bibliography abdul ghani, k. and jayabalan, v., 11 alvarez gila,...
TRANSCRIPT
253
BIBLIOGRAPHY
1. Abdul Ghani, K. and Jayabalan, V., 2000. Advanced Manufacturing Technology and
Planned Organizational Change, The Journal of High Technology Management Research,
11 (1): 1-18.
2. Alvarez Gila, M.J., Burgos Jimenezb, J.J. and Cespedes Lorentec, 2001. An analysis
of environmental management, organizational context and performance of Spanish
hotels, Omega, 29: 457-471.
3. Alvarez-Gil, M.J., 1994, Capital budgeting and flexible manufacturing, International
Journal of Pro-duction Economics, 36: 109-28.
4. Amoako-Gyampah, K. and Boye, S.S., 2001. Operations strategy in an emerging
economy: the case of the Ghanaian manufacturing industry, Journal of Operations
Management, 19: 59-79.
5. Amoako-Gyampah. K., 2003. The relationships among selected business environment
factors and manufacturing strategy: insights from an emerging economy, Omega, 31:
287 - 301.
6. Anthony Inman, R. Samuel Sale, R. Kenneth W. Green Jr. and Dwayne Whitten,
2011. Agile manufacturing: Relation to JIT, operational performance and firm
performance, Journal of Operations Management, 29: 343-355.
7. Badri MA and Davis, D., 2000. Operations strategy, environmental uncertainty and
performance: a path analytic model of industries in developing countries. Omega,
282:155-73.
8. Barclay, D., Higgins, C. and Thompson, R., 1995. The partial least squares (PLS)
approach to causal modelling: personal computer adoption and use as an illustration,
Technology Studies, 2 (2): 285-324.
9. Baumgartner, H. and Homburg, C., 1996, Applications of Structural Equation
Modeling in Marketing and Consumer and Research: A Review, International Journal of
Research in Marketing, 13 (2): 139-161.
10. Bentler, P.M., 1992a. EQS: Structural Equations Program Manual. Los Angeles:
BMDP Statistical Software.
254
11. Bharadwaj, A.S., 2000. A Resource-Based Perspective on Information Technology
Capability and Firm Performance: An Empirical Investigation, MIS Quarterly, 24 (1):
169-196.
12. Boddy, D., & Buchanan, D.A., 1986. Managing new technology. UK: Basil Blackwell.
13. Boyer, K. and Lewis, M., 2002. Competitive priorities: investigating the need for trade-
offs in operations strategy, Production and Operations Management, 11 (1): 9-20.
14. Bragdon, J. and Merlin, J., 1972. Is pollution profitable? Risk Management April, 9-18.
15. Brown, M.W. and Cudeck, R., 1993. Alternative ways of assessing model fit, in Bollen,
K.A. and Long, J.S. (Eds), Testing Structural Equation Models, Sage, Thousand Oaks,
CA, 136-62.
16. Burgess, T.F. Gules, H.K. Gupta, J.N.D., and Tekin, 1998. Competitive priorities,
process innovations and time based competition in the manufacturing sectors of
industrializing economies: the case of Turky, Benchmarking for Quality Management
and Technology, 5(4):304-316.
17. Byrne, B.M., 1988. The Self Description Questionnaire III: Testing for equivalent
factorial validity across ability. Educational and Psychological Measurement, 48:
397-406.
18. Carmines, E.G. and Zeller, R.A., 1979. Reliability and Validity Assessment, Sage,
Newbury Park, CA.
19. Carpinetti, L.C.R. and Gerolamo, M.C. and Dorta, M., 2000. A conceptual
framework for deployment of strategy-related continuous improvements, The TQM
Magazine, 12 (5): 340-9.
20. Ce´sar Camiso´n and Ana Villar Lo´pez, 2010. An examination of the relationship
between manufacturing flexibility and firm performance: The mediating role of
innovation, International Journal of Operations & Production Management, 30 (8): 853-
878.
21. Chakraborty, S., 2011. Applications of the MOORA method for decision making in
manufacturing environment, International Journal of Advanced Manufacturing
Technology, 54: 1155-66.
22. Chen, C.-T., 2000. Extensions of the TOPSIS for group decision-making under fuzzy
environment, Fuzzy Sets and Systems, 9:11-4 1.
