Blackrod SAGD Pilot Project Athabasca Oil Sands Area Scheme Approval No. 11522G 2018 Annual Performance Presentation Alberta Energy Regulator March 13, 2019

Upload: others

Post on 21-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod SAGD Pilot ProjectAthabasca Oil Sands AreaScheme Approval No. 11522G

2018 Annual Performance PresentationAlberta Energy Regulator March 13, 2019

Page 2: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Subsurface

Page 3: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Subsurface Agenda

1. Background

2. Geology / Geoscience

3. Drilling & Completions

4. Artificial Lift

5. Well Instrumentation

6. Scheme Performance

3

Page 4: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Subsurface

1. Background

4

Page 5: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Project Overview

Approved Development Area as per ERCB Scheme Approval No. 11522G

CORED WELLS

BLACKPEARL OIL SANDS LEASE HOLDINGS

5

Page 6: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Project Summary

• AER Scheme Approval No. 11522G

• One (1) Operating SAGD Well Pairs

• Portage area on Oil Sands Lease 7407060158

• Pilot site located in 02‐36‐076‐18W4

• Target formation is the Lower Grand Rapids Unit 1 (L.GR1)

• Initial reservoir data:‒ Pressure: 1700 KPA

‒ Temperature: 13oC

‒ Depth: 300m

• Traditional SAGD recovery process

• BlackPearl is the 100% W.I. Owner

6

Page 7: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Pilot Site

7

Page 8: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Project Milestones – 10‐36 WP2

• Feb 2012 AER Approval No. 11522C for 10‐36 WP2 and facility expansion 

• Feb 2013 Drill 10‐36 WP2

• Oct 2013 Commission Phase 2 Pilot Facility Expansion

• Nov 2013 Commence Circulation Phase

• Mar 2014 Convert to SAGD Production Phase

• Apr 2015 Production surpasses commercial rate of 400 bopd

• Dec 2016 21 consecutive month of +500 bopd with an iSOR of <3.0

• Dec 2017 Produce 645,000 cumulative barrels of oil

• Dec 2018 Produced 800,000 cumulative barrels of oil

8

Page 9: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Subsurface

2. Geology / Geoscience

9

Page 10: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Original Bitumen in Place

• OBIPWP2 =  A2 * h2 * So2 * Ø2 * Bo=  (100 m * 1050 m) * 25 m * 0.63 * 0.34 * 1.0=  562,275 m3

Where:OBIP = Original Bitumen In PlaceA = Drainage Areah =  Thickness So =  Oil SaturationØ =  Average PorosityBo =  Expansion FactorWP2= 2nd Pilot Well Pair drilled at 10‐36‐076‐18W4

10

Page 11: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Lower Grand Rapids (L. GR) Net Pay Map

• Existing lease and access selected for Pilot surface location

• Bottom hole locations for both Pilot Well Pairs selected based on offsetting well control

• L. GR is a Shoreface deposit consisting of three (3) coarsening‐upward parasequences:‒ L. GR Unit 1 = upper to middle shoreface

bitumen target zone

‒ L. GR Unit 2 = middle to lower shorefacetransition zone

‒ L. GR Unit 3 = bottom H2O saturated aquiferLOG CUTOFFS• Gamma Ray < 75 API• Resistivity > 20 Ohm.m• Porosity > 33% 

Total L.GR1 SAGD Net Oil Pay

11

Page 12: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

L. GR Unit 3 Bottom Water Isopach Map

12

Page 13: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Type Log

LOG CUTOFFS• Gamma Ray < 75 API• Resistivity > 20 Ohm.m• Porosity > 33% 

13

Page 14: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Representative Core

100/15‐25‐076‐18W4/00

304.0m

307.7m

307.7m

313.1m

CAPPING SHALE

L.GR1

L.GR1* Core Characteristics:• Oil saturation:  0.60• Bitumen weight:  11%• Net pay thickness:  26 m• Porosity:  36%• Vertical permeability:  3024 mD• Horizontal permeability:  3450 mD• Kv/Kh:  0.88• API Gravity: 9.8 (at 15.6 ᵒC)

L.GR2L.GR3

14

Page 15: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Cross Section Through 10‐36 WP2

• 10‐36 producer well was drilled  with a minimum 5m standoff from LGR2 transition zone

• LGR2 transitions from 30% oil saturation to 100% water  

15

Page 16: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Seismic

W E

3D X‐Line along 13‐25 WP1 3D Seismic Area Coverage

16

Page 17: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Structure Map

L.GR1 TOP L.GR1 BASE

17

Page 18: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Primary Cap Rock

• MFS (Maximum Flooding Shale) 

