Depth 0-30 m

Core drilling, diameter minimum 76 mm. Depth 30-100 m

5.3.04.06 Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m 5.3.04.06

5.3.04.07 Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m 5.3.04.07

5.3.04.09 Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests 5.3.04.09

5.3.05.01 Concrete pavement. Concrete Class B. Thickness minimum 150 mm. Reinforcement mesh min 6.5 kg/m2 5.3.05.01

Page 134: BoQ Part 1 Version 1

Description Unit Quantity

Reinforcement of invert. At or behind the face kg 40,000.00

INVESTIGATION AND INSTRUMENTATION.Investigation and testing underground. Down time. hr 200Core drilling. Set-up at each drilling location. no 1

m 120

m 100

Core drilling. Hole stabilisation. Cement grouting. kg 800

Lugeon tests no 12

Number of hydrofracture or hydraulic jacking tests no 6Convergence station. Max. 3 pins. no 2Multipoint borehole extensometer. no 2

CONCRETE WORKS.

Bill 5.3 Headrace tunnel H01 to H18

Bill No. 5 - HeadraceBill 5.3 Headrace tunnel H01 to H18

Core drilling, diameter minimum 76 mm. Depth 0-30 m

Core drilling, diameter minimum 76 mm. Depth 30-100 m

Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m no 6.00

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m no 6.00

Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests no 2.00

Concrete pavement. Concrete Class B. Thickness minimum 150 mm. Reinforcement mesh min 6.5 kg/m2 m 5,668.00

Page 135: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

2.4 96,000.00

605 121,000.001,108.00 1,108.00125.06 15,007.20

171.84 17,184.00

1.9 1,520.00

1,440.00 17,280.00

961.56 5,769.363,269.62 6,539.247,612.00 15,224.00

18,812,561.81

115.56 693.36

135.56 813.36

1,140.23 2,280.46

166.49 943,665.32

Page 136: BoQ Part 1 Version 1

Item Description Item

5.4.01.0 ROCK EXCAVATION. 5.4.01.05.4.01.01 Underground. Excavation of tunnel, minimum net cross section 30.1 m2, (6m x 5.50m) 5.4.01.01

5.4.01.02 5.4.01.02

5.4.01.03 5.4.01.03

5.4.01.04 5.4.01.04

a) Addition for 1/2 blasting roundsb) Addition for 1/4 blasting rounds

5.4.01.05 5.4.01.05

5.4.01.07 5.4.01.07

5.4.01.12 Water measuring station 5.4.01.12

5.4.02.00 EXPLORATORY DRILLING AND GROUTING. 5.4.02.00

5.4.02.05 Flushing between holes. At the face. 5.4.02.055.4.02.06 Flushing between holes. Behind the face. 5.4.02.065.4.02.07 Grouting. per packer setting. Depth 0-5 m. At the face 5.4.02.075.4.02.08 Grouting. per packer setting. Depth 0-5 m. Behind the face 5.4.02.085.4.02.09 Cement grouting. Type A. Cement consumption 5.4.02.095.4.02.10 Cement grouting. Type B. Cement consumption 5.4.02.105.4.02.11 Cement grouting. Type C. Cement consumption 5.4.02.115.4.02.12 Contact grouting. Type D. 5.4.02.125.4.02.13 Grouting time. At the face 5.4.02.135.4.02.14 Grouting time. Behind the face 5.4.02.14

5.4.03.00 ROCK SUPPORT tunnel and portal 5.4.03.005.4.03.01 5.4.03.01

5.4.03.02 5.4.03.02

5.4.03.03 5.4.03.03

5.4.03.04 High pressure water flushing. Behind the face 5.4.03.04

Bill No. 5 - HeadraceBill 5.4 Headrace tunnel H18 to H31

Bill No. 5 - HeadraceBill 5.4 Headrace tunnel H18 to H31

Underground. Excavation of tunnel. Addition for increased cross-section.

Underground. Excavation of tunnel. Abnormal overbreak.

Underground. Excavation of tunnel with cross section 30.1 m2. Addition for short blasting rounds.

Underground. Excavation of tunnel.Addition for subdivision of cross-section into heading and benches.

5.4.01.06 Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required). 5.4.01.06

Underground. Excavation of tunnel. Addition for excavation of rock trap.

5.4.01.08 Underground. Water discharge.Pump out rate 1 - 2 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

5.4.01.08

5.4.01.09 Underground. Water discharge.Pump out rate 2 - 3 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

5.4.01.09

5.4.01.10 Underground. Water discharge.Pump out rate 3 - 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel.Measured on each front

5.4.01.10

5.4.01.11 Underground. Water discharge.Pump out rate more than 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

5.4.01.11

5.4.02.01 Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face 5.4.02.01

5.4.02.02 Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face 5.4.02.02

5.4.02.03 Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face 5.4.02.03

5.4.02.04 Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face 5.4.02.04

Extra scaling. At the face.

Extra scaling. Behind the face.

Invert cleaning and scaling. Behind the face.

5.4.03.05 Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

5.4.03.05

5.4.03.06 Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

5.4.03.06

5.4.03.07 Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

5.4.03.07

Page 137: BoQ Part 1 Version 1

Description Unit Quantity

ROCK EXCAVATION. EXCAVACION DE ROCA Underground. Excavation of tunnel, minimum net cross section 30.1 m2, (6m x 5.50m) m 4,215.00

m3 500

m3 1,200.00

m

a) Addition for 1/2 blasting rounds m 300b) Addition for 1/4 blasting rounds m 150

m 80

m3 600

Water measuring station no 3

EXPLORATORY DRILLING AND GROUTING.PERFORACIÓN EXPLORATORIA E INYECCION

Flushing between holes. At the face. no 130Flushing between holes. Behind the face. 15Grouting. per packer setting. Depth 0-5 m. At the face no 400Grouting. per packer setting. Depth 0-5 m. Behind the face no 40Cement grouting. Type A. Cement consumption kg 150,000.00Cement grouting. Type B. Cement consumption kg 100,000.00Cement grouting. Type C. Cement consumption kg 40,000.00Contact grouting. Type D. kg 200Grouting time. At the face hr 400Grouting time. Behind the face hr 40

ROCK SUPPORT tunnel and portal SOPORTE DE ROCA TUNEL Y PORTALhr 500

hr 1,000.00

m2 100

High pressure water flushing. Behind the face m2 100

Bill No. 5 - HeadraceBill 5.4 Headrace tunnel H18 to H31

Underground. Excavation of tunnel. Addition for increased cross-section.

Underground. Excavation of tunnel. Abnormal overbreak.

Underground. Excavation of tunnel with cross section 30.1 m2. Addition for short blasting rounds.

Underground. Excavation of tunnel.Addition for subdivision of cross-section into heading and benches.

Underground. Contour boreholes for perimeter blasting (when less than 0.7 m distance is required). m 1,000.00

Underground. Excavation of tunnel. Addition for excavation of rock trap.

Underground. Water discharge.Pump out rate 1 - 2 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

month 8.00

Underground. Water discharge.Pump out rate 2 - 3 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

month 4.00

Underground. Water discharge.Pump out rate 3 - 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel.Measured on each front

month 2.00

Underground. Water discharge.Pump out rate more than 4 m3/min. Includes the part of the tunnel excavated from Checras and the part of the tunnel excavated from Adit 1 downstream the surgetunnel. Measured on each front

month 1.00

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. At the face m 12,000.00

Percussion drilling, diameter minimum 50 mm. Depth 0 - 30 m. Behind the face m 1,200.00

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. At the face no 120.00

Water pressure testing. per packer setting. Testing with single packer. Depth 0-5 m. Behind the face no 15.00

Extra scaling. At the face.

Extra scaling. Behind the face.

Invert cleaning and scaling. Behind the face.

Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

no 1,100.00

Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

no 4,000.00

Resin end-anchored rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

no 3,500.00

Page 138: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

2,121.98 8,944,145.70

31.71 15,855.00

15.76 18,912.00

655.17 196,551.002,306.34 345,951.00855.66 68,452.80

31.71 19,026.00

2,385.50 7,156.50

30.3 3,939.0026.25 393.75

143.86 57,544.00140.23 5,609.20

1.01 151,500.002.59 259,000.007.19 287,600.00

22.57 4,514.00605 242,000.00520 20,800.00

87.62 43,810.00

69.96 69,960.00

24.34 2,434.00

9.06 906

15.23 15,230.00

9,942.33 79,538.64

12,052.57 48,210.28

14,162.81 28,325.62

16,273.05 16,273.05

15.58 186,960.00

13.55 16,260.00

73.32 8,798.40

60.68 910.20

53.27 58,597.00

54.35 217,400.00

65.04 227,640.00

Page 139: BoQ Part 1 Version 1

Item Description Item

5.4.03.19 5.4.03.19

5.4.03.20 5.4.03.20

5.4.03.21 5.4.03.21

5.4.03.22 5.4.03.22

5.4.03.23 5.4.03.23

5.4.03.24 5.4.03.24

5.4.03.25 5.4.03.25

5.4.03.26 5.4.03.26

5.4.03.27 5.4.03.27

5.4.03.28 Supply of rebars for ribs of reinforced shotcrete. 5.4.03.285.4.03.29 5.4.03.29

5.4.03.30 5.4.03.30

5.4.03.31 Prefabrication and supply of lattice girders. 5.4.03.315.4.03.32 5.4.03.32

5.4.03.33 5.4.03.33

5.4.03.34 5.4.03.34

5.4.03.35 5.4.03.35

5.4.03.36 Formwork for concrete lining, Class C 5.4.03.365.4.03.37 5.4.03.37

5.4.03.38 5.4.03.38

5.4.03.39 Reinforcement of roof and/or walls 5.4.03.395.4.03.40 Reinforcement of invert. At or behind the face 5.4.03.40

5.4.04.00 INVESTIGATION AND INSTRUMENTATION. 5.4.04.005.4.04.01 Investigation and testing underground. Down time. 5.4.04.01

Bill No. 5 - HeadraceBill 5.4 Headrace tunnel H18 to H31

Bill No. 5 - HeadraceBill 5.4 Headrace tunnel H18 to H31

5.4.03.08 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

5.4.03.08

5.4.03.09 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

5.4.03.09

5.4.03.10 Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

5.4.03.10

5.4.03.11 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

5.4.03.11

5.4.03.12 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

5.4.03.12

5.4.03.13 Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

5.4.03.13

5.4.03.14 Fully cement-grouted rock bolts, deformed bar. At the face.D=25 mm. Depth in rock 5.9 m

5.4.03.14

5.4.03.15 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

5.4.03.15

5.4.03.16 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

5.4.03.16

5.4.03.17 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

5.4.03.17

5.4.03.18 Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 5.9 m

5.4.03.18

Chainlinked mesh fixed to rock bolts. At the face.

Welded wire fabric fixed to rock bolts. At the face.

Welded wire fabric fixed to rock bolts. Behind the face.

Steel straps fixed to rock bolts. At the face.

Steel straps fixed to rock bolts. Behind the face.

Shotcrete. Plain. At the face.

Shotcrete. Plain. Behind the face.

Shotcrete. Fibre-reinforced. At the face.

Shotcrete. Fibre-reinforced. Behind the face.

Installation of ribs of reinforced shotcrete. At the face.

Installation of ribs of reinforced shotcrete. Behind the face.

Installation of lattice girders for ribs of shotcrete. At the face.

Installation of lattice girders for ribs of shotcrete. Behind the face.

Concrete lining. Behind the face.

Additional concrete. Behind the face.

Invert concrete. At the face.

Invert concrete. Behind the face.

Page 140: BoQ Part 1 Version 1

5.4.04.02 Core drilling. Set-up at each drilling location. 5.4.04.02

Page 141: BoQ Part 1 Version 1

Description Unit Quantity

m2 150

m2 500

m2 500

m 400

m 200

m3 500

m3 500

m3 5,600.00

m3 2,800.00

Supply of rebars for ribs of reinforced shotcrete. kg 22,500.00m 900

m 600

Prefabrication and supply of lattice girders. kg 15,000.00m 600

m 400

m3 200

m3 20

Formwork for concrete lining, Class C m2 850m3 600

m3 250

Reinforcement of roof and/or walls kg 10,000.00Reinforcement of invert. At or behind the face kg 40,000.00

INVESTIGATION AND INSTRUMENTATION. INVESTIGACION E INSTRUMENTACION Investigation and testing underground. Down time. hr 200

Bill No. 5 - HeadraceBill 5.4 Headrace tunnel H18 to H31

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

no 200.00

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

no 200.00

Resin end-anchored rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

no 200.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.4 m

no 200.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 2.9 m

no 450.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=20 mm. Depth in rock 3.9 m

no 1,000.00

Fully cement-grouted rock bolts, deformed bar. At the face.D=25 mm. Depth in rock 5.9 m

no 3,000.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.4 m

no 300.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 2.9 m

no 4,000.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 3.9 m

no 3,200.00

Fully cement-grouted rock bolts, deformed bar. Behind the face.D=20 mm. Depth in rock 5.9 m

no 250.00

Chainlinked mesh fixed to rock bolts. At the face.

Welded wire fabric fixed to rock bolts. At the face.

Welded wire fabric fixed to rock bolts. Behind the face.

Steel straps fixed to rock bolts. At the face.

Steel straps fixed to rock bolts. Behind the face.

Shotcrete. Plain. At the face.

Shotcrete. Plain. Behind the face.

Shotcrete. Fibre-reinforced. At the face.

Shotcrete. Fibre-reinforced. Behind the face.

Installation of ribs of reinforced shotcrete. At the face.

Installation of ribs of reinforced shotcrete. Behind the face.

Installation of lattice girders for ribs of shotcrete. At the face.

Installation of lattice girders for ribs of shotcrete. Behind the face.

Concrete lining. Behind the face.

Additional concrete. Behind the face.

Invert concrete. At the face.

Invert concrete. Behind the face.

Page 142: BoQ Part 1 Version 1

Core drilling. Set-up at each drilling location. no 1

Page 143: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

14.48 2,172.00

10.45 5,225.00

9.51 4,755.00

42.01 16,804.00

37.89 7,578.00

300.41 150,205.00

260.72 130,360.00

363.79 2,037,224.00

315.64 883,792.00

1.8 40,500.0018.87 16,983.00

13.7 8,220.00

3.2 48,000.0071.17 42,702.00

59.43 23,772.00

190.04 38,008.00

190.04 3,800.80

136.53 116,050.50100.41 60,246.00

99.56 24,890.00

2.31 23,100.002.4 96,000.00

605 121,000.00

47.72 9,544.00

52.95 10,590.00

61.32 12,264.00

49.06 9,812.00

50.65 22,792.50

61.20 61,200.00

93.00 279,000.00

43.62 13,086.00

47.74 190,960.00

54.26 173,632.00

106.50 26,625.00

Page 144: BoQ Part 1 Version 1

1,108.00 1,108.00

Page 145: BoQ Part 1 Version 1

Item Description Item

5.4.04.03 5.4.04.03

5.4.04.04 5.4.04.04

5.4.04.05 Core drilling. Hole stabilisation. Cement grouting. 5.4.04.05

5.4.04.08 Lugeon tests 5.4.04.08

5.4.04.10 Number of hydrofracture or hydraulic jacking tests 5.4.04.105.4.04.11 Convergence station. Max. 3 pins. 5.4.04.115.4.04.12 Multipoint borehole extensometer. 5.4.04.12

5.4.05.0 CONCRETE WORKS. 5.4.05.05.4.05.01 Formwork Class B. Plain. Lining from rocktrap to cone including transissions 5.4.05.015.4.05.02 Concrete Class C. 5.4.05.025.4.05.03 Reinforcement. Deformed bars. 5.4.05.035.4.05.04 Reinforcement. Welded mesh 5.4.05.045.4.05.05 Grouted rock bolts D = 25 mm, depth in rock 2.5 m depth in concrete 1 m 5.4.05.05

5.4.05.06 5.4.05.06

Sum Bill 5.4 Headrace tunnel H18 to H31 Sum

Bill No. 5 - HeadraceBill 5.4 Headrace tunnel H18 to H31

Bill No. 5 - HeadraceBill 5.4 Headrace tunnel H18 to H31

Core drilling, diameter minimum 76 mm. Depth 0-30 m

Core drilling, diameter minimum 76 mm. Depth 30-100 m

5.4.04.06 Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m 5.4.04.06

5.4.04.07 Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m 5.4.04.07

5.4.04.09 Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests 5.4.04.09

Concrete pavement. Concrete Class B. Thickness minimum 150 mm. Reinforcementmesh min 6.5 kg/m2

Page 146: BoQ Part 1 Version 1

Description Unit Quantity

m 120

m 100

Core drilling. Hole stabilisation. Cement grouting. kg 800

Lugeon tests no 12

Number of hydrofracture or hydraulic jacking tests no 3Convergence station. Max. 3 pins. no 2Multipoint borehole extensometer. no 2

CONCRETE WORKS. OBRAS DE CONCRETOFormwork Class B. Plain. Lining from rocktrap to cone including transissions m2 900Concrete Class C. m3 560Reinforcement. Deformed bars. t 14Reinforcement. Welded mesh t 0.5Grouted rock bolts D = 25 mm, depth in rock 2.5 m depth in concrete 1 m no 80

m 4,215.00

Bill 5.4 Headrace tunnel H18 to H31

Bill No. 5 - HeadraceBill 5.4 Headrace tunnel H18 to H31

Core drilling, diameter minimum 76 mm. Depth 0-30 m

Core drilling, diameter minimum 76 mm. Depth 30-100 m

Packer setting for water pressure test. Testing concurrent with drilling (single packer). Depth 0-100 m no 6.00

Packer setting for water pressure test. Testing after completed drilling (double packer). Depth 0-100 m no 6.00

Mobilisation/demobilisation of experts and equipment for hydrofracture and hydraulic jacking tests no 1.00

Concrete pavement. Concrete Class B. Thickness minimum 150 mm. Reinforcementmesh min 6.5 kg/m2

Page 147: BoQ Part 1 Version 1

Unit Price Total PriceUSD USD

125.06 15,007.20

171.84 17,184.00

1.9 1,520.00

1,440.00 17,280.00

961.56 2,884.683,269.62 6,539.247,612.00 15,224.00

67.26 60,534.00142.91 80,029.601,459.67 20,435.382,812.50 1,406.25

77.22 6,177.60

167.18 704,663.70

17,333,736.54

115.56 693.36

135.56 813.36

1,140.23 1,140.23

Page 148: BoQ Part 1 Version 1

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

7.1.01.0 ROCA EXCAVACIÓN.

7.1.01.01 m 101 3,623.00 365,923.00

7.1.01.02 m3 50 31.71 1,585.50

7.1.01.03 m3 25 15.76 394

7.1.01.04 mes 1 9,942.33 9,942.33

7.1.01.05 mes 0.5 12,052.57 6,026.29

7.1.01.06 mes 0.5 14,162.81 7,081.41

7.1.01.07 no 2 2,385.50 4,771.00

7.1.02.00

7.1.02.01 m 300 15.58 4,674.00

7.1.02.02 m 1,100.00 13.55 14,905.00

Proyecto de Ley No. 7 - acero forrado tubería forzada, H31 como Powerhouse caverna

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Underground. La excavación del túnel. De diámetro de acero forro entre el cono de admisión y bifurcación 2,4 m, diámetro de acero de revestimiento entre la bifurcación y entrada de la turbina tubo de 2,0 m. Sección transversal de la excavación para ser recomendado por contracto r . Tasa independiente de la subdivisión de corte transversal.

Underground. La excavación del túnel. La adición de una mayor sección transversal.

Underground. La excavación del túnel. Desmonte excesivo anormal.

Underground. La descarga de agua. 

Bombear tasa de 1 -. 2 m3 / min Incluye también se descarga de las vías fluviales y otras cavidades excavadas en este túnel

Underground. La descarga de agua. 

Bombear tasa. 2 - 3 m3 / min Incluye también se descarga de las vías fluviales y otras cavidades excavadas en este túnel

Underground. La descarga de agua. 

Bombear tasa. 3 - 4 m3 / min Incluye también se descarga de las vías fluviales y otras cavidades excavadas en este túnel

Estación de medición de agua

La perforación exploratoria e inyección.

Perforación de percusión, el diámetro mínimo de 50 mm de profundidad 0 -. 30 m en la cara.

Perforación de percusión, el diámetro mínimo de 50 mm de profundidad 0 -. 30 m Detrás de la cara.

