biogas plant components - eihp plant components ... homogenisation insertion transport, ... •...
TRANSCRIPT
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Biogas Plant
Components
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Biogas plant components
• A Biogas plant is a complex installation
• Main components are to find in every plant
• Design depends on feedstock types and amount
• Components are defined by process steps
Crushing
Sorting
Pasteurisation
Discharge
Desulphurisation
Drying
CO2-sequestration
Gas storage
Heat
CHP(electricty + heat)
Feeding into gas grid
Fuel cells
Fuel
Wet digestion
Dry digestion
Feedstock substrates
Substrate Substrate
conditioningDigesting
technology
Gas processing
system
Delivery
Storage
Gas utilisation Digestate storage
and -utilisation
Storage
Application and
Disposal
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
• Main components and general process flow
Substrate storage
Conditioning
Digestate storage
Digestate application
Digester
Energy
Biogas storage Power
Unit
Biogas plant components
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Process stages of agricultural biogas plants
Delivery and storage
Conditioning and pre-treatment (optional)
Separation, sorting, crushing, mashing,
homogenisation
Insertion
transport, dosage
Biogas production
Anaerobic digestion inside the digester
DigestateBiogas
1. Process stage
2. Process stage
Digestate storage and/or post
digestion
Digestate conditioning
Biogas
Disposal or
composting
wihtoutwithout
sSolid /liquid
separation
Solid-lLiquid-sSeparation
(optional)
Liquid
fertilize
r
Disposal,,
Composting
4. Process stage3. Process stage
Biogas conditioning and storage
Drying, de-sulphurization
Biogas utilisation
Electricity and heat production
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Feedstock delivery and storage
• Transport and supply plays an important role in the operation of a plant
• Should be stable and continous
• Control and record data (type, weight, quality)
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Feedstock storage
• Compensate the seasonal fluctuations in supply
• Type depends on used feedstock (solid – liquid)
• Bunker silo • Storage tank
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Bunker Silo
• Frequently used to store energy crops for biogas plants
• For dry material with a water content 55 – 70%
• Pressed to get out the air to avoid aerobic processes
• Fermentation process produces VFA (Volatile Fatty Acids)
• Usually covered with plastic foil or other materials
• Silage releases corrosive liquids with high nutrient content
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Storage tanks
• Pumpable feedstock
• Concrete tanks, sometimes metal or plastic
• Co-substrate can be mixed, cut and crushed with stirrers
• Sedimentation should be considered
• Odour from the tanks can be reduced by cover or biofilter ventilation
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Feedstock conditioning
• Sorting and separation
• Sanitation
• Crushing
• Mashing, homogenising
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Feedstock sorting and separation
• Depends on the feedstock
• Agricultural feedstock is almost pure
• Stones and sand can be removed by sedimentation
• Household waste, catering and food waste are full of impurities.
Removing is necessary to protect the process
• Several methods to separate
Grocery store waste Separation unit
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
The Material is pressed a second time, for example by a screw press, reducing the
weight by 50% again. The efficiency and the mass of reject always depends on the quality of the waste.
