bird rock ca corridor with roundabouts
TRANSCRIPT
__________________________________________________________________________Engineering & Capital Projects
Roundabout Product Demonstration Roundabout Product Demonstration ShowcaseShowcase
Bird Rock Traffic Flow Improvement Bird Rock Traffic Flow Improvement ProjectProject
December 10, 2008December 10, 2008
City of San DiegoCity of San DiegoEngineering & Capital Projects DepartmentEngineering & Capital Projects Department
Mike Arnold, Design Project ManagerMike Arnold, Design Project ManagerGary Chui, T.E.Gary Chui, T.E.
Project Design ConsultantsProject Design ConsultantsDomenic Lupo, P.E.Domenic Lupo, P.E.
__________________________________________________________________________Engineering & Capital Projects
Aerial View Looking Aerial View Looking NorthNorth
__________________________________________________________________________Engineering & Capital Projects
Seahaus Roundabout
__________________________________________________________________________Engineering & Capital Projects
Design Process – Began in 2004Design Process – Began in 2004
Construction Process – Began in 2007Construction Process – Began in 2007
Project HistoryProject HistoryPlanning Process Began in January 2000Planning Process Began in January 2000
4 Year Collaboration:4 Year Collaboration:City StaffCity Staff CommunityCommunity MerchantsMerchants ResidentsResidentsConsultantsConsultants
Commitment by council officeCommitment by council officeWalkable Communities Walkable Communities CharretteCharrette Walking ToursWalking Tours
Creation of Focus GroupsCreation of Focus Groups Bird Rock Traffic Task ForceBird Rock Traffic Task ForceBird Rock Beautification CommitteeBird Rock Beautification Committee
0.125 in3 per 3 min
340 ft3 per 8 years
__________________________________________________________________________Engineering & Capital Projects
Project PhasesProject Phases• Barrett/Seahaus Roundabouts:Barrett/Seahaus Roundabouts:
– Two roundabouts and landscaped center medianTwo roundabouts and landscaped center median– Two intersections: Colima and MidwayTwo intersections: Colima and Midway
• Bird Rock CIP Phase OneBird Rock CIP Phase One– Wrelton Street closureWrelton Street closure– Traffic circle at Sea Ridge and ChelseaTraffic circle at Sea Ridge and Chelsea– Traffic circle at Chelsea Ave. and Bird RockTraffic circle at Chelsea Ave. and Bird Rock– Pop-outs at Camino de la Costa and Chelsea St.Pop-outs at Camino de la Costa and Chelsea St.– Raised medians and pop outs at Camino de la Costa and BeaumontRaised medians and pop outs at Camino de la Costa and Beaumont– Traffic circle at Bellevue Ave. and Bird Rock Ave.Traffic circle at Bellevue Ave. and Bird Rock Ave.– Raised landscaped median on Forward St. between Bellevue Ave. and Taft Ave.Raised landscaped median on Forward St. between Bellevue Ave. and Taft Ave.– Mini-roundabout at La Jolla Hermosa and ColimaMini-roundabout at La Jolla Hermosa and Colima– Pop-outs on La Jolla Mesa Dr. and Linda Rosa Ave. and Colima St.Pop-outs on La Jolla Mesa Dr. and Linda Rosa Ave. and Colima St.– Speed Table on Dolphin Ave.Speed Table on Dolphin Ave.
