ESKOM WEIGHBRIDGEALMA
Item Quantity Rate AmountNo
BILL NO. 1
PRELIMINARIES AND GENERAL
i) The preliminaries are to be the JBCC Series 2000Preliminaries prepared by the Joint Building ContractsCommittee, January 2001 edition and shall be deemedto be incorporated herein
ii) Tenderers are referred to the abovementioneddocuments for the full intent and meaning of eachclause thereof (hereinafter referred to by heading andclause number only) for which such allowance must bemade as may be considered necessary
iii) Where standard clauses or alternatives are notentirely applicable to this contract such modifications,corrections or supplements as will apply are givenunder each relevant clause heading
i v ) Where any item is not relevant to this specificcontract such item is marked N/A (signifying "notapplicable")
v) If Alternative A as set out in clause B10.3 hereinafteris to be used for the adjustment of the preliminarieseach item priced is to be allocated to one or more ofthe three categories, where "F" denotes a fixed amount(amount not to be varied), "V" denotes an amountvariable in proportion to value and "T" denotes anamount in proportion to time
-------------------------
Carried Forward R Bill No. 1PRELIMINARIES
1 A
ESKOM WEIGHBRIDGEALMA
Brought Forward R
PRELIMINARIES
Definition and interpretation (B1)
1 Definition and interpretation (B1.1 - B1.6.5)
F:............................. V:............................ T:............................ Item
Documents (B2)
2 Checking of documents (B2.1)
F:............................. V:............................ T:............................ Item
3 These bills of quantities contain pages and annexures asindexed on the index
The items in these bills of quantities are to be read and pricedin conjunction with and the descriptions regarded as amplifiedby the Model Preambles for Trades as recommended andpublished by the Association of South African QuantitySurveyors, 1997 edition, and no claim arising from brevity ofdescription of items fully described in the said Model Preamblesfor Trades will be entertained
Item
4 Provisional bills of quantities (B2.2)
F:............................. V:............................ T:............................ N/A
5 These bills of quantities are in Multiple Procurement format i.e.the "Wet Trades" - earthworks, concrete, formwork andreinforcement, precast concrete, masonry, waterproofing andsub-surface drainage are fully measured and the subsequenttrades are budgetary allowances
F:............................. V:............................ T:............................ Item
6 Availability of construction documentation (B2.3)
F:............................. V:............................ T:............................ Item
Carried Forward R Bill No. 1PRELIMINARIES
2 A
ESKOM WEIGHBRIDGEALMA
Brought Forward R
7 The budgetary allowances allocated for subsequent tradesincluded in this document will be separately procured, based onmultiple procurement of nominated subcontractors during theconstruction period
F:............................. V:............................ T:............................ Item
8 Interests of agents (B2.4)
F:............................. V:............................ T:............................ Item
9 Priced documents (B2.5)
F:............................. V:............................ T:............................ Item
10 Tender submission (B2.6)
F:............................. V:............................ T:............................ Item
11 Notwithstanding anything contained in this clause tenders shallbe valid for a period of .......12........... weeks from the closingdate of tenders
F:............................. V:............................ T:............................ Item
The site (B3)
12 Defined works area (B3.1)
F:............................. V:............................ T:............................ Item
13 The area of the works to be occupied by the contractor, anyrestriction on the area and the limit of access or exit will bepointed out to the contractor by the principal agent on handingover of the site
F:............................. V:............................ T:............................ Item
14 Geotechnical investigation (B3.2)
F:............................. V:............................ T:............................ Item
Carried Forward R Bill No. 1PRELIMINARIES
3 A
ESKOM WEIGHBRIDGEALMA
Brought Forward R
15 Inspection of the site (B3.3)
F:............................. V:............................ T:............................ Item
16 No claims for extras arising from the contractor having failed tocomply with this clause will be entertained
F:............................. V:............................ T:............................ Item
17 Existing buildings will be occupied and parking areas aroundbuildings will also be used, and contractor must allow for (B3.4)
F:............................. V:............................ T:............................ Item
18 Previous work - dimensional accuracy (B3.5)
F:............................. V:............................ T:............................ Item
Work executed under a previous contract is:
This work is on an existing site
