bilal final gypsum board constraction ii project one-layout3

1
D'1 D'2 D'2 D'1 Plan D'3 1 2 3 3 7 8 1 6 4 5 2 1 Screws Metal Groove Roll Bot Gypsum Board C channel 1. 3. 6. 2. 5. 4. Long Screws Metal Sand concrete slab 7. 8. PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Upload: bilal-ezzo

Post on 13-Jan-2017

128 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bilal final gypsum board constraction II project one-Layout3

D'1

D'2

D'2D'1

Plan

D'3

1

2

3

3

7

8

1

6

4

5

2

1

Screws Metal

Groove

Roll Bot

Gypsum Board

C channel

1.

3.

6.

2.

5.

4.

Long Screws Metal

Sand

concrete slab

7.

8.

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K E

DU

CA

TIO

NA

L P

RO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K E

DU

CA

TIO

NA

L P

RO

DU

CT