Page 1: Bill of Quantities

BOQ 1

PROJECT:

OWNER:

BILL OF QUANTITIES

SL. NO DISCRIPTION OF WORK QTY UNIT RATE AMOUNT

A Preliminaries & Mobilization

1 Preliminaries & Mobilization L.S

2 L.S

3 Dewatering L.S

4 Sheeting and shoring L.S

BILL No. A Preliminaries & Mobilization

B Sub-Structure work

1 Excavation M3

2 Road base M3

3 P.C.C below raft, tie beams, solid block. Etc M3

4 R.C.C. for Raft M3

5 R.C.C. for strap beam M3

6 R.C.C. for tie beams M3

7 R.C.C. for Neck columns & shear wall M3

8 Floor concretewith BRC mesh M3

9 RCC for underground water tank M3

10 M2

11 Water stopper for water tank LM

12 M2

13 M2

14 M2

15 Polythene sheets M2

16 Refilling with excavated material M3

17 Surplus material removal from site M3

18 M2

19 Anti termite protection M2

Cutting / filling / grading to make finished ground level

Internal water proofing for underground water tank

2 layer SBS membrane water proofing to outside of water tankProtection board to protect vertical water proofing membrane

5cm screed to protect horizontal water proofing membrane

Water proofing for substructue-bitumen paint

Page 2: Bill of Quantities

BOQ 2

20 L.S.

BILL No. B Substructure works

C Super structure works

1 R.C. Columns and walls M3

2 R.C. beams M3

3 R.C. solid slabs M3

4 R.C. Lintels / Arches etc. M3

5 R.C. Stair case M3

6 R.C.C. Parapet M3

7 Decoration works in Elevation L.S.

BILL No. C Super structure works

D Block work

1 200mm thk Heat insulation block work M2

2 100mm thk hollow block work M2

3 200mm thk hollow block work M2

4 200mm thk solid block work M2

5 100mm thk solid block work M2

BILL No. D Block works

E Plaster works

1 Plaster for ceiling M2

2 Plaster for internal wall M2

3 Plaster for external wall M2

BILL No. E Plaster works

F Floor finished

1 Mosaic tiles - BC 21 Dhs/m2 M2

2 Ceramic tiles - BC 40 Dhs/m2 M2

3 Ceramic tiles - BC 30 Dhs/m2 M2

4 Ceramic tiles - BC 20 Dhs/m2 M2

5 Marble - BC 150 Dhs/m2 M2

6 Epoxy flooring M2

7 Marble Steps - BC 150 Dhs/m2 LM

Entrance steps, ramp, trench & transformer foundation

Page 3: Bill of Quantities

BOQ 3

8 Marble ramp - BC 150 Dhs/m2 M2

BILL No. F Floor finishes

G Wall finishes

1 Ceramic tiles - BC 40 Dhs/m2 M2

2 Ceramic tiles - BC 20 Dhs/m2 M2

3 Ceramic tiles - BC 30 Dhs/m2 M2

4 Marble - BC 150 Dhs/m2 M2

5 Emulsion paint M2

6 Epoxy paint M2

BILL No. G Wall finishes

H Ceiling finishes

1 Emulsion paint M2

2 Epoxy paint M2

3 60 x 60 gypsum BC 40/m2 M2

Note False ceiling considered nly for kitch, bath, toilet, pantry

BILL No. H Ceiling finishes

I External finishes

1 Epoxy paint M2

2 Stone paint M2

3 Decoration concrete mooulding L.S.

4 Decoration column head nos

5 Brackets L.S.

6 Manglore roof tiles L.S.

7 Manglore roof ridge tiles L.S.

BILL No. I External finishes

J Stair Block

1 L.M.

2 Mosaic treads and risers BC Dhs. 45/LM L.M.

Marble treads and risers from Ground floor to First floor BC Dhs. 150/LM

Page 4: Bill of Quantities

BOQ 4

3 Marble landing BC Dhs. 150/M2 M2

4 Mosaic landing BC Dhs. 21/M2 M2

BILL No. J Stair Block

K Skirting

1 Marble skirting - BC Dhs. 25/LM L.M.

2 Ceramic skirting - BC Dhs. 5/LM L.M.

3 L.M.

BILL No. K Skirting

L External works

1 Interlock - 8cm M2

2 Kerb stone L.M.

3 Holding tank 120 users L.S.

BILL No. L External work

M Joinery and wood work

1

1.a Flat main door- 2000/No nos

1.b Internal door- 1,500/No nos

2 Wooden cup board M2

BILL No. M Joinery and wood work

N Metal Works

1 L.S.

2 Aluminum staircase handrail r.m

3 Aluminum composite cladding M2

4 Handrail at rampwith BC 1000/LM LM

Marble threshold for internal door - BC Dhs. 60/LM

Interlock paving considered inside plot limit only

Wooden doors with full ironmongery. ( Locks, Hinges, Door stoppers, View lens etc.)

Aluminum and glazing for doors and windows.

Page 5: Bill of Quantities

BOQ 5

5 Handrail at Balcony with BC 1000/LM LM

6 LM

7 Gas duct covering grill M2

BILL No. N Metal Works

O

1 Roof water proofing with roofing tiles M2

2 Roof skirting LM

3 Water proofing for baths, kitchen & balcony M2

BILL No. O Roofing and waterproofing

P Electricals

1 Electrical work

BILL No. P Electricals

Q Telephone - Dish antenna/Intercom installations

1

BILL No. Q Telephone - Dish antenna/Intercom install

R Plumbing & Drainage

1 Plumbing & Drainage work

2 Supplying & fixing of vanity counter r.m

BILL No. R Plumbing & Drainage

S Fire Fighting & Fire Alarm work

1 L.S.

BILL No. S Fire Fighting & Fire Alarm work

T Miscellaneous Items

1 Lift L.S.

2 Air Conditioning - LG L.S.

3 Garbage chute L.S.

4 Gas L.S.

5 Light fittings L.S.

BILL No. T Miscellaneous Items

Kitchen cabinets and counters Basic cost Dhs. 1000/LM

Roofing and waterproofing on Concrete Slab

Telephone - Dish antenna/Intercom installations ( Conduits only )

Supply, install, testing and commissioning of fire fighting system & fire fighting equipment as per drawing & spec.

Page 6: Bill of Quantities

BOQ 6

U

1 M.E.P. civil related works L.S.

BILL No. U Any item contractor find it necessary to price

Grand Total

PROJECT:

OWNER:

CONSULTANT:

SUMMARY OF B.O.Q

ITEM NO. DESCRIPTION AMOUNT

A Preliminaries & Mobilization

B Sub-Structure work

C Super-Structure work

D Block work

E Plaster works

F Floor finishes

G Wall finishes

H Ceiling finishes

I External finishes

J Stair block

K Skirting

L External works

M Joinery and wood works

N Metal works

O Roofing and waterproofing on Concrete Slab

P Electrical works

Q

R Plumbing & Drainage work

S Fire fighting & Fire Alarm work

T Miscellaneous Items

Any item contractor find it necessary to price

Telephone - Dishes antenna-Intercom installation (Conduit only)

Page 7: Bill of Quantities

BOQ 7

U Any item contractor find it necessary to price

GRAND TOTAL