  • BLOCK : SAM DISTRICT : JAISALMER

    AGRO CLIMATIC ZONE- I C

    TOTAL GEOGRAPHICAL AREA- 9270 Hac.

    TOTAL EFFECTIVE AREA- 8000 Hac.

    TOTAL COST 1200.00 Lacs.

    UNIT COST- 15000/Hac.

    ----------------&&&&&&&&----------------

    SUBMITTED BY

    PROJECT MANAGER

    DISTRICT WATERSHED DEVELOPMENT UNIT

    JAISALMER (RAJASTHAN)

  • DPR TEMPLATE Index

    S.No Topics Page no.

    1 Chapter

    • Location

    • General Features of watershed (Cost and Area details)

    • Climatic and Hydrological information

    • Other Development Schemes in the project area

    • Details of infrastructure in the project areas

    • Institutional arrangements (,DWDU,PIA,WDT,WC)

    2 Chapter Basic Data ,Analysis and Scope

    2.1 Demography Details

    2.2 Development Indicators 2.3 Land use 2.4 Agriculture status and Productivity Gap Analysis

    2.5 Horticulture/Vegetable/Floriculture status 2.6 Land holding pattern 2.7 Livestock status

    2.8 Fodder status

    2.9 Farm Implements 2.10 NREGS Status 2.11 Migration details

    2.12 Livelihood Details. 2.13 Existing SHG 2.14 Ground Water details

    2.15 Drinking Water Status 2.16 Water use efficiency 2.17 Slope details

    2.18 Water Budgeting

    2.19 Soil Details 2.20 Soil erosion status

    3 Chapter Proposed Development Plan

    4 Chapter Activity wise Total Abstract of cost

    5 Chapter Annual Action Plan

    5.1 Project fund 5.2 Convergence Plan

    6 Chapter Project outcomes

    7 Technical designs and estimates for proposed activities

    8 Enclosures

    8 .1 Maps

    a. Location –District, block, village, watershed location map

    b. Map of Project with Watershed Boundary demarcation in cadastral map

    c. Land Use Land Cover map d. Existing water bodies, DLT e. PRA Map (along with photos & paper drawing)

    f. GIS based intervention map g. Treatment map ie proposed works on revenue map

  • 8.2 Documents of Agreements:

    • Proceedings of gram sabha for EPA approval

    • Proceedings of gram sabha Resolution for committee constitution

    • Documents related to PRA exercise

    • Proceedings of gram sabha for DPR approval

    • Proceedings of Panchayat Samiti General body for DPR approval

    • Watershed Committee Registration certificate

    • MoU – PIA – DWMA, PIA – WC(in case of NGO as PIA)

  • CHAPTER – I

    Location.

    Jaisalmer- IWMP IV Project is located in jaisalmer Block of jaisalmer district.

    The Project area is between the 26.69 latitudes & 71.19 longitudes it is at a distance

    of 60 km from its Block & District head quarters. There are 5947 no. of habitations

    in the project area and other details are given below.

    General features of watershed

    S.No. Name of Project(as per GOI) Sam (IWMP) IV 2009-10

    (a) Name of Catchment Fatehgarh

    (b) Name of watershed area(local name) Fatehgarh

    © Project Area 9270 ha.

    (d) Net treatable Area 8000 ha.

    e) Cost of Project 1200 lac

    f) Cost/hectare 15,000

    g) Year of Sanction 2009-10

    h) Watershed Code

    i) No. of Gram Panchayats in project area 5

    j) No. of villages in project area 8

    k) Type of Project Desert

    l) Elevation (metres) 190

    m) Major streams -

    n) Slope range (%) 0--2%

    Macro/micro Name of Gram

    Panchayat

    Name of Villages

    Covered

    Census code of

    villages Area (Hact)

    Cluster Fatehgarh Sandhwa 2074100 1000

    Fatehgarh Kodiyasar 2073500 1000

    Sangar Bhailani 2073200 1000

    Riwadi Riwadi 2074400 1000

    Riwadi Sangram ki dhani 2074500 1000

    Dangri Sandaha 2015300 1000

    Dangri Ramsar 2073700 1000

    Mandai Koriyo ka ganv 2077600 1000

  • The watershed falls in Agroclimatic Zone- IC . The soil texture is sandylomy The average rainfall is

    194mm.The temperatures in the area are in the ranges between 49--32 centigrade during summer and 26—4

    centigrade during winter.

    The major crops in the area are Bajra, Guar, Mung etc The 34.00% land is under cultivation 8.41%

    land fallow,16.61% land is wasteland. The 0.48% area is irrigated through tubewells.

    316 No of households are BPL (27.05% households) 105 are landless households(8.98% households)

    and 218 household are small and marginal farmers( 18.66 %household). Average land holding in the

    area is 7.9 ha. 40% area is single cropped area and 0.05% is double cropped. The main source of irrigation is

    Tube well’s.

    The average annual rainfall (10 years) in the area is 194 mm. There is no Major streams in the

    Watershed area. The major festivals in the villages are Holi, Deewali, krishana janamaastmi, Navratra,

    Gangor, Raksha-bandhan, Moharam & Eid. At present this village is having 4631 population with

    Communities like Rajput, Muslim, Kumhar, Suthar, Megwal and Bhil.

    Climatic and Hydrological information

    Sl.No. Year Average Annual Rainfall(mm)

    1 2001 361

    2 2002 31

    3 2003 137

    4 2004 42

    5 2005 176

    6 2006 501

    7 2007 142

    8 2008 112

    9 2009 72

    10 2010 361

    2. Average Monthly rainfall (last ten years)

    Sl.

    No Month 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

    Average

    Rainfall(

    mm)

    I June 80.50 6.80 0.00 7.30 23.70 49.80 0.70 13.20 33.00 100.90 31.59

    Ii July 216.50 0.00 60.30 2.20 44.60 3.50 21.00 27.50 21.00 77.70 47.43

    Iii August 64.80 0.40 77.00 28.50 2.20 442.80 105.30 71.80 17.80 90.70 90.13

    iv September 0.00 23.80 0.00 4.10 105.70 5.50 15.10 0.00 0.60 92.00 24.68

  • 3 Maximum rainfall intensity (mm)

    Duration rainfall

    intensity(mm)

    i) 15 minute duration 40

    ii) 30 minute duration 58

    iii) 60 minute duration 69

    4 Temperature (Degree C)

    Season Max Min

    i) Summer Season 49 32

    ii) Winter Season 26 4

    iii) Rainy Season 35 24

    5 Potential Evaporation Transpiration (PET) (mm/dd)

    Season PET

    i) Summer 3200

    ii) Winter 2464

    iii) Rainy 2784

    6 Runoff

    i) Peak Rate (cum/hr) 95.25

    ii) Total run off volume of rainy season

    (ha.m.)

    50.76

    iii) Time of return of maximum flood 5

    years

    10

    years

    In-

    Year

    iv)Periodicity of Drought in village

    area

    3 7 -

    Other Development Schemes in the project area

    S.No Scheme Name of the

    department

    Key

    interventions

    under the

    Scheme

    Targeted

    Beneficiaries

    Provisions

    under the

    Scheme

    1 MG NREGA

    RURAL

    DEVELOPMENT &

    PANCHAYAT RAJ

    DEPARTMENT

    Providing

    Employment

    4631

    176 lac

    2 TFC - 21.25 lac

    3 SFC - 12.20 lac

    4 BRGF TSC -

    29.60 lac 5 SGSY/ IAY -

    6 -

    7 -

  • Details of infrastructure in the project areas

    Parameters Status

    (i) No. of villages connected to the main road by an all- weather road 8

    (ii) No. of villages provided with electricity 8

    (iii) No. of households without access to drinking water 0

    (iv)

    No. of educational institutions : (P) (S) (HS) (VI)

    Primary(P)/ Secondary(S)/ Higher Secondary(HS)/vocational

    institution(VI) 10 3 2 -

    (v) No. of villages with access to Primary Health Centre 6

    (vi) No. of villages with access to Veterinary Dispensary 2

    (vii) No. of villages with access to Post Office 5

    (viii) No. of villages with access to Banks 5

    (ix) No. of villages with access to Markets/ mandis 3

    (x) No. of villages with access to Agro-industries 0

    (xi) Total quantity of surplus milk 835 Ltr.

    (xii) No. of milk collection centres (U) (S) (PA) (O)

    (e.g. Union(U)/ Society(S)/ Private agency(PA)/others (O)) - - 8 -

    (xiii) No. of villages with access to Anganwadi Centre 8

    (xiv) Any other facilities with no. of villages (please specify) -

    (xv) Nearest KVK Jaisalmer

    (xvi) cooperative society 4

    (xvii) NGOs 2

    (xviii) Credit institutions

    (i) Bank 2

    (ii) Cooperative Society 3

    (xix) Agro Service Centre's -

    Institutional arrangements (SLNA,DWDU,PIA,WDT,WC, Secretary)

    DWDU Details

    S.No Particulars Details of DWDU

    1 PM ,DWDU Sh. Ramesh Chandra Mathur, Executive

    Engineer

    2 Address with contact no., website PM, DWDU District Jaisalmer, Zila Parishad,

    Jaisalmer

    3 Telephone 02992-250712

    4 Fax 02992-250712

    5 E-mail [email protected]

    PIA particulars

    S.No Particulars Details of PIA

    6 Name of PIA Sh. Vedprakash Sharma

    7 Designation Assist. Engineer

    8 Address with contact no., website AEN. (IWMP) P.S. Sam

    9 Telephone 9414127796

    10 Fax ---------

    11 E-mail

  • WDT Particulars:

    S.

    No

    Name of WDT

    member M/F Age Qualification

    Experience

    in watersh

    ed(Yrs)

    Description

    of professi

    onal

    training

    Role/ Function

    1 2 3 4 5 6 7 8

    1 Sh Ugrasen Bisnoi M 26 LSA - Yes Animal Husbandry

    2 Sh Paramveer singh M 27 L.S.A - Yes Animal Husbandry

    3 Smt Anjali Rawat F 24 BA - - SHG

    4 Sh Mahendra Singh M 27 BSC Ag - - Agriculture

    Details of Watershed Committees (WC)

    S.

    N.