Page 149: BoQ Part 1 Version 1

7.1.02.03 no 10 73.32 733.2

7.1.02.04 no 40 60.68 2,427.20

7.1.02.05 no 10 30.3 303

7.1.02.06 20 26.25 525

7.1.02.07 no 15 143.86 2,157.90

7.1.02.08 no 60 140.23 8,413.80

7.1.02.09 kg 10,000.00 1.01 10,100.00

7.1.02.10 kg 9,000.00 2.59 23,310.00

7.1.02.11 kg 2,000.00 7.19 14,380.00

7.1.02.12 kg 3,000.00 1.9 5,700.00

7.1.02.13 m 250 31.11 7,777.50

7.1.02.14 kg 1,000.00 22.57 22,570.00

7.1.02.15 kg 1,500.00 26.23 39,345.00

7.1.02.16 hr 20 605 12,100.00

7.1.02.17 hr 50 520 26,000.00

7.1.03.00 APOYO DEL ROCK

7.1.03.01 hr 10 87.62 876.2

7.1.03.02 hr 10 69.96 699.6

7.1.03.03 m2 350 24.34 8,519.00

7.1.03.04 m2 500 9.06 4,530.00

7.1.03.05 no 60 53.27 3,196.20

7.1.03.06 no 50 54.35 2,717.50

Pruebas de presión de agua. Por valor de empacador. Prueba con solo empacador. Profundidad 0-5 m. En la cara

Pruebas de presión de agua. Por valor de empacador. Prueba con solo empacador. Profundidad 0-5 m. Detrás de la cara

El lavado entre los agujeros. En la cara.

El lavado entre los agujeros. Detrás de la cara.

Lechada. Por valor de empacador. Profundidad 0-5 m. En la cara

Lechada. Por valor de empacador. Profundidad 0-5 m. Detrás de la cara

Lechada de cemento. Tipo de consumo A. Cemento

Lechada de cemento. Tipo consumo B. Cemento

Lechada de cemento. Escriba C. El consumo de cemento

Inyecciones de consolidación.

Tubos flexibles para contacto lechada.

Contacto mampostería. Escriba D.

Contacto mampostería. Tipo E.

Tiempo de la lechada. En la cara

Tiempo de la lechada. Detrás de la cara

Escalamiento Extra. En la cara.

Escalamiento Extra. Detrás de la cara.

Invierta limpieza y escalamiento. Detrás de la cara.

Alta presión de descarga de agua. Detrás de la cara

Anclado final Resina pernos de roca, barra corrugada. En la cara. 

D = 20 mm. De profundidad en la roca 2,4 m

Anclado final Resina pernos de roca, barra corrugada. En la cara. 

Page 150: BoQ Part 1 Version 1

7.1.03.06 no 50 54.35 2,717.50

7.1.03.07 no 10 65.04 650.4

7.1.03.08 no 10 47.72 477.2

7.1.03.09 no 10 52.95 529.5

7.1.03.10 no 5 61.32 306.6

7.1.03.11 no 5 49.06 245.3

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

7.1.03.12 no 5 50.65 253.25

7.1.03.13 no 20 61.2 1,224.00

7.1.03.14 no 50 93 4,650.00

7.1.03.15 no 55 43.62 2,399.10

D = 20 mm. De profundidad en la roca 2,9 m

Anclado final Resina pernos de roca, barra corrugada. En la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Final anclados Resina pernos de roca, barra corrugada. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 2,4 m

Final anclados Resina pernos de roca, barra corrugada. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 2,9 m

Final anclados Resina pernos de roca, barra corrugada. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 20 mm. De profundidad en la roca 2,4 m

Proyecto de Ley No. 7 - acero forrado tubería forzada, H31 como Powerhouse caverna

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 20 mm. De profundidad en la roca 2,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 25 mm. De profundidad en la roca 5,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 2,4 m

Page 151: BoQ Part 1 Version 1

7.1.03.16 no 50 47.74 2,387.00

7.1.03.17 no 5 54.26 271.3

7.1.03.18 no 5 106.5 532.5

7.1.03.19 m2 50 14.48 724

7.1.03.20 m2 0

7.1.03.21 m2 10 10.45 104.5

7.1.03.22 m2 10 9.51 95.1

7.1.03.23 m 10 42.01 420.1

7.1.03.24 m 10 37.89 378.9

7.1.03.25 m3 10 300.41 3,004.10

7.1.03.26 m3 10 260.72 2,607.20

7.1.03.27 m3 80 363.79 29,103.20

7.1.03.28 m3 25 315.64 7,891.00

7.1.03.29 kg 300 1.8 540

7.1.03.30 m 12 18.87 226.44

7.1.03.31 m 8 13.7 109.6

7.1.03.32 kg 200 3.2 640

7.1.03.33 m 8 71.17 569.36

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 2,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 5,9 m

Malla Chainlinked fijado para el rock pernos. En la cara.

Malla Chainlinked fijado para el rock pernos. Detrás de la cara.

Mallazo fija a pernos de anclaje. En la cara.

Mallazo fija a pernos de anclaje. Detrás de la cara.

Correas de acero fijados a pernos de anclaje. En la cara.

Correas de acero fijados a pernos de anclaje. Detrás de la cara.

El hormigón proyectado. Plain. En la cara.

El hormigón proyectado. Plain. Detrás de la cara.

El hormigón proyectado. De fibra reforzada. En la cara.

El hormigón proyectado. De fibra reforzada. Detrás de la cara.

Suministro de barras de refuerzo para las costillas de hormigón proyectado reforzado.

La instalación de las costillas de hormigón proyectado reforzado. En la cara.

La instalación de las costillas de hormigón proyectado reforzado. Detrás de la cara.

Prefabricación y suministro de vigas de celosía.

La instalación de vigas de celosía para costillas de hormigón proyectado. En la cara.

Page 152: BoQ Part 1 Version 1

7.1.03.34 m 5 59.43 297.15

7.1.03.35 m3 10 100.41 1,004.10

7.1.03.36 kg 500 2.4 1,200.00

7.1.04.00

7.1.04.01 hr 60 605 36,300.00

7.1.04.02 no 2 1,108.00 2,216.00

7.1.04.03 m 90 125.06 11,255.40

7.1.04.04 m 80 171.84 13,747.20

7.1.04.05 kg 500 1.01 505

7.1.04.06 no 4 115.56 462.24

7.1.04.07 no 4 135.56 542.24

7.1.04.08 Pruebas Lugeon no 8 1,440.00 11,520.00

7.1.04.09 no 2 3,269.62 6,539.24

7.1.04.10 no 2 7,612.00 15,224.00

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

7.1.05.00

7.1.05.01 m2 100 136.53 13,653.00

7.1.05.02 m2 60 136.53 8,191.80

7.1.05.03 m3 100 142.91 14,291.00

7.1.05.04 t 2 1,459.67 2,919.34

La instalación de vigas de celosía para costillas de hormigón proyectado. Detrás de la cara.

Invierta concreto. En la cara.

Refuerzo de invertido. En o detrás de la cara

INVESTIGACIÓN E INSTRUMENTACIÓN.

Investigación y pruebas subterráneas. Tiempo de inactividad.

Perforación de base. Puesta en marcha en cada lugar de perforación.

Perforación de base, diámetro mínimo de 76 mm. De profundidad de 0-30 m

Perforación de base, diámetro mínimo de 76 mm. De profundidad 30-100 m

Perforación de base. Estabilización Hole. Lechada de cemento.

Ajuste Packer para la prueba de presión de agua. Prueba concurrente con la perforación (single envasador). Profundidad 0-100 m

Ajuste Packer para la prueba de presión de agua. Prueba de perforación después de completado (doble packer). Profundidad 0-100 m

Estación de Convergencia. Max. 3 pines.

Multipunto extensómetro pozo.

Proyecto de Ley No. 7 - acero forrado tubería forzada, H31 como Powerhouse caverna

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

OBRAS DE CONCRETO.

Encofrado Clase B. Plain. Cono de entrada

Encofrado Clase B. curvada. Cono de entrada

Clase de hormigón C. Cono Inlet

Refuerzo. Barras corrugadas.

Page 153: BoQ Part 1 Version 1

7.1.05.05 m 47 7,305.90 343,377.30

7.1.05.06 m 54 5,844.72 315,614.88

7.1.06.00

7.1.06.01 m2 100 3.59 359

7.1.06.02

1,0 m

7.1.06.03 no 30 77.22 2,316.60

7.1.06.04 no 10 88.36 883.6

7.1.06.05

no 100 6.66 666

no 60 11.14 668,4

no 50 17.63 881.5

7.1.06.06 LS 1 4,025.40 4,025.40

7.1.06.07 LS 1 66,270.00 66,270.00

Penstock empotramiento revestimiento, 

túnel con tubo de D = 2,4 m. Hormigón Clase C

Penstock empotramiento revestimiento, 

túnel con tubo de D = 2,0 m. Hormigón Clase C

ACCIONES PARA LA INSTALACIÓN DE FORRO DE ACERO Y REJUNTADO DE ÁREA DEL CONO

Preparación de superficie de la roca para el hormigonado en el área del cono

Lechada pernos de anclaje para el anclaje de apoyo concreto, D = 25 mm. Longitud en concreto 

a) La profundidad en la roca 3,0 m

b) Profundidad en la roca 4,0 m

Pernos de anclaje con lechada de calidad soldable para la fijación del revestimiento tubería forzada

a) D = 25 mm, profundidad en la roca 1,0 m

b) D = 25 mm, profundidad en la roca 2,0 m

c) D = 32 mm, profundidad en la roca 2,0 m

Instalación del estante de piedra delante de cono de entrada, aprox. (Alto x ancho) 1,0 mx 4,5 m

Interfaz con H en el montaje de la tubería de carga en el túnel. Se hace referencia a los documentos H-tiernas. 

En esta partida se incluyen los trabajos relacionados con el montaje de la tubería de carga en el túnel que no están incluidos en otras partidas, en coordinación con la H-contratista en su transporte y el trabajo, etc.

Page 154: BoQ Part 1 Version 1

Suma 1,546,953.67

Bill 8.1 Acceso Túnel

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

8.1.01.0 TIERRA DE OBRAS.

8.1.01.01 ja 1 9,990.00 9,990.00

8.1.01.02 Excavación del suelo

m3 1,500.00 6.14 9,210.00

m3 50 6.14 307

8.1.01.03 m2 50 3.59 179.5

8.1.01.04 Llenar y rellenar

a) No se utiliza

b) relleno estructural m3 200 15.92 3,184.00

m3 200 23.68 4,736.00

m3 100 14.89 1,489.00

8.1.01.05 Encespado (opcional) m2 200 0.32 64

8.1.02.0 OBRAS VIALES.

8.1.02.01 m2 3,800.00 46.04 174,952.00

8.1.02.02 m3 800 9.37 7,496.00

8.1.03.0 ROCA EXCAVACIÓN.

8.1.03.01 m3 200 29.66 5,932.00

8.1.03.02 m 150 21.76 3,264.00

Proyecto de Ley No. 7 - acero forrado tubería forzada, H31 como Powerhouse caverna

Proyecto de Ley No. 8 - Casa de Máquinas y Acceso Túnel 

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

El apoyo de la roca en el portal se considerará y se mide como el trabajo de apoyo detrás de la cara

Compensación y arranque

a) Excavación para estropear depósito

b) La excavación de zapatas / estructuras

Preparación de la fundación de la roca para el hormigonado

c) Alta calidad de escollera

d) El relleno de las zanjas

Concreto pavimento en túnel, el tipo de hormigón C, espesor mínimo de 200 mm, tratamiento de superficies UB, refuerzo min 12,0 kg / m2

Placa de conexión por debajo del pavimento de hormigón, espesor 100 mm

En la tierra. Excavación a granel roca (anchura> 2 m).

En la tierra. Barrenos de contorno perimetral para voladuras (cuando menos de 0,7 m 

Page 155: BoQ Part 1 Version 1

8.1.03.02

Se requiere distancia).

m 150 21.76 3,264.00

8.1.03.03 m3 20 14.2 284

8.1.03.04 m 960 2,582.81 2,479,497.60

8.1.03.05 m3 150 31.71 4,756.50

8.1.03.06 m3 300 15.76 4,728.00

8.1.03.07

m 60 727.4 43,644.00

m 40 2,502.70 100,108.00

8.1.03.08 m 20 855.66 17,113.20

8.1.03.09 m 200 15.23 3,046.00

se requiere).

8.1.03.10 mes 12 9,942.33 119,307.96

8.1.03.11 mes 4 12,052.57 48,210.28

8.1.03.12 mes 2 14,162.81 28,325.62

8.1.03.13 mes 1 16,273.05 16,273.05

8.1.03.14 no 4 2,385.50 9,542.00

En la tierra. Roca excavación. 

Desmonte excesivo anormal.

Underground. La excavación del túnel. Sección transversal 41 m2, (7.30m 6.00mx), zanja incl

Underground. La excavación del túnel. La adición de una mayor sección transversal.

Underground. La excavación del túnel. 

Desmonte excesivo anormal.

Underground. La excavación del túnel. La adición de rondas de voladura cortos.

a) Adición de medio rondas de voladura

b) Adición de cuarta rondas de voladura

Además para la subdivisión de la sección transversal en el rumbo y bancos

Subterráneas. Perforaciones contorno perimetral para voladuras (cuando menos de 0,7 m de distancia 

Underground. La descarga de agua. 

Bombear tasa de 1 - 2 m3 / min. Incluye las descargas de las vías fluviales y otras cavidades excavadas en este túnel (incluido, pero no limitado a, casa de máquinas, túnel de presión y

Underground. La descarga de agua. 

Bombear tasa de 2-3 m3 / min Incluye altas por vías fluviales y otras cavidades excavadas en este túnel.

Underground. La descarga de agua. 

Bombear tasa de 3-4 m3 / min Incluye altas por vías fluviales y otras cavidades excavadas en este túnel.

Underground. La descarga de agua. 

Bombear tasa de más de 4 m3 / min.Includes descarga de las vías fluviales y otras cavidades excavadas en este túnel

Estación de medición de agua

Page 156: BoQ Part 1 Version 1

8.1.04.00

8.1.04.01 m 1,600.00 15.58 24,928.00

8.1.04.02 m 200 13.55 2,710.00

8.1.04.03 no 16 73.32 1,173.12

8.1.04.04 no 2 60.68 121.36

8.1.04.05 no 16 30.3 484.8

8.1.04.06 no 2 26.25 52.5

8.1.04.07 no 30 143.86 4,315.80

8.1.04.08 no 5 140.23 701.15

8.1.04.09 kg 20,000.00 1.01 20,200.00

8.1.04.10 kg 10,000.00 2.59 25,900.00

8.1.04.11 kg 5,000.00 7.19 35,950.00

8.1.04.12 kg 100 23.71 2,371.00

8.1.04.13 kg 1,000.00 1.9 1,900.00

8.1.04.14 hr 50 605 30,250.00

8.1.04.15 hr 10 520 5,200.00

Bill 8.1 Acceso Túnel

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

8.1.05.00

La perforación exploratoria e inyección.

Perforación de percusión, el diámetro mínimo de 50 mm de profundidad 0 -. 30 m en la cara.

Perforación de percusión, el diámetro mínimo de 50 mm de profundidad 0 -. 30 m Detrás de la cara.

Pruebas de presión de agua. Por valor de empacador. Prueba con solo empacador. Profundidad 0-5 m. En la cara

Pruebas de presión de agua. Por valor de empacador. Prueba con solo empacador. Profundidad 0-5 m. Detrás de la cara

El lavado entre los agujeros. En la cara.

El lavado entre los agujeros. Detrás de la cara.

Lechada. Por valor de empacador. Profundidad 0-5 m. En la cara

Lechada. Por valor de empacador. Profundidad 0-5 m. Detrás de la cara

Lechada de cemento. Tipo de consumo A. Cemento

Lechada de cemento. Tipo consumo B. Cemento

Lechada de cemento. Escriba C. El consumo de cemento

Lechada química. Escriba D. consumo lechada peso seco

Inyecciones de consolidación.

Tiempo de la lechada. En la cara

Tiempo de la lechada. Detrás de la cara

Proyecto de Ley No. 8 - Casa de Máquinas y Acceso Túnel 

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

ROCA túnel APOYO y portal

Page 157: BoQ Part 1 Version 1

8.1.05.01 1 100,000.00 100,000.00

8.1.05.02 hr 100 87.62 8,762.00

8.1.05.03 hr 150 69.96 10,494.00

8.1.05.04 m2 200 24.34 4,868.00

8.1.05.05 m2 500 9.06 4,530.00

8.1.05.06 no 800 54.35 43,480.00

8.1.05.07 no 800 65.04 52,032.00

8.1.05.08 no 150 80.22 12,033.00

8.1.05.09 no 50 52.95 2,647.50

8.1.05.10 no 60 61.32 3,679.20

8.1.05.11 no 40 73.74 2,949.60

8.1.05.12 no 50 50.65 2,532.50

8.1.05.13 no 300 61.2 18,360.00

8.1.05.14 no 300 71.44 21,432.00

Instalación temporal de protección contra caídas de roca en el portal. Diseño Contratistas

Prov. Suma

Escalamiento Extra. En la cara.

Escalamiento Extra. Detrás de la cara.

Invierta limpieza y escalamiento. Detrás de la cara.

Alta presión de descarga de agua. Detrás de la cara

Anclado final Resina pernos de roca, barra corrugada. En la cara. 

D = 20 mm. De profundidad en la roca 2,9 m

Anclado final Resina pernos de roca, barra corrugada. En la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Anclado final Resina pernos de roca, barra corrugada. En la cara. 

D = 20 mm. De profundidad en la roca 4,9 m

Final anclados Resina pernos de roca, barra corrugada. Detrás de la cara. 

D = 20 mm. De profundidad en roca 2.9m

Final anclados Resina pernos de roca, barra corrugada. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Final anclados Resina pernos de roca, barra corrugada. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 4,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 20 mm. De profundidad en la roca 2,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

Page 158: BoQ Part 1 Version 1

8.1.05.14 no 300 71.44 21,432.00

8.1.05.15 no 600 93 55,800.00

8.1.05.16 no 700 47.74 33,418.00

8.1.05.17 no 800 54.26 43,408.00

8.1.05.18 no 500 67.87 33,935.00

8.1.05.19 no 50 106.5 5,325.00

8.1.05.20 m2 50 14.48 724

8.1.05.21 m2 500 13.1 6,550.00

8.1.05.22 m2 100 10.45 1,045.00

8.1.05.23 m2 100 9.51 951

8.1.05.24 m 100 42.01 4,201.00

8.1.05.25 m 500 37.89 18,945.00

8.1.05.26 m3 70 300.41 21,028.70

8.1.05.27 m3 40 260.72 10,428.80

8.1.05.28 m3 1,400.00 363.79 509,306.00

8.1.05.29 m3 700 315.64 220,948.00

8.1.05.30 kg 5,000.00 1.8 9,000.00

D = 20 mm. De profundidad en la roca 4,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 25 mm. De profundidad en la roca 5,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 2,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 4,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 5,9 m

Malla Chainlinked fijado para el rock pernos. En la cara.

Malla Chainlinked fijado para el rock pernos. Detrás de la cara.

Mallazo fija a pernos de anclaje. En la cara.

Mallazo fija a pernos de anclaje. Detrás de la cara.

Correas de acero fijados a pernos de anclaje. En la cara.

Correas de acero fijados a pernos de anclaje. Detrás de la cara.

El hormigón proyectado. Plain. En la cara.

El hormigón proyectado. Plain. Detrás de la cara.

El hormigón proyectado. De fibra reforzada. En la cara.

El hormigón proyectado. De fibra reforzada. Detrás de la cara.

Suministro de barras de refuerzo para las costillas de hormigón proyectado reforzado.

Page 159: BoQ Part 1 Version 1

8.1.05.31 m 200 18.87 3,774.00

8.1.05.32 m 100 13.7 1,370.00

8.1.05.33 kg 3,300.00 3.2 10,560.00

8.1.05.34 m 120 71.17 8,540.40

8.1.05.35 m 100 59.43 5,943.00

8.1.05.36 m3 50 190.04 9,502.00

8.1.05.37 m3 5 190.04 950.2

8.1.05.38 m2 230 136.53 31,401.90

8.1.05.39 m3 80 100.41 8,032.80

En la cara.

Bill 8.1 Acceso Túnel

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

8.1.05.40 m3 40 99.56 3,982.40

8.1.05.41 kg 2,500.00 2.31 5,775.00

8.1.05.42 kg 6,000.00 2.4 14.400,00

8.1.06.00

8.1.06.01 hr 300 605 181,500.00

8.1.06.02 no 6 1,108.00 6,648.00

8.1.06.03 m 420 125.06 52,525.20

8.1.06.04 m 140 171.84 24,057.60

8.1.06.05 kg 2,500.00 1.9 4,750.00

La instalación de las costillas de hormigón proyectado reforzado. En la cara.