255
23. Chen, I.J. and Paulraj, A., 2004. Towards a theory of supply chain management: the
constructs and measurement. Journal of Operations Management, 22 (2): 119-150.
24. Chen, Y.-S., Chong, P.P., and Chen, J.C.-H., 2000. Small Business Management: An
ITBased Approach, Journal of Computer Information Systems, 41 (2): 40-47.
25. Chin, W.W., 1998. The partial least squares approach to structural equation modelling,
in Marcoulides, G.A. (Ed.), Modern Methods for Business Research, Lawrence Erlbaum
Associates, Mahwah, NJ, 295-336.
26. Clark, J.T., 1982. Selling top management understanding the financial impact of
manufacturing systems, American Production and Inventory Control Society Conference
Proceedings, Falls Church, VA.
27. Cordeiro, J. J, and Sarkis, J., 1997. Environmental pro activism and firm performance:
evidence from security analyst earning forecast. Business Strategy and the Environment,
6 (2):104-14.
28. Cornelis, G. Deschrijver and E.E. Kerre, 2006. Advances and challenges in interval-
valued fuzzy logic, Fuzzy Sets and Systems, 157: 622-627.
29. Cronbach, L. J., 1951. Coefficient alpha and the internal structure of tests,
Psychometrika, 16: 297-334.
30. Dangayach GS, and Deshmukh S. G., 2005. Advanced manufacturing technology
implementation Evidence from Indian small and medium enterprises (SMEs) Journal of
Manufacturing Technology Management, 16 (5): 483-496.
31. Dangayach, G.S. and Deshmukh S.G., 2001. Practice of manufacturing strategy:
evidence from select Indian automobile companies, International Journal of Production
Research, 39 (11): 2353- 2393.
32. Dangayach, G.S. and Deshmukh S.G., 2003. Evidence of manufacturing strategies in
Indian industry: a survey, International Journal of Production Economics, 83: 279-298.
33. Dean, A.S., Mcdermott, C. and Stock, G.N., 2000. Advanced manufacturing
technology: does more radicalness mean more perceived benefits?, The Journal of High
Technology Management Research, 11 (1): 19-33.
34. Dean, J.W. and Snell, S.C., 1996, The strategic use integrated manufacturing: an
empirical examination, Strategic Management Journal, 17:459-480.
256
35. Deming, E.W., 1986. Out of Crisis, Cambridge, MA: MIT Center for Advanced
Engineering Study (Cambridge, MA) and Gitlow and Gitlow, The Deming Guide to
Quality and Competitive Position (1987), Prentice-Hall, (Englewood Cliffs, NJ).
36. Deming, W.E., 1982. Quality, Productivity and Competitive Position. MIT Center for
Advanced Engineering Study, Cambridge, MA.
37. Deng, H., Robert, J.W. and Yeh, C.H., 2000. Inter-company comparison using
modified TOPSIS with objective weight, Computer & Operation Research, 27 (10):
963-73.
38. Department of Industries and Commerce, Puducherry, India.
www.industrypondicherry.com.
39. Dess, G.G. and Beard, D.W., 1984. Dimensions of organizational task environments,
Administrative Science Quarterly, 29 (1): 52-73.
40. Directorate of Economics and Statistics, Puducherry, India.
www.statistics.puducherry.gov.in.
41. Dornier, P.P., Ernest, R., Fender, M., Kouvelis, P., 1998. Global Operations and
Logistics - Text and Cases. John Wiley and Sons Inc., Berlin. Chapter 8, 252- 257;
Chapter 12, 441-442.
42. Droge, C., Vickery, S. and Markland, R.E., 1994. Sources and outcomes of
competitive advantage: an exploratory study in the furniture industry, Decision Sciences,
25 (5/6): 669-89.
43. Ebben, J.J., and Johnson, A.C., 2005. Efficiency, Flexibility or Both? Evidence
Linking Strategy to Performance in Small Firms, Strategic Management Journal, 26:
1249-1259.
44. Ely lauremo Paiva and Iuri Gavronski, 2009. Beyond the functional silos: a
performance analysis based on the cumulative capabilities perspective, POMS 20th
international conference, 011-0510, 1-26.
45. Everitt, B., 2006, The Cambridge dictionary of statistics, 3rd edn, Cambridge University
Press, Cambridge, UK ; New York.
