bond work index for less than usd 75! -...
TRANSCRIPT
![Page 1: Bond Work Index for less than USD 75! - aminpro.comaminpro.com/wp-content/uploads/2017/09/MiniBond-English.pdf · Bond Work Index for less than USD 75! MiniBond Calibration Protect](https://reader031.vdocuments.us/reader031/viewer/2022022113/5c68502409d3f2f5638b57a9/html5/thumbnails/1.jpg)
Better Coverage. Lower Cost.Bond Work Index for less than USD 75!
MiniBond Calibration
Protect your drill core M
iniB
ond
www.aminpro.com© 2017
• Scale mill from the standard mill (mass, volume and surface).• High reproducibility: 0.4% relative standard deviation between duplicates.• Average error: 3.1%.• Requires less than 600g of sample.• The cost is less than USD 75 (depends on volume).• Requires calibration with standard tests.
The MiniBond test
Cost dependes on volume and it’s subject to change.Cost do not include bulk sample preparation.
With the same budget, one can generate 9 times more testscompared to the traditionalStandard Bond test.
The MiniBond test is a modification of the Standard Bond test to predict the performance of a ball mill. This test is part of Metsuite, a group of geometallurgical tools, and therefore is an exclusive test of Aminpro.The MiniBond test takes less than an hour (outside the preparation of the load), it can be calibrated at different cut meshes and has an average error of 3%. For the same period of time and budget one can do nine times more tests than with the traditional test; it means, you can get nine times more information to model your deposit.
More than 800 testssince its beginning and homologated in more than four geometalurgic programs.
Contact in Chile: [email protected] in Peru: [email protected]
Bond
Wor
k In
dex
[KW
h/tm
]
MiniBond