blueplanet xp10u-h4 installation instructions

Upload: ruwan-wijemanne

Post on 03-Jun-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    1/52

    Instruction Manual Authorized Electricians

    blueplanetXP10U-H4

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    2/52

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    3/52

    Installation Instructions blueplanet XPU-H Page

    General Notes ............................................

    . About this documentation .................................

    . Design features .......................................................

    Safety .........................................................

    . Intended use ............................................................

    . Protection features ................................................

    . Standards and regulations ..................................

    Description ................................................. How it works ............................................................

    . Unit description ......................................................

    Technical Data ..........................................

    . Electrical Data .........................................................

    . Mechanical Data ....................................................

    Transportation and Delivery...................

    . Delivery .....................................................................

    . Transportation ........................................................

    Mounting the Inverter .............................

    Installing the Inverter ..............................

    . Opening the connection area .........................

    . Drilling holes for electrical and interfaceconnection ..............................................................

    . Carrying out the electrical connection .........

    . Connecting the interfaces ................................

    . Sealing the connection area ............................

    . Starting up the inverter ......................................

    Conguration and Operation ................

    . Controls ....................................................................

    . Initial start-up ........................................................

    . Menu structure......................................................

    . Monitoring the inverter .....................................

    . Performing a software update ........................

    Maintenance/Troubleshooting..............

    . Visual inspection ................................................... Cleaning the inverter externally .....................

    . Shutting down for maintenance andtroubleshooting ....................................................

    . Faults .........................................................................

    . Messages on the display and theFault LED .............................................................

    . Replacing or cleaning the fan .........................

    Service......................................................

    Shutdown/Disassembly .........................

    . Shutting down the inverter .............................

    . Deinstalling the inverter ...................................

    . Dismantling the inverter ...................................

    Recycling and disposal ...........................

    Appendix .................................................

    Installation Instructions

    for authorized electricans

    blueplanet

    XPU-H

    Contents

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    4/52

    General Notes

    Page blueplanet Installation Instructions Powador . TL, . TL, . TL_EN

    General Notes

    . About this documentation

    WARNING

    Improper handling of the inverter can be hazardous

    IMPORTANT SAFETY INSTRUCTIONS.

    You must read and understand the operating instructions before you can install and use theinverter safely.

    This manual is intended for inverter model blueplanet XPU-H and shall be followed during installation and main-tenance of this inverter model.

    .. Other Applicable Documents

    During installation, observe all assembly and installation instructions for components and other parts of the system.These instructions are delivered together with the respective components and other parts of the system.

    Some of the documents which are required for registering and approving your photovoltaic (PV) system areincluded with the operating instructions.

    .. Retention of documents

    SAVE THESE INSTRUCTIONS. These instructions and other documents must be stored near the system and beavailable whenever they are needed.

    . Design features

    .. Symbols used in this document

    General hazard symbol Risk of re or explosion

    High voltage Risk of burns

    Authorised electrician The tasks indicated with this symbol may only be carried out by an authorisedelectrician.

    .. Description of safety instructions

    DANGER

    Imminent danger

    Failure to observe this warning will lead directly to serious bodily injury or death.

    WARNING

    Potential danger

    Failure to observe this warning may lead to serious bodily injury or death.

    CAUTIONLow-risk hazard

    Failure to observe this warning will lead to minor or moderate bodily injury.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    5/52

    General Notes

    blueplanet Installation Instructions Powador . TL, . TL, . TL_EN Page

    CAUTION

    Hazard with risk of property damage

    Failure to observe this warning will lead to property damage.

    .. Description of additional information

    NOTICE

    Useful information and notes

    .. Description of action instructions

    a) One-step actions or actions that can be carried out in any sequence:

    Action instructions

    Prerequisite(s) for your action(s) (optional)

    Carry out action.

    (Additional actions, if applicable)

    Result of your action(s) (optional)

    b) Multi-step action instructions that must be carried out in a xed sequence:

    Action instructions

    Prerequisite(s) for your actions (optional)

    . Carry out action.

    . Carry out action.

    . (Additional actions, if applicable)

    Result of your actions (optional)

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    6/52

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    7/52

    Safety

    Installation Instructions blueplanet XPU-H Page

    . Protection features

    For your safety, the following monitoring and protective functions are integrated into Powador inverters:

    Overvoltage conductors/varistors to protect the power semiconductors from high-energy transients on thegrid and generator side

    Temperature monitoring of the heat sink

    EMC lters to protect the inverter from high-frequency grid interference

    Grid-side grounded varistors to protect the inverter against burst and surge pulses

    Islanding detection according to VDE --

    . Standards and regulations

    Electrical conformity according to U.S., Canadian and international safety operating standards and coderequirements:

    UL -: Rev. May

    CSA . No. -: Rev IEEE Std. -

    IEEE Std. .-

    FCC Part Class B

    NEC Sections (ANSI/NFPA )

    Directive concerning Electromagnetic Compatibility with Class B (Council Directive //EC)

    Low Voltage Directive (Council Directive //EC)

    The blueplanet inverter has complete on-board overcurrent, over-temperature and anti-islanding protection.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    8/52

    Description

    Page Installation Instructions blueplanet XPU-H

    Description

    . How it works

    The inverter converts the DC voltage generated by the PV modules into AC voltage and leads this into the gridfeed-in. The feed-in process begins when there is suffi cient irradiance and a specic minimum voltage is presentin the inverter. If, as nightfall approaches, the voltage drops below the minimum voltage value, feed-in mode endsand the inverter switches off.

    . Unit description

    .. Inverter as part of a PV system

    ... System layout

    v

    Figure : Overview circuit diagram for a system with two inverters

    KWhKWh

    PV generator PV generator

    Inverter Inverter

    Safetyfuse

    Safetyfuse

    Consumer

    Feed-in meterReferencemeter

    Main switch

    Grid connectionpoint

    Selective main switch

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    9/52

    Description

    Installation Instructions blueplanet XPU-H Page

    ... A summary of the components

    PV generator

    The PV generator, i.e. the PV modules, converts the radiant energy of sunlight into electrical energy.

    DC terminal pointVariants of parallel connection of several generator strings:

    To a DC terminal point between the DC generator and inverter

    Directly to the inverter (plug connectors for (x) strings are provided on the inverter)

    Directly to the PV generator with a positive and negative lead to the inverter

    Line fuses

    Safety fuses are suitable.

    Feed-in meter

    The feed-in meter is specied and installed by the power supply company. Some power supply companies alsoallow the installation of your own calibrated meters.

    Selective main switch

    If you have questions about the selective main switch, contact your power supply company.

    .. Design of the inverter

    1

    23

    4

    5

    Figure : Design of the inverter

    Key

    1 Operator panel 4 USB interface

    2 Cover for the connection area 5 Mounting plate

    3 Connection board

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    10/52

    Description

    Page Installation Instructions blueplanet XPU-H

    .. Electrical functions

    ... Fault signal relay

    A potential-free relay contact is integrated in the inverter. The contact closes as soon as there is a fault duringoperation.

    For the connection, see section . on page .

    .. Interfaces

    The inverter offers the following interfaces for communication and remote monitoring:

    RS interface

    Ethernet interface

    USB interface

    S interface

    You congure the interfaces and the web server in the conguration menu.

    ... RS interface

    Use this monitoring variant if you cannot check the function of the system on-site on a regular basis, e.g. if yourplace of residence is located a great distance from the system. To connect the RS interface, contact yourauthorised electrician.

    For monitoring your PV system using the RS interface, KACO new energy GmbH offers the following units:

    Powador-proLOG S to XL (optional)

    Powador-proLOG allows you to monitor up to inverters simultaneously. Depending on the product version,Powador-proLOG sends yield and operating data by SMS or e-mail.

    Powador-link RS (optional)

    Use the Powador-link RS to bridge long distances between several inverters or between an inverter and thePowador-proLOG by means of wireless radio transmission.

    ... Ethernet interface

    The monitoring can occur directly on the unit using the integrated Ethernet interface. A local web server is installedin the unit for this purpose.

    For monitoring a system comprising several inverters, we recommend you use an external data logging andmonitoring system.

    ... USB interface

    The USB connection of the inverter is a type A socket. It is located on the connection board on the underside of theinverter under a cover. The USB connection is specied to draw mA of power. Use the USB interface for readingout stored operating data and loading software updates using a FAT-formatted USB stick.

    ... S interface

    The S interface transmits pulses between a pulsing counter and a tariff metering unit. It is a galvanically isolatedtransistor output. It is designed according to DIN EN -:- (Pulse output devices for electromechanicaland electronic meters).

