bim digitalization of the public real estate - village24 · bim digitalization of the public real...

16
Torino, 24 novembre 2016 BIM Digitalization of the Public Real Estate Città di Torino case study Francesca Maria UGLIOTTI

Upload: ngoque

Post on 18-Feb-2019

219 views

Category:

Documents


0 download

TRANSCRIPT

Torino, 24 novembre 2016

BIM Digitalization of the Public Real EstateCittà di Torino case study

Francesca Maria UGLIOTTI

Public Real Estate Management

EnergyRefurbishment

2010/31/UE2012/27/UE

Consumption rationalization

Energy AnalysisInformation

system

Monitoring

2010/31/UE2012/27/UE

BIM

http://www.drawingtothefuture.polito.it/

PA

Real Estate

FacilityManagement

EnergyManagement

Public Real Estate Management

CITTÀ DI TORINO

FONDAZIONE TORINO SMART CITY

IREN

POLITECNICO DI TORINO

CSI PIEMONTE

Energy AnalysisEnergy certification

Systems integrationArchibus set up

System optimizationEnergy refurbishment

SurveyBuilding Information Model

http://www.drawingtothefuture.polito.it/

Public Real Estate Management

LOD

Survey

Data

Digitalization

Geometry

Ndimensions

BIM

DataCollection

BIM

http://www.drawingtothefuture.polito.it/

Management

http://www.drawingtothefuture.polito.it/

Data collection

Case Study: Office building, Piazza di Città 7

GEOMETRY + DATA

BUILDING

SYSTEMSSPACES

BIMMODELS

SurveyCAD

Image-based modelling

As-Built

http://www.drawingtothefuture.polito.it/

Building Information Modelling

LOD

Properties

Shared Parameters

Case Study: Historical Archives of the City of Turin

http://www.drawingtothefuture.polito.it/

Building Information Modelling

3D – nDModels

Simulations

• Design

• Construction

• FM

• Energetic• Safety• Logistics / Production• Budget/Cost Control

As-built

Selection of data

Variants Added Value

• Architectural• Structural• MEP• Constructive

DB

LOD

SmartInteroperability

Maintenance plan

Building process

http://www.drawingtothefuture.polito.it/

Use of BIM Models

BIM MODEL

Windows schedule

Roof schedule

Walls scheduleMechanical equipment

schedule Lighting devicesschedule

Mass schedule

Room schedule

… Building components and technological assets inventory

http://www.drawingtothefuture.polito.it/

INDICATORS• % NFA/GFA• % NLA/NUA• % Utilization rate of spaces• m2/Zones - Tenant- Category - Type• m2Heated-Conditioned /Tenant-Zones• m3Heated-Conditioned /Tenant-Zones• m2 Public spaces/Zones-Tenant• m2 Suspended ceiling/NLA• # Occupants/Floor –Zones-Tenant• m2/per Occupants-Workstation• # Equipments /room-level-building

COSTS• € TCO/ m2 GFA• € Maintenance / m2 GFA-User-Tenant• € Cleaning /m2-User• € Utilities /m2-User• Electric energy consumption kWh/m2 GFA -User-

Tenant

… Space Management

Case study: Office building, via Meucci 4

Use of BIM Models

http://www.drawingtothefuture.polito.it/

… Energy Simulations

… Illuminotechnical Simulations

Use of BIM Models

Case study: Public Works Archive

Caso studio: Palazzo di CittàAs-is

Proposal #1: Relamping and devices increasing

Proposal #2: The LED technology

http://www.drawingtothefuture.polito.it/

Use of BIM Models

VR

… Maintenance

AR

Case study: Santorre di Santarosa Primary School

Case study: Office building via Giolitti 42

http://www.drawingtothefuture.polito.it/

… Visual logic resource for information

Use of BIM Models

Case Study: Ex Regio Manicomio

PROPRIETÀ

The Cadastre of the future

Conclusions

http://www.drawingtothefuture.polito.it/

Conclusions

http://www.drawingtothefuture.polito.it/