• Bird Rock CIP Phase TwoBird Rock CIP Phase Two– Three roundabouts on La Jolla Blvd at the intersections of Camino de la Costa, Three roundabouts on La Jolla Blvd at the intersections of Camino de la Costa,
Bird Rock Ave., and Forward St.Bird Rock Ave., and Forward St.– Landscaped center medians from Camino de la Costa to MidwayLandscaped center medians from Camino de la Costa to Midway– Mini roundabout at the La Jolla Hermosa Ave/ForwardMini roundabout at the La Jolla Hermosa Ave/Forward– Landscaped median on La Jolla Mesa DriveLandscaped median on La Jolla Mesa Drive
__________________________________________________________________________Engineering & Capital Projects
DESIGN PROCESSDESIGN PROCESS• Geometrical Design
– Horizontal layout for chosen intersections– Design constraints included existing buildings &
r/w– Other design considerations included proposed
lane widths, proposed median, proposed parking– Input from Community
• Construction Documents– Tie proposed horizontal to existing roads– Add vertical design to horizontal layout– Coordinate pedestrian access– Coordinate sewer design– Design to acceptable City standards/FHWA
Guidelines
__________________________________________________________________________Engineering & Capital Projects
CHALLENGES• Unique Design Solution
• Accommodating Existing Drainage
• Roundabouts are relatively new to San Diego
• Fitting a ‘round peg in a square hole’
• Grading design (LJ Blvd flat, side streets steep)
• Construction – keep pedestrian and parking access open
__________________________________________________________________________Engineering & Capital Projects
CHALLENGES• Defining Project Scope:
– Pop-outs verses Traffic circle– Roundabouts verses Traffic circles– Additive Alternatives– Funding to match scope of work
• Right-of-Way/ Permits to Work on Private Property• Maintenance Assessment District formation• Horizontal Alignment• Design Vehicle - Turning template• Grant Funding Allocation and Authorization, HRER, Visual Impact Study• Impacts to Existing Improvements - Minimize
LESSONS LEARNED• Low-Bed Trailer• In-pavement Flashers• Landscaping – Low Maintenance and Site Visibility• Entry and Exit Width• Truck Apron Material• Survey Data• Intersection Angle
__________________________________________________________________________Engineering & Capital Projects
Before
Before
Defining Project Scope at CDefining Project Scope at Chelsea/Sea Ridgehelsea/Sea Ridge1200 1200 ADT (total intersection volume)ADT (total intersection volume)
8585thth percentile speed – 30 mph percentile speed – 30 mph
__________________________________________________________________________Engineering & Capital Projects
CChelsea/Sea Ridge - Afterhelsea/Sea Ridge - After
__________________________________________________________________________Engineering & Capital Projects
No ROW Impact Significant ROW Impact
Horizontal Geometry Adjustments During Design Minimize ROW Impact
__________________________________________________________________________Engineering & Capital Projects
Horizontal Geometry Adjustments During DesignLa Jolla Hermosa/Forward St. Final Design
__________________________________________________________________________Engineering & Capital Projects
La Jolla Hermosa/Forward St. Final Design
__________________________________________________________________________Engineering & Capital Projects
La Jolla Hermosa/Forward St. - Before
__________________________________________________________________________Engineering & Capital Projects
La Jolla Hermosa/Forward St. - After
__________________________________________________________________________Engineering & Capital Projects
La Jolla Hermosa/Forward St. - After(nearly complete)
__________________________________________________________________________Engineering & Capital Projects
Landscape ConceptMaintenance Assessment District
__________________________________________________________________________Engineering & Capital Projects
Landscape ConceptCommunity Effort
__________________________________________________________________________Engineering & Capital Projects
TYPICAL INTERSECTIONCamino de La Costa/La Jolla Blvd, Bird Rock/La Jolla Blvd, & Forward/La Jolla
Blvd
Additional Opportunity for Landscaping
Additional Landscaping
__________________________________________________________________________Engineering & Capital Projects
La Jolla Boulevard/Forward St.
__________________________________________________________________________Engineering & Capital Projects
La Jolla Boulevard/Forward St.
__________________________________________________________________________Engineering & Capital Projects
• Turning template– Typical turning
template using Auto-Turn
– Buses– Fire Trucks– WB-50– SU-30– Through Movements– Left Turns– Right Turns
__________________________________________________________________________Engineering & Capital Projects
SU-30 Truck Turning Template Example on LJB/CDLC
__________________________________________________________________________Engineering & Capital Projects
Truck Turning Template Example on LJB/Forward St
__________________________________________________________________________Engineering & Capital Projects
Fire Truck Specifications
__________________________________________________________________________Engineering & Capital Projects
Fire Truck Left Turn Movement
75 % Design
__________________________________________________________________________Engineering & Capital Projects
La Jolla Blvd. and Forward St. – Intersection Angle
__________________________________________________________________________Engineering & Capital Projects
• Bus Stop Design– MTS Coordination– Near side vs. Far side– Dimensions 30-50-30
N
__________________________________________________________________________Engineering & Capital Projects
N
Bus Stop on La Jolla Blvd @ Camino De La Costa
__________________________________________________________________________Engineering & Capital Projects
Forward Bus Stop
__________________________________________________________________________Engineering & Capital Projects
City Bus Through Movement Simulation
Bird Rock
__________________________________________________________________________Engineering & Capital Projects
Bus Stop NW corner La Jolla Blvd. and Bird Rock Ave.
BeforeBefore
AfterAfter
__________________________________________________________________________Engineering & Capital Projects
La Jolla Blvd Roundabout – Truck Through Movement
__________________________________________________________________________Engineering & Capital Projects
La Jolla Blvd/Midway St. - Long Flatbed Trailer Video
__________________________________________________________________________Engineering & Capital Projects
Right of Way Impacts – La Jolla Blvd. and Forward St.