46. Ferdows, K. and De Meyer, A., 1990. Lasting improvements in manufacturing
performance: in search of a new theory, Journal of Operations Management, 9 (2):
168-83.
257
47. Fornell, C. and Larcker, D., 1981. Evaluating structural equation models with
unobservable variables and measurement error, Journal of Marketing Research, 18 (1):
39-50.
48. George W. Mechling, James W. Pearce and James W. Busbin, 1995. Exploiting AMT
in small manufacturing firms for global competitiveness, International Journal of
Operations & Production Management, 15 (2): 61-76.
49. Goldhar, J.D. and Jelinek, M., 1983. Plan for economies of scope, Harvard Business
Review, 61: 141-8.
50. Gorzalczany, M.B., 1987. A method of inference in approximate reasoning based on
interval-valued fuzzy sets, Fuzzy Sets and Systems, 21: 1-17.
51. Grattan-Guinness, 1975. Fuzzy membership mapped onto interval and many-valued
quantities, Z. Math. Logik Grundlag. Mathe, 22: 149–160.
52. Groebner, D. F. and Shannon, P. W., 1990. Business statistic: a decision-making
approach third edition edn, Macmillian Publishing Company, New York.
53. Grzegorzewski, P., 2004. Distances between intuitionist fuzzy sets and/or interval
valued fuzzy sets based on the Hausdorff metric, Fuzzy Set and Systems, 148: 319–328.
54. Haeri, A.G. 2005. Total quality management in an Iranian Auto Part Manufacture: The
case of ―RAFA‖. Master of Art dissertation, 1-68.
55. Hair, J. F., Black, W. C., Babin, B. J., Anderson, R. E. and Tatham, R. L., 2006.
Multivariate data analysis, 6th edn, Pearson Prentice Hall, Upper Saddle River, N.J.
56. Hair, J.F., Anderson, R.E., Tatham, R.l. and Black, W.C., 1998. Multivariate Data
Analysis, 5th ed., Prentice-Hall International, Englewood Cliffs, NJ.
57. Hambrick, D.C., 1983. Some tests of the effectiveness and functional attributes of Miles
and Snow‘s strategic types, Academy of Management Journal, 26 (1): 5-26.
58. Harris, R.D., 2004. Organizational task environments: an evaluation of convergent and
discriminant validity, Journal of Management Studies, 41 (5): 857-82.
59. Harrison, N & Samson, D., 1997. International Best Practice in the Adoption and
Management of New Technology, Department Industry, Science and Tourism, Australia.
60. Hayes, R. and Wheelwright, S., 1984. Restoring Our Competitive Edge: Competing
Through Manufacturing, Wiley, New York, NY.
258
61. Heizer, J. and Render B., 1993. Production and operations management: strategies and
tactics, 3rd ed. Englewood Cli€s, NJ: Prentice Hall.
62. Hendricks, K. B., and Singhal, V.R., 1997. Does implementing an effective TQM
program actually improve operating performance? Empirical evidence from firms that
have won quality awards. Management Science, 43: 1258-1274.
63. Hendricks, K.B., and Singhal, V.R., 2001. Firm characteristics, total quality
management, and financial performance. Journal of Operations Management, 19: 269-
285.
64. Hill, C.W.L. and Jones, G.R., 1992. Strategic Management Theory, An Integrated
Approach, Houghton Mifflin Company, Boston, MA.
65. Hinton, M., Francis, G. and Holloway J., 2000, Best practice benchmarking in UK,
Benchmarking: An International Journal, 7(1):52-61.
66. Hofer, C.W., 1975. Toward a contingency theory of business strategy. Academy of
Management Journal, 18: 784–810.
67. Hong, D.H. and Lee, S., 2002. Some algebraic properties and a distance measure for
interval valued fuzzy numbers, Information Sciences, 148: 1–10.
68. Honggeng Zhou, G.Keong Leong, PatrikJonsson and Chee-ChuongSum, 2009. A
comparative study of advanced manufacturing technology and manufacturing
infrastructure investments in Singapore and Sweden, International Journal of
Production Economics, 120: 42–53.
69. Hoque Z., 2004. A contingency model of the association between strategy,
environmental uncertainty and performance measurement: impact on organizational
performance, International Business Review, 13: 485–502.