La instalación de las costillas de hormigón proyectado reforzado. Detrás de la cara.

Prefabricación y suministro de vigas de celosía.

La instalación de vigas de celosía para costillas de hormigón proyectado. En la cara.

La instalación de vigas de celosía para costillas de hormigón proyectado. Detrás de la cara.

Revestimiento de hormigón. Detrás de la cara.

Hormigón adicional. Detrás de la cara.

Encofrado para revestimiento de hormigón, Clase C

Hormigón Invertir. 

Proyecto de Ley No. 8 - Casa de Máquinas y Acceso Túnel 

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Invierta concreto. Detrás de la cara.

Refuerzo del techo y / o paredes

Refuerzo de invertido. En o detrás de la cara

INVESTIGACIÓN E INSTRUMENTACIÓN.

Investigación y pruebas subterráneas. Tiempo de inactividad.

Perforación de base. Puesta en marcha en cada lugar de perforación.

Perforación de base, diámetro mínimo de 76 mm. De profundidad de 0-30 m

Perforación de base, diámetro mínimo de 76 mm. De profundidad 30-100 m

Perforación de base. Estabilización Hole. Lechada de cemento.

Page 160: BoQ Part 1 Version 1

8.1.06.06 no 100 115.56 11,556.00

8.1.06.07 no 10 135.56 1,355.60

8.1.06.08 Pruebas Lugeon no 70 1,440.00 100,800.00

8.1.06.09 no 2 1,210.56 2,421.12

8.1.06.10 no 3 1,140.23 3,420.69

8.1.06.11 no 4 5,160.00 20,640.00

8.1.06.12 no 16 961.56 15,384.96

8.1.06.13 no 6 3,269.62 19,617.72

8.1.06.14 no 5 7,612.00 38,060.00

8.1.07.0

8.1.07.01 m 2,000.00 8.92 17,840.00

8.1.08.0

8.1.08.01 m2 1,500.00 67.26 100,890.00

8.1.08.02 m2 50 96.29 4,814.50

8.1.08.03 m2 350 4.65 1,627.50

8.1.08.04 m2 60 4.85 291

8.1.08.05 Hormigón Clase C. m3 650 142.91 92,891.50

8.1.08.06 t 50 1,459.67 72,983.50

8.1.08.07 t 0.5 2,812.50 1,406.25

Ajuste Packer para la prueba de presión de agua. Prueba concurrente con la perforación (single envasador). Profundidad 0-100 m

Ajuste Packer para la prueba de presión de agua. Prueba de perforación después de completado (doble packer). Profundidad 0-100 m

Movilización / desmovilización de expertos y equipo para mediciones de tensión en 3 dimensiones

Movilización / desmovilización de expertos y equipo a hydrofracture y pruebas de gato hidráulico

Número de mediciones de tensión en 3 dimensiones

Número de hydrofracture o pruebas de gato hidráulico

Estación de Convergencia. Max. 3 pines.

Multipunto extensómetro pozo.

ALCANTARILLAS tubería y tubos de desagüe.

Drainpipe PVC, D = 100 mm en túnel, incl. Tubos de acceso cada 60 m, articulaciones, excavación y relleno.

OBRAS DE CONCRETO.

Estructura de entrada, conductos y alcantarillas cable.

Encofrado Clase B. Plain. Inclinada o vertical.

Encofrado Clase B. curvada.

El acabado de superficies no formadas, UB Clase.

El acabado de superficies no formadas, clase UC.

Refuerzo. Barras corrugadas.

Refuerzo. Mallas soldadas

Page 161: BoQ Part 1 Version 1

8.1.08.08 no 30 77.22 2,316.60

1 m

8.1.08.09 m 970 183.22 177,723.40

8.1.09.0 METAL WORKS.

8.1.09.01 kg 2,000.00 6.34 12,680.00

8.1.09.02 kg 2,000.00 6.34 12,680.00

8.1.09.03 no 1,200.00 27.28 32,736.00

8.1.09.04 Escaleras de acero. kg 300 7.01 2,103.00

8.1.09.05 no 1 6,108.00 6,108.00

8.1.09.06 no 1 4,275.00 4,275.00

8.1.10.0

8.1.10.01 m 2,000.00 21.34 42,680.00

8.1.10.02 no 150 230.3 34,545.00

Suma Bill 8.1 Acceso Túnel 5,722,270.58

Bill 8,2 socavón Construcción de túnel de descarga

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

8.2.01.0 ROCA EXCAVACIÓN.

Pernos de anclaje con lechada para muros de hormigón D = 25 mm, profundidad en la roca 1,5 m departamento en concreto 

Cable de alcantarillas, conductos prefabricados de hormigón con recubrimiento de hormigón desmontable con carga de diseño de 15 kN / m2, incluyendo ganchos de elevación y relleno.

Para trabajo pesado fundido y de hierro para alcantarilla de drenaje

Cubierta del conducto de alta resistencia para alcantarilla cable

Los pernos de anclaje para escaleras de cable, rallado, aptos para soldadura, longitud de 2 m, 1 m de roca.

Puertas de acero individuales. Dimensiones externas 1000x2100mm

Puerta de entrada, doble, lado bisagras de puerta plegable de aluminio, 5,5 mx 5,5 m

OBRAS CIVILES VARIOS

Tomas de tierra enterrados. Hilos de cobre 1 x 95 mm2. En el túnel

Cadwelding de juntas, conexiones e intersecciones

Proyecto de Ley No. 8 - Casa de Máquinas y Acceso Túnel 

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Page 162: BoQ Part 1 Version 1

8.2.01.01 m 150 1,533.80 230,070.00

8.2.01.02 m3 50 31.71 1,585.50

8.2.01.03 m3 30 15.76 472.8

8.2.01.04

m 10 363.92 3,639.20

m 10 1,766.92 17,669.20

8.2.01.05 mes 4 9,942.33 39,769.32

8.2.01.06 mes 2 12,052.57 24,105.14

8.2.01.07 mes 1 14,162.81 14,162.81

8.2.01.08 mes 1 16,273.05 16,273.05

8.2.01.09 no 1 2,385.50 2,385.50

8.2.02.00

8.2.02.01 m 250 15.58 3,895.00

8.2.02.02 m 50 13.55 677.5

8.2.02.03 no 3 73.32 219.96

Underground. La excavación del túnel. Sección mínima de 22,6 m2.

Underground. La excavación del túnel. 

Además de una mayor sección transversal.

Underground. La excavación del túnel. Desmonte excesivo anormal.

Underground. La excavación del túnel. La adición de rondas de voladura cortos.

a) Adición de medio rondas de voladura

b) incoporacion por cuarta rondas de voladura

Underground. La descarga de agua. 

Bombear tasa de 1 -. 2 m3 / min Incluye también se descarga de las vías fluviales y otras cavidades excavadas en este túnel

Underground. La descarga de agua. 

Bombear tasa. 2 - 3 m3 / min Incluye también se descarga de las vías fluviales y otras cavidades excavadas en este túnel

Underground. La descarga de agua. 

Bombear tasa. 3 - 4 m3 / min Incluye también se descarga de las vías fluviales y otras cavidades excavadas en este túnel

Underground. La descarga de agua. 

Bombear tasa de más de 4 m3 / min. Incluye también se descarga de las vías fluviales y otras cavidades excavadas en este túnel

Estación de medición de agua

La perforación exploratoria e inyección.

Perforación de percusión, el diámetro mínimo de 50 mm de profundidad 0 -. 30 m en la cara.

Perforación de percusión, el diámetro mínimo de 50 mm de profundidad 0 -. 30 m Detrás de la cara.

Pruebas de presión de agua. Por valor de empacador. Prueba con solo empacador. Profundidad 0-5 m. En la cara

Page 163: BoQ Part 1 Version 1

8.2.02.04 no 1 60.68 60.68

8.2.02.05 no 3 30.3 90.9

8.2.02.06 1 26.25 26.25

8.2.02.07 no 10 143.86 1,438.60

8.2.02.08 no 5 140.23 701.15

8.2.02.09 kg 3,000.00 1.01 3,030.00

8.2.02.10 kg 2,000.00 2.59 5,180.00

8.2.02.11 kg 1,000.00 7.19 7,190.00

8.2.02.12 kg 100 23.71 2,371.00

8.2.02.13 hr 10 605 6,050.00

8.2.02.14 hr 10 520 5,200.00

8.2.03.00 APOYO DEL ROCK

8.2.03.01 hr 10 87.62 876.2

8.2.03.02 hr 10 69.96 699.6

8.2.03.03 m2 100 24.34 2,434.00

8.2.03.04 m2 100 9.06 906

8.2.03.05 no 80 53.27 4,261.60

8.2.03.06 no 90 54.35 4,891.50

8.2.03.07 no 50 65.04 3,252.00

Pruebas de presión de agua. Por valor de empacador. Prueba con solo empacador. Profundidad 0-5 m. Detrás de la cara

El lavado entre los agujeros. En la cara.

El lavado entre los agujeros. Detrás de la cara.

Lechada. Por valor de empacador. Profundidad 0-5 m. En la cara

Lechada. Por valor de empacador. Profundidad 0-5 m. Detrás de la cara

Lechada de cemento. Tipo de consumo A. Cemento

Lechada de cemento. Tipo consumo B. Cemento

Lechada de cemento. Escriba C. El consumo de cemento

Lechada química. Escriba D. consumo lechada peso seco

Tiempo de la lechada. En la cara

Tiempo de la lechada. Detrás de la cara

Escalamiento Extra. En la cara.

Escalamiento Extra. Detrás de la cara.

Invierta limpieza y escalamiento. Detrás de la cara.

Alta presión de descarga de agua. Detrás de la cara

Anclado final Resina pernos de roca, barra corrugada. En la cara. 

D = 20 mm. De profundidad en la roca 2,4 m

Anclado final Resina pernos de roca, barra corrugada. En la cara. 

D = 20 mm. De profundidad en la roca 2,9 m

Anclado final Resina pernos de roca, barra corrugada. En la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Page 164: BoQ Part 1 Version 1

8.2.03.08 no 10 47.72 477.2

8.2.03.09 no 10 52.95 529.5

8.2.03.10 no 5 61.32 306.6

8.2.03.11 no 5 49.06 245.3

Bill 8,2 socavón Construcción de túnel de descarga

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

8.2.03.12 no 60 50.65 3,039.00

8.2.03.13 no 60 61.2 3,672.00

8.2.03.14 no 90 93 8,370.00

8.2.03.15 no 5 43.62 218.1

8.2.03.16 no 120 47.74 5,728.80

Final anclados Resina pernos de roca, barra corrugada. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 2,4 m

Final anclados Resina pernos de roca, barra corrugada. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 2,9 m

Final anclados Resina pernos de roca, barra corrugada. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 20 mm. De profundidad en la roca 2,4 m

Proyecto de Ley No. 8 - Casa de Máquinas y Acceso Túnel 

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 20 mm. De profundidad en la roca 2,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 25 mm. De profundidad en la roca 5,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 2,4 m

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 2,9 m

Page 165: BoQ Part 1 Version 1

8.2.03.17 no 100 54.26 5,426.00

8.2.03.18 no 5 106.5 532.5

8.2.03.19 m2 50 14.48 724

8.2.03.20 m2 15 10.45 156.75

8.2.03.21 m2 15 9.51 142.65

8.2.03.22 m 15 42.01 630.15

8.2.03.23 m 5 37.89 189.45

8.2.03.24 m3 15 300.41 4,506.15

8.2.03.25 m3 15 260.72 3,910.80

8.2.03.26 m3 220 363.79 80,033.80

8.2.03.27 m3 50 315.64 15,782.00

8.2.03.28 kg 700 1.8 1,260.00

8.2.03.29 m 30 18.87 566.1

8.2.03.30 m 18 13.7 246.6

8.2.03.31 kg 400 3.2 1,280.00

8.2.03.32 m 20 71.17 1,423.40

8.2.03.33 m 10 59.43 594.3

8.2.03.34 m3 14 100.41 1,405.74

8.2.03.35 kg 600 2.4 1,440.00

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 5,9 m

Malla Chainlinked fijado para el rock pernos. En la cara.

Mallazo fija a pernos de anclaje. En la cara.

Mallazo fija a pernos de anclaje. Detrás de la cara.

Correas de acero fijados a pernos de anclaje. En la cara.

Correas de acero fijados a pernos de anclaje. Detrás de la cara.

El hormigón proyectado. Plain. En la cara.

El hormigón proyectado. Plain. Detrás de la cara.

El hormigón proyectado. De fibra reforzada. En la cara.

El hormigón proyectado. De fibra reforzada. Detrás de la cara.

Suministro de barras de refuerzo para las costillas de hormigón proyectado reforzado.

La instalación de las costillas de hormigón proyectado reforzado. En la cara.

La instalación de las costillas de hormigón proyectado reforzado. Detrás de la cara.

Prefabricación y suministro de vigas de celosía.

La instalación de vigas de celosía para costillas de hormigón proyectado. En la cara.

La instalación de vigas de celosía para costillas de hormigón proyectado. Detrás de la cara.

Invierta concreto. En la cara.

Refuerzo de invertido. En o detrás de la cara

Page 166: BoQ Part 1 Version 1

8.2.04.00

8.2.04.01 no 2 3,269.62 6,539.24

8.2.05.00

8.2.05.01 m2 60 67.26 4,035.60

8.2.05.02 Hormigón Clase C. m3 15 142.91 2,143.65

8.2.05.03 t 0.5 1,459.67 729.84

8.2.05.04 no 30 77.22 2,316.60

8.2.05.05 m 160 169.72 27,155.20

8.2.06.00 METAL WORKS.

8.2.06.01 kg 300 6.11 1,833.00

Suma 591,174.48

Bill socavón 8.3 Construcción de túnel de aducción

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

8.3.01.0 ROCA EXCAVACIÓN.

8.3.01.01 m 285 1,521.55 433,641.75

8.3.01.02 m3 50 31.71 1,585.50

8.3.01.03 m3 50 15.76 788

8.3.01.04 0

m 20 359.56 7,191.20

INVESTIGACIÓN E INSTRUMENTACIÓN.

Estación de Convergencia. Max. 3 pines.

OBRAS DE CONCRETO.

Encofrado Clase B. Plain.

Refuerzo. Barras corrugadas.

Pernos de anclaje con lechada para muros de hormigón D = 25 mm, profundidad en la roca 1,5 m dept en hormigón de 1 m

Hormigón Clase B. pavement.Concrete espesor mínimo de 150 mm. De malla de refuerzo min 6,5 kg / m2

Steeldoor, 2 alas con cerradura W x H = 3,0 m x 3,0 m en el extremo superior del túnel. La presión de diseño de 0,1 bar ambos lados

Bill 8,2 socavón Construcción de túnel de descarga

Proyecto de Ley No. 8 - Casa de Máquinas y Acceso Túnel 

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Underground. La excavación del túnel socavón de túnel de aducción y socavón a la habitación ventilación. Sección mínima de 22,6 m2.

Underground. La excavación del túnel. La adición de una mayor sección transversal.

Underground. La excavación del túnel. Desmonte excesivo anormal.

Underground. La excavación del túnel. La adición de rondas de voladura cortos.

a) Adición de medio rondas de voladura

Page 167: BoQ Part 1 Version 1

m 10 1,744.84 17,448.40

8.3.01.05 m 70 15.23 1,066.10

8.3.02.00

8.3.02.01 m 1,500.00 15.58 23,370.00

8.3.02.02 m 1,200.00 13.55 16,260.00

8.3.02.03 no 15 73.32 1,099.80

8.3.02.04 no 40 60.68 2,427.20

8.3.02.05 no 15 30.3 454.5

8.3.02.06 10 26.25 262.5

8.3.02.07 no 60 143.86 8,631.60

8.3.02.08 no 70 140.23 9,816.10

8.3.02.09 kg 24,000.00 1.01 24,240.00

8.3.02.10 kg 20,000.00 2.59 51,800.00

8.3.02.11 kg 5,000.00 7.19 35,950.00

8.3.02.12 kg 2,000.00 1.9 3,800.00

8.3.02.13 m 250 31.11 7,777.50

8.3.02.14 kg 1,000.00 22.57 22,570.00

8.3.02.15 kg 1,500.00 26.23 39,345.00

8.3.02.16 hr 50 605 30,250.00

8.3.02.17 hr 50 520 26,000.00

8.3.03.00 APOYO DEL ROCK

b) Adición de cuarta rondas de voladura

Subterráneas. Perforaciones contorno perimetral para voladuras (cuando menos que se requiere 0,7 m de distancia).

La perforación exploratoria e inyección.

Perforación de percusión, el diámetro mínimo de 50 mm de profundidad 0 -. 30 m en la cara.

Perforación de percusión, el diámetro mínimo de 50 mm de profundidad 0 -. 30 m Detrás de la cara.

Pruebas de presión de agua. Por valor de empacador. Prueba con solo empacador. Profundidad 0-5 m. En la cara

Pruebas de presión de agua. Por valor de empacador. Prueba con solo empacador. Profundidad 0-5 m. Detrás de la cara

El lavado entre los agujeros. En la cara.

El lavado entre los agujeros. Detrás de la cara.

Lechada. Por valor de empacador. Profundidad 0-5 m. En la cara

Lechada. Por valor de empacador. Profundidad 0-5 m. Detrás de la cara

Lechada de cemento. Tipo de consumo A. Cemento

Lechada de cemento. Tipo consumo B. Cemento

Lechada de cemento. Escriba C. El consumo de cemento

Inyecciones de consolidación.

Tubos flexibles para contacto lechada.

Contacto mampostería. Escriba D.

Contacto mampostería. Tipo E.

Tiempo de la lechada. En la cara

Tiempo de la lechada. Detrás de la cara

Page 168: BoQ Part 1 Version 1

8.3.03.01 hr 20 87.62 1,752.40

8.3.03.02 hr 20 69.96 1,399.20

8.3.03.03 m2 500 24.34 12,170.00

8.3.03.04 m2 500 9.06 4,530.00

8.3.03.05 no 100 53.27 5,327.00

8.3.03.06 no 170 54.35 9,239.50

8.3.03.07 no 100 65.04 6,504.00

8.3.03.08 no 15 47.72 715.8

8.3.03.09 no 15 52.95 794.25

8.3.03.10 no 15 61.32 919.8

8.3.03.11 no 15 49.06 735.9

8.3.03.12 no 120 50.65 6,078.00

8.3.03.13 no 100 61.2 6,120.00

Escalamiento Extra. En la cara.

Escalamiento Extra. Detrás de la cara.

Invierta limpieza y escalamiento. Detrás de la cara.

Alta presión de descarga de agua. Detrás de la cara

Anclado final Resina pernos de roca, barra corrugada. En la cara. 

D = 20 mm. De profundidad en la roca 2,4 m

Anclado final Resina pernos de roca, barra corrugada. En la cara. 

D = 20 mm. De profundidad en la roca 2,9 m

Anclado final Resina pernos de roca, barra corrugada. En la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Final anclados Resina pernos de roca, barra corrugada. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 2,4 m

Final anclados Resina pernos de roca, barra corrugada. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 2,9 m

Final anclados Resina pernos de roca, barra corrugada. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 20 mm. De profundidad en la roca 2,4 m

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 20 mm. De profundidad en la roca 2,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Page 169: BoQ Part 1 Version 1

8.3.03.14 no 150 93 13,950.00

Bill socavón 8.3 Construcción de túnel de aducción

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

8.3.03.15 no 10 43.62 436.2

8.3.03.16 no 300 47.74 14,322.00

8.3.03.17 no 200 54.26 10,852.00

8.3.03.18 no 5 106.5 532.5

8.3.03.19 m2 50 14.48 724

8.3.03.20 m2 30 10.45 313.5

8.3.03.21 m2 30 9.51 285.3

8.3.03.22 m 30 42.01 1,260.30

8.3.03.23 m 30 37.89 1,136.70

8.3.03.24 m3 30 297.33 8,919.90

8.3.03.25 m3 30 257.64 7,729.20

8.3.03.26 m3 400 360.71 144,284.00

8.3.03.27 m3 100 312.56 31,256.00

Totalmente pernos de cemento-lechada roca, barras deformadas. En la cara. 

D = 25 mm. De profundidad en la roca 5,9 m

Proyecto de Ley No. 8 - Casa de Máquinas y Acceso Túnel 

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 2,4 m

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 2,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 3,9 m

Totalmente pernos de cemento-lechada roca, barras deformadas. Detrás de la cara. 

D = 20 mm. De profundidad en la roca 5,9 m

Malla Chainlinked fijado para el rock pernos. En la cara.