Southwest Corner – ROW Impact and Tree removal required (The tree has been blown down
by wind in February, 2005)Northeast corner - ROW Impact and impact
to planter box attached to the building
N
__________________________________________________________________________Engineering & Capital Projects
Right of Way Impacts – La Jolla Blvd. and Forward St.
Forward St.
__________________________________________________________________________Engineering & Capital Projects
Roundabout at La Jolla Blvd/Forward StBefore
After
Before
__________________________________________________________________________Engineering & Capital Projects
Proposed Design vs. Existing Improvements Bird Rock Ave. and La Jolla Blvd.
Might need temporary easement for construction.
Right of WayBack of New sidewalk
__________________________________________________________________________Engineering & Capital Projects
Bird Rock Ave. and La Jolla Blvd. SW corner
Back of proposed sidewalk
Southwest Corner of La Jolla Blvd/Bird Rock
N
ROW Impact: 10sqft
__________________________________________________________________________Engineering & Capital Projects
Low-bed Trailers & Truck Apron
__________________________________________________________________________Engineering & Capital Projects
Trailer Model TA35 34.2ft from the truck’s rearmost to the trailer’s foremost axle
Overall length of a tractor semi-trailer combination: 65ft
N
La Jolla Blvd/Midway
__________________________________________________________________________Engineering & Capital Projects
Trailer Model TA35 34.2ft from the truck’s rearmost to the trailer’s foremost axle
Overall length of a tractor semi-trailer combination: 65ft
La Jolla Blvd/Colima
N
__________________________________________________________________________Engineering & Capital Projects
• Example of new in-pavement flashers layout • Reduce pedestrian crossing time and exposure to vehicles• Street Width - 68 feet to two 14-foot segments• From 17 - 27 seconds to 3.5 – 5.6 seconds
In Pavement flashers
Traffic Flow
Traffic Flow
In-Pavement Flashers
__________________________________________________________________________Engineering & Capital Projects
In-Pavement Flashers at Midway and ColimaIn-Pavement Flashers at Midway and Colima
__________________________________________________________________________Engineering & Capital Projects
In-Pavement Flashers – New DesignIn-Pavement Flashers – New Design
__________________________________________________________________________Engineering & Capital Projects
Other Design Details
• Driveway Relocations
• Utility Relocation
• Median Maintenance Walkway
• Sewer Alignment – Offset to Centerline
• Impacts to Existing Improvements
__________________________________________________________________________Engineering & Capital Projects
Driveway Relocation
Existing driveway to be relocated
N
__________________________________________________________________________Engineering & Capital Projects
Driveway Relocation
__________________________________________________________________________Engineering & Capital Projects
Utility Pole Relocation
__________________________________________________________________________Engineering & Capital Projects
Landscape Maintenance WalkwayLandscape Maintenance Walkway
__________________________________________________________________________Engineering & Capital Projects
Traffic Control Phasing
__________________________________________________________________________Engineering & Capital Projects
Drainage Problem – La Jolla Blvd. to AlleyDrainage Problem – La Jolla Blvd. to Alley
__________________________________________________________________________Engineering & Capital Projects
Drainage Solution from La Jolla Blvd. to AlleyDrainage Solution from La Jolla Blvd. to Alley
__________________________________________________________________________Engineering & Capital Projects
Drainage Solution along La Jolla Blvd. crossing Drainage Solution along La Jolla Blvd. crossing Forward Ave.Forward Ave.
__________________________________________________________________________Engineering & Capital Projects
Concept
__________________________________________________________________________Engineering & Capital Projects
Camino de La Costa/ La Jolla Blvd
Before After
__________________________________________________________________________Engineering & Capital Projects
Bird Rock/ La Jolla Blvd
Before After
__________________________________________________________________________Engineering & Capital Projects
Forward/ La Jolla Blvd
Before After
__________________________________________________________________________Engineering & Capital Projects
Midway/ La Jolla Blvd
Before After
__________________________________________________________________________Engineering & Capital Projects
Colima/ La Jolla Blvd
Before After
__________________________________________________________________________Engineering & Capital Projects
__________________________________________________________________________Engineering & Capital Projects
New Guide Sign?? NOT supported by MUTCD or Local Agency
__________________________________________________________________________Engineering & Capital Projects
Thank You! (619) 533-4661
Photo: Mike Arnold