70. Hu, L. and Bentler, P.M., 1998. Fit indices in covariance structure modeling: sensitivity
to underparameterized model misspecification. Psychological Methods, 3 (4): 424-453.
71. Hu, L. and Bentler, P.M., 1999. Cutoff criteria for fit indexes in covariance structure
analysis: conventional criteria versus new alternatives. Structural Equation Modeling, 6
(1): 1-55.
72. Hwang, C. L. and Yoon, K., 1981. Multiple Attribute Decision Making-Methods and
Applications, Springer-Verlag, Heidelberg, Berlin.
259
73. Jahanshahloo, G.R., F. Hosseinzadeh Lotfi, and Izadikhah, M., 2006. Extension of
the TOPSIS method for decision-making problems with fuzzy data, Applied Mathematics
Computer, 181, 1544-1551.
74. Jöreskog, K. G. and Sörbom, D., 1996, Lisrel 8: User's Reference Guide, Scientific
Software International, Inc., Chicago, IL.
75. Joreskog, K.G. and Sorbom, D., 1993. New Features in LISREL 8. Scientific Software,
Chicago.
76. Judge, W. and Douglas, T., 1998. Performance implications of incorporating natural
environmental issues into the strategic planning process: an empirical assessment. Journal
of Management Studies, 35 (2): 241-262.
77. Karnik, N.N. and Mendel, J.M., 2001. Operations on type-2 fuzzy sets, Fuzzy Sets and
Systems, 122: 327-348.
78. Kathuria, R., Porth, S. J. and Joshi, M. P., 1999. Manufacturing priorities: do general
managers and manufacturing managers agree?, International Journal of Production
Research, 37 (9): 2077- 2092.
79. Kennerly, M. and Neely, A., 2002. A framework of the factors affecting the evolution of
performance measurement systems, International journal of Operations Production
Managemen,. 22 (11): 1222-1245.
80. Kenneth K. Boyer and Marianne W. Lewis, 2002. Competitive priorities: investigating
the need for trade-offs in operations strategy, Production and Operations Management,
11 (1): 9-20.
81. Kenneth K. Boyer and Mark Pagell, 2000. Measurement issues in empirical research:
improving measures of operations strategy and advanced manufacturing technology,
Journal of Operations Management, 18: 361–374.
82. Kenneth K. Boyer, G. Keong Leong, Peter T. Ward and Lee J. Krajewski, 1997.
Unlocking the potential of advanced manufacturing technologies, Journal of Operations
Management, 15: 331-347.
83. Ketokivi MA and Schroeder R. G., 2004b. Strategic, structural contingency and
institutional explanations in the adoption of innovative manufacturing practices, Journal
of Operations and Management, 22: 63-89.
260
84. Ketokivi, M., & Schroeder, R., 2004. Manufacturing Practices, Strategic Fit and
Performance A Routine-Based View, International Journal of Operations and
Production Management, 24 (2): 171-191.
85. Kim, J.S. and Arnold, P., 1996. Operationalising manufacturing strategy: an exploratory
study of constructs and linkage, International Journal of Operations & Production
Management, 16 (12): 45-73.
86. Klassen, R.D. and McLaughlin CP., 1996. The impact of environmental management
on firm performance. Management Science, 42(8):1199–214.
87. Kongkiti Phusavat and Rapee Kanchana, 2008. Future competitiveness: viewpoints
from manufacturers and service providers, Industrial Management & Data Systems, 108
(2): 191-207.
88. Krajewski, L.J. and Ritzman, L.P., 1993. Operations Management: Strategy and
Analysis, 3rd ed., Addison-Wesley, Wokingham.
89. Krajewsky L. and Ritzman L., 1996. Operations management: strategy and analysis,
4th ed. Reading, MA: Adison-Wesley Publishing Company.
90. Kwasi Amoako-Gyampah and Moses Acquaah, 2008. Manufacturing strategy,
competitive strategy and firm performance: An empirical study in a developing economy
environment, International journal of Production Economics, 111: 575–592.
91. Lankoski, L. 2000. Determinants of Environmental Profit. Helsinki University of
Technology Institute of Strategy and International Business Doctoral Dissertations
2000 / 1.
92. Laosirihongthong and Dangayach. G. S., 2005. A Comparative Study of
Implementation of Manufacturing Strategies in Thai and Indian Automotive
Manufacturing Companies, Journal of Manufacturing Systems, 24(2): 131-143.