    The S interface pulse rate can be chosen in three unit intervals (, , and , pulses/kWh).

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    11/52

    Technical Data

    4H-U01PXsleveLtupnI

    000,21]W[rewoprotarenegVP.xaM

    055...082]V[ot]V[morfegnarPPMCD

    *055...002]V[ot]V[morfegnargnitarepO

    052]V[egatlovgnitratS

    )006ottrats(006]V[egatlovtiucricnepO

    x2]A[tnerrucdetar.xaM 18.6

    18.6

    Max. power per tracker [W] 10,200

    2x2sgnirtsforebmuN

    2slortnocPPMforebmuN

    edoidtiucric-trohSdraugefasytiraloP

    IIyrogetacegatlovrevoCD

    Output Levels

    000,01]AV[rewopdetaR

    000,01]AV[rewop.xaM

    )ASU(084/772]V[L-L/N-LegatlovdirG

    403-432]V[N-LegnargnitarepoegatlovdirG

    1.21x3]A[tnerrucdetaR

    1.21x3]A[tnerruc.xaM

    )3.16...9.85(06]zH[ycneuqerfdetaR

    99.>)ihpsoc(daollluftarotcafrewoP

    3sesahpni-deefforebmuN

    5.5]%[rotcafnoitrotsiD

    IIIyrogetacegatlovrevoCA

    General electrical data

    4.79]%[ycneic

    0.79]%[ycneic

    5.1

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    12/52

    Technical Data

    Page Installation Instructions blueplanet XPU-H

    . Mechanical Data

    XP10U-H4

    Display LCD graphical display, 3 LEDs

    Controls 4-way key, 2 keys

    Interfaces Ethernet, USB, RS485, S0

    Fault signal relay Potential-free NO contact, 277 V/1 A

    Connections for AC PCB terminal PCB terminals inside the unit (max. cross section: 7 AWG)

    DC connections PCB terminals inside the unit (max. cross section: 11 AWG)

    Connection for Ethernet cable connection RJ45 connector

    Optional DC connection -

    Ambient temperature range [F] -13 ... 140 (-25C ... 60 C)

    Storage temperature range [F] -22 ... 158 (-30C ... 70C)

    Humidity range (non-condensing) [%] 0 ... 95

    Maximum installation elevation [ft above sea level] 6,561

    Temperature monitoring Yes

    Cooling Fan cooling

    Protection class NEMA 4

    Degree of contamination 2

    DC disconnectBuilt-in

    Housing Aluminum cast

    H x W x D [in] 27.2 x 16.5 x 7.9 (690 x 420 x 200 mm)

    Total weight [lbs] 88 (40 kg)

    Tabelle 2: Mechanical Data

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    13/52

    Transportation and Del ivery

    Installation Instructions blueplanet XPU-H Page

    Transportation and Delivery

    . Delivery

    Every inverter leaves our factory in proper electrical and mechanical condition. Special packaging ensures that theyare transported safely. The shipping company is responsible for any transport damage that occurs.

    Scope of delivery

    inverter

    wall bracket

    connection board

    installation kit

    documentation set

    Checking your delivery. Thoroughly inspect your inverter.

    . Immediately notify the shipping company in case of the following:

    Damage to the packaging that indicates that the inverter may have been damaged

    Obvious damage to the inverter

    . Immediately send a damage report to the shipping company.

    The damage report must be delivered to the shipping company in writing within six days following receipt of theinverter. We will be glad to help you, if necessary.

    . Transportation

    WARNING

    Impact hazard, risk of breakage to the inverter

    Securely pack the inverter for transport.

    Carefully transport the inverter using the the carrying handles of the pallet.

    Do not subject the inverter to shocks.

    For safe transportation of the inverter, use the holding openings in the carton.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    14/52

    Mounting the Inverter

    Page Installation Instructions blueplanet XPU-H

    Authorised electrician

    Mounting the Inverter

    DANGER

    Risk of fatal injury from re or explosions

    Fire caused by ammable or explosive materials in the vicinity of the inverter can lead to seriousinjuries.

    Do not mount the inverter in an area at risk of explosion or in the vicinity of highly ammablematerials.

    CAUTION

    Risk of burns from hot housing components.

    Coming into contact with the housing can cause burns.

    Mount the inverter so that it cannot be touched unintentionally.

    Installation space As dry as possible, climate-controlled, with the waste heat dissipated away from the inverter

    Unobstructed air circulation

    When installing the unit in a control cabinet, provide forced ventilation so that the heat is suffi ciently dissipated

    Easily accessible from the front and sides

    Protected from direct sunshine outdoors

    For easy operation, ensure during installation that the display is slightly below eye level.

    Wall

    With suffi cient load-bearing capacity

    Accessible for installation and maintenance

    Made from heat-resistant material (up to F/C)

    Flame resistant

    Minimum clearance during installation: see Fig. on page and Fig. on page .

    CAUTION

    Use suitable mounting xtures.

    Only use the supplied mounting xtures.

    Mount the inverter upright on a vertical wall only.

    NOTICE

    Power reduction due to heat accumulation.

    If the recommended minimum clearances are not observed, the inverter can have power regulationand a protective shutdown due to insuffi cient ventilation and the associated heat

    Maintain minimum clearances.

    Provide for suffi cient heat dissipation.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    15/52

    Mounting the Inverter

    Installation Instructions blueplanet XPU-H Page

    Authorised electrician

    54 3/5

    16

    10 59/260

    22 1/4

    44 1/10

    13

    Figure : Instructions for wall mounting Figure : Drill stencil for wall mounting with

    minimum clearances (inches)

    1

    2

    310in

    10in

    10in

    Clearance from ceiling 20 in

    Clearance from another inverter 27 3/5 in

    Clearance from the oor 20 in

    Clearance from another inverter 27 3/5 in

    4

    5

    Figure : Minimum clearances/mounting plate

    Key

    1 Fixings for mounting 4 Detachment protector

    2 Mounting plate 5 Suspension brackets (back of housing)

    3 Screws for mounting

    Mounting the inverter

    . Mark the positions of the drill holes using the cut-outs in the mounting plate.NOTICE: The minimum clearances between two inverters, or the inverter and the ceiling/oor have alreadybeen taken into account in the drawing.

    . Fix mounting plate to the wall with the supplied mounting xtures.Make sure that the mounting plate is oriented correctly.

    . Hang the inverter on the mounting plate using the suspension brackets on the back of the housing.

    . Fix the inverter with the enclosed screws to the detachment protector at the connection area. The mounting of the inverter is complete. Continue with the installation.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    16/52

    Instal l ing the Inverter

    Page Installation Instructions blueplanet XPU-H

    Authorised electrician

    Installing the Inverter

    DANGER

    Lethal voltages are still present in the terminals and leads of the inverter even after theinverter has been switched off and disconnected.

    Severe injuries or death if the leads and terminals in the inverter are touched.

    Only authorised electricians who are approved by the supply grid operator may open and install theinverter.

    The inverter must be mounted in a xed position before being connected electrically.

    Observe all safety regulations and the currently applicable technical connection specications ofthe responsible power supply company.

    Disconnect the AC and DC sides.

    Secure them against being inadvertently switched back on.

    Assure that the AC and DC sides are completely voltage-free.

    Connect the inverter only after the aforementioned steps have been taken.

    NOTICE

    Install the inverter in accordance with NEC, ANSI/NFPA .

    . Opening the connection area

    Opening the connection area

    You have mounted the inverter on the wall.

    . Unscrew the four Torx screws from the front side of the connection cover.. Pull down the connection cover.

    Carry out the electrical connection.

    . Drilling holes for electrical and interface connection

    The inverter is shipped with a connection board. You are required to drill holes into the board to accomodate theAC, DC and interface connection leads.

    In order to avoid interference between current-carrying leads and interface cables, adher to the following drawing:

    3

    2

    1

    4

    Figure : Connection board

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    17/52

    Instal l ing the Inverter

    Installation Instructions blueplanet XPU-H Page

    Authorised electrician

    Key

    1 Connection area for DC leads 3 Connection area for AC leads

    2 Connection area for interface andgrounding leads

    4 USB port

    . Carrying out the electrical connection

    Make the connection to the PV generator and the grid connection via the PCB terminals in the connection area ofthe inverter. Maintain the following conductor cross-sections:

    AC connection DC connection

    Max. conductor cross-section without wire sleeves 6 AWG 8 AWG

    Max. conductor cross-section with wire sleeves 7 AWG 11 AWG

    Length of insulation to be stripped off 2/5 in 3/5 in

    .. Connecting the inverter to the power gridThe grid connection leads are connected on the right side of the connection area (see gure ).