    Name of

    WCs

    Date of

    Gram

    Sabha

    for

    WC

    Date of

    Registrati

    on as a

    Society

    (dd/mm/yy

    yy

    Designati on Name M/F

    SC/ST/

    OBC/G

    eneral

    Landless/

    MF/SF/

    BF

    Name of

    UG/SHG

    Educational

    qualification

    1 Sadhawa

    25.0

    5.2

    010

    President Sh. Ghamanda ram M SC MF UG Secondary

    Secretary Sh. Balaram M SC MF - Secondary

    Member Smt Ganga F SC MF - Middle

    Smt Hato F MF - Middle

    Smt Ajano F SC MF UG Middle

    Sh Harakha ram M SF - Middle

    Smt Anach kanwar F SF SHG Middle

    Sh Banaram M SF - Middle

    Sh. Kan singh M Gen MF UG Primary

    Sh. Purkha ram M MF - Middle

  • 2 Sangram ki

    Dhani

    28.1

    1.2

    010

    President Sh. Fote khan M OBC MF - Secondary

    Secretary Sh. Mathar khan M OBC MF - Secondary

    Member Sh Amain M OBC MF - Middle

    Sh Nura M OBC MF - Middle

    Sh Jusab M OBC MF - Primary

    Sh Nihal khan M OBC SF - Middle

    Smt Jabbi F OBC SF - Primary

    Smt Izmat F OBC SF - Middle

    Smt Firoja F OBC MF - Primary

    Smt Jenab F OBC MF - Middle

    3 Rewadi

    22

    .05.2

    01

    0

    -

    President Sh.Aaidan singh M GEN MF UG Middle

    Secretary Sh. Narayan datt M GEN MF - BA

    Member Smt khemi F SC MF - Middle

    Smt Saraswti devi F OBC MF - Middle

    Smt Makhani F MF UG Middle

    Smt Kansubi devi F SC SF - Middle

    Sh Sawai lal M SF SHG Primary

    Sh Tararam M SC SF - Middle

    Sh Rewataram M SC MF UG Primary

    Sh Ranaram M SC MF - Middle

    4 Sanda

    19.0

    8.2

    010

    President Sh Jeewandan M MF - Middle

    Secretary Sh Mohan dan M MF - Secondary

    Member Sh deep dan M MF - Middle

    Sh Aamaba ram M MF - Middle

    Sh Jamb khan M OBC MF SHG Middle

    Sh Jambe khan M OBC SF - Middle

    Smt Har kanwar F SF - Middle

    Smt Godawari F SF SHG Middle

    Smt Aayati F MF SHG Primary

    Smt kenku F MF - Middle

  • 5 Koriyo ka

    goaw

    27.0

    5.2

    010

    President Sh Ali mohamad M OBC MF UG Secondary

    Secretary Smt Miyan F OBC MF UG Hr

    Secondary

    Member Smt Nemat F OBC MF UG Middle

    Smt Makhani F OBC MF UG Middle

    Smt Hajara F OBC MF SHG Middle

    Sh Padamaram M SF SHG Middle

    Sh dwarkaram M SF SHG Middle

    Sh Aalam M SF UG Middle

    Sh Data M MF UG Primary

    Sh Gulam

    mohamad M MF UG Middle

    6 Bhelani

    19.0

    5.2

    010

    President Smt santosh

    kanwar F MF UG Secondary

    Secretary Sh Jeewraj singh M Gen MF UG Secondary

    Member Sh Jetmal singh M Gen MF UG Primary

    Smt kanu kanwar F MF UG Primary

    Smt Kenku F ST MF SHG Primary

    Smt chhagu F ST SF SHG Primary

    Smt Gomi F SC SF SHG Primary

    Smt Roopo F SC SF UG Primary

    Sh kanwaraj singh M Gen MF UG Primary

    Sh sanbhu dan M MF UG Primary

    7 Ramsar

    23.0

    5.2

    010

    President Sh Hathe singh M MF UG Secondary

    Secretary Sh Sawai singh M MF UG Hr

    Secondary

    Member Sh Rawata ram M MF UG Middle

    Sh sanga ram M MF UG Middle

    Sh Saliman khan M MF SHG Middle

    Sh Mag singh M SF SHG Middle

    Sh Roop singh M SF SHG Middle

    Smt padama F SF UG Middle

    Sh Bheru singh M MF UG Primary

  • Sh Bhima ram M MF UG Middle

    8 Kodiyasar ----

    President Sh Eliyas khan M Mino MF UG Secondary

    Secretary Sh Changej khan M Mino SF SHG Hr

    Secondary

    Member Sh Alisher khan M Mino MF SHG Secondary

    Sh Mohammad

    khan M Mino SF UG Middle

    Smt Panna F Mino MF UG Primary

    Smt Jannat F Mino SF SHG Primary

    Sh raydhan M Mino MF UG Middle

    Sh Reshe khan M Mino MF SHG Middle

    Sh Talab khan M Mino SF UG Middle

    Smt Rahima F Mino MF UG Primary

  • Problems and scope of improvement in the project area

    The socio economic conditions of the area can be improved through increased production

    which can be achieved through expansion in cultivated area and productivity enhancement.

    1540 ha land is arable wasteland and 780 ha is fallow can be brought under cultivation.

    45 ha is only irrigated and with efforts this can be increased to 65. The productivity gap of

    major crops in the area as compared with district and with areas in the same agro climatic

    zones indicate potential to increase the productivity. The demonstration of improved

    package of practices, improved varieties, increased irrigation facilities and soil conservation

    measures under the project can bridge this gap. Due to small land holdings in the area focus

    of the project would be on diversification in agriculture (horticulture, vegetables, green

    houses, Agro forestry, fodder crops)and diversification in Livelihoods(Agriculture, Animal

    husbandry, self employment)

    553890 Quintal fodder scarcity can be met out through Pasture development

    .Improved animal Husbandry practices can increase the productivity of livestock. 175 no of

    persons migrate due to unemployment this migration can be checked through creation of

    employment opportunities in the project area through increase in production and

    diversification in agriculture and Livelihoods as mentioned above.

  • CHAPTER – II

    DEMOGRAPHICAL DETAILS

    Table 2.1 Population & Household Details:

    Total Population

    Mal

    e

    Female

    Total

    SC

    ST

    2465 2166 4631 763 268

    Household Details

    BPL

    household

    L. Less

    Large

    Farmer

    Small

    Farmer

    M.

    Farmer

    Total

    household

    SC

    household

    ST

    household

    316 105 430 218 99 1168 96 34

    Male, 3780,

    54%

    Female, 3235,

    46%

    Male

    Female Series1, 763,

    16%

    Series1, 268,

    6%

    Series1,

    3600, 78%

    SC

    ST

    OTHER

    0

    200

    400

    600

    800

    1000

    1200

    1400

    BPL

    hous

    ehol

    d

    BPL

    L.Les

    s

    Larg

    e Fa

    rmer

    Sm

    all F

    armer

    M. F

    armer

    Tota

    l hou

    seho

    ld

    SC h

    ouse

    hold

    ST

    hous

    ehold

    Series1

  • Table 2.2 Development indicators

    S. No. Development Indicators State Project Area

    1 Per capita income (Rs.) 16,260 9270

    2 Poverty ratio 0.22 0.18

    3 Literacy (%) 60.4 50

    4 Sex Ratio 926 870

    5 infant mortality rate 6.3% 6.2%

    6 maternal mortality ratio 0.38% 0.05%

    The table indicates poor socio economic conditions.

    Comparistion of Various Date of State and Projected Area

    0

    20

    40

    60

    80

    100

    120

    Per

    capita

    incom

    e

    Povert

    y

    ratio

    Litera

    cy

    (%)

    Sex

    Ratio

    infa

    nt

    mort

    alit

    y

    rate

    mate

    rnal

    mort

    alit

    y

    ratio

    1 2 3 4 5 6

    State

    Project Area

  • Table 2.3Land Use

    Land Use Total area in Ha.

    Private Panchayat Government Community Total

    Agriculture Land 2458 0 0 0 2458

    Temporary fallow 0 0 0 0 0

    Permanent Fallow 0 0 0 0 0

    Cultivated Rainfed 3202 0 780 0 3982

    Cultivated irrigated 0 0 0 0 0

    Net Sown Area 1190 0 0 0 1190

    Net Area sown more than once 45 0 0 0 45

    Forest Land 0 0 20 0 20

    Waste Land 0 0 1540 0 1540

    Pastures 0.00 0 35 0 35

    Others 0 0 0 0 0

    Total 6895 0 2375 0 9270

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    Agriculture

    Land

    Tem

    pora

    ry

    fallo

    w

    Perm

    anent

    Fallo

    w

    Cultiv

    ate

    d

    Rain

    fed

    Cultiv

    ate

    d

    irrigate

    d

    Net

    Sow

    n

    Are

    a

    Net

    Are

    a

    sow

    n m

    ore

    than o

    nce

    Fore

    st

    Land

    Waste

    Land

    Pastu

    res

    Oth

    ers

    Private

    Panchayat

    Government

  • The project area has 780 ha of cultivable wasteland . 0 ha of fallow land (total 780 ha)

    can be brought under cultivation if some irrigation source can be provided through

    Construction of WHS like Khadin, Tanka, Farm ponds etc. and also through

    demonstration of rainfed varieties of crops. Construction of WHS can also increase in

    area under irrigation which is only 1540 ha is under wastelands and can be brought

    under vegetative cover, with reasonable effort .Activities like Earthen check dams,

    Vegetative filter strip, V- ditches, staggered trenches ,WHS (Johad) Afforestation of

    wastelands and Pasture development will be taken up on these lands

    Pasture development the land use table shows that there is 35 hectare pasture

    land This emphasizes the need for taking up pastureland development works through

    sowing of promising species of grasses and plantation

    Table 2.4 .a Agriculture and Horticulture status and fuel availability.

    Cropping Status S.

    No

    Season Crop

    sown

    Rain fed Irrigated Total

    Varieties Area

    (ha)

    Production

    (Ton)

    Productiv

    ity

    (kg/ha)

    Varietie

    s

    Area

    (ha)

    Produc

    tion

    (Ton)

    Produc

    tivity

    (kg/ha)

    Area

    (ha)

    Product

    ion

    (Ton)

    1 Kharif Bajra HHB 67 780 280 359 - - - - 780 280

    Moong K851 130 68 518 - - - - 130 68

    Guar 280 159 566 280 159

    2 Rabi Mustured - 45 23 496 - - - - 45 23

    Table 2.4.b Abstract of cropped Area(ha)

    Area under Single crop 1190

    Area under Double crop 45

    Area under Multiple crop 0

    **Write for each crop: The farmers are using WCC 75 ,Raj. 171, varieties of Bajra,

    whereas varieties like HHB 67 , RCB2 can increase the production.

    the crop rotation shows that fallow lands are there. This indicates that there is scope for

    change in crop rotation in fields where there are fallow lands through Soil and Water

    conservation measures, crop demonstration and diversification in agriculture.

    Soil and Water conservation measures besides putting fallow lands under cultivation

    can change the area under single cropping to double and multiple cropping.

  • Table 2.4.c Productivity Gap Analysis (The table can also be given in bar chart form)

    Name of the crop

    Productivity kg/ha

    India

    Highest Average

    in Rajasthan

    Highest Average of

    Agro climatic

    zone

    District Project Area

    Bajara - 339 500 415 780

    Guar - 476 600 550 280

    Moong 886 679 750 625 130

    Mustared - - - - 45

    Analysis of the above table indicate that besides national gap there is wide gap in

    productivity within state and even within same agro climatic zones.

    The reasons for this variation are

    • The farmers are using local seeds & varieties like WBC-75,Raj.171 of Bajra, and Maru

    Guar for cultivation of Guar Whereas the recommended varieties for Bajara are RHB

    58, RHB-121 HHB 67 for Moong RMG-62 & K-851 for Guar RBC-936 & RBC-986 to

    provide more yield.

    • Lack of Availability of good quality seeds of desired crop and variety in adequate

    quantities and time to the farmers.

    • Availability of water for cultivation

    The productivity gap and reasons of it indicate potential to increase the productivity through

    crop demonstration .Crop demonstrations would be carried out on improved crops/ varieties,

    improved agronomic practices. INM, IPM, Mixed cropping, distribution of fodder seed mini

    kit. Demonstration of improved methods and economics of fodder crops cultivation and also

    distribution foundation seeds of Forage Crops for further multiplication, introduction of fodder

    crops in the existing crop rotations.

  • Table 2.5 Existing area under horticulture/Vegetables/Floriculture (ha)

    Activity Area Species Varieties Recommended varieties

    Production

    Horticulture - - - - -

    Vegetables - - - - -

    Floriculture - - - - -

    Medicinal Plants

    - - - - -

    Table 2.6 Land holding Pattern in project area

    Type of Farmer

    Total House holds

    Land holding (ha) irrigation source wise

    Land holding (ha)Social group wise

    Irrigated (source)

    Rain fed

    Total Gen SC ST OBC BPL

    (i)Large farmer

    430 0 2431 2431 1460 316 132 523 0

    (ii) Small farmer

    218 0 1016 1016 58 694 89 175 0

    (iii) Marginal farmer

    99 0 477 477 35 295 105 42 0

    (iv) Landless person

    105 0 0 0 0 0 0 0 0

    (V)No. of BPL households

    316 0 58 58 4 36 14 4 0

    Total 1168 0 3982 3982 1557 1341 340 744 0

  • Table 2.7 Livestock Status - animals/milk production / average yield.

    S.No .

    Description of animals

    Population in No.

    Yield(milk/mutton/ Wool)

    Equ. cow units

    Dry matter requirement per year (7Kg per animal.)

    Total requirement in M.T.

    1 Cows

    Indigenous 2416 3.5 ltr. per day 2416 6172880 6172

    Hybrid 156 - 14656 398580 398

    2 Buffaloes 27 6 ltr. per day 27 68985 68

    3 Goat 8350 1 ltr. per day 4175 31334250 31334

    4 Sheep 18020 1 to 1½ Kg per no. 9010 46041100 46041

    5 Camel 285 - 285 728175 728

    6 Poultry 960 750 Grm per bird - - 0

    7 Piggery 0 - 0 0 0

    Total 30214 - 93282 74743970 74743

  • In spite of the large number of livestock, production is less hence increase in productivity

    across all species, is a major challenge. To reduce production of unproductive cattle and

    improve the productivity by improving the breeds by breeding management following

    activities will be taken up

    • Castration

    • Artificial insemination

    • Distribution of superior Breeding bulls for use in Cattle,Buffalo, shee & Goat

    • Breeding distribution crossbred rams

    Besides breed improvement other animal husbandry practices like better health, hygiene

    and feeding practices can increase productivity of livestock. Hence Activities like Animal

    health camps ,Urea-Molasses treatment demonstration ,demonstration of improved methods

    of conservation and utilization of Forage crops are proposed.

    Table 2.8 Existing area under fodder (ha)

    S.No Item Unit Area/Quantity

    1 Existing Cultivable area under Fodder Ha 3982

    2 Production of Green fodder

    Tonns/year 0

    3 Production of Dry fodder Tonns/ Year 27874

    4 Area under Pastures Ha 1595

    5 Production of fodder Tonns/year 33456.5

    6 Existing area under Fuel wood

    Ha 30

    7 Supplementary feed Kgs/ day -

    8 Silage Pits No -

    9 Availability of fodder Ton 33456.5

    i.Requirement of fodder= 74744 tonns ii. Availability of fodder = 33456.5 tonns.