• Directly overlays Lower Grand Rapids formation

• Regionally extensive

• 3 m average thickness

• Mini Frac Analysis:

‒Performed on the 13‐25‐076‐18W4 OSE Core Hole

‒ Initial Breakdown Pressure = 8500 kPa

‒Closure Pressure Gradient = 13.7 kPa/m

18

Page 19: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

MFS Cap Rock Isopach Map

19

Page 20: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

MFS Cap Rock Structure Map

20

Page 21: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

MFS Cap Rock Base Depth Map

21

Page 22: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Secondary Cap Rock

• Joli Fou formation 

• 45 m above Lower Grand Rapids formation

• Regionally extensive

• 20 m average thickness

• Mini Frac Analysis:

‒Performed on the 01‐36‐076‐18W4 OSE Core Hole

‒ Initial Breakdown Pressure = 12,750 kPa

‒Closure Pressure Gradient Range = 19.4 kPa/m

22

Page 23: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Joli Fou Cap Rock Isopach Map

23

Page 24: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Joli Fou Cap Rock Structure Map

24

Page 25: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Joli Fou Cap Rock Base Depth Map

25

Page 26: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Subsurface

3. Drilling and Completions

26

Page 27: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Pilot Well Network

27

Page 28: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

10‐36 WP2 ‐ Injector

28

Page 29: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

10‐36 WP2 – Producer (Prod. Phase)

29

Page 30: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

10‐36 WP2 –Downhole Modifications

• Injector Well:

‒ No modifications

• Producer Well:

‒ No modifications

30

Page 31: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

4. Artificial Lift

Blackrod Subsurface

31

Page 32: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Electrical Submersible Pump

• Fluid production via “Ultra Temp” Electrical Submersible Pumps (ESP)

• ESP advantages:

‒Operate and lift fluids at controlled downhole pressures

‒Maintain continuous fluid production

• Variable Flow Drive (VFD) utilized to control pump speed and production rates

• Current ESP has +1400 days of runtime 

32

Page 33: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Subsurface

5. Well Instrumentation

33

Page 34: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

10‐36 WP2 –Obs Wells

• Toe Obs Well:

‒ 100/07‐36‐076‐18W4

‒ 17.5 m West of WP2

‒ Thermocouples to monitor temperature above, below, and within L.GR1

‒ P/T gauge to monitor pressure & temperature within L.GR3 aquifer

• Heel Obs Well:

‒ 100/02‐36‐076‐18W4

‒ 16.1 m East of WP2

‒ Thermocouples to monitor temperature above, below, and within L.GR1

‒ P/T gauge to monitor pressure & temperature within L.GR3 aquifer

34

Page 35: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

10‐36 WP2 – Instrumentation Overview

35

Page 36: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Groundwater Monitoring Wells

• 100/03‐36‐076‐18W4 GWM:

‒ Directionally drilled from 14‐25 lease

‒ PCP to sample/analyze non‐saline L.GR3 H2O 

‒ P/T gauge to monitor pressure & temperature within L.GR3 aquifer

• 100/14‐25‐076‐18W4 GWM:

‒ Directionally drilled from 14‐25 lease

‒ PCP to sample/analyze non‐saline L.GR3 H2O 

‒ P/T gauge to monitor pressure & temperature within L.GR3 aquifer

• 100/15‐25‐076‐18W4 GWM:

‒ PCP to sample/analyze non‐saline Viking H2O 

‒ P/T gauge to monitor pressure & temperature within Viking aquifer

* Annual Groundwater Monitoring Summary Report Submitted to the AER in Q1 201636

Page 37: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Subsurface

6. Scheme Performance

37

Page 38: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

10‐36 WP2 Performance as of Dec 31, 2018

• 59 months of SAGD Production Phase

• Maturing steam chamber / Oil production in decline 

• Oil production currently averaging 68 m3/d

38

Page 39: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

10‐36 WP2 Summary

• Applied Learnings:• Improved well design (i.e. longer HZ section and WWS for sand control)

• Objective(s):• Evaluate SAGD performance from a commercial well pair prototype• Target 100% up‐time

• Well Placement:• “Cautious” placement above L. GR Unit 3 Bottom Water

39

Page 40: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

10‐36 WP2 Key Learnings

• Longer ramp‐up periods now expected at Blackrod

• WWS favorable to the Blackrod L. GR reservoir

• Scab liner effective in protecting ESP and facilitating heat conformance across HZ section

• Heat conformance can be achieved across 950+ m HZ section

40

Page 41: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

10‐36 WP2 Oil Production as of Dec 31, 2018

• Cumulative Production = 127,000 m3

• Recovery = 22.6%

• Ultimate Recovery = 55 ‐ 60% 

• CSOR including Circ. Phase = 3.60

• CSOR during Prod. Phase only = 3.4

• Average Rate during Prod. Phase = 70.82 m3/day (445.40 bopd)