    DANGER

    Risk of fatal injury due to electric shock

    Severe injuries or death will result if the live connections are touched. Disconnect the inverter from all power sources before you insert the grid power lead into the unit.

    CAUTION

    Risk of re

    Insuffi cient over current protection can increase the risk of re. Connect only to a circuit provided with a A branch circuit over current protection in accordance

    with the national electrical code ANSI/NFPA .

    Recommended conductor cross-sections and fuse protection of NYM leads for xed wiring according to

    VDE part

    We recommend the following conductor cross-sections for cable lengths up to ft:

    AWG up to AWG , Copper Wire. Larger cross-sections schould be used for longer leads. A breaker.

    This unit is provided with xed trip limits and shall not be aggregated above kw on a single point of commonconnection.

    NOTICE

    The installation shall indicate that wiring methods in accordance with the NEC, ANSI/NFPA are tobe used.

    NOTICE

    Use copper conductors only.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    18/52

    Instal l ing the Inverter

    Page Installation Instructions blueplanet XPU-H

    Authorised electrician

    NOTICE

    When the lead impedance is high (i.e. long grid-side leads), the voltage at the grid terminals of theinverter will increase during feed-in to the grid. The inverter monitors this voltage. If it exceeds thecountry-specic line overvoltage limit value, the inverter switches off.

    Ensure that the lead cross-sections are suffi ciently large or that the lead lengths are suffi cientlyshort.

    Making the grid connection

    Drill a hole for the AC leads into the connection board.

    . Remove the outer cladding of the AC leads.

    . Insert the AC leads through the hole into the connection area through the conduit pipe.

    . Strip the insulation from the AC leads.

    . Open the locks of the PCB terminals.

    . Connect the leads in accordance with the labelling of the PCB terminals.

    . Close the locks of the PCB terminals.. Check that all connected leads are tightly seated.

    The inverter is now connected to the power grid.

    NOTICE

    An AC-side disconnection unit must be provided in the nal installation. This disconnection unitmust installed in such a manner that access to it is possible at any time without hindrance.

    If a residual current circuit breaker is necessary due to the installation specication, then a type A AFI(AC/DC-sensitive residual current circuit breaker) must be used.

    .. Connecting the PV generator

    Connect the PV generator to the DC positive and the DC negative connection terminals in the connection areaof the inverter.

    DANGER

    Risk of fatal injury due to contact voltages.

    During installation: Electrically disconnect the DC positive and DC negative from the protectiveearth (PE).

    Removing the connection without previously disconnecting the inverter from the DC generator can

    result in a hazard to health and damage to the inverter.

    WARNING

    No internal GFDI.

    This unit is not provided with a GFDI (ground-fault detector-interrupter). The inverter must be usedwith an external GFDI device as required by the article of the national electrical code for theinstallation location.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    19/52

    Instal l ing the Inverter

    Installation Instructions blueplanet XPU-H Page

    Authorised electrician

    MPPtracker A

    MPPtracker B

    Figure : Connection terminals for DC positive and DC negative leads

    ... Before the connection

    Ensure that there is no ground fault

    . Determine the DC voltage between the

    Protective earth (PE) and the positive lead of the PV generator Protective earth (PE) and the negative lead of thePV generator

    If stable voltages can be measured, there is a ground fault in the DC generator or its wiring. The ratio between themeasured voltages gives an indication as to the location of this fault.

    . Rectify any faults before taking further measurements.

    . Determine the electrical resistance between the

    Protective earth (PE) and the positive lead of the PV generator

    Protective earth (PE) and the negative lead of the PV generator

    Low resistance (< M) indicates a high-ohm ground fault of the DC generator.

    . Rectify any faults before connecting the DC generator.

    ... Maximum input power

    The input power of the inverter is limited only by the maximum input current of . A per input. This causes themaximum input power per path to increase with the input voltage.

    A detailed table with power values as a function of the DC voltage can be found in the appendix.

    NOTICE

    The overall power of the unit continues to be limited. If one input is connected to more thanP(DCmax)/, the maximum input power of the second input decreases accordingly. Take care thatthe maximum input power is not exceeded.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    20/52

    Instal l ing the Inverter

    Page Installation Instructions blueplanet XPU-H

    Authorised electrician

    ... Recommended standard connection

    Equal MPP voltages must be applied to input and , as well as inputs and . The MPP voltages of the two DCpaths can be different. They are tracked by separate, independently operating MPP trackers (MPP trackers A and B).(n

    =n

    , n

    =n

    ).

    Electrical data for standard connection

    Connection of the DC inputs Number of modules per string n=n

    , n

    =n

    Pmax

    per string < 6 kW

    MPP trackers A+B together < 12 kW

    Imax

    < 18.6 A per tracker

    MPP tracker A MPP tracker B

    UMPP=350-800V

    n1

    n2

    n3

    n4

    = =

    UMPP=350-800V

    Figure : Recommended standard connection

    ... Parallel input connection

    The DC inputs can also be connected in parallel. Only strings with identical MPP voltage can be connected inparallel (n

    =n

    =n

    m).

    The maximum input current rises to . A for parallel connection.

    In case of a parallel input connection, MPP trackers A and B must be bridged. If input is connected to input andinput is connected to input , then there is no parallel operation and the maximum input current continues to be. A. Parallel operation is automatically recognized by the inverter.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    21/52

    Instal l ing the Inverter

    Installation Instructions blueplanet XPU-H Page

    Authorised electrician

    Electrical data for parallel connection

    Connection of the DC inputs Number of modules per string n=n=n

    m

    Pmax < 12 kW

    Imax

    < 37.2 A

    MPP tracker A MPP tracker B

    UM

    PP=350-800V

    ...

    n1

    n2

    nm

    = =

    MPP tracker A MPP tracker B

    UMP

    P=350-800V

    ...

    n1

    n2

    nm

    = =

    Figure : Parallel input connection in the

    generator junction box

    Figure : Parallel input connection with Y adapter,

    short circuit of MPP tracker B

    ... Unconnected inputs

    NOTICE

    If one of the MPP trackers (A or B) is not used it must be short-circuited. Otherwise, faults can occurin the self-test of the unit and the feed-in operation is not guaranteed. This does not lead to damageto the unit.

    The recommended standard connection or the parallel input connection should be selected asa matter of course before an MPP tracker is short-circuited and therefore remains unused.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    22/52

    Instal l ing the Inverter

    Page Installation Instructions blueplanet XPU-H

    Authorised electrician

    ... Connecting the PV generator

    DANGER

    Risk of fatal injury due to electric shock

    Severe injuries or death will result if the live connections are touched. When there is irradiance, DCvoltage is present on the open ends of the DC leads.

    Do not touch the open ends of the leads.

    Avoid short circuits.

    Connecting the PV generator

    Drill one hole for each DC negative and DC positive lead into the connection board.

    . Remove the outer cladding of the DC leads.

    . Insert the DC leads into the connection area through the conduit pipes.

    . Strip the insulation from the DC leads.

    . Connect the leads to the PCB terminals in accordance with the labelling. The inverter is connected to the PV generator.

    .. Grounding the housing

    An optional grounding of the housing is possible at the grounding point provided for that purpose in the connec-tion area of the inverter. Please observe any national installation regulations in this regard.

    Ground the housing of the inverter, if necessary, at the grounding point provided for that purpose in the connection

    area of the inverter. It is marked with the symbol.

    Figure : Grounding point in the connection area

    Grounding the housing Drill a hole for the grounding lead into the connection board.

    . Remove the outer cladding from the grounding lead.

    . Insert the grounding lead into the connection area through the conduit pipe.

    . Remove the insulation from the grounding lead.

    . Furnish the stripped lead with an M ring cable lug.

    . Screw the ring cable lug to the grounding point with an M screw.

    . Check for rm seating of the lead.

    . Connecting the interfaces

    All interface connectors are located on the connection board. Drill holes for the conduits into the connectionboard.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    23/52

    Instal l ing the Inverter

    Installation Instructions blueplanet XPU-H Page

    Authorised electrician

    DANGER

    Risk of fatal injury due to electric shock

    Severe injury or death from improper use of the interface connections and non-observance ofprotection class III.

    The SELV circuits (SELV: safety extra low voltage) can only be connected to other SELV circuits withprotection class III.

    NOTICE

    When laying the interface connection cables, note that too little clearance to the DC or AC leads cancause interference during data transfer.