19 Previous work - defects (B3.6)
F:............................. V:............................ T:............................ Item
20 Services - known (B3.7)
F:............................. V:............................ T:............................ Item
21 Services - unknown (B3.8)
F:............................. V:............................ T:............................ Item
22 Protection of trees etc (B3.9)
F:............................. V:............................ T:............................ Item
Carried Forward R Bill No. 1PRELIMINARIES
4 A
ESKOM WEIGHBRIDGEALMA
Brought Forward R
23 Articles of value (B3.10)
F:............................. V:............................ T:............................ Item
24 Inspection of adjoining properties etc (B3.11)
F:............................. V:............................ T:............................ Item
Management of contract (B4)
25 Management of the works (B4.1)
F:........................ V:............................ T:............................ Item
26 Programming for the works (B4.2)
F:............................. V:............................ T:............................ Item
27 Progress meetings (B4.3)
F:............................. V:............................ T:............................ Item
28 Technical meetings (B4.4)
F:............................. V:............................ T:............................ Item
Samples and shop drawings (B5)
29 Samples of materials (B5.1)
F:............................. V:............................ T:............................ Item
30 Workmanship samples (B5.2)
F:............................. V:............................ T:............................ Item
31 Shop drawings (B5.3)
F:............................. V:............................ T:............................ Item
Carried Forward R Bill No. 1PRELIMINARIES
5 A
ESKOM WEIGHBRIDGEALMA
Brought Forward R
Temporary works and plant (B6)
32 Deposits and fees (B6.1)
F:............................. V:............................ T:............................ Item
33 Enclosure of the works (B6.2)
F:............................. V:............................ T:............................ Item
34 Advertising (B6.3)
F:............................. V:............................ T:............................ Item
35 Plant, equipment, sheds and offices (B6.4)
F:.........................V:............................ T:............................ Item
36 Main notice board (B6.5)
F:......................... V:............................ T:............................ Item
37 Subcontractors notice board (B6.6)
F:............................. V:............................ T:............................ N/A
Temporary services (B7)
38 Location (B7.1)
F:............................. V:............................ T:............................ Item
39 Water (B7.2)
F:.........................V:............................ T:............................ Item
40 Electricity (B7.3)F:......................... V:............................ T:............................ Item
Carried Forward R Bill No. 1PRELIMINARIES
6 A
ESKOM WEIGHBRIDGEALMA
Brought Forward R
41 Telecommunication equipment (B7.4)
F:............................. V:............................ T:............................ Item
42 Ablution facilities (B7.5)
F:........................ V:............................ T:............................ Item
Prime cost amounts (B8)
43 Responsibility for prime cost amounts (B8.1)
F:............................. V:............................ T:............................ Item
Attendance on N/S Subcontractors (B9)
44 General attendance (B9.1)
F:............................. V:............................ T:............................ Item
45 Special attendance (B9.2)
F:............................. V:............................ T:............................ Item
46 Commissioning - Fuel, water and power (B9.3)
F:............................. V:............................ T:............................ Item
Financial aspects (B10)
Statutory taxes, duties and levies (B10.1)
F:............................. V:............................ T:............................ Item
47 Provision is made in the summary of these bills of quantities forthe inclusion of Value Added Tax (VAT)
F:............................. V:............................ T:............................ Item
Carried Forward R Bill No. 1PRELIMINARIES
7 A
ESKOM WEIGHBRIDGEALMA
Brought Forward R
48 Payment of preliminaries (B10.2)
F:............................. V:............................ T:............................ Item
49 Adjustment of preliminaries (B10.3)
F:............................. V:............................ T:............................ Item
50 Payment certificate cash flow (B10.4)
F:............................. V:............................ T:............................ Item
51 Contractor information supply (B10.5)
F:............................. V:............................ T:............................ Item
General (B11)
52 Protection of works (B11.1)
F:............................. V:............................ T:............................ Item