Mallazo fija a pernos de anclaje. En la cara.

Mallazo fija a pernos de anclaje. Detrás de la cara.

Correas de acero fijados a pernos de anclaje. En la cara.

Correas de acero fijados a pernos de anclaje. Detrás de la cara.

El hormigón proyectado. Plain. En la cara.

El hormigón proyectado. Plain. Detrás de la cara.

El hormigón proyectado. De fibra reforzada. En la cara.

El hormigón proyectado. De fibra reforzada. Detrás de la cara.

Page 170: BoQ Part 1 Version 1

8.3.03.28 kg 1,300.00 1.8 2,340.00

8.3.03.29 m 50 18.87 943.5

8.3.03.30 m 40 13.7 548

8.3.03.31 kg 800 3.2 2,560.00

8.3.03.32 m 30 71.17 2,135.10

8.3.03.33 m 20 59.43 1,188.60

8.3.03.34 m3 30 100.41 3,012.30

8.3.03.35 kg 1,300.00 2.4 3,120.00

8.3.04.00

8.3.04.01 hr 300 605 181,500.00

8.3.04.02 no 6 1,108.00 6,648.00

8.3.04.03 m 420 125.06 52,525.20

8.3.04.04 m 140 171.84 24,057.60

8.3.04.05 kg 2,500.00 1.9 4,750.00

8.3.04.06 no 100 115.56 11,556.00

8.3.04.07 no 10 135.56 1,355.60

8.3.04.08 Pruebas Lugeon no 70 1,440.00 100,800.00

Suministro de barras de refuerzo para las costillas de hormigón proyectado reforzado.

La instalación de las costillas de hormigón proyectado reforzado. En la cara.

La instalación de las costillas de hormigón proyectado reforzado. Detrás de la cara.

Prefabricación y suministro de vigas de celosía.

La instalación de vigas de celosía para costillas de hormigón proyectado. En la cara.

La instalación de vigas de celosía para costillas de hormigón proyectado. Detrás de la cara.

Invierta concreto. En la cara.

Refuerzo de invertido. En o detrás de la cara

INVESTIGACIÓN E INSTRUMENTACIÓN.

Investigación y pruebas subterráneas. Tiempo de inactividad.

Perforación de base. Puesta en marcha en cada lugar de perforación.

Perforación de base, diámetro mínimo de 76 mm. De profundidad de 0-30 m

Perforación de base, diámetro mínimo de 76 mm. De profundidad 30-100 m

Perforación de base. Estabilización Hole. Lechada de cemento.

Ajuste Packer para la prueba de presión de agua. Prueba concurrente con la perforación (single envasador). Profundidad 0-100 m

Ajuste Packer para la prueba de presión de agua. Prueba de perforación después de completado (doble packer). Profundidad 0-100 m

Page 171: BoQ Part 1 Version 1

8.3.04.09 no 2 1,210.56 2,421.12

8.3.04.10 no 12 1,140.23 13,682.76

8.3.04.11 no 6 3,269.62 19,617.72

8.3.04.12 no 5 7,612.00 38,060.00

8.3.05.0

8.3.05.01 m2 225 67.26 15,133.50

8.3.05.02 m2 10 96.29 962.9

8.3.05.03 Hormigón Clase C. m3 500 139.83 69,915.00

8.3.05.04 t 10 1,459.67 14,596.70

8.3.05.05 m2 450 3.59 1,615.50

8.3.05.06 m2 50 4.65 232.5

8.3.05.07 m 10 36.12 361.2

8.3.05.08 m 20 22.63 452.6

8.3.05.09 m 180 163.15 29,367.00

Bill socavón 8.3 Construcción de túnel de aducción

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

8.3.06.0

8.3.06.01

no 30 88.36 2,650.80

no 30 66.07 1,982.10

8.3.06.02 m 100 24.93 2,493.00

Movilización / desmovilización de expertos y equipo a hydrofracture y pruebas de gato hidráulico

Número de hydrofracture o pruebas de gato hidráulico

Estación de Convergencia. Max. 3 pines.

Multipunto extensómetro pozo.

OBRAS DE CONCRETO.

Encofrado Clase B. Plain. Inclinada o vertical.

Encofrado Clase B. curvada. Transición Forro

Refuerzo. Barras corrugadas.

Preparación de superficie de la roca para el hormigonado

Acabado de superficies sin forma, UB Clase

Ranuras, rectangulares 100 x 100 mm

Teclas cortantes en juntas de construcción

Hormigón Clase pavement.Concrete C. espesor mínimo de 150 mm. De malla de refuerzo min 6,5 kg / m2

Proyecto de Ley No. 8 - Casa de Máquinas y Acceso Túnel 

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

ACCIONES PARA LA INSTALACIÓN DE MAMPARO

Pernos de anclaje con lechada de calidad weldble para la fijación de la puerta, D = 25 mm.

a) Longitud 3 m, profundidad en la roca 2,0 m

b) Longitud 2 m, profundidad en la roca 1,0 m

PVC Waterstop en juntas de construcción, 200 mm de ancho

Page 172: BoQ Part 1 Version 1

8.3.06.03 no 20 24.2 484

8.3.06.04 LS 1 44,180.00 44,180.00

8.3.07.0 DRENAJE

8.3.07.01 m 70 63.4 4,438.00

8.3.07.02 m 180 43.34 7,801.20

8.3.07.03 m3 70 31.71 2,219.70

8.3.07.04 m 360 8.92 3,211.20

8.3.07.05 m 90 5.45 490.5

1,733,471.50

Bill 8.4 de Powerhouse Caverna

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

PVC tuberías para inyección de huecos entre hormigón y roca para contactar lechada. Colocado a través encofrado. Dimensión de acuerdo con el equipo de contratistas rejuntado

Interfaz con H, empotramiento y rejuntado de mamparo. Documentos de referencia H-tierno, Parte D, Sección 2. Esta partida incluirá obras relacionadas con la preparación para, y empotramiento en el hormigón y similares para el cierre, que puede no estar incluida en otros artículos, la coordinación con la H-contratista en su transporte y trabajo Scaling, encofrado, armadura, hormigón y mampostería es atender a otros lugares.

Perforación del agujero dos drenaje para túnel de descarga D = min 120 mm, longitud de cada hoyo 35 m, todo incluido.

Tubería de PVC D = 300 mm, en la trinchera de cierre, incluyendo la excavación de la zanja y relleno.

Roca excavación de zanja, sobre artículo 8.3.07.02

Drainpipe, PVC, D = 100 mm con acceso tubería cada 60 m

Tubería de PE fija al techo del túnel para areation Ø 50 mm

Bill socavón 8.3 Construcción de túnel de aducción

Proyecto de Ley No. 8 - Casa de Máquinas y Acceso Túnel 

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Page 173: BoQ Part 1 Version 1

8.4.01.0 ROCA EXCAVACIÓN.

8.4.01.01 m3 6,600.00 68.62 452,892.00

8.4.01.02 m3 18,250.00 41.2 751,900.00

8.4.01.03 m 300 15.23 4,569.00

8.4.02.0

8.4.02.01 m 450 15.58 7,011.00

8.4.02.02 no 5 73.32 366.6

8.4.02.03 Lavado entre agujeros no 5 30.3 151.5

8.4.02.04 no 25 143.86 3,596.50

8.4.02.05 kg 3,000.00 1.01 3,030.00

8.4.02.06 kg 6,000.00 2.59 15,540.00

8.4.02.07 kg 1,000.00 7.19 7,190.00

8.4.02.08 hr 20 605 12,100.00

8.4.03.0 APOYO DEL ROCK.

8.4.03.01 hr 70 87.62 6,133.40

8.4.03.02 m2 1,000.00 24.34 24,340.00

8.4.03.03 m2 200 38.42 7,684.00

8.4.03.04 m2 500 9.06 4,530.00

8.4.03.05 no 400 54.35 21,740.00

Caverna se considerará y se mide por el trabajo de apoyo detrás de la cara

Underground. La excavación de la caverna. Independiente de la subdivisión de la sección transversal. Aplicable para Top Rubro

Underground. La excavación de la caverna. Independiente de la subdivisión de la sección transversal. Aplicable para Bancos

Subterráneos. Perforaciones contorno perimetral para voladuras (cuando se requiere menos de 0,7 m de distancia).

La perforación exploratoria e inyección.

Perforación de percusión, diámetro mínimo de 50 mm de profundidad 0 -. 30 m.

Pruebas de presión de agua. Ajuste Packer. Las pruebas con solo empacador. Profundidad 0-5 m

Lechada por ajuste empacador. Profundidad 0-5 m

Lechada de cemento. Tipo A ..

Lechada de cemento. Tipo consumo B. Cemento

Lechada de cemento. Escriba C. El consumo de cemento

Lechada. Tiempo de inactividad.

Escalamiento Extra. 

Aplicable para la central eléctrica de Top Rumbo y Bancos

Invierta limpieza y escalamiento.

Cincel escalado / vigas de grúa

Alta presión de descarga de agua.

Resina extremo anclado pernos de roca, barra corrugada. D = 20 mm. Profundidad en la roca 2,9 m

Page 174: BoQ Part 1 Version 1

8.4.03.06 no 500 65.04 32,520.00

8.4.03.07 no 400 80.22 32,088.00

8.4.03.08 no 300 52.95 15,885.00

8.4.03.09 no 500 61.32 30,660.00

8.4.03.10 no 400 73.74 29,496.00

8.4.03.11 no 200 93 18,600.00

8.4.03.12 no 100 116.21 11,621.00

8.4.03.13 m2 100 14.48 1,448.00

8.4.03.14 m2 1,000.00 10.45 10,450.00

8.4.03.15 m 100 42.01 4,201.00

8.4.03.16 no 5 210.3 1,051.50

8.4.03.17 no 5 252.36 1,261.80

8.4.03.18 no 10 189.27 1,892.70

8.4.03.19 no 10 227.12 2,271.20

8.4.03.20 m 375 30.4 11,400.00

8.4.03.21 m 100 18.98 1,898.00

8.4.03.22 no 5 315.46 1,577.30

Resina extremo anclado pernos de roca, barra corrugada. D = 20 mm. Profundidad en la roca 3,9 m

Resina extremo anclado pernos de roca, barra corrugada. D = 20 mm. Profundidad en la roca 4,9 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. D = 20 mm. Profundidad en la roca 2,9 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. D = 20 mm. Profundidad en la roca 3,9 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. D = 25 mm. Profundidad en la roca 4,9 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. D = 25 mm. Profundidad en la roca 5,9 m pernos spiling así como pernos radiales

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. D = 32 mm. Profundidad en la roca 6,9 m pernos spiling así como pernos radiales

Chainlinked malla fija para el rock pernos.

Mallazo fija a pernos de anclaje.

Correas de acero fijados para el rock pernos.

Suministro de la barra de tendones (activos) anclajes de roca. Longitud 10 m

Suministro de la barra de tendones (activos) anclajes de roca. Longitud 15 m

Suministro de hebra tendón (pasivo) anclajes de roca. Longitud 10 m

Suministro de hebra tendón (pasivo) anclajes de roca. Longitud 15 m

La perforación de agujero para bar / hebra anclas ..

Re-perforación después de la lechada para bar / hebra anclas ..

Instalación de la barra de tendones (activos) anclajes de roca. Longitud 10 m

Page 175: BoQ Part 1 Version 1

8.4.03.23 no 5 378.54 1,892.70

8.4.03.24 no 10 283.91 2,839.10

8.4.03.25 no 10 340.69 3,406.90

8.4.03.26 m3 150 300.41 45,061.50

8.4.03.27 m3 1,200.00 363.79 436,548.00

8.4.03.28 kg 11,000.00 1.8 19.800,00

8.4.03.29 m 750 18.87 14,152.50

8.4.04.0

8.4.04.01 no 3 3,269.62 9,808.86

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

8.4.04.02 no 3 3,339.62 10,018.86

8.4.04.03 no 8 7,612.00 60,896.00

8.4.04.04 hr 10 605 6,050.00

8.4.05.0

8.4.05.01 m 150 8.92 1,338.00

8.4.05.02 m3 30 22.24 667.2

8.4.05.03 m3 5 22.61 113.05

8.4.05.04 m3 100 23.1 2,310.00

Instalación de la barra de tendones (activos) anclajes de roca. Longitud 15 m

Instalación de hebra tendón (pasivo) anclajes de roca. Longitud 10 m

Instalación de hebra tendón (pasivo) anclajes de roca. Longitud 15 m

El hormigón proyectado. Plain.

El hormigón proyectado. Reforzado con fibra.

Suministro de barras de refuerzo para las costillas de hormigón proyectado reforzado (RRS). Aplicable para la central eléctrica

Instalación de costillas de hormigón proyectado reforzado (RRS). En la cara. Aplicable para la central eléctrica

INVESTIGACIÓN E INSTRUMENTACIÓN.

Estación de Convergencia. Max. 3 pines.

Bill No. 8 - Casa de Máquinas y Acceso Túnel Bill 8.4 de Powerhouse Caverna

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Estación de Convergencia. Max. 5 pines.

Multipunto extensómetro pozo.

Investigación e instrumentación. Tiempo de inactividad.

ALCANTARILLAS tubería y tubos de desagüe.

De desagüe de PVC-pipe. Incluyendo curvas y accesorios. Complete. D = 100 mm

Compactado roca triturada 8-16 mm a lo largo de las tuberías de drenaje.

Compactado roca triturada 8-11 mm alrededor del tanque de recogida.

Compactado roca triturada 16-32 mm como supuesto Base de losa de hormigón

Page 176: BoQ Part 1 Version 1

8.4.06.0

8.4.06.01 m2 250 69.43 17,357.50

8.4.06.02 m2 50 84.01 4,200.50

8.4.06.03 m2 20 81.12 1,622.40

8.4.06.04 m2 1,650.00 67.26 110,979.00

8.4.06.05 m2 2,150.00 75.33 161,959.50

8.4.06.06 m2 2,400.00 82.86 198,864.00

8.4.06.07 m2 1,850.00 92.8 171,680.00

8.4.06.08 m2 500 68.51 34,255.00

8.4.06.09 m2 750 76.73 57,547.50

8.4.06.10 m2 850 84.4 71,740.00

8.4.06.11 m2 350 92.84 32,494.00

8.4.06.12 m2 100 72.31 7,231.00

8.4.06.13 m2 100 80.98 8,098.00

8.4.06.14 m2 300 73.21 21,963.00

8.4.06.15 m2 100 85.12 8,512.00

8.4.06.16 m2 1,000.00 156.65 156,650.00

8.4.06.17 no 30 26.7 801

8.4.06.18 no 30 26.7 801

OBRAS DE CONCRETO.

Encofrado Clase A. Llano. Inclinada o vertical. Por encima de la elevación 1569.0

Encofrado Clase A. Llano. Horizontal. Por encima de la elevación 1569.0

Encofrado Clase A. curvas. Por encima de la elevación 1569.0

Encofrado Clase B. Plain. Inclinada o vertical. Por debajo de la elevación 1561.3

Encofrado Clase B. Plain. Inclinada o vertical. De elevación 1.561,3 1.565,0 a la elevación

Encofrado Clase B. Plain. Inclinada o vertical. De elevación 1.565,0 1.569,0 a la elevación

Encofrado Clase B. Plain. Inclinada o vertical. Por encima de la elevación 1569.0

Encofrado Clase B. Plain. Horizontal. Por debajo de la elevación 1561.30

Encofrado Clase B. Plain. Horizontal. De elevación 1.561,3 1.565,0 a la elevación

Encofrado Clase B. Plain. Horizontal. De elevación 1.565,0 1.569,0 a la elevación

Encofrado Clase B. Plain. Horizontal. Por encima de la elevación 1569.0

Encofrado Clase C. Plain. Inclinada o vertical. Por debajo de la elevación 1561.3

Encofrado Clase C. Plain. Horizontal. Por debajo de la elevación 1561.3

Encofrado articulaciones Clase C. Construcción. Por debajo de la elevación 1569.0

Encofrado articulaciones Clase C. Construcción. Por encima de la elevación 1569.0

Encofrado. Clase A. grúa Vigas y Columnas

Vacío rectangular, de hasta 0,1 m2.

Vacío rectangular, 0,1 a 0,5 m2.

Page 177: BoQ Part 1 Version 1

8.4.06.19 no 20 41.2 824

8.4.06.20 no 10 41.2 412

8.4.06.21 m 200 33.5 6,700.00

8.4.06.22 m 100 36.12 3,612.00

8.4.06.23 m 200 37.23 7,446.00

8.4.06.24 m 200 22.63 4,526.00

8.4.06.25 m 700 42.12 29,484.00

8.4.06.26 t 385 1,459.67 561,972.95

8.4.06.27 t 3 1,459.67 4,379.01

8.4.06.28 t 2 2,812.50 5,625.00

8.4.06.29 no 20 66.07 1,321.40

8.4.06.30 no 50 66.07 3,303.50

8.4.06.31 no 20 66.07 1,321.40

8.4.06.32 no 54 129.48 6,991.92

8.4.06.33 no 160 129.48 20,716.80

8.4.06.34 no 100 66.07 6,607.00

8.4.06.35 m2 700 3.59 2,513.00

8.4.06.36 m3 700 137.15 96,005.00

8.4.06.37 m3 1,550.00 142.91 221,510.50

8.4.06.38 m3 1,550.00 142.91 221,510.50

Sin efecto la Circular, hasta 0,35 m de diámetro.

Sin efecto la Circular, 0,35 a 0,9 m de diámetro.

Groove, triangular garganta goteo 25 mm.

Groove, rectangular. W x H = 100 x 100 mm

Groove, rectangular. W x H = 200 x 200 mm

Teclas cortantes en juntas de construcción

Encofrado. Ranura de drenaje a lo largo de las paredes de roca

Refuerzo. Barras corrugadas.

Refuerzo. Las barras lisas.

Refuerzo. Mallazo.

Lechada barras corrugadas. D = 20 mm. Longitud total 2,0 m. Profundidad en la roca 1,0 m

Lechada barras corrugadas. D = 25 mm. Longitud en concreto 1,0 m. Profundidad en la roca 1,5 m

Lechada barras corrugadas. D = 32 mm. Longitud de hormigón de 1,5 m. Profundidad en la roca 2,0 m

Lechada barras corrugadas. D = 32 mm. Longitud de hormigón de 1,5 m. Profundidad en la roca 6,0 m. Grúa Vigas y Columnas

Lechada barras corrugadas. D = 25 mm. Longitud de hormigón de 1,5 m. Profundidad en la roca 5,0 m. Grúa Vigas y Columnas

Deformados bares. D = 25 mm. Longitud: 2,0m. Longitud de hormigón de 1,0 m. de calidad soldable para la fijación de acería hidráulicas, equipos electromecánicos etc. parcialmente embutidos.

Preparación de superficie de la roca para el hormigonado.

Clase de hormigón B. A continuación elevación 1561.30

Clase de hormigón C. A continuación elevación 1561.30

Clase de hormigón C. De elevación 1.561,3 1.569,0 a la elevación

Page 178: BoQ Part 1 Version 1

8.4.06.39 m3 370 142.91 52,876.70

8.4.06.40 m3 300 142.91 42,873.00

8.4.06.41 l 400 2.5 1,000.00

8.4.06.42 m2 600 4.2 2,520.00

8.4.06.43 m2 2,700.00 4.65 12,555.00

8.4.06.44 m2 300 4.85 1,455.00

8.4.06.45 m 200 15.27 3,054.00

8.4.06.46 m 100 24.93 2,493.00

8.4.06.47 no 10 97.35 973.5

8.4.06.48 no 20 15.71 314.2

8.4.06.49 m 20 40.08 801.6

8.4.06.50 m 20 78.18 1,563.60

8.4.06.51 m 100 8.92 892

8.4.06.52 m 100 8.92 892

8.4.06.53 m 100 8.92 892

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

8.4.06.54 m 50 43.34 2,167.00

8.4.06.55 m 100 110.2 11,020.00

Clase de hormigón C. Por encima de la elevación 1569.0

Hormigón Clase C. Crane Vigas y Columnas

Lechada bajo carriles para viajar grúas con la expansión de mortero. Rails serán suministrados por otros.

El acabado de superficies no formadas, Clase UA.

El acabado de superficies no formadas, UB Clase.

El acabado de superficies no formadas, clase UC.

Waterstop PVC, 150 mm de ancho.

Waterstop PVC, 200 mm de ancho.

Ganchos de elevación. Barras de acero inoxidable. D = 25 mm

Hierros Paso. Parcialmente incrustado en el hormigón.

Inoxidable tubos de acero. Parcialmente incrustado en concreto, inlcuyendo flexión y accesorios. Diam. = 100mm.