    RS485 S0 ERR

    B A B A + - + -

    EthernetRCL

    Figure : Connection area: Connection and pinout of the interfaces

    .. Connecting the RS bus

    blueplanet

    Inverters

    Terminal unit

    blueplanet

    Inverters

    blueplanet

    Inverters

    Kaco

    proLOGCommunication

    VAC

    Figure : RS interface wiring diagram

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    24/52

    Instal l ing the Inverter

    Page Installation Instructions blueplanet XPU-H

    Authorised electrician

    NOTICE

    Different manufacturers interpret the standard on which the RS protocol is based in differentways. Note that the wire designations (- and +) for wires A and B can be different depending on themanufacturer.

    NOTICE

    Calculating effi ciency by measuring the current and voltage values leads to unusable results due tothe tolerances of the measurement devices. The sole purpose of these measured values is to monitorthe basic operation of the system.

    Connecting the RS bus

    Maximum length of the RS wiring: , m under optimal conditions.

    Maximum number of connected bus devices: inverters + data monitoring unit.

    Use twisted, shielded data lines.

    Recommendation (using wire sleeves) LIYCYv (TP) black for laying cable outside and in the ground x x .

    LIYCY (TP) grey for dry and moist spaces x x .

    Drill a hole for the RS connection cable into the connection board.

    . Thread the connection cable through the hole.

    . Connect the connection cable to the connection terminals provided (see gure on page ).

    . Connect the following to all inverters and Kaco-proLOG as follows:

    Wire A (-) with wire A (-) and

    Wire B (+) with wire B (+) (see gure on page )

    . Activate the terminating resistor on the terminal unit.

    .. Connecting the remote control line for the power supply company

    This connection can be used in the future by your power supply company as an optional remote control line. Whenconnecting, please observe the polarity (see gure on page ).

    Maximum contact load: - VDC, mA.

    .. Connecting the S output

    An S pulse output is located on the communication board. Use this output to control accessories such as a largedisplay, for example. The pulse rate of the output is adjustable.

    Connecting the S output

    Drill a hole for the S connection cable into the connection board.

    . Thread the connection cable through the hole.

    . Connect the connection cable to the connection terminals.

    .. Connecting the Ethernet interface

    NOTICE

    Use a suitable category network cable. The maximum length of a network segment is m.Ensure that the cable is correctly assigned. The Ethernet connection of the inverter supports auto-sensing. You can use both crossed and : Ethernet connection cables.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    25/52

    Instal l ing the Inverter

    Installation Instructions blueplanet XPU-H Page

    Authorised electrician

    Connecting an Ethernet cable to the inverter

    Drill a hole for the Ethernet connection cable into the connection board.

    . Thread the connection cable through the hole.

    . Connect the connection cable to the Ethernet interface (see gure on page ).

    Connecting the inverter with the network

    Connect the Ethernet cable to the inverter.

    Congure the Ethernet interface in the conguration menu.

    Connect the Ethernet cable to the network or a computer.

    Congure the Ethernet settings and web server in the Settings menu.

    .. Connecting the fault signal relay

    The contact is designed as am N/O contact. Maximum contact load: DC V/ A,AC: V/ A

    Connecting the fault signal relay Drill a hole for the fault signal relay connection cable into the connection board.

    . Thread the connection cable through the hole.

    . Connect the connection cable to the connection terminals.

    . Sealing the connection area

    . Screw the connection board to the inverter with the ve Torx screws.

    . Place the connection cover on the connection area of the inverter.

    . Screw in the four Torx screws on the front side of the connection cover.

    . Starting up the inverter

    DANGER

    Lethal voltages are still present in the terminals and leads of the inverter even after the

    inverter has been switched off and disconnected.

    Severe injuries or death if the leads and terminals in the inverter are touched.

    Only authorised electricians who are approved by the supply grid operator may start up the inverter.

    .. Switching on the inverter The inverter has been mounted and electrically installed. The cover for the connection area is grounded and closed.

    The PV generator is supplying a voltage > V.

    . Connect the grid voltage using the external circuit breakers.

    . Connect the PV generator using the DC disconnector ().

    The inverter begins to operate.

    During the initial start-up: Follow the instructions on the inverter display.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    26/52

    Configuration and Operation

    Page Installation Instructions blueplanet XPU-H

    Conguration and Operation

    . Controls

    The inverter has a backlit LCD as well as three status LEDs. The inverter is operated using six keys.

    1

    2

    3

    4

    5

    67

    Figure : Control panel

    Key

    1 Operating LED 5 4-way key

    2 Feed-in LED 6 Enter key

    3 Fault LED 7 ESC key

    4 LCD

    .. LED indicators

    The three LEDs on the front of the inverter show the different operating states.The LEDs can take on the following states:

    LED illuminated LED ashing LED not illuminated

    The LED indicators show the following operating states:

    Operating state LEDs Display Description

    Start The green Operating LED is illuminated

    if an AC voltage is present,independently of the DC voltage.

    Feed-in start Power fed into the grid

    or measured values

    The green Operating LED is illuminated.

    The green Feed-in LED is illuminatedafter the country-specic waiting period*.

    The inverter is ready to feed in, i.e. is onthe grid.

    You can hear the line relay switch on.

    * The waiting period ensures that the generator voltage continuously remains above the power delivery limit of V.For the country-specic waiting times, see section . on page .

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    27/52

    Configuration and Operation

    Installation Instructions blueplanet XPU-H Page

    Operating state LEDs Display Description

    Feed-in operation Power fed into the grid

    or measured values

    The green Operating LED is illuminated.

    The green Feed-in LED is illuminated.

    The Feed-in icon appears on thedesktop.

    The inverter feeds into the grid.

    Non-feed-inoperation

    Status message The display shows the correspondingmessage.

    Voltage Fault message The display shows the correspondingmessage.

    The red Fault LED is illuminated.

    .. Graphical display

    The graphical display shows measured values and data and allows the conguration of the inverter using a graphi-cal menu. In normal operation, the backlighting is switched off. As soon as you press one of the control keys, thebacklight is activated. If no key is pressed for an adjustable period of time, it switches off again. You can also perma-nently activate or deactivate the backlighting. In sleep mode, the inverter deactivates the display regardless of theselected setting.

    NOTICE

    Depending on the tolerances of the measuring elements, the measured and displayed valuesare not always the actual values. However, the measuring elements ensure maximum solar yield.Due to these tolerances, the daily yields shown on the display may deviate from the values on the

    grid operators feed-in meter by up to %.After being switched on and after the initial start-up is complete, the inverter displays the start screen (the desktop).If you are in the menu and do not touch the control keys for two minutes, the inverter returns to the desktop.For information about initial start-up, see section . on page .

    1

    2

    34

    5

    67

    8

    Figure : Desktop

    Key

    1 Current date 6 Status bar

    2 Current power 7 Current time

    3 Menu indicator 8 Feed-in indicator

    4 Daily yield

    5 Annual yield

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    28/52

    Configuration and Operation

    Page Installation Instructions blueplanet XPU-H

    .. Control keys

    You operate the inverter using the -way key and the OK and ESC control keys.

    ... Desktop

    Opening the menu The inverter is operating.

    The LCD is showing the desktop.

    Press the right arrow key.

    The menu opens up over the desktop from left to right.

    Displaying the daily output

    The inverter is operating.

    The LCD is showing the desktop.

    Press the down arrow key.

    The LCD displays the daily yield in a diagram.

    To return to the desktop, press any key.

    ... Inverter menu

    Selecting a menu item

    You have left the desktop. The inverter displays the menu.

    Use the up and down arrow keys.

    Opening a menu item or a setting

    Use the right arrow key and the OK key.

    Jump to the next higher menu level/discard changes

    Press the left arrow key or the ESC key.

    Selecting an option

    Use the right and left arrow keys.

    Changing an option/the value of an input eld

    Use the keys with the up and down arrows.

    Saving changed settings

    Press the OK key.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    29/52

    Configuration and Operation

    Installation Instructions blueplanet XPU-H Page

    . Initial start-up

    When started for the rst time, the inverter displays the conguration assistant. It takes you through the settingsnecessary for the initial start-up.

    NOTICEAfter successful completion of the conguration, the conguration assistant does not appear againwhen the inverter is restarted. You can then change the country setting only in the password-pro-tected parameter menu. The other settings can still be changed in the conguration menu.

    NOTICE

    The sequence of the settings required for initial start-up is preset in the conguration assistant.

    Initial conguration In order to select a setting, press the up and down keys.

    To select the next menu item, press the OK key.

    To return to the most recently selected menu item, press the ESC key.

    Carry out the required settings.

    Press the OK key in the last menu item.

    You have completed the initial conguration. The inverter begins to operate.