    Deficiency of fodder = 74744-33456.5 = 41287.5 tonns. The table above shows there is fodder deficiency (Requirement is 74744 tonns and

    Availability 33456.5 tonns) is 41287.5 tonns.

    To minimize the large and expanding gap between feed and fodder resource availability

    and demand there is need for

  • • Increase in area under fodder crops

    • Increase in productivity of fodder crops

    • Development of pastures • And reduction in large number of livestock production through replacement by few but

    productive animals

    Table 2.9 Farm implements

    S. No Implements Nos.

    1 Tractor 51

    2 Sprayers-manual/ power 27

    3 Cultivators/Harrows 60

    4 Seed drill 0

    5 Any Other 44

    Farm mechanization and seed banks: As discussed earlier 36% land holdings belong

    to small and marginal farmers who own only 31% of total cultivated area so owning of big

    farm implements by individual farmers is not economical so SHG would be promoted to

    buy farm implements and rent to farmer

  • Table 2.10 NREGA Status - No. of Card Holder, activities taken so far,

    employment status.

    Sr. no.

    Name of village Total No .of job

    cards Employment

    Status Activity taken up so

    far

    1 Sandhwa 135 9720

    Nadi,Tanka,Greval road,Bunding

    2 Kodiyasar 160 11520

    3 Bhailani 170 12240

    4 Riwadi 226 16272

    5 Sangram ki dhani 178 12816

    6 Sandaha 176 12672

    7 Ramsar 156 11232

    8 Koriyo ka ganv 162 11664

    0

    2000

    4000

    6000

    8000

    10000

    12000

    14000

    16000

    18000

    Sand

    hwa

    Kodiya

    sar

    Bhailani

    Riw

    adi

    Sang

    ram

    ki d

    hani

    Sand

    aha

    Ram

    sar

    Koriy

    o ka

    gan

    v

    Total No .of job cards

    Employment

  • Table 2.11 Migration Details

    Name of village

    No. of

    persons

    migrating

    No. of days per

    year of

    migration

    Major reason(s)

    for migrating

    Distance of

    destination of

    migration from

    the village (km)

    Occupation

    during migration

    Income from

    such occupation

    (Rs. in lakh)

    Sandhwa 26 170

    Employment

    & Business 150-2000

    Employment

    & Business

    7.25

    Kodiyasar 25 164 7.15

    Bhailani 18 160 7.50

    Riwadi 27 175 8.50

    Sangram ki

    dhani

    21 165 8.25

    Sandaha 19 170 8.75

    Ramsar 16 175 7.12

    Koriyo ka ganv 23 176 7.65

    The migration can be checked by creation of employment opportunities, enhancing farm level economy, increase in the income of the people engaged in animal husbandry by dairy and marketing and value addition. (As discussed earlier) and diversification in livelihoods .

    Chart of migrate person & person days

    020406080

    100120140160180200

    San

    dhwa

    Kod

    iyas

    ar

    Bha

    ilani

    Riw

    adi

    San

    gram

    ki d

    hani

    San

    daha

    Ram

    sar

    Kor

    iyo

    ka g

    anv

    No. of persons migrating

    No. of days per year of

    migration

  • Livelihood Details

    Table 2.12 (a)Major activities (On Farm)

    Name of activity No of House holds Average annual income from the

    cultivators 573 544 lac

    Dairying 490 441 lac

    Poultry - -

    Piggery - -

    Landless Agri. Labourers 105 47 lac

  • Table 2.12(b)Major activities (Off Farm)

    Name of activity

    Households/individuals Average annual income from

    the

    Artisans - -

    Carpenter 92 4.02 Lac

    Blacksmith 50

    1.25

    Leather Craft - - Porter 155 1.60

    Mason 106 4.40

    Others specify (Cycle Repair ,STD,Craft etc)

    - -

    The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals

    Table 2.13( a ) Status of Existing SHG

    S.No Name of SHG

    Members Activity involved

    Monthly income

    Fund avai.

    Assistance available

    Source of assistance

    Training receive

    1 Maa durga 10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    2 Maa bharti 10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    3 Maa parwati

    10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    4 Maa avad maa

    10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    5 Maa bhilani ray

    10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    6 Maa deval 10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    7 Pabu ji 10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    8 Maa deg rai 10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    9 Tanot mata 10 1,000 - Bank Loan Z.P.Jaisalmer Yes

    The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance

    II. Technical Features

    Table 2.14 Ground Water Details

    S.No Source No. Functional depth(meter )

    Dry Area irrigated

    Water availability (days)

    i) Dug wells 0 0 0 - -

    ii) Shallow tube wells - - - - -

    iii) Pumping sets - - - - -

    iv) Deep Tube Wells 28 150-230 - 1160 365 days

    Total 28 - - - -

  • Table 2.15 Availability of drinking water Sl No. Name of

    the

    Village

    Drinking

    water

    requirement

    ltrs/ day

    Present

    availability

    of drinking

    water

    ltrs/day

    No of

    drinking

    water

    sources

    available

    No

    functional

    No

    requires

    repairs

    No

    defunct

    1 Sandhwa

    2970 2860 3 3

    2 Kodiyasar

    7029 6999 4 4

    3 Bhailani

    6858 6670 2 2

    4 Riwadi

    8667 8570 2 2

    5 Sangram ki dhani

    4023 3950 1 1

    6 Sandaha

    4887 4720 3 3

    7 Ramsar

    3050 2950 4 4

    8 Koriyo ka ganv

    7245 7135 1 1

    Chart of Drinking water requirement and present availability of drinkings water

    0100020003000400050006000700080009000

    10000

    San

    dhwa

    Kod

    iyas

    ar

    Bha

    ilani

    Riw

    adi

    San

    gram

    ki d

    hani

    San

    daha

    Ram

    sar

    Kor

    iyo

    ka g

    anv

    Drinking water requirement

    ltrs/ day

    Present availability of drinking

    water ltrs/day

  • Table 2.16 Water Use efficiency

    Name of major crop

    Area (Hectare)

    through water saving

    devices(Drip/S prinklers)

    through water

    conserving agronomic

    practices#

    Any other (pl. specify)

    Total

    Mustard 60% 20% - -

    Mung 60% 20% - -

    • The tables above indicate need for judicious use of available Water.

    • Encouraging optimum use of water through installation of sprinklers on every operational wells

  • Table 2.17 Slope details.

    Slope of Watershed S.No. Slope percentage Area in

    hectares 1 0 to 2% 9270 2 3 to 8% - 3 8 to 25% - 4 > 25% -

    As most of the area has slope less than 3% construction of contour bunds can solve the problem of water erosion in agriculture fields and protect washing of top soil and manures/fertilizers

  • CHAPTER – III

    Proposed Development Plan: The Activities are indicative addition /deletion in activities will be as per local conditions

    A) Preparatory phase activities Capacity Building Trainings and EPA

    The IEC activities like Kalajathas, Group meetings, door to door campaign, slogans and

    wall writings etc. were carried out in all the habitations of fatehgarh (IWMP) V

    Micro Watershed. A series of meetings were conducted with Gram Panchayat members,

    community and discussed about the implementation of IWMP programme. User groups

    were also formed.

    Grama Sabhas were conducted for approval of EPA (Village), for selecting the

    watershed committee and approval of DPR.

    S.no Name of the Gram Panchayat

    Date on which Grama Sabha approved EPA

    1 Fatehgarh 02-10-2010

    2 Sangar 20-10-2010

    3 Riwadi 02-10-2010

    4 Dangri 02-10-2010

    5 Mandai 02-10-2010

    S. No.

    Names of village

    Amount earmarked for EPA

    Entry Point Activities planned

    Estimated cost

    Expenditure incurred

    Balance

    Expected outcome

    Actual outcome

    1 Sandhwa 6.00 12 6.00 3.75 2.25 6.00 3.75

    2 Kodiyasar 6.00 12 6.00 3.75 2.25 6.00 3.75

    3 Bhailani 6.00 12 6.00 3.75 2.25 6.00 3.75

    4 Riwadi 6.00 12 6.00 3.75 2.25 6.00 3.75

    5 Sangram ki dhani

    6.00 12 6.00 3.75 2.25 6.00 3.75

    6 Sandaha 6.00 12 6.00 3.75 2.25 6.00 3.75

    7 Ramsar 6.00 12 6.00 3.75 2.25 6.00 3.75

    8 Koriyo ka ganv

    6.00 12 6.00 3.75 2.25 6.00 3.75

  • The PRA exercise was carried out in all the villages on the dates shown below:

    S.no Name of the village/Habitation

    Date on which PRA conducted

    1 Sandhwa 14-07-2011

    2 Kodiyasar 27-06-2011

    3 Bhailani 19-06-2011

    4 Riwadi 18-07-2011

    5 Sangram ki dhani 01-07-2011

    6 Sandaha 07-07-2011

    7 Ramsar 15-07-2011

    8 Koriyo ka ganv 23-07-2011

  • Transact walk were carried out involving the community for Social mapping, Resource

    mapping. detailed discussions and deliberations with all the primary stakeholders were carried

    out.

    Socio-economic survey was carried out during 28-3-2011 (dates) period covering all the

    households and primary data on demography, Land holdings, Employment status, Community

    activities etc. was collected as mentioned in chapter 2.

    State remote sensing department was assigned the work of preparing various

    thematic layers using Cartosat-1 and LISS-3 imageries for Creation, development and

    management of geo-spatial database depicting present conditions of land (terrain), water and

    vegetation with respect to watershed under different ownerships at village level

    Various thematic layers provided by SRSAC are :

    • Digitised Khasara maps of the villages falling in project area.

    • Network of Drainage lines, existing water bodies, falling in the project area.

    • Base maps (transport network, village/boundaries, and settlements).

    • Land Use / Land cover map.

    • Contours at 1 meter interval, slope map

    Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as

    discussed in chapter 2) final Treatment plan on revenue map for implementation has been

    framed. Thus each intervention identified has been marked on revenue map (map enclosed in

    DPR as annexure------).The GIS based intervention map, PRA based intervention map are

    annexed as ------.

    .

  • s

  • (A)

    Quanitiy Total CostCost From Project

    Fund

    Convergen

    ce Fund

    Beneficiary

    Contribution

    Admn. 10% - 0 120.00 120.00 0 0

    Monitoring 1% - 0 12.00 12.00 0 0

    Evaluation 1% - 0 12.00 12.00 0 0

    EPA 4% - 0 48.00 48.00 0 0

    I & CB 5% - 0 60.00 60.00 0 0

    DPR 1% - 0 12.00 12.00 0 0

    Total (A) 264.00 264.00 0 0

    (B)

    Earthen Bund/khadeen No. 150000 247 370.50 370.50 0.00 27.79

    Tanka No. 75000 214 160.50 160.50 0.00 12.04

    Khet talai/du gout pond No. 200000 15 30.00 30.00 0.00 2.25

    Diggi No. 200000 24 48.00 48.00 0.00 3.60

    Renovation of Bawari No. 200000 4 8.00 8.00 0.00 0.60

    Bank Stabilisation/

    Peripheral BundsMtr 0 0 0.00 0.00 0.00 0.00

    Pasture Development hact. 50000 38 19.00 19.00 0.00 1.43

    V- ditch Mtr 27.69 94425 26.15 26.15 0.00 1.96

    Water Harvesting Structure No. 100000 31 31.00 31.00 0.00 2.33

    Afforestation hact. 50000 42 21.00 21.00 0.00 1.58

    MMS No. 0 0 0.00 0.00 0.00 0.00

    LSCD No. 15000 39 5.85 5.85 0.00 0.44

    WHS No. 0 0 0.00 0.00 0.00 0.00

    Gully Plugs (ECD) No. 0 0 0.00 0.00 0.00 0.00

    Ground water recharge

    StructureNo. 0 0 0.00 0.00 0.00 0.00

    Total (B) 720.00 720.00 0.00 54.00

    (C)

    Horticulture Plantation No. 95 7875 7.48 7.48 0.00 2.24

    Sprinklers and Drip

    irrigationhact. 0 0 0.00 0.00 0.00 0.00

    Floriculture No. 0 0 0.00 0.00 0.00 0.00

    Vegetables No. 0 0 0.00 0.00 0.00 0.00

    Medicinal Plants No. 0 0 0.00 0.00 0.00 0.00

    Vermi compost No. 6000 382 22.92 22.92 0.00 6.88

    Crop Demonstration No. 2150 2933 63.06 63.06 0.00 18.92

    Dairy No. 1000 1069 10.69 10.69 0.00 3.21

    Annual Camp No. 10000 308 30.80 30.80 0.00 9.24

    Poultry No. 0 0 0.00 0.00 0.00 0.00

    Local Artisans/ crafts No. 0 0 0.00 0.00 0.00 0.00

    Animal Minral/ Mixar No. 1000 955 9.55 9.55 0.00 2.87

    SHG Land less/ BPL No. 50000 71 35.50 35.50 0.00 10.65

    Food Processing No. 0 0 0.00 0.00 0.00 0.00

    Total ( C) 180.00 180.00 0.00 54.00

    (D) Consolidation 36.00 36.00 0.00 0.00

    Total (D) 36.00 36.00 0.00 0.00

    Grand Total 1200.00 1200.00 0.00 108.00

    Total

    Conservation measures for arable land (private land)