Inoxidable tubos de acero. Parcialmente embebido en el hormigón, incluyendo doblarse y accesorios. Diam. = 150mm.

Parcialmente incrustado PVC-pipe. Incluyendo curvas y accesorios. Complete. D = 50 mm

Parcialmente incrustado PVC-pipe. Incluyendo curvas y accesorios. Complete. D = 100 mm

Parcialmente incrustado PVC-pipe. Incluyendo curvas y accesorios. Complete. D = 150 mm

Bill No. 8 - Casa de Máquinas y Acceso Túnel Bill 8.4 de Powerhouse Caverna

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Parcialmente incrustado PVC-pipe. Incluyendo curvas y accesorios. Complete. D = 200 mm

Hinchazón banda arcilla

Page 179: BoQ Part 1 Version 1

8.4.06.56 kg 20 18.25 365

8.4.06.57 kg 20 31.35 627

8.4.06.58 m 50 52.32 2,616.00

8.4.06.59 kg 10 18.25 182.5

8.4.06.60 LS 1 18,627.10 18,627.10

8.4.06.61 LS 1 12,873.10 12,873.10

8.4.07.0

8.4.07.01 m2 50 17.02 851

8.4.07.02 Baldosas de cerámica. m2 30 28.43 852.9

8.4.07.03 Los pisos de vinilo. m2 40 70.98 2,839.20

8.4.07.04 Suelos de terrazo. m2 30 59.57 1,787.10

8.4.07.05 m2 40 522.8 20,912.00

8.4.07.06 m2 40 73.3 2,932.00

8.4.07.07 Enyesado, interno. m2 80 42.76 3,420.80

8.4.07.08 m2 50 17.1 855

8.4.07.09 m2 50 17.1 855

8.4.07.10 Azulejo cerámico. m2 130 28.43 3,695.90

8.4.07.11 m2 50 55.9 2,795.00

8.4.07.12 Suspendido del techo. m2 40 27.35 1,094.00

8.4.07.13 m 200 18.58 3,716.00

8.4.07.14 m2 200 6.67 1,334.00

8.4.07.15 no 26 3,049.00 79,274.00

Compuesto de sellado de juntas.

Tubo de neopreno Sellado de juntas.

Sellado de juntas. Tubo de inyección.

Sellado de juntas. La inyección de tubos de inyección con epoxi.

Sellado alrededor de tuberías, cables, conductos, etc., en bloqueadores con masilla resistente al fuego para satisfacer clase A60 fuego. Varios espesor de las paredes. El trabajo que se lleva a cabo después de la instalación de los equipos.

Segunda etapa en concreto bloqueadores con mortero. Varios espesor de las paredes. El trabajo que se lleva a cabo después de la instalación de los equipos.

CONSTRUCTORES DE TRABAJO

Piso solado de hormigón, 50 mm de espesor.

Sistema de suelo elevado.

Mampostería de bloques de hormigón. Espesor nominal.

Rendering, llano, externo.

Rendering, teñido, externo.

Pared Luz partición (perfiles de acero / placas de yeso).

Tubería por debajo de la viga de la grúa para drenar fosa.

De alta densidad de la lana mineral. Espesor 100 mm

Aislados puertas de acero individuales. Clasificación fuego A60. Dimensiones externas 1000x2100mm

Page 180: BoQ Part 1 Version 1

8.4.07.16 no 4 3,049.00 12,196.00

8.4.07.17 no 4 4,505.00 18,020.00

8.4.07.18 no 6 5,542.00 33,252.00

8.4.07.19 no 6 5,542.00 33,252.00

8.4.07.20 no 3 1,044.67 3,134.01

8.4.07.21 no 1 9,874.02 9,874.02

8.4.07.22 m2 2,000.00 24.43 48,860.00

8.4.07.23 m2 900 24.43 21,987.00

8.4.07.24 m2 8,500.00 24.43 207,655.00

8.4.07.25 m2 1,500.00 24.43 36,645.00

8.4.07.26 no 34 61.12 2,078.08

8.4.07.27 no 12 119.5 1,434.00

8.4.07.28 no 3 34 102

8.4.08.0

8.4.08.01 m2 1,000.00 293.55 293,550.00

Aislados puertas de acero individuales. Clasificación fuego A60. Dimensiones externas 1000x2100mm presión de explosión de ambos lados: 10 kN / m2.

Aislados puertas de acero individuales. Clasificación fuego A60. Dimensiones externas 1100x2500mm

Puertas de acero de doble aislamiento. Clasificación fuego A60. Dimensiones externas 1600x2200mm

Puertas de acero de doble aislamiento. Clasificación fuego A60. Dimensiones externas 2000x2500mm

Puertas de madera interiores individuales. Ranura aire Inclusiv. Dimensiones externas 900x2100 mm.

Principal puerta de entrada a sala de máquinas. Aluminio compuerta rodante. Dimensión exterior 4500x5500mm.

Pintura del suelo con epoxi.

Pintura del suelo con epoxi autonivelante. Máquina piso Hall.

Pintura de paredes de hormigón.

Acabado de superficies de hormigón proyectado en casa caverna con rociado de pintura de hormigón blanco.

La pintura de las puertas de acero, solo

La pintura de las puertas de acero, doble

Pintura de puertas de madera interiores

ACERO ESTRUCTURAL DE OBRAS.

Arco de techo. Pernos completos incluido roca, abrazaderas de cables, estructura de soporte y cinta cóncava leve láminas de techo de acero. Canalones y tubos de drenaje hacia abajo a la viga de la grúa también se incluirán.

Page 181: BoQ Part 1 Version 1

8.4.09.0

8.4.09.01 1 600,000.00 600,000.00

8.4.09.02 1 110,000.00 110,000.00

8.4.09.03 1 25,000.00 25,000.00

8.4.09.04 LS 1 71,530.00 71,530.00

8.4.09.05 1 80,000.00 80,000.00

8.4.09.06 1 14,000.00 14,000.00

8.4.10.0 METAL WORKS.

8.4.10.01 kg 4.000,00 7.01 28,040.00

8.4.10.02 kg 35,000.00 6.34 221,900.00

8.4.10.03 kg 1,000.00 7.01 7,010.00

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

8.4.10.04 kg 100 6.34 634

8.4.10.05 kg 1,000.00 7.01 7,010.00

8.4.10.06 kg 1,000.00 6.34 6,340.00

8.4.10.07 kg 1,000.00 6.34 6,340.00

HVAC, SANITARIAS Y DE LUCHA CONTRA INCENDIOS INSTALACIONES. PARA TÚNEL DE ACCESO, central eléctrica, TÚNELES BARRAS, TRANSFORMADOR HALL Y CABLE DEL TÚNEL

Aire acondicionado y sistemas de ventilación. En sala de máquinas de un hall de transformador. Diseño de empleador.

Prov. Suma

Aire acondicionado y sistemas de ventilación. En el edificio de oficinas de la sala de máquinas. Diseño por el empleador.

Prov. Suma

Sistema de agua helada. Diseño por el empleador.

Prov. Suma

Alcantarillado, instalaciones de fontanería y sanitarios, con planta de tratamiento de agua potable y alcantarillado del tanque de volumen mínimo 6.000 l, etc.

Instalaciones de lucha contra incendios y equipos de rescate. Diseño por el empleador.

Prov. Suma

Piezas de repuesto que se especifican en la lista de piezas de repuesto.

Prov. Suma

Tapa de la escotilla de poca potencia.

Tapa de la escotilla de servicio pesado.

Cubierta del conducto de poca potencia.

Bill No. 8 - Casa de Máquinas y Acceso Túnel Bill 8.4 de Powerhouse Caverna

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Cubierta del conducto de alta resistencia.

Rejilla de poca potencia.

Rejilla de alta resistencia.

Barandilla desmontable alrededor del cascarón.

Page 182: BoQ Part 1 Version 1

8.4.10.08

a) Tipo 1 kg 2,000.00 7.01 14,020.00

b) Tipo 2 kg 1,000.00 7.01 7,010.00

8.4.10.09 Carril interno mano.

a) Tipo A kg 400 7.01 2,804.00

b) Tipo B kg 100 7.01 701

8.4.10.10 Escaleras de acero. kg 2,000.00 7.01 14,020.00

8.4.10.11 Escalas de acero. kg 1,000.00 7.01 7,010.00

8.4.10.12 Elevador LS 1 36,644.00 36,644.00

8.4.10.13 LS 1 0

8.4.10.14 kg 100 7.03 703

8.4.10.15 kg 200 6.34 1,268.00

8.4.11.0

8.4.11.1 LS 1 73,089.60 73,089.60

8.4.11.2 LS 1 67,416.00 67,416.00

8.4.12.0

8.4.12.01 m 300 21.34 6,402.00

8.4.12.02 m 200 21.34 4,268.00

Barandilla de la escalera interna.

Piezas de recambio para ascensor por cinco (5) años, tal como recomiendan la fabricación

Guías y alféizares de las trozas de parada. Incrustado en concreto.

Deje de registros. Acero.

Interfaz con E:. M, empotramiento de equipos electromecánicos Esta partida incluirá todos los trabajos relacionados con la preparación para, y imbedment en hormigón y similares, de electro relevante - equipo mecánico (incluyendo, pero no limitado a, el proyecto de turbina de tubo y otras partes de la turbina, generador de los mecanismos de apoyo, etc.)

La formación de rebajes, bloqueadores y similares, para devide entre las diferentes etapas de hormigonado

Provisión y remoción de encofrados para elementos a ser incorporados, extra más para empotramiento y encofrado.

OBRAS CIVILES VARIOS

Tierra electrodos, contra la roca o fijado al refuerzo. Hilos de cobre 1 x 95 mm2. En caverna central eléctrica.

Tierra electrodos, contra la roca o fijos a los cables reinforcementCu 2 x 95 mm2. En caverna central eléctrica.

Page 183: BoQ Part 1 Version 1

8.4.12.03 no 10 101.2 1,012.00

8.4.12.04 no 4 101.2 404.8

8.4.12.05 no 80 230.3 18,424.00

8.4.12.06 LS 1 14,155.20 14,155.20

6,889,577.46

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

8.5.01.0 ROCA EXCAVACIÓN.

8.5.01.01 m 40 2,226.50 89,060.00

8.5.01.02 m3 25 15.76 394

8.5.01.03 m3 3,200.00 76.61 245,152.00

8.5.01.04 m3 1,200.00 63.49 76,188.00

8.5.01.05 m 100 15.23 1,523.00

Varillas de puesta a tierra en los agujeros perforados, min 6 m de largo

Varillas de puesta a tierra en los agujeros perforados, mínimo 10 m de largo

Cadwelding de juntas, conexiones e intersecciones

Plataforma temporal en la cota 1569,0 para la descarga de los distribuidores y los tubos de entrada

Bill 8.4 de Powerhouse Caverna

Bill No. 8 - Casa de Máquinas y Acceso Túnel 

Bill 8.5 Transformador Cavern y embarrado Conexiones

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Embarrado conexiones y caverna se considerarán y se miden para el trabajo de apoyo detrás de la cara

Underground. La excavación del túnel. Sección transversal 14.2 m2 

Aplicable para embarrado Túneles e independiente de la subdivisión de la sección transversal

Underground. La excavación del túnel. Desmonte excesivo anormal.

Underground. La excavación de la caverna. Independiente de la subdivisión de la sección transversal. Aplicable para el transformador Salón Top Rubro

Underground. La excavación de la caverna. Independiente de la subdivisión de la sección transversal. Aplicable para Transformer Ayuntamiento Bancos

Subterráneos. perforaciones contorno perimetral para voladuras (cuando se requiere menos de 0,7 m de distancia).

Page 184: BoQ Part 1 Version 1

8.5.01.06

LS 1 26,712.25 26,712.25

m 25 30.4 760

m 25 85.76 2,144.00

m 25 18.98 474.5

m 25 60.75 1,518.75

8.5.02.0

8.5.02.01 m 450 15.58 7,011.00

8.5.02.02 no 5 73.32 366.6

8.5.02.03 Lavado entre agujeros no 5 30.3 151.5

8.5.02.04 no 25 143.86 3,596.50

8.5.02.05 kg 3,000.00 1.01 3,030.00

8.5.02.06 kg 6,000.00 2.59 15,540.00

8.5.02.07 kg 1,000.00 7.19 7,190.00

8.5.02.08 hr 20 605 12,100.00

8.5.03.0 APOYO DEL ROCK

8.5.03.01 hr 60 87.62 5,257.20

8.5.03.02 m2 500 24.34 12,170.00

8.5.03.03 no 70 53.27 3,728.90

8.5.03.04 no 30 53.27 1,598.10

Tubo de drenaje del pozo al tanque del transformador al botton de potencia

a) Las movilizaciones / desmovilización de los equipos de perforación

b) Perforación de excavación de al menos 300 mm de diámetro

c) lechada de presión para la estabilización del agujero

d) re-perforación después de la lechada

e) Suministro e instalación de tubería de acero de 200 mm de diámetro, con empotramiento

La perforación exploratoria e inyección.

Percusión perforación, diámetro mínimo de 50 mm. de profundidad 0 - 30 m.

Pruebas de presión de agua. Ajuste Packer. Las pruebas con solo empacador. Profundidad 0-5 m

Lechada por ajuste empacador. Profundidad 0-5 m

Lechada de cemento. Tipo A ..

Lechada de cemento. Tipo consumo B. Cemento

Lechada de cemento. Escriba C. El consumo de cemento

Lechada. Tiempo de inactividad.

Extra de escala. Aplicable para el transformador Salón Top Rubro y bancos, así como de embarrado Túneles

Invierta limpieza y escalamiento.

Resina extremo anclado pernos de roca, barra corrugada. D = 20 mm. Profundidad en la roca 1,9 m

Resina extremo anclado pernos de roca, barra corrugada. D = 20 mm. Profundidad en la roca 2,4 m

Page 185: BoQ Part 1 Version 1

8.5.03.05 no 50 54.35 2,717.50

8.5.03.06 no 100 65.04 6,504.00

8.5.03.07 no 70 80.22 5,615.40

8.5.03.08 no 40 49.06 1,962.40

8.5.03.09 no 40 49.06 1,962.40

8.5.03.10 no 50 50.65 2,532.50

8.5.03.11 no 70 61.2 4,284.00

8.5.03.12 no 70 93 6,510.00

8.5.03.13 no 70 93 6,510.00

8.5.03.14 m2 50 14.48 724

8.5.03.15 m2 250 10.45 2,612.50

8.5.03.16 m 100 42.01 4,201.00

8.5.03.17 m3 20 300.41 6,008.20

8.5.03.18 m3 350 363.79 127,326.50

8.5.03.19 kg 1,300.00 1.8 2,340.00

Resina extremo anclado pernos de roca, barra corrugada. D = 20 mm. Profundidad en la roca 2,9 m

Resina extremo anclado pernos de roca, barra corrugada. D = 20 mm. Profundidad en la roca 3,9 m

Resina extremo anclado pernos de roca, barra corrugada. D = 20 mm. Profundidad en la roca 4,9 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. D = 20 mm. Profundidad en la roca 1,9 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. D = 20 mm. Profundidad en la roca. 2,4 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. D = 20 mm. Profundidad en la roca 2,9 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. D = 20 mm. Profundidad en la roca 3,9 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. D = 25 mm. Profundidad en la roca 4,9 m pernos spiling así como pernos radiales.

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. D = 25 mm. Profundidad en la roca 5,9 m pernos spiling así como pernos radiales.

Chainlinked malla fija para el rock pernos.

Mallazo fija a pernos de anclaje.

Correas de acero fijados para el rock pernos.

El hormigón proyectado. Plain.

El hormigón proyectado. Reforzado con fibra.

Suministro de barras de refuerzo para las costillas de hormigón proyectado reforzado (RRS).

Page 186: BoQ Part 1 Version 1

8.5.03.20 m 90 18.87 1,698.30

8.5.04.0

8.5.04.01 no 2 3,269.62 6,539.24

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

8.5.04.02 no 2 3,339.62 6,679.24

8.5.04.03 no 2 7,612.00 15,224.00

8.5.04.04 hr 10 605 6,050.00

8.5.05.0

8.5.05.01 m 30 8.92 267.6

8.5.05.02 m3 15 22.24 333.6

8.5.05.03 m3 20 23.1 462

8.5.06.0

8.5.06.01 m2 1,200.00 92.8 111,360.00

8.5.06.02 m2 320 92.84 29,708.80

8.5.06.03 m2 100 72.31 7,231.00

8.5.06.04 m2 10 80.98 809.8

8.5.06.05 m2 20 73.21 1,464.20

8.5.06.06 m2 25 102.2 2,555.00

8.5.06.07 no 3 26.7 80.1

8.5.06.08 no 3 26.7 80.1

8.5.06.09 no 5 41.2 206

8.5.06.10 no 2 41.2 82.4

La instalación de las costillas de hormigón proyectado reforzado (RRS).

INVESTIGACIÓN E INSTRUMENTACIÓN.

Estación de Convergencia. Max. 3 pines.

Bill No. 8 - Casa de Máquinas y Acceso Túnel 

Bill 8.5 Transformador Cavern y embarrado Conexiones

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Estación de Convergencia. Max. 5 pines.

Multipunto extensómetro pozo.

Investigación e instrumentación. Tiempo de inactividad.

ALCANTARILLAS tubería y tubos de desagüe.

Escurrir PVC tubería, incluyendo curvas y accesorios, completo, D = 100 mm

Compactado roca triturada 8-16 mm a lo largo de las tuberías de desagüe

Compactado roca triturada 16-32 mm como capa de base para la losa de hormigón

OBRAS DE CONCRETO.

Encofrado Clase B. Plain. Inclinada o vertical.

Encofrado Clase B. Plain. Horizontal.

Encofrado Clase C. Plain. Inclinada o vertical.

Encofrado Clase C. Plain. Horizontal.

Encofrado articulaciones Clase C. Construcción.

Encofrado Clase B. Suelo y escaleras en los túneles de barras

Vacío rectangular, de hasta 0,1 m2.

Vacío rectangular, 0,1 a 0,5 m2.

Sin efecto la Circular, hasta 0,35 m de diámetro.

Sin efecto la Circular, 0,35 a 0,9 m de diámetro.

Page 187: BoQ Part 1 Version 1

8.5.06.11 m 100 33.5 3,350.00

8.5.06.12 m 10 36.12 361.2

8.5.06.13 m 30 37.23 1,116.90

8.5.06.14 m 100 22.63 2,263.00

8.5.06.15 m 140 42.12 5,896.80

8.5.06.16 t 40 1,459.67 58,386.80

8.5.06.17 t 1 1,459.67 1,459.67

8.5.06.18 no 60 66.07 3,964.20

8.5.06.19 no 40 66.07 2,642.80

8.5.06.20 no 20 68.24 1,364.80

8.5.06.21 no 20 66.07 1,321.40

8.5.06.22 m2 200 3.59 718

8.5.06.23 Hormigón Clase C. m3 500 142.91 71,455.00

8.5.06.24 m2 10 4.2 42

8.5.06.25 m2 600 4.65 2,790.00

8.5.06.26 m2 100 4.85 485

8.5.06.27 m 60 15.27 916.2

8.5.06.28 no 16 77.22 1,235.52

8.5.06.29 m 10 8.92 89.2

8.5.06.30 m 10 8.92 89.2

8.5.06.31 m 50 43.34 2,167.00

Groove, triangular garganta goteo 25 mm.

Groove, rectangular. W x H = 100 x 100 mm

Groove, rectangular. W x H = 200 x 200 mm

Teclas cortantes en juntas de construcción

Encofrado. Ranura de drenaje a lo largo de las paredes de roca

Refuerzo. Barras corrugadas.

Refuerzo. Las barras lisas.

Lechada barras corrugadas. D = 20 mm. Longitud 2,0 m. Profundidad en la roca 1,0 m

Lechada barras corrugadas. D = 25 mm. Longitud en concreto 1,0 m. Profundidad en la roca 1,5 m

Lechada barras corrugadas. D = 32 mm. Longitud en concreto 1,0 m. Profundidad en la roca 2,5 m

Bares. D = 20 mm. Longitud: 1,0 m Longitud de hormigón de 0,6 m. Parcialmente roscado para la fijación de los equipos.

Preparación de superficie de la roca para el hormigonado.

El acabado de superficies no formadas, Clase UA.

El acabado de superficies no formadas, UB Clase.

El acabado de superficies no formadas, clase UC.

Waterstop PVC, 150 mm de ancho.