    . Menu structure

    .. Display on the LCD

    1

    3

    4

    2

    Figure : Main menu

    Key

    1 Display of the menu level (0, 1, 2, 3) 3 Active menu (example: main menu)

    2 Designation of the active menu 4 Menu items of the next lower menu level

    SettingsInformationVendor

    Main menuMeasurements Generator

    GridPower controlUnit temperatureYield counterYield todayTotal yield

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    30/52

    Configuration and Operation

    Page Installation Instructions blueplanet XPU-H

    .. Menu structure

    Icons used:

    0 1 2 3 Menu level (0, 1, 2, 3) Password-protected menu

    Display menu Submenu available

    Option menu

    Menu

    level

    Display/settings Action in this menu/meaning

    Desktop Desktop Press the right arrow key.

    0 1 2 30 Measurements menu Open the menu: Press the right arrow key or the OK key.

    0 1 2 31

    Generator Displays the DC-side voltage, amperage and power.

    0 1 2 31 Grid Displays the AC-side voltage, amperage and power.

    0 1 2 31 Unit temperature Displays the temperature in the inverter housing.

    0 1 2 31 Yield counterDisplays the yield in kWh.

    Reset the counter using the Reset key.

    0 1 2 31 Yield today Displays the yield of the current day up to now.

    0 1 2 31 Total yield Displays the total yield up to now.

    0 1 2 31 CO2 savings Displays the calculated CO2savings (in kg).

    0 1 2 31 Oper. hours counterDisplays the duration of operation in hours.

    Reset the counter using the Reset key.

    0 1 2 31 Oper. time today Displays the duration of operation on the current day.

    0 1 2 31 Total op. time Displays the total operating time.

    0 1 2 31 Log data view Open the menu: Press the right arrow key or

    the OK key.

    0 1 2 32 Daily view

    Displays the recorded operating data graphically.. Select the measured value to be displayed.

    Supported measured values:

    Grid power P(grid)

    DC power per string P(PV) -

    DC voltage per string U(PV) -

    Unit temperature

    . Select a date.

    . Press the OK key.

    The display shows the selected data.

    Press any key to return to the previous menu.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    31/52

    Configuration and Operation

    Installation Instructions blueplanet XPU-H Page

    Menu

    level

    Display/settings Action in this menu/meaning

    0 1 2 32 Monthly view

    Displays the recorded operating data graphically.

    . Select a date.

    . Press the OK key.

    The display shows the selected data.

    Press any key to return to the previous menu.

    0 1 2 32 Yealy view

    Displays the recorded operating data graphically.

    . Select a date.

    . Press the OK key.

    The display shows the selected data.

    Press any key to return to the previous menu.

    0 1 2 32 Save to USB

    In this menu, you can export the saved operating data to aconnected USB storage device.

    You have connected a USB storage device to the inverter.

    . Select the data to be exported (year, month or day) with the-way key.

    . Press the OK key.

    The inverter writes the data to the USB storage device.

    0 1 2 30 Settings menu Open the menu: Press the right arrow key or

    the OK key.

    0 1 2 31 Language Select the desired language for the user interface.

    0 1 2 31 Dene total yield

    You set the total yield to a freely selectable value, for example,when you have received a replacement unit and want to continuethe recording from the present value.

    Select the Save button and conrm with theOK button.

    0 1 2 31 Interface

    If the inverter is a terminal unit: Activate termination (Bustermination menu item)

    Assign a unique RS bus address to the inverter(proLOG address menu item). The address must not coincidewith that of another inverter or a proLOG unit.

    0 1 2 31 S0 pulse rate Set the pulse rate of the S connection.

    0 1 2 31

    Logging interval

    Set the time between two log data recordings.

    0 1 2 31 Log data backup

    The inverter supports the backing up of all recorded yield data to aconnected USB storage device.

    Activate or deactivate log data backup.

    0 1 2 31 Display

    Congure the contrast setting for the display.

    Set the length of time without user input after which thebacklighting of the LCD switches off.

    Alternatively: Permanently activate or deactivate backlightingby selecting On or Off.

    0 1 2 31 Date & time

    Set the time and date.

    NOTICE: For self-diagnostic purposes, the inverter carries out adaily restart at midnight. To avoid having a restart occur duringfeed-in operation and to always obtain reliable log data, ensurethat the time is correctly set.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    32/52

    Configuration and Operation

    Page Installation Instructions blueplanet XPU-H

    Menu

    level

    Display/settings Action in this menu/meaning

    0 1 2 31 Ethernet

    Assign a unique IP address.

    Assign a subnet mask.

    Assign a gateway.

    0 1 2 31 Webserver Activate or deactivate the integrated webserver.

    0 1 2 30 Parameters menu

    Press the right arrow key or the OK key.

    NOTICE: The inverter does not display the Parameters menu inthe standard conguration. To display the menu:

    . Open the menu.

    . Simultaneously hold down the up and down keys for severalseconds.

    0 1 2 31 Country

    . Input the four-character password via the -way key. The

    password is unit-specic.. Conrm the entry with the OK key.

    . Set the desired country setting.

    NOTICE: This option inuences the country-specic operatingsettings of the inverter. Please consult KACO service for furtherinformation.

    0 1 2 31Grid type/

    guideline

    If available, select the type of grid applicable to the use of theinverter.

    0 1 2 31 DC starting volt.The inverter begins feed-in as soon as this PV voltage is present.

    Set the starting voltage.

    0 1 2 31 Const. volt. ctrl

    Offers the possibility of deactivating the MPP seek mode in orderto operate the inverter with a constant DC voltage.

    Activate or deactivate MPP seek mode.

    Set value for constant voltage control ( - V).

    NOTICE:The possible input power is reduced at voltages lowerthan 350 voltage. The input current is limited to 18.6 A per input.

    0 1 2 30 Information menu Open the menu: Press the right arrow key or

    the OK key.

    0 1 2 31 Inverter type Displays the type designation of the inverter.

    0 1 2 31 SW version Displays the installed software version.

    0 1 2 31 Serial number Displays the serial number of the inverter.

    0 1 2 31 Display countryDisplays the selected country setting.Optional: Displays the grid type if a grid type has been selected.

    0 1 2 30 Vendor menu The display shows information about the unit manufacturer.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    33/52

    Configuration and Operation

    Installation Instructions blueplanet XPU-H Page

    . Monitoring the inverter

    The inverter has an integrated web server. This makes it possible to monitor and record the operating state andyield of your PV system.

    You can display the recorded data via:

    The integrated LCD

    The integrated web server using an Internet-capable device connected to the Ethernet interface of the inverter

    You can read the recorded data using a storage medium connected to the USB interface of the inverter, e.g. a USBstick.

    .. USB interface

    Use an external USB storage device to read operating data saved in the inverter.

    ... Reading log data

    NOTICEThe USB interface is approved solely for usage with USB ash memories (USB sticks). The maximumavailable current is mA. If a device with a higher power requirement is used, the power supply forthe USB interface automatically shuts down to protect the inverter from damage.

    Reading log data

    . Connect a suitable USB storage device to the USB interface on the underside of the inverter.

    . Open the Log data view menu.

    . Select the Save to USB item.

    . Select the desired log data using the -way key.

    . Press the OK key.

    The inverter saves the selected log data to the USB storage device.

    .. Web server

    The inverter has an integrated web server. After conguration of the network and activation of the web server inthe conguration menu, you can open the web server from an Internet browser. The language version of the website delivered by the browser is dynamically adapted, based on the pre-set language preferences in your Internetbrowser. If your Internet browser requests a language that is unknown to the inverter, the web server uses the menulanguage set in the inverter.

    ... Setting up the web server

    Conguring the Ethernet interface

    You have connected the inverter to your network.

    . Open the Settings/Ethernet menu.

    . Assign a unique IP address.

    . Assign a subnet mask.

    . Assign a gateway.

    . Save your settings.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    34/52

    Configuration and Operation

    Page Installation Instructions blueplanet XPU-H

    ... Using the web server

    To avoid problems with incompatibility, use the most recent version of your Internet browser.

    NOTICE

    You can also access the web server of the inverter via the Internet. To do this, additional settings ofyour network conguration, particularly your Internet router, are required.

    Note that communication with the inverter is carried out over an unsecured connection, particularlyin the case of a connection over the Internet.

    Calling up the web server

    Congure the Ethernet interface.

    Connect the Ethernet interface.

    . Open an Internet browser.

    . In the address eld of the Internet browser, enter the IP address of the inverter and call up the site.

    The Internet browser displays the start screen of the web server.