    Conservation measures For non arable land

    Drainage line treatment

    Production measures for arable land

    Micro Enterprise

    PROPOSED DEVELOPMENT PLAN

    Unit Unit Cost

    Preparatory Phase activities capacity building trainings & EPA

    Activity

  • (A)

    Quanitiy Total CostCost From Project

    Fund

    Convergen

    ce Fund

    Beneficiary

    Contribution

    Admn. 10% 0.00 0 30.00 30.00 0 0

    Monitoring 1% 0.00 0 3.00 3.00 0 0

    Evaluation 1% 0.00 0 3.00 3.00 0 0

    EPA 4% 0.00 0 12.00 12.00 0 0

    I & CB 5% 0.00 0 15.00 15.00 0 0

    DPR 1% 0.00 0 3.00 3.00 0 0

    Total (A) 66.00 66.00 0 0

    (B)

    Earthen Bund/khadeen No. 150000 58 87.00 87.00 0.00 6.53

    Tanka No. 75000 56 42.00 42.00 0.00 3.15

    Khet talai/du gout pond No. 200000 2 4.00 4.00 0.00 0.30

    Diggi No. 200000 9 18.00 18.00 0.00 1.35

    Renovation of Bawari No. 200000 0 0.00 0.00 0.00 0.00

    Bank Stabilisation/

    Peripheral BundsMtr 0 0 0.00 0.00 0.00 0.00

    Pasture Development hact. 50000 11 5.50 5.50 0.00 0.41

    V- ditch Mtr 27.69 26725 7.40 7.40 0.00 0.56

    Water Harvesting Structure No. 100000 7 7.00 7.00 0.00 0.53

    Afforestation hact. 50000 14 7.00 7.00 0.00 0.53

    MMS No. 0 0 0.00 0.00 0.00 0.00

    LSCD No. 15000 14 2.10 2.10 0.00 0.16

    WHS No. 0 0 0.00 0.00 0.00 0.00

    Gully Plugs (ECD) No. 0 0 0.00 0.00 0.00 0.00

    Ground water recharge

    StructureNo. 0 0 0.00 0.00 0.00 0.00

    Total (B) 180.00 180.00 0.00 13.50

    (C)

    Horticulture Plantation No. 95 2000 1.90 1.90 0.00 0.57

    Sprinklers and Drip

    irrigationhact. 0 0 0.00 0.00 0.00 0.00

    Floriculture No. 0 0 0.00 0.00 0.00 0.00

    Vegetables No. 0 0 0.00 0.00 0.00 0.00

    Medicinal Plants No. 0 0 0.00 0.00 0.00 0.00

    Vermi compost No. 6000 50 3.00 3.00 0.00 0.90

    Crop Demonstration No. 2150 890 19.14 19.14 0.00 5.74

    Dairy No. 1000 246 2.46 2.46 0.00 0.74

    Annual Camp No. 10000 80 8.00 8.00 0.00 2.40

    Poultry No. 0 0 0.00 0.00 0.00 0.00

    Local Artisans/ crafts No. 0 0 0.00 0.00 0.00 0.00

    Animal Minral/ Mixar No. 1000 250 2.50 2.50 0.00 0.75

    SHG Land less/ BPL No. 50000 16 8.00 8.00 0.00 2.40

    Food Processing No. 0 0 0.00 0.00 0.00 0.00

    Total ( C) 45.00 45.00 0.00 13.50

    (D) Consolidation 9.00 9.00 0.00 0.00

    Total (D) 9.00 9.00 0.00 0.00

    Grand Total 300.00 300.00 0.00 27.00

    Drainage line treatment

    Production measures for arable land

    Micro Enterprise

    Conservation measures for arable land (private land)

    Conservation measures For non arable land

    PROPOSED DEVELOPMENT PLAN

    Unit Unit Cost

    Preparatory Phase activities capacity building trainings & EPA

    Activity

    Gram Panchayat Fatehgarh

  • (A)

    Quanitiy Total CostCost From Project

    Fund

    Convergen

    ce Fund

    Beneficiary

    Contribution

    Admn. 10% - 0.00 30.00 30.00 0 0

    Monitoring 1% - 0.00 3.00 3.00 0 0

    Evaluation 1% - 0.00 3.00 3.00 0 0

    EPA 4% - 0.00 12.00 12.00 0 0

    I & CB 5% - 0.00 15.00 15.00 0 0

    DPR 1% - 0.00 3.00 3.00 0 0

    Total (A) 66.00 66.00 0 0

    (B)

    Earthen Bund/khadeen No. 150000 69 103.50 103.50 0.00 7.76

    Tanka No. 75000 53 39.75 39.75 0.00 2.98

    Khet talai/du gout pond No. 200000 3 6.00 6.00 0.00 0.45

    Diggi No. 200000 3 6.00 6.00 0.00 0.45

    Renovation of Bawari No. 200000 0 0.00 0.00 0.00 0.00

    Bank Stabilisation/

    Peripheral BundsMtr 0 0 0.00 0.00 0.00 0.00

    Pasture Development hact. 50000 11 5.50 5.50 0.00 0.41

    V- ditch Mtr 27.69 22025 6.10 6.10 0.00 0.46

    Water Harvesting Structure No. 100000 7 7.00 7.00 0.00 0.53

    Afforestation hact. 50000 9 4.50 4.50 0.00 0.34

    MMS No. 0 0 0.00 0.00 0.00 0.00

    LSCD No. 15000 11 1.65 1.65 0.00 0.12

    WHS No. 0 0 0.00 0.00 0.00 0.00

    Gully Plugs (ECD) No. 0 0 0.00 0.00 0.00 0.00

    Ground water recharge

    StructureNo. 0 0 0.00 0.00 0.00 0.00

    Total (B) 180.00 180.00 0.00 13.50

    (C)

    Horticulture Plantation No. 95 1880 1.79 1.79 0.00 0.54

    Sprinklers and Drip

    irrigationhact. 0 0 0.00 0.00 0.00 0.00

    Floriculture No. 0 0 0.00 0.00 0.00 0.00

    Vegetables No. 0 0 0.00 0.00 0.00 0.00

    Medicinal Plants No. 0 0 0.00 0.00 0.00 0.00

    Vermi compost No. 6000 100 6.00 6.00 0.00 1.80

    Crop Demonstration No. 2150 743 15.97 15.97 0.00 4.79

    Dairy No. 1000 298 2.98 2.98 0.00 0.89

    Annual Camp No. 10000 80 8.00 8.00 0.00 2.40

    Poultry No. 0 0 0.00 0.00 0.00 0.00

    Local Artisans/ crafts No. 0 0 0.00 0.00 0.00 0.00

    Animal Minral/ Mixar No. 1000 276 2.76 2.76 0.00 0.83

    SHG Land less/ BPL No. 50000 15 7.50 7.50 0.00 2.25

    Food Processing No. 0 0 0.00 0.00 0.00 0.00

    Total ( C) 45.00 45.00 0.00 13.50

    (D) Consolidation 9.00 9.00 0.00 0.00

    Total (D) 9.00 9.00 0.00 0.00

    Grand Total 300.00 300.00 0.00 27.00

    Gram Panchayat Dangri

    Conservation measures for arable land (private land)

    Conservation measures For non arable land

    Drainage line treatment

    Production measures for arable land

    Micro Enterprise

    PROPOSED DEVELOPMENT PLAN

    Unit Unit Cost

    Preparatory Phase activities capacity building trainings & EPA

    Activity

  • (A)

    Quanitiy Total CostCost From Project

    Fund

    Convergen

    ce Fund

    Beneficiary

    Contribution

    Admn. 10% - 0 15.00 15.00 0 0

    Monitoring 1% - 0 1.50 1.50 0 0

    Evaluation 1% - 0 1.50 1.50 0 0

    EPA 4% - 0 6.00 6.00 0 0

    I & CB 5% - 0 7.50 7.50 0 0

    DPR 1% - 0 1.50 1.50 0 0

    Total (A) 33.00 33.00 0 0

    (B)

    Earthen Bund/khadeen No. 150000 30 45.00 45.00 0.00 3.38

    Tanka No. 75000 30 22.50 22.50 0.00 1.69

    Khet talai/du gout pond No. 200000 3 6.00 6.00 0.00 0.45

    Diggi No. 200000 2 4.00 4.00 0.00 0.30

    Renovation of Bawari No. 200000 0 0.00 0.00 0.00 0.00

    Bank Stabilisation/

    Peripheral BundsMtr 0 0 0.00 0.00 0.00 0.00

    Pasture Development hact. 50000 4 2.00 2.00 0.00 0.15

    V- ditch Mtr 27.69 12825 3.55 3.55 0.00 0.27

    Water Harvesting Structure No. 100000 4 4.00 4.00 0.00 0.30

    Afforestation hact. 50000 5 2.50 2.50 0.00 0.19

    MMS No. 0 0 0.00 0.00 0.00 0.00

    LSCD No. 15000 3 0.45 0.45 0.00 0.03

    WHS No. 0 0 0.00 0.00 0.00 0.00

    Gully Plugs (ECD) No. 0 0 0.00 0.00 0.00 0.00

    Ground water recharge

    StructureNo. 0 0 0.00 0.00 0.00 0.00

    Total (B) 90.00 90.00 0.00 6.75

    (C)

    Horticulture Plantation No. 95 1000 0.95 0.95 0.00 0.29

    Sprinklers and Drip

    irrigationhact. 0 0 0.00 0.00 0.00 0.00

    Floriculture No. 0 0 0.00 0.00 0.00 0.00

    Vegetables No. 0 0 0.00 0.00 0.00 0.00

    Medicinal Plants No. 0 0 0.00 0.00 0.00 0.00

    Vermi compost No. 6000 40 2.40 2.40 0.00 0.72

    Crop Demonstration No. 2150 300 6.45 6.45 0.00 1.94

    Dairy No. 1000 95 0.95 0.95 0.00 0.29

    Annual Camp No. 10000 30 3.00 3.00 0.00 0.90

    Poultry No. 0 0 0.00 0.00 0.00 0.00

    Local Artisans/ crafts No. 0 0 0.00 0.00 0.00 0.00

    Animal Minral/ Mixar No. 1000 125 1.25 1.25 0.00 0.38

    SHG Land less/ BPL No. 50000 15 7.50 7.50 0.00 2.25

    Food Processing No. 0 0 0.00 0.00 0.00 0.00

    Total ( C) 22.50 22.50 0.00 6.75

    (D) Consolidation 4.50 4.50 0.00 0.00

    Total (D) 4.50 4.50 0.00 0.00

    Grand Total 150.00 150.00 0.00 13.50

    Gram Panchayat Mandai

    Conservation measures for arable land (private land)

    Conservation measures For non arable land

    Drainage line treatment

    Production measures for arable land

    Micro Enterprise

    PROPOSED DEVELOPMENT PLAN

    Unit Unit Cost

    Preparatory Phase activities capacity building trainings & EPA

    Activity

  • (A)

    Quanitiy Total CostCost From Project

    Fund

    Convergen

    ce Fund

    Beneficiary

    Contribution

    Admn. 10% - 0 30.00 30.00 0 0

    Monitoring 1% - 0 3.00 3.00 0 0

    Evaluation 1% - 0 3.00 3.00 0 0

    EPA 4% - 0 12.00 12.00 0 0

    I & CB 5% - 0 15.00 15.00 0 0

    DPR 1% - 0 3.00 3.00 0 0

    Total (A) 66.00 66.00 0 0

    (B)

    Earthen Bund/khadeen No. 150000 58 87.00 87.00 0.00 6.53

    Tanka No. 75000 50 37.50 37.50 0.00 2.81

    Khet talai/du gout pond No. 200000 5 10.00 10.00 0.00 0.75

    Diggi No. 200000 7 14.00 14.00 0.00 1.05

    Renovation of Bawari No. 200000 4 8.00 8.00 0.00 0.60

    Bank Stabilisation/

    Peripheral BundsMtr 0 0 0.00 0.00 0.00 0.00

    Pasture Development hact. 50000 8 4.00 4.00 0.00 0.30

    V- ditch Mtr 27.69 20950 5.80 5.80 0.00 0.44

    Water Harvesting Structure No. 100000 8 8.00 8.00 0.00 0.60

    Afforestation hact. 50000 9 4.50 4.50 0.00 0.34

    MMS No. 0 0 0.00 0.00 0.00 0.00

    LSCD No. 15000 8 1.20 1.20 0.00 0.09

    WHS No. 0 0 0.00 0.00 0.00 0.00

    Gully Plugs (ECD) No. 0 0 0.00 0.00 0.00 0.00

    Ground water recharge

    StructureNo. 0 0 0.00 0.00 0.00 0.00

    Total (B) 180.00 180.00 0.00 13.50

    (C)