93. Lawless, M.W. and Finch, L.K., 1989. Choice and determinism: a test of Hrebiniak and
Joyce‘s framework on strategy-environment fit, Strategic Management Journal, 10 (4):
351-65.
94. Lei, D., Hitt, M.A., Goldhar, J.D., 1996. Advanced manufacturing technology:
organizational design and strategic flexibility. Organization Studies, 17 (3): 501–523.
95. Lewis-Beck, M. S., Bryman, A. & Liao, T., 2004, The Sage encyclopedia of social
science research methods, 3 vols., Sage Thousand Oaks, Calif.
261
96. LI Ping,QI Zhong-ying,Tian Ye-zhuang and Zhang Li, 2008. An Empirical Study
on the Cumulative Relationship of Competitive Priorities in Chinese Manufacturing
Enterprises, International Conference on Management Science & Engineering (15th
),
Long Beach, USA, September 10-12.
97. Li, L., 2000. Manufacturing capability development in a changing business environment,
Industrial Management & Data Systems, 100 (6): 261-70.
98. Lindman, F.T., Callarman, T.E., Fowler, K.L. and McClatchey, C.A., 2001. Strategic
consensus and manufacturing performance, Journal of Managerial Issues, 13 (1): 45-64.
99. Louis Raymond, 2005. Operations management and advanced manufacturing
technologies in SMEs A contingency approach, Journal of Manufacturing Technology
Management, 16 (8): 936-955.
100. Lucia Avella, 1999. Focal points in manufacturing strategic planning in Spain
Comparison with American and other European manufacturers, International Journal of
Operations & Production Management, 19 (12): 1292-1317.
101. Lynn Ling X. Li, 2000. Manufacturing capability development in a changing business
environment, Industrial Management & Data Systems, 100/6: 261-270.
102. Macarena Sacrista´n Dı´az, Marı´a Jose´ A ´ lvarez Gil and Jose´ A. Dominguez
Machuca, 2005. Performance measurement systems, competitive priorities, and
advanced manufacturing technology - Some evidence from the aeronautical sector,
International Journal of Production and Operations Management, 25 (8): 781-799.
103. Macarena Sacristán D´ıaz, José A.D. Machuca and Marıa José Álvarez-Gil, 2003.
A view of developing patterns of investment in AMT through empirical taxonomies:
new evidence, Journal of Operations Management, 21: 577–606.
104. Marianne W. Lewis and Kenneth K. Boyer, 2002. Factors impacting AMT
implementation: an integrative and controlled study, Journal of Engineering and
Technology and Management, 19: 111–130.
105. Masood A. Badri, Donald Davis and Donna Davis, 2000. Operations strategy,
environmental uncertainty and performance: a path analytic model of industries in
developing countries, Omega, 28: 155-173.
106. Miller, D. and Friesen, P.H., 1983. Strategy-making and environment: the third link.
Strategic Management Journal 4 (3): 221–235.
262
107. Miller, D., and Friesen, P.H., 1982. Innovation in conservative and entrepreneurial
firms: Two models of strategic momentum. Strategic Management Journal, 3:1-25.
108. Mintzberg, H., 1979. The Structuring of Organizations, Prentice-Hall, Englewood
Cliffs, NJ.
109. Motwani, J.G., Mahmoud, E., and Rice, G., 1994. Quality practices of Indian
organization: An empirical analysis. International Journal of Quality and Reliability
Management, 11: 38-52.
110. Nagabhushana and Janat Shah, 1999. Manufacturing priorities and action programmes
in the changing environment An empirical study of Indian industries, International
Journal of Operations & Production Management, 19 (4): 389-398.
111. Nobel, M.A., 1995. Manufacturing strategy: testing the cumulative model in a multiple
country context, Decision Sciences, 26 (5): 693-718.
112. Nunnally, J. C., 1987. , Psychometric methods, Mc Grow-Hill, New York, NY.
113. Oleh and Lena Ellitan, 2007. The influence of manufacturing strategies and
environmental munificence as moderators of technology-manufacturing performance
relationship: An evidence from Indonesia, Journal Management, 6 (2).
114. Pagell, M., Handfield, R.D. and Barber, A.E., 2000. Effects of operational employee
skills on advanced manufacturing technology performance, Production and Operations
Management, 9 (3): 222-38.