    After it has been called up, the web server displays information about the inverter as well as the current yield data.The web server supports the display of the following measurement data and yield data:

    Feed-in power Generator power

    Status Generator voltage

    Grid power Unit temperature

    Grid voltage

    In order to display and export yield data, proceed as follows:

    Select the display period. Call up the web server.

    . Select the display period by choosing one of the keys: day view, month view, year view or overall view.

    Filtering display data (day view only)

    . Call up the web server.

    . Select the day view.

    . To show or hide measured values, select or deselect the corresponding checkboxes in the Select displayarea.

    Exporting data. Filter the display data if necessary.

    . Select the display period if applicable (day, month, year or overall view).

    . Click the Export data key.

    . Save the le.

    NOTICE

    Regardless of the display data selected in the Select display area, an export le always contains allmeasurement data and yield data available for the selected period.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    35/52

    Configuration and Operation

    Installation Instructions blueplanet XPU-H Page

    . Performing a software update

    You can update the software of the inverter to a new version via the integrated USB interface. Us a FAT-formattedUSB stick to do this. Do not use any storage media, such as an external hard disk, with an external power supply.

    NOTICEEnsure that the power supply of the AC and DC sides is active. It is only possible to update allcomponents of the inverter to the most current software version in this operating state.

    CAUTION

    Damage to the inverter

    The update can fail if the power supply is interrupted during the update process.Parts of the software or of the inverter itself can then be damaged.

    Do not interrupt the DC and AC power supply during the update process.

    Preparing for the software update

    . Download the software update le from the KACO web site and store it on your hard disk.

    . Extract the update le (.ZIP) completely onto the USB stick.

    Perform software update.

    Perform software update.

    Prepare for the software update.

    Ensure supply of DC and AC power.

    . Connect USB stick to the inverter.

    The message Conguration found. Would you like to load it? appears on the display.

    . If you would like to perform the update, select the Yes button.

    The inverter begins the update.

    The update can take several minutes. The Operating LED ashes during the update process. The inverter mayrestart several times. The update is completely loaded when the display screen shows the desktop.

    The inverter then returns to feed-in mode. You can check the success of the update in the menu:

    Display software version

    Open the Information/SW version menu

    The inverter will display the versions and checksums of the currently loaded software.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    36/52

    Maintenance/Troubleshooting

    Page Installation Instructions blueplanet XPU-H

    Maintenance/Troubleshooting

    . Visual inspection

    Inspect the inverter and the leads for visible damage and pay attention to the operating status display of theinverter. In case of damage, notify your installer. Repairs may only be carried out by authorised electricians.

    NOTICE

    Have your installer check for proper operation of the inverter at regular intervals.

    . Cleaning the inverter externally

    DANGER

    Lethal voltages in the inverter

    Serious injuries or death if moisture enters the inverter.

    Only use objects that are free of moisture to clean the inverter.

    The inverter should only be cleaned on the outside.

    Cleaning the inverter

    Do not use compressed air.

    Use a vacuum cleaner or a soft brush to remove dust from the fan cover and from the top side of the inverteron a regular basis.

    Remove dust from the ventilation inlets if necessary.

    . Shutting down for maintenance and troubleshooting

    DANGER

    Lethal voltages are still present in the terminals and leads of the inverter even after the

    inverter has been switched off and disconnected.

    Severe injuries or death if the leads and terminals in the inverter are touched.

    When there is irradiance, DC voltage is present on the open ends of the DC leads. Arcing may occur ifthe DC leads are disconnected while under a load.

    Only authorised electricians who are approved by the supply grid operator may open and maintain

    the inverter. Observe all safety regulations and the currently applicable technical connection specications of

    the responsible power supply company.

    Disconnect the AC and DC sides.

    Secure the AC and DC sides from being switched on again.

    Do not touch the open ends of the leads.

    Avoid short circuits.

    Open the inverter only after these two steps are complete.

    After shutdown, wait at least minutes before working on the inverter.

    Authorised electrician

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    37/52

    Maintenance/Troubleshooting

    Installation Instructions blueplanet XPU-H Page

    CAUTION

    Destruction of the DC connection

    The connection terminals can be destroyed by arcing if disconnected under load.

    It is absolutely necessary that the shutdown sequence be carried out in the correct order.

    Shutting down the inverter

    . Switch off the grid voltage by deactivating the external circuit breakers.

    . Disconnect the PV generator using the DC disconnect.

    DANGER! The DC leads remain live.

    Ensure that there is no voltage present on the grid connection terminals.

    . Faults

    .. Procedure

    DANGER

    Lethal voltages are still present in the terminals and leads of the inverter even after the

    inverter has been switched off and disconnected.

    Severe injuries or death if the leads and terminals in the inverter are touched.

    When a fault occurs, notify an authorised electrician approved by the supply grid operator orKACO new energy, Inc. Service.

    The operator can only carry out actions marked with a B.

    In case of power failure, wait for the system to automatically restart.

    Notify your electrician if there is an extended power failure.

    .. Rectifying faults

    Fault Cause of fault Explanation/remedy By

    The display isblank and theLEDs do not

    light up.

    Line voltage notavailable

    Check whether the DC and AC voltages are within thepermitted limits (see Technical Data).

    E

    Notify KACO Service. ETabelle 5: Troubleshooting

    O = Action of the operator

    E = The indicated work must only be carried out by an authorised electrician.

    K = The indicated work must only be carried out by a service employee of KACO new energy, Inc.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    38/52

    Maintenance/Troubleshooting

    Page Installation Instructions blueplanet XPU-H

    Fault Cause of fault Explanation/remedy By

    The inverterstops feedinginto the gridshortly afterbeing switchedon, even thoughthere is irradi-ance.

    Faulty gridseparation relayin the inverter.

    If the grid separation relay is defective, the inverter willrecognize this during the self-test.

    Ensure that there is suffi cient PV generator power. E

    If the grid separation relay is defective have it replacedby KACO Service.

    Notify KACO Service.

    K

    The inverter isactive but doesnot feed into thegrid. The displayindicates a linefailure.

    Grid-feed isinterrupted dueto a grid fault.

    Due to a grid fault (grid impedance too high, over/undervolt-age, over/underfrequency), the inverter stopped the grid-feedand disconnected from the grid for safety reasons.

    Change the line parameters within the permitted operat-ing limits (see the Start-Up section).

    E

    The linefuse trips.

    The line fusecapacity istoo low.

    In cases of high irradiance, the inverter exceeds its ratedcurrent for a short period, depending on the PV generator.

    Select the capacity of the inverters pre-fuse to besomewhat higher than the maximum feed-in current(see the Installation section).

    E

    Contact the grid operator if the grid failure constantlyoccurs.

    E

    Damage tothe invertershardware.

    If the line fuse immediately trips when the inverter goes intofeed-in mode (after the start-up period is complete), the invert-ers hardware is probably damaged.

    Contact KACO Service to test the hardware. E

    The inverterdisplays animpossible dailypeak value.

    Faults in the grid. The inverter continues to operate as normal without lossesto the yield, even when an erroneous daily peak value isdisplayed. The value is reset overnight.

    To immediately reset the value, switch the inverter off andon again by disconnecting it from the grid and switchingoff the DC.

    E

    Daily yields donot correspond tothe yields on thefeed-in meter.

    Tolerances ofthe measuringelements inthe inverter.

    The measuring elements of the inverter have been selectedto ensure maximum yields. Due to tolerances, the daily yieldsshown may deviate from the values on the feed-in meter byup to 15%.

    No action. -

    Tabelle 5: Troubleshooting

    O = Action of the operator

    E = The indicated work must only be carried out by an authorised electrician.

    K = The indicated work must only be carried out by a service employee of KACO new energy, Inc.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    39/52

    Maintenance/Troubleshooting

    Installation Instructions blueplanet XPU-H Page

    Fault Cause of fault Explanation/remedy By

    The inverter isactive but doesnot feed into the

    grid. Display:Waiting forfeed-in

    Generatorvoltage too low

    Grid voltageor PV generatorvoltageunstable.

    The PV generator voltage or power is not suffi cient forfeed-in (solar irradiance is too low).

    The inverter checks the line parameters before the feed-inprocess begins. The length of the switch-on time differs bycountry according to applicable standards and regulationsand can take several minutes.

    The starting voltage may have been set incorrectly.

    Adjust starting voltage in the Parameter menu if required. E

    Noise emissionfrom the inverter.

    Particular ambientconditions.

    When there are certain ambient conditions, the units may emitaudible noises.

    Line interference or grid failure caused by particular loads(motors, machines, etc.) which are either connected to thesame point on the grid or located in the vicinity of the

    inverter. In cases of volatile weather conditions (frequent switching

    between sunny and cloudy conditions) or strong irradiance,a light hum may be audible due to the increased power.