    Horticulture Plantation No. 95 1942 1.84 1.84 0.00 0.55

    Sprinklers and Drip

    irrigationhact. 0 0 0.00 0.00 0.00 0.00

    Floriculture No. 0 0 0.00 0.00 0.00 0.00

    Vegetables No. 0 0 0.00 0.00 0.00 0.00

    Medicinal Plants No. 0 0 0.00 0.00 0.00 0.00

    Vermi compost No. 6000 130 7.80 7.80 0.00 2.34

    Crop Demonstration No. 2150 700 15.05 15.05 0.00 4.52

    Dairy No. 1000 277 2.77 2.77 0.00 0.83

    Annual Camp No. 10000 82 8.20 8.20 0.00 2.46

    Poultry No. 0 0 0.00 0.00 0.00 0.00

    Local Artisans/ crafts No. 0 0 0.00 0.00 0.00 0.00

    Animal Minral/ Mixar No. 1000 184 1.84 1.84 0.00 0.55

    SHG Land less/ BPL No. 50000 15 7.50 7.50 0.00 2.25

    Food Processing No. 0 0 0.00 0.00 0.00 0.00

    Total ( C) 45.00 45.00 0.00 13.50

    (D) Consolidation 9.00 9.00 0.00 0.00

    Total (D) 9.00 9.00 0.00 0.00

    Grand Total 300.01 300.01 0.00 27.00

    Gram Panchayat Rivadi

    Conservation measures for arable land (private land)

    Conservation measures For non arable land

    Drainage line treatment

    Production measures for arable land

    Micro Enterprise

    PROPOSED DEVELOPMENT PLAN

    Unit Unit Cost

    Preparatory Phase activities capacity building trainings & EPA

    Activity

  • (A)

    Quanitiy Total CostCost From Project

    Fund

    Convergen

    ce Fund

    Beneficiary

    Contribution

    Admn. 10% - 0 15.00 15.00 0 0

    Monitoring 1% - 0 1.50 1.50 0 0

    Evaluation 1% - 0 1.50 1.50 0 0

    EPA 4% - 0 6.00 6.00 0 0

    I & CB 5% - 0 7.50 7.50 0 0

    DPR 1% - 0 1.50 1.50 0 0

    Total (A) 33.00 33.00 0 0

    (B)

    Earthen Bund/khadeen No. 150000 32 48.00 48.00 0.00 3.60

    Tanka No. 75000 25 18.75 18.75 0.00 1.41

    Khet talai/du gout pond No. 200000 2 4.00 4.00 0.00 0.30

    Diggi No. 200000 3 6.00 6.00 0.00 0.45

    Renovation of Bawari No. 200000 0 0.00 0.00 0.00 0.00

    Bank Stabilisation/

    Peripheral BundsMtr 0 0 0.00 0.00 0.00 0.00

    Pasture Development hact. 50000 4 2.00 2.00 0.00 0.15

    V- ditch Mtr 27.69 11900 3.30 3.30 0.00 0.25

    Water Harvesting Structure No. 100000 5 5.00 5.00 0.00 0.38

    Afforestation hact. 50000 5 2.50 2.50 0.00 0.19

    MMS No. 0 0 0.00 0.00 0.00 0.00

    LSCD No. 15000 3 0.45 0.45 0.00 0.03

    WHS No. 0 0 0.00 0.00 0.00 0.00

    Gully Plugs (ECD) No. 0 0 0.00 0.00 0.00 0.00

    Ground water recharge

    StructureNo. 0 0 0.00 0.00 0.00 0.00

    Total (B) 90.00 90.00 0.00 6.75

    (C)

    Horticulture Plantation No. 95 1053 1.00 1.00 0.00 0.30

    Sprinklers and Drip

    irrigationhact. 0 0 0.00 0.00 0.00 0.00

    Floriculture No. 0 0 0.00 0.00 0.00 0.00

    Vegetables No. 0 0 0.00 0.00 0.00 0.00

    Medicinal Plants No. 0 0 0.00 0.00 0.00 0.00

    Vermi compost No. 6000 62 3.72 3.72 0.00 1.12

    Crop Demonstration No. 2150 300 6.45 6.45 0.00 1.94

    Dairy No. 1000 153 1.53 1.53 0.00 0.46

    Annual Camp No. 10000 36 3.60 3.60 0.00 1.08

    Poultry No. 0 0 0.00 0.00 0.00 0.00

    Local Artisans/ crafts No. 0 0 0.00 0.00 0.00 0.00

    Animal Minral/ Mixar No. 1000 120 1.20 1.20 0.00 0.36

    SHG Land less/ BPL No. 50000 10 5.00 5.00 0.00 1.50

    Food Processing No. 0 0 0.00 0.00 0.00 0.00

    Total ( C) 22.50 22.50 0.00 6.75

    (D) Consolidation 4.50 4.50 0.00 0.00

    Total (D) 4.50 4.50 0.00 0.00

    Grand Total 150.00 150.00 0.00 13.50

    Gram Panchayat Sangar

    Conservation measures for arable land (private land)

    Conservation measures For non arable land

    Drainage line treatment

    Production measures for arable land

    Micro Enterprise

    PROPOSED DEVELOPMENT PLAN

    Unit Unit Cost

    Preparatory Phase activities capacity building trainings & EPA

    Activity

  • s

  • Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

    Admn. 10% 0% 0.00 120.00 0.00 12.00 0.00 12.00 0.00 36.00 0.00 28.80 0.00 19.20 0.00 12.00 0.00 120.00

    Monitoring 1% 0% 0.00 12.00 0.00 1.20 0.00 1.20 0.00 3.60 0.00 2.88 0.00 1.92 0.00 1.20 0.00 12.00

    Evaluation 1% 0% 0.00 12.00 0.00 1.20 0.00 1.20 0.00 3.60 0.00 2.88 0.00 1.92 0.00 1.20 0.00 12.00

    EPA 4% 0% 0.00 48.00 0.00 4.80 0.00 4.80 0.00 14.40 0.00 11.52 0.00 7.68 0.00 4.80 0.00 48.00

    I & CB 5% 0% 0.00 60.00 0.00 6.00 0.00 6.00 0.00 18.00 0.00 14.40 0.00 9.60 0.00 6.00 0.00 60.00

    DPR 1% 0% 0.00 12.00 0.00 1.20 0.00 1.20 0.00 3.60 0.00 2.88 0.00 1.92 0.00 1.20 0.00 12.00

    Total (A) 264.00 26.40 26.40 79.20 63.36 42.24 26.40 264.00

    Earthen Bund/khadeen No. 247 7.5 370.5 8 12 12 18 60 90 83 124.5 50 75 34 51 247 370.5

    Tanka No. 214 3.75 160.5 8 6 17 12.75 53 39.75 88 66 27 20.25 21 15.75 214 160.5

    Khet talai/du gout pond No. 15 10 30 0 0 3 6 3 6 4 8 2 4 3 6 15 30

    Diggi No. 24 10 48 0 0 0 0 0 0 2 4 15 30 7 14 24 48

    Renovation of Bawari No. 4 10 8 0 0 0 0 0 0 0 0 0 0 4 8 4 8

    Bank Stabilisation/ Peripheral Bunds Mtr 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Conservation measures for non arable land 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Pasture Development hact. 38 2.5 19 4 2 30 15 0 0 0 0 0 0 4 2 38 19

    V - ditch Mtr 94425 0.0014 26.14628 3560 0.9858 15400 4.2643 14550 4.0289 40225 11.1383 15170 4.20057 5520 1.52849 94425 26.1463

    Water Harvesting Structure No. 31 5 31 0 0 0 0 16 16 8 8 5 5 2 2 31 31

    Afforestation hact. 42 2.5 21 2 1 15 7.5 12 6 8 4 2 1 3 1.5 42 21

    Drainage line treatment MMS No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    LSCD No. 39 0.75 5.85 6 0.9 24 3.6 5 0.75 0 0 3 0.45 1 0.15 39 5.85

    WHS No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Gully Plugs(ECD) No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Ground water recharge Structure No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Total (B) 720.00 22.89 67.11 162.53 225.64 139.90 101.93 720.00

    Horticulture plantation (vegetable,Medicine) No. 7875 0.0048 7.48125 330 0.3135 351 0.3335 4101 3.89595 2074 1.9703 480 0.456 539 0.51205 7875 7.48125

    Sprinklers and Drip irrigation hact. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    foriculture No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Vegetables No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Medicinal Plants No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Vermi compost No. 382 0.3 22.92 63 3.78 80 4.8 146 8.76 60 3.6 2 0.12 31 1.86 382 22.92

    Crop Demonstration No. 2933 0.1075 63.0595 58 1.247 170 3.655 825 17.7375 1268 27.262 338 7.267 274 5.891 2933 63.0595

    Micro Enterprise

    Dairy No. 1069 0.05 10.69 24 0.24 129 1.29 447 4.47 279 2.79 140 1.4 50 0.5 1069 10.69

    Animal camp/Breed improovement No. 308 0.5 30.8 0 0 40 4 52 5.2 99 9.9 81 8.1 36 3.6 308 30.8

    Poultry No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Local Artisans/craft No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Animal Minral/ Mixar No. 955 0.05 9.55 10 0.1 74 0.74 338 3.38 304 3.04 208 2.08 21 0.21 955 9.55

    SHG Land less/ BPL No. 71 2.5 35.5 0 0 7 3.5 28 14 28 14 4 2 4 2 71 35.5

    Food Processing No. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Total (C) 180.00 5.68 18.32 57.44 62.56 21.42 14.57 180.00

    (D) Consolidation 3% 36 0 0 0 0 0 0 0 0 0 0 0 36 0 36Grand Total 1200.00 54.97 111.83 299.17 351.56 203.56 178.90 1200.0

    ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)

    Total

    Activity Unit Qty.Unit

    Cost

    Total

    cost

    1st year 2nd year 3rd year

    Conservation measures for arable land(private land)

    (C) Production System and micro enterprise(15%)

    Production measures for arable land

    4th year 5th year 6th year Total

    (A) Preparatory phase activities capacity building trainings & EPA

    (B) Natural resource management (60%)

  • Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

    Admn. 10% 0% 30.00 0 3.00 0 3.00 0 9.00 0 7.20 0 4.80 0 3.00 0 30.00

    Monitoring 1% 0% 3.00 0 0.30 0 0.30 0 0.90 0 0.72 0 0.48 0 0.30 0 3.00

    Evaluation 1% 0% 3.00 0 0.30 0 0.30 0 0.90 0 0.72 0 0.48 0 0.30 0 3.00

    EPA 4% 0% 12.00 0 1.20 0 1.20 0 3.60 0 2.88 0 1.92 0 1.20 0 12.00

    I & CB 5% 0% 15.00 0 1.50 0 1.50 0 4.50 0 3.60 0 2.40 0 1.50 0 15.00

    DPR 1% 0% 3.00 0 0.30 0 0.30 0 0.90 0 0.72 0 0.48 0 0.30 0 3.00

    Total (A) 66.00 6.60 6.60 19.80 15.84 10.56 6.60 66.00

    Earthen Bund/khadeen No. 58 1.50 87.00 2 3.00 2 3.00 14 21.00 23 34.50 6 9.00 11 16.50 58 87.00

    Tanka No. 56 0.75 42.00 2 1.50 4 3.00 13 9.75 20 15.00 7 5.25 10 7.50 56 42.00

    Khet talai/du gout pond No. 2 2.00 4.00 0 0.00 1 2.00 1 2.00 0 0.00 0 0.00 0 0.00 2 4.00

    Diggi No. 9 2.00 18.00 0 0.00 0 0.00 0 0.00 0 0.00 9 18.00 0 0.00 9 18.00

    Renovation of Bawari No. 0 2.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Bank Stabilisation/ Peripheral Bunds Mtr 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00

    Conservation measures for non arable land 0

    Pasture Development hact. 11 0.50 5.50 1 0.50 10 5.00 0 0.00 0 0.00 0 0.00 0 0.00 11 5.50

    V - ditch Mtr 26725 0.00028 7.40 800 0.22 3900 1.08 4050 1.12 14150 3.92 2000 0.55 1825 0.51 26725 7.40

    Water Harvesting Structure No. 7 1.00 7.00 0 0.00 0 0.00 4 4.00 1 1.00 1 1.00 1 1.00 7 7.00

    Afforestation hact. 14 0.50 7.00 1 0.50 3 1.50 4 2.00 4 2.00 2 1.00 0 0.00 14 7.00

