blocks & ribbons workshop - miami-dade...
TRANSCRIPT
-
Blocks & Ribbons WorkshopBlocks & Ribbons Workshop
MiamiMiami--Dade MPODade MPOPresented by:Presented by:
June 2008June 2008
Transportation Planning for MiamiTransportation Planning for Miami--Dade County, FloridaDade County, Florida
-
Workshop PurposeWorkshop Purpose
• Raise awareness about the growth that is expected in
Miami-Dade County by 2035
• Discuss the impact this growth will have on the county’s Transportation Infrastructure
• Incorporate your opinions and priorities in the LRTP goals and objectives
• Stimulate dialogue about the transportation challenges facing Miami-Dade County
2035 Miami2035 Miami--Dade LRTP Blocks & Ribbons Workshop | June 2008Dade LRTP Blocks & Ribbons Workshop | June 2008
-
Exercise GuideExercise Guide
1. Short Survey– To assess your transportation needs
– To obtain your opinions on how to address those needs
2. Legos® Allocation– 253 Yellow Legos® [Households
Growth to 2035]
– 160 Red Legos® [Employment Growth to 2035]
3. Ribbons Allocation– Two (2) spools of ribbon:
1 Highway · 1 Transit
4. Prioritize– Transportation Improvements vs.
Limited Funding Availability
5. Implications– Review and finalize your scenario
2035 Miami2035 Miami--Dade LRTP Blocks & Ribbons Workshop | June 2008Dade LRTP Blocks & Ribbons Workshop | June 2008
-
2035 Miami2035 Miami--Dade LRTP Blocks & Ribbons Workshop | June 2008Dade LRTP Blocks & Ribbons Workshop | June 2008
LegosLegos®® PlacementPlacement
• 1 Yellow Legos® represents 1,280
households
• 1 Red Legos® represents 3,840
jobs
• Place Legos® onto Miami-Dade
Projected Growth Scenario Map
(2005-2035)
• Growth Intensity
– Vertically stack the Legos® within
each grid by number of
households and jobs anticipated
(Place yellow Legos® on top of
red Legos®
1,280 Households/3,160 people
3,840 Jobs/6 jobs per acre
-
2035 Miami2035 Miami--Dade LRTP Blocks & Ribbons Workshop | June 2008Dade LRTP Blocks & Ribbons Workshop | June 2008
Transportation CorridorsTransportation Corridors
• Two (2) spools of ribbon: Purple for Highway Corridors; Orange for Transit
Corridors
• Shared Corridors: Purple Ribbon + Orange Ribbon
– Example: Light-Rail/Commuter Rail with a new or enhanced highway corridor
• Utilize all the ribbon you need to address transportation issues
Purple ribbons for Highway CorridorsPurple ribbons for Highway Corridors Orange ribbons for Transit CorridorsOrange ribbons for Transit Corridors PurplePurple ++ OrangeOrange for Shared Corridorsfor Shared Corridors
-
2035 Miami2035 Miami--Dade LRTP Blocks & Ribbons Workshop | June 2008Dade LRTP Blocks & Ribbons Workshop | June 2008
Transportation CorridorsTransportation Corridors
•• Prioritize, Prioritize, PrioritizePrioritize, Prioritize, Prioritize……
• ___ inches of ribbon for transportation improvements:
Purple (Highways/Roadways) = __ inches; Orange (Transit) = __ inches
• Every inch of ribbon is equivalent to 1.5 miles
• Rank your suggested improvements against the allowable lengths
• Remember: Prioritize your ribbon allocations based on scarce funding
resources
Ribbon Prioritization for Ribbon Prioritization for HIGHWAYSHIGHWAYS Ribbon Prioritization for Ribbon Prioritization for TRANSITTRANSIT Ribbon Prioritization for Ribbon Prioritization for SHARED CORRIDORSSHARED CORRIDORS
-
2035 Miami2035 Miami--Dade LRTP Blocks & Ribbons Workshop | June 2008Dade LRTP Blocks & Ribbons Workshop | June 2008
Exercise RulesExercise Rules
• Growth Projections are not
negotiable
• All growth allocations are in
addition to existing conditions
• Everyone has an equal voice
• Think big & Keep an open mind
• Examine Alternatives
• Compromise
• Add your Input/Opinions onto the
Tablet
• Most Importantly - Have Fun!
-
2035 Miami2035 Miami--Dade LRTP Blocks & Ribbons Workshop | June 2008Dade LRTP Blocks & Ribbons Workshop | June 2008
Density Visuals Density Visuals -- ResidentialResidential
-
2035 Miami2035 Miami--Dade LRTP Blocks & Ribbons Workshop | June 2008Dade LRTP Blocks & Ribbons Workshop | June 2008
Density Visuals Density Visuals -- ResidentialResidential
-
2035 Miami2035 Miami--Dade LRTP Blocks & Ribbons Workshop | June 2008Dade LRTP Blocks & Ribbons Workshop | June 2008
Density Visuals Density Visuals -- EmploymentEmployment
-
2035 Miami2035 Miami--Dade LRTP Blocks & Ribbons Workshop | June 2008Dade LRTP Blocks & Ribbons Workshop | June 2008
Density Visuals Density Visuals -- EmploymentEmployment
-
2035 Miami2035 Miami--Dade LRTP Blocks & Ribbons Workshop | June 2008Dade LRTP Blocks & Ribbons Workshop | June 2008
-
2035 Miami2035 Miami--Dade LRTP Blocks & Ribbons Workshop | June 2008Dade LRTP Blocks & Ribbons Workshop | June 2008
Next StepsNext Steps
1. Development of Transportation Improvements to Address Needs– Public Meetings scheduled in Fall 2008
– To obtain your input on needs plan
2. Development of Cost Feasible Plan– Public meetings scheduled in mid 2009
– To obtain your input on proposed cost feasible plan
3. Adoption of LRTP– Public hearing scheduled in the Fall 2009
-
2035 Miami2035 Miami--Dade LRTP Blocks & Ribbons Workshop | June 2008Dade LRTP Blocks & Ribbons Workshop | June 2008
Stay InvolvedStay Involved
1. Contact MPO– Carlos Roa [email protected] (305) 375-1833
– Elizabeth Rockwell [email protected] (305) 375-4507
2. Visit Websites– Miami-Dade MPO website
http://www.miamidade.gov/MPO/
– Project website to be launched soon
http://www.miamidade2035transportationplan.com
3. Watch for brochures and media advisories for upcoming meetings
-
2035 Miami2035 Miami--Dade LRTP Blocks & Ribbons Workshop | June 2008Dade LRTP Blocks & Ribbons Workshop | June 2008