    Under particular grid conditions, resonances may formbetween the units input lter and the grid, which may beaudible even when the inverter is switched off.

    These noise emissions do not affect the operation of theinverter. They do not lead to loss of effi ciency, failure, damageor to a shortening of the units service life.

    People with very sensitive hearing (particularly children) areable to hear the high-frequency hum caused by the invertersoperating frequency of approximately 17 kHz.

    No action.

    In spite of highirradiance, theinverter doesnot feed in themaximum powerinto the grid.

    The device is toohot and the poweris reduced.

    Because the temperatures inside the unit are too high, theinverter reduces its power to prevent damage to the unit. Notethe technical data. Ensure unhindered convection cooling fromthe exterior. Do not cover the cooling ns.

    Provide for suffi cient cooling of the unit.

    Do not cover the cooling ns.

    O, E

    Tabelle 5: Troubleshooting

    O = Action of the operator

    E = The indicated work must only be carried out by an authorised electrician.

    K = The indicated work must only be carried out by a service employee of KACO new energy, Inc.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    40/52

    Maintenance/Troubleshooting

    Page Installation Instructions blueplanet XPU-H

    . Messages on the display and the Fault LED

    Many fault signals indicate a fault in the grid. They are not operational faults of the inverter. The minimum triggeringlevels are determined by standards. The inverter must switch off if the permitted values are undershot or exceeded.

    .. Display of status and fault messages

    Display Fault LED (red)

    FS (fault status) ON Fault signal relay has switched.

    Feed-in was ended due to a fault.

    OS (operating status) OFF

    The fault signal relay deenergizes again.

    The inverter feeds back into the grid againafter a country-specic time period.

    On the display you can nd details regarding the fault or operating status or the data that was recorded through the

    RS interface.

    .. Status and fault signals

    The following table lists the possible status and fault signals that the inverter shows on the LCD and the LEDs.

    Status Display Explanation Action By

    OS 1 Waiting for feed-in Self test: Grid parameters and genera-tor voltage are being checked.

    - -

    OS 2 Generator voltagetoo low

    Generator voltage and power are toolow; situation before transition intonight shutdown

    - -

    OS 7 Self-test Checks the shutdown of the powerelectronics as well as the line relaybefore feed-in mode. The self-testconsists of three successive individualtests with the status 7, 75 and 8.

    - -

    OS 75 Self-test

    OS 8 Self-test

    FS 10 Temperature in

    unit too high

    In case of overheating, the inverter

    switches off. Possible causes: Ambient temperature too high

    Fans covered

    Inverter defect

    Cool off the vicinity

    of the inverter. Uncover the fans.

    Notify your autho-rised electrician.

    O

    O

    E

    OS 11 Measured values Power limitation: If the generatorpower is too high, the inverter limitsitself to the maximum power (e.g. inthe midday hours if the generator hasbeen too largely dimensioned).

    - -

    Tabelle 6: Operating states and fault messages on the display

    OS = operating status, FS = fault status;

    O = Action of the operatorE = The indicated work must only be carried out by an authorised electrician.

    K = The indicated work must only be carried out by a service employee of KACO new energy, Inc.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    41/52

    Maintenance/Troubleshooting

    Installation Instructions blueplanet XPU-H Page

    Status Display Explanation Action By

    FS 18 Resid. currentshutdown

    Residual current was detected.The feed-in was interrupted.

    Notify your autho-rised electrician.

    E

    FS 19 Generatorinsulation fault

    There is an insulation fault on the PVgenerator. The feed-in was inter-rupted.

    Notify your electri-cian if the faultoccurs several times.

    E

    FS 30 Voltage

    trans. fault

    The current and voltage measure-ments in the inverter are not plausible.

    - -

    FS 32 Fault

    Self-test

    The internal grid separation relay testhas failed.

    Notify your autho-rised electrician ifthe fault occursseveral times.

    E

    FS 33 Fault

    DC feed in

    The DC feed-in has exceeded thepermitted value. This DC feed-in can

    be adopted from the grid onto theinverter so that no fault occurs.

    Notify your autho-rised electrician if

    the fault occursseveral times.

    E

    FS 34 Internal communi-cation error

    A communication error has occurredin the internal data transmission.

    Notify your autho-rised electrician.

    E

    Check the datacable.

    FS 35 Protect.shutdown SW

    Protection shutdown of the software(AC overvoltage, AC overcurrent,DC link overvoltage, DC overvoltage,DC overtemperature).

    Not a fault. Grid-relatedshutdown, the gridconnects again auto-matically.

    -

    FS 36 Protect.

    shutdown HW

    Protection shutdown of the hardware

    (AC overvoltage, AC overcurrent,DC link overvoltage).

    Not a fault.

    Grid-related shutdown,the grid connects againautomatically.

    -

    FS 38 Generator over-voltage error

    The voltage of the DC generator is toohigh. The PV generator is incorrectlydimensioned.

    Notify your autho-rised electrician.

    E

    FS 41 Line failure:

    undervolt. L1

    The voltage of a grid phase is too low;the grid cannot be fed into. The phaseexperiencing failure is displayed.

    Notify your autho-rised electrician.

    E

    FS 42 Line failure:

    overvolt. L1

    The voltage of a grid phase is too high,the grid cannot be fed into.The phase experiencing failure isdisplayed.

    Notify your autho-rised electrician.

    E

    FS 43 Line failure:

    undervolt. L2

    The voltage of a grid phase is too low;the grid cannot be fed into. The phaseexperiencing failure is displayed.

    Notify your autho-rised electrician.

    E

    FS 44 Line failure:

    overvolt. L2

    The voltage of a grid phase is too high,the grid cannot be fed into.The phase experiencing failure isdisplayed.

    Notify your autho-rised electrician.

    E

    Tabelle 6: Operating states and fault messages on the display

    OS = operating status, FS = fault status;

    O = Action of the operator

    E = The indicated work must only be carried out by an authorised electrician.

    K = The indicated work must only be carried out by a service employee of KACO new energy, Inc.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    42/52

    Maintenance/Troubleshooting

    Page Installation Instructions blueplanet XPU-H

    Status Display Explanation Action By

    FS 45 Line failure:

    undervolt. L3

    The voltage of a grid phase is too low;the grid cannot be fed into. The phaseexperiencing failure is displayed.

    Notify your autho-rised electrician.

    E

    FS 46 Line failure:

    overvolt. L3

    The voltage of a grid phase is too high,the grid cannot be fed into.The phase experiencing failure isdisplayed.

    Notify your autho-rised electrician.

    E

    FS 47 Line failure:line-to-line volt

    The measured line-to-line voltage isoutside of the tolerance limits.

    FS 48 Line failure:

    Underfrequency

    Grid frequency is too low.This fault can be grid-related.

    Notify your autho-rised electrician.

    E

    FS 49 Line failure:

    Overfrequency

    Grid frequency too high.This fault can be grid-related.

    Notify your autho-rised electrician.

    E

    FS 50 Line failure:

    average voltage

    The grid voltage measurementaccording to EN 50160 has exceededthe maximum permitted limitvalue.

    Notify your autho-rised electrician.

    E

    FS 57 Waiting for

    reactivation

    Waiting time of the inverter after afault.

    Inverter does not switchon again until a country-specic time haselapsed.

    FS 58 Control board

    overtemp.

    The temperature inside the unit wastoo high. The inverter switches off toprevent damage to the hardware.

    Provide for suffi cientventilation.

    E

    FS 59 Self test error A fault occurred during a self test.

    Notify your autho-rised electrician. E

    OS 60 Generator voltagetoo high

    The inverter does not begin feedinginto the grid until the PV voltage fallsbelow a specied value.

    - -

    OS 61 External limit (%) The external limit Power controlwasactivated by the grid operator.The inverter limits its power.

    - -

    OS 63 Measured values P(f)/frequency-dependent powerreduction: Frequency-dependentpower reduction is activated with

    the activation of the BDEW MediumVoltage Directive (Mittelspannungs-richtlinie). Power reduction startsat a frequency of 50.2 Hz.

    - -

    OS 64 Measured values Output current limiting: The ACcurrent is limited once the speciedmaximum value has been reached.

    - -

    FS 67 Fault powersection 1

    There is a fault in the power section. Notify your autho-rised electrician.

    E

    Tabelle 6: Operating states and fault messages on the display

    OS = operating status, FS = fault status;

    O = Action of the operatorE = The indicated work must only be carried out by an authorised electrician.