    Drainage line treatment 0

    MMS No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    LSCD No. 14 0.15 2.10 0 0.00 8 1.20 5 0.75 0 0.00 1 0.15 0 0.00 14 2.10

    WHS No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Gully Plugs(ECD) No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Ground water recharge Structure No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (B) 180.00 5.72 16.78 40.62 56.42 34.95 25.51 180.00

    Horticulture plantation (vegetable,Medicine) No. 2000 0.00095 1.90 40 0.04 70 0.07 1890 1.80 0 0.00 0 0.00 0 0.00 2000 1.90

    Sprinklers and Drip irrigation hact. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0 0.00

    foriculture No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Vegetables No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Medicinal Plants No. 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00

    Vermi compost No. 50 0.06 3.00 7 0.42 22 1.32 21 1.26 0 0.00 0 0.00 0 0.00 50 3.00

    Crop Demonstration No. 890 0.0215 19.14 40 0.86 70 1.51 300 6.45 309 6.64 100 2.15 71 1.53 890 19.14

    Micro Enterprise 0 0

    Dairy No. 246 0.01 2.46 10 0.10 49 0.49 187 1.87 0 0.00 0 0.00 0 0.00 246 2.46

    Animal camp/Breed improovement No. 80 0.10 8.00 0 0.00 4 0.40 12 1.20 20 2.00 23 2.30 21 2.10 80 8.00

    Poultry No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Local Artisans/craft No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Animal Minral/ Mixar No. 250 0.01 2.50 0 0.00 30 0.30 128 1.28 0 0.00 91 0.91 1 0.01 250 2.50

    SHG Land less/ BPL No. 16 0.5 8.00 0 0.00 1 0.50 1 0.50 14 7.00 0 0.00 0 0.00 16 8.00

    Food Processing No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (C) 45.00 1.42 4.58 14.36 15.64 5.36 3.64 45.00

    (D) Consolidation 3% 9.00 0.00 0.00 0.00 0.00 0.00 9.00 9.00Grand Total 300.00 13.74 27.96 74.78 87.90 50.87 44.74 300.00

    ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)

    Gram Panchayat Fatehgarh

    Activity Unit Qty.Unit

    Cost

    Total

    cost

    1st year 2nd year 3rd year

    Conservation measures for arable land(private land)

    (C) Production System and micro enterprise(15%)

    Production measures for arable land

    4th year 5th year 6th year Total

    (A) Preparatory phase activities capacity building trainings & EPA

    (B) Natural resource management (60%)

  • Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

    Admn. 10% 0% 30.00 0 3.00 0 3.00 0 9.00 0 7.20 0 4.80 0 3.00 0 30.00

    Monitoring 1% 0% 3.00 0 0.30 0 0.30 0 0.90 0 0.72 0 0.48 0 0.30 0 3.00

    Evaluation 1% 0% 3.00 0 0.30 0 0.30 0 0.90 0 0.72 0 0.48 0 0.30 0 3.00

    EPA 4% 0% 12.00 0 1.20 0 1.20 0 3.60 0 2.88 0 1.92 0 1.20 0 12.00

    I & CB 5% 0% 15.00 0 1.50 0 1.50 0 4.50 0 3.60 0 2.40 0 1.50 0 15.00

    DPR 1% 0% 3.00 0 0.30 0 0.30 0 0.90 0 0.72 0 0.48 0 0.30 0 3.00

    Total (A) 66.00 6.60 6.60 19.80 15.84 10.56 6.60 66.00

    Earthen Bund/khadeen No. 69 1.50 103.50 2 3.00 2 3.00 15 22.50 20 30.00 16 24.00 14 21.00 69 103.50

    Tanka No. 53 0.75 39.75 2 1.50 4 3.00 12 9.00 24 18.00 8 6.00 3 2.25 53 39.75

    Khet talai/du gout pond No. 3 2.00 6.00 0 0.00 1 2.00 1 2.00 1 2.00 0 0.00 0 0.00 3 6.00

    Diggi No. 3 2.00 6.00 0 0.00 0 0.00 0 0.00 0 0.00 2 4.00 1 2.00 3 6.00

    Renovation of Bawari No. 0 2.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Bank Stabilisation/ Peripheral Bunds Mtr 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00

    Conservation measures for non arable land 0

    Pasture Development hact. 11 0.50 5.50 1 0.50 10 5.00 0 0.00 0 0.00 0 0.00 0 0.00 11 5.50

    V - ditch Mtr 22025 0.00028 6.10 980 0.27 3900 1.08 4050 1.12 12350 3.42 500 0.14 245 0.07 22025 6.10

    Water Harvesting Structure No. 7 1.00 7.00 0 0.00 0 0.00 4 4.00 2 2.00 1 1.00 0 0.00 7 7.00

    Afforestation hact. 9 0.50 4.50 0 0.00 3 1.50 4 2.00 2 1.00 0 0.00 0 0.00 9 4.50

    Drainage line treatment 0

    MMS No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    LSCD No. 11 0.15 1.65 3 0.45 8 1.20 0 0.00 0 0.00 0 0.00 0 0.00 11 1.65

    WHS No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Gully Plugs(ECD) No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Ground water recharge Structure No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (B) 180.00 5.72 16.78 40.62 56.42 35.14 25.32 180.00

    Horticulture plantation (vegetable,Medicine) No. 1880 0.00095 1.79 140 0.13 140 0.13 630 0.60 820 0.78 80 0.08 70 0.07 1880 1.79

    Sprinklers and Drip irrigation hact. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0 0.00

    foriculture No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Vegetables No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Medicinal Plants No. 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00

    Vermi compost No. 100 0.06 6.00 18 1.08 19 1.14 35 2.10 28 1.68 0 0.00 0 0.00 100 6.00

    Crop Demonstration No. 743 0.0215 15.97 5 0.11 40 0.86 210 4.52 278 5.98 101 2.17 109 2.34 743 15.97

    Micro Enterprise 0 0

    Dairy No. 298 0.01 2.98 5 0.05 30 0.30 120 1.20 100 1.00 20 0.20 23 0.23 298 2.98

    Animal camp/Breed improovement No. 80 0.10 8.00 0 0.00 10 1.00 12 1.20 30 3.00 18 1.80 10 1.00 80 8.00

    Poultry No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Local Artisans/craft No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Animal Minral/ Mixar No. 276 0.01 2.76 5 0.05 15 0.15 75 0.75 120 1.20 61 0.61 0 0.00 276 2.76

    SHG Land less/ BPL No. 15 0.5 7.50 0 0.00 2 1.00 8 4.00 4 2.00 1 0.50 0 0.00 15 7.50

    Food Processing No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (C) 45.00 1.42 4.58 14.36 15.64 5.36 3.64 45.00

    (D) Consolidation 3% 9.00 0.00 0.00 0.00 0.00 0.00 9.00 9.00Grand Total 300.00 13.74 27.96 74.78 87.90 51.06 44.56 300.00

    ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)

    Gram Panchayat Dangari

    Activity Unit Qty.Unit

    Cost

    Total

    cost

    1st year 2nd year 3rd year

    Conservation measures for arable land(private land)

    (C) Production System and micro enterprise(15%)

    Production measures for arable land

    4th year 5th year 6th year Total

    (A) Preparatory phase activities capacity building trainings & EPA

    (B) Natural resource management (60%)

  • Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

    Admn. 10% 0% 30.00 0 3.00 0 3.00 0 9.00 0 7.20 0 4.80 0 3.00 0 30.00

    Monitoring 1% 0% 3.00 0 0.30 0 0.30 0 0.90 0 0.72 0 0.48 0 0.30 0 3.00

    Evaluation 1% 0% 3.00 0 0.30 0 0.30 0 0.90 0 0.72 0 0.48 0 0.30 0 3.00

    EPA 4% 0% 12.00 0 1.20 0 1.20 0 3.60 0 2.88 0 1.92 0 1.20 0 12.00

    I & CB 5% 0% 15.00 0 1.50 0 1.50 0 4.50 0 3.60 0 2.40 0 1.50 0 15.00

    DPR 1% 0% 3.00 0 0.30 0 0.30 0 0.90 0 0.72 0 0.48 0 0.30 0 3.00

    Total (A) 66.00 6.60 6.60 19.80 15.84 10.56 6.60 66.00

    Earthen Bund/khadeen No. 58 1.50 87.00 2 3.00 3 4.50 15 22.50 20 30.00 16 24.00 2 3.00 58 87.00

    Tanka No. 50 0.75 37.50 2 1.50 4 3.00 12 9.00 24 18.00 8 6.00 0 0.00 50 37.50

    Khet talai/du gout pond No. 5 2.00 10.00 0 0.00 1 2.00 1 2.00 1 2.00 0 0.00 2 4.00 5 10.00

    Diggi No. 7 2.00 14.00 0 0.00 0 0.00 0 0.00 0 0.00 2 4.00 5 10.00 7 14.00

    Renovation of Bawari No. 4 2.00 8.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 4 8.00 4 8.00

    Bank Stabilisation/ Peripheral Bunds Mtr 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00

    Conservation measures for non arable land 0

    Pasture Development hact. 8 0.50 4.00 1 0.50 7 3.50 0 0.00 0 0.00 0 0.00 0 0.00 8 4.00

    V - ditch Mtr 20950 0.00028 5.80 980 0.27 5525 1.53 4200 1.16 8600 2.38 1245 0.34 400 0.11 20950 5.80

    Water Harvesting Structure No. 8 1.00 8.00 0 0.00 0 0.00 4 4.00 3 3.00 1 1.00 0 0.00 8 8.00

    Afforestation hact. 9 0.50 4.50 0 0.00 3 1.50 4 2.00 2 1.00 0 0.00 0 0.00 9 4.50

    Drainage line treatment 0

    MMS No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    LSCD No. 8 0.15 1.20 3 0.45 5 0.75 0 0.00 0 0.00 0 0.00 0 0.00 8 1.20

    WHS No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Gully Plugs(ECD) No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Ground water recharge Structure No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (B) 180.00 5.72 16.78 40.66 56.38 35.34 25.11 180.00

    Horticulture plantation (vegetable,Medicine) No. 1942 0.00095 1.84 140 0.13 141 0.13 631 0.60 824 0.78 80 0.08 126 0.12 1942 1.84

    Sprinklers and Drip irrigation hact. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0 0.00

    foriculture No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Vegetables No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Medicinal Plants No. 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00

    Vermi compost No. 130 0.06 7.80 18 1.08 19 1.14 35 2.10 28 1.68 0 0.00 30 1.80 130 7.80

    Crop Demonstration No. 700 0.0215 15.05 5 0.11 40 0.86 210 4.52 278 5.98 101 2.17 66 1.42 700 15.05

    Micro Enterprise 0 0

    Dairy No. 277 0.01 2.77 5 0.05 30 0.30 120 1.20 101 1.01 20 0.20 1 0.01 277 2.77

    Animal camp/Breed improovement No. 82 0.10 8.20 0 0.00 10 1.00 12 1.20 33 3.30 24 2.40 3 0.30 82 8.20

    Poultry No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Local Artisans/craft No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Animal Minral/ Mixar No. 184 0.01 1.84 5 0.05 15 0.15 75 0.75 89 0.89 0 0.00 0 0.00 184 1.84

    SHG Land less/ BPL No. 15 0.5 7.50 0 0.00 2 1.00 8 4.00 4 2.00 1 0.50 0 0.00 15 7.50

    Food Processing No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (C) 45.00 1.42 4.58 14.36 15.64 5.35 3.65 45.00

    (D) Consolidation 3% 9.00 0.00 0.00 0.00 0.00 0.00 9.00 9.00Grand Total 300.01 13.74 27.96 74.83 87.86 51.25 44.36 300.01

    ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)

    Gram Panchayat Rivadi

    Activity Unit Qty.Unit

    Cost

    Total

    cost

    1st year 2nd year 3rd year

    Conservation measures for arable land(private land)

    (C) Production System and micro enterprise(15%)

    Production measures for arable land

    4th year 5th year 6th year Total

    (A) Preparatory phase activities capacity building trainings & EPA

    (B) Natural resource management (60%)

  • Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

    Admn. 10% 0% 15.00 0 1.50 0 1.50 0 4.50 0 3.60 0 2.40 0 1.50 0 15.00

    Monitoring 1% 0% 1.50 0 0.15 0 0.15 0 0.45 0 0.36 0 0.24 0 0.15 0 1.50

    Evaluation 1% 0% 1.50 0 0.15 0 0.15 0 0.45 0 0.36 0 0.24 0 0.15 0 1.50

    EPA 4% 0% 6.00 0 0.60 0 0.60 0 1.80 0 1.44 0 0.96 0 0.60 0 6.00

    I & CB 5% 0% 7.50 0 0.75 0 0.75 0 2.25 0 1.80 0 1.20 0 0.75 0 7.50

    DPR 1% 0% 1.50 0 0.15 0 0.15 0 0.45 0 0.36 0 0.24 0 0.15 0 1.50

    Total (A) 33.00 3.30 3.30 9.90 7.92 5.28 3.30 33.00

    Earthen Bund/khadeen No. 32 1.50 48.00 1 1.50 2 3.00 8 12.00 10 15.00 6 9.00 5 7.50 32 48.00