50% 50%
Removal of contaminants, mass balance
90%
Example food waste:
Dry substance matter (DM): 20-30%
Contamination up to 25% of DM
• dishes, cutlery, plastic bags
• bones, egg and seafood shells
• glass
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Output of substrate and contaminants
View into a container with contaminantsFood waste afer treatment
90 – 95 % 5 – 10 %
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Feedstock sanitation
• Contamination risks for human, animal or the environment must be
avoid
• Regulated by law (e.g. European Regulation EC 1774)
• The sanitation treatment is described with parameters
• Typical monitoring parameters are temperature, retention time,
pressure and volume
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Feedstock crushing
• Prepares the surface of the particles for decomposition
• Degradation is faster when particle size is smaller
Extruder Crusher and separator
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Feedstock mashing and homogenising
• Obtain a higher water content to handle material with pumps
• Takes place in storage tanks or pre-digesters
• Liquids used: Liquid manure, digestate, process or fresh water
• Homogenisation for a constant and stabile gas production
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Feeding system
• A continuous flow of feedstock is to aim (in practice several small
batches)
• Feeding technique depends on dry substance matter of feedstock
• Stackable feedstock or pumpable feedstock
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Transport and feeding of stackable feedstock
• Insertion into digester must be air-tight
• Pressing below surface layer
Feed conveyors Wash-in shaftFeed pistons
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Feeding of Stackable feedstock
• Stackable feedstock is transported from the storage (bunker silo) to
the digester by loader or tractor
Container system with scraper floor and conveyor screws
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Pumps for transport of feedstock and digestate
• Two types: Centrifugal and displacement pumps
• „A centrifugal pump is a rotodynamic pump that uses a rotating
impeller to increase the pressure and flowrate of a fluid.“
• Centrifugal pumps are often submerged. (not self-sucking)
• Cutting pumps for feedstock with long fibre are available
• „A displacement pump causes a fluid to move by trapping a fixed
amount of it then forcing (displacing) that trapped volume into the
discharge pipe“
• Self-sucking, pressure stable
• Flow depends on rotation speed (precise dosing)
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Pumps for transport of feedstock and digestate
• For maintenance reasons, pumps are equipped with stop-valves, are
easily accessible and ensure sufficient work room
• The function is often controlled by PLC or at least a timer
• In some biogas plants, the whole transport of digestate is realised by
one or two pumps, located in a pumping station.
Rotary piston pumpPiston pump
Centrifugal pump
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Pipelines
• Material of the pipe depends on the
transported material
• Must be corrosion proof
• PVC, PE, steel, stainless steel
• Long and angled pipelines lead to a
loss of pressure
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Valves
• Corrosion proof
• Slide valves and butterfly valves are the most common types
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Heating system - digester heating
• Constant process temperature is the aim
• Temperature fluctuations have to be compensated
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Digesters
• The digester is the core of the biogas plant
• Air proof container
• Different in size, material, shape.
• Two basic digestion systems
batchcontinousDigester type
drywetDigestion system
>15 %<15 %Dry matter content
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Batch type digesters
• Operation: Feed – Digestate – Remove
• Feedstock: Biowaste, grass cutting, solid manure and energy crops
• No mixing or stirring while digestion
• Percolation liquid has to be circulated
‘Garage Digester’
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Continous type digesters
• Operation: Feedstock is constantly fed in
• Produce biogas without interruption
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Maintenance of Digesters
Skimming unit
Ø max. 13 m
max. 10 m
Output
Floor scraper
• Removal of Sediments and swimming layers
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
The floor scraper wipes
Sediments into an floor outlet
from were the sediment is
pumped into a classifier.
Removal of sediments
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Removal of swimming layers
Floating material is
skimmed from the surface
and pumped to a sieve. Due
to is construction the
skimming unit is self
regulating and gas proof.
Gas proof separation :
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Stirrer technologies
• Methane bacteria is unable to move
• Nutrients have to be brought to them
• Passive stirring from thermal convection and bubbles
• Mechanical stirring (90% of the biogas plants)
• Pneumatic stirring
• Hydraulic stirring
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Mechanical stirring
• Different speed with different geometries
• Paddle stirrers
• Axial stirrers
• Submersible axial stirrers
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Biogas storage
• Compensate the fluctuation in biogas production
• Low pressure storage facilyties are most commen
Gas tight membrane Gas bladder
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Thank you for your attention.
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Truck for the collection of food waste
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Biogas plant for 4000 t/a of bio waste
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
Biogas plant for 8000 t/a of food- and biowaste
www.fitec.comwww.fitec.com
Finsterwalder Umwelttechnik GmbH & Co. KG, Mailinger Weg 5, 83233 Bernau
Tel. +49 (0) 8051 965910-10, Fax +49 (0) 8051 965910-20, Email: [email protected]
BTTP and wood-chip drying