115. Palmer, K.W., Oates, W.E. and Portney, P.R., 1995. Tightening environmental
standards—the benefit–cost or the no-cost paradigm, Journal of Economic Perspectives,
9 (4): 119–132.
116. Parthasarthy, R. and Sethi, S.P., 1992. The impact of flexible automation on business
strategy and organizational structure, Academy of Management Review, 17 (1): 86-111.
117. Peter T. Ward, Rebecca Duray, G. Keong Leong and Chee-Chuong Sum, 1995.
Business environment, operations strategy, and performance: An empirical study of
Singapore manufacturers, Journal of Operations Management, 13: 99-115.
118. Phusavat, K. and Kanchana, R., 2007. Competitive priorities of manufacturing firms in
Thailand, Industrial Management and Data Systems, 7(7): 979-996.
263
119. Phusavat, K., Anussornnitisarn, P., Helo, P., and Dwight, Richard, 2009.
Performance measurement: Roles and challenges, Industrial Management & Data
Systems, 109 (5): 646-664.
120. Porter, M. and van der Linde, C., 1995. Green and competitive: Ending the stalemate.
Harvard Business Review, September–October, 120–134.
121. Ravi Kathuria, Stephen J. Porth and N.N. Kathuria, 2010. Competitive priorities and
strategic consensus in emerging economies: evidence from India, International Journal
of Operations & Production Management, 30(8): 879-896.
122. Rouhollah Mojtahedzadeh and Veeri Chettiar Arumugam, (2011). Determinants of
TQM in the Iranian Automotive Industry: A Theoretical Approach, International Journal
for Quality research, 5(1).
123. Rusjan, B., 2006. The impact of manufacturing focus on manufacturing and business
unit performance: an empirical investigation, Economic and Business Review, 8 (1): 5-
18.
124. Russo, M.V. and Fouts PA., 1997. A resource based perspective on corporate
environmental performance and profitability. Academy of Management Journal, 40
(3):534–59.
125. Saaty T. L., 1980. the analytic hierarchy process. McGraw Hill, New York
126. Saaty T. L., 2000. Fundamentals of decision making and priority theory with the AHP.
RWS Publications, Pittsburg.
127. Salaheldin Ismail Salaheldin, 2007.The impact of organizational characteristics on
AMT adoption -A study of Egyptian manufacturers, Journal of Manufacturing
Technology Management, 18 (4): 443-460
128. Sanchez, A.M., 1996. Adopting AMTs: experience from Spain, Journal of
Manufacturing Systems, 15 (2): 133-40.
129. Santhanam, R., and Hartono, E., 2003. Issues in Linking Information Technology
Capability to Firm Performance, MIS Quarterly, 27 (1): 125-153.
130. Schroder, R. and Sohal, A.S., 1999. Organizational characteristics associated with AMT
adoption; towards a contingency framework, International Journal of Operations &
Production Management, 19 (12): 1270-91.
264
131. Sherwat E. Ibrahim, 2010. An alternative methodology for formulating an operations
strategy: the case of BTC-Egypt, Management Decision, 48 (6): 868-893.
132. Shim, S., Eastlick, M.A., Lotz, S.L. and Warrington, P., 2001. An online prepurchase
intentions model: the role of intention to search, Journal of Retailing, 77: 397-416.
133. Skinner, W., 1969. Manufacturing: missing link in corporate strategy, Harvard Business
Review, 47 (3): 136-45.
134. Small, M.H. and Yasin, M.M., 1997. Developing a framework for the effective planning
and implementation of advanced manufacturing technologies, International Journal of
Operations & Production Management, 17 (5): 468-89.
135. Swamidass, P.M. and Kotha, S., 1998. Explaining manufacturing technology use, firm
size and performance using a multidimensional view of technology, Journal of
Operations Management, 17 (1):23–37.
136. Swamidass, P.M. and Newell WT., 1987 Manufacturing strategy, environmental
uncertainty and performance: a path analytic model, Management Science, 33 (4) : 509–
24.
137. Szmidt, E. and Kacprzyk, J., 2000. Distances between intuitionistic fuzzy sets, Fuzzy
Sets and Systems, 114: 505–518.
138. Tabachnick, B. G. and Fidell, L. S., 2007, Using multivariate statistics, 5th edn,
Pearson/Allyn & Bacon, Boston.