    Tanka No. 25 0.75 18.75 1 0.75 2 1.50 8 6.00 10 7.50 2 1.50 2 1.50 25 18.75

    Khet talai/du gout pond No. 2 2.00 4.00 0 0.00 0 0.00 0 0.00 1 2.00 1 2.00 0 0.00 2 4.00

    Diggi No. 3 2.00 6.00 0 0.00 0 0.00 0 0.00 1 2.00 1 2.00 1 2.00 3 6.00

    Renovation of Bawari No. 0 2.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Bank Stabilisation/ Peripheral Bunds Mtr 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00

    Conservation measures for non arable land 0

    Pasture Development hact. 4 0.50 2.00 1 0.50 3 1.50 0 0.00 0 0.00 0 0.00 0 0.00 4 2.00

    V - ditch Mtr 11900 0.00028 3.30 400 0.11 325 0.09 1125 0.31 2550 0.71 5000 1.38 2500 0.69 11900 3.30

    Water Harvesting Structure No. 5 1.00 5.00 0 0.00 0 0.00 2 2.00 1 1.00 1 1.00 1 1.00 5 5.00

    Afforestation hact. 5 0.50 2.50 0 0.00 4 2.00 0 0.00 0 0.00 0 0.00 1 0.50 5 2.50

    Drainage line treatment 0

    MMS No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    LSCD No. 3 0.15 0.45 0 0.00 2 0.30 0 0.00 0 0.00 1 0.15 0 0.00 3 0.45

    WHS No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Gully Plugs(ECD) No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Ground water recharge Structure No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (B) 90.00 2.86 8.39 20.31 28.21 17.03 13.19 90.00

    Horticulture plantation (vegetable,Medicine) No. 1053 0.00095 1.00 5 0.00 0 0.00 450 0.43 210 0.20 160 0.15 228 0.22 1053 1.00

    Sprinklers and Drip irrigation hact. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0 0.00

    foriculture No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Vegetables No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Medicinal Plants No. 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00

    Vermi compost No. 62 0.06 3.72 10 0.60 10 0.60 38 2.28 2 0.12 1 0.06 1 0.06 62 3.72

    Crop Demonstration No. 300 0.0215 6.45 4 0.09 10 0.22 50 1.08 200 4.30 18 0.39 18 0.39 300 6.45

    Micro Enterprise 0 0

    Dairy No. 153 0.01 1.53 2 0.02 10 0.10 20 0.20 45 0.45 50 0.50 26 0.26 153 1.53

    Animal camp/Breed improovement No. 36 0.10 3.60 0 0.00 8 0.80 10 1.00 8 0.80 8 0.80 2 0.20 36 3.60

    Poultry No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Local Artisans/craft No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Animal Minral/ Mixar No. 120 0.01 1.20 0 0.00 7 0.07 20 0.20 45 0.45 28 0.28 20 0.20 120 1.20

    SHG Land less/ BPL No. 10 0.5 5.00 0 0.00 1 0.50 4 2.00 3 1.50 1 0.50 1 0.50 10 5.00

    Food Processing No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (C) 22.50 0.71 2.29 7.18 7.82 2.68 1.82 22.50

    (D) Consolidation 3% 4.50 0.00 0.00 0.00 0.00 0.00 4.50 4.50Grand Total 150.00 6.87 13.97 37.39 43.95 24.99 22.82 150.00

    ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)

    Gram Panchayat Sangar

    Activity Unit Qty.Unit

    Cost

    Total

    cost

    1st year 2nd year 3rd year

    Conservation measures for arable land(private land)

    (C) Production System and micro enterprise(15%)

    Production measures for arable land

    4th year 5th year 6th year Total

    (A) Preparatory phase activities capacity building trainings & EPA

    (B) Natural resource management (60%)

  • Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

    Admn. 10% 0% 15.00 0 1.50 0 1.50 0 4.50 0 3.60 0 2.40 0 1.50 0 15.00

    Monitoring 1% 0% 1.50 0 0.15 0 0.15 0 0.45 0 0.36 0 0.24 0 0.15 0 1.50

    Evaluation 1% 0% 1.50 0 0.15 0 0.15 0 0.45 0 0.36 0 0.24 0 0.15 0 1.50

    EPA 4% 0% 6.00 0 0.60 0 0.60 0 1.80 0 1.44 0 0.96 0 0.60 0 6.00

    I & CB 5% 0% 7.50 0 0.75 0 0.75 0 2.25 0 1.80 0 1.20 0 0.75 0 7.50

    DPR 1% 0% 1.50 0 0.15 0 0.15 0 0.45 0 0.36 0 0.24 0 0.15 0 1.50

    Total (A) 33.00 3.30 3.30 9.90 7.92 5.28 3.30 33.00

    Earthen Bund/khadeen No. 30 1.50 45.00 1 1.50 3 4.50 8 12.00 10 15.00 6 9.00 2 3.00 30 45.00

    Tanka No. 30 0.75 22.50 1 0.75 3 2.25 8 6.00 10 7.50 2 1.50 6 4.50 30 22.50

    Khet talai/du gout pond No. 3 2.00 6.00 0 0.00 0 0.00 0 0.00 1 2.00 1 2.00 1 2.00 3 6.00

    Diggi No. 2 2.00 4.00 0 0.00 0 0.00 0 0.00 1 2.00 1 2.00 0 0.00 2 4.00

    Renovation of Bawari No. 0 2.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Bank Stabilisation/ Peripheral Bunds Mtr 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00

    Conservation measures for non arable land 0

    Pasture Development hact. 4 0.50 2.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 4 2.00 4 2.00

    V - ditch Mtr 12825 0.00028 3.55 400 0.11 1750 0.48 1125 0.31 2575 0.71 6425 1.78 550 0.15 12825 3.55

    Water Harvesting Structure No. 4 1.00 4.00 0 0.00 0 0.00 2 2.00 1 1.00 1 1.00 0 0.00 4 4.00

    Afforestation hact. 5 0.50 2.50 1 0.50 2 1.00 0 0.00 0 0.00 0 0.00 2 1.00 5 2.50

    Drainage line treatment 0

    MMS No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    LSCD No. 3 0.15 0.45 0 0.00 1 0.15 0 0.00 0 0.00 1 0.15 1 0.15 3 0.45

    WHS No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Gully Plugs(ECD) No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Ground water recharge Structure No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (B) 90.00 2.86 8.38 20.31 28.21 17.43 12.80 90.00

    Horticulture plantation (vegetable,Medicine) No. 1000 0.00095 0.95 5 0.00 0 0.00 500 0.48 220 0.21 160 0.15 115 0.11 1000 0.95

    Sprinklers and Drip irrigation hact. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0 0.00

    foriculture No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Vegetables No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Medicinal Plants No. 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00

    Vermi compost No. 40 0.06 2.40 10 0.60 10 0.60 17 1.02 2 0.12 1 0.06 0 0.00 40 2.40

    Crop Demonstration No. 300 0.0215 6.45 4 0.09 10 0.22 55 1.18 203 4.36 18 0.39 10 0.22 300 6.45

    Micro Enterprise 0 0

    Dairy No. 95 0.01 0.95 2 0.02 10 0.10 0 0.00 33 0.33 50 0.50 0 0.00 95 0.95

    Animal camp/Breed improovement No. 30 0.10 3.00 0 0.00 8 0.80 6 0.60 8 0.80 8 0.80 0 0.00 30 3.00

    Poultry No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Local Artisans/craft No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Animal Minral/ Mixar No. 125 0.01 1.25 0 0.00 7 0.07 40 0.40 50 0.50 28 0.28 0 0.00 125 1.25

    SHG Land less/ BPL No. 15 0.5 7.50 0 0.00 1 0.50 7 3.50 3 1.50 1 0.50 3 1.50 15 7.50

    Food Processing No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

    Total (C) 22.50 0.71 2.29 7.18 7.82 2.68 1.82 22.50

    (D) Consolidation 3% 4.50 0.00 0.00 0.00 0.00 0.00 4.50 4.50Grand Total 150.00 6.87 13.97 37.39 43.96 25.39 22.43 150.00

    ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)

    Gram Panchayat Mandai

    Activity Unit Qty.Unit

    Cost

    Total

    cost

    1st year 2nd year 3rd year

    Conservation measures for arable land(private land)

    (C) Production System and micro enterprise(15%)

    Production measures for arable land

    4th year 5th year 6th year Total

    (A) Preparatory phase activities capacity building trainings & EPA

    (B) Natural resource management (60%)

  • s

  • Unit of Pre-project Expected Post-

    measurement Status project Status Remarks

    1 Meters 150-230 120-150

    2 No. - -

    3 Description salty Clean water

    4 Description 6 month 12 month

    5 Ha - -

    6 Description - -

    7 Ha -

    I Area under single crop Ha 1190 1600

    Ii Area under double crop Ha 45 85

    Iii Area under multiple crop Ha 0 0

    8 Ha 3982 4500

    9 yield of q/ha 3.59 4.25

    major crops of

    areaq/ha 5.18 6

    q/ha 0 0

    q/ha 4.96 5.5

    10 production ton 280 360

    of major crops of

    areaton 68 90

    ton - -

    ton 23 45

    11 Ha 0 0

    12 Ha 0 0

    13 Ha 30 52

    14 Ha 5577 6500

    15 Q 33456.5 74744

    16 Litres/day 17514 30000

    17 No. 0 32

    18 No. 4631 5052

    19 Rs.in la 0.16 0.2

    20 No. 175 100

    21 No. - 1

    CHAPTER- VI EXPECTED OUT COMES

    S. No. Item

    Status of water table (Depth to

    Ground water structures

    Quality of drinking water

    Availability of drinking water

    Change in irrigated Area

    Change in cropping/ land use

    Area under agricultural crop

    Change in cultivated Area

    Yield of Bajra

    Yield of Wheat

    Yield of GUAR

    Yield of MOONG

    Production of Bajra

    Production of Wheat

    Production of GUAR

    Production of MOONG

    Area under vegetation

    Area under horticulture

    Area under fuel

    Area under Fodder

    Fodder production

    Milk production

    SHGs Active

    No. of livelihoods

    Income

    Migration

    SHG Federations formed

  • Critical Assumption

    • No severe droughts/ unexpected floods/ natural disasters

    • Adequate funds are allocated for the same and released on time.

    • There is no significant pest/ disease attack, and if so, then it will have been contained before

    irreversible damage is done.

    • Adverse market conditions do not persist long.

    • Sound macro-economic and growth conditions continue and the benefits are widely distributed

    particularly in the rural areas.

    • Facilitating agencies and resource providers have the required competent staff so that timely and

    appropriate technical advice and services are provided to farmers whenever required.

    • The Capacity Building Plan is implemented, monitored and modified to address evolving needs and

    feedback from participants.

    • The execution of the Women’s Empowerment Pedagogy is regularly monitored by the District and

    State level Implementing Agencies

    Means of Verification of indicators

    • Baseline surveys like household income ,expenditure, health and nutrition etc at the beginning, mid-

    term and end of the project period

    • Annual participatory assessment by communities during project period.

    • Data maintained by Government department (Revenue, Agriculture, Groundwater, Irrigation, Animal

    Husbandry

    • Regular project monitoring reports prepared by project monitoring teams/ agencies.

    • Membership and other Records, Minutes of Meetings maintained by the SHGs, WCs/ Individual

    beneficiaries/project-related village and local bodies/PRIs.

    • External review missions

  • s

  • CHAPTER VII TECHNICAL DESIGNS AND ESTIMATES

    Technical designs and estimates for proposed activities.

    For Estimates GKN of the districts should be used. For Production System

    activities, rates of Agriculture/Horticulture/Animal Husbandry should be used.