• Current Rate =  68 m3/day (427.6 bopd)

41

Page 42: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

10‐36 WP2 Steam Injection as of Dec 31, 2018

• Average Steam Chamber Pressure = 2160 kPa

• Average Surface Steam Temperature = 265 ᵒC

• Wellhead Steam Quality = 95 – 100%

42

Page 43: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

1

10

100

1,000

1

10

100

1,000

Nov‐13

Dec‐13

Jan‐14

Feb‐14

Mar‐14

Apr‐14

May‐14

Jun‐14

Jul‐1

4Au

g‐14

Sep‐14

Oct‐14

Nov‐14

Dec‐14

Jan‐15

Feb‐15

Mar‐15

Apr‐15

May‐15

Jun‐15

Jul‐1

5Au

g‐15

Sep‐15

Oct‐15

Nov‐15

Dec‐15

Jan‐16

Feb‐16

Mar‐16

Apr‐16

May‐16

Jun‐16

Jul‐1

6Au

g‐16

Sep‐16

Oct‐16

Nov‐16

Dec‐16

Jan‐17

Feb‐17

Mar‐17

Apr‐17

May‐17

Jun‐17

Jul‐1

7Au

g‐17

Sep‐17

Oct‐17

Nov‐17

Dec‐17

Jan‐18

Feb‐18

Mar‐18

Apr‐18

May‐18

Jun‐18

Jul‐1

8Au

g‐18

Sep‐18

Oct‐18

Nov‐18

Dec‐18

SOR 

Fluid rate (m

3/d)

Blackrod 10‐36 WP2 ‐ Performance Plot

Produced Crude Oil/Bitumen Produced Water Injected Steam ISOR CSOR

10‐36 WP2 Performance Plot

43

Pulled Scab Liner Facility Turn Around

Page 44: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Surface Operations

Page 45: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Surface Operations Agenda

1. Facilities

2. Measurement & Reporting

3. Water Source 

4. Disposal

5. Environmental

6. Compliance Statement

45

Page 46: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Surface Operations

1. Facilities

46

Page 47: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Pilot Facility Overview

47

Page 48: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Pilot Facility Plot Plan

48

Page 49: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Pilot Facility Plot Plan (cont.)

49

Page 50: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Pilot Facility Performance

• No issues with bitumen treatment, water treatment, or steam generation

• Pilot Facility uptime 98.5% in 2018

• Generated steam, produced bitumen, produced water, and produced gas volumes reported to Petrinex 

• Purchased gas volumes reported to Petrinex 

• Flared gas volumes reported to AER and Petrinex

• SO2 & Nox emissions and ambient air quality data submitted to AER both monthly and annually as per terms of EPEA Approval 00264736‐00‐02

• GHG emissions reporting not required for Blackrod Pilot Facility as per terms of EPEA Approval 00264736‐00‐02

50

Page 51: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Pilot Facility Monthly Volumes

• Fuel gas is combined with produced gas upstream of flare to maintain a minimum lower heating value of 12MJ/m3

51

2018

Steam Generated (m3)

Bitumen Volumes (m3)

Produced Water Volumes (m3)

Purchased Gas (e3m3)

Produced Gas (e3m3)

Fuel Gas to Flare Volume 

(e3m3)Flared Gas Volume 

(e3m3)

January 10318 2166 7440 887 24 28 52

February 9365 1948 8054 807 22 28 50

March 10389 2182 8611 884 24 24 48

April 10142 1935 8457 842 23 14 37

May 10604 2007 8625 857 24 13 36

June 10259 1933 8272 832 23 15 38

July 10774 2032 8743 860 28 13 41

August 9372 2006 8568 850 29 14 43

September 9776 1975 8131 796 27 15 42

October 10673 2054 8963 891 33 15 48

November 9729 2143 8181 827 30 14 44

December 10306 2122 8867 875 29 16 45

Total 121706.5 24501.4 100911.2 10206.9 314.2 209 523.53

Page 52: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod NOx Emissions

52

2018Run Time          (hours) Nox (tonnes)

January 744 0.21

February 672 0.19

March 744 0.21

April 720 0.20

May 744 0.21

June 720 0.2

July 744 0.21

August 744 0.21

September 684 0.19

October 744 0.21

November 720 0.20

December 744 0.21

Total 2.45

• Under Section 4.1.17 and 4.1.18 of the EPEA approval, BlackPearl is required to conduct a manual stack survey on the 15 MW steam generator once within six months of commissioning.