    K = The indicated work must only be carried out by a service employee of KACO new energy, Inc.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    43/52

    Maintenance/Troubleshooting

    Installation Instructions blueplanet XPU-H Page

    Status Display Explanation Action By

    FS 70 Fan error Fan 1 is malfunctioning. Replace defectivefan

    E

    FS 73 Standalonegrid err.

    Standalone mode was detected. - -

    OS 74 Externalidle powerrequirement

    The grid operator limits the feed-inpower of the inverter.

    - -

    Tabelle 6: Operating states and fault messages on the display

    OS = operating status, FS = fault status;

    O = Action of the operator

    E = The indicated work must only be carried out by an authorised electrician.

    K = The indicated work must only be carried out by a service employee of KACO new energy, Inc.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    44/52

    Maintenance/Troubleshooting

    Page Installation Instructions blueplanet XPU-H

    . Replacing or cleaning the fan

    The inverter is equipped with axial fan. It is located in the upper right area of the housing.Replace the fan:

    In case of heavy soiling

    If it is defective

    Removing the fan

    . Ensure complete disconnection on the AC and DCsides.

    . Wait until the fan is no longer turning.

    . Unscrew the Torx crews of the side housing cover(Figure on page ).

    . Remove the side housing cover.

    . Unplug the fan plug.

    . Remove the side housing cover with the fan from thehousing.

    . Remove the fan from the side housing cover by pull-ing it away from the cover.

    Install the replacement fan.

    Figure : Removing the side housing cover

    Installing the fan

    You have removed the defective fan.

    Replace the fan only with a fan recommended byKACO. Ask KACO Service if necessary.

    . Insert the replacement fan into the fan holdingxture (see Figure on page ).

    . Plug in the fan plug.

    . Place the side housing cover on the unit.

    . Fasten the side housing cover to the unit with theTorx screws.

    . Check that the ttings are secure and that the termi-nals are well seated.

    The replacement fan is ready for operation.

    Figure : Replacing the fan

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    45/52

    Service

    Installation Instructions blueplanet XPU-H Page

    Service

    We place special emphasis on the quality and longevity of our inverters, starting even in the product developmentphase. More than years of experience in the eld of power converters support us in this philosophy.

    However, in spite of all quality assurance measures, faults may occur in rare cases. In such cases, KACO new energy,Inc. will provide you with the maximum possible support. KACO new energy, Inc. will make every effort to remedysuch faults in an expeditious manner and without a great deal of bureaucracy.If you need help solving a technical problem with one of our KACO products, please contact our service hotline.Please have the following information ready so that we can help you quickly and effi ciently:

    Inverter type/serial number

    Fault message shown on the display/Description of the fault/Did you notice anything unusual?/What has alreadybeen done to analyse the fault?

    Module type and string circuit

    Date of installation/Start-up report

    Consignment identication/Delivery address/Contact person (with telephone number)

    You will nd our warranty conditions on our website.

    http://www.kaco-newenergy.com/service/warranty

    From there, you can easily navigate to our international websites by clicking on the appropriate ag.

    Please use our website to register your unit within months:

    http://www.kaco-newenergy.com/service/warranty/online-warranty-registration

    On this page as well, you can click on the appropriate ag to easily reach the website for your own nation.

    In this manner, you can assist us in providing you with the quickest service possible.

    We have prepared a form for complaints. It is located athttp://www.kaco-newenergy.com/service/technical-support

    Hotlines

    Technical problem resolution Technical consultation

    +1 866 KACO SOLAR +1 866 KACO SOLAR

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    46/52

    Shutdown/Disassembly

    Page Installation Instructions blueplanet XPU-H

    Authorised electrician

    Shutdown/Disassembly

    . Shutting down the inverter

    DANGER

    Lethal voltages are still present in the terminals and leads of the inverter even after the

    inverter has been switched off and disconnected.

    Severe injuries or death if the leads and terminals in the inverter are touched.

    When there is irradiance, DC voltage is present on the open ends of the DC leads. Arcing may occurif the DC leads are disconnected while under a load.

    It is absolutely necessary that the shutdown sequence be carried out in the correct order.

    After shutdown, wait at least minutes before working on the inverter.

    When working on photovoltaic modules, in addition to disconnecting from the grid, alwaysdisconnect the DC main switch.Disconnecting the grid voltage is not enough.

    Shutdown sequence

    . Switch off the grid voltage by deactivating the external circuit breakers.

    . Disconnect the PV generator using the DC disconnector.

    DANGER! The DC leads remain live.

    Ensure that there is no voltage present on the grid connection terminals.

    . Deinstalling the inverter

    Shut down the inverter.

    . Open the connection area.

    . Remove the interface cables.

    . Detach DC connection plugs.

    . Detach AC connection leads from the connection terminals.

    . Pull out the leads.

    The deinstallation of the inverter is complete. Continue with dismantling.

    . Dismantling the inverter

    Shut down the inverter.

    Deinstall the inverter.

    . Detach screw from the detachment protector.

    . Remove the inverter from the mounting plate.

    . Securely pack the inverter if it is to be further used,orhave the inverter professionally disposed of.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    47/52

    Recycl ing and disposal

    Installation Instructions blueplanet XPU-H Page

    Recycling and disposal

    For the most part, both the inverter and the corresponding transport packaging are made from recyclable materials.

    KACO does its best to ensure our vendors follow a low carbon manufacturing process as we do ourselves. It is notalways possible but if you have questions about our products or the components in our products dont hesitate tocall +1 866 KACO SOLAR and ask.

    Hallo. Dies ist ein Test der nderungsverfolgung.

    Device

    Do not dispose of faulty inverters or accessories together with household waste. Ensure that the old unit and, whereapplicable, any accessories are disposed of in a proper manner. Most areas have public electronic waste disposaland/or recycling plants. Feel free to contact KACO at +1 866 KACO SOLAR to request information about e-wasterecycling in your area.

    Packaging

    Ensure that the transport packaging is recycled.

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    48/52

    Appendix

    Page Operating Instructions blueplanet XPU-H

    Appendix

    Input power per input (in W. Max. current: . A.)

    DC voltages (in V) XP10U-H4 DC voltages (in V) XP10U-H4

    280 5208 720 10200

    290 5394 730 10200

    300 5580 740 10200

    310 5766 750 10200

    320 5952 760 10200

    330 6438 770 10200

    340 6324 780 10200

    350 6510 790 10200

    360 6696 800 10200

    370 6882 570 10200380 7068 580 10200

    390 7254 590 10200

    400 7440 600 10200

    410 7626 610 10200

    420 7812 620 10200

    430 7998 630 10200

    440 8184 640 10200

    450 8370 650 10200

    460 8556 660 10200

    470 8742 670 10200

    480 8928 680 10200

    490 9114 690 10200

    500 9300 700 10200

    510 9486 710 10200

    520 9672 720 10200

    530 9858 730 10200

    540 10044 740 10200

    550 10200 750 10200

    560 10200 760 10200

    670 10200 770 10200

    680 10200 780 10200

    690 10200 790 10200

    700 10200 800 10200

    710 10200

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    49/52

    Appendix

    Operating Instructions blueplanet XPU-H Page

    Connection examples

    Input 1 Input 2 Input 3 Input 4

    Voltage Power Voltage Power Voltage Power Voltage Power

    400 V 3500 W 400 V 3500 W 700 V 3500 W 700 V 3500 W

    600 V 7000 W Unconnected 500 V 7000 W Unconnected

    500 V 12800 W Unconnected Bridged to 1 Unconnected

    500 V 5000 W 500 V 5000 W Unconnected 750 V 4000 W

    750 V 6000 W 750 V 6000 W 350 V 1000 W 350 V 1000 W

    600 V 6000 W Unconnected Short-circuited Short-circuited

    Invalid connectionsInvalid switching states are shown in the following table with a dark background:

    Input 1 Input 2 Input 3 Input 4

    Voltage Power Voltage Power Voltage Power Voltage Power

    400 V 3500 W 700 V 3500 W 400 V 3500 W 700 V 3500 W

    600 V 7000 W 600 V 7000 W Unconnected Unconnected

    500 V 12800 W Bridged to 1 Unconnected Unconnected

    600 V 6000 W Short-circuited Short-circuited Unconnected

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    50/52

    Appendix

    Page Operating Instructions blueplanet XPU-H

    Notes

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    51/52

    Appendix

    Operating Instructions blueplanet XPU-H Page

    Notes

  • 8/12/2019 Blueplanet XP10U-H4 Installation Instructions

    52/52

    Thetextandfiguresrefl

    ectthecurrenttechnicalstateatthetimeofprinting.

    Subjecttotechnicalchanges.Errorsandomissionsexcepted.

    3001904-01-111209