53 Protection/isolation of existing/sectionally occupied works(B11.2)
F:............................. V:............................ T:............................ Item
54 Site security (B11.3)
F:............................. V:............................ T:............................ Item
55 Notice before covering work (B11.4)
F:............................. V:............................ T:............................ Item
56 Disturbance (B11.5)
F:............................. V:............................ T:............................ Item
Carried Forward R Bill No. 1PRELIMINARIES
8 A
ESKOM WEIGHBRIDGEALMA
Brought Forward R
57 Works cleaning and clearing (B11.6)
F:......................... V:............................ T:............................ Item
58 Vermin (B11.7)
F:............................. V:............................ T:............................ Item
59 Overhand work (B11.8)
F:............................. V:............................ T:............................ Item
Schedule of variables (B12)
60 Pre-tender information (B12.1)
F:............................. V:............................ T:............................ Item
Information necessary for elections and completion of thoseclauses contained in the schedule which are necessary fortender purposes is given hereunder. Where no information isgiven it shall mean that either no details or specificrequirements are available or that the clause is not relevant tothis specific contract
12.1.1 Provisional bills of quantities (B2.2)The quantities are provisional:
No
12.1.2 Availability of construction documentation (B2.3)Construction documentation is complete
Yes
12.1.3 Interest of agents (B2.4) Yes
12.1.4 Defined works area (B3.1) Yes
61 12.1.5 Geotechnical investigation (B3.2) No Item
12.1.6 Existing premises occupied (B3.4) Yes
Carried Forward R Bill No. 1PRELIMINARIES
9 A
ESKOM WEIGHBRIDGEALMA
Brought Forward R
12.1.7 Services - known (B3.7) Yes
12.1.8 Protection of trees (B3.9) Yes
1 2 . 1 . 9 Inspection of adjoining properties (B3.11) Yes
12.1.10 Enclosure of the works (B6.2) Yes
12.1.11 Offices (B6.4.3) Yes
12.1.12 Main notice board (B6.5) Yes
12.1.13 Subcontractors notice board (B6.6)
No
12.1.14 Water (B7.2)Alternative Selected: B The contractor must supply if
insufficient
12.1.15 Electricity (B7.3)- The contractor must supply
12.1.16 Telecommunications (B7.4)Alternative selected: A
12.1.17 Ablution facilities (B7.5)None availible - the contractor must supply
12.1.8 Special attendance (B9.2) No
12.1.19 Protection of the works (B11.1) Yes
12.1.20 Protection of existing/sectionally occupied works(B11.2)
Protection is required : Yes
12.1.21 Disturbance (B11.5) Yes
62 Post tender information (B12.2)
F:............................. V:............................ T:............................ Item
Carried Forward R Bill No. 1PRELIMINARIES
1 0 A
ESKOM WEIGHBRIDGEALMA
Brought Forward R
12.2.1 Payment of preliminariesAlternative selected: B
12.2.2 Adjustment of preliminariesAlternative selected: A
12.2.3 Additional agreed preliminaries itemsNone...............................................................-
Carried Forward R Bill No. 1PRELIMINARIES
1 1 A
ESKOM WEIGHBRIDGEALMA
Brought Forward R
SPECIFIC PRELIMINARIES
63 PROPRIETARY BRANDED PRODUCTSThe contractor shall take delivery of, handle, store, use applyand/or fix all proprietary branded products in strict accordancewith the manufacturers' instruction after consultation with themanufacturer's authorised representative
F:............................. V:............................ T:............................ Item
64 OVERTIME
Should overtime be required to be worked for any reasonwhatsoever, the costs of such overtime are to be borne by thecontractor unless the principal agent has specifically authorisedin writing, prior to the execution thereof, that costs for suchovertime are to be borne by the employer.
F:............................. V:............................ T:............................ Item
65 SITE INSTRUCTIONS
Site instructions issued on site are to be recorded in triplicate ina site instruction book which is to be maintained on site by thecontractor
F:............................. V:............................ T:............................ Item
66 LABOUR RECORD
At the end of each week the contractor shall provide theprincipal agent with a written record, in schedule form, reflectingthe number and description of tradesmen and labourersemployed by him and all subcontractors on the works each day.
F:............................. V:............................ T:............................ Item
67 NON CESSION OF MONIES
The contractor shall not cede nor assign his rights or claims toany monies due or to become due under this contract
F:............................. V:............................ T:............................ Item
Carried Forward R Bill No. 1PRELIMINARIES
1 2 A
ESKOM WEIGHBRIDGEALMA
Brought Forward R
68 HEALTH & SAFETY
The contractor shall provide a Health & Safety plan uponrequest and comply with all regulations and applicable laws. The contractor must comply with the latest addition of the actas no claims in this regard will be recognised.