• A manual stack survey was conducted which gave an average mass flow rate of 0.28 kg/h which is below the 1.4 kg/hr limit for NOx in the approval

• Monthly NOx is calculated by using the hourly emissions rate and knowing the monthly run time hours 

Page 53: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod SO2 Emissions

53

Page 54: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

• No modifications in 2018

Pilot Facility Modifications

54

Page 55: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Surface Operations

2. Measurement & Reporting

55

Page 56: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

• BlackPearl remains compliant with AER Directive 017 as well as Directive 042 as per the terms of our approved MARP (Measurement, Accounting, and Reporting Plan)

• To validate compliance with Directive 017 and Directive 042, BlackPearl performs a detailed EPAP (Enhanced Production Audit Program) review annually as per Directive 076 with an independent consulting group

Blackrod MARP

56

Page 57: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Process Flow Diagram

57

Page 58: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Process Flow Diagram (cont.)

58

Page 59: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Surface Operations

3. Water Source

59

Page 60: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Water Source(s)

• 1F1/14‐24‐076‐18W4 L.GR3 WSW:

‒ Non‐saline (~3700 TDS)

‒ AER Water Act Licence No. 00308617‐01‐00 valid until Jun 2019

‒ Approved for 109,500 m3 annually

‒ Production volumes reported to AER and Petrinex 

‒ 100/14‐24‐076‐18W4 monitoring well 20 m North of 1F1/14‐24 WSW

‒ No issues with water softening process

• 1F1/15‐25‐076‐18W4 Grosmont Member D WSW:

‒ Saline (~13,800 TDS) 

‒ No issues with saline treatment process

60

Page 61: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Water Source(s)

61

Page 62: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Surface Operations

4. Disposal

62

Page 63: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Disposal

• Produced Water:

‒ 100/02‐25‐076‐18W4 Class 1b Disposal Well

‒ AER Scheme Approval No. 11703A

‒Disposal into Grosmont Members B, A 

‒Maximum wellhead injection pressure of 6300 kPa

‒ This well continues to operate on vacuum with no pressure at the wellhead

‒All disposal volumes reported to Petrinex 

• Waste:

‒Waste fluids (i.e. sewage, sludge, etc.) trucked out to third party disposal facilities.

63

Page 64: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Disposal

64

Page 65: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Surface Operations

5. Environmental Issues

65

Page 66: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Environmental

• No environmental issues to date

• BlackPearl remains compliant with the terms of AER Approval No. 264736‐00‐00:

‒ CPP (Caribou Protection Plan)

‒Air Monitoring

‒Groundwater Monitoring

‒ Soil Monitoring

‒ Etc.

66

Page 67: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Surface Operations

6. Compliance

67

Page 68: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Compliance

• To the best of BlackPearl’s knowledge, the Blackrod SAGD Pilot Project is currently in full compliance with all conditions and regulatory requirements related to AER Scheme Approval No. 11522G

68

Page 69: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Future Plans

Page 70: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Future Plans

• BlackPearl Resources was acquired by International Petroleum Corporation (IPC) at the end of Q4 2018 

• As of January 2019 IPC will be operating the Blackrod project 

70

Page 71: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Blackrod Future Plans

1. Ongoing Pilot Objectives

71

Page 72: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

• Drill and complete a 3rd well pair

⁻ The well will be drilled with a longer lateral and completed with flow control devices (FCD). Learnings from the 3rd well pair will be used to further develop a commercial well pair prototype

• Trial new water treatment technology

⁻ BlackPearl is planning on completing a 1 year trial, to test a new produced water treatment technology. Learnings from the trial will be applied to the commercial facility design.  

Ongoing Pilot Objectives

72

Page 73: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

2. SAGD Commercial Development

Blackrod Future Plans

73

Page 74: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

SAGD Commercial Development

• Commercial SAGD Application No. 1728831‐ Approved

• 80,000 bbl/d (12,720 m3/d) to be developed in phases, with the first phase planned for 20,000 bbl/d; two additional phases of 30,000 bbl/d each to follow 

74

Working Interest Lands

Application Area

Thermal Pay (>10 m)

Phase 1 Wells

Phase 2 and 3 Wells

Central Processing Facility

Shale Channels

1 mile

SAGD Pilot

Page 75: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Appendices

Page 76: Blackrod Subsurface - AER€¦ · Blackrod Subsurface 5.Well Instrumentation 33. 10‐36 WP2 –Obs Wells •Toe Obs Well: ‒100/07‐36‐076‐18W4 ... annually as per Directive

Appendices

1. Pressure & Temperature Data• 13‐25 WP1  • 10‐36 WP2• Heel & Toe Observation Wells

76