Ganchos de elevación. Barras de acero inoxidable. D = 25 mm, L = 4,0 M

Parcialmente incrustado PVC-pipe. Incluyendo curvas y accesorios. Complete. D = 50 mm

Parcialmente incrustado PVC-pipe. Incluyendo curvas y accesorios. Complete. D = 100 mm

Parcialmente incrustado PVC-pipe. Incluyendo curvas y accesorios. Complete. D = 150 mm

Page 188: BoQ Part 1 Version 1

8.5.06.32 m 10 43.34 433.4

8.5.06.33 kg 10 18.25 182.5

8.5.06.34 kg 10 31.35 313.5

8.5.06.35 m 50 52.32 2,616.00

8.5.06.36 kg 5 18.25 91.25

8.5.06.37 no 24 683.06 16,393.44

8.5.06.38 kg 60 12.9 774

8.5.06.39 kg 100 12.9 1,290.00

8.5.07.0

8.5.07.01 no 4 3,049.00 12,196.00

8.5.07.02 no 1 9,874.00 9,874.00

8.5.07.03 m2 600 24.43 14,658.00

8.5.07.04 Pintura de paredes. m2 400 24.43 9,772.00

8.5.07.05 no 4 61.12 244.48

8.5.08.0

8.5.08.01 m2 350 293.55 102,742.50

8.5.09.0 METAL WORKS.

8.5.09.01 kg 100 7.01 701

Parcialmente incrustado PVC-pipe. Incluyendo curvas y accesorios. Complete. D = 200 mm

Compuesto de sellado de juntas.

Tubo de neopreno Sellado de juntas.

Sellado de juntas. Tubo de inyección.

Sellado de juntas. La inyección de tubos de inyección con epoxi.

Reforzados vigas de hormigón delante de transformadores. BxHxL = aprox. 300x400x7000mm

Galvanizado tirando ganchos para transformator en paredes de hormigón. Steelplate con pernos de anclaje parcialmente incrustado.

Galvanizado tirando ganchos para transformator en paredes de roca. Steelplate soldada a bulones A25 lechada. pernos Rock: Profundidad en 2.5m roca.

CONSTRUCTORES DE OBRAS.

Aislado puerta de acero individual. Clasificación fuego A60. 1000x2100mm externa de apertura. presión de explosión de ambos lados: 50 kN / m2.

Aluminio compuerta rodante. La apertura al exterior 3500 x 4500 mm

Pintura del suelo con epoxi. Tipo:

La pintura de las puertas de acero, solo

ACERO ESTRUCTURAL DE OBRAS.

Arco de techo. Pernos completos incluido roca, abrazaderas de cables, estructura de soporte y acanalada de acero suave revestimiento de tejados y bajantes.

Tapa de la escotilla de poca potencia.

Page 189: BoQ Part 1 Version 1

8.5.09.02 kg 10,000.00 6.34 63,400.00

8.5.09.03 kg 500 7.01 3,505.00

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

8.5.09.04 kg 100 6.34 634

8.5.09.05 kg 100 7.01 701

8.5.09.06 kg 2,500.00 6.34 15,850.00

8.5.09.07 kg 3,500.00 6.34 22,190.00

8.5.09.08 kg 500 6.34 3.170,00

8.5.09.09 kg 1,000.00 6.34 6,340.00

8.5.09.10 kg 500 6.34 3.170,00

8.5.09.11 m3 25 22.88 572

8.5.10.0

8.5.10.01 m 300 21.34 6,402.00

8.5.10.02 m 100 21.34 2,134.00

8.5.10.03 no 4 101.2 404.8

8.5.10.04 no 2 101.2 202.4

8.5.10.05 no 80 230.3 18,424.00

8.5.10.06 m3 25 23.41 585.25

Tapa de la escotilla de servicio pesado.

Cubierta del conducto de poca potencia.

Bill No. 8 - Casa de Máquinas y Acceso Túnel 

Bill 8.5 Transformador Cavern y embarrado Conexiones

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Cubierta del conducto de alta resistencia.

Rejilla de poca potencia.

Acero resistente rejilla en las bahías de transformador.

Embedded Transformador Rail 35 kg.

Barandilla desmontable alrededor del cascarón.

Escalera de caracol. Incl. barandilla. Diam .: Aprox: 0.9m

Guías y alféizares de las trozas de parada. Incrustado en concreto.

Filtro de grava en las bahías de transformador, D = 60-90 mm, bien limpia

OBRAS CIVILES VARIOS

Tierra electrodos, contra la roca o fijado al refuerzo. Hilos de cobre 1 x 95 mm2. En caverna transformador y la conexión de barras colectoras

Tierra electrodos, contra la roca o fijados a los cables de refuerzo de Cu 2 x 95 mm2. En caverna transformador y la conexión de barras colectoras

Varillas de puesta a tierra en los agujeros perforados, min 6 m de largo

Varillas de puesta a tierra en los agujeros perforados, mínimo 10 m de largo

Cadwelding de jonts, conexiones e intersecciones

Filtro de grava en las bahías de transformador. D = 60 a 90 mm. Bien limpiado.

Page 190: BoQ Part 1 Version 1

1,370,389.29

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

9.1.01.0 TIERRA DE OBRAS.

9.1.01.01 m3 5 3.34 16.7

9.1.01.02 Excavación del suelo

m3 5,000.00 10.05 50,250.00

9.1.01.03

a) Para el hormigonado m2 50 3.59 179.5

9.1.01.04 Llenar y rellenar

a) relleno estructural m3 3,500.00 15.92 55,720.00

9.1.02.0 ROCA EXCAVACIÓN.

9.1.02.01 m3 500 29.66 14,830.00

9.1.02.02 m 150 21.76 3,264.00

9.1.02.03 m3 20 14.2 284

9.1.02.04 m 3,250.00 1,785.53 5,802,972.50

9.1.02.05 m 60 1,658.30 99,498.00

9.1.02.06 m3 400 31.71 12,684.00

2

9.1.02.07 m3 500 31.71 15,855.00

Bill 8.5 Transformador Cavern y embarrado Conexiones

Bill No. 9 - Tailrace túnel

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Portales se considerarán y valoran como trabajo de apoyo detrás de la cara

Excavación tierra vegetal.

a) de excavación a granel

Preparación de la fundación de la roca

Por encima del suelo. Excavación de roca a granel (anchura> 2 m).

Por encima del suelo. Pozos de contorno perimetral para voladuras (cuando menos que se requiere 0,7 m de distancia).

Por encima del suelo. Excavación de la roca. Desmonte excesivo anormal.

Underground. La excavación del túnel incluyendo túneles a ambas unidades. Sección mínima de 24,9 m2, (5.70m 4.80mx)

Túnel de descarga, ramas a la Unidad 1 y 2. Cross.section mínimo de 3,50 mx 5,70 m

Adicional excavación en transición entre túnel de descarga y ramas a la Unidad 1 y

Underground. La excavación del túnel. Además de una mayor sección transversal.

Page 191: BoQ Part 1 Version 1

9.1.02.08 m3 700 15.76 11,032.00

9.1.02.09

m 200 575.83 115,166.00

m 120 2,009.16 241,099.20

9.1.02.10 m 70 855.66 59,896.20

9.1.02.11 m 500 15.23 7,615.00

9.1.02.12 mes 4 9,942.33 39,769.32

9.1.02.13 mes 2 12,052.57 24,105.14

9.1.02.14 mes 1 14,162.81 14,162.81

9.1.02.15 mes 1 16,273.05 16,273.05

9.1.02.16 no 1 2,385.50 2,385.50

9.1.03.00

9.1.03.01 m 4,500.00 15.58 70,110.00

9.1.03.02 m 500 13.55 6,775.00

Underground. La excavación del túnel. Desmonte excesivo anormal.

Underground. La excavación del túnel. Además para las rondas de voladura cortos.

a) Adición de medio rondas blastning

b) Adición de cuarta rondas de voladura

Underground. La excavación del túnel. La adición de subdivisión de la sección transversal en el rumbo y bancos.

Subterráneas. perforaciones contorno perimetral para voladuras (cuando menos que se requiere 0,7 m de distancia).

Underground. La descarga de agua. Bombear tasa de 1 - 2 m3 / min. Incluye también los vertidos de las vías fluviales y otras cavidades excavadas en este túnel

Underground. La descarga de agua. Bombear tasa de 2-3 m3 / min. Incluye también los vertidos de las vías fluviales y otras cavidades excavadas en este túnel

Underground. La descarga de agua. Bombear tasa de 3-4 m3 / min. Incluye también los vertidos de las vías fluviales y otras cavidades excavadas en este túnel

Underground. La descarga de agua. Bombear tasa de más de 4 m3 / min. Incluye también los vertidos de las vías fluviales y otras cavidades excavadas en este túnel

Estación de medición de agua

La perforación exploratoria e inyección.

Percusión de perforación, con un diámetro de 50 mm. Profundidad 0 - 30 m. En la cara

Percusión de perforación, con un diámetro de 50 mm. Profundidad 0 - 30 m. Detrás de la cara

Page 192: BoQ Part 1 Version 1

9.1.03.03 no 45 73.32 3,299.40

9.1.03.04 no 5 60.68 303.4

9.1.03.05 no 45 30.3 1,363.50

9.1.03.06 5 26.25 131.25

9.1.03.07 no 60 143.86 8,631.60

9.1.03.08 no 10 140.23 1,402.30

9.1.03.09 kg 55,000.00 1.01 55,550.00

9.1.03.10 kg 35,000.00 2.59 90,650.00

9.1.03.11 kg 15,000.00 7.19 107,850.00

9.1.03.12 kg 100 23.71 2,371.00

9.1.03.13 kg 1,000.00 1.9 1,900.00

9.1.03.14 hr 150 605 90,750.00

9.1.03.15 hr 15 520 7,800.00

9.1.04.00

9.1.04.01 1 25,000.00 25,000.00

9.1.04.02 hr 250 87.62 21,905.00

9.1.04.03 hr 300 69.96 20,988.00

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

9.1.04.04 m2 500 24.34 12,170.00

9.1.04.05 m2 500 9.06 4,530.00

Agua prueba de presión. Por valor de empacador. Las pruebas con solo empacador. Profundidad 0-5 m. En la cara

Agua prueba de presión. Por valor de empacador. Las pruebas con solo empacador. Profundidad 0-5 m. Detrás de la cara

El lavado entre los agujeros. En la cara.

El lavado entre los agujeros. Detrás de la cara.

Lechada. Por valor de empacador. Profundidad 0-5 m. En la cara

Lechada. Por valor de empacador. Profundidad 0-5 m. Detrás de la cara

Lechada de cemento. Tipo de consumo A. Cemento

Lechada de cemento. Tipo consumo B. Cemento

Lechada de cemento. Escriba C. El consumo de cemento

Lechada química. Escriba D. consumo lechada peso seco

Inyecciones de consolidación.

Tiempo de la lechada. En la cara

Tiempo de la lechada. Detrás de la cara

ROCA túnel APOYO y portal

Temporal de instalación de protección contra caídas de roca en el portal de aguas abajo. Diseño de Contratistas

Prov. Suma

Extra de escala. En la cara.

Extra de escala. Detrás de la cara.

Bill No. 9 - Tailrace túnel

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Invierta limpieza y escalamiento. Detrás de la cara.

Alta presión de descarga de agua. Detrás de la cara

Page 193: BoQ Part 1 Version 1

9.1.04.06 no 700 53.27 37,289.00

9.1.04.07 no 2,200.00 54.35 119,570.00

9.1.04.08 no 2,100.00 65.04 136,584.00

9.1.04.09 no 100 47.72 4,772.00

9.1.04.10 no 100 52.95 5,295.00

9.1.04.11 no 100 61.32 6,132.00

9.1.04.12 no 100 49.06 4,906.00

9.1.04.13 no 1,000.00 50.65 50,650.00

9.1.04.14 no 1,000.00 61.2 61,200.00

9.1.04.15 no 1,300.00 93 120,900.00

9.1.04.16 no 100 43.62 4,362.00

9.1.04.17 no 2,650.00 47.74 126,511.00

Resina extremo anclado pernos de roca, barra corrugada. En la cara. D = 20 mm. Profundidad en la roca 2,4 m

Resina extremo anclado pernos de roca, barra corrugada. En la cara. D = 20 mm. Profundidad en la roca 2,9 m

Resina extremo anclado pernos de roca, barra corrugada. En la cara. D = 20 mm. Profundidad en la roca 3,9 m

Resina extremo anclado pernos de roca, barra corrugada. Detrás de la cara. D = 20 mm. Profundidad en la roca 2,4 m

Resina extremo anclado pernos de roca, barra corrugada. Detrás de la cara. D = 20 mm. Profundidad en la roca 2,9 m

Resina extremo anclado pernos de roca, barra corrugada. Detrás de la cara. D = 20 mm. Profundidad en la roca 3,9 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. En la cara. D = 20 mm. Profundidad en la roca 2,4 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. En la cara. D = 20 mm. Profundidad en la roca 2,9 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. En la cara. D = 20 mm. Profundidad en la roca 3,9 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. En la cara. D = 25 mm. Profundidad en la roca 5,9 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. Detrás de la cara. D = 20 mm. Profundidad en la roca 2,4 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. Detrás de la cara. D = 20 mm. Profundidad en la roca 2,9 m

Page 194: BoQ Part 1 Version 1

9.1.04.18 no 2,000.00 54.26 108,520.00

9.1.04.19 no 50 106.5 5,325.00

9.1.04.20 m2 100 14.48 1,448.00

9.1.04.21 m2 1,500.00 13.1 19,650.00

9.1.04.22 m2 400 10.45 4,180.00

9.1.04.23 m2 300 9.51 2,853.00

9.1.04.24 m 300 42.01 12,603.00

9.1.04.25 m 500 37.89 18,945.00

9.1.04.26 m3 300 300.41 90,123.00

9.1.04.27 m3 200 260.72 52,144.00

9.1.04.28 m3 3,300.00 363.79 1,200,507.00

9.1.04.29 m3 1,500.00 315.64 473,460.00

9.1.04.30 kg 12,000.00 1.8 21,600.00

9.1.04.31 m 500 18.87 9,435.00

9.1.04.32 m 300 13.7 4,110.00

9.1.04.33 kg 8,000.00 3.2 25,600.00

9.1.04.34 m 300 71.17 21,351.00

9.1.04.35 m 220 59.43 13,074.60

9.1.04.36 m3 140 190.04 26,605.60

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. Detrás de la cara. D = 20 mm. Profundidad en la roca 3,9 m

Totalmente pernos de anclaje con lechada de cemento, barra corrugada. Detrás de la cara. D = 20 mm. Profundidad en la roca 5,9 m

Chainlinked malla fija para el rock pernos. En la cara.

Chainlinked malla fija para el rock pernos. Detrás de la cara.

Soldado tela metálica fijada a bulones. En la cara.

Soldado tela metálica fijada a bulones. Detrás de la cara.

Acero correas fijadas para el rock pernos. En la cara.

Acero correas fijadas para el rock pernos. Detrás de la cara.

El hormigón proyectado. Plain. En la cara.

El hormigón proyectado. Plain. Detrás de la cara.

El hormigón proyectado. reforzado con fibra. En la cara.

El hormigón proyectado. reforzado con fibra. Detrás de la cara.

Suministro de barras de refuerzo para las costillas de hormigón proyectado reforzado.

Instalación de costillas de hormigón proyectado reforzado. En la cara.

Instalación de costillas de hormigón proyectado reforzado. Detrás de la cara.

Prefabricación y suministro de vigas de celosía.

Instalación de vigas de celosía para costillas de hormigón proyectado. En la cara.

Instalación de vigas de celosía para costillas de hormigón proyectado. Detrás de la cara.

Concrete forro. Detrás de la cara.

Page 195: BoQ Part 1 Version 1

9.1.04.37 m3 10 190.04 1,900.40

9.1.04.38 m2 600 136.53 81,918.00

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

9.1.04.39 m3 240 100.41 24,098.40

9.1.04.40 m3 100 99.56 9,956.00

9.1.04.41 kg 7,000.00 2.31 16,170.00

9.1.04.42 kg 16,000.00 2.4 38,400.00

9.1.05.00

9.1.05.01 hr 40 605 24,200.00

9.1.05.02 no 1 1,108.00 1,108.00

9.1.05.03 m 50 125.06 6,253.00

9.1.05.04 m 30 171.84 5,155.20

9.1.05.05 kg 100 1.01 101

9.1.05.06 no 5 115.56 577.8

9.1.05.07 no 5 135.56 677.8

9.1.05.08 Pruebas Lugeon no 10 95.56 955.6

9.1.05.09 no 2 3,269.62 6,539.24

9.1.06.0

9.1.06.01 m3 100 18.08 1,808.00

9.1.06.02 Rip-rap

Adicional concreto. Detrás de la cara.

Encofrado para revestimiento de hormigón, Clase C

Bill No. 9 - Tailrace túnel

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Invertir hormigón. En la cara.

Invertir hormigón. Detrás de la cara.

Refuerzo del techo y / o paredes

Refuerzo de invertido. En o detrás de la cara

INVESTIGACIÓN E INSTRUMENTACIÓN.

Investigación y pruebas subterráneas. Tiempo de inactividad.

Perforación de base. Puesta en marcha en cada lugar de perforación.

Núcleo de perforación, diámetro mínimo de 76 mm. Profundidad 0-30 m

Núcleo de perforación, diámetro mínimo de 76 mm. Profundidad 30-100 m

Perforación de base. Estabilización Hole. Lechada de cemento.

Packer escenario de prueba de presión de agua. Prueba concurrente con la perforación (envasador individual). Profundidad 0-100 m

Packer escenario de prueba de presión de agua. Pruebas después de la perforación completa (doble packer). Profundidad 0-100 m

Estación de Convergencia. Max. 3 pines.

DRENAJE Y EROSIÓN DE PROTECCIÓN

Erosión de protección con roca triturada 50-200 mm Min. espesor 300 mm

Page 196: BoQ Part 1 Version 1

m3 60 20.04 1,202.40

m3 100 20.43 2,043.00

9.1.06.03 Filtro de tela

m2 200 6.66 1,332.00

9.1.06.04 Gaviones Colchones m2 150 24.4 3,660.00

9.1.06.05 Gaviones m3 80 46.44 3,715.20

9.1.07.0

9.1.07.01 m2 2,300.00 67.26 154,698.00

9.1.07.02 m2 350 96.29 33,701.50

9.1.07.03 Hormigón Clase C. m3 920 142.91 131,477.20

9.1.07.04 t 60 1,459.67 87,580.20

9.1.07.05 m 3,340.00 179.14 598,327.60

11,147,799.11

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

10.1.01.0

10.1.01.01 no 30 105.23 3,156.90

10.1.01.02 ja 6 9,990.00 59,940.00

10.1.01.03 Excavación Topsoil m3 450 3.34 1,503.00

10.1.01.04 Excavación del suelo

m3 10,500.00 3.68 38,640.00

m3 3,000.00 3.68 11,040.00

m3 2,000.00 3.68 7,360.00

10.1.01.05 m2 500 3.59 1,795.00

10.1.01.06 Llenar y rellenar

m3 2,000.00 16.76 33,520.00

b) relleno estructural m3 2,000.00 15.92 31,840.00

m3 600 14.89 8,934.00

m3 600 25.96 15,576.00

m3 600 26.49 15,894.00

a) Tamaño de piedra 300-500 mm

b) bloques seleccionados> 500 mm

a) Mínimo de 250 g / m2

OBRAS DE CONCRETO.

Encofrado Clase B. Plain. Inclinada o vertical.

Encofrado Clase B. curvada.

Refuerzo. Barras corrugadas.