  • Ø-la- dk;Z dk uke la[;k yackbZ pkSMkbZmapkbZ@

    ekSVkbZek=k nj bdkbZ jkf'k

    1 fu'kkunsgh dk;Z 5 ls 7-5 lseh xgjk 2 400 800 800 0.25 izjeh 200

    2

    feV~Vh o cka/k cukus dk dk;Z ¼feV~Vh [kqnkbZ ,oa 15 lseh

    ijrksa esa dqVkbZ djuk bR;kfn½

    l[r feVV~h esa

    0

    ¼feV~Vh dk;Z dh x.kuk rkfydk ls½ 1695.87 1695.9 75 iz?keh 127190.25

    3 chtksa dh ykxr ¼fdxzk izfr ehVj½ 0

    >Mcsjh dh feU>h 0.0005 250 0.125 0.125 500 izfdxzk 62.5

    ?kkl dk cht @lksukeq[kh 0.002 250 0.5 0.5 71.14 izfdxzk 35.57

    tsVjksQk@vjaMh dk cht 0.002 250 0.5 0.5 50 izfdxzk 25

    4

    ?kkl ds chtksa dh xfy;ka cukuk] fpduh feV~Vh ,oa [kkn

    dks dqV Nkudj ?kkl ds chtksa dh lQkbZ djds cht [kkn

    jsr o fpduh feV~Vh dk 1%1%2%2 dk feJ.k cukdj xksfy;ka

    cukuk

    0.002 250 0.5 0.5 13 izfdxzk 6.5

    5 uksfpax ,oa fMcfyax }kjk >Mcsjh ds cht dh cqvkbZ 5 250 1250 1250 0.52 izeh 650

    6 uksfpax ,oa fMcfyax }kjk vjaMh ds cht dh cqvkbZ 1 250 250 250 0.52 izeh 130

    7

    ?kkl cht dh xksfy;ksa dks cht [kkn ckyw ,oa fpduh

    feV~Vh 1%1%2%2 ds vuqikr esa feyk dj fMcfyax }kjk cksuk

    ¼4fdxzk cht izfr gSDVj½

    0.002 250 0.5 0.5 25.44 izfdxzk 12.72

    8 eqje] ckbZfMax lkexzh dh vkiwfrZ ¼ifjogu vyx½ ¼0-08½ 1 250 4.2 0.08 84 84 60 iz?keh 5040

    9 eqje fcNkus dk dk;Z 1 250 4.2 1050 1050 1.25 izoeh 1312.5

    10 eqje ifjogu dk;Z ¼5 fdeh rd½ 1 250 4.2 0.08 84 84 75.86 iz?keh 6372.24

    11

    uhao] [kkbZ] ijukyk esa 1-5 xgjkbZ rd feV~vh dh [kqnkbZ

    djuk] ry dks dqVuk] ikuh Mkyuk] cxy dks laokjuk] [kqnh

    feV~Vh dks ckgj fudkyuk] uhao Hkjus ds ckn [kyh Lfkkuksa

    dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj

    dh nwjh rd fuLrkj.k djukA

    2 7.5 3 3 135

    1 3 3 3 27

    ;ksx 162 4.5918 72 iz?keh 330.61

    12

    lhesaV dadzhV uhao ;k Q'kZ esa 40 feeh ukeh; eki dh iRFkj

    feV~Vh lhesaV jsr elkyk esa 1 lhesaV jsr elkyk esa 1 lhesaV

    % 4 jsr % 8 fxV~Vh

    feykdj Mkyuk rFkk dqVkbZ djuk] rjkbZ djuk

    2 7.5 3 0.5 22.5

    1 3 3 0.5 4.5

    ;ksx 27 0.7653 1633 iz?keh 1249.74

    13

    uhao rFkk dqlhZ esa iRFkj dh os j)k&

  • Ø-la- dk;Z dk uke la[;k yackbZ pkSMkbZmapkbZ@

    ekSVkbZek=k nj bdkbZ jkf'k

    2 0.785 4 0 6.28

    ;ksx 12.56

    'kq) ;ksx 33.94 3.1572 50.1 izoeh 158.18

    16

    50 eheh eksVkbZ esa lhesaV ddzdhaV 1%2%4 feJ.k ftlesa 1

    lhesaV 2 ctjh 4 iRFkj dh ;k bZaV dh 12 eh- ukHkh;

    fxV~Vh ds lkFk feykdj Mkyuk] dwVuk] nckuk rFkk rjkbZ

    vkfn lesrA

    2 7.5 1.5 0 22.5

    1 2.5 2.5 0 6.25

    ;ksx 28.75 2.6744 201 izoeh 537.56

    18 vkjlhlh ikbZi vkiwfrZ vkbZ,lvkbZ ekdZ 600 ,e,e M;k 1 7.5 0 0 7.5 7.5 939 izeh 7042.50

    156724.68

    150000.00

    = 150000 @ 29 Num. 4350000

    say =

  • psuttehu dk

    vkj,y

    VkWi caM

    ysoy

    [kMhu dh

    mapkbZ

    mij dh

    pkSMkbZ

    vk/kkj dh

    pkSMkbZ

    ,Dl&lsD'ku

    {kS=Qy

    ek/;

    ,Dl&lsD'ku

    {kS=Qy

    yackbZfeV~Vh dk;Z

    dh ek=k

    eh eh eh eh eh eh oeh oeh eh ?keh

    0 51.5 51.9 0.4 1.5 3.1 0.92 0.46 0 0.00

    30 51.5 51.9 0.4 1.5 3.1 0.92 0.92 30 27.60

    60 51.4 51.9 0.5 1.5 3.5 1.25 1.09 30 32.55

    90 51.3 51.9 0.6 1.5 3.9 1.62 1.44 30 43.05

    120 51 51.9 0.9 1.5 5.1 2.97 2.30 30 68.85

    150 50.4 51.9 1.5 1.5 7.5 6.75 4.86 30 145.80

    180 49.4 51.9 2.5 1.5 11.5 16.25 11.50 30 345.00

    210 49.5 51.9 2.4 1.5 11.1 15.12 15.69 30 470.55

    240 49.8 51.9 2.1 1.5 9.9 11.97 13.55 30 406.35

    270 49.9 51.9 2 1.5 9.5 11.00 11.49 30 344.55

    0.83 4.26 270.00 1884.30

    1695.87

    feV~Vh dk;Z dh x.kuk rkfydk

    Total

    After 10% Dedu.

  • Sn. Item Quantity Comoponent Cement Comoponent Bajri Comoponent Aggrate Comoponent Stone Comoponent Other

    1 CC 1:4:8 0.76 3.2 2.432 0.45 0.342 0.9 0.684 0 0 0 0

    2RR STONE

    MASONARY CM 1:82.75 1.07 2.9425 0.3 0.825 0 0 1 2.75 0 0

    3RR STONE

    MASONARY CM 1:61.95 1.4 2.73 0.3 0.585 0 0 1 1.95 0 0

    4FLUSH POINTING

    CM 1:34.55 0.028 0.1274 0.003 0.01365 0 0 0 0 0 0

    5 CC 1:2:4 2.67 0.312 0.83304 0.022 0.05874 0.045 0.12015 0 0 0 0

    6 RCC PIPE 7.5 0 0 0 0 0 0 0 0 1 7.5

    7 MURRUM 120.96 0 0 0 0 0 0 0 0 1 120.96

    TOTAL 9.06494 1.82439 0.80415 4.7

    Material Consupation

  • 1 dk;Z dk uke %&dk;Z dk uke Vkdak fuekZ.k dk;Z

    xzke %& lka/kok xzke iapk;r %& Qrsgx<

    ;kstuk dk uke Jaisalmer IWMP V Fetahgarh 2009-10 dk;Zdkjh ,tsUlh & tyxzg.k desVh lka/kok

    Je dqy Je dqy

    1 2 uhao] [kkbZ] ijukyk esa 1-5 xgjkbZ rd feêh dh[kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk] cxy dks

    laokjuk] [kqnh feêh dks ckgj fudkyuk] uhao Hkjus ds

    ckn [kkyh LFkkuksa dks iqu% feêh ls Hkjuk rFkk cph

    gqbZ feêh dks 50 ehVj dh nwjh rd fuLrkj.k djukA

    ¼c½ dBksj feV̀Vh 1 22 10 11 2420

    2420 ?kQh0

    68.527 ?keh0 72 72 4933.93 4933.93

    2

    11¼c½ lhesUV dkaØhV uhao ;k Q'kZ esa 40 fe- eh- ukeh;

    eki dh iRFkj fxÍh ¼gkFk ls rksMh xbZ½@bZV fxÍh]

    lhesUV & jsr elkyk esa 1 lhesUV % 4 jsr % 8 fxÍh

    vuqikr eas feykdj Mkyuk rFkk dqVkbZ djuk] rjkbZ

    lesrA

    ¼v½ iRFkj dh fxêh ds lkFk 1 14 10 0.5 70

    70 ?kQh0

    1.98 ?keh0 228.97 1633 453.86 3236.90

    3

    24¼v½ uhao rFkk dqlhZ es iRFkj dh os j)k&jh

    cUn djuk rFkk rjkbZ vkfnA

    2 22 1.25 10 550.00

    2 7.5 1.25 10 187.50

    737.50

    ?kVk;s tkyh 2 1 1.25 1 2.50

    2.50

    735.00 ?kQh0

    20.81 ?keh0 415.1 1426 8,639.43 29679.17

    4

    36 vOoy ntsZ dh iRFkj dh ifê;ksa dh Nr Mkyuk]

    Åij rFkk uhps ls tksMksa es iRFkj dh phi ds lkFk

    1%4 vuqikr esa lhesaV elkys ls HkjukA

    1 22 10 220.00

    deduct Door cover 1 1.5 1.5 -2.25

    217.75 oxZeh0

    20.26 oxZeh0 239.4 989 4,849.24 20033.00

    6

    57 50 eh- eh- eksVkbZ esa lhesaV dadzhV 1%2%4 feJ.k

    ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh ;k bZaV dh 12 -

    eh- ukHkh; fxV̀Vh ds lkFk feykdj Mkyuk] dwVuk]

    nckuk rFkk rjkbZ vkfn lesr A

    ¼v½ iRFkj dh fxV̀Vh ¼ vkxksj ½1 22 10 220.00

    1 19.5 7.5 146.25

    366.25

    deduct Door Cover 1 1.5 1.5 -2.25

    368.50 oxZQh0

    34.23 oxZeh0 80 201 2,738.78 6881.19

    7

    67 lhesaV IykLVj nhokj ij 1%6 vuqikr es lhesaV&ctjh

    feykdj tksMksa dks dqjsnus rFkk rjkbZ lesrA 2 19.5 12.5 487.50

    2 7.5 12.5 187.50

    675.00 oxZQh0

    62.71 oxZeh0 40.04 82 2,510.89 5142.18

    pkS0 m0 ek=k bdkbZ nj jkf'k

    IWMP iapk;r lfefr lefuekZ.k dk;Z gsrq foLr`r ykxr vuqeku

    tyxzg.k {ks=

    dz-

    l-a

    ch-,l-vkj-

    vkbZVe la[;k fof'k"V nj vuqlwph ls la[;k y0

  • Je dqy Je dqy pkS0 m0 ek=k bdkbZ

    nj jkf'kdz-

    l-a

    ch-,l-vkj-

    vkbZVe la[;k fof'k"V nj vuqlwph ls la[;k y0

    8

    70 iRFkj ds dke ij likV ;k :YM Vhi 1%3 vuqikr

    esa lhesV ctjh elkys ea e; rjkbZ ds

    iRFkj ds mij 2 32 2 128.00

    128.00 oxZQh0

    11.89 oxZeh0 40.2 50.1 478.04 595.77

    9

    29 j}k drkj

  • Sn. Item Quantity Consumption Cement Consumption Bajri Consumption Aggrate Consumption Stone Consumption Other

    1 CC 1:4:8 2.28 3.20 7.30 0.45 1.03 0.90 2.05 0 0.00 0 0.00

    2RR STONE

    MASONARY CM 1:616.14 1.40 22.60 0.30 4.84 0.00 0.00 1 16.14 0 0.00

    3 STONE 9.42 0.07 0.64 0.09 0.85 0.00 0.00 1 0.70 0 0.00

    4 CC 1:2:4 24.78 0.31 7.73 0.02 0.55 0.05 1.12 0 0.00 0 0.00

    5 Cement Plaster 1:6 36.19 0.12 4.21 0.02 0.87 0.00 0.00 0 0.00 0 0.00

    6 Flush Pointing 1:3 9.48 0.03 0.27 0.00 0.03 0.00 0.00 0 0.00 0 0.00

    7 Covor 1 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 1 1.00

    TOTAL 42.734638 8.15796 3.1671 16.84 1

    Material Consumption

  • 1 dk;Z dk uke %&dk;Z dk uke

    xzke %& xzke iapk;r %& Qrsgx<

    ;kstuk dk ukedk;Zdkjh

    ,tsUlh

    Ø-la- dk;Z dk uke la[;k yackbZ pkSMkbZmapkbZ@

    ekSVkbZek=k nj bdkbZ jkf'k

    1

    feV~Vh dk cka/k cukus dk dk;Z ¼feV~Vh [kqnkbZ ,oa 15 lseh

    ijrksa esa dqVkbZ djuk bR;kfn½

    l[r feVV~h esa

    1 41 60 0.91 2238.6

    2238.6 75 iz?keh 167895.00

    2 50 ehVj vfrfjDr nqjh ij Qsadus ds fy, 872.75 29.75 iz?keh 259