139. Tawfik Mady, 2008. The impact of plant size and type of industry on manufacturing
competitive priorities, An empirical investigation, Competitiveness Review: An
International Business Journal, 18 (4): 351-366.
140. Taylor J and Gutfeld R., 1992. CBOT Selected to run auctions for polluters. Wall Street
Journal, September 25 :16-17.
141. Ting Chi, Peter P.D. Kilduff and Vidyaranya B. Gargeya, 2009. Alignment between
business environment characteristics, competitive priorities, supply chain structures, and
firm business performance, International Journal of Productivity and Performance
Management, 58 (7): 645-669.
142. Turksen, I.B., 1996. Interval-valued strict preference with Zadeh triples, Fuzzy Sets and
Systems, 78: 183–195.
265
143. Van Dierdonck, R. and Miller, J.G., 1980. Designing production planning and control
systems, Journal of Operations Management, 1 (1): 37–46.
144. Vickery, S., Droge, C. and Markland, R., 1993. Production competence and business
strategy: do they affect business performance?, Decision Sciences, 24 (2): 435-455.
145. Vickery, S.K., 1991. A theory of production competence revisited, Decision Sciences, 22
(3): 635-43.
146. Vickery, S.K., Droge, C. and Markland, R.E., 1993. Production competence and
business strategy: do they affect business performance, Decision Sciences, 24 (2): 435-
55.
147. Wade, M., and Hulland, J., 2004. Review: The Resource-Based View and Information
Systems Research: Review, Extension, and Suggestions for Future Research [1], MIS
Quarterly, 28 (1): 107-142.
148. Wang, G. and X. Li, 1998. The applications of interval-valued fuzzy numbers and
interval-distribution numbers, Fuzzy Sets and Systems, 98: 331– 335.
149. Ward .P. T and Rebecca Duray, 2000. Manufacturing strategy in context:
environment, competitive strategy and manufacturing strategy, Journal of Operations
Management, 18: 123–138.
150. Ward, P. and Duray, R., 2000. Manufacturing strategy in context: environment,
competitive strategy and manufacturing strategy, Journal of Operations Management, 18
(2): 123-138.
151. Ward, P.T., Duray, R., Leong, G.K. and Sum, C., 1995. Business environment,
operations strategy, and performance: an empirical study of Singapore manufacturers,
Journal of Operations Management, 13: 99-115.
152. Wheelwright, S.C. 1984. Manufacturing strategy: defining the missing link, Strategic
Management Journal, 5 (1): 77-91.
153. Wiarda, E., 1987. Frostbelt Automation: The ITI Status Report on Great Lakes
Manufacturing, Industrial Technology Institute, Ann Arbor, MI.
154. Wood, C.H., Ritzman, L.P. and Sharma, D., 1990. Intended and achieved competitive
priorities: measures, frequencies, and financial impact, in Ettlie, J., Burstein, E. and
Fiegenbaum, M.C. (Eds), Manufacturing Strategy, Kluwer Academic Publishers, Boston,
MA, 225-32.
266
155. Worrell D, Gilley KM, Davidson III WD. and El-Jely A., 1995. When green turns to
red: stock market reaction to announced greening activities, Proceedings of the Academy
of Management Meeting, Vancouver, Canada, 1-3.
156. Xiande Zhao, Jeff Hoi Yan Yeung and Qiang Zhou, 2002. Competitive priorities of
enterprises in mainland China, Total Quality Management, 13(3): 285- 300.
157. Yang T, and C-C. Hung, 2007. Multiple-attribute decision making methods for plant
layout design problem, Robotics Comput. Intregrated Manufacturing, 23: 126–137.
158. Yinan Qi, Chee-Chuong Sum and Xiande Zhao, 2009. Simultaneous effects of
functional involvement and improvement programs on manufacturing and financial
performance in Chinese firms, International Journal of Operations & Production
Management, 29 (6): 636-662.
159. Zadeh, L., 1975. The concept of a linguistic variable and its application to approximate
reasoning - I, Information Science, 8: 199–249.
160. Zhao, X., Sum, C.C., Qi, Y., Zhang, H. and Lee, T.S., 2006b. A taxonomy of
manufacturing strategies in China, Journal of Operations Management, 24: 621-36.