Concreto pavement.Concrete Clase B. espesor mínimo de 150 mm. Malla de refuerzo min 6,5 kg / m2

Proyecto de Ley No. 9 - Tailrace Túnel

Bill No. 10 - Picunche Presa y Embalse de Compensación

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

MOVIMIENTOS DE TIERRA

Retire la madera utilizable

Compensación y arranque

a) la excavación a granel, para estropear depósito

b) Excavación de pila de almacenamiento (grava, cantos rodados)

c) Las excavaciones para cimientos

Preparación de la fundación de la roca para el hormigonado

a) de relleno del terraplén / grava

c) El relleno de las zanjas

d) material de filtro, 0-60 mm

e) material de drenaje, 50 - 100 mm

Page 197: BoQ Part 1 Version 1

10.1.01.07

m3 7,800.00 18.38 143,364.00

m3 14,800.00 15.29 226,292.00

m3 3,000.00 15.18 45,540.00

m3 600 25.24 15,144.00

10.1.01.08 m2 800 0.32 256

10.1.01.09 Encespado (opcional) m2 500 0.32 160

10.1.02.0

10.1.02.01

m3 3,000.00 18.92 56,760.00

m3 300 20.37 6,111.00

10.1.02.02 Pozos de contorno m 400 17.98 7,192.00

10.1.03.0

10.1.03.01 m 200 15.58 3,116.00

10.1.03.02 m 400 66.74 26,696.00

10.1.03.03 m 50 69.18 3,459.00

10.1.03.04 no 5 119.42 597.1

10.1.03.05 no 250 129.12 32,280.00

10.1.03.06

a) 0 - 100 kg kg 8,000.00 0.88 7,040.00

b) 0 a 200 kg kg 6,000.00 1.05 6,300.00

c) 0 a 300 kg kg 2,000.00 1.27 2,540.00

d) 0 - 500 kg kg 2,000.00 1.63 3,260.00

e) Más de 500 kg kg 1,000.00 2.61 2,610.00

10.1.03.07 Acelerador kg 50 2.5 125

10.1.03.08 kg 100 23.71 2,371.00

10.1.03.09

a) Longitud 2.0 m no 20 56.9 1,138.00

Sección Dique de contención

Relleno de terraplén de grava bien graduada procesado

a) Zona 2, Zona de transición 0-32 mm

b) Zona 3, grava, 0-64 mm

c) Zona 4, Piedras> 64 mm

d) material de base carretera

Colocación de tierra vegetal

EXCAVACIÓN DEL ROCK

La excavación del estribo derecho y fundamento para la estructura de toma, pilar izquierdo:

a) de excavación a granel

b) Trench / zanja de excavación

PRUEBAS DE SUELO Y GROUTEO, APOYO DEL ROCK

Perforación de percusión, diámetro mínimo de 51 mm, profundidad 0-20 m (en roca y hormigón)

Perforación rotatoria con revestimiento, diámetro mínimo de 76 mm, profundidad de 0-20 m

Extra sobre 10.1.03.01 y 10.1.03.02 para agujeros inclinados

Pruebas de presión de agua, por ajuste empacador

Grouting presión Cemento, por ajuste empacador

Cemento lechada: El consumo de cemento per ajuste envasador, tipo B (microcemento

Lechada química. Tipo de lechada: Epoxi

Pernos de anclaje con lechada. D = 32 mm

Page 198: BoQ Part 1 Version 1

b) Longitud 3.0 m no 10 68.24 682.4

c) Longitud 4.0 m no 5 79.57 397.85

d) Longitud 6.0 m no 5 102.26 511.3

e) Longitud 8.0 m no 5 129.48 647.4

f) Longitud 10.0 m no 5 161.85 809.25

10.1.04.0

10.1.04.01 m3 1,000.00 18.08 18,080.00

10.1.04.02 Rip-rap

m3 500 20.01 10,005.00

m3 500 20.04 10,020.00

m3 1,000.00 20.43 20,430.00

d) lechada Rip rap m3 1,290.00 129.62 167,209.80

10.1.04.03 Filtro de tela

m2 1,800.00 6.41 11,538.00

m2 500 6.66 3,330.00

m2 500 7.01 3,505.00

10.1.04.04 m 50 15.58 779

10.1.04.05 m3 100 3.41 341

10.1.04.06

a) 150 mm m 200 24.32 4,864.00

b) 200 mm m 100 33.28 3,328.00

10.1.05.0

10.1.05.01

no 20 77.22 1,544.40

no 30 88.36 2,650.80

no 5 97.35 486.75

10.1.05.02

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

DRENAJE Y EROSIÓN DE PROTECCIÓN

Erosión de protección con roca triturada 50-200 mm Min. espesor 300 mm

a) Tamaño de piedra 150-300 mm

b) Tamaño de piedra 300-600 mm

c) los bloques seleccionados> 600 mm

a) Mínimo de 180 g / m2

b) Un mínimo de 250 g / m2

c) Un mínimo de 300 g / m2

La perforación de agujeros de drenaje, vertical o inclinada agujeros. Diámetro min. 51 mm

La excavación de zanjas y drenajes permanentes catchwater

Reforzado tuberías de drenaje concretas incluyendo curvas y tees. Diámetro interior:

OBRAS DE CONCRETO

Lechada pernos de anclaje. D = 25 mm Longitud en concreto 1,5 m

a) La profundidad en la roca 2,0 m

b) Profundidad en la roca 3,0 m

c) Profundidad en la roca 4,0 m

Lechada pernos de anclaje. D = 32 mm Longitud de hormigón de 1,5 m

Bill No. 10 - Picunche Presa y Embalse de Compensación

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Page 199: BoQ Part 1 Version 1

no 10 68.24 682.4

no 10 79.57 795.7

no 5 102.26 511.3

no 5 129.48 647.4

10.1.05.03

m2 4,500.00 53.95 242,775.00

b) la casa Puerta m2 250 53.95 13,487.50

10.1.05.04

m2 500 73.51 36,755.00

10.1.05.05

m2 100 53.99 5,399.00

b) la casa Puerta m2 70 53.99 3,779.30

m2 2,000.00 53.99 107,980.00

10.1.05.06 Encofrado Clase C.

m2 6,000.00 51.55 309,300.00

m2 300 51.55 15,465.00

10.1.05.07 Surcos

m 100 33.5 3,350.00

10.1.05.08 Huecos rectangulares

no 4 26.7 106.8

no 5 26.7 133.5

m2 5 53.95 269.75

10.1.05.09 m 50 22.63 1,131.50

10.1.05.10 PVC waterstop

a) 150 mm de ancho m 50 15.27 763.5

b) 225 mm de ancho m 750 24.93 18,697.50

10.1.05.11

m 100 3.67 367

b) lechada de cemento kg 100 1.01 101

c) grouting Química l 40 2.5 100

10.1.05.12 m2 50 6.2 310

10.1.05.13 kg 60 18.25 1,095.00

10.1.05.14 m 40 72.58 2,903.20

a) La profundidad en la roca 2,0 m

b) Profundidad en la roca 3,0 m

c) Profundidad en la roca 4,0 m

d) Profundidad en la roca 6,0 m

Encofrado Clase A. Llano.

a) Dam, sección cerrada y puente

Encofrado A. Curved Clase

a) Dam, sección cerrada y puente

Encofrado Clase B. Llano

a) Dam, sección cerrada y puente

c) Dique de contención: cara de concreto y zócalo

a) Dam, sección cerrada y puente

b) La construcción y juntas de dilatación incl. chavetas de cizalladura

a) triangulares, gargantas de goteo, 25 mm

a) Sección transversal no exceda de 0,1 m2

b) Sección transversal desde 0,1 hasta 0,5 m2

c) de encofrado para el hormigonado de huecos. Clase de acuerdo con la superficie adyacente

Teclas cortantes en juntas de construcción

Lechada de las articulaciones y los interfases

a) Suministro e instalación de tubos

Escriba (a rellenar por el Contratista):

Revestimiento bituminoso sobre superficie de hormigón

Compuesto de sellado de juntas.

Cubiertas de hormigón de conducto en bridgedeck incluyendo marcos de acero etc. Ancho 500 mm

Page 200: BoQ Part 1 Version 1

10.1.05.15

a) barras corrugadas t 950 1,459.67 1,386,686.50

b) Las barras lisas t 2 1,459.67 2,919.34

t 2 2,812.50 5,625.00

10.1.05.16

a) D = 20 mm no 20 8.05 161

b) D = 25 mm no 140 11.14 1,559.60

c) D = 32 mm no 50 17.63 881.5

no 10 27.28 272.8

no 10 17.95 179.5

10.1.05.17

a) D = 50 mm m 20 5.45 109

b) D = 75 mm m 30 7.15 214.5

c) D = 100 mm m 50 8.92 446

d) D = 150 mm m 35 16.9 591.5

10.1.05.18 no 3 123.23 369.69

10.1.05.19 kg 60 7.41 444.6

10.1.05.20 no 20 15.71 314.2

10.1.05.21 kg 400 7.41 2,964.00

10.1.05.22 Hormigón Clase B

a) Casa Puerta m3 70 129.94 9,095.80

m3 200 129.94 25,988.00

10.1.05.23 Hormigón Clase C

m3 12,000.00 137.07 1,644,840.00

b) la casa Puerta m3 25 137.07 3,426.75

m3 2,800.00 137.07 383,796.00

d) Muros m3 500 137.07 68,535.00

m3 1,100.00 137.07 150,777.00

10.1.05.24 Hormigón Clase D

a) Cubierta de puente m3 100 167.38 16,738.00

Refuerzo. Todas las dimensiones

c) refuerzo de malla soldada

Deformados barras de acero de calidad soldable para la fijación de estructuras de acero hidráulico tales como revestimiento de acero, guías de compuerta, etc. Longitud .2.0 aprox m parcialmente embutidos

d) las barras de acero inoxidable. D = 32 mm

e) las barras de acero inoxidable. D = 25 mm

PVC-tubos empotrados, incluida curvas y accesorios

Barrancos piso de hierro fundido Embedded con galvanizado cubierta de acero caliente

Acero sección angular de 100 x 100 con anclaje c / c de 300 mm, encerrado en primera etapa concreta

Paso hierro parcialmente incrustado en el hormigón

Guías y alféizares de las trozas de parada Embebido en hormigón

b) las alcantarillas, conductos

a) Dam, sección cerrada y puente

c) losas de protección contra la erosión

e) Dique de contención: cara de concreto y zócalo

Page 201: BoQ Part 1 Version 1

10.1.05.25 Hormigón Clase E

m3 600 174.57 104,742.00

10.1.05.26 Hormigón Clase F m3 100 124.14 12,414.00

10.1.05.27

a) Clase UA m2 1,200.00 4.2 5,040.00

b) Clase UB m2 200 4.65 930

m2 100 4.65 465

d) Clase UC m2 300 4.85 1,455.00

10.1.05.28 no 30 48.2 1,446.00

10.1.05.29 l 250 2.5 625

10.1.05.30 l 40 2.5 100

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

10.1.05.31 l 20 2.5 50

10.1.05.32 m2 20 10.64 212.8

10.1.06.0

a) aberturas de puertas, piso y partes inferiores de los muelles y muros de protección contra la erosión y la losa.

El acabado de superficies formadas

c) Clase de la UB, superficies curvas

Blockout para y rejuntado de los postes de la cerca en losas de hormigón

Lechada de las juntas de construcción con mortero a base de cemento. Incl. posicionamiento planta

Lechada acería alrededor hidráulicos con la expansión de mortero. Incl. posicionamiento planta

Bill No. 10 - Picunche Presa y Embalse de Compensación

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Lechada de las juntas de construcción con lechada de base química tal como fue aprobado por el Ingeniero. Incl.posicionamiento de la planta.

Arenado de superficies de hormigón

INTERFACE CON H, Integración de los HIDRÁULICO STEELWORKS

Page 202: BoQ Part 1 Version 1

10.1.06.01 LS 1 8,099.74 8,099.74

10.1.06.02 LS 1 2,945.36 2,945.36

10.1.06.03 LS 1 26,508.24 26,508.24

10.1.06.04 LS 1 17,672.16 17,672.16

10.1.06.05 Otros (describir): LS 1 0

10.1.07.0

10.1.07.01 Perpiaño Walling

a) 150 mm m2 50 73.3 3,665.00

b) 100 mm m2 20 73.3 1,466.00

10.1.07.02 Membrana para techos m2 125 146.58 18,322.50

10.1.07.03 Puertas

no 5 3,049.00 15,245.00

no 1 3,415.00 3,415.00

no 1 5,542.00 5,542.00

no 4 1,044.67 4,178.68

10.1.07.04 Ventanas

Referencia H-tierna documentos, Parte D, Sección 2 Esta partida incluirá todos los trabajos relacionados con la formación de huecos, bloqueadores y similares para dividir entre la primera y segunda etapa de hormigonado, provisión y remoción de los encofrados para elementos para ser embebido, extra más para empotramiento y segunda etapa de hormigonado y similares, para acería hidráulicos como se indica a continuación. Los volúmenes de concreto y refuerzo de concreto son atendidos bajo Concrete Works.

Inundaciones Flushing Puertas

Descargue Reguladora de Gates

Detener registro Guías, Flushing Puertas

Detener Guías registro, descarga Reguladora de Gates

OBRAS DEL CONSTRUCTOR

a) aislados puertas de acero individuales. Clasificación fuego A60. Dimensiones externas 1000x2100mm

b) las puertas de acero con aislamiento doble. Clasificación fuego A60. Dimensiones externas 1600x2100mm

c) puertas de acero con aislamiento doble. Clasificación fuego A60. Dimensiones externas 2200x2200mm

d) Individual puerta de madera interior. La apertura al exterior 900 x 2100

Page 203: BoQ Part 1 Version 1

no 8 427.5 3,420.00

no 4 464 1,856.00

m2 5 1,044.67 5,223.35

10.1.07.05

m2 10 28.43 284.3

m2 20 28.43 568.6

c) Suelo de vinilo m2 20 70.98 1,419.60

d) enlucido de paredes m2 140 42.76 5,986.40

10.1.07.06

m2 20 24.43 488.6

m2 3 24.43 73.29

m2 30 24.43 732.9

m2 115 24.43 2,809.45

m2 200 24.43 4,886.00

m2 100 24.43 2,443.00

m2 60 24.43 1,465.80

m2 40 24.43 977.2

10.1.08.0

10.1.08.01 no 4 975.67 3,902.68

10.1.08.02 m 80 9.75 780

10.1.08.03

no 2 911.3 1,822.60

b) Fundación en suelo no 3 842.95 2,528.85

10.1.08.04

a) Ventana de aluminio con paneles fijos Tamaño 1000 x 1200 mm

b) las rejillas de ventilación de lamas de aluminio con marco de aluminio y tamaño de pantalla de insectos 500 x 400 mm

c) de acristalamiento 5 mm de vidrio flotado y acristalamiento en paneles de cualquier tamaño.

Piso, Pared y Techo Acabados

a) baldosas de cerámica

b) Los revestimientos cerámicos

Pintura y decoración. Pintura de:

a) metalistería Interna o estructuras de acero

b) trabajos en metal galvanizado

c) Las superficies externas de estructuras de acero

d) las superficies de concreto externos

e) Internos enyesado o superficies de hormigón Paredes

f) Internos enyesado o superficies de concreto, techos

g) Los pisos de concreto con cargas moderadas, Epoxi Tipo (a rellenar por el Contratista):

h) Los pisos de concreto con cargas pesadas, incluyendo salas de baterías. Auto Epoxi nivelación Tipo (a rellenar por el Contratista):

INVESTIGACIÓN E INSTRUMENTACIÓN

Piezómetro Electric. Dispositivo de medición

Piezómetro eléctrico, tuberías

Monumentos de liquidación de superficie

a) de la Fundación en la roca

Punto de asentamiento superficie fija

Page 204: BoQ Part 1 Version 1

no 2 915.86 1,831.72

b) Fundación en suelo no 3 847.51 2,542.53

10.1.09.0 OBRAS DIVERSAS

10.1.09.01 kg 60 7.01 420.6

10.1.09.02 kg 100 6.34 634

10.1.09.03 kg 100 6.34 634

10.1.09.04 kg 200 7.01 1,402.00

10.1.09.05 kg 1,200.00 6.34 7,608.00

10.1.09.06

a) Tipo A kg 2,000.00 7.01 14,020.00

b) Tipo B kg 500 7.01 3,505.00

10.1.09.07 Escaleras de acero kg 120 7.01 841.2

10.1.09.08 m 160 85.5 13,680.00

10.1.09.09

a) la puerta doble ala no 1 4,275.00 4,275.00

b) de puerta única ala no 1 1,832.00 1,832.00

10.1.09.10 m2 1,000.00 0.88 880

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

10.1.09.11 m3 240 29.25 7,020.00

10.1.09.12 m3 180 29.25 5,265.00

10.1.09.13 m2 1,000.00 4.37 4,370.00

10.1.09.14

a) 1 x 95 hilos de cobre m 300 21.34 6,402.00

no 5 101.2 506

no 50 230.3 11,515.00

10.1.09.15 m2 2 8.5 17

a) de la Fundación en la roca

Tapa de la escotilla de poca potencia

Heavy Duty tapa de escotilla incl. accesorios con hormigón, Clase C y acabado de superficies

Arrabio resistente del enrejado de canales de drenaje

Cubierta del conducto de poca potencia

Cubierta del conducto de alta resistencia

Barandillas exteriores, fijas o desmontables

Esgrima, excavación y vaciado de fundación individuo incluidos

Puertas de la cerca, y la excavación para hormigonado de fundaciones individuales incluidos

Preparación de nivel subrasante

Bill No. 10 - Picunche Presa y Embalse de Compensación

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Subbase de roca triturada (0-75 mm) Espesor min. 200 mm

Llevar curso de roca triturada (0-30 mm) Espesor min. 150 mm

Tratamiento de la superficie bitumenous Doble

Electrodos de puesta a tierra

b) varillas de puesta a tierra, 6 m de largo

c) Cadwelding de juntas, conexiones e intersecciones

Ampliado de poliestireno en los estribos del puente 50 mm de espesor

Page 205: BoQ Part 1 Version 1

10.1.10.0

10.1.10.01 LS 1 5,006.00 5,006.00

10.1.11.0

10.1.11.01 LS 1 11,075.00 11,075.00

10.1.12.0

10.1.12.01 LS 1 5,006.00 5,006.00

5,943,047.73

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

01.11.00

11.1.01.0

11.1.01.01 m2 4,400.00 0.99 4,356.00

11.1.01.02 m3 500 5.86 2,930.00

11.1.01.03 m3 500 5.86 2,930.00

11.1.01.04 m3 50 26.18 1,309.00

11.1.01.05 m3 2,500.00 23.1 57,750.00

VENTILACIÓN Y AIRE ACONDICIONADO

Ventilación y aire acondicionado en la casa de la puerta de entrada. Diseño, suministro e instalación.

SUMINISTRO DE AGUA, FONTANERIA E INSTALACION SANITARIA Y ALCANTARILLADO

El agua de alimentación, fontanería e instalación sanitaria y alcantarillado en la casa de la puerta de entrada. Diseño, suministro e instalación.

LUCHA CONTRA INCENDIOS INSTALACIONES

Instalaciones de lucha contra incendios y equipos de rescate.

Proyecto de Ley No. 10 - Picunche Presa y Embalse de Compensación

Bill No. 11 - Obras

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Switchyard Y CREACIÓN DE SERVICIO EN TÚNEL DE ACCESO

MOVIMIENTOS DE TIERRA

Compensación y arranque

Excavación del suelo. A granel.

Excavación del suelo. Fundaciones, zanjas, etc.

Compactado roca triturada 16-32 mm. Por supuesto Base para losas de concreto, canales de cables, fundaciones, etc.

Compactado túnel proyectado botín 30-60 mm en Switchyard

Page 206: BoQ Part 1 Version 1

11.1.01.06 m3 50 22.24 1,112.00

11.1.01.07 m 150 8.92 1,338.00

11.1.01.08 m 200 16.9 3,380.00

11.1.01.09 m2 1,500.00 7.01 10,515.00

11.1.01.10 Turfing m2 1,000.00 0.32 320

11.1.01.11 m3 9,500.00 23.68 224,960.00

11.1.02.0

11.1.02.01 m3 100 5.86 586

11.1.03.0

11.1.03.01 m2 1,100.00 53.95 59,345.00

11.1.03.02 m2 30 53.99 1,619.70

11.1.03.03 m2 50 53.99 2,699.50

11.1.03.04 m2 1,100.00 51.55 56,705.00

11.1.03.05 m2 20 51.55 1,031.00

11.1.03.06 m2 50 51.55 2,577.50

11.1.03.07 m 200 22.63 4,526.00

11.1.03.08 t 50 1,459.67 72,983.50

11.1.03.09 t 1 1,459.67 1,459.67

11.1.03.10 m2 50 3.59 179.5

11.1.03.11 Hormigón Clase C. m3 500 137.07 68,535.00

11.1.03.12 m2 100 4.2 420

11.1.03.13 m 50 15.27 763.5

11.1.03.14 m 100 43.34 4,334.00

Compactado roca triturada 8-16 mm a lo largo de las tuberías de drenaje, tubos para cables, etc.

De desagüe de PVC-pipe. Incluyendo curvas y accesorios. Complete. D = 100 mm

PVC-pipe para curvas cables.Including y accesorios. Complete. D = 150 mm

Filtro de tela (300 g / m2)

Rellenos sanitarios, material de escombros del túnel, la protección permanente caída de rocas.

EXCAVACIÓN DEL ROCK

La excavación de zanjas para cimientos, canales de cables, paredes, etc.

OBRAS DE CONCRETO

Muros de contención, fundaciones, cable conducto etc.