F:........................... V:.........................T:............................Item
69 TRANSPORTATION OF WORKERS
Transportation of workers must not be on open vehicles. Thecontractor must provide mini-bus / bus transport from site to thenearest taxi rank for the duration of the contract
F:...........................V:...........................T:.......................... Item
Carried to Summary R Bill No. 1PRELIMINARIES
1 3 A
ESKOM WEIGHBRIDGEALMA
Item Quantity Rate AmountNo
BILL NO. 2
DEMOLITIONS
REMOVAL OF EXISTING WORK
Breaking up and removing reinforced concrete
1 Surface bed not exceeding 200mm thick for new foundations(elsewhere) m3 12
2 Cut straight cut through existing 200mm thick reinforcedconcrete surfacebed for new foundations (elsewhere) m 38
Carried to Summary R Bill No. 2DEMOLITIONS
1 4 A
ESKOM WEIGHBRIDGEALMA
Item Quantity Rate AmountNo
BILL NO. 3
EARTHWORKS
EXCAVATIONS
Excavation in existing compacted gravel filling, notexceeding 2m deep for
1 Foundations m3 4
Extra over all excavations for carting away
2 Surplus material from excavations and/or stock piles on site toa dumping site to be located by the contractor m3 4
Risk of collapse of excavations
3 Sides of trench and hole excavations not exceeding 1,5m deep m2 11
Keeping excavations free of water
4 Keeping excavations free of all water other than subterraneanwater
Item
FILLING ETC
Approved selected G6 imported material carted oncompacted in 150mm layers to 95% Mod AASHTO density
5 Under ramps m3 7
Carried to Summary R Bill No. 3EARTHWORKS
1 5 A
ESKOM WEIGHBRIDGEALMA
Item Quantity Rate AmountNo
BILL NO. 4
CONCRETE
UNREINFORCED MASS CONCRETE
15MPa/19mm concrete
1 In filling below ground slab m3 11
2 In filling below ramps m3 14
REINFORCED CONCRETE
30MPa/19mm concrete in
3 Foundations m3 9
4 Ground slabs m3 8
5 Ramps m3 10
6 Impact protectors m3 1
CONCRETE SUNDRIES
Finishing top surfaces of concrete smooth with a powerfloat
7 To surface beds m2 66
8 To ramps m2 48
Carried to Summary R Bill No. 4CONCRETE
1 6 A
ESKOM WEIGHBRIDGEALMA
Item Quantity Rate AmountNo
BILL NO. 5
FORMWORK
ROUGH FORMWORK (DEGREE OF ACCURACY II)
Rough formwork to sides
1 To edges exceeding 150mm but not exceeding 300mm high m 24
Carried to Summary R Bill No. 5FORMWORK
1 7 A
ESKOM WEIGHBRIDGEALMA
Item Quantity Rate AmountNo
BILL NO. 6
REINFORCEMENT
High tensile steel reinforcement to concrete work
1 Y20 rods kg 39.46
2 Y16 rods kg 867.00
Fabric reinforcement
3 Type 193 mesh reinforcement in foundations m2 12
4 Type 245 fabric reinforcement in ground slabs m2 66
5 Type 311 fabric reinforcement in concrete ramps m2 48
Carried to Summary R Bill No. 6REINFORCEMENT
1 8 A
ESKOM WEIGHBRIDGEALMA
Item Quantity Rate AmountNo
BILL NO. 7
METALWORK
MILD STEEL
1 24mm diameter x 900mm long threaded rods cast into concreteincluding nuts and washers No 32
2 500 x 500 x 25mm thick baseplates four times drilled for 24mmanchor rods (elsewhere) No 8
3 5mm thick sheet steel formwork around impact protectors bentto detail 2,28m girth x 800mm high girth No 4
Carried to Summary R Bill No. 7METALWORK
1 9 A
ESKOM WEIGHBRIDGEALMA
Item Quantity Rate AmountNo
BILL NO. 8
PAINTING
ON METAL
Prepare and apply one coat Galvogrip primer, oneundercoat and two coats polyurethane enamel paint onsteel
1 Impact protectors m2 7
Carried to Summary R Bill No. 8PAINTWORK
2 0 A
ESKOM WEIGHBRIDGEALMA
Item Quantity Rate AmountNo
BILL NO. 9
WEIGHBRIDGE
1 Heavy duty electronic weighbridge 22m long x 3m wide with aloading capacity of 70 tons installed complete including loadcells, lightning protection and operational PC, printer andsoftware system and all necessary electrical installation. Allinstalled and calibrated according to manufacturersspecification in compliance with SANS 1649 Item
2 Allow for profit Item
3 Allow for attendance Item
Carried to Summary R Bill No. 9WEIGHBRIDGE
2 1 A
ESKOM WEIGHBRIDGEALMA
FINAL SUMMARY
Bill Page AmountNo No
1 13APRELIMINARIES
2 14ADEMOLITIONS
3 15AEARTHWORKS
4 16ACONCRETE
5 17AFORMWORK
6 18AREINFORCEMENT
7 19AMETALWORK
8 20APAINTWORK
9 21AWEIGHBRIDGE
SUBTOTAL R
Value Added Tax (14%) R
Carried to Form of Offer and Acceptance (Page 2) R