Encofrado Clase B. Plain. Inclinada o vertical.

Encofrado Clase B. Plain. Curvo

Encofrado Clase B. Plain. Horizontal.

Encofrado Clase C. Plain. Inclinada o vertical.

Encofrado Clase C. Plain. Curvadas.

Encofrado Clase C. Plain. Horizontal.

Teclas cortantes en juntas de construcción

Refuerzo. Barras corrugadas.

Refuerzo. Las barras lisas.

Preparación de superficie de la roca para el hormigonado.

El acabado de superficies no formadas, Clase UA.

Waterstop PVC, 150 mm de ancho.

Parcialmente incrustado PVC-pipe. Incluyendo curvas y accesorios. Complete. D = 200 mm

Page 207: BoQ Part 1 Version 1

11.1.03.15 no 80 48.2 3,856.00

11.1.03.16 m2 150 53.95 8,092.50

11.1.03.17 m2 400 53.99 21,596.00

11.1.03.18 m2 20 53.99 1,079.80

11.1.03.19 m2 150 51.55 7,732.50

11.1.03.20 m 200 22.63 4,526.00

11.1.03.21 no 20 26.7 534

11.1.03.22 no 10 26.7 267

11.1.03.23 t 35 1,459.67 51,088.45

11.1.03.24 t 1 1,459.67 1,459.67

11.1.03.25 m2 50 3.59 179.5

11.1.03.26 Hormigón Clase C. m3 450 137.07 61,681.50

11.1.03.27 m2 90 4.2 378

11.1.03.28 m2 20 4.65 93

11.1.03.29 m 50 8.92 446

11.1.03.30 m 50 8.92 446

11.1.03.31 m 50 43.34 2,167.00

11.1.04.0

Edificio de servicios

11.1.04.01 Baldosas de cerámica. m2 35 28.43 995.05

11.1.04.02 Azulejo cerámico. m2 25 28.43 710.75

11.1.04.03 Los pisos de vinilo. m2 15 70.98 1,064.70

11.1.04.04 m2 65 31.55 2,050.75

11.1.04.05 Enyesado, interno. m2 200 17.58 3,516.00

11.1.04.06 m2 150 17.1 2,565.00

Bloqueadores para y rejuntado de los postes de la cerca en losas y muros de hormigón

Edificio de servicios y zona al aire libre

Encofrado Clase A. Llano. Inclinada o vertical.

Encofrado Clase B. Plain. Inclinada o vertical.

Encofrado Clase B. Plain. Horizontal.

Encofrado Clase C. Plain. Inclinada o vertical.

Teclas cortantes en juntas de construcción

Vacío rectangular, de hasta 0,1 m2.

Vacío rectangular, 0,1 a 0,5 m2.

Refuerzo. Barras corrugadas.

Refuerzo. Las barras lisas.

Preparación de superficie de la roca para el hormigonado.

El acabado de superficies no formadas, Clase UA.

El acabado de superficies no formadas, UB Clase.

Parcialmente incrustado PVC-pipe. Incluyendo curvas y accesorios. Complete. D = 100 mm

Parcialmente incrustado PVC-pipe. Incluyendo curvas y accesorios. Complete. D = 150 mm

Parcialmente incrustado PVC-pipe. Incluyendo curvas y accesorios. Complete. D = 200 mm

OBRAS DEL CONSTRUCTOR

Mampostería de bloques de hormigón. 150 mm Espesor nominal

Rendering, teñido, externo.

Page 208: BoQ Part 1 Version 1

11.1.04.07 Suspendido del techo. m2 20 27.35 547

11.1.04.08 no 4 3,049.00 12,196.00

11.1.04.09 no 1 3,415.00 3,415.00

11.1.04.10 no 2 1,044.50 2,089.00

11.1.04.11 no 1 1,044.50 1,044.50

11.1.04.12 no 1 1,044.50 1,044.50

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

11.1.04.13 no 1 1,044.50 1,044.50

11.1.04.14 m2 3 1,044.67 3,134.01

11.1.04.15 m2 45 24.43 1,099.35

11.1.04.16 m2 400 24.43 9,772.00

11.1.04.17 m2 150 24.43 3,664.50

11.1.04.18 no 4 61.12 244.48

11.1.04.19 no 1 119.5 119.5

11.1.04.20 no 3 34 102

11.1.04.21 m2 155 25.34 3,927.70

11.1.04.22 LS 1 35,523.00 35,523.00

11.1.04.23 m2 115 6.67 767.05

11.1.05.0 OBRAS DIVERSAS

Aislados puertas de acero individuales. Clasificación fuego A60. 1000x2100mm abertura en la pared

Aislados puertas de acero dobles. Clasificación fuego A60. 1600x2200mm abertura en la pared

Puertas de madera interiores individuales. 900x2100 abertura en la pared.

Soltero puertas de madera interiores. Con ranura de aire. 900x2100 abertura en la pared.

Aluminio ventana con combinación de louvres / paneles fijos. Tamaño 2000x1000 mm

Bill No. 11 - Obras

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Aluminio ventana con combinación de louvres / paneles fijos. Tamaño 1000x1000 mm

Acristalamiento 5 mm de vidrio flotado y acristalamiento en paneles de cualquier tamaño.

Pintura del suelo. Epoxi. Escriba Sherwin Williams poli-cote 4685

Pintura de paredes. Interna.

Pintura de paredes. Externo.

La pintura de las puertas de acero, solo

La pintura de las puertas de acero, doble

Pintura de puertas interiores de madera

Cinta cóncava suave techo de acero laminado incl. parpadear, mosquitera etc.

Canalones y tubos para drenaje del techo

100 mm de alta densidad de lana mineral fijado a correas de acero de calibre ligero.

Page 209: BoQ Part 1 Version 1

11.1.05.01 Valla m 75 85.51 6,413.25

11.1.05.02 Puerta de dos alas no 1 4,275.00 4,275.00

11.1.05.03 Única puerta ala no 1 1,832.00 1,832.00

11.1.05.04 Valla m 90 85.51 7,695.90

11.1.05.05 Puerta de dos alas no 1 4,275.00 4,275.00

11.1.05.06 Única puerta ala no 1 1,832.00 1,832.00

11.1.05.07 kg 16,000.00 6.34 101,440.00

11.1.05.08 Guardia casa no 1 1,222.00 1,222.00

11.1.06.0

11.1.06.01 m 300 21.34 6,402.00

11.1.06.02 no 8 101.2 809.6

11.1.06.03 no 10 230.3 2,303.00

11.1.07.0

11.1.07.01 LS 1 70,087.00 70,087.00

11.1.08.0

11.1.08.01 LS 1 34,842.00 34,842.00

11.1.09.0

11.1.09.01 LS 1 15,749.00 15,749.00

02.11.00

02.11.01

no 5 3,181.96 15,909.80

no 5 3,550.52 17,752.60

no 5 4,169.20 20,846.00

02.11.02 no 5 707.4 3,537.00

El vallado de la zona servicebuilding.

El vallado de la zona de maniobras.

Cubierta del conducto de alta resistencia.

SERVICIOS ELÉCTRICOS

Tomas de tierra enterrados. Hilos de cobre 1 x 95 mm2.

Varillas de puesta a tierra, min. Longitud 6 m

Cadwelding de juntas, conexiones e intersecciones

VENTILACIÓN Y AIRE ACONDICIONADO

Ventilación y aire acondicionado. Diseño, suministro e instalación

SUMINISTRO DE AGUA, FONTANERIA E INSTALACION SANITARIA Y ALCANTARILLADO

El agua de alimentación, fontanería e instalación sanitaria y el sistema de alcantarillado. Diseño, suministro e instalación.

Figthing FUEGO INSTALACIONES

Instalaciones figthing Bomberos y equipos de rescate

INVESTIGACIÓN E INSTRUMENTACIÓN

Extensómetros de pozos

a) la profundidad de anclaje 2 m

b) la profundidad de anclaje 4 m

c) Ancla profundidad de 8 m

Metros Conjunta deformación

Page 210: BoQ Part 1 Version 1

02.11.03 no 5 731.8 3,659.00

11.02.04

a) Presa Huaura LS 1 4,269.00 4,269.00

b) Presa Checras LS 1 7,319.00 7,319.00

c) Picunche Presa LS 1 4,269.00 4,269.00

LS 1 13,111.00 13,111.00

03.11.00 ANCLA DEL SUELO

03.11.01

a) Número de Anclas no 10 98.71 987.1

m 80 3.1 248

03.11.02

a) Número de Anclas no 10 131.27 1,312.70

m 100 3.1 310

1,197,632.08

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

01.12.00 TRABAJO

Estación con muesca en V vertedero para medir y registrar las fugas en los túneles

Monitoreo del agua subterránea durante el período de construcción

d) Túneles y Casa de Máquinas

Obras concretas que figuran en los puntos de facturas por encima de

Auto ancla de perforación del suelo (tipo Ischebeck Titan (40/16) o similar), incluyendo las placas y accesorios, totalmente inyectados.

b) Longitud total de Anclas

Ancla Auto perforación del suelo (tipo Ischebeck Titan 52/20 o similar), totalmente lechada

b) Longitud total de Anclas

Proyecto de Ley No. 11 - Obras

Bill No. 12 - Dayworks

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Page 211: BoQ Part 1 Version 1

01.12.01 Ingeniero hr 1,000.00 65 65,000.00

01.12.02 Capataz hr 1,000.00 20.6 20,600.00

01.12.03 Topógrafo hr 500 20.6 10,300.00

01.12.04 hr 20,000.00 16 320,000.00

01.12.05 Obrero semicualificado hr 3,000.00 16 48,000.00

01.12.06 Obrero cualificado hr 3,000.00 16 48,000.00

12.01.07 Conductor hr 3,000.00 19.9 59,700.00

01.12.08 Operador de equipo hr 1,000.00 19.9 19,900.00

12.01.09 hr 1,000.00 20.92 20,920.00

02.12.00 MATERIALES

02.12.01 100,000.00 1 100,000.00

02.12.02 % 100,000.00 30 30,000.00

12.02.03 kg 2,000.00 1.42 2,840.00

02.12.04 kg 2,000.00 6.02 12,040.00

12.02.05 kg 2,000.00 20.24 40,480.00

12.02.06 kg 2,000.00 23.9 47,800.00

02.12.07 1 -200,000.00 -200,000.00

Las tasas dayworks cotizados para el trabajo serán las cantidades totales a pagar, e incluirán todos los costos, tales como subsidios para el cumplimiento de la legislación laboral, seguros, alojamiento, tiempo de viaje, compensación por horas extras, uso y mantenimiento de pequeñas herramientas de trabajo, supervisión, gastos generales y ganancias. Las tarifas serán aplicables a todas las categorías funciona 

independiente de la cantidad de trabajo; dentro del turno-disposición utilizada en el sitio. Sólo el tiempo real dedicado a la obra será pagado.

Trabajador no cualificado

Operador de equipo pesado

Todos los materiales utilizados en dayworks deberán cumplir con las especificaciones. Las tarifas incluirán la entrega en el lugar y el almacenamiento necesario y la manipulación.

Prov. suma

Los gastos generales del contratista y el beneficio sobre el punto 12.2.01

Lechada de cemento. Tipo B. Expirado material

Lechada de cemento. Tipo C. Expirado material

Contacto mampostería. Tipo D. Expirado material

Contacto mampostería. Tipo E. material caducado

Las regalías de materiales de cantera

Prov. Suma

Page 212: BoQ Part 1 Version 1

12.03.00

03.12.01 Tunneljumbo hr 500 369.32 184,660.00

03.12.02 hr 500 99.8 49,900.00

03.12.03 hr 600 84.48 50,688.00

03.12.04 hr 600 34.6 20,760.00

12.03.05 hr 200 74.3 14,860.00

12.03.06 hr 500 74.3 37,150.00

12.03.07 hr 200 129.4 25,880.00

12.03.08 hr 200 84.34 16,868.00

12.03.09 D6 Dozer o equivalente hr 300 221.31 66,393.00

12.3.10 D6 Dozer o equivalente hr 300 221.31 66,393.00

12.3.11 D7 Dozer o equivalente hr 300 296.91 89,073.00

03.12.12 D8 Dozer o equivalente hr 300 331.11 99,333.00

12.03.13 hr 300 161.91 48,573.00

03.12.14 hr 300 179.91 53,973.00

12.03.15 hr 200 125.91 25,182.00

03.12.16 hr 200 170.91 34,182.00

03.12.17 10 t rodillo rueda lisa hr 200 71.61 14,322.00

12.03.18 hr 200 71.61 14,322.00

12.03.19 hr 200 23.31 4,662.00

12.03.20 8 t camión hr 500 62.91 31,455.00

EQUIPO / MAQUINARIA

Las tarifas de los equipos deberán incluir todos los costos de operación y mantenimiento, combustible, aceite, grasa, operadores y turnboys salarios, gastos generales y beneficio. Sólo el tiempo empleado realmente en el trabajo se ha pagado y las tasas deberá incluir la compensación por tiempo de inactividad, viajar y con el tiempo.

Robot de proyección de hormigón, Capacidad 4 m3 / hs

Aparejo de atornillamiento

Equipo completo para la lechada

Equipo completo para escalamiento hidráulico (20 toneladas)

Cargador frontal con la cesta de escala fija

Mobile grúa con cesta y máquina de perforación para la perforación de agujeros para pernos de anclaje. La grúa podrá acceder y llegar a todas las alturas en las cavernas

Generador de energía 75-115 KVA

Motoniveladoras completo con ripper, Cat. D12 o equivalente

Ditto, Cat. 14 o equivalente

Excavadora, retroexcavadora 0,7 m3

Cargadora de ruedas. Gato. 966 o equivalente

6 t rodillo vibrante remolcado

Rodillo de vibración mano-impulsado o vibración compactador de placa

Page 213: BoQ Part 1 Version 1

03.12.21 8 t volquete camión hr 500 71.91 35,955.00

12.03.22 11 t camión volquete hr 200 80.91 16,182.00

12.03.23 hr 500 44.91 22,455.00

03.12.24 hr 200 98.91 19,782.00

12.03.25 hr 200 116.91 23,382.00

03.12.26 hr 200 143.91 28,782.00

12.03.27 hr 200 287.91 57,582.00

12.03.28 hr 200 107.91 21,582.00

12.03.29 hr 200 107.91 21,582.00

03.12.30 hr 200 179.91 35,982.00

03.12.31 hr 200 53.91 10,782.00

03.12.32 hr 200 71.91 14,382.00

12.03.33 Tractor, hasta 100 CV. hr 200 71.91 14,382.00

03.12.34 hr 500 44.91 22,455.00

03.12.35 hr 300 3.6 1,080.00

03.12.36 hr 300 81.32 24,396.00

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

12.04.00

12.04.01 hr 200 378.8 75,760.00

12.04.02 hr 200 17.15 3,430.00

12.04.03 hr 200 118.25 23,650.00

12.04.04 hr 200 40.17 8,034.00

12.04.05 hr 200 66.18 13,236.00

04.12.06 Manitou hr 200 49.32 9,864.00

12.04.07 hr 200 29.24 5,848.00

12.04.08 hr 200 30.5 6,100.00

04.12.09 hr 200 35.8 7,160.00

12.04.10 Microbus 9 pasajeros hr 200 64.25 12,850.00

12.04.11 Autobuses 51 pasajeros hr 200 148.87 29,774.00

0,75 a 1,0 t de capacidad de recogida

Grúa móvil, hasta 25 t de capacidad.

Grúa móvil, 25 - capacidad de 50 t.

Grúa móvil, 50 - capacidad de 75 t.

Grúa móvil, más de 75 t de capacidad.

Camión mezclador de concreto. Capacidad 6-10 m3.

Bomba de hormigón. Capacidad de hasta 50 m3 / hora.

Bomba de hormigón. Capacidad de más de 50 m3 / hora.

Aire compresor con accesorios. Capacidad 10-20 m3 / min.

Aire compresor con accesorios. Capacidad mínima de 20 m3 / min.

Pick-up, 0.75 t - capacidad de 1,0 t.

Completo de la bomba de agua. Capacidad 1.000 l / min

Cisterna de agua, min. 8 000 l de capacidad.

Bill No. 12 - Dayworks

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

OTRO EQUIPO QUE SE DESCRIBEN EN CONTRATISTA

Planta de trituración (w / o mano de obra)

Báscula (w / o mano de obra)

Baño de hormigón (w / o mano de obra)

Shotcrete Bthing (w / o mano de obra)

Camión mezclador de 4 m3

Unidad de ventilación D = 900 mm

Unidad de ventilación D = 1200 mm

Unidad de ventilación D = 1400 mm

Page 214: BoQ Part 1 Version 1

12.04.12 Generadores 1000 KVA hr 200 220.71 44,142.00

04.12.13 Equipo de Soldadura hr 200 16.44 3,288.00

12.05.00

12.05.01 m3 200 21.45 4,290.00

12.05.02 m3 200 30.63 6,126.00

12.05.03 m3 200 15.1 3,020.00

12.05.04 m3 200 15.1 3,020.00

05.12.05 tonelada 500 22.8 11,400.00

12.05.06 tonelada 500 22.02 11,010.00

12.05.07 m3 100 255.13 25,513.00

06.12.00

12.06.01 m3 100 1.35 135

12.06.02 m3 100 1.39 139

12.06.03 m3 100 1.69 169

12.06.04 m3 100 2.39 239

12.06.05 m3 100 4.32 432

12.06.06 m3 100 7.52 752

12.06.07 m3 100 13.68 1,368.00

12.06.08 m3 100 20.5 2,050.00

VARIOS PRECIOS DE LA UNIDAD

Sand cargado en camión / camión

Grava cargado en camión / camión

Adoquín, guijarro cargado en camión / camión

Botín túnel cargado en camión / camión

Aplastamiento / tamizado de despojo túnel (tamaño 0-30 mm) y se almacena en el área de depósito de despojos.

Aplastamiento / tamizado de despojo túnel (tamaño 30 a 120 mm) y se almacena en el área de depósito de despojos.

Hormigón Clase C entregado en el sitio

TRANSPORTE depende de la distancia TRANSPORTE

Los siguientes tipos se utilizan para los camiones / volquetes en el sitio o de tamaño similar, donde el transporte de transporte no es parte de la obra contractual o donde los costos de transporte se ajustarán de acuerdo a la longitud de transporte, según el acuerdo con el Ingeniero. Para distancias mayores de 0,2 km y entre dos de las distancias indicadas en la tabla, lineal

a) Longitud de transporte 0,2 kilometros

b) Longitud de transporte 0,5 kilometros

c) Longitud de transporte 1,0 kilometros

d) Longitud de transporte 2,0 kilometros

e) Longitud de transporte 5,0 kilometros

f) Longitud de transporte 10 kilometros

longitud g) Transporte 20 kilometros

longitud h) Transporte 30 kilometros

Page 215: BoQ Part 1 Version 1

12.06.09 m3 100 33.26 3,326.00

12.06.10 m3 100 0.68 68

12.06.11 m3 1,000.00 2.81 2,810.00

12.06.12 cama x día 22,800.00 25 570,000.00

12.06.13 cama x día 43,300.00 15 649,500.00

3,503,455.00

Artículo Descripción Unidad Cantidad Precio Unitario Precio total

14.1

14.01.01 m 3,848.52

14.01.02 m 4,055.31

01.14.03 m 4,424.31

14.01.04 m 4,421.48

01.14.05 m 4,687.73

14.01.06 m 2,892.56

01.14.07 m 2,952.68

01.14.08 m 5,076.93

i) Longitud de transporte 50 kilometros

j) Longitud de transporte en exceso de 50 km, por km

k) La carga de camiones / camiones / volquetes

l) Las camas de Personal (1 persona / habitación)

m) Las camas de mano de obra especializada (2 personas / habitación)

Proyecto de Ley No. 12 - Dayworks

Bill No. 14 - Alternativa Precio por unidad

DÓLAR ESTADOUNIDENSE

DÓLAR ESTADOUNIDENSE

Undeground Excavación cuarta ronda (Mecánico)

Underground Excavación cuarta ronda (Mecánico) Túnel de Transferencia

Excavación Underground cuarta ronda (Mecánico) Adit 1 Túnel

Underground Excavación cuarta ronda (Mecánico) sobretensiones Tunel Túnel

Underground Excavación cuarta ronda (Mecánico) de aducción Túnel

Underground Excavación cuarta ronda (Mecánico) Acceso Tunel

Underground Excavación cuarta ronda (Mecánico) By Pass Tunel a Tailrace

Underground Excavación cuarta ronda (Mecánico) By Pass Tunel de aducción

Underground Excavación cuarta ronda (Mecánico) Tailrace Túnel